High-penetrating-power double-pipe vibration immersed pipe guide hole inserting plate construction technology and equipment

Through the double-tube vibrating immersive pipe hole-guided process driven by high-frequency vibrating hammer, the prefabricated conical pile tip of solid alloy steel was used to smash the stone, which solved the problem of penetrating the deep gravel filling layer in the existing technology, and realized the problem of Effective insertion of plates in complex formations.

CN118932993APending Publication Date: 2024-11-12SHANGHAI HARBOUR SOFT SOIL TREATMENT ENG (GRP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411055150.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The prior art is difficult to penetrate deep gravel soil fill layer, resulting in insufficient penetration power of the plate inserter during construction and unable to effectively insert the plastic drainage plate.

Method used

The double-tube vibrating immersive pipe hole-guided process driven by high-frequency vibrating hammer is adopted. The inner tube and the outer tube are fixed by pile clamping machines. The inner tube is a solid alloy steel prefabricated conical pile tip, which is used to smash stones, and the outer tube is used as a protective wall. , realize hole formation and insertion plate of the gravel fill layer.

Benefits of technology

It effectively overcomes the problem of insufficient penetration of the plate inserter in complex formations, and can insert plastic drainage plates into deep gravel layers to meet the needs of deep foundation treatment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932993A_ABST
    Figure CN118932993A_ABST
Patent Text Reader

Abstract

The invention discloses a high-penetrating-power double-pipe vibration immersed pipe guide hole inserting plate construction technology and equipment, and relates to the technical field of foundation treatment. The construction technology comprises the steps that 1, guide hole equipment is in place; (2) the hole is led to the position about 1 m below the bottom face of the block gravel filling layer through double pipes, a vibratory hammer is started, the vibratory hammer drives the inner pipe and the outer pipe to synchronously sink and sequentially sink to the bottom of the block gravel filling layer from top to bottom to form a hole, then the vibratory hammer pulls out the inner pipe, and an outer pipe protection wall is reserved in the hole; a plastic drainage plate is inserted into the outer pipe from the upper portion of the outer pipe, the plastic drainage plate penetrates through soft soil layers such as broken stone filling layer guide holes and sludge till the needed depth is reached, and then the drainage plate is cut off; and 4) vibrating and pulling the outer pipe and combining the inner pipe and the outer pipe. The equipment comprises a vibratory hammer, a pile gripper, an inner pipe and an outer pipe, the inner pipe sleeves the outer pipe to form an inner sleeve and an outer sleeve, the inner pipe and the outer pipe are fixed through the pile gripper, and the vibratory hammer is arranged at the top of the pile gripper; the device further comprises a plate inserting machine. The method solves the problem that a deep and thick block-containing broken stone filling layer is difficult to penetrate when a guide hole inserting plate is used at present.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of foundation treatment, and in particular to a high-penetration double-tube vibration pipe sinking hole plugging plate construction process and equipment. Background Art

[0002] In the field of foundation reinforcement in construction projects, plastic drain boards are often used for drainage in the treatment of soft foundations. During construction, it is necessary to first use a board inserter to insert the plastic drain board into the soft foundation to be treated to form a drainage channel. Usually a crawler-type travel mechanism is used, on which a vibrator is provided, and below the vibrator is a guide rod (insertion pipe). When inserting the pipe, first insert the plastic drain board into the guide rod, and then under the action of the vibrator, the guide rod together with the plastic drain board inside it is inserted into the soft foundation. After reaching the predetermined depth, the guide rod is withdrawn, leaving the plastic drain board in the soft foundation, so as to provide a drainage channel for the water contained in the soft soil during the construction process, which is conducive to the rapid discharge of water.

[0003] At present, there is such a geological situation in foundation drainage treatment. The stratum contains a gravel layer of fill or construction waste fill. The particle size distribution of the fill layer is very uneven, the soft and hard distribution is extremely uneven, and the thickness varies greatly. The maximum diameter is 1.2m and the maximum thickness is 22m. There is also a certain thickness of silt and other soft soil layers and clay layers under the fill layer. In view of this geological situation, the resistance of the plug is large, and the penetration of the construction equipment is very high.

[0004] The existing Chinese invention patent with the patent authorization announcement number CN106400775B discloses a powerful plate inserting machine, including a crawler-type travel mechanism and a frame arranged on one side of the crawler-type travel mechanism, and also includes: an inner tube arranged on the frame, which can move up and down along the frame and can insert a plastic drain plate, an inner tube vibrator is arranged above the inner tube, and the power of the inner tube vibrator meets the power of the drain plate; an outer tube arranged on the frame, which can move up and down along the frame, the outer tube is sleeved on the outside of the inner tube, and an outer tube vibrator is arranged above, and the power of the outer tube vibrator is sufficient to penetrate the hard layer of backfilled rock. The bottom of the outer tube is a valve-type conical head, and the outer tube valve-type conical head is easily damaged when passing through the hard layer of backfilled block stone with larger particle size, so it cannot penetrate the thicker block crushed stone filling layer. Summary of the invention

[0005] The purpose of the present invention is to solve the shortcomings of the prior art and to propose a high-penetration double-tube vibration pipe sinking hole plugging plate construction process and equipment to solve the current problem that it is difficult to penetrate thick and heavy gravel fill layers when using hole plugging plates.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions:

[0007] A high-penetration double-tube vibration sinking pipe hole plugging plate construction process includes the following steps:

[0008] Step 1) The drilling equipment is in place: the vibrating hammer fixes the inner and outer pipes through the pile clamp, and the pile frame is aligned with the pile position;

[0009] Step 2) Double-tube drilling to about 1m below the bottom of the gravel fill layer: Turn on the vibrating hammer, which drives the inner and outer pipes to sink synchronously, and vibrate and sink from top to bottom in sequence to about 1m below the bottom of the gravel fill layer to form a hole, then the vibrating hammer pulls out the inner pipe, leaving the outer pipe protective wall in the hole;

[0010] Step 3) Insert the board: insert the plastic drain board from the top of the outer tube into it, through the hole of the gravel fill layer, silt and other soft soil layers to the required depth, and then cut off the drain board;

[0011] Step 4) Vibrate and pull out the outer tube, and combine the inner and outer tubes: Use a vibration hammer to vibrate and pull out the outer tube, and as the outer tube lifts the inner tube, the inner and outer double casings are reassembled and moved to the next plug-in plate position.

[0012] Furthermore, in step 2), after the vibration hammer pulls out the inner tube, the inner tube remains on the pile frame waiting for the next construction step.

[0013] Furthermore, in the step 2), the diameter of the lead hole is 200-400 mm.

[0014] Furthermore, in the step 3), the method of inserting the board includes: using a board inserting machine.

[0015] A high-penetration double-tube vibration pipe sinking and hole-guiding plug-in plate construction equipment, comprising a vibration hammer, a pile clamp, an inner pipe and an outer pipe, wherein the inner pipe is sleeved outside the outer pipe to form an inner and outer double sleeve, the inner pipe and the outer pipe are fixed by the pile clamp, and the vibration hammer is arranged on the top of the pile clamp;

[0016] Also included is a board inserter, which is used for inserting boards.

[0017] Furthermore, the vibration hammer adopts a high-frequency vibration hammer with a relatively large power of more than 200kw.

[0018] Furthermore, the inner tube head is a solid alloy steel prefabricated conical pile tip, and the inner tube pile tip extends out of the outer tube head.

[0019] Furthermore, the outer diameter of the inner tube is consistent with the inner diameter of the outer tube, or the outer diameter of the inner tube is slightly smaller than the inner diameter of the outer tube.

[0020] Compared with the prior art, the present invention has the following beneficial effects:

[0021] In the present invention, the plate inserting construction process adopts a vibratory hammer combined with a double-tube vibratory pipe sinking to drill holes in the thick block gravel fill layer, that is, a relatively high-frequency vibratory hammer is used for impact vibration to form holes, and the inner and outer tubes are synchronously sunk by a vibratory hammer fixture. The end of the inner tube is equivalent to a solid alloy steel prefabricated pile tip, which can impact and crush the block stone directly below, and the outer tube is used for wall protection after the hole is formed until the plate is inserted in the soft soil layer such as the block gravel fill layer and the silt and then pulled out. This can effectively overcome the disadvantage that conventional plate inserting machines cannot penetrate in complex formations such as pebbles, gravel, and large boulders, and can meet the needs of inserting plastic drainage boards in soft soil foundations with hard layers such as thick block gravel layers. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is an overall schematic diagram of the present invention.

[0023] In the figure: 1. Vibratory hammer; 2. Pile clamp; 3. Inner pipe; 4. Outer pipe;

[0024] 100. Gravel fill layer; 200. Silt and other soft soil layers; 300. Non-soft soil layer. DETAILED DESCRIPTION

[0025] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0026] Reference Figure 1 A high-penetration double-tube vibration pipe sinking hole plug-in plate construction equipment includes a vibration hammer 1, a pile clamp 2, an inner pipe 3 and an outer pipe 4. The inner pipe 3 is sleeved outside the outer pipe 4 to form an inner and outer double sleeve. The inner pipe 3 and the outer pipe 4 are fixed by the pile clamp 2, and the vibration hammer 1 is provided on the top of the pile clamp 2.

[0027] The construction equipment also includes a plate inserting machine (not shown in the figure), which is used for inserting plates. It should be noted that the plate inserting machine is a prior art and will not be described in detail here.

[0028] The vibrating hammer 1 is a relatively high-power high-frequency vibrating hammer 1. Preferably, the vibrating hammer 1 is a relatively high-power high-frequency vibrating hammer of more than 200 kW.

[0029] The head of the inner tube 3 is a solid alloy steel prefabricated conical pile tip, and the pile tip of the inner tube 3 extends out of the head of the outer tube 4. The solid alloy steel prefabricated conical pile tip is used to impact and crush the block stone or construction waste directly below.

[0030] In a possible embodiment, the outer diameter of the inner tube 3 is consistent with the inner diameter of the outer tube 4 .

[0031] Alternatively, the outer diameter of the inner tube 3 is slightly smaller than the inner diameter of the outer tube 4 . Preferably, the outer diameter of the inner tube 3 is 5-20 mm smaller than the inner diameter of the outer tube 4 .

[0032] In addition, the construction equipment of this embodiment also includes a pile frame (not shown in the figure). It should be noted that the pile frame is a prior art and will not be described in detail here.

[0033] Based on the given construction equipment, this embodiment also provides a high-penetration double-tube vibration pipe sinking hole insertion plate construction process, by appropriately increasing the double-tube hole depth of the inner tube 3 and the outer tube 4 to the bottom elevation of the gravel fill layer, and inserting the plate inside the outer tube 4 to the design elevation of the top of the gravel fill layer 200, and then pulling out the outer tube 4.

[0034] See also Figure 1 , specifically including the following steps:

[0035] Step 1) The drilling equipment is in place: the vibrating hammer 1 fixes the sleeved inner pipe 3 and outer pipe 4 through the pile clamp 2, and the pile frame is aligned with the pile position;

[0036] Step 2) Double-tube hole leading to the bottom elevation of the block gravel filling layer: Turn on the vibrating hammer 1, the vibrating hammer 1 drives the inner pipe 3 and the outer pipe 4 to sink synchronously, and vibrate and sink from top to bottom to the bottom of the block gravel filling layer 100 to form a hole, and then the vibrating hammer 1 pulls out the inner pipe 3, leaving the outer pipe 4 in the hole to protect the wall; wherein, after the vibrating hammer 1 pulls out the inner pipe 3, the inner pipe 3 is retained on the pile frame waiting for the next step of construction;

[0037] Step 3) Inserting the board: inserting the plastic drainage board from the top of the outer tube 4 into the outer tube, passing through the hole of the gravel filling layer 100, the soft soil layer 200 such as silt, and the non-soft soil layer 300 to the required depth, and then cutting off the drainage board; wherein, the board insertion method is carried out by a board insertion machine;

[0038] Step 4) Vibrating and pulling out the outer tube 4, combining the inner and outer tubes 4: The vibration hammer 1 vibrates and pulls out the outer tube 4, and as the outer tube 4 lifts the inner tube 3 and the outer tube 4, the inner and outer double sleeves are reassembled and moved to the next plug-in plate position.

[0039] Preferably, the diameter of the lead hole is 200-400 mm and the pile length can reach 20-40 m.

[0040] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A high-penetration double-tube vibration sinking pipe hole plugging construction process, It is characterized in that The following steps are involved: Step 1) The drilling equipment is in place: the vibrating hammer fixes the inner and outer pipes through the pile clamp, and the pile frame is aligned with the pile position; Step 2) Double-tube hole is drilled to about 1m below the bottom of the gravel filling layer: the vibrating hammer is turned on, and the inner and outer pipes are driven to sink synchronously by the vibrating hammer, and vibrate and sink sequentially from top to bottom to the bottom of the gravel filling layer to form a hole, and then the inner pipe is pulled out by the vibrating hammer, leaving the outer pipe protective wall in the hole; Step 3) Insert the board: insert the plastic drain board from the top of the outer tube into it, through the hole of the gravel fill layer, silt and other soft soil layers to the required depth, and then cut off the drain board; Step 4) Vibrate and pull out the outer tube, and combine the inner and outer tubes: Use a vibration hammer to vibrate and pull out the outer tube, and as the outer tube lifts the inner tube, the inner and outer double casings are reassembled and moved to the next plug-in plate position.

2. According to the high-penetration double-tube vibration sinking pipe guide hole plugging plate construction process of claim 1, It is characterized in that In step 2), after the inner pipe is pulled out by the vibration hammer, the inner pipe remains on the pile frame and waits for the next construction step.

3. According to the high-penetration double-tube vibration sinking pipe hole plugging plate construction process of claim 1, It is characterized in that In the step 2), the diameter of the lead hole is 200-400 mm.

4. According to the high-penetration double-tube vibration sinking pipe guide hole plugging plate construction process of claim 1, It is characterized in that In the step 3), the method of inserting the board includes: using a board inserting machine.

5. A high-penetration double-tube vibration sinking pipe hole plugging construction equipment, It is characterized in that It includes a vibrating hammer, a pile clamp, an inner tube and an outer tube, wherein the inner tube is sleeved outside the outer tube to form an inner and outer double sleeve, the inner tube and the outer tube are fixed by the pile clamp, and the vibrating hammer is arranged on the top of the pile clamp; Also included is a board inserter, which is used for inserting boards.

6. The high-penetration double-tube vibration sinking pipe hole plugging plate construction equipment according to claim 5, It is characterized in that The vibrating hammer adopts a high-frequency vibrating hammer with a relatively large power of more than 200kw.

7. The high-penetration double-tube vibration sinking pipe hole plugging plate construction equipment according to claim 5, It is characterized in that The inner tube head is a solid alloy steel prefabricated conical pile tip, and the inner tube pile tip extends out of the outer tube head.

8. The high-penetration double-tube vibration sinking pipe hole plugging plate construction equipment according to claim 5, It is characterized in that The outer diameter of the inner tube is consistent with the inner diameter of the outer tube, or the outer diameter of the inner tube is slightly smaller than the inner diameter of the outer tube.