High-penetrating-power double-tube vibration impact guide hole immersed tube pile construction technology and equipment

Through the high penetration double-tube vibration impact hole-guiding process, the high-power vibrating hammer and the inner and outer double casings are used to synchronous sinking, the inner tube impacts the broken stone, and the outer tube guards the wall to form holes, which solves the problem of sinking pipe piles in blocks The problem of difficulty in penetrating gravel fill layer improves construction efficiency and equipment penetration.

CN118932992APending Publication Date: 2024-11-12SHANGHAI HARBOUR SOFT SOIL TREATMENT ENG (GRP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411055147.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing construction methods of immersed pipe piles are difficult to penetrate the gravel filling layer, resulting in low construction efficiency and equipment damage.

Method used

The high-penetration double-tube vibration impact hole technology is adopted, and the high-power high-frequency vibration hammer and the inner and outer double sleeves are synchronously sinking. The end of the inner tube is a solid alloy steel prefabricated conical pile tip, which impacts the broken stone. And use the outer pipe guard wall to form holes until the soft soil layer, then remove the inner pipe and combine the inner and outer pipes to move to the next pile position.

Benefits of technology

The problem of penetration of immersed pipe piles in complex formations is effectively overcome, the construction efficiency and penetration of equipment in deep gravel layers are improved, and the demand for immersed pipe piles to form piles on soft soil foundations is met.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932992A_ABST
    Figure CN118932992A_ABST
Patent Text Reader

Abstract

The invention discloses a high-penetrating-power double-pipe vibration impact guide hole immersed tube pile construction technology and equipment, and relates to the technical field of foundation treatment, the high-penetrating-power double-pipe vibration impact guide hole immersed tube pile construction technology comprises the following steps: 1) guide hole equipment is in place; (2) double-pipe hole guiding is conducted to the position about 1 m below the bottom face of the block gravel filling layer, specifically, a vibratory hammer is started, the vibratory hammer drives the inner pipe and the outer pipe to synchronously sink till the bottom of the block gravel filling layer is subjected to vibration sinking to form a hole, and then the vibratory hammer pulls out the inner pipe; (3) pipe sinking pile construction is conducted, specifically, a pile pipe is sunk into the outer pipe from the upper portion of the outer pipe, the outer pipe penetrates through soft soil layers such as block gravel filling layer guide holes and sludge till the needed depth is reached, then feeding is conducted in the pile pipe, and the pile pipe is lifted while feeding is conducted to form a dense pile body; and 4) vibrating and pulling the outer pipe and combining the inner pipe and the outer pipe. The equipment comprises a vibratory hammer, a pile gripper, an inner pipe and an outer pipe, the inner pipe is sleeved with the outer pipe to form an inner sleeve and an outer sleeve, the inner pipe and the outer pipe are fixed through the pile gripper, and the vibratory hammer is arranged at the top of the pile gripper; the device further comprises a tubular pile sinking machine. The problem that a broken stone filling layer is difficult to penetrate during pipe sinking of an existing pipe sinking pile is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of foundation treatment, and in particular to a high-penetration double-tube vibration impact guide hole sinking pipe pile construction process and equipment. Background Art

[0002] In the field of foundation reinforcement of construction projects, sinking pipe piles are often used for foundation reinforcement in the treatment of soft foundations. Sinking pipe piles include sinking pipe gravel piles and sinking pipe concrete cast-in-place piles. Sinking pipe gravel piles refer to the process of drilling holes in soft foundations by means of vibration or hammering pipe sinking, and then pressing gravel into the formed holes through pile pipes. During the pile sinking process, the piles are gradually compacted and vibrated to form a dense pile body composed of large-diameter gravel. Sinking pipe cast-in-place piles use steel pipes (i.e. casings) that are compatible with the design size of the piles. After the pile tip is put on the end or a valve pile tip is set and the pile is sunk into the soil, a steel skeleton is suspended in the casing, and then the pipe is vibrated or hammered while pouring concrete. The vibration during the pipe pulling is used to compact the concrete to form the required cast-in-place piles.

[0003] At present, there is such a geological situation in the foundation reinforcement treatment. The stratum contains a gravel layer fill or construction waste fill. The particle size distribution of the fill layer is very uneven, the soft and hard distribution is extremely uneven, and the thickness varies greatly. The maximum diameter is 1.2m and the maximum thickness is 22m. There is also a certain thickness of silt and other soft soil layers and clay layers under the fill layer. In view of this geological situation, the sinking resistance of the pipe pile is large, and the penetration force of the construction equipment is very high.

[0004] The existing patent authorization announcement number is CN101575852A, which is a Chinese invention patent. It discloses a wall-protecting type bottom-expanding pipe-sinking pile construction method. The vibrating hammer is used as a power device. The sinking pipe is an inner and outer double-layer sinking pipe. The lower end of the core pipe is provided with a valve pile tip, and the outer sinking pipe is extended. First, the inner and outer sinking pipes are sunk into the pile position by the vibrating hammer, and then the core pipe is lifted, and the outer sinking pipe is filled with the designed amount of bottom-expanding concrete. The outer sinking pipe is lifted up so that the outer sinking pipe does not separate from the bottom-expanding concrete. The core pipe is driven by the vibrating hammer to repeatedly vibrate and tamp along the outer sinking pipe to expand and fill concrete until the bottom expansion requirement is met; then the core pipe is pulled out, and the steel cage is placed along the outer sinking pipe to form a pile. The pile operation can overcome the technical drawbacks of the existing sinking pipe-sinking pile construction method, such as shrinkage and collapse. However, in this technical solution, the bottom of the core pipe is a valve-type conical head, and the valve-type conical head of the outer pipe is easily damaged when passing through the hard layer of backfilled block stone with a larger particle size, so it cannot penetrate the thicker block gravel fill layer. Summary of the invention

[0005] Based on the above problems, the present invention aims to propose a high-penetration double-tube vibration impact lead-hole sinking pile construction process and equipment to solve the problem that it is difficult to penetrate the gravel fill layer when sinking the pipe pile. The specific solution is as follows:

[0006] A high-penetration double-tube vibration impact lead-hole sinking pile construction process comprises the following steps:

[0007] Step 1) The drilling equipment is in place: the vibrating hammer fixes the inner and outer pipes through the pile clamp, and the pile frame is aligned with the pile position;

[0008] Step 2) Double-tube hole is drilled to about 1m below the bottom of the gravel filling layer: the vibrating hammer is turned on, and the inner and outer pipes are driven to sink synchronously by the vibrating hammer, and vibrate and sink sequentially from top to bottom to the bottom of the gravel filling layer to form a hole, and then the inner pipe is pulled out by the vibrating hammer, leaving the outer pipe protective wall in the hole;

[0009] Step 3) Pipe-sinking pile construction: sink the pile pipe from the top of the outer pipe into the inner pipe, pass through the block gravel fill layer, silt and other soft soil layers to the required depth, then add materials into the pile pipe, and lift the pile pipe while adding materials to form a dense pile body;

[0010] Step 4) Vibrate and pull out the outer pipe, and combine the inner and outer pipes: Use a vibrating hammer to vibrate and pull out the outer pipe, and as the outer pipe lifts the inner pipe, the inner and outer double casings are reassembled and moved to the next pile position.

[0011] Furthermore, in step 2), after the vibration hammer pulls out the inner tube, the inner tube remains on the pile frame waiting for the next construction step.

[0012] Furthermore, if the particle size distribution of the crushed stone fill layer is good and the collapse is not serious after the hole is drilled, only the inner tube can be used to drill the hole.

[0013] Furthermore, in step 3), the pipe-sinking piles include: gravel piles and concrete cast-in-place piles.

[0014] Furthermore, in the step 3), the method of constructing the pipe piles includes: using a pipe pile driving machine.

[0015] A high-penetration double-tube vibration impact lead-hole sinking pipe pile construction equipment, comprising a vibration hammer, a pile clamp, an inner pipe and an outer pipe, wherein the inner pipe is sleeved in the outer pipe to form an inner and outer double sleeve, the inner pipe and the outer pipe are fixed by the pile clamp, and the vibration hammer is arranged on the top of the pile clamp;

[0016] It also includes a pipe pile driver, which is used to form pipe piles. Preferably, the diameter of the crushed stone pile or concrete pile during construction is generally 500-800mm, the pile length can reach 20-40m, and the lead hole diameter is about 50-100mm larger than the pipe pile diameter.

[0017] Furthermore, the vibration hammer adopts a high-power high-frequency vibration hammer of more than 300kw.

[0018] Furthermore, the inner tube head is a solid alloy steel prefabricated conical pile tip, and the inner tube pile tip extends out of the outer tube head.

[0019] Furthermore, the outer diameter of the inner tube is consistent with the inner diameter of the outer tube, or the outer diameter of the inner tube is slightly smaller than the inner diameter of the outer tube.

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] In the present invention, the pipe-sinking pile construction process adopts a vibratory hammer combined with a double-tube vibratory pipe sinking to drill holes in a thick block gravel fill layer, that is, a relatively high-frequency vibratory hammer is used for impact vibration to form holes, and the inner and outer tubes are synchronously sunk by a vibratory hammer fixture, and the end of the inner tube is equivalent to a solid alloy steel prefabricated pile tip, which can impact and crush the block stone directly below, and the outer tube is used for wall protection after the hole is formed until the pipe pile is pulled out after it is formed in the block gravel fill layer, silt and other soft soil layers. This can effectively overcome the disadvantage that conventional pipe-sinking pile machines cannot penetrate in complex formations such as pebbles, large boulders, and large stones, and can meet the needs of pipe-sinking pile formation in soft soil foundations with hard layers such as thick block gravel layers. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is an overall schematic diagram of the present invention.

[0023] In the figure: 1. Vibratory hammer; 2. Pile clamp; 3. Inner pipe; 4. Outer pipe;

[0024] 100. Gravel fill layer; 200. Silt and other soft soil layers; 300. Non-soft soil layer. DETAILED DESCRIPTION

[0025] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0026] like Figure 1 As shown, a high-penetration double-tube vibration impact boring and pipe-sinking pile construction equipment comprises a vibration hammer 1, a pile clamp 2, an inner tube 3 and an outer tube 4. The inner tube 3 is sleeved in the outer tube 4 to form an inner and outer double sleeve. The inner tube 3 and the outer tube 4 are fixed by the pile clamp 2. The vibration hammer 1 is provided on the top of the pile clamp 2.

[0027] The construction equipment also includes a pipe pile driver (not shown in the figure), which is used to form pipe piles. It should be noted that the pipe pile driver is a prior art and will not be described in detail here.

[0028] The vibrating hammer 1 is a high-power high-frequency vibrating hammer. Preferably, the vibrating hammer 1 is a high-power high-frequency vibrating hammer with a power of more than 300 kW.

[0029] The head of the inner tube 3 is a solid alloy steel prefabricated conical pile tip, and the pile tip of the inner tube 3 extends out of the head of the outer tube 4. The solid alloy steel prefabricated conical pile tip is used to impact and crush the block stone or construction waste directly below.

[0030] In a possible embodiment, the outer diameter of the inner tube 3 is consistent with the inner diameter of the outer tube 4 .

[0031] In another possible embodiment, the outer diameter of the inner tube 3 is slightly smaller than the inner diameter of the outer tube 4 . Preferably, the outer diameter of the inner tube 3 is 5-20 mm smaller than the inner diameter of the outer tube 4 .

[0032] In addition, the construction equipment of this embodiment also includes a pile frame (not shown in the figure). It should be noted that the pile frame is a prior art and will not be described in detail here.

[0033] Based on the given construction equipment, this embodiment also provides a high-penetration double-tube vibration impact hole-drilling pipe pile construction process, by appropriately increasing the double-tube hole depth of the inner tube 3 and the outer tube 4 to the bottom elevation of the gravel fill layer 100, and sinking the pipe pile in the outer tube 4 to the designed elevation of the top of the gravel fill layer 100, and then pulling out the outer tube 4.

[0034] See also Figure 1 , specifically including the following steps:

[0035] Step 1) The drilling equipment is in place: the vibrating hammer 1 fixes the sleeved inner pipe 3 and outer pipe 4 through the pile clamp 2, and the pile frame is aligned with the pile position;

[0036] Step 2) Double-tube hole is drilled to about 1m below the bottom of the gravel filling layer 100: the vibrating hammer 1 is turned on, and the vibrating hammer 1 drives the inner pipe 3 and the outer pipe 4 to sink synchronously, and vibrates and sinks from top to bottom to the bottom of the gravel filling layer 100 to form a hole, and then the vibrating hammer 1 pulls out the inner pipe 3, leaving the outer pipe 4 in the hole to protect the wall; after the vibrating hammer 1 pulls out the inner pipe 3, the inner pipe 3 is retained on the pile frame waiting for the next step of construction;

[0037] Step 3) Pipe-sinking pile construction: sink the pile pipe from the top of the outer pipe 4 into the inner pipe, pass through the block gravel filling layer 100, the silt and other soft soil layers 200 to the required depth, then add materials into the pile pipe, and lift the pile pipe while adding materials to form a dense pile body; wherein, the method of pipe-sinking pile construction includes: using a pipe-sinking pile machine; pipe-sinking piles include: gravel piles, concrete cast-in-place piles;

[0038] Step 4) Vibrating and pulling out the outer tube 4, and combining the inner and outer tubes 4: The vibration hammer 1 vibrates and pulls out the outer tube 4, and as the outer tube 4 lifts the inner tube 3 and the outer tube 4, the inner and outer double casings are reassembled and moved to the next pile position.

[0039] Preferably, the diameter of the gravel pile or concrete pile during construction is generally 500-700 mm, the pile length can reach 20-40 m, and the lead hole diameter is about 50-100 mm larger than the diameter of the pipe-sinking pile.

[0040] Furthermore, if the particle size distribution of the crushed stone filling layer 100 is good and the collapse is not serious after the hole is drilled, only the inner pipe 3 may be used to drill the hole.

[0041] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A high-penetration double-tube vibration impact lead-hole sinking pile construction process, characterized in that: The following steps are involved: Step 1) The drilling equipment is in place: the vibrating hammer fixes the inner and outer pipes through the pile clamp, and the pile frame is aligned with the pile position; Step 2) Double-tube hole is drilled to about 1m below the bottom of the gravel filling layer: the vibrating hammer is turned on, and the inner and outer pipes are driven to sink synchronously by the vibrating hammer, and vibrate and sink sequentially from top to bottom to the bottom of the gravel filling layer to form a hole, and then the inner pipe is pulled out by the vibrating hammer, leaving the outer pipe protective wall in the hole; Step 3) Pipe-sinking pile construction: sink the pile pipe from the top of the outer pipe into the inner pipe, pass through the block gravel fill layer, silt and other soft soil layers to the required depth, then add materials into the pile pipe, and lift the pile pipe while adding materials to form a dense pile body; Step 4) Vibrate and pull out the outer pipe, and combine the inner and outer pipes: Use a vibrating hammer to vibrate and pull out the outer pipe, and as the outer pipe lifts the inner pipe, the inner and outer double casings are reassembled and moved to the next pile position.

2. The high-penetration double-tube vibration impact hole sinking pile construction process according to claim 1 is characterized in that: In step 2), after the inner tube is pulled out by the vibration hammer, the inner tube remains on the pile frame and waits for the next construction step.

3. The high-penetration double-tube vibration impact hole sinking pile construction process according to claim 1 is characterized in that: If the particle grading of the crushed stone fill layer is good and the landslide is not serious after drilling the hole, only the inner pipe can be used to drill the hole.

4. The high-penetration double-tube vibration impact hole sinking pile construction process according to claim 1 is characterized in that: In step 3), the pipe-sinking piles include: gravel piles and concrete cast-in-place piles.

5. The high-penetration double-tube vibration impact hole sinking pile construction process according to claim 1 is characterized in that: In the step 3), the method of constructing the pipe pile includes: using a pipe pile driving machine.

6. A high-penetration double-tube vibration impact lead-hole sinking pile construction equipment, characterized in that: It includes a vibrating hammer, a pile clamp, an inner tube and an outer tube, wherein the inner tube is sleeved in the outer tube to form an inner and outer double sleeve, the inner tube and the outer tube are fixed by the pile clamp, and the vibrating hammer is arranged on the top of the pile clamp; Also included is a pipe pile driving machine, which is used to form pipe piles.

7. The high-penetration double-tube vibration impact hole sinking pile construction equipment according to claim 6 is characterized in that: The vibrating hammer adopts a high-power high-frequency vibrating hammer of more than 300kw.

8. The high-penetration double-tube vibration impact hole sinking pile construction equipment according to claim 6 is characterized in that: The inner tube head is a solid alloy steel prefabricated conical pile tip, and the inner tube pile tip extends out of the outer tube head.

9. The high-penetration double-tube vibration impact hole sinking pile construction equipment according to claim 6 is characterized in that: The outer diameter of the inner tube is consistent with the inner diameter of the outer tube, or the outer diameter of the inner tube is slightly smaller than the inner diameter of the outer tube.