Dike seepage damage downstream plugging structure and plugging method thereof

By setting up a cofferdam downstream of the dam and combining it with upstream filling materials, the problem of poor sealing effect of dam seepage failure was solved, and the short-term safety reinforcement of the dam and effective control of seepage channels were achieved.

CN118932936AActive Publication Date: 2024-11-12POWERCHINA HUADONG ENG CORP LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411180137.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-12
Estimated Expiration
2044-08-27

AI Technical Summary

Technical Problem

Existing methods for sealing seepage damage to dams suffer from poor effectiveness, high risk of material loss from dumping, and low sealing efficiency. In particular, they are difficult to effectively control the expansion of seepage channels when the seepage channels are uncertain.

Method used

The method of combining downstream cofferdam structure with upstream sealing and backfilling and downstream embankment embankment construction involves setting up and constructing a cofferdam downstream of the seepage channel, filling sandbags and gravel, and fixing it with fishing nets to reduce the impact of water flow, gradually raising the water level to reduce the seepage gradient, and filling clay and medium-coarse sand upstream to form a filter layer to reinforce the embankment.

Benefits of technology

It significantly improves the short-term safety of the dike, reduces the risk of seepage damage and expansion, ensures the sealing effect, reduces the loss of fill material, improves sealing efficiency, and enhances the safety of the dike.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932936A_ABST
    Figure CN118932936A_ABST
Patent Text Reader

Abstract

The invention discloses a downstream blocking structure and method for dike seepage failure, and relates to the technical field of dike blocking, the downstream blocking structure comprises a dike located on the bank side of an original river channel, a seepage channel and a harmful crack formed by flood seepage failure are arranged in the dike, and a cofferdam is arranged at the downstream position of the seepage channel and the harmful crack; the dam is used for blocking and reinforcing the permeation channel in the mode of upstream blocking and backfilling and downstream dam body ridging. The downstream water level is raised by adopting the downstream cofferdam, so that the seepage gradient of the seepage channel of the embankment body is reduced, the seepage gradient is gradually reduced and the seepage failure effect is gradually weakened along with the lifting of the downstream cofferdam, the short-term safety of the embankment body is remarkably improved, and the situation that the embankment body is deficient due to seepage failure expansion in a short time is avoided; and meanwhile, more favorable conditions are created for upstream throwing, filling and plugging.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of dam plugging, and in particular to a plugging structure and a plugging method for downstream of dam seepage damage. Background Art

[0002] There are many rivers in my country, and a large number of towns and villages are distributed along the rivers. In order to ensure the safety of flood discharge in towns and villages, embankments are generally used to raise the river for protection. Due to the quality of the embankments themselves or due to biological invasions, disrepair, etc., during sudden floods, the embankments often suffer from seepage damage and gradually expand, eventually leading to the shortage of embankments, causing damage to surrounding towns and villages, and endangering the safety of people's lives and property. When the embankment is damaged by seepage, it is generally temporarily blocked by throwing slag and sand bags from the upstream, or excavating and backfilling the outlet of the downstream leakage channel for reverse filtration and slag pressing. However, these two traditional emergency blocking methods have major defects, and the failure of the blocking often leads to the further development of the seepage channel until the embankment bursts.

[0003] The existing plugging methods have poor plugging effectiveness in the upstream due to the uncertainty of the infiltration channel. It is necessary to expand the range of slag and sandbag filling. At the same time, the filling materials are lost due to the impact of river water, resulting in low plugging efficiency. There is also a risk of continuous expansion of the infiltration channel during the plugging period. Summary of the invention

[0004] In order to improve the problems mentioned above in the existing plugging methods, the upstream plugging method has poor plugging effectiveness due to the uncertainty of the seepage channel, and it is necessary to expand the filling range of slag and sandbags. At the same time, the filling materials are lost due to the impact of river water, the plugging efficiency is low, and there is a risk of continuous expansion of the seepage channel during the plugging period. The present invention provides a downstream plugging structure for embankment seepage damage and a plugging method thereof.

[0005] The present invention provides a downstream blocking structure for seepage damage of a levee, comprising a levee located on the bank of an original river channel, wherein a seepage channel and hazardous cracks formed by flood seepage damage are opened in the levee, and a cofferdam is arranged at the downstream portion of the seepage channel and hazardous cracks. The levee is used for blocking and reinforcing the seepage channel by adopting a method of upstream blocking backfilling and downstream levee body earthing.

[0006] Optionally, in the above-mentioned downstream blocking structure for embankment seepage damage, the cofferdam is arranged at the outlet of the downstream seepage channel and the hazardous cracks, and the cofferdam is formed by filling and stacking sandbags.

[0007] Optionally, in the above-mentioned downstream blocking structure for embankment seepage damage, the top width of the cofferdam is not less than 1 m, and the slope on the upstream side of the cofferdam is 1:1~1:1.5, and the slope on the downstream side of the cofferdam is 1:2.

[0008] Optionally, in the above-mentioned downstream blocking structure for embankment seepage damage, the height of the cofferdam is less than 5m, and the top height is flush with or higher than the river water level.

[0009] Optionally, in the above-mentioned downstream blocking structure for embankment seepage damage, the upstream blocking backfill is composed of dumping bodies such as large stones and sandbags and upstream clay dumping bodies.

[0010] Optionally, in the above-mentioned downstream plugging structure for embankment seepage damage, the downstream embankment body soiling from upstream to downstream is respectively clay bag, medium-coarse sand filter layer, and slag backfill material, and all of them are formed by underwater dumping.

[0011] Optionally, in the above-mentioned downstream blocking structure for embankment seepage damage, a plurality of fishing nets blocking the cofferdam are arranged downstream of the cofferdam along the transverse direction of the water flow, and both ends of the fishing nets are fixed to the original ground by wooden stakes.

[0012] The present invention also proposes a method for plugging downstream of dike seepage damage, which is completed by using the above-mentioned dike seepage damage downstream plugging structure, and includes the following steps: Step 1: inspect the distribution locations of the seepage channels (2) and the hazardous cracks (3) of the dam (1), determine the hazardous scope of the seepage channels (2) and the hazardous cracks (3) and the control line of the cofferdam (4); Step 2: further excavating the cofferdam (4) and its downstream relatively flat and shallow water flow to increase the length of the flow section downstream of the seepage water and stretching and fixing multiple fishing nets along the transverse direction of the water flow downstream of the cofferdam (4); Step 3: Cofferdam (4) is constructed using sandbags and terrain to enclose the infiltration hazard area; Step 4: while building the cofferdam (4), the upstream river surface is backfilled with slag (603) to carry out upstream plugging backfill (5); Step 5: After the cofferdam (4) is closed, the back of the cofferdam (4) is widened and thickened; Step 6: While carrying out step 5 or when the overall flow rate downstream is significantly reduced, clay packs (601) are dumped at the outlet of the back infiltration channel (2) and the hazardous cracks (3), and the dumping amount is twice the designed dumping amount. The dumping is stopped when the leakage amount is significantly reduced according to human subjective judgment; Step 7: Pour medium-coarse sand from the top of the dam (1) and manually dump it onto the back of the clay bag (601), and the filling amount of the medium-coarse sand is 1.5 times the designed filling amount. Considering the small natural repose angle underwater and the driving effect of the water flow, the medium-coarse sand is deposited on the surface of the clay bag (601) to form a medium-coarse sand filter layer (602); Step 8: During the implementation of steps 6 and 7, stop upstream plugging and backfilling (5) according to the actual situation on site; Step 9: Use a dump truck to directly transport the slag backfill material (603) to backfill the water pit formed by the cofferdam (4) with the slag backfill material (603) until it is full and exceeds the upstream flood level or the predicted warning water level, and then use a roller to compact the slag backfill material (603).

[0013] Furthermore, in step 3, the cofferdam (4) is first constructed from the dry land on both sides to the middle. As the cofferdam (4) is constructed, the water level continues to rise. While the cofferdams (4) on both sides are raised, they are gradually pushed toward the middle until they are closed. The cofferdams (4) on both sides are raised at a speed slightly slower than the rising speed of the water level, but the depth of the flow on both sides is controlled within 50 cm.

[0014] Furthermore, in step five, if the height limit of the embankment of the formed cofferdam (4) cannot reach the water level on the upstream side, sandbags are manually thrown on the back to increase the size of the cofferdam (4).

[0015] In summary, the present invention includes at least one of the following beneficial effects: By using the downstream cofferdam to raise the water level downstream, the seepage gradient of the seepage channel of the embankment is reduced. As the downstream cofferdam is raised, the seepage gradient gradually decreases, and the seepage damage effect gradually weakens, which significantly improves the short-term safety of the embankment and avoids the short-term shortage of the embankment due to the expansion of seepage damage. At the same time, it creates more favorable conditions for upstream dumping and plugging. The flat terrain downstream of the levee disperses the water flow. After the water flow is dispersed, the impact capacity of the water flow per unit width is significantly reduced. In addition, the water depth is shallow, so the difficulty of underwater construction of the downstream cofferdam is low and easy to implement. By utilizing the high water level of the downstream cofferdam and the sealing effect of the upstream fill, the amount of seepage water and the flow rate can be effectively controlled. The relatively gentle water flow in the downstream cofferdam is effectively sealed through the layered fill, ensuring the safety of the embankment during the flood season. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 is a plan layout diagram of the present invention; Figure 2 It is a typical structural diagram of the present invention.

[0017] In the figure: 1. embankment; 2. infiltration channel; 3. hazardous cracks; 4. cofferdam; 5. upstream plugging and backfilling; 6. downstream embankment body earthing; 601. clay bag; 602. medium-coarse sand filter layer; 603. slag backfill. DETAILED DESCRIPTION

[0018] The following is combined with Figure 1-2The present invention is described in further detail.

[0019] Please refer to the attached figure in the instruction manual Figure 1-2 An embodiment of the present invention is as follows: a downstream blocking structure for dike seepage damage, comprising a dike 1 located on the bank of an original river channel, wherein the terrain downstream of the original river channel is higher than the terrain of the riverbed, and the dike 1 has a seepage channel 2 and a hazardous crack 3 formed by flood seepage damage, and a cofferdam 4 is arranged at the downstream portion of the seepage channel 2, and the cofferdam 4 is arranged at the outlet of the downstream seepage channel 2 and the hazardous crack 3, and the cofferdam 4 is formed by filling and stacking sandbags; the top width of the cofferdam 4 is not less than 1m, and the slope of the upstream side of the cofferdam 4 is 1:1~1:1.5, and the slope of the downstream side of the cofferdam 4 is 1:2; the height of the cofferdam 4 is less than 5m, and the top height of the cofferdam 4 is flush with or higher than the river channel water level.

[0020] Several fishing nets are set along the horizontal direction of the water flow downstream of the cofferdam 4 to block the cofferdam 4. The two ends of the fishing nets are fixed to the original river channel by wooden stakes. Other similar lightweight flexible nets with strong tensile strength can also be used. The fishing nets can easily reduce the possibility of the cofferdam 4 being washed away by the water flow during the construction process, especially when the cofferdam 4 is closed.

[0021] The dam 1 is used to block and reinforce the infiltration channel 2 by adopting the upstream blocking backfill 5 and the downstream embankment earthwork 6. The upstream blocking backfill 5 is composed of large stones, sandbags and other dumping bodies and upstream clay dumping bodies; the downstream embankment earthwork 6 is composed of clay bag 601, medium-coarse sand filter layer 602, and slag backfill 603 from upstream to downstream, and they are all formed by underwater dumping. The backfill elevation of the slag backfill 603 is higher than the river water level and the expected warning water level. After filling above the water surface, it is compacted by a roller.

[0022] Since the flow velocity in the infiltration channel 2 is relatively high, it is difficult to achieve a blocking effect by upstream blocking. At this time, it is necessary to build a low cofferdam 4 downstream of the infiltration channel, raise the downstream water level, reduce the infiltration gradient and infiltration volume in the dam 1, and then use a combination of upstream blocking backfill 5 and downstream embankment earthing 6 to block and reinforce the embankment infiltration channel, so as to ensure flood safety.

[0023] The raw materials used in this solution can be excavated nearby and can be replaced with each other. For example, sand bags can be used to replace clay bags 601 or clay bags 601 can be used to replace sand bags. There is no clear performance requirement for the slag backfill material 603. Although the material adjustment will affect the sealing effect, it meets the requirements of short-term risk removal and avoiding further expansion of risks.

[0024] In summary: by using sandbags and taking advantage of the terrain to build the cofferdam 4, the scope of the seepage hazard is enclosed. When building the cofferdam 4, it is first built from the dry land on both sides to the middle. As the cofferdam 4 is built, the water level continues to rise. While the cofferdams 4 on both sides are raised, they are gradually pushed toward the middle until they are closed. After the cofferdam 4 is closed, the back of the cofferdam 4 is widened and thickened. While building the cofferdam 4, the upstream river surface is filled with slag backfill 603 to perform upstream plugging backfill 5, and at the same time, the outlet of the back infiltration channel 2 and the hazardous cracks 3 are filled with clay bags 601, and the filling amount is twice the designed filling amount, and medium-coarse sand is poured from the top of the embankment 1 and manually filled to the back of the clay bag 601, and the filling amount of medium-coarse sand is 1.5 times the designed filling amount, so as to form a medium-coarse sand filter layer 602; Finally, a dump truck is used to directly transport the slag backfill material 603 to backfill the water pit formed by the cofferdam 4 with the slag backfill material 603 until it is full and exceeds the upstream flood level or the predicted warning water level, and then a road roller is used to compact the slag backfill material 603.

[0025] In order to better demonstrate a downstream plugging structure for dike seepage damage, this embodiment now proposes a downstream plugging method for dike seepage damage, including the following steps: Step 1: First, conduct an intensified inspection of the locations where the seepage channels 2 and the hazardous cracks 3 of the dam 1 are distributed, so as to determine the hazardous scope of the seepage channels 2 and the hazardous cracks 3 and the control line of the cofferdam 4 construction; Step 2: Then further excavate the relatively flat and shallow water flow areas at the cofferdam 4 and its downstream to increase the length of the flow section downstream of the seepage water, which is then used to disperse the water flow, and stretch multiple fishing nets along the transverse direction of the water flow at the downstream of the cofferdam 4, and fix the fishing nets with wooden stakes at both ends; Step 3: The cofferdam 4 is constructed using sandbags and terrain to enclose the scope of infiltration hazards. When constructing the cofferdam 4, it is first built from the dry land on both sides to the middle. As the cofferdam 4 is built, the water level continues to rise. While the cofferdams 4 on both sides are raised, they are gradually pushed toward the middle until they are closed. In order to reduce the difficulty of closing the cofferdam 4, the cofferdams 4 on both sides are raised slightly slower than the rising speed of the water level, but the depth of the flow on both sides is controlled within 50cm to ensure the safety of personnel operations; Step 4: while building the cofferdam 4, dumping slag backfill material 603 on the upstream river surface to perform upstream plugging backfill 5; Step 5: After the cofferdam 4 is closed, the back of the cofferdam 4 is widened and thickened. If the cofferdam 4 formed at this time cannot reach the water level on the upstream side due to the limitation of the embankment height, there may still be a top overflow. When encountering this situation, the overflowing water is generally shallow. Sandbags can be manually thrown on the back to increase the size of the cofferdam 4 and ensure its stability.

[0026] Step 6: While carrying out step 5 or when the overall flow velocity downstream is obviously reduced significantly, clay packs 601 are dumped at the outlet of the back infiltration channel 2 and the hazardous cracks 3, and the dumping amount is twice the designed dumping amount, and the dumping is stopped when the leakage amount is significantly reduced through human subjective judgment; Step 7: Pour medium-coarse sand from the top of the dam 1 and manually dump it onto the back of the clay bag 601. The filling amount of the medium-coarse sand is 1.5 times the designed filling amount. Considering the small natural repose angle underwater and the driving effect of the water flow, the medium-coarse sand is deposited on the surface of the clay bag (601) to form a medium-coarse sand filter layer (602). Step 8: During the implementation of steps 6 and 7, stop upstream plugging and backfilling 5 according to the actual situation on site; Step nine: Finally, use a dump truck to directly transport the slag backfill material 603 to backfill the water pit formed by the cofferdam 4 with the slag backfill material 603 until it is full and exceeds the upstream flood level or the predicted warning water level, and then use a roller to compact the slag backfill material 603.

[0027] The above are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, any equivalent changes made based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A downstream blocking structure for levee seepage damage, comprising a levee (1) located on the bank of an original river channel, wherein the levee (1) has a seepage channel (2) and a hazardous crack (3) formed by flood seepage damage, and is characterized in that: A cofferdam (4) is provided at the downstream portion of the infiltration channel (2) and the hazardous crack (3), and the dam (1) is used to seal and reinforce the infiltration channel (2) by adopting upstream sealing and backfilling (5) and downstream embankment body earthing (6).

2. The downstream plugging structure for levee seepage damage according to claim 1 is characterized by: The cofferdam (4) is arranged at the outlet of the downstream infiltration channel (2) and the hazardous crack (3), and the cofferdam (4) is formed by filling and stacking sandbags.

3. The downstream plugging structure for levee seepage damage according to claim 2 is characterized by: The top width of the cofferdam (4) is not less than 1 m, and the slope of the upstream side of the cofferdam (4) is 1:1-1:1.5, and the slope of the downstream side of the cofferdam (4) is 1:

2.

4. The downstream plugging structure for levee seepage damage according to claim 3 is characterized by: The height of the cofferdam (4) is less than 5 m, and the top height is flush with or higher than the water level of the river channel.

5. The downstream plugging structure for levee seepage damage according to claim 1 is characterized by: The upstream plugging backfill (5) is composed of large rocks, sandbags and other dumping bodies and upstream clay dumping bodies.

6. The downstream plugging structure for levee seepage damage according to claim 1, characterized in that: The downstream embankment soil (6) comprises, from upstream to downstream, a clay bag (601), a medium-coarse sand filter layer (602), and a slag backfill material (603), all of which are formed by underwater dumping.

7. The downstream plugging structure for levee seepage damage according to claim 1 is characterized by: A plurality of fishing nets are arranged downstream of the cofferdam (4) along the transverse direction of the water flow to block the cofferdam (4), and both ends of the fishing nets are fixed to the original ground by wooden stakes.

8. A method for plugging downstream of dike seepage damage, characterized in that: The downstream plugging structure for dike seepage damage according to any one of claims 1 to 7 comprises the following steps: Step 1: inspect the distribution locations of the seepage channels (2) and the hazardous cracks (3) of the dam (1), determine the hazardous scope of the seepage channels (2) and the hazardous cracks (3) and the control line of the cofferdam (4); Step 2: further excavating the cofferdam (4) and its downstream relatively flat and shallow water flow to increase the length of the flow section downstream of the seepage water and stretching and fixing multiple fishing nets along the transverse direction of the water flow downstream of the cofferdam (4); Step 3: Cofferdam (4) is constructed using sandbags and terrain to enclose the infiltration hazard area; Step 4: while building the cofferdam (4), the upstream river surface is backfilled with slag (603) to carry out upstream plugging backfill (5); Step 5: After the cofferdam (4) is closed, the back of the cofferdam (4) is widened and thickened; Step 6: While carrying out step 5 or when the overall flow rate downstream is significantly reduced, clay packs (601) are dumped at the outlet of the back infiltration channel (2) and the hazardous cracks (3), and the dumping amount is twice the designed dumping amount. The dumping is stopped when the leakage amount is significantly reduced according to human subjective judgment; Step 7: Pour medium-coarse sand from the top of the dam (1) and manually dump it onto the back of the clay bag (601), and the filling amount of the medium-coarse sand is 1.5 times the designed filling amount. Considering the small natural repose angle underwater and the driving effect of the water flow, the medium-coarse sand is deposited on the surface of the clay bag (601) to form a medium-coarse sand filter layer (602); Step 8: During the implementation of steps 6 and 7, stop upstream plugging and backfilling (5) according to the actual situation on site; Step 9: Use a dump truck to directly transport the slag backfill material (603) to backfill the water pit formed by the cofferdam (4) with the slag backfill material (603) until it is full and exceeds the upstream flood level or the predicted warning water level, and then use a roller to compact the slag backfill material (603).

9. The blocking method according to claim 8, characterized in that: In step 3, the cofferdam (4) is first constructed from the dry land on both sides to the middle. As the cofferdam (4) is constructed, the water level continues to rise. While the cofferdams (4) on both sides are raised, they are gradually pushed toward the middle until they are closed. The cofferdams (4) on both sides are raised at a speed slightly slower than the rising speed of the water level, but the depth of the flow on both sides is controlled within 50 cm.

10. The blocking method according to claim 8, characterized in that: In step 5, if the height limit of the cofferdam (4) cannot reach the water level on the upstream side, sandbags are manually thrown on the back to increase the size of the cofferdam (4).

Citation Information

Patent Citations

  • Earth rock cofferdam water seepage treatment structure and construction method

    CN110761307A

  • High homogeneous dam for dispersive soil

    CN112195874A

  • Widening anti-seepage structure for permeated earth and rockfill dam and construction method

    CN114960555A

  • Flexible dam foundation pre-buried culvert diversion flood control structure

    CN215289967U

  • Combined anti-seepage dam body

    CN221421831U