Double-tube vibration impact immersed tube gravel pile or cast-in-place concrete pile construction process and equipment
Through the construction technology and equipment of double-tube vibration impact pipe, high-power high-frequency vibration hammers and solid alloy steel prefabricated pile tips, the problem of difficult penetration of block gravel fill layer in the existing technology is solved, and the complex formation is realized The efficient hole formation and pile pile formation improves construction efficiency and equipment penetration.
Patent Information
- Application Number
- CN202411055154.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-11-12
AI Technical Summary
Existing gravel piles or concrete cast-injected piles are difficult to penetrate thick gravel fills during construction. The vibration effect of the existing technology is insufficient and cannot meet the penetration requirements of the deep gravel fills. The equipment Prone to damage.
The construction technology and equipment of double-tube vibration impact sinking pipes are adopted, and the inner and outer pipes are driven to sink simultaneously through a high-power high-frequency vibration hammer. The inner pipe is used as a solid alloy steel prefabricated pile tip to impact the broken stones, and the outer pipe is used as a protective wall to form holes, and the After completion, remove it to achieve effective penetration of deep gravel fill layer.
It effectively overcomes the problem of penetration of construction equipment in complex formations, realizes high-efficiency holes and piles in the gravel filling layer, soft soil layer and holding layer, and improves the construction efficiency and penetration power of the equipment. .
Smart Images

Figure CN118932995A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of foundation treatment, and in particular to a construction process and equipment for double-tube vibration impact sinking gravel piles or concrete cast-in-place piles. Background Art
[0002] In the field of foundation reinforcement for construction projects, gravel piles can be used to strengthen weak foundations to reduce foundation settlement or eliminate foundation liquefaction. Existing gravel pile construction techniques - sinking stone piles and vibrating stone piles - cannot be constructed in harder soil layers. Conventional vibrating stone piles use vibrators to sink with water, which is mainly horizontal vibration and generally has no vertical vibration capability.
[0003] At present, there is such a geological situation in foundation reinforcement. The soil layer contains block gravel fill. The particle size distribution of the block gravel fill layer is very uneven, the soft and hard distribution is extremely uneven, and the thickness varies greatly. The maximum diameter is 1.2m and the maximum thickness is 22m. There is also a certain thickness of soft soil layer and bearing layer under the block gravel fill layer. The maximum depth of the gravel pile is about 31m. In view of this geological situation, the pile sinking resistance is large, and the penetration force requirements of the construction equipment are very high.
[0004] The existing Chinese invention patent with the patent authorization announcement number CN106284286B discloses a method for reinforcing soft foundations with a high-penetration vibrator. The high-penetration vibrator is hoisted by a crane, and the high-frequency vibrator is turned on. The vibrator head vibrates downward until the depth of the soft foundation to be treated is reached; penetrating hard sand and gravel to improve production efficiency. The above construction method adds a high-frequency vibrator to increase vertical vibration, but the vibration effect is still weak, and it is difficult to meet the penetration requirements of the block gravel fill layer, and it is impossible to penetrate the deep block gravel fill layer.
[0005] The existing Chinese invention patent with the patent authorization announcement number CN108729432B discloses a controllable vibration vibrator with bottom feeding and a method for vibrating and compacting into gravel piles, including a vibrator, a guide tube sleeved on the outside of the vibrator, and a vibrator arranged on the top of the guide tube; the top of the guide tube is open to form a drop port, and a plurality of openable and closable valves are installed at the bottom, and the valves are connected to the vibrator through a hanging chain. The gravel of the present invention can be fed from the drop port and fed from the valve opening, so that the gravel is not wasted and the utilization rate of the gravel is improved. The above construction method adopts a valve pile tip and bottom dropping, but the valve pile tip is easily damaged when passing through a gravel fill layer, and it is difficult to meet the requirements of penetrating a thicker fill layer containing gravel. Summary of the invention
[0006] Based on the above problems, the present invention aims to propose a double-tube vibration impact sinking pipe gravel pile or concrete cast-in-place pile construction process and equipment to solve the problem that the current vibrating gravel pile or concrete cast-in-place pile is difficult to penetrate the block gravel fill layer. The specific scheme is as follows:
[0007] The construction process of double-tube vibration impact sinking pipe gravel pile or concrete cast-in-place pile includes the following steps:
[0008] Step 1) The drilling equipment is in place: the vibrating hammer fixes the inner and outer pipes through the pile clamp, and the pile frame is aligned with the pile position;
[0009] Step 2) Double-tube drilling to the designed pile bottom elevation: Turn on the vibrating hammer, which drives the inner and outer tubes to sink synchronously, and vibrate and sink them from top to bottom in sequence to form holes in the gravel fill layer, soft soil layer, and bearing layer until the designed pile bottom elevation is reached;
[0010] Step 3) Backfill with gravel or concrete: Use a vibrating hammer to pull out the inner tube, leaving the outer tube wall in the hole, and then backfill the hole with gravel or concrete until the designed elevation of the pile top;
[0011] Step 4) Vibrate and pull out the outer pipe, and combine the inner and outer pipes: Use a vibrating hammer to vibrate and pull out the outer pipe, and as the outer pipe lifts the inner pipe, the inner and outer double casings are reassembled and moved to the next pile position.
[0012] Furthermore, in step 3), after the vibration hammer pulls out the inner tube, the inner tube remains on the pile frame waiting for the next construction step.
[0013] The double-tube vibration impact sinking stone pile or concrete cast-in-place pile construction equipment comprises a vibration hammer, a pile clamp, an inner tube and an outer tube. The inner tube is sleeved outside the outer tube to form an inner and outer double sleeve. The inner tube and the outer tube are fixed by the pile clamp. The vibration hammer is arranged on the top of the pile clamp.
[0014] Furthermore, the vibration hammer adopts a high-power and high-frequency vibration hammer.
[0015] Furthermore, the inner tube head is a solid alloy steel prefabricated conical pile tip, and the inner tube pile tip extends out of the outer tube head.
[0016] Furthermore, the outer diameter of the inner tube is consistent with the inner diameter of the outer tube, or the outer diameter of the inner tube is slightly smaller than the inner diameter of the outer tube.
[0017] Compared with the prior art, the present invention has the following beneficial effects:
[0018] In the present invention, a high-power high-frequency vibration hammer is used for vibration impact drilling. The inner and outer tubes are synchronously sunk by a vibration hammer fixture. The end of the inner tube is equivalent to a solid alloy steel prefabricated pile tip, which can impact and crush the stone block directly below. The outer tube is used for wall protection after the hole is formed until it is pulled out after the piles are formed in the block and gravel fill layer, the soft soil layer, and the bearing layer. The construction process uses a vibration hammer combined with a double-tube vibration sinking pipe to drill holes in deep block and gravel fill layers, which can effectively overcome the disadvantage that construction equipment cannot quickly penetrate and drill holes in complex formations such as pebbles, gravel, and large boulders. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is an overall schematic diagram of the present invention.
[0020] In the figure: 1. Vibratory hammer; 2. Pile clamp; 3. Inner pipe; 4. Outer pipe;
[0021] 100, gravel fill layer; 200, soft soil layer; 300, bearing layer. DETAILED DESCRIPTION
[0022] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0023] like Figure 1 As shown, a double-tube vibration impact pipe-sinking gravel pile or concrete cast-in-place pile construction equipment includes a vibration hammer 1, a pile clamp 2, an inner tube 3 and an outer tube 4. The inner tube 3 is sleeved outside the outer tube 4 to form an inner and outer double sleeve. The inner tube 3 and the outer tube 4 are fixed by the pile clamp 2, and the vibration hammer 1 is provided on the top of the pile clamp 2.
[0024] The vibration hammer 1 is a high-power high-frequency vibration hammer. Preferably, the vibration hammer 1 is a high-power high-frequency vibration impact hammer of more than 300KW.
[0025] The head of the inner tube 3 is a solid alloy steel prefabricated conical pile tip, and the pile tip of the inner tube 3 extends out of the head of the outer tube 4. The solid alloy steel prefabricated conical pile tip is used to impact and crush the block stone directly below.
[0026] In a possible embodiment, the outer diameter of the inner tube 3 is consistent with the inner diameter of the outer tube 4 .
[0027] Alternatively, the outer diameter of the inner tube 3 is slightly smaller than the inner diameter of the outer tube 4 . Preferably, the outer diameter of the inner tube 3 is 5-20 mm smaller than the inner diameter of the outer tube 4 .
[0028] In addition, the construction equipment of this embodiment also includes a pile frame (not shown in the figure). It should be noted that the pile frame is a prior art and will not be described in detail here.
[0029] Based on the given construction equipment, this embodiment also provides a double-tube vibration impact sinking stone pile or concrete bored pile construction process, by appropriately increasing the double-tube hole depth of the inner tube 3 and the outer tube 4 to below the bottom of the soft soil layer, increasing the protective wall of the soft soil layer 200, and first filling the outer tube 4 to the design elevation of the top of the soft soil layer 200, and then pulling out the outer tube 4.
[0030] See also Figure 1 , specifically including the following steps:
[0031] Step 1) The boring equipment is in place: the vibrating hammer 1 fixes the sleeved inner pipe 3 and outer pipe 4 through the pile clamp 2, and the pile frame is aligned with the pile position;
[0032] Step 2) Double-tube drilling to the designed pile bottom elevation: Turn on the vibrating hammer 1, which drives the inner tube 3 and the outer tube 4 to sink synchronously, and vibrate and sink successively from top to bottom to form holes in the block gravel filling layer 100, the soft soil layer 200, and the bearing layer 300 until the designed pile bottom elevation is reached;
[0033] Step 3) Backfill with gravel or concrete: The vibrating hammer 1 pulls out the inner tube 3, leaving the outer tube 4 in the hole as a protective wall, and then backfills the hole with gravel or concrete until the pile top is designed. After the vibrating hammer 1 pulls out the inner tube 3, the inner tube 3 remains on the pile frame waiting for the next step of construction.
[0034] Step 4) Vibrating and pulling out the outer tube 4, and combining the inner and outer tubes 4: The vibration hammer 1 vibrates and pulls out the outer tube 4, and as the outer tube 4 lifts the inner tube 3 and the outer tube 4, the inner and outer double casings are reassembled and moved to the next pile position.
[0035] Preferably, the diameter of the crushed stone pile or concrete pile during construction is generally 500-800 mm, and the pile length can reach 20-40 m.
[0036] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. Double-tube vibration impact sinking stone pile or concrete cast-in-place pile construction process, characterized in that: The following steps are involved: Step 1) The drilling equipment is in place: the vibrating hammer fixes the inner and outer pipes through the pile clamp, and the pile frame is aligned with the pile position; Step 2) Double-tube drilling to the designed pile bottom elevation: Turn on the vibrating hammer, which drives the inner and outer tubes to sink synchronously, and vibrate and sink them from top to bottom in sequence to form holes in the gravel fill layer, soft soil layer, and bearing layer until the designed pile bottom elevation is reached; Step 3) Backfill with gravel or concrete: Use a vibrating hammer to pull out the inner tube, leaving the outer tube wall in the hole, and then backfill the hole with gravel or concrete until the designed elevation of the pile top; Step 4) Vibrate and pull out the outer pipe, and combine the inner and outer pipes: Use a vibrating hammer to vibrate and pull out the outer pipe, and as the outer pipe lifts the inner pipe, the inner and outer double casings are reassembled and moved to the next pile position.
2. The double-tube vibration impact sinking stone pile or concrete cast-in-place pile construction process according to claim 1 is characterized in that: In step 3), after the inner pipe is pulled out by the vibration hammer, the inner pipe remains on the pile frame and waits for the next construction step.
3. Double-tube vibration impact sinking stone pile or concrete cast-in-place pile construction equipment, characterized in that: It comprises a vibrating hammer, a pile clamp, an inner tube and an outer tube. The inner tube is sleeved outside the outer tube to form an inner and outer double sleeve. The inner tube and the outer tube are fixed by the pile clamp. The vibrating hammer is arranged on the top of the pile clamp.
4. The double-tube vibration impact sinking stone pile or concrete cast-in-place pile construction equipment according to claim 3 is characterized in that: The vibration hammer adopts a high-power high-frequency vibration hammer.
5. The double-tube vibration impact sinking stone pile or concrete cast-in-place pile construction equipment according to claim 3 is characterized in that: The inner tube head is a solid alloy steel prefabricated conical pile tip, and the inner tube pile tip extends out of the outer tube head.
6. The double-tube vibration impact sinking stone pile or concrete cast-in-place pile construction equipment according to claim 3 is characterized in that: The outer diameter of the inner tube is consistent with the inner diameter of the outer tube, or the outer diameter of the inner tube is slightly smaller than the inner diameter of the outer tube.