Truss supporting type prefabricated laminated hollow floor system

By using the design of truss-supported precast composite hollow floor slabs, combining precast beams and truss mesh to form a truss load-bearing structure, the need for under-support during floor slab construction is solved, the rigidity and load-bearing capacity of the floor slab are improved, the construction period is shortened, and efficient construction without under-support is achieved.

CN118933247AActive Publication Date: 2024-11-12CCCC FHDI ENG
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411158852.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-12
Estimated Expiration
2044-08-22

AI Technical Summary

Technical Problem

In existing construction techniques, floor slab construction requires a large number of lower supports, especially for the top floor slab, which affects the construction flow and speed. Furthermore, the transportation and installation of precast base slabs with large column grids are difficult, resulting in poor applicability.

Method used

The precast composite hollow floor slab supported by trusses is adopted. Through the combination of precast beams, precast composite floor slabs and truss mesh, a truss force system is formed, realizing construction without lower support. The load-bearing structure is formed by the detachable connection of the truss web members and the upper chord members combined with the cast-in-place concrete layer.

Benefits of technology

It enables floor slab construction without lower support, improves the rigidity and load-bearing capacity of the floor slab, reduces construction materials, shortens the construction period, and allows the top layer process to be carried out before the concrete reaches the required strength for demolding, thus improving construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933247A_ABST
    Figure CN118933247A_ABST
Patent Text Reader

Abstract

The invention discloses a truss supporting type prefabricated laminated hollow floor which comprises a plurality of parallel prefabricated beam bodies fixed to a plurality of structural columns and a plurality of side-by-side prefabricated laminated floor slabs, the two ends of the bottom faces of the prefabricated laminated floor slabs are placed on the prefabricated beam bodies, and at least two truss meshes are fixed to the prefabricated laminated floor slabs. Each truss net piece comprises a truss upper chord member, a plurality of web member connecting supports and a plurality of truss web members, all the truss net pieces and the prefabricated laminated floor cover plate jointly form a truss stress structure, and the box type core formworks are fixed to the upper surface of the prefabricated laminated floor cover plate in a matrix mode; and the concrete cast-in-place layer comprises concrete hidden beams formed by pouring in the intervals of the box type core formworks, and the top face of the concrete cast-in-place layer is higher than the top face of the prefabricated beam body and lower than the connecting positions of the web member connecting supports and the truss web members. And the construction of a net beam hollow floor system without a lower support can be realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of prefabricated building construction, and more specifically, to a truss-supported prefabricated composite hollow floor. Background Art

[0002] The floor slab is a specialized floor structure at the top of a building. During the use of the building, it needs to bear various loads such as the mechanical and electrical equipment foundation, equipment room, waterproof structure, personnel, construction machinery, etc. on the floor. The force requirement is much greater than that of the general floor slab structure. In the current construction process, the construction process of casting the floor slab as a whole after building the support frame is often adopted. In addition to the need to support the support frame on site, this process cannot directly use the support form of the standard layer because the thickness and size of the floor slab are larger than the slab of the standard layer, and an additional support frame is required.

[0003] At present, in order to reduce the deadweight of the floor and reduce the support system while ensuring the bearing capacity and rigidity of the floor, the hollow floor with grid beams is gradually applied to various projects. This type of floor forms a grid-like beam group under the relatively thin surface plate of the floor by setting box-type core molds at intervals when supporting the plate formwork. While the bearing capacity of the floor is basically the same as that of the integral cast-in-place floor of the same thickness, the deadweight of the floor is greatly reduced, thereby reducing the amount of engineering work for supporting the support frame before pouring the floor. However, this type of process still requires support from below, and because the floor is the topmost slab structure of the building, it is often required to remove the support when the concrete strength of the floor reaches 100%, which also affects the construction flow.

[0004] The invention patent with application publication number CN106088434A provides an assembled steel structure composite hollow floor and its construction method, including steel beams, prefabricated bottom plates, rib beams, filling bodies and cast-in-place concrete layers. The steel beams between the columns can support the prefabricated panels during construction, and no formwork is required on site, so the construction speed is fast. However, this type of hollow floor column grid bottom plates need to be prefabricated and hoisted as a whole, which is only suitable for small column grids. It is difficult to transport and install prefabricated bottom plates for large column grids. In addition, since the prefabricated bottom plates can be regarded as conventional composite board bodies, a large amount of lower support is still required for pouring, and the applicability is poor.

[0005] Therefore, it is necessary to propose a new type of floor form and supporting construction method, which can not only fundamentally reduce the lower supporting structure but also facilitate on-site assembly and construction. Summary of the invention

[0006] One object of the present invention is to provide a truss-supported prefabricated composite hollow floor. The present invention combines the advantages of a lattice-beam hollow floor construction method, a prefabricated composite plate construction method, and truss force, thereby realizing the construction of a lattice-beam hollow floor without lower support.

[0007] In order to achieve these purposes and other advantages according to the present invention, according to one aspect of the present invention, the present invention provides a truss-supported prefabricated composite hollow floor, comprising:

[0008] A plurality of prefabricated beams parallel to each other, which are fixed on a plurality of completed structural columns; a plurality of prefabricated composite floor panels spliced ​​side by side, wherein the long sides of the prefabricated composite floor panels are spliced ​​with the long sides of other prefabricated composite floor panels, and the two short sides of the bottom surface are placed on two parallel prefabricated beams, and at least two mutually parallel truss meshes are fixed on the upper surface of the prefabricated composite floor panels, and the truss meshes include a truss upper chord higher than the upper surface of the prefabricated composite floor panels and parallel to the long sides of the prefabricated composite floor panels, a plurality of web connecting supports and a plurality of truss webs, and the plurality of web connecting supports are fixed on the prefabricated composite floor panels in a row at intervals, and each web One or more truss webs are detachably fixedly connected between the rod connecting support and the truss upper chord, and a number of truss connecting rods are connected between any two adjacent truss meshes, wherein all the truss meshes and the prefabricated composite floor slabs together form a truss force-bearing structure, and a number of box-type core formworks are fixed in a matrix manner on the upper surface of the prefabricated composite floor slab; a cast-in-place concrete layer is formed above the prefabricated composite floor slab, and the cast-in-place concrete layer includes a concrete hidden beam cast in the interval of the box-type core formwork, and the top surface height of the cast-in-place concrete layer is higher than the top surface of the prefabricated beam body and is not higher than the connection between the web connecting support and the truss web.

[0009] Preferably, the precast beam body is a steel beam body structure, and flange plates extend from the bottom surface of the beam body of the precast beam body to both sides, and the flange plates of any two adjacent precast beam bodies support a number of precast composite floor slabs spliced ​​side by side.

[0010] Preferably, the web connecting support includes a support fixing plate and two first sleeves, the support fixing plate is fixed to the upper surface of the prefabricated composite floor slab, the two first sleeves are symmetrically welded to the support fixing plate, the truss upper chord includes a plurality of groups of second sleeves obliquely downward, the second sleeves are coaxially opposite to the first sleeves one by one, both ends of the truss web are provided with external threads, the second sleeve and the first sleeve are provided with internal threads matching the truss web, the two ends of the truss web are matched and screwed into the corresponding second sleeve and the first sleeve, wherein, when the truss web is screwed to the top in the direction of the corresponding first sleeve or the second sleeve, one end of the truss web is in a disengaged state.

[0011] Preferably, the truss upper chord includes a chord main tube and a chord connecting tube which are alternately threadedly connected, matching threads are provided at both ends of the chord main tube and the chord connecting tube, and two second sleeves are connected obliquely downward to the middle of the tube body of the chord main tube, wherein each chord main tube is located directly above the midpoint of two adjacent web connecting supports in the same row, and the two second sleeves on the chord main tube are both screwed together with the relative first sleeves to have the truss web.

[0012] Preferably, two connecting rod sleeves are fixed on both horizontal sides of the middle part of the chord main tube, the connecting rod sleeves are provided with internal threads, and both ends of the truss connecting rod are provided with external threads, and a truss connecting rod is threadedly connected between any two opposite connecting rod sleeves of the same prefabricated composite floor slab.

[0013] Preferably, the truss upper chord, truss web and truss connecting rod are all steel tubular structures.

[0014] Preferably, the construction method of the truss-supported prefabricated composite hollow floor comprises the following steps:

[0015] S1. Design the dimensions of prefabricated composite floor slabs and prefabricated beams according to the beam and column arrangement of the building, the on-site hoisting capacity, and the force calculation results. After all components are processed in the prefabricated component processing plant, they will be uniformly delivered to the construction site;

[0016] S2. At the construction site, according to the design requirements, the chord main tube and the chord connecting tube are screwed in sequence to form a single integral truss upper chord and temporarily supported. After the corresponding number of web connecting supports are stacked in place, the corresponding number of truss webs are connected between the web connecting supports and the truss upper chord to form a truss mesh;

[0017] S3, screwing the truss tie rods between several truss meshes belonging to the same prefabricated composite floor slab, and then fixing the bottom surface of the support fixing plate to the prefabricated composite floor slab;

[0018] S4, hoisting all prefabricated beams onto the fixed structural columns, and hoisting the prefabricated composite floor slabs in sequence and placing them on the flange plates of two adjacent prefabricated beams until all prefabricated composite floor slabs are hoisted;

[0019] S5, on the surface of the prefabricated composite floor slab between any two truss meshes, a number of parallel fixed rows of box core formwork spaced apart;

[0020] S6. Fix the hidden beam steel cage in the space between any two rows of box core templates, then support the plate surface steel bars and carry out water and electricity pipe routing;

[0021] S7, blocking the joints between any two adjacent prefabricated composite floor slabs, blocking the gap between the box core formwork and the upper surface of the prefabricated composite floor slab, and pouring the cast-in-place concrete layer;

[0022] S8. Maintain the cast-in-place concrete layer until it reaches the design strength requirement, then remove all the truss upper chords and truss webs, fill the first sleeve with grouting material for sealing, and complete the floor construction.

[0023] Preferably, in step S5, steel adhesive is applied to the bottom surface of the support fixing plate so that it is fixed to the upper surface of the prefabricated composite floor slab.

[0024] Preferably, in step S7, the distance between any two box core templates is the same.

[0025] The present invention has at least the following beneficial effects:

[0026] First, the prefabricated composite floor slab used in the present invention cooperates with several truss meshes above, and can be regarded as a truss load-bearing structure in actual stress. The weight of the cast-in-place concrete layer is distributed to the truss meshes connected to the prefabricated composite floor slab and transmitted to the prefabricated beam body that has been fixed. The rigidity of the prefabricated composite floor slab is greatly improved compared with the conventional composite slab, and the box core formwork can be effectively placed and concrete can be poured. The present invention combines the advantages of the hollow mesh beam floor slab construction method, the prefabricated composite slab construction method, and the truss load, so as to realize the construction of the hollow mesh beam floor slab without lower support.

[0027] Second, the web member connecting support of the present invention is detachably connected to the truss web member, and the connection portion is higher than the cast-in-place concrete layer. After the cast-in-place concrete layer reaches a certain strength, the truss web member and the truss main chord member can be manually removed, saving construction materials.

[0028] Thirdly, the present invention does not require support from below, so the top-layer-related processes can be arranged before the concrete strength of the floor slab reaches the requirements for demolding, and the demolding work does not affect the construction work of the top layer, thus compressing the construction period to a considerable extent.

[0029] Fourth, the truss load-bearing structure formed by the truss upper chord, truss web and prefabricated composite floor slab of the present invention bears the load of the cast-in-place concrete layer and the corresponding construction load, wherein the height of the truss upper chord determines the stiffness of the overall load-bearing structure, so prefabricated composite floor slabs of the same size can be used in different floor design thicknesses, and when the weight of the cast-in-place concrete layer increases, the purpose of adjusting the stiffness and the bearing capacity is achieved by adjusting the setting height of the truss upper chord, the length of the truss web and the spacing between the web connection supports.

[0030] Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 A schematic diagram of the hoisting of a prefabricated composite floor slab in a technical solution of the present invention;

[0032] Figure 2 This is a schematic diagram of the completion of the hoisting of a prefabricated composite floor in a technical solution of the present invention;

[0033] Figure 3 A top view showing the completion of the hoisting of a prefabricated composite floor in a technical solution of the present invention;

[0034] Figure 4 A side view showing the completion of the hoisting of a prefabricated composite floor in a technical solution of the present invention;

[0035] Figure 5 This is a schematic diagram of the completion of the cast-in-place concrete layer in a technical solution of the present invention;

[0036] Figure 6 A schematic diagram of a prefabricated composite floor slab in a technical solution of the present invention;

[0037] Figure 7 A schematic diagram of installing a box core formwork for a prefabricated composite floor slab in a technical solution of the present invention;

[0038] Figure 8 It is a disassembled side view of a truss mesh in a technical solution of the present invention;

[0039] Fig. 9 A schematic diagram of the assembly of prefabricated composite floor panels in a technical solution of the present invention;

[0040] Fig.10 This is a schematic diagram of a prefabricated composite floor slab before pouring in a technical solution of the present invention;

[0041] Fig.11 It is a schematic diagram of disassembly of a prefabricated composite floor slab before pouring in a technical solution of the present invention;

[0042] Fig.12 This is a schematic diagram of a prefabricated composite floor slab after pouring in a technical solution of the present invention;

[0043] Fig.13 A schematic diagram of disassembly of a prefabricated composite floor slab after pouring in a technical solution of the present invention

[0044] Fig.14 A schematic diagram of the installation of a truss mesh on a prefabricated composite floor slab in a technical solution of the present invention;

[0045] Fig.15 It is a schematic diagram of a web connecting support in a technical solution of the present invention;

[0046] Fig.16 It is a side view of the state of the prefabricated composite floor slab corresponding to each process in a technical solution of the present invention.

[0047] Legend: 1-truss mesh, 10-web connecting support, 101-support fixing plate, 102-first sleeve, 11-truss upper chord, 111-chord main tube, 112-chord connecting tube, 12-truss web, 120-second sleeve, 13-truss connecting rod, 130-connecting rod sleeve, 2-precast composite floor slab, 3-box core formwork, 31-box core formwork at joint, 4-cast-in-place concrete layer, 41-concrete hidden beam, 411-cavity, 42-concrete surface layer, 5-on-site tied steel bars, 51-hidden beam steel cage, 52-slab surface steel bars, 6-precast beam body, 61-flange plate, 7-structural column. DETAILED DESCRIPTION

[0048] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments so that those skilled in the art can implement the invention with reference to the description.

[0049] It should be understood that the terms such as “having”, “including” and “comprising” used herein do not exclude the existence or addition of one or more other elements or combinations thereof.

[0050] It should be noted that the experimental methods described in the following embodiments are conventional methods unless otherwise specified, and the reagents and materials can be obtained from commercial sources unless otherwise specified; in the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "set" should be understood in a broad sense, for example, they can be fixedly connected, set, or detachably connected, set, or connected and set in one piece. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood in specific circumstances. The orientation or position relationship indicated by the terms "lateral", "longitudinal", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation of the present invention.

[0051] like Figures 1 to 16 As shown, the present invention provides a truss-supported prefabricated composite hollow floor, comprising:

[0052] A plurality of mutually parallel prefabricated beam bodies 6, which are fixed on a plurality of completed structural columns 7; a plurality of prefabricated composite floor slabs 2 spliced ​​side by side, wherein the long sides of the prefabricated composite floor slabs 2 are spliced ​​with the long sides of other prefabricated composite floor slabs 2, and the two short sides of the bottom surface are placed on two parallel prefabricated beam bodies 6, and at least two mutually parallel truss meshes 1 are fixed on the upper surface of the prefabricated composite floor slab 2, and the truss meshes 1 include a truss upper chord 11 which is higher than the upper surface of the prefabricated composite floor slab 2 and parallel to the long sides of the prefabricated composite floor slab 2, a plurality of web connecting supports 10 and a plurality of truss webs 12, and the plurality of web connecting supports 10 are fixed on the prefabricated composite floor slab 2 in a row at intervals, and each web connecting support 10 is fixed on the prefabricated composite floor slab 2 at intervals. One or more truss webs 12 are detachably fixedly connected between the connecting support 10 and the truss upper chord 11, and a plurality of truss connecting rods 13 are connected between any two adjacent truss meshes 1, wherein all the truss meshes 1 and the prefabricated composite floor slabs 2 together form a truss force-bearing structure, and a plurality of box core formworks 3 are fixed in a matrix manner on the upper surface of the prefabricated composite floor slabs 2; a cast-in-place concrete layer 4 is formed above the prefabricated composite floor slabs 2, and the cast-in-place concrete layer 4 includes a concrete hidden beam 41 cast in the interval of the box core formworks 3, and the top surface height of the cast-in-place concrete layer 4 is higher than the top surface of the prefabricated beam body 6 and is not higher than the connection between the web connecting support 10 and the truss web 12.

[0053] In the present technical solution, the structural column 7 is a cast-in-place or prefabricated column component that has been completed on the top floor. Its strength and fixing means are sufficient to bear all the design loads of the floor. The structural column 7 forms a column grid on the top floor. The prefabricated beam body 6 is a component that needs to be prefabricated. It is a steel structure or a reinforced concrete structure. It is connected to the structural column 7 by on-site grouting or steel structure node form. The prefabricated beam body 6 can adopt a structure that requires secondary pouring of concrete to form a complete beam body so that it can better cooperate with the cast-in-place concrete layer 4 on the prefabricated composite floor slab 2. The main body of the prefabricated beam body 6 has a bearing capacity and can bear the allocated floor load. The prefabricated The composite floor slab 2 is a long strip of concrete slab with internal reinforcement, and additional reinforcement can be made inside for the subsequent fixing position of the web connecting support 10. The two short sides of the prefabricated composite floor slab 2 are placed on two prefabricated beams 6. If there are no protruding steel bars on the long sides of the prefabricated composite floor slab 2, the adjacent slabs are tightly spliced. If the long sides of the prefabricated composite floor slab 2 are designed to be protruding steel bars, there will be a certain gap between the adjacent prefabricated composite floor slabs 2 to form a post-cast joint, and the protruding steel bars are 100% overlapped. Optionally, in addition to the two short side ends of the prefabricated composite floor slab 2 being placed on the prefabricated beam 6, the bottom of the slab can also be fixed to other prefabricated beams 6.

[0054] In the present technical solution, the truss upper chord 11, the truss web 12, and the truss connecting rod 13 in the truss mesh 1 are made of finished steel pipes or steel sections, wherein the truss web 12, the truss connecting rod 13 and the truss upper chord 11 can be connected by bolts or threaded sleeves, and the connection form is similar to the steel structure truss node form, and the web connecting support 10 is a component made of steel plates or steel pipes, and the end of the truss web 12 can be connected by bolts or threaded sleeves. The web member connecting support 10 and the top surface of the prefabricated composite floor slab 2 can be fixed by anchor glue or expansion bolts. In terms of force, the truss mesh 1 can be regarded as a single-piece steel tube truss sheet that simplifies the lower chord. Since the prefabricated composite floor slab 2 can be regarded as a lower chord structure, when the slab surface reinforcement construction and the cast-in-place concrete layer 4 are constructed, the prefabricated composite floor slab 2 and its upper truss mesh 1 are combined to bear force, and the stiffness and bearing capacity are greatly improved compared with conventional composite floors.

[0055] Stiffness refers to the ability of an object to not be easily deformed when subjected to external forces. The stiffness of a truss load-bearing structure is closely related to its bearing capacity. In the present technical solution, since the spacing between the truss upper chord 11 and the prefabricated composite floor slab 2 determines the stiffness of the truss mesh 1, prefabricated composite floor slabs 2 of the same thickness specification can be used in different floor design thicknesses. When the thickness, i.e., the weight, of the cast-in-place concrete layer 4 increases, the purpose of improving the overall bearing capacity is achieved by adjusting the relative setting height of the truss upper chord 11 relative to the prefabricated composite floor slab 2, the corresponding length of the truss web 12, and the spacing of the web connecting supports 10. Since the truss upper chord 11, the truss web 12, and the web connecting supports 10 are all matching and detachable components, the operator can quickly adjust and assemble them. Optionally, a rod structure can be added between any two web connecting supports 10 to further improve the overall stiffness and strength.

[0056] In the present technical solution, the truss meshes 1 are vertically fixed on the prefabricated composite floor slabs 2, and the box-type core formwork 3 is a square or rectangular hollow box made of metal or plate materials, which can be placed between any two adjacent truss meshes 1 and fixed to the prefabricated composite floor slabs 2 by bolts or adhesives. The gap between the box-type core formworks 3 is filled with a hidden beam steel cage 51 and then poured with concrete to form a concrete hidden beam 41. The area above the top surface height of the box-type core formwork 3 is a concrete surface layer 42. Figure 5As shown, after the concrete cast-in-place layer 4 is completed, a number of spaced hollow chambers 411 are formed in the floor slab between the concrete hidden beams 41, the concrete surface layer 42 and the prefabricated composite floor slab 2 due to the box-type core formwork 3. The stiffness and bearing capacity of the floor slab are not significantly weakened, while the weight is greatly reduced. The two ends of each concrete hidden beam 41 are cast into one with the prefabricated beam body 6 serving as the main beam during the construction of the concrete cast-in-place layer 6. The several concrete hidden beams 41 forming a mesh can effectively bear the load of the floor slab in subsequent use and transfer it to its main load-bearing structure. Optionally, the box-type core formwork 3 adopts square boxes of the same specifications and is arranged at equal intervals in the horizontal and vertical directions to form a mesh force-bearing structure of concrete hidden beams 41 with equal intervals and sizes. Box-type core formworks 3 in hexagonal, octagonal and other shapes can also be used to make the concrete hidden beams 41 form dense-rib force-bearing structures of different shapes.

[0057] In the present technical scheme, since the web connecting support 10 and the truss web 12 are detachably connected, the connection between the web connecting support 10 and the truss web 12 is higher than the top surface elevation of the cast-in-place concrete layer 4. Therefore, except for the connection with the truss web 12, the other parts of the web connecting support 10 are cast inside the cast-in-place concrete layer 4. Before the cast-in-place concrete layer 4 solidifies and reaches the demolding strength, the truss mesh 1 and the prefabricated composite floor slab 2 jointly bear the load. When the cast-in-place concrete layer 4 reaches the demolding strength, the connection between the web connecting support 10 and the truss web 12 is released, and the cast-in-place concrete layer 4 and the prefabricated composite floor slab 2 cast as one with it bear their own weight and the load on it. The prefabricated composite floor slab 2 used in the present invention, in conjunction with several truss meshes 1 above, can be regarded as a truss load-bearing structure in actual stress. The cover plate 2 is connected to the truss mesh 1 and is transferred to the prefabricated beam body 4 and the structural column 7 that have been fixed. The rigidity of the truss load-bearing structure formed by the prefabricated composite floor slab 2 after the truss mesh 1 is installed is greatly improved compared with the conventional single-piece composite slab. The box core formwork 3, the steel bars 5 and the concrete can be effectively placed. Moreover, due to the detachable design of the truss mesh 1 itself, the truss mesh 1 and the prefabricated composite floor slab 2 are also detachable. The rigidity of the truss load-bearing structure composed of the truss mesh 1 and the prefabricated composite floor slab 2 can be easily adjusted. The present invention combines the advantages of the hollow mesh floor construction method, the prefabricated composite slab construction method and the truss load-bearing form to realize the construction of the hollow mesh floor slab without lower support, which fundamentally solves the problem of a large number of lower supports used in conventional processes and the inability to perform additional processes on the top layer before demolding.

[0058] In another technical solution, the prefabricated beam body 6 is a steel beam body structure, and the bottom surface of the beam body of the prefabricated beam body 6 extends flange plates 61 on both sides. The flange plates 61 of any two adjacent prefabricated beam bodies 6 support a number of prefabricated composite floor slabs 2 spliced ​​side by side, wherein the prefabricated beam body 6 is a single full-length steel section with an I-shaped or rectangular cross-section. The prefabricated beam body 6 has a lighter deadweight and a higher bearing capacity. The prefabricated beam body 6 is fixedly connected to the structural column 7 by bolts or welding, and the bottom surface of the prefabricated beam body 6 extends laterally on both sides. The flange plate 61 is provided, and the two short side ends of the prefabricated composite floor slab 2 are placed on the flange plate 61. Before the construction of the cast-in-place concrete layer 4, the hidden beam steel cage 51 and the slab surface steel bars 52 tied on the prefabricated composite floor slab 2 can be fixed to the prefabricated beam body 6 by welding or anchoring to improve the strength of the beam-slab node. Optionally, the beam body of the prefabricated beam body 6 is provided with horizontal through holes. The prefabricated composite floor slab 2 on both sides of the prefabricated beam body 6 can use the horizontal through holes on the prefabricated beam body 6 to connect the steel bars on both sides when tying the steel bars.

[0059] In the present technical solution, the precast beam body 6 and the cast-in-place concrete layer 4 together form the load-bearing main beam in the general floor structure, and the concrete hidden beam 41 can be regarded as a secondary beam. The precast beam body 6 of the steel beam structure is equivalent to the steel bar structure in the general main beam body, and because the precast composite floor slabs 2 on both sides are placed and attached to the flange plate 61, it is only necessary to properly seal the joint position before pouring the concrete without the need for additional formwork support.

[0060] In another technical solution, the web connecting support 10 includes a support fixing plate 101 and two first sleeves 102, the support fixing plate 101 is fixed to the upper surface of the prefabricated composite floor slab 2, and the two first sleeves 102 are symmetrically welded to the support fixing plate 101, and the truss upper chord 11 includes a plurality of groups of second sleeves 120 obliquely downward, and the second sleeves 120 are coaxially opposite to the first sleeves 102 one by one, and the two ends of the truss web 12 are provided with external threads, and the second sleeve 120 and the first sleeve 102 are provided with internal threads matching the truss web 12, and the two ends of the truss web 12 are matched and screwed into the corresponding second sleeves 120 and the first sleeve 102, wherein, when the truss web 12 is screwed to the top in the direction of the corresponding first sleeve 102 or the second sleeve 120, one end of the truss web 12 is in a disengaged state. In this technical solution, the support fixing plate 101 is The truss web 12 is cut from finished steel plates, and the first sleeve 102 and the second sleeve 120 are both finished steel pipe segments with internal threads. The truss web 12 is a round rod or round tube structure, and both ends of the truss web 12 are provided with external threads that match the first sleeve 102 and the second sleeve 120 respectively. The direction in which one end of the truss web 12 is screwed into the first sleeve 102 is opposite to the direction in which the other end is screwed into the second sleeve 120. After one end of the truss web 12 is screwed into the bottom of the second sleeve 120 in the positive direction, the first sleeve 102 of the web connecting support 10 is aligned with the other end of the truss web 12. At this time, the truss web 12 is screwed in the opposite direction, and the two ends of the truss web 12 are respectively screwed out of the second sleeve 120 and screwed into the first sleeve 102. For the distance that the truss web 12 is screwed into the second sleeve 120 and the first sleeve 102, force calculation is required to avoid the sliding sleeve from coming out under the load-bearing state.

[0061] In another technical solution, the truss upper chord 11 includes a chord main tube 111 and a chord connecting tube 112 which are alternately threadedly connected, and matching threads are provided at both ends of the chord main tube 111 and the chord connecting tube 112. Two second sleeves 120 are connected obliquely downward to the middle of the tube body of the chord main tube 111, wherein each chord main tube 111 is located directly above the midpoint of two adjacent web connecting supports 10 in the same row, and the two second sleeves 120 on the chord main tube 111 are both screwed together with the relative first sleeve 102 to have a truss web 12. In this technical solution, the web connecting supports 10 not on both sides in the same row are connected to two chord main tubes 111 connected by a chord connecting tube 112 through two truss webs 12 to form a triangular structure. The truss main tube 111 and the two truss webs 12 connected thereto and the prefabricated composite floor slab 2 also form a triangular structure, and the truss mesh 1 is stable and strong.

[0062] In another technical solution, two connecting rod sleeves 130 are fixed on both horizontal sides of the middle part of the body of the chord main tube 111, and the connecting rod sleeves 130 are provided with internal threads, and both ends of the truss connecting rod 13 are provided with external threads. A truss connecting rod 13 is threadedly connected between any two opposite connecting rod sleeves 130 of the same prefabricated composite floor slab 2, wherein the direction in which one end of the truss connecting rod 13 is screwed into one of the two opposite connecting rod sleeves 130 is opposite to the direction in which the other end is screwed into the other connecting rod sleeve 130. When installing the truss connecting rod 13 between the truss meshes 1, first screw the truss connecting rod 13 between the truss meshes 1. One end of the truss connecting rod 13 is screwed into the bottom of all the connecting rod sleeves 130 on one of the truss meshes 1, and then the relative truss mesh 1 is placed in the designed position. At this time, all the connecting rod sleeves 130 on the truss mesh 1 are aligned with the other end connected to the truss connecting rod 13, and the truss connecting rods 13 are screwed in reverse one by one so that one end of them is out of the connecting rod sleeve 130 and the other end is screwed into the connecting rod sleeve on the other truss mesh 1 to complete the connection of the two truss meshes 1. Similarly, this kind of operation is performed during the lifting process between two adjacent truss meshes 1 that do not belong to the same prefabricated composite floor slab 2.

[0063] In another technical solution, the truss upper chord 11, the truss web 12, and the truss connecting rod 13 are all steel tubular structures. Compared with a rod body with a smaller diameter, the steel tube has better bending and torsion resistance.

[0064] In another technical solution, the construction method of the truss-supported prefabricated composite hollow floor comprises the following steps:

[0065] S1. The dimensions of the prefabricated composite floor slab 2 and the prefabricated beam body 6 are designed according to the beam and column arrangement of the building, the on-site hoisting capacity, and the force calculation results. After all the components are processed in the prefabricated component processing plant, they are uniformly sent to the construction site. Specifically, in the concrete component processing plant, the prefabricated composite floor slab 2 is constructed according to the designed dimensions and the designed reinforcement scheme, and is uniformly sent to the construction site after maintenance. In the steel component processing plant, the commercial steel plates and steel pipes are cut by a laser cutting machine, and the steel plates are processed into prefabricated beam bodies 6 and support fixing plates 101 that meet the size requirements, and the steel pipes are processed into The chord main tube 111, the chord connecting tube 112, the connecting rod sleeve 130, the truss connecting rod 13, the truss web 12, the first sleeve 102, and the second sleeve 120 are of suitable size and length, and the internal and external threaded sections of the above components are processed by tapping and threading equipment. The two second sleeves 120 and the two connecting rod sleeves 130 are welded to the same chord main tube 111 at the designed angle, and the two first sleeves 102 are welded to the support fixing plate 101 cut from the finished steel plate to form the web connecting support 10. After the processing of each component is completed, it is uniformly loaded and sent to the construction site.

[0066] S2. At the construction site, according to the design requirements, the chord main tube 111 and the chord connecting tube 112 are screwed in sequence at intervals to form a single integral truss upper chord 11 and provide temporary support. After a corresponding number of web connecting supports 10 are put in place, a corresponding number of truss webs 12 are connected between the web connecting supports 10 and the truss upper chord 11 to form a truss mesh 1. Specifically, at the construction site, the assembly of the truss upper chord 11 is completed, a corresponding number of truss webs 12 are screwed into the top of the second sleeve 120, and then the truss upper chord 11 is erected by a bracket. After a corresponding number of web connecting supports 10 are put in place, the truss webs 12 are screwed in the opposite direction so that they are partially out of the second sleeve 120 and partially screwed into the first sleeve 102.

[0067] S3. Screw the truss connecting rod 13 between several truss meshes 1 belonging to the same prefabricated composite floor slab 2, and then fix the bottom surface of the support fixing plate 101 to the prefabricated composite floor slab 2. Specifically, first screw the truss connecting rod 13 to the bottom on the connecting rod sleeve 130 on one of the truss meshes 1, and then put the other truss mesh 1 in place, and uniformly screw the truss connecting rod 13 back to complete the connection of the two truss meshes 1, and place the integrated truss mesh 1 on the prefabricated composite floor slab 2, wherein the support fixing plate 101 can be fixed to the prefabricated composite floor slab 2 by screws or steel glue.

[0068] S4. Hoist all prefabricated beams 6 onto the fixed structural columns 7, and hoist the prefabricated composite floor slabs 2 in turn and place them on the flange plates 61 of two adjacent prefabricated beams 6 until all the prefabricated composite floor slabs 2 are hoisted. Specifically, the ends of the structural columns 7 are designed for node connection with the prefabricated beams 6. The prefabricated beams 6 can be fixed to the structural columns 7 by socket grouting, bolts or welding. After the prefabricated beams 6 on the top floor are installed, the prefabricated composite floor slabs 2 connected to the truss mesh 1 are hoisted one by one using on-site hoisting equipment so that both short sides are placed on the flange plates 61. The long sides of the prefabricated composite floor slabs 2 at the edges or special positions can also be placed on the flange plates 61.

[0069] S5. On the surface of the prefabricated composite floor slab 2 between any two truss meshes 1, a box-type core formwork 3 arranged in parallel and spaced apart is fixed. Specifically, the box-type core formwork 3 is designed according to the size of the concrete hidden beam 41 in the floor slab, and is processed in advance in the factory or on the construction site. The box-type core formwork 3 is placed between two truss meshes 1 of the same prefabricated composite floor slab 2. The box-type core formwork 3 can be placed and fixed before the prefabricated composite floor slab 2 is hoisted, or it can be installed after the prefabricated composite floor slab 2 is hoisted. When all the prefabricated composite floor slabs 2 are hoisted, the box-type core formwork 3 is fixed between two adjacent truss meshes 1 and belonging to different prefabricated floors. A box core formwork 31 is installed between the truss meshes 1 of the composite floor slab 2. The box core formwork 3 and the bottom of the box core formwork 31 at the joint are fixed to the prefabricated composite floor slab 2 by bolts or adhesives to prevent displacement or floating during the pouring process. The joints can be sealed by filling sponge strips, polyurethane coatings, etc. Optionally, in some structural designs that have special requirements on the size and arrangement of the concrete hidden beams 41, the shapes of the box core formwork 3 and the box core formwork 31 at the joint also need to be appropriately adjusted to avoid collision with the truss mesh 1.

[0070] S6. Fix the hidden beam steel cage 51 in the interval space between any two rows of box core formworks 3, then support the slab surface steel bars 52 and carry out water and electricity piping. Specifically, the hidden beam steel cage 51 needs to be padded with pads and protective layer rings so that the hidden beam steel cage 51 does not contact the box core formwork 3. The hidden beam steel cage 51 and the web connecting support 10 at the intersection can be tied together. The hidden beam steel cage 51 is continuous and both ends need to extend to the prefabricated beam body 6 and be connected to the prefabricated beam body 6 by bending anchors, sleeves, welding, etc., or holes are reserved on the prefabricated beam body 6 so that the hidden beam steel cages 51 on both sides of the prefabricated beam body 6 can pass through and complete the connection. The slab surface steel bars 52 are constructed synchronously with the water and electricity piping. When designing the slab surface steel bars 52, the connection method with the hidden beam steel cage 51 and the prefabricated beam body 6 needs to be considered.

[0071] S7. Seal the joints between any two adjacent prefabricated composite floor slabs 2, seal the gap between the box core formwork 3 and the upper surface of the prefabricated composite floor slab 2, and pour the cast-in-place concrete layer 4. Specifically, after the construction of the steel bars, water and electricity pipes on all the prefabricated composite floor slabs 2 is completed, use sponge strips and other sealing materials to seal the joints below the prefabricated composite floor slabs 2, and use polyurethane coating or other colloidal sealing materials to apply the connection position of the web connecting support 10 and the truss web 12 to prevent the concrete slurry from contaminating the connection. Concrete pouring can be carried out only after inspection.

[0072] S8. Cure the cast-in-place concrete layer 4 until the design strength requirement is met, then remove all the truss upper chords 11 and truss webs 12, fill the first sleeve 102 with grouting material for sealing, and complete the construction of the floor. Specifically, before the strength of the cast-in-place concrete layer 4 reaches 75%, people are prohibited from going on the floor, but other construction processes can be carried out on the top floor. After the strength of the cast-in-place concrete layer 4 reaches 100%, people on the floor remove the truss upper chords 11 and truss webs 12, first clean the sealing material at the connection between the web connecting support 10 and the truss web 12, then screw the truss web 12 to screw it out of the first sleeve 102, and after hoisting the removed components, uniformly pour high-strength cement slurry or other forms of grouting materials into the first sleeve 102 to complete the sealing of the first sleeve 102.

[0073] In the present technical scheme, all components are processed outside the construction site, and during the construction of the top-level beams and columns, the construction workers can assemble them synchronously in the component yard, and fix the box core formwork 3 between the two truss meshes 1 on the same prefabricated composite floor slab 2 and then hoist them. Only after the hoisting is correct can the box core formwork 31 at the joint, the on-site tied steel bars 5, and the water and electricity pipelines be constructed, which greatly saves the on-site construction time, and after the cast-in-place concrete layer 4 reaches the demolding strength, the truss upper chord 11 and the truss web 12 are both removable and circulated components, which also reduces the construction cost.

[0074] In another technical solution, in step S5, the bottom surface of the support fixing plate 101 is coated with steel adhesive to fix it to the upper surface of the prefabricated composite floor slab 2. In this technical solution, the main components of the steel adhesive are A and B two-component bisphenol A modified epoxy resin structural adhesive, which can be cured at room temperature and has little shrinkage during the curing process. Before applying the steel adhesive, the bottom surface of the support fixing plate 101 and the surface of the prefabricated composite floor slab 2 at the bonding point need to be cleaned with sandpaper and a spray bottle. Before the steel adhesive is cured, the truss mesh 1 needs to be temporarily supported to avoid shaking and affecting the bonding effect.

[0075] In another technical solution, in step S7, the distance between any two box core templates 3 is the same, so that the concrete hidden beams 41 form a dense-ribbed beam network with consistent spacing and size.

[0076] Although the embodiments of the present invention have been disclosed as above, they are not limited to the applications listed in the specification and the implementation modes, and they can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and the illustrations shown and described herein.

Claims

1. Truss-supported prefabricated composite hollow floor, characterized in that: include: A number of prefabricated beams parallel to each other, which are fixed to a number of completed structural columns; A plurality of prefabricated composite floor panels spliced ​​side by side, wherein the long sides of the prefabricated composite floor panels are spliced ​​with the long sides of other prefabricated composite floor panels, and the two short side ends of the bottom surface are placed on two parallel prefabricated beams, and at least two mutually parallel truss meshes are fixed to the upper surface of the prefabricated composite floor panels, and the truss meshes include a truss upper chord higher than the upper surface of the prefabricated composite floor panels and parallel to the long sides of the prefabricated composite floor panels, a plurality of web connecting supports and a plurality of truss webs, and the plurality of web connecting supports are fixed to the prefabricated composite floor panels in a row at intervals, and more than one truss web is detachably fixed between each web connecting support and the truss upper chord, and a plurality of truss connecting rods are connected between any two adjacent truss meshes, wherein all the truss meshes and the prefabricated composite floor panels together form a truss force-bearing structure, and a plurality of box core templates are fixed in a matrix manner on the upper surface of the prefabricated composite floor panels; A cast-in-place concrete layer is formed above the prefabricated composite floor slab. The cast-in-place concrete layer includes a concrete hidden beam cast in the interval of the box core formwork. The top surface height of the cast-in-place concrete layer is higher than the top surface of the prefabricated beam body and is not higher than the connection between the web connecting support and the truss web.

2. The truss-supported prefabricated composite hollow floor as claimed in claim 1, characterized in that: The prefabricated beam body is a steel beam body structure, and flange plates are extended to both sides from the bottom surface of the beam body of the prefabricated beam body. The flange plates of any two adjacent prefabricated beam bodies support a number of prefabricated composite floor slabs spliced ​​side by side.

3. The truss-supported prefabricated composite hollow floor as claimed in claim 2, characterized in that: The web connecting support includes a support fixing plate and two first sleeves, the support fixing plate is fixed to the upper surface of the prefabricated composite floor slab, and the two first sleeves are symmetrically welded to the support fixing plate. The truss upper chord includes a plurality of groups of second sleeves inclined downward, and the second sleeves are coaxially opposite to the first sleeves one by one. Both ends of the truss web are provided with external threads, and the second sleeve and the first sleeve are provided with internal threads matching the truss web. The two ends of the truss web are matched and screwed into the corresponding second sleeve and the first sleeve, wherein, when the truss web is screwed to the top in the direction of the corresponding first sleeve or the second sleeve, one end of the truss web is in a disengaged state.

4. The truss-supported prefabricated composite hollow floor as claimed in claim 3, characterized in that: The upper chord of the truss includes a chord main tube and a chord connecting tube which are alternately threadedly connected, and matching threads are provided at both ends of the chord main tube and the chord connecting tube. Two second sleeves are connected obliquely downward to the middle of the tube body of the chord main tube, wherein each chord main tube is located directly above the midpoint of two adjacent web connecting supports in the same row, and the two second sleeves on the chord main tube are both screwed together with the relative first sleeves to have the truss web.

5. The truss-supported prefabricated composite hollow floor as claimed in claim 4, characterized in that: Two connecting rod sleeves are fixed on both horizontal sides of the middle part of the chord main tube, the connecting rod sleeves are provided with internal threads, and both ends of the truss connecting rod are provided with external threads. A truss connecting rod is threadedly connected between any two opposite connecting rod sleeves of the same prefabricated composite floor slab.

6. The truss-supported prefabricated composite hollow floor as claimed in claim 5, characterized in that: The truss upper chord, truss web and truss connecting rod are all steel tubular structures.

7. The construction method of the truss-supported prefabricated composite hollow floor as claimed in claim 6, characterized in that: The following steps are involved: S1. Design the dimensions of prefabricated composite floor slabs and prefabricated beams according to the beam and column arrangement of the building, the on-site hoisting capacity, and the force calculation results. After all components are processed in the prefabricated component processing plant, they will be uniformly delivered to the construction site; S2. At the construction site, according to the design requirements, the chord main tube and the chord connecting tube are screwed in sequence to form a single integral truss upper chord and temporarily supported. After the corresponding number of web connecting supports are stacked in place, the corresponding number of truss webs are connected between the web connecting supports and the truss upper chord to form a truss mesh; S3, screwing the truss tie rods between several truss meshes belonging to the same prefabricated composite floor slab, and then fixing the bottom surface of the support fixing plate to the prefabricated composite floor slab; S4, hoisting all prefabricated beams onto the fixed structural columns, and hoisting the prefabricated composite floor slabs in sequence and placing them on the flange plates of two adjacent prefabricated beams until all prefabricated composite floor slabs are hoisted; S5, on the surface of the prefabricated composite floor slab between any two truss meshes, a number of parallel fixed rows of box core formwork spaced apart; S6. Fix the hidden beam steel cage in the space between any two rows of box core templates, then support the plate surface steel bars and carry out water and electricity pipe routing; S7, blocking the joints between any two adjacent prefabricated composite floor slabs, blocking the gap between the box core formwork and the upper surface of the prefabricated composite floor slab, and pouring the cast-in-place concrete layer; S8. Maintain the cast-in-place concrete layer until it reaches the design strength requirement, then remove all the truss upper chords and truss webs, fill the first sleeve with grouting material for sealing, and complete the floor construction.

8. The construction method of the truss-supported prefabricated composite hollow floor as claimed in claim 7, characterized in that: In the step S5, steel adhesive is applied to the bottom surface of the support fixing plate to fix it to the upper surface of the prefabricated composite floor slab.

9. The construction method of the truss-supported prefabricated composite hollow floor as claimed in claim 7, characterized in that: In step S7, the distance between any two box core templates is the same.

Citation Information

Patent Citations

  • Force-bearing type template component

    CN101230662A

  • Assembly type steel structure overlapped hollow floor and construction method thereof

    CN106088434A

  • Concrete-filled steel tube special-shaped column frame system

    CN117328709A

  • Fabricated steel frame-combined flat beam floor system

    CN209397804U

  • Inverted detachable support-free steel bar truss composite floor slab

    CN215802555U