Fabricated steel-concrete composite structure and rapid construction method thereof
By setting up fitting grooves and insertion grooves at the docking of steel-mixed columns and steel-mixed beams, and fixing them with node connectors and screws, the complex connection problem of node connections in traditional steel-mixed composite structures is solved, and the bearing capacity of nodes is improved. Assembly efficiency.
Patent Information
- Application Number
- CN202411120557.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-08-15
AI Technical Summary
The node connection part of the traditional steel-concrete composite structure is complex, which leads to inconvenient splicing method, reduces work efficiency, and is difficult to ensure the strength and stability of the node connection part.
A node connection structure with mutual embeddedness is designed. A new construction groove and insertion groove are set at the docking of steel-concrete columns and steel-concrete beams, and a node connection and connecting plate are snapped and fixed with screws. Form of steel-concrete combination node.
It improves the connection integrity and bearing capacity of the node core area, achieves the speed and accuracy of assembly, and enhances the assembly effect.
Smart Images

Figure CN118933175A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of steel-concrete composite structures, and more particularly to an assembled steel-concrete composite structure and a quick construction method thereof. Background Art
[0002] A steel-concrete composite structure is a structure that combines steel structure and concrete structure, and has the advantages of both. An assembled steel-concrete composite structure is a steel-concrete composite structure produced in a factory. It is prefabricated in the factory and then assembled on site. This assembled steel-concrete composite structure has been widely used in major construction industries.
[0003] Since prefabricated structures adopt factory production methods, it provides technical and quality assurance for the processing of structural components with different material combinations. Based on this, according to the earthquake damage mechanism of different structures and components, high-strength steel, ordinary steel, high-strength concrete, and ordinary concrete are combined with each other to form a combined structural system, giving full play to the advantages of their respective materials and finding a balance in safety, economy, efficiency, environmental protection and other aspects. This is an important means to break through the current bottleneck in the development of prefabricated structures. When using prefabricated steel-concrete composite structures, steel-concrete columns and beams need to be spliced on site, but the node connection part of the traditional steel-concrete composite structure is relatively complex. On the one hand, the complex structure makes the splicing method inconvenient and reduces work efficiency, but using a simple splicing method, it is difficult to ensure the strength and stability of the node connection part, which has certain disadvantages. Summary of the Invention
[0004] The purpose of the present invention is to solve the existing practical problems. Compared with the existing technology, it provides an assembled steel-concrete composite structure and a quick construction method thereof. The steel structure and the concrete structure are reasonably assembled to form steel-concrete columns and steel-concrete beams respectively, so as to effectively ensure the stress and deformation capacity of the composite structure, and a mutually embedded node connection structure is set at the joint of the steel-concrete columns and the steel-concrete beams. During assembly, a pair of steel-concrete beams are first embedded and positioned in the fitting grooves of the steel-concrete columns for preliminary positioning, and then the node connectors are used to clamp them between the two adjacent steel-concrete columns above and below. The inner docking columns and connecting plates are respectively interference fit with the connection grooves and docking grooves formed by the steel-concrete columns and the steel-concrete beams. A new form of steel-concrete composite node is constructed between the three, which not only effectively improves the connection integrity of the node core area and increases the bearing capacity of the node, but also realizes fast and accurate assembly through the design of the card points, effectively improving the assembly effect.
[0005] The object of the present invention can be achieved through the following technical solutions: an assembled steel-concrete composite structure, comprising a steel-concrete column and a steel-concrete beam vertically connected to each other, the steel-concrete column comprising a steel base column and a concrete base column cast in the middle of the steel base column, the upper and lower ends of the steel base column are both reserved with an embedding groove located outside the concrete base column and used for the butt-jointing installation of the steel-concrete beam, the steel-concrete beam comprises a pair of steel base beams horizontally distributed front and back and a concrete base beam cast therebetween, both sides of the concrete base beam are provided with abutment portions integrally formed with the pair of steel base beams, a gap consistent with the thickness of the steel base column is reserved between the concrete base beam and the abutment portion, and the left and right ends of the steel base column are both provided with an insertion groove connected to the embedding groove and used for the embedding installation of the pair of steel base beams;
[0006] The upper and lower pairs of steel-concrete columns are connected to the steel-concrete beams via node connectors. The node connectors include external docking columns, on which are embedded and mounted connecting plates extending up and down and connected to a pair of steel base beams. The steel base columns are fixedly connected to the connecting plates and the steel base beams via screws.
[0007] Furthermore, a pair of the steel base beams are provided with rivet grooves of matching rivets at the left and right ends respectively, the rivet grooves are connected vertically, the rivet portions are consistent in width with the rivet grooves, and elastic gaskets that are narrow at the top and wide at the bottom are embedded and installed on the left and right relative inner walls of the rivet grooves.
[0008] Furthermore, the height of the engaging groove is consistent with the height of the steel base beam, and the width thereof is greater than the overall width of the steel-concrete beam.
[0009] Furthermore, after the pair of steel-concrete beams are butt-jointed in the fitting groove, a connecting groove for fitting and butting with the connecting plate is formed between the butt-jointed steel-concrete columns and the inner wall of the fitting groove.
[0010] Furthermore, a docking groove is formed between the two abutting parts of the steel-concrete column, and an inner docking column extending up and down and docking with the docking groove is embedded in the middle position of the outer docking column. The inner docking column and the end of the connecting plate are arranged flush, and the bottom end of the connecting plate is in contact with the upper end wall of the concrete base column.
[0011] Furthermore, the left and right ends of the steel-concrete column are each provided with a screw hole 1 that passes through the front and back, and the corresponding positions of the steel base beam, the abutment part and the connecting plate are respectively provided with a screw hole 2 and a screw hole 3 that are connected inside and outside, and the screws are connected between the screw hole 1, the screw hole 2 and the screw hole 3 on the same axis.
[0012] Furthermore, the ends of the outermost node connectors in the vertical direction are butt-jointed with column end connectors that are also embedded and installed with steel-concrete beams, and the side ends of the outermost node connectors in the left-right direction are butt-jointed with beam end connectors.
[0013] Furthermore, the column end connector is consistent with the steel-concrete column end structure, and the beam end connector includes a connecting block adapted to a pair of insertion groove structures. The connecting blocks are fixedly connected with abutment blocks embedded in the embedding grooves. The abutment blocks and the abutment parts adjacent to one side of them also form a docking groove, and a pair of symmetrical connecting blocks are respectively provided with riveted blocks and riveted interfaces. The connecting blocks are consistent with the steel base beam structure, and the riveted blocks and riveted interfaces are consistent with the riveted parts and riveted groove structures.
[0014] Furthermore, an edge sealing plate is embedded and installed between a pair of upper and lower adjacent connecting blocks in the left and right directions, and an embedding groove for embedding and installing the end portions of the connecting blocks is opened on the edge sealing plate.
[0015] The present invention also provides a quick construction method for an assembled steel-concrete composite structure, comprising the following steps:
[0016] Step 1: Prefabricate steel-concrete columns, steel-concrete beams, node connectors, column end connectors, edge banding, and beam end connectors in the factory;
[0017] Step 2: Transport all prefabricated components that have passed inspection to the construction site;
[0018] Step 3: Splicing between steel-concrete columns and steel-concrete beams. Insert a pair of steel-concrete beams into the fitting grooves of the steel-concrete columns from the outside to the inside. Insert the steel base beams into the fitting grooves. The abutting parts abut against the inner end walls of the steel base columns. The riveted parts and riveting grooves at the ends of the pair of steel base beams are interference fit with each other to complete the clamping between the pair of steel-concrete beams and the ends of the steel-concrete columns.
[0019] Step 4: Lock the multiple groups of spliced steel-concrete columns and steel-concrete beams with node connectors. Insert the node connectors into the ends of the steel-concrete columns with a pair of steel-concrete beams pre-installed. Insert the inner docking columns and the connecting plates into the docking grooves and the connecting grooves formed by the steel-concrete columns and the steel-concrete beams. Then, screws are sequentially passed through the first screw hole, the third screw hole, and the second screw hole to lock them. This completes the fixed connection between the upper and lower pairs of steel-concrete columns. The adjacent pairs of steel-concrete beams are distributed in the upper and lower directions of the connection between the upper and lower pairs of steel-concrete columns.
[0020] Step 5: After the assembly of multiple groups of steel-concrete columns and steel-concrete beams is completed, the steel-concrete columns and steel-concrete beams at the edges are installed in the same way using the combined structure of node connectors, column end connectors, and beam end connectors. Finally, the exposed adjacent pairs of beam end connectors are nested and edge-sealed using edge-sealing plates to complete the overall assembly of the steel-concrete composite structure.
[0021] Compared with the prior art, the advantages of the present invention are:
[0022] (1) This scheme is to rationally assemble the steel structure and the concrete structure to form steel-concrete columns and steel-concrete beams respectively, effectively ensuring the stress and deformation capacity of the composite structure, and setting mutually embedded node connection structures at the joints of the steel-concrete columns and the steel-concrete beams. During assembly, first, a pair of steel-concrete beams are embedded and positioned in the interlocking grooves of the steel-concrete columns for preliminary positioning. Between the two upper and lower adjacent steel-concrete columns connected by the outer docking columns with inner docking columns and connecting plates, the inner docking columns and connecting plates are respectively interference fit with the connection grooves and docking grooves formed by the steel-concrete columns and the steel-concrete beams. A new form of steel-concrete composite node is constructed between the three, which not only effectively improves the connection integrity of the core area of the node and increases the bearing capacity of the node, but also through the design of the card points, during assembly, it is only necessary to align the card points for card connection, so that assembly is fast and accurate, and the assembly effect is effectively improved.
[0023] (2) This plan also adds column end connectors and beam end connectors that are consistent with the end structure of steel-concrete columns and steel-concrete beams, which are used to assemble the nodes of the steel-concrete columns and steel-concrete beams at the edges in the same way as the node connectors, so as to achieve overall edge sealing after the assembly of the steel-concrete columns and steel-concrete beams is completed. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 This is a schematic diagram of the overall structure of the present invention after assembly;
[0025] Figure 2 This is a structural diagram of the steel-concrete housing of the present invention;
[0026] Figure 3 It is a structural schematic diagram of the steel-concrete beam of the present invention;
[0027] Figure 4 This is a schematic structural diagram of the present invention when a pair of steel-concrete beams are assembled onto steel-concrete columns in sequence;
[0028] Figure 5 This is a cross-sectional view of the present invention when one of the steel-concrete beams is assembled from top to bottom onto the other steel-concrete beam;
[0029] Figure 6 This is a partial enlarged view of a pair of steel-concrete beams after being assembled on the steel-concrete columns of the present invention;
[0030] Figure 7 It is a structural schematic diagram of a node connector of the present invention;
[0031] Figure 8 This is a structural schematic diagram of the present invention when the node connector is assembled onto the assembled steel-concrete column and steel-concrete beam;
[0032] Figure 9 This is a partial enlarged view of the present invention when the upper and lower sets of steel-concrete columns assembled with steel-concrete beams are assembled using node connectors;
[0033] Figure 10 This is a structural diagram of the present invention in which a node connector, a column end connector, a beam end connector, and a butt plate are used to assemble and connect the steel-concrete column and the steel-concrete beam at the edge;
[0034] Figure 11 This is a partial enlarged view of the present invention when assembling the beam end connector and the steel-concrete beam end into the column end connector;
[0035] Figure 12 It is a partial schematic diagram of the present invention for assembling and connecting the steel-concrete column and the steel-concrete beam at the edge by using the node connector, the column end connector, the beam end connector, and the butt plate;
[0036] Figure 13 This is a schematic diagram of the structure of the present invention after the steel-concrete columns and steel-concrete beams at the edges are assembled using node connectors, column end connectors, beam end connectors, and butt plates.
[0037] Description of the numbers in the figure:
[0038] 1. Steel-concrete column; 11. Steel base column; 12. Concrete base column; 13. Fitting groove; 14. Insertion groove; 15. Screw hole one; 2. Steel-concrete beam; 21. Steel base beam; 22. Concrete base beam; 23. Abutment part; 24. Riveted part; 25. Riveted groove; 251. Elastic gasket; 26. Screw hole two; 3. Node connector; 31. External docking column; 32. Internal docking column; 33. Connecting plate; 34. Screw hole three; 4. Column end connector; 5. Edge banding plate; 6. Screw; 7. Connecting groove; 8. Docking groove; 9. Beam end connector; 91. Connecting block; 92. Abutment block; 93. Riveted block; 94. Riveted interface. DETAILED DESCRIPTION
[0039] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making creative work shall fall within the scope of protection of the present invention.
[0040] Example 1: The present invention discloses an assembled steel-concrete composite structure, see Figures 1-4 , including a steel-concrete column 1 and a steel-concrete beam 2 connected vertically to each other, the steel-concrete column 1 includes a steel base column 11 and a concrete base column 12 cast in the middle of the steel base column 11, and the upper and lower ends of the steel base column 11 are reserved with an engaging groove 13 located outside the concrete base column 12 and used for docking and installing the steel-concrete beam 2;
[0041] The steel-concrete beam 2 includes a pair of steel base beams 21 horizontally distributed front and back and a concrete base beam 22 cast between the two. Both sides of the concrete base beam 22 are provided with abutment parts 23 integrally formed with the pair of steel base beams 21. A gap consistent with the thickness of the steel base column 11 is reserved between the concrete base beam 22 and the abutment part 23. The left and right ends of the steel base column 11 are provided with insertion grooves 14 connected to the embedding grooves 13 and used for embedding and installing a pair of steel base beams 21. The height of the embedding grooves 13 is consistent with the height of the steel base beam 21, and its width is greater than the overall width of the steel-concrete beam 2.
[0042] See also Figure 3-Figure 6 The left and right ends of a pair of steel base beams 21 are respectively provided with a rivet portion 24 and a rivet groove 25 that match each other. The rivet groove 25 is through-through, and the rivet portion 24 and the rivet groove 25 have the same width. Elastic gaskets 251 that are narrow at the top and wide at the bottom are embedded and installed on the left and right opposite inner walls of the rivet groove 25.
[0043] When carrying out the butt joint installation of the steel-concrete column 1 and the steel-concrete beam 2, first one of the steel-concrete beams 2 is embedded in the embedding groove 13 at the end of the steel-concrete column 1, and the steel base beam 21 is embedded in the insertion groove 14 on one side of the steel-concrete column 1. At this time, the bottom end of the abutting portion 23 abuts on the concrete base column 12, and the side end abuts on the inner wall of the embedding groove 13. The end of the concrete base beam 22 abuts against the outer end wall of the steel base column 11, completing the preliminary butt joint of one steel-concrete beam 2 and the steel-concrete column 1, and then the other steel-concrete beam 2 is installed from the outside toward the embedding groove 13, and the steel base beam 21 is embedded in the insertion groove 14 on the other side of the steel-concrete column 1, and a pair of rivet parts 24 are embedded in the rivet groove 25 one by one, and the rivet parts 24 and the rivet groove 25 are riveted from the outside to the inside, so that the ends of the two steel-concrete beams 2 are embedded and connected in the embedding groove 13 of the steel-concrete column 1, realizing the preliminary butt joint installation between the steel-concrete column 1 and the pair of steel-concrete beams 2.
[0044] See also Figure 6 After a pair of steel-concrete beams 2 are butted in the fitting groove 13, a connecting groove 7 is formed between the butted steel-concrete columns 1 and the inner wall of the fitting groove 13 to be fitted with the connecting plate 33, and a butt joint groove 8 is formed between the two abutting portions 23 of the butt joint steel-concrete columns 1.
[0045] See also Figure 7-Figure 8 The upper and lower pairs of steel-concrete columns 1 are connected to the steel-concrete beams 2 through node connectors 3. The node connectors 3 include outer docking columns 31 that are consistent with the outer dimensions of the steel base columns 11. The outer docking columns 31 are embedded with connection plates 33 that extend up and down and are connected to the pair of steel base beams 21.
[0046] See also Figure 9, an inner docking column 32 extending up and down and embedded in the docking groove 8 is embedded in the middle position of the outer docking column 31, and the inner docking column 32 and the end of the connecting plate 33 are flush, and the bottom end of the connecting plate 33 is in contact with the upper end wall of the concrete base column 12. When the node connector 3 is inserted into the end of the steel-concrete column 1 with a pair of steel-concrete beams 2 pre-installed, the inner docking column 32 and the connecting plate 33 are embedded in the docking groove 8 and the connecting groove 7 one by one, effectively limiting the node of the pair of steel-concrete beams 2. The steel-concrete column 1, the steel-concrete beam 2, and the node connector 3 are mechanically connected by screws 6 to complete the positioning. The node connector 3 is then used to connect the steel-concrete column 1 with the steel-concrete beam 2 on the upper and lower sides. The adjacent pair of steel-concrete beams 2 are distributed in the upper and lower directions of the connection part to enhance the connection strength between the column and the beam.
[0047] A screw hole 15 is provided at both ends of the steel-concrete column 1, which runs through the front and back. A screw hole 26 and a screw hole 34 that are connected inside and outside are provided at corresponding positions of the steel base beam 21, the abutment portion 23 and the connecting plate 33. The screws 6 are connected between the screw holes 15, 26 and 34 on the same axis. After the node connector 3, the steel-concrete column 1 and the steel-concrete beam 2 are nested with each other, the same group of screw holes 15, 26 and 34 are on the same axis and are connected to each other. The steel base column 11 is fixedly connected to the connecting plate 33 and the steel base beam 21 by screws 6.
[0048] Example 2: Please refer to Figure 10 The end of the outermost node connector 3 in the vertical direction is butted against the column end connector 4 which is also embedded with the steel-concrete beam 2, and the side end of the outermost node connector 3 in the left-right direction is butted against the beam end connector 9;
[0049] See also Figure 11 , the column end connector 4 is consistent with the end structure of the steel-concrete column 1, the beam end connector 9 includes a connecting block 91 adapted to a pair of insertion grooves 14 structures, and the connecting blocks 91 are fixedly connected with an abutting block 92 embedded in the fitting groove 13, and the abutting block 92 and the abutting portion 23 adjacent to one side thereof also form a docking groove 8, and a pair of left and right symmetrical connecting blocks 91 are respectively provided with a rivet block 93 and a rivet port 94, the connecting block 91 is consistent with the structure of the steel base beam 21, the rivet block 93 and the rivet port 94 are consistent with the structure of the rivet portion 24 and the rivet groove 25, and an edge banding plate 5 is embedded and installed between the upper and lower adjacent pairs of connecting blocks 91 in the left and right directions, and an embedding groove for embedding and installing the end of the connecting block 91 is opened on the edge banding plate 5;
[0050] See also Figures 9-13After the assembly of multiple groups of steel-concrete columns 1 and steel-concrete beams 2 is completed, the node connectors 3, column end connectors 4, and beam end connectors 9 are used to match the structure to install the steel-concrete columns 1 and steel-concrete beams 2 at the edges in the same way. Finally, the edge sealing plates 5 are used to nest and edge seal the exposed adjacent pair of beam end connectors 9 to complete the overall assembly of the steel-concrete composite structure, realizing the overall edge sealing treatment after the assembly of the steel-concrete columns 1 and steel-concrete beams 2 is completed.
[0051] Example 3: The present invention also proposes a quick construction method for an assembled steel-concrete composite structure, comprising the following steps:
[0052] Step 1: Prefabricate the steel-concrete column 1, the steel-concrete beam 2, the node connector 3, the column end connector 4, the edge plate 5, and the beam end connector 9 in the factory;
[0053] Step 2: Transport all prefabricated components that have passed inspection to the construction site;
[0054] Step 3: Splicing between the steel-concrete column 1 and the steel-concrete beam 2. A pair of steel-concrete beams 2 are successively embedded in the fitting groove 13 of the steel-concrete column 1 from the outside to the inside. The steel base beam 21 is inserted into the insertion groove 14. The abutment portion 23 abuts against the inner end wall of the steel base column 11. The riveted portions 24 and riveted grooves 25 at the ends of the pair of steel base beams 21 are interference fit with each other to complete the clamping between the pair of steel-concrete beams 2 and the ends of the steel-concrete column 1.
[0055] Step 4: The assembled structure of multiple groups of steel-concrete columns 1 and steel-concrete beams 2 is locked using node connectors 3. The node connectors 3 are inserted into the ends of the steel-concrete columns 1 on which a pair of steel-concrete beams 2 are pre-installed. The inner docking columns 32 and the connecting plates 33 are embedded in the docking grooves 8 and the connecting grooves 7 formed by the steel-concrete columns 1 and the steel-concrete beams 2, respectively. Screws 6 are then passed through the first screw hole 15, the third screw hole 34, and the second screw hole 26 in sequence to lock the structure. This completes the fixed connection between the upper and lower pairs of steel-concrete columns 1. The adjacent pairs of steel-concrete beams 2 are distributed in the upper and lower directions of the connection between the upper and lower pairs of steel-concrete columns 1.
[0056] Step 5: After the assembly of multiple groups of steel-concrete columns 1 and steel-concrete beams 2 is completed, the steel-concrete columns 1 and steel-concrete beams 2 at the edges are installed in the same way using the combined structure of node connectors 3, column end connectors 4, and beam end connectors 9. Finally, the exposed adjacent pair of beam end connectors 9 are nested and edge-sealed using edge-sealing plates 5 to complete the overall assembly of the steel-concrete composite structure.
[0057] Among them, in step 1, the prefabrication process of the steel-concrete column 1 mainly includes: using channel steel as the main body to make a hollow steel base column 11, placing a concrete formwork inside the steel base column 11, injecting concrete into the gap between the steel base column 11 and the concrete formwork, waiting for the concrete to completely solidify, forming a concrete base column 12 inside the steel base column 11, and reserving an interlocking groove 13 located outside the concrete base column 12 and used for docking and installing the steel-concrete beam 2 at both ends of the steel base column 11. The prefabrication of the steel-concrete base column is completed, and an insertion groove 14 for embedding the steel-concrete beam 2 is opened on the left and right sides of the interlocking groove 13, and a screw hole 15 for the screw 6 to pass through is opened on both sides of the end of the steel base column 11 in the direction perpendicular to the insertion groove 14.
[0058] The prefabrication process of the steel-concrete beam 2 mainly includes: using channel steel as the main body to make two steel base beams 21 connected to each other by a pair of abutment parts 23, placing a concrete formwork outside the pair of steel base beams 21, forming a casting trough between the concrete formwork and the pair of steel base beams 21, pouring concrete into the casting trough, waiting for the concrete to completely solidify, forming a concrete base beam 22 between the pair of steel base beams 21, and reserving a gap of the same size as the width of the steel base column 11 between the abutment part 23 and the concrete base beam 22. The left and right ends of the steel base beam 21 are respectively provided with matching rivet parts 24 and rivet grooves 25, and screw holes 26 corresponding to the positions of screw holes 15 are opened on the end walls of the steel base beam 21 and the abutment part 23.
[0059] The prefabrication process of the node connector 3 mainly includes: using channel steel as the main body to make an outer docking column 31 with an inner docking column 32 and a connecting plate 33. The upper and lower end walls of the connecting plate 33 are both provided with screw holes 34 corresponding to the positions of screw holes 15;
[0060] The prefabrication process of the column end connector 4, the edge banding plate 5, and the beam end connector 9 mainly includes: the column end connector 4 and the beam end connector 9 are consistent with the end structure of the steel-concrete column 1 and the steel-concrete beam 2 respectively; the edge banding plate 5 is a rectangular plate made of channel steel, and an embedding groove for the beam end connector 9 is provided on the rectangular plate.
[0061] The above are only preferred specific implementation methods of the present invention; however, the protection scope of the present invention is not limited thereto; any technician familiar with the technical field within the technical scope disclosed by the present invention; any equivalent replacement or change based on the technical solution and improved conception of the present invention shall be covered within the protection scope of the present invention.
Claims
1. An assembled steel-concrete composite structure, comprising a steel-concrete column (1) and a steel-concrete beam (2) vertically connected to each other, characterized in that: The steel-concrete column (1) comprises a steel base column (11) and a concrete base column (12) cast in the middle of the steel base column (11); the upper and lower ends of the steel base column (11) are reserved with an inserting groove (13) located outside the concrete base column (12) and used for the butt installation of the steel-concrete beam (2); the steel-concrete beam (2) comprises a pair of steel base beams (21) horizontally distributed front and rear and a concrete base beam (22) cast between the two; both sides of the concrete base beam (22) are provided with abutment portions (23) integrally formed with the pair of steel base beams (21); a gap having the same thickness as the steel base column (11) is reserved between the concrete base beam (22) and the abutment portion (23); and the left and right ends of the steel base column (11) are provided with an insertion groove (14) connected with the inserting groove (13) and used for the insert installation of the pair of steel base beams (21); The upper and lower pairs of steel-concrete columns (1) are connected to the steel-concrete beam (2) via a node connection piece (3). The node connection piece (3) comprises an outer connection column (31). A connection plate (33) extending up and down and connected to the pair of steel base beams (21) is embedded and installed on the outer connection column (31). The steel base column (11) is fixedly connected to the connection plate (33) and the steel base beam (21) via screws (6).
2. The assembled steel-concrete composite structure according to claim 1, characterized in that: The left and right ends of the pair of steel base beams (21) are respectively provided with a rivet portion (24) and a rivet groove (25) that match each other, the rivet groove (25) is connected vertically, the rivet portion (24) and the rivet groove (25) are of the same width, and elastic gaskets (251) that are narrow at the top and wide at the bottom are embedded and installed on the left and right opposite inner walls of the rivet groove (25).
3. The assembled steel-concrete composite structure according to claim 1, characterized in that: The height of the engaging groove (13) is consistent with the height of the steel base beam (21), and its width is greater than the overall width of the steel-concrete beam (2).
4. The assembled steel-concrete composite structure according to claim 1, characterized in that: After the pair of steel-concrete beams (2) are butt-jointed in the engaging groove (13), a connecting groove (7) that is butt-jointed with the connecting plate (33) is formed between the butt-jointed steel-concrete columns (1) and the inner wall of the engaging groove (13).
5. The assembled steel-concrete composite structure according to claim 4 is characterized in that: A butt joint groove (8) is formed between two abutting portions (23) of the steel-concrete column (1), and an inner butt joint column (32) extending up and down and being butt jointed with the butt joint groove (8) is embedded and installed in the middle of the outer butt joint column (31). The inner butt joint column (32) and the end of the connecting plate (33) are arranged flush with each other, and the bottom end of the connecting plate (33) is in contact with the upper end wall of the concrete foundation column (12).
6. The assembled steel-concrete composite structure according to claim 1, characterized in that: The left and right ends of the steel-concrete column (1) are each provided with a screw hole (15) that penetrates forward and backward, and the corresponding positions of the steel base beam (21), the abutment portion (23) and the connecting plate (33) are respectively provided with a screw hole (26) and a screw hole (34) that are connected inside and outside, and the screw (6) is connected between the screw hole (15), the screw hole (26) and the screw hole (34) on the same axis.
7. The assembled steel-concrete composite structure according to claim 1, characterized in that: The ends of the node connectors (3) located in the outermost layer in the vertical direction are butt-jointed with column end connectors (4) which are also embedded and installed with the steel-concrete beam (2), and the side ends of the node connectors (3) located in the outermost layer in the horizontal direction are butt-jointed with beam end connectors (9).
8. The assembled steel-concrete composite structure according to claim 7, characterized in that: The column end connector (4) is consistent with the structure of the end of the steel-concrete column (1), and the beam end connector (9) includes a connecting block (91) adapted to a pair of insertion grooves (14) structure, and abutment blocks (92) embedded in the insertion grooves (13) are fixedly connected between the connecting blocks (91), and a butt joint (8) is also formed between the butt joint block (92) and the butt joint (23) adjacent to one side thereof, and a pair of left-right symmetrical connecting blocks (91) are respectively provided with a rivet block (93) and a rivet joint (94), and the connecting block (91) is consistent with the structure of the steel base beam (21), and the rivet block (93) and the rivet joint (94) are consistent with the structure of the rivet portion (24) and the rivet groove (25).
9. The assembled steel-concrete composite structure according to claim 8, characterized in that: An edge sealing plate (5) is embedded and installed between a pair of upper and lower adjacent connection blocks (91) in the left-right direction, and an embedding groove for embedding and installing the end of the connection block (91) is provided on the edge sealing plate (5).
10. A quick construction method for an assembled steel-concrete composite structure, using an assembled steel-concrete composite structure as claimed in any one of claims 1 to 9, characterized in that: The following steps are involved: Step 1: Prefabricate the steel-concrete column (1), the steel-concrete beam (2), the node connector (3), the column end connector (4), the edge sealing plate (5), and the beam end connector (9) in the factory; Step 2: Transport all prefabricated assemblies that have passed the inspection to the construction site; Step 3: Splicing the steel-concrete column (1) and the steel-concrete beam (2), embedding the pair of steel-concrete beams (2) in the embedding grooves (13) of the steel-concrete column (1) from the outside to the inside, inserting the steel base beam (21) into the insertion groove (14), the abutting portion (23) abutting against the inner end wall of the steel base column (11), and the riveting portions (24) and the riveting grooves (25) at the ends of the pair of steel base beams (21) are interference-fitted with each other, thereby completing the clamping connection between the pair of steel-concrete beams (2) and the ends of the steel-concrete column (1). Step 4: The assembled structure of multiple groups of steel-concrete columns (1) and steel-concrete beams (2) are locked by using node connectors (3). The node connectors (3) are inserted into the ends of the steel-concrete columns (1) pre-installed with a pair of steel-concrete beams (2). The inner docking columns (32) and the connecting plates (33) are embedded in the docking grooves (8) and the connecting grooves (7) formed by the steel-concrete columns (1) and the steel-concrete beams (2). The screws (6) are then passed through the screw holes 1 (15), 3 (34) and 2 (26) in sequence to lock the assembled structure. The fixed connection between the upper and lower pairs of steel-concrete columns (1) is completed. The adjacent pairs of steel-concrete beams (2) are distributed in the upper and lower directions of the connection parts of the upper and lower pairs of steel-concrete columns (1). Step 5: After the assembly of multiple groups of steel-concrete columns (1) and steel-concrete beams (2) is completed, the steel-concrete columns (1) and steel-concrete beams (2) at the edges are installed in the same manner using the node connectors (3), column end connectors (4), and beam end connectors (9) combined structure. Finally, the adjacent pair of beam end connectors (9) exposed to the outside are nested and edge-sealed using edge-sealing plates (5), thereby completing the overall assembly of the steel-concrete composite structure.
Citation Information
Patent Citations
Assembled bamboo / wood beam / column, connection member and disassembling method thereof, and bamboo / wood structure node
CN109930746A
Steel structure integrated green building
CN113585462A
Novel assembled integral reinforced concrete frame structure
CN114086663A
Post roof beam connection structure for building
CN205369541U
Two-way hoop head type steel structure mortise and tenon connection structure
CN213174156U