Climbing frame and unloading platform integrated lifting device
Through the integrated lifting device of the climbing frame unloading platform, the guide rails and lifting truss are used to strengthen the vertical movement of the unloading platform and the climbing frame. Through the attachment support limit support, the safety hazards of the cantilever unloading platform are solved. The problem of improvement of construction safety and saving costs.
Patent Information
- Application Number
- CN202411199597.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-11-12
AI Technical Summary
The frequent installation and removal of cantilever unloading platforms at the construction site leads to safety hazards and poses a high risk of safety accidents.
An integrated lifting device for unloading platform of climbing frame is designed, including a lifting unit, attachment support and unloading platform. The guide rails and lifting trusses are strengthened through electric hoist drive to realize the vertical movement of the unloading platform and climbing frame, and the vertical movement of the unloading platform and climbing frame is achieved through attachment. The support is limited to support at a predetermined position, and fixes the unloading platform and climbing frame.
After the first installation, there is no need to disassemble and assemble layer by layer. The unloading platform and climbing frame are automatically climbed layer by layer through electric hoists, which reduces the use of tower crane equipment, significantly improves construction safety, and saves labor and equipment costs.
Smart Images

Figure CN118933324A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of construction equipment, and in particular to an integrated lifting device for a climbing frame unloading platform. Background Art
[0002] In construction projects, cantilevered unloading platforms are common facilities, mainly used for vertical transportation of materials. Cantilevered unloading platforms are usually composed of a pre-made material platform, steel wire ropes and corresponding buckles, pre-buried anchor rings and pull rings on the structure, and some accessories that play a fixing role. After the unloading platform is assembled, it is hoisted to the use floor by a tower crane, and the steel wire rope is passed through the inclined pull ring to tie it to the main structure. The cantilevered main beam and the pre-buried ring of the floor are filled with triangular square wood and embedded tightly. After use, it is transferred to the next floor with the tower crane again.
[0003] At the construction site, the cantilever unloading platform has potential safety hazards that cannot be ignored due to its frequent installation and dismantling, which has resulted in frequent safety accidents.
[0004] Therefore, there is an urgent need to provide a technical solution to the above-mentioned deficiencies in the prior art. Summary of the invention
[0005] The purpose of the present application is to provide an integrated lifting device for a climbing frame unloading platform to solve or alleviate the problems existing in the above-mentioned prior art.
[0006] In order to achieve the above objectives, this application provides the following technical solutions: The present application provides an integrated lifting device for a climbing frame and an unloading platform, comprising: a lifting unit, an attachment support, an unloading platform and a climbing frame; the lifting unit comprises an electric hoist, and the electric hoist is fixed to a hanging member installed on a construction body; the climbing frame comprises two reinforced guide rails symmetrically arranged along a width direction, and the two reinforced guide rails are connected by a lifting truss, and the lifting truss is connected to a hook of the electric hoist; the unloading platform is connected to the two reinforced guide rails; there are a plurality of attachment supports, and the plurality of attachment supports are divided into two groups along a width direction and symmetrically arranged on the construction body, and are respectively adapted to the two reinforced guide rails, and a plurality of attachment supports in the same group are arranged in parallel along a vertical direction; each of the attachment supports comprises a limit support unit and a rolling support unit, and the reinforced guide rail is slidably mounted in the rolling support unit, so that the reinforced guide rail moves in a vertical direction under the drive of the electric hoist; the limit support unit can limit the reinforcement guide rail after the climbing frame is lifted to a predetermined position, so that the climbing frame is fixed to the unloading platform.
[0007] Preferably, the reinforced guide rail includes: a sliding rod, a limit rod, a transverse connecting rod and a platform connecting rod; there are two sliding rods, and a plurality of limit rods are evenly distributed in parallel between the two sliding rods; one end of the transverse connecting rod is connected to the middle part of the limit rod, and the other end is connected to the platform connecting rod; wherein, the sliding rod and the platform connecting rod both extend in the vertical direction, and the limit rod and the transverse connecting rod are both arranged in the horizontal direction and are perpendicular to each other.
[0008] Preferably, the platform connecting rods of the two reinforced guide rails are detachably connected to the lifting truss and the unloading platform, wherein the unloading platform is located below the lifting truss.
[0009] Preferably, the attachment support includes: a support body, the support body includes a connecting plate and a mounting platform, the connecting plate is provided with a waist-shaped hole for connecting with two embedded bolts arranged in parallel along the width direction on the construction body; the mounting platform is connected to the connecting plate for installing the limiting support unit and the rolling support unit.
[0010] Preferably, the limit support unit includes: an upper limit assembly and a lower limit assembly, the upper limit assembly and the lower limit assembly are arranged side by side in a vertical direction, the upper limit assembly is rotatably connected to a support ear plate provided on the upper surface of the mounting platform; the lower limit assembly is installed in a limit installation cavity provided on the lower surface of the mounting platform; wherein, after the climbing frame is lifted to a predetermined position, the upper limit assembly performs limit support on the reinforced guide rail through manual adjustment, and after the climbing frame is lifted to a predetermined position, the lower limit assembly automatically performs limit support on the reinforced guide rail.
[0011] Preferably, the upper limit assembly includes: a rotating connection part, a double-headed adjustment stud and a supporting part, the rotating connection part is rotatably connected to the supporting ear plate, and a first adjustment nut is fixedly provided on the rotating connection part; one end of the double-headed adjustment stud is threadedly connected to the first adjustment nut, and the thread rotation directions of the two ends of the double-headed adjustment stud are different; a second adjustment nut is fixedly provided at the lower end of the supporting part, and the second adjustment nut is threadedly connected to the other end of the double-headed adjustment stud; and an arc-shaped supporting surface is provided at the upper end of the supporting part, and the arc-shaped supporting surface is adapted to the supporting part of the reinforced guide rail.
[0012] Preferably, the lower limit assembly comprises: a limit support block and a limit paddle; the limit support block is rotatably mounted in the limit installation cavity, and the upper surface of the limit support block is pre-tightenedly connected with the inner side wall of the limit installation cavity through a tension spring, so that the upper end of the limit support block is tightened toward the limit installation cavity during the lifting process of the climbing frame; The limit paddle is rotatably connected to the limit ear plate arranged at the lower part of the limit support block through a torsion spring; during the lifting process of the climbing frame, the upper end of the limit paddle contacts the reinforced guide rail, rotates toward the limit installation cavity under the action of the reinforced guide rail, and is reset under the action of the torsion spring, so that the lower end of the limit paddle abuts against the lower part of the limit support block; after the climbing frame is lifted to a predetermined position, the upper end of the limit paddle rotates toward the reinforced guide rail under the action of the reinforced guide rail, so that the lower end of the limit paddle drives the limit support block to rotate toward the reinforced guide rail, so as to provide limit support for the reinforced guide rail.
[0013] Preferably, the rolling support unit includes two groups of roller groups symmetrically arranged along the width direction, and each group of the roller groups includes two spindle cone rollers symmetrically arranged along the length direction; correspondingly, the lower surface of the mounting platform is symmetrically provided with two roller mounting cavities along the width direction, and the two groups of roller groups are respectively installed in the two roller mounting cavities.
[0014] Preferably, the small ends of the spinning cone rollers in the two groups of roller groups are arranged face to face.
[0015] Preferably, the climbing frame also includes: a slide rail bracket, which is fixedly mounted on the reinforced guide rail, and the slide rail bracket is provided with a horizontal slide rail extending along the length direction; correspondingly, a roller bearing adapted to the horizontal slide rail is installed on the unloading platform, so that the unloading platform can move between the two reinforced guide rails along the length direction.
[0016] Beneficial effects: In the integrated lifting device of the climbing frame and unloading platform provided in the embodiment of the present application, the electric hoist of the lifting unit is fixed on the hanging part installed on the construction body, and the two reinforced guide rails of the climbing frame are symmetrically arranged along the width direction, and are connected by a lifting truss, and the lifting truss is connected to the hook of the electric hoist, and the unloading platform is connected to the two reinforced guide rails; thereby, the lifting of the electric hoist drives the lifting truss, the climbing frame, and the unloading platform to move in the vertical direction. When the climbing frame and the unloading platform move to the predetermined position, they are limitedly supported by the attachment support installed on the construction body to fix the climbing frame and the unloading platform.
[0017] There are multiple attachment supports for limited support. The multiple attachment supports are divided into two groups along the width direction and symmetrically arranged on the construction body, and are adapted to the two reinforced guide rails arranged symmetrically along the width direction. Multiple attachment supports in the same group are arranged in parallel along the vertical direction to provide limited support for the reinforced guide rails on the same side. In each attachment support, the reinforced guide rail is slidably mounted in the rolling support unit, so that the reinforced guide rail automatically moves layer by layer in the vertical direction under the drive of the electric hoist; after the climbing frame is lifted to the predetermined position, the limited support unit provides limited support for the reinforced guide rail to prevent the climbing frame and the unloading platform from falling, thereby fixing the climbing frame and the unloading platform.
[0018] Therefore, after the unloading platform and the climbing frame are installed for the first time, there is no need to disassemble and assemble them layer by layer during the construction process. The unloading platform and the climbing frame body can climb up layer by layer synchronously and autonomously through the electric hoist, and tower crane lighting equipment is no longer needed to assist in lifting, which greatly improves construction safety and saves labor and equipment costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The drawings constituting part of the present application are used to provide a further understanding of the present application. The exemplary embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. Among them: Figure 1 It is a schematic diagram of the installation of a climbing frame unloading platform integrated lifting device provided according to some embodiments of the present application; Figure 2 for Figure 1 A side view of the integrated lifting device for the rack unloading platform; Figure 3 It is a structural schematic diagram of a climbing frame unloading platform integrated lifting device provided according to some embodiments of the present application; Figure 4 This is an axial schematic diagram of the mobile installation of the unloading platform on the climbing frame according to some embodiments of the present application; Figure 5 for Figure 4 Another axonometric view of the illustrated embodiment; Figure 6 for Figure 4 a front view of the illustrated embodiment; Figure 7 for Figure 6 A partial view at A in the view shown; Figure 8 A schematic diagram of the structure of a climbing frame provided according to some embodiments of the present application; Fig. 9 A schematic diagram of the structure of a reinforced guide rail provided according to some embodiments of the present application; Fig.10A schematic diagram of a structure of an attachment support provided according to some embodiments of the present application; Fig.11 Another structural schematic diagram of an attachment support provided according to some embodiments of the present application; Fig.12 for Fig.10 a cross-sectional view of the attachment support shown; Fig.13 for Fig.12 Schematic diagram of the middle BB section; Fig.14 A schematic diagram of the structure of an upper limit unit provided according to some embodiments of the present application; Fig.15 A schematic diagram of a structure of a position-limiting support block provided according to some embodiments of the present application; Fig.16 Another structural schematic diagram of a position-limiting support block provided according to some embodiments of the present application; Fig.17 It is a schematic diagram of the structure of a spinning cone roller provided according to some embodiments of the present application.
[0020] Description of reference numerals: 100, lifting unit; 200, attachment support; 300, unloading platform; 400, climbing frame; 201, support body; 202, upper limit assembly; 203, lower limit assembly; 204, rolling support unit; 213, limit support block; 223, tension spring; 233, limit paddle; 301, roller bearing; 401, reinforced guide rail; 402, hoisting truss; 403, slide rail bracket; 413, horizontal slide rail; 411, sliding rod; 421, limiting rod; 431, transverse connecting rod; 441, platform connecting rod. DETAILED DESCRIPTION
[0021] The present application will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments. Each example is provided by way of explanation of the present application and does not limit the present application. In fact, it will be clear to those skilled in the art that modifications and variations may be made in the present application without departing from the scope or spirit of the present application. For example, a feature shown or described as a part of an embodiment may be used in another embodiment to produce yet another embodiment. All other embodiments obtained by those of ordinary skill in the art based on the embodiments in the embodiments of the present invention should belong to the scope of protection of the embodiments of the present invention.
[0022] At present, the on-site installation and frequent disassembly and assembly of the cantilevered unloading platform result in great safety hazards during the construction process. Based on this, the present application provides an integrated lifting device for the climbing frame unloading platform, which combines the unloading platform and the climbing frame body. After the first installation is completed, during the construction process, there is no need to disassemble and assemble each layer by layer, and the unloading platform and the climbing frame body are synchronously and autonomously climbed layer by layer through electric hoists, and tower crane lighting equipment is no longer needed to assist in lifting, which greatly improves construction safety and saves labor and equipment costs.
[0023] It should be noted that the construction entity in this application is explained using building construction as an example. In the construction layout, the direction from left to right is the length direction, and in the same horizontal plane, the direction perpendicular to the length direction is the width direction.
[0024] like Figures 1 to 17 As shown, the climbing frame unloading platform integrated lifting device includes: a lifting unit 100, an attachment support 200, an unloading platform 300 and a climbing frame 400. Among them, the unloading platform 300 is detachably connected to the climbing frame 400, the climbing frame 400 is connected to the hook of the lifting unit 100, and the electric hoist of the lifting unit 100 is fixed to the hanging part installed on the construction body; the attachment support 200 is installed on the construction body and is slidably mounted with the climbing frame 400, so that, under the action of the electric hoist, the climbing frame 400 and the unloading platform 300 climb autonomously layer by layer in the vertical direction. During the climbing process, the attachment support 200 is used to limit the movement direction of the climbing frame 400 and the unloading platform 300 to prevent the climbing frame 400 and the unloading platform 300 from tilting toward the outside of the construction body; after the climbing frame 400 and the unloading platform 300 climb to the right position, the attachment support 200 limits the climbing frame 400 to achieve the fixing of the climbing frame 400 and the unloading platform 300.
[0025] In the lifting unit 100, the hanging parts are fixed to the structural concrete with M30 bolts, and the concrete strength of the floor where the hanging parts are located is not less than C20. The M30 bolts are inserted from the outside of the wall, and a gasket and two nuts are installed on the inside for fixing. After the hanging parts are fixed, the electric hoist is fixed to the hanging parts, and the frame (hoisting truss 402) is hooked by a sling or a lifting ring, and the chain is tightened to keep the force on each electric hoist consistent.
[0026] The climbing frame 400 includes two reinforced guide rails 401 arranged symmetrically along the width direction, and the two reinforced guide rails 401 are connected by a hoisting truss 402, and the hoisting truss 402 is hooked and connected with the hook of the electric hoist. Among them, the reinforced guide rail 401 includes: a sliding rod 411, a limit rod 421, a transverse connecting rod 431 and a platform connecting rod 441. The cross section of the sliding rod 411 is circular, and there are two sliding rods 411, and a plurality of limit rods 421 are evenly distributed in parallel between the two sliding rods 411; one end of the transverse connecting rod 431 is connected to the middle part of the limit rod 421, and the other end is connected to the platform connecting rod 441. Here, the platform connecting rod 441 is connected to the limit rod 421 through a plurality of groups of transverse connecting rods 431 arranged in parallel along the vertical direction, and each group of transverse connecting rods 431 has a plurality of transverse connecting rods 431, and the plurality of transverse connecting rods 431 in the same group are respectively connected to the corresponding plurality of limit rods 421 in a one-to-one correspondence. It should be noted that the sliding rod 411 and the platform connecting rod 441 are both extended in the vertical direction, and the limiting rod 421 and the horizontal connecting rod are both arranged in the horizontal direction and are perpendicular to each other.
[0027] The lifting truss 402 and the unloading platform 300 are detachably connected between the two platform connecting rods 441 of the two reinforcing guide rails 401. The two ends of the lifting truss 402 are detachably connected to the two platform connecting rods 441 through bolt fasteners.
[0028] After the unloading platform 300 and the climbing frame 400 are assembled into a whole, they can move in a vertical direction under the action of the electric hoist. The attachment support 200 installed on the construction body guides, supports and limits the overall movement of the unloading platform 300 and the climbing frame 400.
[0029] Specifically, there are multiple attachment supports 200, which are divided into two groups along the width direction and symmetrically arranged on the construction body, and are respectively matched with the reinforcing guide rails 401, and multiple attachment supports 200 in the same group are arranged in parallel along the vertical direction. Thereby, the overall movement of the climbing frame 400 and the unloading platform 300 is limited in the width direction by the two groups of attachment supports 200 arranged symmetrically along the width direction, so as to avoid the lateral displacement of the overall movement of the climbing frame 400 and the unloading platform 300. The overall movement of the climbing frame 400 and the unloading platform 300 is guided in the height direction by the multiple attachment supports 200 arranged in parallel along the vertical direction in the same group, so as to avoid the outward tilting of the overall movement of the climbing frame 400 and the unloading platform 300; thus, the directional movement of the climbing frame 400 and the unloading platform 300 in the vertical direction is realized.
[0030] In the present application, when installing the attachment support 200, first, insert the high-strength bolt M30 into the reserved hole of the structure, then connect the attachment support 200 to two M30 high-strength bolts arranged in parallel along the width direction, and connect and tighten them through gasket nuts. Among them, each attachment support 200 includes: a support body 201, a limit support unit and a rolling support unit 204. Among them, the support body 201 includes a connecting plate and a mounting platform, the connecting plate and the mounting platform are perpendicular to each other, and a waist-shaped hole is provided on the connecting plate in the width direction to connect with two embedded bolts (M30 high-strength bolts) arranged in parallel along the width direction on the construction body, so that the support body 201 is fixed on the construction body.
[0031] The mounting platform is connected to the connecting plate and is used to install the limiting support unit and the rolling support unit 204. The reinforcing guide rail 401 is slidably mounted in the rolling support unit 204, so that the reinforcing guide rail 401 moves in the vertical direction under the drive of the electric hoist; the limiting support unit can provide limiting support for the reinforcing guide rail 401 after the climbing frame 400 is lifted to a predetermined position, so that the climbing frame 400 is fixed to the unloading platform 300.
[0032] Specifically, the limit support unit includes: an upper limit assembly 202 and a lower limit assembly 203, which are arranged in parallel along the vertical direction, and the upper limit assembly 202 is rotatably connected to the support ear plate provided on the upper surface of the installation platform; the lower limit assembly 203 is installed in the limit installation cavity provided on the lower surface of the installation platform. Among them, the upper limit assembly 202 is manually adjusted to provide limit support for the reinforced guide rail 401 after the climbing frame 400 is lifted to the predetermined position, and the lower limit assembly 203 automatically provides limit support for the reinforced guide rail 401 after the climbing frame 400 is lifted to the predetermined position.
[0033] In a specific example, the upper limit assembly 202 includes: a rotating connection part, a double-headed adjustment stud and a support part. The rotating connection part is rotatably connected to the support ear plate, including: two rotating connection plates arranged in parallel and a first adjustment nut located between the two rotating connection plates, the first adjustment nut is located at one end of the rotating connection shaft away from the rotating connection plate and the support ear plate; and a rotating reinforcement plate is also used between the two rotating connection plates for structural reinforcement.
[0034] The support part includes two support plates arranged in parallel and a second adjusting nut located between the two support plates. The upper end of the support plate is provided with an arc-shaped support surface adapted to the support part of the reinforced guide rail 401, that is, the arc-shaped support surface is adapted to the limit rod 421, so that after the overall movement of the climbing frame 400 and the unloading platform 300 is in place, the arc-shaped support surface provides limit support to the limit rod 421.
[0035] One end of the double-headed adjusting stud is threadedly connected to the first adjusting nut, and the other end is threadedly connected to the second adjusting nut located at the lower ends of the two support plates, wherein the thread rotation directions at both ends of the double-headed adjusting stud are different. By rotating the double-headed adjusting stud, the relative distance between the first adjusting nut and the second adjusting nut can be adjusted, so that the arc-shaped supporting surface can be pressed against the limit rod 421 or accelerated to separate from the limit rod 421.
[0036] In another specific example, the lower limit assembly 203 includes: a limit support block 213 and a limit paddle 233. The limit support block 213 is rotatably mounted in the limit installation cavity, and the upper surface of the limit support block 213 is pre-tightened and connected to the inner side wall of the limit installation cavity through a tension spring 223. Specifically, a spring mounting plate is provided in the limit installation cavity, one end of the tension spring 223 is connected to the welding nut on the spring mounting plate, and the other end is connected to a pull ring provided on the upper surface of the limit support block 213, so that when no external force is applied, under the action of the tension spring 223, the upper end of the limit support block 213 has a tendency to rotate upward, and is always tightened toward the limit installation cavity.
[0037] The limiting paddle 233 is rotatably connected to the limiting ear plate provided at the lower part of the limiting support plate through a torsion spring, so that when no external force is applied, under the action of the torsion spring, the upper end of the limiting paddle 233 always has a tendency to rotate downward, that is, rotates in a direction away from the limiting installation cavity and close to the reinforcing guide rail 401. During the lifting process of the climbing frame 400, due to the spacing between two adjacent limiting rods 421, the upper end of the limiting paddle 233 intermittently contacts the limiting rod 421 of the reinforcing guide rail 401. When the limiting paddle 233 contacts the limiting rod 421, under the action of the reinforcing guide rail 401 (the reinforcing guide rail 401 moves upward), the upper end of the limiting paddle 233 is driven to rotate upward, that is, rotate toward the limiting installation cavity; when the limiting paddle 233 is out of contact with the current limiting rod 421, the limiting paddle 233 is reset under the action of the torsion spring, that is, the lower end of the limiting paddle 233 abuts against the lower part of the limiting support block 213.
[0038] After the climbing frame 400 is lifted to the predetermined position, before the limit support unit provides limit support to the reinforced guide rail 401, the climbing frame 400 and the unloading platform 300 as a whole have a downward movement tendency; the lower surface of the limit rod 421 above the limit paddle 233 contacts the upper end of the limit paddle 233, and the upper end of the limit paddle 233 rotates downward under the action of the limit rod 421 of the reinforced guide rail 401, that is, rotates toward the reinforced guide rail 401, so that the lower end of the limit paddle 233 is pressed against the limit support block 213, thereby driving the lower end of the limit support block 213 to rotate upward, even if the lower end of the limit support block 213 rotates downward, it moves toward the limit rod 421 of the reinforced guide rail 401, so that the upper end of the limit support block 213 is inserted between two adjacent limit rods 421, thereby realizing the limit support for the reinforced guide rail 401.
[0039] In the present application, a limit baffle is further provided in the limit installation cavity to limit the rotational travel of the limit support block 213 so that the limit support block 213 can effectively provide limit support to the reinforcing guide rail 401 .
[0040] In another specific example, the rolling support unit 204 includes two groups of roller groups symmetrically arranged along the width direction, and each group of roller groups includes two cone-shaped rollers symmetrically arranged along the length direction; correspondingly, two roller installation cavities are symmetrically arranged along the width direction according to the lower surface of the platform, and two groups of roller groups are respectively installed in the two roller installation cavities. The two roller groups are respectively matched with the two sliding rods 411 of the reinforcing guide rail 401, and the two cone-shaped rollers in each group of roller groups perform rolling guide limit and overturning limit on one sliding rod 411. Furthermore, the small ends of the cone-shaped rollers in the two groups of roller groups are arranged face to face, so as to realize the automatic centering of the reinforcing guide rail 401 during the vertical movement, and further avoid the lateral displacement of the reinforcing guide rail 401 along the width direction.
[0041] In this application, the attachment support 200 is installed and fixed by inserting M30 high-strength bolts into the reserved holes of the structure, and then the reinforcement rail 401 is installed and connected to the attachment support 200; then, the lifting truss 402 is connected between the two reinforcement rails 401 by bolt fasteners, and the assembled unloading platform 300 is connected to the reinforcement rail 401. Among them, the unloading platform 300 is connected by profiles, plates, etc. through bolts with double nuts, welding, etc., and each bolt is checked by a torque wrench after installation.
[0042] In a specific example, the unloading platform 300 and the reinforcing guide rail 401 are fixedly connected to form a whole. In the installation process of the unloading platform 300 and the reinforcing guide rail 401, a steel wire rope can be inserted into the lifting ring of the unloading platform 300 and fixed to the reinforcing guide rail 401 to achieve a reinforced and stable connection between the unloading platform 300 and the reinforcing guide rail 401. At the same time, the ends of the unloading platform 300 are connected to two platform connecting rods 441, and the sides of the unloading platform 300 are detachably connected through the reinforcing connecting plate. The sides of the unloading platform 300 are also connected to the platform connecting rod 441 of the reinforcing guide rail 401 through the platform inclined rod to enhance the overall stability of the unloading platform 300 after being connected to the climbing frame 400. In particular, one end of the platform inclined rod is connected to the platform connecting rod 441, and the other end is connected to the unloading platform 300.
[0043] After the installation of the attachment support 200, the unloading platform 300, the reinforced guide rail 401, etc. is completed, the cover plate is fixed at the position of the discharge port of the unloading platform 300, and the unloading platform 300 is used to transport the materials vertically. After the transportation of the working materials is completed, the climbing frame 400 and the unloading platform 300 are automatically climbed as a whole by the electric hoist until they are used on the next floor.
[0044] In another specific example, the unloading platform 300 and the reinforced guide rail 401 are connected in a manner that allows relative movement to form a whole. Specifically, a slide rail bracket 403 is installed on the reinforced guide rail 401, and a horizontal slide rail 431 extending along the length direction is provided on the slide rail bracket 403; at the same time, a roller bearing 301 adapted to the horizontal slide rail is installed on the lower side of the unloading platform 300, and the roller bearing 301 can move in the horizontal slide rail, so that the unloading platform 300 can move between the two reinforced guide rails along the length direction. Among them, the slide rail bracket 403 adopts a truss structure to enhance the structural stability of the slide rail bracket 403; the horizontal slide rail can be made of profiles such as channel steel, and connected to the slide rail bracket 403 by bolting or welding.
[0045] Thereby, after the climbing frame 400 drives the unloading platform 300 to move to the specified position, the unloading platform 300 can move toward the construction body through the movement of the unloading platform 300 along the length direction, and the materials in the unloading platform 300 can be dumped. Therefore, there is no need to set up a cover plate, which effectively avoids the danger that may arise when workers move between the unloading platform 300 and the construction body; when the materials in the unloading platform 300 are dumped, the unloading platform 300 moves outward along the horizontal slide rail 431 to reset.
[0046] Therefore, during the construction process, there is no need to disassemble and assemble the climbing frame 400 and the unloading platform 300 layer by layer, and the unloading platform 300 and the main body of the climbing frame 400 climb up layer by layer synchronously and autonomously through the electric hoist, and tower crane lighting equipment is no longer needed to assist in lifting, which greatly improves construction safety and saves labor and equipment costs.
[0047] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0048] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0049] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0050] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0051] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" mean that the specific features, structures, materials, or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0052] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A climbing frame unloading platform integrated lifting device, characterized in that: include: Lifting units, attachment supports, unloading platforms and climbing frames; The lifting unit includes an electric hoist, and the electric hoist is fixed to a hanging member installed on the construction body; The climbing frame includes two reinforced guide rails symmetrically arranged along the width direction, and the two reinforced guide rails are connected by a lifting truss, and the lifting truss is connected to the hook of the electric hoist; the unloading platform is connected to the two reinforced guide rails; There are multiple attachment supports, which are divided into two groups along the width direction and symmetrically arranged on the construction body, and are respectively matched with the two reinforcing guide rails, and multiple attachment supports in the same group are arranged in parallel along the vertical direction; Each of the attachment supports includes a limit support unit and a rolling support unit. The reinforcing guide rail is slidably mounted inside the rolling support unit so that the reinforcing guide rail moves in a vertical direction driven by the electric hoist. The limit support unit can provide limit support for the reinforcing guide rail after the climbing frame is lifted to a predetermined position so that the climbing frame is fixed to the unloading platform.
2. The integrated lifting device for the climbing frame and unloading platform according to claim 1 is characterized in that: The reinforced guide rail comprises: a sliding rod, a limiting rod, a transverse connecting rod and a platform connecting rod; There are two sliding rods, and a plurality of limiting rods are evenly distributed in parallel between the two sliding rods; One end of the transverse connecting rod is connected to the middle part of the limiting rod, and the other end is connected to the platform connecting rod; Wherein, the sliding rod and the platform connecting rod both extend in the vertical direction, and the limiting rod and the transverse connecting rod are both arranged in the horizontal direction and are perpendicular to each other.
3. The integrated lifting device for the climbing frame and unloading platform according to claim 2 is characterized in that: The platform connecting rods of the two reinforced guide rails are detachably connected to the hoisting truss and the unloading platform, wherein the unloading platform is located below the hoisting truss.
4. The integrated lifting device for the climbing frame and unloading platform according to claim 1 is characterized in that: The attachment support comprises: a support body, The support body includes a connecting plate and a mounting platform, and the connecting plate is provided with a waist-shaped hole for connecting with two embedded bolts arranged in parallel along the width direction on the construction body; The mounting platform is connected to the connecting plate and is used for mounting the limiting support unit and the rolling support unit.
5. The integrated lifting device for the climbing frame and unloading platform according to claim 4 is characterized in that: The limit support unit comprises: an upper limit assembly and a lower limit assembly, the upper limit assembly and the lower limit assembly are arranged side by side in a vertical direction, the upper limit assembly is rotatably connected to a support ear plate arranged on the upper surface of the mounting platform; the lower limit assembly is installed in a limit installation cavity arranged on the lower surface of the mounting platform; Among them, the upper limit assembly supports the reinforcing guide rail by manual adjustment after the climbing frame is lifted to the predetermined position, and the lower limit assembly automatically supports the reinforcing guide rail by limiting the position after the climbing frame is lifted to the predetermined position.
6. The integrated lifting device for the climbing frame and unloading platform according to claim 5 is characterized in that: The upper limit assembly comprises: a rotating connection part, a double-headed adjustment stud and a support part, wherein the rotating connection part is rotatably connected to the support ear plate, and a first adjustment nut is fixedly arranged on the rotating connection part; One end of the double-ended adjusting stud is threadedly connected to the first adjusting nut, and the thread rotation directions of the two ends of the double-ended adjusting stud are different; A second adjusting nut is fixedly provided at the lower end of the support portion, and the second adjusting nut is threadedly connected to the other end of the double-headed adjusting stud; and an arc-shaped supporting surface is provided at the upper end of the support portion, and the arc-shaped supporting surface is adapted to the supporting portion of the reinforced guide rail.
7. The integrated lifting device for the climbing frame and unloading platform according to claim 5 is characterized in that: The lower limit assembly includes: a limit support block and a limit paddle; The limit support block is rotatably installed in the limit installation cavity, and the upper surface of the limit support block is pre-tightenedly connected with the inner side wall of the limit installation cavity through a tension spring, so that the upper end of the limit support block is tightened toward the limit installation cavity during the lifting process of the climbing frame; The limiting paddle is rotatably connected to the limiting ear plate provided at the lower part of the limiting support block through a torsion spring; During the lifting process of the climbing frame, the upper end of the limit paddle contacts the reinforcing guide rail, rotates toward the limit installation cavity under the action of the reinforcing guide rail, and resets under the action of the torsion spring, so that the lower end of the limit paddle abuts against the lower part of the limit support block; After the climbing frame is lifted to a predetermined position, the upper end of the limit paddle rotates toward the reinforced guide rail under the action of the reinforced guide rail, so that the lower end of the limit paddle drives the limit support block to rotate toward the reinforced guide rail to provide limit support for the reinforced guide rail.
8. The integrated lifting device for the climbing frame and unloading platform according to claim 4 is characterized in that: The rolling support unit comprises two groups of rollers arranged symmetrically along the width direction, and each group of rollers comprises two spindle cone rollers arranged symmetrically along the length direction; Correspondingly, two roller installation cavities are symmetrically arranged on the lower surface of the installation platform along the width direction, and two groups of roller groups are respectively installed in the two roller installation cavities.
9. The integrated lifting device for the climbing frame and unloading platform according to claim 8 is characterized in that: The small ends of the spinning cone rollers in the two groups of roller groups are arranged face to face.
10. The integrated lifting device for the climbing frame unloading platform according to any one of claims 1 to 9, characterized in that: The climbing frame further comprises: a slide rail bracket, the slide rail bracket is fixedly mounted on the reinforced guide rail, and the slide rail bracket is provided with a horizontal slide rail extending along the length direction; Correspondingly, a roller bearing matched with the horizontal slide rail is installed on the unloading platform, so that the unloading platform can move between the two reinforced guide rails along the length direction.
Citation Information
Patent Citations
Self-climbing safety hard protection and hoisting integrated platform and construction method thereof
CN112302326A
Climbing type discharging platform
CN212743427U
Climbing frame unloading device
CN218092113U
Construction
US20060219478A1
Cited By
Rail type lifting crane for petrochemical steel structure platform construction
CN122646754A