Steel pipe pile construction device for shallow covering layer deepwater steel trestle
By integrating inclination detection, guidance, correction and adjustment mechanisms in the steel pipe pile construction device, the problems of unstable sinking of steel pipe piles and damage to the guide barrel in the deep water position of shallow cover layer are solved, real-time detection and correction of tilt are achieved. Ensure construction quality.
Patent Information
- Application Number
- CN202411203173.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-08-29
AI Technical Summary
When constructing in deep water locations of shallow cover layers, the steel pipe piles sink unstable and easily shift or inclination occurs, resulting in damage to the guide barrel and affecting the construction quality.
A construction device including a guide cylinder, an inclination detection mechanism, a guide mechanism, a deviation correction mechanism and an adjustment mechanism are designed. The tilt of the steel pipe pile is detected through the sliding shaft and the trigger alarm component. The guide mechanism keeps the steel pipe pile vertical and the deviation correction mechanism corrects the tilt. The adjustment mechanism adjusts the position of the guide barrel to ensure that the steel pipe piles are in the center of the guide barrel.
Real-time detection and correction of the inclination of steel pipe piles is achieved to prevent deformation and damage, and ensure the stability and construction accuracy of the guide barrel.
Smart Images

Figure CN118932986A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steel pipe pile construction, and more specifically to a steel pipe pile construction device for a shallow overburden deep-water steel trestle. Background Art
[0002] Steel pipe pile construction for steel trestle refers to the process of using steel pipe piles as the main supporting structure when building a steel trestle. Steel pipe piles are widely used in bridge construction due to their high bearing capacity, good seismic performance, easy construction and economy, especially in bridge foundation construction in deep water, soft soil foundation or complex geological conditions.
[0003] At present, the construction of steel pipe piles for steel trestle bridges usually adopts crawler cranes and vibrating hammers to drive steel pipe piles. The crawler crane is parked on the completed temporary bridge deck and the temporary bridge foundation steel pipe piles are driven in. After the surveying team determines that the pile position and the verticality of the pile meet the requirements, the vibrating hammer is started to vibrate and lower the steel pipe piles. In order to ensure the verticality of the steel pipe piles during the lowering process, the prior art usually adopts underwater robots equipped with cameras to perform tilt detection when lowering the steel pipe piles. However, for the more complex underwater environment, it is easy to cause damage to the underwater robot, and the cost of the underwater robot is relatively high. It is expensive, so for complex underwater environments, guide cylinders are currently used to guide steel pipe piles. In the early stage of sinking of the steel pipe pile, the use of a guide tube can help maintain the verticality of the pile body and prevent it from shifting. The vibrating hammer will generate strong vibrations when working, and its vibration will be transmitted to the steel pipe pile. In order to avoid the vibration of the steel pipe pile being transmitted to the guide cylinder during the lowering process, affecting the stability of the guide frame, and even causing it to shift or be damaged, it is necessary to ensure that the steel pipe pile is located in the guide cylinder during the lowering process, and there is no contact between the steel pipe pile and the inner wall of the guide cylinder.
[0004] However, during the lowering process of the steel pipe piles, due to the deep water position of the shallow covering layer, the soil in the shallow covering layer is usually loose and has a high water content. The physical and mechanical properties of the soil in the shallow covering layer are poor and its bearing capacity is limited. When the steel pipe piles are driven, the soil may not be able to provide sufficient supporting force, which may easily lead to unstable sinking of the steel pipe piles, displacement or tilting. When the steel pipe piles tilt, due to the large weight of the steel pipe piles themselves, the guide tube is easily squeezed when the steel pipe piles tilt, causing deformation and damage to the steel pipe piles, affecting the guiding function of the guide tube. Summary of the invention
[0005] The present invention provides a steel pipe pile construction device for a shallow cover layer deep water steel trestle, and aims to solve the following problems: in the process of lowering and piling the existing steel pipe piles by a vibrating hammer, the steel pipe piles are guided by a guide cylinder, and in order to prevent vibration transmission from affecting the stability of the guide cylinder, it is necessary to ensure that the steel pipe piles are not in contact with the inner wall of the guide cylinder. However, since the deep water position of the shallow cover layer is usually relatively soft, the physical and mechanical properties of the shallow cover layer soil are relatively poor, and its bearing capacity is limited, which easily leads to unstable sinking of the steel pipe piles, and displacement or tilting. In addition, the steel pipe piles themselves are relatively heavy, so when the steel pipe piles are tilted, they are easily squeezed to squeeze the guide cylinder, causing deformation and damage of the steel pipe piles, affecting the guiding effect of the guide cylinder.
[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a steel pipe pile construction device for a shallow overburden deep-water steel trestle, comprising: a guide cylinder and a steel pipe pile, the steel pipe pile is located inside the guide cylinder, the guide cylinder is used to guide the steel pipe pile during piling, and a mounting mechanism is installed on the guide cylinder, and the mounting mechanism is used to fasten and fix the guide cylinder;
[0007] A tilt detection mechanism is arranged on the guide cylinder, and the tilt detection mechanism includes a plurality of sliding shafts that can slide laterally and a trigger alarm component. The plurality of sliding shafts are arranged laterally, and the steel pipe pile is located between the plurality of sliding shafts, and the plurality of sliding shafts are evenly distributed in the circumferential direction of the steel pipe pile. The tilt detection mechanism triggers the alarm component by squeezing the sliding shaft by the steel pipe pile to detect the tilt state of the steel pipe pile and issue an alarm.
[0008] In a preferred embodiment, the trigger alarm component includes a moving contact, a static contact and a buzzer, a moving contact is arranged at the end of each of the sliding shafts, and elastic parts are arranged on each of the sliding shafts, the elastic parts are used for the resetting movement of the sliding shafts, and the moving contact, the static contact and the buzzer are electrically connected.
[0009] In a preferred embodiment, the moving contact includes a connecting seat, a contact and a buffer. The connecting seat is fixedly arranged at the end of the sliding shaft, the contact is slidably arranged in the connecting seat, and a buffer is arranged between the contact and the connecting seat.
[0010] In a preferred embodiment, a guide mechanism is provided on the guide cylinder, and the guide mechanism includes three rollers that can move synchronously and close to each other, and the three rollers are evenly distributed in the circumferential direction. In the initial stage of lowering the steel pipe pile, the guide mechanism makes the steel pipe pile be located in the center position of the guide cylinder by making the three rollers contact with the outer wall of the steel pipe pile.
[0011] In a preferred embodiment, the guide mechanism also includes a power component one, which is installed on the guide cylinder, and a mobile frame is fixedly arranged on each of the three rollers, and the output end of the power component one is fixedly connected to one of the mobile frames, and slots are provided on the three mobile frames, and a disc is rotatably arranged in the guide cylinder, and three circular shafts are arranged on the disc, and the three circular shafts are slidably arranged in the corresponding slots.
[0012] In a preferred embodiment, a correction mechanism is provided on the guide cylinder, and the correction mechanism includes a fixed seat, which is installed on the guide cylinder, a support is rotatably provided on the fixed seat, a power component 2 is fixedly provided on the support, and a correction plate is installed on the output end of the power component 2.
[0013] In a preferred embodiment, the correction mechanism also includes a rotation drive assembly, which includes a power component three, a driving gear is installed at the output end of the power component three, a gear ring is rotatably arranged in the fixed seat, the driving gear is meshed with the gear ring, and the gear ring is fixedly connected to the support.
[0014] In a preferred embodiment, the mounting mechanism includes a cross frame fixedly disposed on one side of the guide cylinder, a support steel fixedly disposed at the end of the cross frame, a fastener disposed at the bottom of the support steel, and the fastener is used to be fixed to the preliminarily constructed steel trestle.
[0015] In a preferred embodiment, an adjustment mechanism is provided on the support steel, and the adjustment mechanism includes a linear drive component 1 and a linear drive component 2, and the adjustment mechanism adjusts the position of the guide cylinder through the linear drive component 1 and the linear drive component 2.
[0016] In a preferred embodiment, linear drive component 1 includes support seat 1, which is installed on support steel, power component 4 is fixedly installed on support seat 1, screw rod 1 is installed on the output end of power component 4, slide seat 1 is slidably arranged on support seat 1, slide seat 1 is threadedly connected to screw rod 1, linear drive component 2 includes support seat 2, support seat 2 is fixedly installed on slide seat 1, power component 5 is fixedly installed on support seat 2, screw rod 2 is installed on the output end of power component 5, slide seat 2 is slidably arranged on support seat 2, slide seat 2 is threadedly connected to screw rod 2, and the cross frame is fixedly arranged on slide seat 2.
[0017] The beneficial effects of the present invention are:
[0018] The present invention can detect the inclination of the steel pipe pile during the lowering process of the steel pipe pile by arranging the inclination detection mechanism, and timely alarm to remind the operator that the steel pipe pile is tilted, so that the operator can stop the machine and operate to correct the steel pipe pile in time. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1It is a schematic diagram of the overall structure of the present invention.
[0020] Figure 2 It is a three-dimensional structural schematic diagram of the mounting mechanism of the present invention.
[0021] Figure 3 The top view of the cross-sectional structure of the guide cylinder of the present invention is shown in FIG. Figure 1 .
[0022] Figure 4 for Figure 3 Enlarged view of part A.
[0023] Figure 5 It is a schematic diagram of the three-dimensional structure of the guide cylinder of the present invention.
[0024] Figure 6 The top view of the cross-sectional structure of the guide cylinder of the present invention is shown in FIG. Figure 1 .
[0025] Figure 7 for Figure 6 Enlarged view of part B.
[0026] Figure 8 It is a schematic diagram of the three-dimensional structure of the deviation correction mechanism of the present invention.
[0027] Fig. 9 It is a schematic diagram of a top view and a cross-sectional structure of the rotary drive mechanism of the present invention.
[0028] Fig.10 It is a schematic diagram of the state of the steel pipe pile after deviation correction of the present invention.
[0029] Fig.11 It is a schematic diagram of the three-dimensional structure of the adjustment mechanism of the present invention.
[0030] The reference numerals are: 1. guide cylinder; 2. mounting mechanism; 21. cross frame; 22. support steel; 23. fastener; 3. tilt detection mechanism; 31. sliding shaft; 32. moving contact; 321. connecting seat; 322. contact; 323. buffer; 33. elastic member; 34. static contact; 35. buzzer; 4. guide mechanism; 41. roller; 42. moving frame; 421. notch; 43. power component 1; 44. round shaft; 45. disc; 5. deviation correction mechanism; 51. fixed Seat; 52, support; 53, power component two; 54, correction plate; 55, rotation drive assembly; 551, power component three; 552, driving gear; 553, gear ring; 6, adjustment mechanism; 61, linear drive assembly one; 611, support seat one; 612, power component four; 613, screw rod one; 614, slide seat one; 62, linear drive assembly two; 621, support seat two; 622, power component five; 623, screw rod two; 624, slide seat two; 7, steel pipe pile. DETAILED DESCRIPTION
[0031] The present application is further described in detail below in conjunction with the accompanying drawings. It is necessary to point out here that the following specific implementation methods are only used to further illustrate the present application and cannot be understood as limiting the scope of protection of the present application. Technical personnel in this field can make some non-essential improvements and adjustments to the present application based on the above application content.
[0032] Refer to the instruction manual Figures 1 to 5 A steel pipe pile construction device for a shallow overburden deep-water steel trestle comprises: a guide cylinder 1 and a steel pipe pile 7, wherein the steel pipe pile 7 is located inside the guide cylinder 1, and the guide cylinder 1 is used to guide the steel pipe pile 7 during piling. A mounting mechanism 2 is mounted on the guide cylinder 1, and the mounting mechanism 2 is used to fasten and fix the guide cylinder 1;
[0033] A tilt detection mechanism 3 is provided on the guide cylinder 1. The tilt detection mechanism 3 includes a plurality of sliding shafts 31 that can slide laterally and a trigger alarm component. The plurality of sliding shafts 31 are all arranged laterally. The steel pipe pile 7 is located between the plurality of sliding shafts 31, and the plurality of sliding shafts 31 are evenly distributed in the circumferential direction of the steel pipe pile 7. The tilt detection mechanism 3 triggers the alarm component by squeezing the sliding shafts 31 by the steel pipe pile 7 to detect the tilt state of the steel pipe pile 7 and issue an alarm.
[0034] It should be noted that the mounting mechanism 2 can be fixedly installed on the initially constructed steel trestle. If a temporary platform can be built on the shore during the initial construction of the steel trestle, the guide cylinder 1 can be firmly fixed by fixing the mounting mechanism 2 on the temporarily constructed platform. The triggering alarm component can be an infrared sensor, an alarm, and a controller. When the steel pipe pile 7 tilts, the steel pipe pile 7 will contact the sliding shaft 31 and squeeze the sliding shaft 31 to slide. At this time, the movement of the sliding shaft 31 is monitored by the infrared sensor, so that the signal can be transmitted to the controller through the infrared sensor, and then the controller drives the alarm to sound an alarm to remind the operator that the steel pipe pile 7 is tilted.
[0035] It should also be noted that, in the initial state, there is a certain distance between the steel pipe pile 7 and the end of the sliding shaft 31 , and the distance is the allowable tilt error of the steel pipe pile 7 .
[0036] The specific implementation scenario is as follows: first, the guide cylinder 1 is stably fixed by the installation mechanism 2, and then the steel pipe pile 7 is lowered by the crawler crane and the vibratory hammer. In the initial stage of lowering, the steel pipe pile 7 is guided by the guide cylinder 1. When the steel pipe pile 7 is placed in the deep water of the shallow covering layer by the vibratory hammer, the bearing capacity of the shallow covering layer is limited due to the poor physical and mechanical properties of the soil. At this time, if the steel pipe pile 7 tilts, when the steel pipe pile 7 tilts, the steel pipe pile 7 will contact the sliding shaft 31 and squeeze the sliding shaft 31 to slide. At this time, the movement of the sliding shaft 31 is monitored by the infrared sensor, so that the signal can be transmitted to the controller through the infrared sensor, and then the controller drives the alarm to sound an alarm to remind the operator that the steel pipe pile 7 is tilted, so that the operator can stop the operation and correct the steel pipe pile in time.
[0037] For further information, please refer to the attached manual. Figures 3 to 5 The trigger alarm component includes a moving contact 32, a stationary contact 34 and a buzzer 35. A moving contact 32 is set at the end of each of the sliding shafts 31, and an elastic member 33 is set on each of the sliding shafts 31. The elastic member 33 is used for the reset movement of the sliding shaft 31. The moving contact 32, the stationary contact 34 and the buzzer 35 are electrically connected.
[0038] It should be noted that the elastic member 33 is a spring, which is used to squeeze the spring when the sliding shaft 31 slides after the steel pipe pile 7 tilts, and after the steel pipe pile 7 is corrected, the sliding shaft 31 can reset under the action of the elastic deformation of the spring. The static contact 34 is arranged in a ring. When the steel pipe pile 7 tilts, the steel pipe pile 7 squeezes the sliding shaft 31 to move, so that the sliding shaft 31 drives the moving contact 32 to move and contact with the static contact 34, and the buzzer 35 is energized, so that the buzzer 35 can sound an alarm to remind the operator that the steel pipe pile 7 has tilted and the steel pipe pile 7 needs to be corrected immediately.
[0039] For further information, please refer to the attached manual. Figure 4 The moving contact 32 includes a connecting seat 321, a contact 322 and a buffer 323. The connecting seat 321 is fixedly arranged at the end of the sliding shaft 31, the contact 322 is slidably arranged in the connecting seat 321, and a buffer 323 is arranged between the contact 322 and the connecting seat 321.
[0040] It should be noted that the buffer 323 is a spring. When the contact 322 contacts the static contact 34, since the machine has not been shut down at this time, the steel pipe pile 7 may continue to tilt during the pile driving process by the vibration hammer. The contact 322 is buffered by the spring to avoid damage to the contact 322 and the static contact 34 caused by excessive squeezing.
[0041] In the above technical scheme, an inclination detection mechanism 3 is provided to detect the inclination of the steel pipe pile 7 during the piling process of the steel pipe pile 7. However, when lowering the steel pipe pile 7, the steel pipe pile 7 needs to be located at the center of the guide tube 1 in order to detect the inclination of the steel pipe pile 7. If the steel pipe pile 7 is not located at the center of the guide tube 1 during the initial lowering of the steel pipe pile 7, the distances between the steel pipe pile 7 and each sliding shaft 31 are different, and it is difficult to accurately detect the inclination of the steel pipe pile 7. For this reason, the present invention proposes a guiding mechanism 4, which guides the steel pipe pile 7 during the initial lowering process of the steel pipe pile 7 so that the steel pipe pile 7 is located at the center of the guide tube 1.
[0042] For details, please refer to the attached manual. Figure 6 and Figure 7 A guide mechanism 4 is provided on the guide cylinder 1. The guide mechanism 4 includes three rollers 41 that can move synchronously and close to each other, and the three rollers 41 are evenly distributed in the circumferential direction. In the initial stage of lowering the steel pipe pile 7, the guide mechanism 4 makes the three rollers 41 contact with the outer wall of the steel pipe pile 7, so that the steel pipe pile 7 is located at the center of the guide cylinder 1. The guide mechanism 4 also includes a power component 43, which is installed on the guide cylinder 1, and a moving frame 42 is fixedly provided on the three rollers 41, and the output end of the power component 43 is fixedly connected to one of the moving frames 42. Slots 421 are provided on the three moving frames 42. A disc 45 is rotatably provided in the guide cylinder 1, and three circular shafts 44 are provided on the disc 45. The three circular shafts 44 are slidably provided in the corresponding slots 421.
[0043] It should be noted that the power component 43 is a cylinder. When the steel pipe pile 7 is initially lowered, one of the mobile frames 42 is pushed by the cylinder to move toward the center of the guide cylinder 1, so that the mobile frame 42 drives the corresponding roller 41 to move toward the center of the guide cylinder 1. At this time, the disc 45 can be rotated through the cooperation of the circular shaft 44 and the groove 421, so that the three rollers 41 can be synchronously moved toward the center of the guide cylinder 1. Then, when the steel pipe pile 7 is lowered, the three rollers 41 can be brought into contact with the outer wall of the steel pipe pile 7, so that the steel pipe pile 7 can be located at the center of the guide cylinder 1 when it is lowered.
[0044] It should also be noted that a plurality of guide mechanisms 4 can be longitudinally arranged in the guide tube 1 so that the steel pipe pile 7 can be kept in a vertical state when being lowered.
[0045] It should also be noted that when the guide mechanism 4 is used to guide and lower the steel pipe pile 7 in the initial stage of lowering, in order to avoid the vibration caused by the vibrating hammer when driving and lowering the steel pipe pile 7 to be transmitted to the guide cylinder 1 and affect the stability of the guide cylinder 1, it is necessary to drive the movement of the reset roller 41 after the initial lowering.
[0046] When the steel pipe pile 7 is tilted during the process of piling, it is necessary to stop piling immediately and correct the steel pipe pile 7. To this end, the present invention proposes a correction mechanism 5 to correct the steel pipe pile 7 when it is tilted.
[0047] For details, please refer to the attached manual. Figure 8 and Fig. 9 A correction mechanism 5 is provided on the guide cylinder 1, and the correction mechanism 5 includes a fixed seat 51, which is installed on the guide cylinder 1, and a support 52 is rotatably provided on the fixed seat 51, and a power component 2 53 is fixedly provided on the support 52, and a correction plate 54 is installed at the output end of the power component 2 53. The correction mechanism 5 also includes a rotation drive assembly 55, and the rotation drive assembly 55 includes a power component 3 551, and a driving gear 552 is installed at the output end of the power component 3 551, and a gear ring 553 is rotatably provided in the fixed seat 51, and the driving gear 552 is meshed with the gear ring 553, and the gear ring 553 is fixedly connected to the support 52.
[0048] It should be noted that power component two 53 is a cylinder, and power component three 551 is a motor. The cylinder drives the correction plate 54 to move in the direction close to the steel pipe pile 7, so that the correction plate 54 pushes the steel pipe pile 7 to correct the deviation, and the motor drives the active gear 552 to rotate, so that the active gear 552 drives the gear ring 553 to rotate, and then it can drive the support 52 to rotate, so that it can adjust the position of the correction plate 54 according to the inclination direction of the steel pipe pile 7 to correct the deviation.
[0049] For further information, please refer to the attached manual. Figure 2 The mounting mechanism 2 includes a cross frame 21, which is fixedly arranged on one side of the guide cylinder 1. A support steel 22 is fixedly arranged at the end of the cross frame 21. A fastener 23 is arranged at the bottom of the support steel 22. The fastener 23 is used to be fixed on the initially constructed steel trestle.
[0050] It should be noted that the fastener 23 may be an anchor bolt, and the guide cylinder 1 may be fastened and installed on the initially constructed steel trestle or the platform temporarily constructed on the shore through the anchor bolt, the support steel 22 and the cross frame 21 .
[0051] However, in the above technical solution, after the inclined steel pipe pile 7 is corrected, since the tilted state position of the steel pipe pile 7 cannot be controlled, there are two situations after the correction of the steel pipe pile 7: one is that the steel pipe pile 7 is corrected and is located at the center of the guide tube 1; the other is that after the correction of the steel pipe pile 7, the steel pipe pile 7 is not located at the center of the guide tube 1. Fig.10As shown, it is a schematic diagram that the steel pipe pile 7 is not in the center position of the guide cylinder 1 after the deviation correction. At this time, the steel pipe pile 7 needs to be driven and lowered. If the steel pipe pile 7 is not in the center position of the guide cylinder 1 at this time, it is difficult to continue to accurately detect the inclination of the steel pipe pile 7. For this reason, the present invention proposes an adjustment mechanism 6, which is used for adjusting the position of the guide cylinder 1 after the steel pipe pile 7 is corrected, if the steel pipe pile 7 is not in the center position of the guide cylinder 1, so that the steel pipe pile 7 is in the center position of the guide cylinder 1.
[0052] For details, please refer to the attached manual. Fig.10 and Fig.11 The support steel 22 is provided with an adjustment mechanism 6, which includes a linear drive component 1 61 and a linear drive component 2 62. The adjustment mechanism 6 adjusts the position of the guide cylinder 1 through the linear drive component 1 61 and the linear drive component 2 62. The linear drive component 1 61 includes a support seat 1 611, which is installed on the support steel 22. A power component 4 612 is fixedly installed on the support seat 1 611. A screw rod 1 613 is installed at the output end of the power component 4 612. A sliding device 1 is installed on the support seat 1 611. A slide seat 614 is provided, and the slide seat 614 is threadedly connected to the screw rod 613. The linear drive component 62 includes a support seat 621, and the support seat 621 is fixedly installed on the slide seat 614. A power component 5 622 is fixedly arranged on the support seat 621. The output end of the power component 5 622 is installed with a screw rod 2 623. A slide seat 2 624 is slidably arranged on the support seat 621. The slide seat 2 624 is threadedly connected to the screw rod 2 623, and the cross frame 21 is fixedly arranged on the slide seat 2 624.
[0053] It should be noted that both power component four 612 and power component five 622 are motors, and power component four 612 drives screw rod one 613 to rotate, so that under the threaded connection between screw rod one 613 and slide seat one 614, slide seat one 614 can move linearly, and power component five 622 drives screw rod two 623 to rotate, so that under the threaded connection between screw rod two 623 and slide seat two 624, slide seat two 624 can move linearly, thereby driving guide cylinder 1 to move through cross frame 21, so that the position of guide cylinder 1 can be moved and adjusted.
[0054] It should also be noted that when the steel pipe pile 7 is lowered by a vibrating hammer, the bottom end of the steel pipe pile 7 has been driven into the soil under deep water, so the position of the steel pipe pile 7 cannot be moved at this time, and only the position of the guide tube 1 can be adjusted.
[0055] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention.
Claims
1. A steel pipe pile construction device for a shallow overburden deep-water steel trestle, characterized in that: include: A guide cylinder (1) and a steel pipe pile (7), wherein the steel pipe pile (7) is located inside the guide cylinder (1), and the guide cylinder (1) is used to guide the steel pipe pile (7) during pile driving. A mounting mechanism (2) is mounted on the guide cylinder (1), and the mounting mechanism (2) is used to fasten and fix the guide cylinder (1); The guide cylinder (1) is provided with a tilt detection mechanism (3), the tilt detection mechanism (3) comprising a plurality of sliding shafts (31) capable of sliding laterally and a trigger alarm component, the plurality of sliding shafts (31) are all arranged laterally, the steel pipe pile (7) is located between the plurality of sliding shafts (31), and the plurality of sliding shafts (31) are evenly distributed in the circumferential direction of the steel pipe pile (7), the tilt detection mechanism (3) triggers the trigger alarm component by the steel pipe pile (7) squeezing the sliding shaft (31) to detect the tilt state of the steel pipe pile (7) and issue an alarm.
2. The steel pipe pile construction device for a shallow overburden deep-water steel trestle according to claim 1 is characterized by: The trigger alarm component comprises a moving contact (32), a stationary contact (34) and a buzzer (35); a moving contact (32) is arranged at the end of each of the plurality of sliding shafts (31); and an elastic member (33) is arranged on each of the plurality of sliding shafts (31); the elastic member (33) is used for the reset movement of the sliding shaft (31); and the moving contact (32), the stationary contact (34) and the buzzer (35) are electrically connected.
3. The steel pipe pile construction device for a shallow overburden deep-water steel trestle according to claim 2 is characterized by: The movable contact (32) comprises a connecting seat (321), a contact (322) and a buffer (323); the connecting seat (321) is fixedly arranged at the end of the sliding shaft (31); the contact (322) is slidably arranged in the connecting seat (321); and a buffer (323) is arranged between the contact (322) and the connecting seat (321).
4. The steel pipe pile construction device for a shallow overburden deep-water steel trestle according to claim 3 is characterized by: The guide cylinder (1) is provided with a guide mechanism (4), the guide mechanism (4) comprising three rollers (41) that can move synchronously and close to each other, and the three rollers (41) are evenly distributed in the circumferential direction. In the initial stage of lowering the steel pipe pile (7), the guide mechanism (4) makes the three rollers (41) contact with the outer wall of the steel pipe pile (7), so that the steel pipe pile (7) is located at the center of the guide cylinder (1).
5. The steel pipe pile construction device for a shallow overburden deep-water steel trestle according to claim 4 is characterized by: The guide mechanism (4) further comprises a power component (43), the power component (43) being mounted on the guide cylinder (1), and a movable frame (42) being fixedly arranged on each of the three rollers (41), and an output end of the power component (43) being fixedly connected to one of the movable frames (42), and a notch (421) being provided on each of the three movable frames (42), and a disc (45) being rotatably arranged in the guide cylinder (1), and three circular shafts (44) being arranged on the disc (45), and the three circular shafts (44) being slidably arranged in corresponding notches (421).
6. The steel pipe pile construction device for a shallow overburden deep-water steel trestle according to claim 5 is characterized by: The guide cylinder (1) is provided with a deviation correction mechanism (5), the deviation correction mechanism (5) comprising a fixed seat (51), the fixed seat (51) being mounted on the guide cylinder (1), a support (52) being rotatably mounted on the fixed seat (51), a power component 2 (53) being fixedly mounted on the support (52), and a deviation correction plate (54) being mounted on the output end of the power component 2 (53).
7. The steel pipe pile construction device for a shallow overburden deep-water steel trestle according to claim 6 is characterized by: The deviation correction mechanism (5) further comprises a rotation drive assembly (55), the rotation drive assembly (55) comprising a power component three (551), an output end of the power component three (551) being provided with a driving gear (552), a gear ring (553) being rotatably arranged in the fixed seat (51), the driving gear (552) being meshed with the gear ring (553), and the gear ring (553) being fixedly connected to the support (52).
8. The steel pipe pile construction device for a shallow overburden deep-water steel trestle according to claim 7 is characterized by: The mounting mechanism (2) comprises a cross frame (21), wherein the cross frame (21) is fixedly arranged on one side of the guide cylinder (1), a support steel (22) is fixedly arranged at the end of the cross frame (21), a fastener (23) is arranged at the bottom of the support steel (22), and the fastener (23) is used to be fixed on the preliminarily constructed steel trestle.
9. The steel pipe pile construction device for a shallow overburden deep-water steel trestle according to claim 8, characterized in that: The support steel (22) is provided with an adjustment mechanism (6), the adjustment mechanism (6) comprising a linear drive component 1 (61) and a linear drive component 2 (62), and the adjustment mechanism (6) adjusts the position of the guide cylinder (1) through the linear drive component 1 (61) and the linear drive component 2 (62).
10. The steel pipe pile construction device for a shallow overburden deep-water steel trestle according to claim 9, characterized in that: The linear drive component 1 (61) comprises a support seat 1 (611), the support seat 1 (611) is mounted on the support steel (22), a power component 4 (612) is fixedly mounted on the support seat 1 (611), a screw rod 1 (613) is mounted on the output end of the power component 4 (612), a slide seat 1 (614) is slidably arranged on the support seat 1 (611), the slide seat 1 (614) is threadedly connected to the screw rod 1 (613), and the linear drive component 2 (62 ) comprises a support seat 2 (621), the support seat 2 (621) is fixedly mounted on a slide seat 1 (614), a power component 5 (622) is fixedly arranged on the support seat 2 (621), a screw rod 2 (623) is installed at the output end of the power component 5 (622), a slide seat 2 (624) is slidably arranged on the support seat 2 (621), the slide seat 2 (624) is threadedly connected to the screw rod 2 (623), and a cross frame (21) is fixedly arranged on the slide seat 2 (624).
Citation Information
Patent Citations
Steel trestle, initial platform and cofferdam construction method in bridge construction process
CN110344335A
Pipe pile sinking construction method for overwater trestle
CN117071557A
Pile driving method
JP2001020282A
Pile punching machine alignment method and device
JP2009156010A
Pile guide and pile installation method
JP2017222982A