Anchoring type double-row steel sheet pile enclosure structure and construction method thereof

Through the anchor pulling double row steel sheet pile enclosure structure, the anchor tension is provided by cantilever connections and anchor cables, the problems of insufficient flexibility of steel sheet piles and difficulty in setting up internal support anchors are solved, and the water stop and construction of foundation pit enclosure are realized Convenient, suitable for water supply and drainage stations and other scenarios.

CN118933018APending Publication Date: 2024-11-12SHANGHAI MUNICIPAL ENG DESIGN INST (GRP) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411110917.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-12

Smart Images

  • Figure CN118933018A_ABST
    Figure CN118933018A_ABST
Patent Text Reader

Abstract

The invention provides an anchoring type double-row steel sheet pile enclosure structure and a construction method thereof. The enclosure structure comprises front-row steel sheet piles, rear-row steel sheet piles, anchor cables, front-row steel sheet pile waist beams and rear-row steel sheet pile waist beams. The upper portions of the front-row steel sheet piles and the upper portions of the rear-row steel sheet piles are connected through the anchor cable structures, the anchor cable structures are fixed through the steel sheet pile waist beams and the anchor heads, and the anchoring cantilever type enclosure structure is formed. The front-row steel sheet piles mainly bear soil pressure, and the rear-row steel sheet piles mainly provide anchoring force for the front-row steel sheet piles and bear certain soil pressure at the same time. The retaining structure is reliable in water stopping, environmentally friendly, recyclable, high in construction efficiency, low in manufacturing cost, short in construction period, small in influence on surrounding buildings (structures) and free of influence on later facility construction, and has good economic benefits and social benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of foundation pit enclosure, in particular to an anchor-pull type double-row steel sheet pile enclosure structure and a construction method thereof. Background Art

[0002] Steel sheet piles have the advantages of high strength, good water-proofing, convenient construction, complete recycling, green environmental protection, and cost saving. In recent years, they have been widely used in foundation pit support projects. However, steel sheet piles are flexible support structures with low rigidity. In order to control the displacement of steel sheet pile support and ensure the safety and stability of foundation pit support in engineering applications, internal supports or anchor rods are often required. For water supply and drainage station projects, due to the high waterproof requirements of the main structure and the tight construction period, it is generally not suitable to set up internal supports; and there are many production pipelines, rainwater and sewage pipelines, and valve wells around the main structure, so anchor rods are not suitable. Summary of the invention

[0003] The purpose of the present invention is to overcome the above-mentioned shortcomings of the prior art and to provide an anchor-pull double-row steel sheet pile retaining structure and a construction method thereof, so as to achieve reliable water stopping, green and environmental protection and recyclability, and to be more suitable for underground structures with high waterproofing requirements where it is inconvenient to set up internal supports and for water supply and drainage station foundation pit retaining projects with a large number of surrounding pipelines where it is inconvenient to set up anchor rods.

[0004] In order to achieve the above object, the technical solution of the present invention is as follows:

[0005] The present invention provides an anchor-pull type double-row steel sheet pile enclosure structure, an anchor-pull type double-row steel sheet pile enclosure structure and a construction method thereof, comprising a front-row steel sheet pile, a rear-row steel sheet pile, an anchor cable, a front-row steel sheet pile waist beam, a rear-row steel sheet pile waist beam, a front-row anchor head and a rear-row anchor head, characterized in that the front-row steel sheet pile and the rear-row steel sheet pile are vertically arranged opposite to each other, the front-row steel sheet pile waist beam and the rear-row steel sheet pile waist beam are respectively arranged on the outer sides of the upper parts of the front-row steel sheet pile and the rear-row steel sheet pile, the two ends of the transversely arranged anchor cable are respectively fixedly connected to the front-row steel sheet pile waist beam and the front-row anchor head, and the rear-row steel sheet pile waist beam and the rear-row anchor head, so that the upper part of the front-row steel sheet pile and the upper part of the rear-row steel sheet pile are connected by the anchor cable, the front-row steel sheet pile mainly bears soil pressure, the rear-row steel sheet pile mainly provides anchor tension for the front-row steel sheet pile, and also bears a certain soil pressure, so as to form a cantilever enclosure structure as a whole.

[0006] Furthermore, the front row steel sheet piles and the rear row steel sheet piles are made of hot-rolled U-shaped steel sheet piles, which are driven in using small lock mouths.

[0007] Furthermore, the spacing between the front row of steel sheet piles and the rear row of steel sheet piles is greater than or equal to one times the excavation depth of the foundation pit.

[0008] Furthermore, the anchor cable may be made of prestressed steel strands or steel bars.

[0009] Furthermore, a plain concrete force transmission belt may be provided between the front row of steel sheet piles and the internal main structure to support the front row of steel sheet piles.

[0010] The present invention also provides a construction method of an anchor-pull type double-row steel sheet pile enclosure structure, comprising the following steps:

[0011] (1) Use piling machinery to put the front row steel sheet piles and the rear row steel sheet piles in place;

[0012] (2) Construction of pit bottom reinforcement of a certain depth and width at the bottom of the foundation pit and in front of the front row of steel sheet piles;

[0013] (3) erecting the front row steel sheet pile waist beam and the rear row steel sheet pile waist beam at the corresponding positions of the front row steel sheet piles and the rear row steel sheet piles;

[0014] (4) Install anchor cables and secure the front row anchor heads;

[0015] (5) The anchor cable is prestressed and fixed with the rear row anchor head;

[0016] (6) Carry out foundation pit excavation construction, and construct the proposed structure after the foundation pit is excavated to the bottom. When constructing the proposed structure, a plain concrete force transfer belt can be constructed to the edge of the front row of steel sheet piles.

[0017] Furthermore, prestressing should be carried out when the anchor cables are connected, and after the front row steel sheet pile waist beam, the rear row steel sheet pile waist beam, the front row anchor heads and the rear row anchor heads are fixed at both ends, the bare soil should be backfilled.

[0018] Furthermore, after the construction of the front row steel sheet piles and the rear row steel sheet piles is completed, C20 early-strength fine stone concrete should be used to fill the gap between the steel sheet piles and the waist beam, and the filling height should be the same as the front row steel sheet pile waist beam and the rear row steel sheet pile waist beam.

[0019] Furthermore, the anchor cable may pass through the front row of steel sheet piles and the rear row of steel sheet piles by drilling holes in the front row of steel sheet piles and the rear row of steel sheet piles or by lowering the height of the steel sheet piles at the corresponding crossing position.

[0020] Furthermore, the rear row of steel sheet piles can be constructed in a continuous manner or in an interval manner such as two groups of steel sheet piles, three groups of steel sheet piles, or four groups of steel sheet piles.

[0021] Furthermore, according to the soil conditions and the requirements for controlling foundation pit deformation, pit bottom reinforcement of a certain depth and width can be constructed at the bottom of the foundation pit and in front of the front row of steel sheet piles. The pit bottom reinforcement can be carried out using cement-soil mixing piles, high-pressure rotary jet piles, and compaction grouting.

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] The present invention provides an anchor-pull double-row steel sheet pile enclosure structure, which is reliable in water stopping, green, environmentally friendly and recyclable, does not require the installation of internal supports and anchor rods, does not affect the construction of internal structures and surrounding pipelines, is convenient in construction and efficient, does not require maintenance, can greatly reduce the construction period, saves construction costs, has little impact on surrounding buildings (structures), does not affect the construction of later facilities, and has good economic and social benefits. The enclosure structure provided by the present invention is particularly suitable for underground structures with high waterproofing requirements that are inconvenient to install internal supports and for water supply and drainage station foundation pit enclosure projects with many surrounding pipelines that are inconvenient to install anchor rods. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 This is a plan view of the enclosure structure of Example 1 of the present invention.

[0025] Figure 2a A three-dimensional schematic diagram of Example 1 of the present invention.

[0026] Figure 2b This is a three-dimensional schematic diagram of Example 1 of the present invention including a plain concrete force transmission belt and a proposed structure.

[0027] Figure 3 It is a cross-sectional view of the enclosure structure of Example 1 and Example 2 of the present invention.

[0028] Figure 4 This is a plan view of the enclosure structure of Example 2 of the present invention.

[0029] Figure 5 It is a three-dimensional schematic diagram of Example 2 of the present invention.

[0030] Figure 6 Detailed diagram of the connection between the front row of steel sheet piles and the anchor cables in Example 1 and Example 2 of the present invention.

[0031] Figure 7 Detailed diagram of the connection between the rear row of steel sheet piles and the anchor cables in Example 1 and Example 2 of the present invention.

[0032] In the figure:

[0033] 1-front row steel sheet piles, 2-rear row steel sheet piles, 3-anchor cables, 4-front row steel sheet pile waist beams, 5-rear row steel sheet pile waist beams, 6-front row anchor heads, 7-rear row anchor heads, 8-plain concrete force transfer belts, 9-pit bottom reinforcement, 10-planned structure. DETAILED DESCRIPTION

[0034] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The advantages and features of the present invention will become more apparent from the following description and claims. It should be noted that the drawings are all in very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.

[0035] Example 1

[0036] Please refer to Figure 1 to Figure 3 , Figure 6 , Figure 7 The present embodiment discloses an anchor-pull type double-row steel sheet pile enclosure structure, comprising a front row steel sheet pile 1, a rear row steel sheet pile 2, an anchor cable 3, a front row steel sheet pile waist beam 4, a rear row steel sheet pile waist beam 5, a front row anchor head 6, and a rear row anchor head 7; the front row steel sheet pile 1 and the rear row steel sheet pile 2 are arranged vertically opposite to each other, and the front row steel sheet pile waist beam 4 and the rear row steel sheet pile waist beam 5 are respectively arranged on the outer sides of the upper parts of the front row steel sheet pile 1 and the rear row steel sheet pile 2, and the two ends of the transversely arranged anchor cable 3 are respectively fixedly connected to the front row steel sheet pile waist beam 4 and the front row anchor head 6, and the rear row steel sheet pile waist beam 5 and the rear row anchor head 7, and the upper part of the front row steel sheet pile 1 and the upper part of the rear row steel sheet pile 2 are connected by the anchor cable 3, and the whole cantilever enclosure structure is formed. A plain concrete force transmission belt 8 is arranged between the front row steel sheet pile 1 and the internal main structure 10 to support the front row steel sheet pile 1. The anchor cable 3 adopts prestressed steel strand or steel bar. The front row of steel sheet piles 1 and the rear row of steel sheet piles 2 are hot-rolled U-shaped steel sheet piles.

[0037] The construction method of the above structure includes the following (but not limited to) steps:

[0038] A pile driving machine is used to construct the front row steel sheet piles 1 and the rear row steel sheet piles 2 in place, with the spacing between the front row steel sheet piles 1 and the rear row steel sheet piles 2 being greater than or equal to one time of the foundation pit excavation depth; a pit bottom reinforcement 9 of a certain depth and width is constructed in front of the foundation pit bottom and the front row steel sheet piles 1; a front row steel sheet pile waist beam 4 and a rear row steel sheet pile waist beam 5 are erected at corresponding positions of the front row steel sheet piles 1 and the rear row steel sheet piles 2; an anchor cable 3 is erected and fixed with a front row anchor head 6; prestress is applied to the anchor cable 3 and fixed with a rear row anchor head 7 to form a cantilever retaining structure; foundation pit excavation construction is carried out, and a proposed structure 10 is constructed after the foundation pit is excavated to the bottom, and a plain concrete force transfer belt 8 is constructed during the construction of the proposed structure 10.

[0039] The following preferred solutions are adopted during the construction process:

[0040] Preferably, the anchor cable 3 should be prestressed when connected, and the bare soil should be backfilled after the front steel sheet pile waist beam 4, the rear steel sheet pile waist beam 5, the front anchor head 6, and the rear anchor head 7 are fixed at both ends.

[0041] Preferably, the front row steel sheet piles 1 and the rear row steel sheet piles 2 are constructed by driving in small locks.

[0042] Preferably, after the construction of the front row steel sheet piles 1 and the rear row steel sheet piles 2 is completed, C20 early-strength fine stone concrete should be used to fill the gap between the steel sheet piles and the waist beam, and the filling height should be the same as the front row steel sheet pile waist beam 4 and the rear row steel sheet pile waist beam 5.

[0043] Preferably, the anchor cable 3 passes through the front row steel sheet piles 1 and the rear row steel sheet piles 2 by drilling holes in the front row steel sheet piles 1 and the rear row steel sheet piles 2 or lowering the height of the steel sheet piles at the corresponding passing position.

[0044] Preferably, the rear row of steel sheet piles 2 is constructed in a continuous manner.

[0045] Preferably, according to the soil conditions and the requirements for controlling the deformation of the foundation pit, a pit bottom reinforcement 9 of a certain depth and width is constructed at the bottom of the foundation pit and in front of the front row of steel sheet piles 1. The pit bottom reinforcement 9 adopts cement soil mixing piles, high-pressure rotary jet piles, or compaction grouting.

[0046] Example 2

[0047] See also Figure 3 to Figure 7 This embodiment discloses an anchor-pull double-row steel sheet pile enclosure structure, in which the rear-row steel sheet piles 2 are arranged in a form of three groups of steel sheet piles arranged at intervals, and the rear-row steel sheet piles can also be arranged in a form of two groups of steel sheet piles arranged at intervals, or in a form of four groups of steel sheet piles arranged at intervals, etc. The rest is the same as in Embodiment 1.

[0048] The above description is only a description of the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention. Any changes or modifications made by a person skilled in the art in the field of the present invention based on the above disclosure shall fall within the scope of protection of the claims.

Claims

1. An anchor-pull double-row steel sheet pile enclosure structure, comprising a front row of steel sheet piles (1), a rear row of steel sheet piles (2), an anchor cable (3), a front row of steel sheet pile waist beams (4), a rear row of steel sheet pile waist beams (5), a front row of anchor heads (6), and a rear row of anchor heads (7), characterized in that: The front row steel sheet piles (1) and the rear row steel sheet piles (2) are arranged vertically opposite to each other. A front row steel sheet pile waist beam (4) and a rear row steel sheet pile waist beam (5) are respectively arranged on the outer sides of the upper parts of the front row steel sheet piles (1) and the rear row steel sheet piles (2). The two ends of the transversely arranged anchor cables (3) are respectively fixedly connected to the front row steel sheet pile waist beam (4) and the front row anchor heads (6), and the rear row steel sheet pile waist beam (5) and the rear row anchor heads (7), so that the upper parts of the front row steel sheet piles (1) and the upper parts of the rear row steel sheet piles (2) are connected through the anchor cables (3), and a cantilever enclosure structure is formed as a whole.

2. The anchor-pull double-row steel sheet pile enclosure structure according to claim 1 is characterized in that: The front row of steel sheet piles (1) and the rear row of steel sheet piles (2) are hot-rolled U-shaped steel sheet piles.

3. The anchor-pull double-row steel sheet pile enclosure structure according to claim 1 is characterized in that: The distance between the front row of steel sheet piles (1) and the rear row of steel sheet piles (2) is greater than or equal to one times the excavation depth of the foundation pit.

4. The anchor-pull double-row steel sheet pile enclosure structure according to claim 1 is characterized in that: The anchor cable (3) is a prestressed steel strand or a steel bar.

5. The anchor-pull double-row steel sheet pile enclosure structure according to claim 1 is characterized in that: A plain concrete force transmission belt (8) is arranged between the front row of steel sheet piles (1) and the proposed structure (10).

6. The construction method of the anchor-pull double-row steel sheet pile enclosure structure according to claim 1 is characterized in that: The following steps are involved: (1) Using a pile driving machine to install the front row of steel sheet piles (1) and the rear row of steel sheet piles (2) in place; (2) Before the foundation pit bottom and the front row of steel sheet piles (1), a pit bottom reinforcement (9) of a certain depth and width is constructed; (3) erecting a front row steel sheet pile waist beam (4) and a rear row steel sheet pile waist beam (5) at corresponding positions of the front row steel sheet piles (1) and the rear row steel sheet piles (2); (4) erecting the anchor cable (3) and fixing the front row anchor head (6); (5) The anchor cable (3) is prestressed and fixed with the rear row anchor head (7); (6) Excavation of the foundation pit is carried out, and after the foundation pit is excavated to the bottom, the proposed structure (10) is constructed. During the construction of the proposed structure (10), a plain concrete force transfer belt (8) can be constructed to the edge of the front row of steel sheet piles.

7. The construction method of the anchor-pull double-row steel sheet pile enclosure structure according to claim 6 is characterized in that: The front row of steel sheet piles (1) and the rear row of steel sheet piles (2) are constructed by driving in small locks.

8. The construction method of the anchor-pull double-row steel sheet pile enclosure structure according to claim 6 is characterized in that: The anchor cable (3) should be prestressed when connected, and after the front steel sheet pile waist beam (4), the rear steel sheet pile waist beam (5), the front anchor head (6) and the rear anchor head (7) are fixed at both ends, the bare soil is backfilled.

9. The construction method of the anchor-pull double-row steel sheet pile enclosure structure according to claim 6 is characterized in that: After the construction of the front row steel sheet piles (1) and the rear row steel sheet piles (2) is completed, C20 early strength fine stone concrete is used to fill the gap between the steel sheet piles and the waist beam, and the filling height is the same as the front row steel sheet pile waist beam (4) and the rear row steel sheet pile waist beam (5).

10. The construction method of the anchor-pull double-row steel sheet pile enclosure structure according to claim 6, characterized in that: The anchor cable (3) passes through the front row of steel sheet piles (1) and the rear row of steel sheet piles (2), which can be achieved by drilling holes in the front row of steel sheet piles (1) and the rear row of steel sheet piles (2) or lowering the height of the steel sheet piles at the corresponding passing position.

11. The construction method of the anchor-pull double-row steel sheet pile enclosure structure according to claim 6, characterized in that: The rear row of steel sheet piles (2) are constructed in a continuous manner or in an interval manner such as two groups of steel sheet piles, three groups of steel sheet piles, or four groups of steel sheet piles.

12. The construction method of the anchor-pull double-row steel sheet pile enclosure structure according to claim 6, characterized in that: The pit bottom reinforcement (9) adopts cement soil mixing piles, high pressure rotary jet piles, or compaction grouting.