Construction method and device for built-in light material of overweight concrete floor
By designing a steel mesh frame and filling strips in the construction of concrete floor slabs, the fast fixing of filling strips is achieved by using positioning units and locking mechanisms, the problem of cumbersome and inefficient positioning of filling materials in traditional methods is solved, and construction efficiency and accuracy are improved sex.
Patent Information
- Application Number
- CN202411333755.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2024-11-12
AI Technical Summary
The positioning method of filling materials in traditional concrete floor slabs is complicated and inefficient, and it is impossible to ensure that the plate is in the middle of the steel frame.
A construction device including a steel mesh frame, a support formwork and a filling strip is designed. The filling strip is equipped with a moving groove and a working tube, and an inner positioning unit and a locking mechanism are inserted. The filling strips are realized through the locking mechanism and the positioning unit. Quick butt and fixation of steel mesh frames.
The rapid positioning and fixing of the filler strips is achieved, the construction efficiency is improved, and the filling strips are ensured in the middle of the steel mesh frame is avoided, thereby avoiding cumbersome operations and positioning errors in traditional methods.
Smart Images

Figure CN118933332A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of concrete slabs, and in particular to a construction method and a device for an overloaded concrete slab with built-in lightweight materials. Background Art
[0002] The traditional cast-in-place reinforced concrete floor structure construction method refers to the production of the floor by supporting formwork, tying steel bars, pouring concrete, and performing maintenance and removing formwork according to the designed position on site. Some insulation floors will also be filled with insulation and sound insulation panels to improve the insulation and sound insulation effects of the floor.
[0003] In the preparation process of existing floor slabs with built-in fillers, after the steel bars are tied, the filling materials are inserted, and then the concrete is poured. When pouring, the filling materials need to be installed in the middle of the steel frame, which requires the plate to be fixed after being inserted into the steel frame. However, traditional plates are usually penetrated by steel wires after insertion, and then the steel wires are connected to the steel frame. This positioning method is cumbersome and inefficient, and it cannot ensure that the plate is in the middle of the steel frame after positioning. Summary of the invention
[0004] The object of the present invention is to provide a method and device for constructing an overloaded concrete floor with built-in lightweight materials, so as to solve the problem of the cumbersome and inefficient plate positioning method proposed in the above-mentioned background technology.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a lightweight material construction device for an overloaded concrete floor, comprising a steel mesh frame and a supporting formwork, and also comprising a plurality of filling strips, wherein two movable grooves are provided on the filling strips, and an I-shaped tube is inserted in the movable groove, and a positioning unit connected to the steel mesh frame is inserted in the I-shaped tube, a docking plate is fixed at one end of the I-shaped tube, and a locking mechanism for connecting the positioning unit is installed in the docking plate.
[0006] Preferably, the positioning unit includes a positioning rod slidably inserted in the I-shaped tube, one end of the positioning rod is fixed with a docking hook compatible with the steel mesh frame, the other end is fixed with a connecting hook compatible with the locking mechanism, and a baffle is fixed at one end of the positioning rod close to the connecting hook.
[0007] Preferably, the locking mechanism includes a locking tube fixed on the docking plate and a locking rod inserted in the locking tube, the locking tube is provided with a plane structure on one side, and a plurality of bevel teeth are fixed at equal intervals on the other side, the locking rod is slidably inserted in the locking tube, and a plurality of bevel plates matching the bevel teeth are fixed at equal intervals on the outside of the locking tube, the cross-sectional shape of the locking tube is an I-shaped shape, a plurality of bevel plates are fixed on one side of the locking tube, and a connecting piece connected to the connecting hook is installed on the other side of the bevel plate.
[0008] Preferably, the connecting member includes a connecting belt, one end of which is fixed to one side of the locking tube, and the other end of which is fixed with a docking ring, the connecting belt is wrapped around the outside of the steel mesh frame, and the docking ring is sleeved with the connecting hook.
[0009] Preferably, an end plate is fixed to the tail end of the connecting belt, and the end plate abuts against the tail end of the locking tube.
[0010] Preferably, the connecting belt is made of a flexible metal belt.
[0011] Preferably, the positioning rod, docking hook and connecting hook are all made of metal of the same material as the steel mesh frame.
[0012] Preferably, a plurality of the helical teeth are provided with through openings.
[0013] Preferably, the filling strip is in the shape of a rectangular strip and is made of a lightweight thermal insulation material.
[0014] The method for constructing a super-heavy-load concrete slab with built-in lightweight materials includes a construction device for constructing a super-heavy-load concrete slab with built-in lightweight materials, and further includes the following steps:
[0015] S1. Support the formwork and tie the steel bars;
[0016] S2. The personnel push several filling strips into the steel frame at one time. Several filling strips are connected by the butt rods. A single filling strip is connected by several butt rods at an equal interval of 500-600mm. After the butt is completed, the locking mechanism and the positioning unit are used to fix it to the steel frame.
[0017] S3. When pouring concrete, workers should vibrate the concrete at the same time when pouring a layer of concrete to avoid problems such as honeycombs, rough surfaces, voids, and vibration leakage in the concrete structure;
[0018] S4. Maintain the poured floor slab and remove the formwork when the designated time comes.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] 1. The present invention optimizes the traditional filling bar positioning method. The designed positioning unit cooperates with the locking mechanism to achieve docking of the steel mesh frame. At the same time, the personnel presses the locking rod in the locking mechanism to tighten the connecting belt, thereby achieving locking positioning. Compared with the traditional method of tightening the steel wire and the steel mesh frame, the positioning speed is fast and can ensure that the filling bar is in the middle of the steel mesh frame.
[0021] 2. The present invention conducts modular assembly design of a plurality of filling bars, which makes it easier to carry the filling bars and install them by personnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0023] Figure 2 This is a schematic diagram of the structure of several filling strips and a steel mesh frame connected to each other in the present invention;
[0024] Figure 3 It is a schematic diagram of the partial docking structure of a single filling strip and a steel mesh frame of the present invention;
[0025] Figure 4 It is a schematic diagram of assembling several filling strips of the present invention;
[0026] Figure 5 It is a top view after partial section of the filling strip of the present invention;
[0027] Figure 6 It is a schematic diagram of the connection between the positioning unit and the locking mechanism of the present invention and the steel bar;
[0028] Figure 7 It is a schematic diagram of the internal structure of the locking tube of the present invention in a partial cross-section;
[0029] Figure 8 It is a side view of the internal structure of the locking tube of the present invention.
[0030] In the figure: 1. steel mesh frame; 2. supporting formwork; 3. filling strip; 4. moving groove; 5. I-shaped pipe; 6. positioning unit; 7. docking plate; 8. locking mechanism; 9. positioning rod; 10. docking hook; 11. connecting hook; 12. baffle; 13. locking tube; 14. locking rod; 15. oblique teeth; 16. oblique plate; 17. connecting piece; 18. connecting belt; 19. docking ring; 20. end plate; 21. through-port. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] Example 1: Please refer to Figure 1 - Figure 5The ultra-heavy load concrete floor built-in lightweight material construction device shown in the figure includes a steel mesh frame 1 and a support formwork 2, and also includes a plurality of filling strips 3. The filling strips 3 are provided with two moving grooves 4. The moving grooves 4 are provided with I-shaped tubes 5. The I-shaped tubes 5 are provided with positioning units 6 connected to the steel mesh frame 1. A docking plate 7 is fixed at one end of the I-shaped tube 5. A locking mechanism 8 for connecting the positioning unit 6 is installed in the docking plate 7.
[0033] In this solution, when inserting the filling strips 3, the personnel first insert one of the filling strips 3 into the steel mesh frame 1, and then move the I-shaped tube 5 so that the positioning unit 6 is docked with the steel mesh frame 1, and finally use the locking mechanism 8 to lock the positioning unit 6, thereby positioning the filling strip 3, and then install the next filling strip 3 in sequence to insert the filling strips 3 in sequence.
[0034] It should also be noted that the filling strip 3 is in the shape of a rectangular strip and is made of a lightweight thermal insulation material having thermal insulation properties and being non-flammable. The material may be, but is not limited to, polystyrene boards, hollow PVC pipes, and customized GRC materials.
[0035] For further information, see Figure 5 - Figure 7 The positioning unit 6 includes a positioning rod 9 slidably inserted in the I-shaped tube 5, one end of the positioning rod 9 is fixed with a docking hook 10 adapted to the steel mesh frame 1, and the other end is fixed with a connecting hook 11 adapted to the locking mechanism 8, and the end of the positioning rod 9 close to the connecting hook 11 is fixed with a baffle 12;
[0036] Also, see Figure 5 - Figure 7 The locking mechanism 8 includes a locking tube 13 fixed on the docking plate 7 and a locking rod 14 inserted in the locking tube 13. The locking tube 13 is provided with a plane structure on one side, and a plurality of bevel teeth 15 are fixed at equal intervals on the other side. The locking rod 14 is slidably inserted in the locking tube 13. A plurality of bevel plates 16 matching the bevel teeth 15 are fixed at equal intervals on the outer side of the locking tube 13. The cross-sectional shape of the locking tube 13 is an I-shaped shape. A plurality of bevel plates 16 are fixed on one side of the locking tube 13. A connecting piece 17 connected to the connecting hook 11 is installed on the other side of the bevel plate 16.
[0037] Among them, the connecting piece 17 includes a connecting belt 18, one end of the connecting belt 18 is fixed to one side of the locking tube 13, and the other end of the connecting belt 18 is fixed with a docking ring 19. The connecting belt 18 is wrapped around the outside of the steel mesh frame 1, and the docking ring 19 is sleeved with the connecting hook 11.
[0038] The locking mechanism 8 cooperates with the positioning unit 6 to lock and position the filling strip 3 according to the principle: first, the personnel inserts the filling strip 3 at the specified position, and then pulls out the connecting belt 18 in the locking mechanism 8, and wraps it around the outside of one of the steel bars in the steel mesh frame 1, and then connects it with the connecting hook 11 through the docking ring 19, and then the personnel adjusts the positioning rod 9 so that the docking hook 10 at the other end of the positioning rod 9 is hooked with the steel bar in the steel mesh frame 1, and finally, the personnel presses the locking rod 14 to tighten the connecting belt 18, and the outer end of the I-shaped tube 5 in the filling strip 3 is abutted against the baffle 12 on the outside of the positioning rod 9, thereby realizing the locking and positioning of the filling strip 3, and at the same time being able to maintain the position of the filling strip 3 in the steel mesh frame 1.
[0039] It should also be noted that in order to improve the stability of the connection between the connecting belt 18 and the locking rod 14, an end plate 20 is fixed at the tail end of the connecting belt 18, and the end plate 20 is against the tail end of the locking tube 13. At the same time, in order to improve the strength, the connecting belt 18 is made of a flexible metal belt, and the positioning rod 9, the docking hook 10 and the connecting hook 11 are all made of the same metal as the steel mesh frame 1.
[0040] In this scheme, the method for constructing a super-heavy-load concrete slab with built-in lightweight materials includes a construction device for constructing a super-heavy-load concrete slab with built-in lightweight materials, and further includes the following steps:
[0041] S1. Support the formwork and tie the steel bars;
[0042] S2. A worker pushes several filling strips 3 into the steel frame at one time. Several filling strips 3 are butted together by butt rods. A single filling strip is connected by several butt rods at an equal spacing of 500-600 mm. After butt jointing, the locking mechanism 8 and the positioning unit 6 are used to fix the strips to the steel frame.
[0043] S3. When pouring concrete, workers should vibrate the concrete at the same time when pouring a layer of concrete to avoid problems such as honeycombs, rough surfaces, voids, and vibration leakage in the concrete structure;
[0044] S4. Maintain the poured floor slab and remove the formwork when the designated time comes.
[0045] Example 2: Please refer to Figure 7 and Figure 8 This embodiment further explains the first embodiment, and the difference lies in that the structure of the helical teeth 15 is optimized.
[0046] Specifically, a plurality of the helical teeth 15 are each provided with a through opening 21 .
[0047] In the present solution, in order to prevent personnel from accidentally touching the locking rod 14 before positioning the filling strip 3, causing the locking rod 14 to penetrate into the locking tube 13 and making it impossible for the connecting belt 18 to be effectively wrapped around the outside of the steel bars on the steel mesh frame 1, a rod-shaped tool can be inserted into the through opening 21. The rod-shaped tool can enter through the through opening 21 and lift up multiple inclined plates 16 in turn, so that the inclined plates 16 can be disengaged from the inclined teeth 15, making it easier for personnel to pull out the locking rod 14.
[0048] Example 3: Please refer to Figure 2 - Figure 4 This embodiment further illustrates other embodiments, and the difference lies in that the structure of the filling strip 3 is optimized.
[0049] Specifically, the filling strip 3 may also be cylindrical. After the personnel disassemble the I-shaped tube 5, the cylindrical filling strip 3 is more convenient to carry and transport.
[0050] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0051] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. Lightweight material construction device built into the overweight concrete floor. include: Steel mesh frame (1) and supporting formwork (2); It is characterized by further comprising: A plurality of filling bars (3) are provided on the filling bars (3), two movable grooves (4) are provided on the movable grooves (4), an I-shaped tube (5) is inserted in the I-shaped tube (5), a positioning unit (6) connected to a steel mesh frame (1) is inserted in the I-shaped tube (5), a docking plate (7) is fixed at one end of the I-shaped tube (5), and a locking mechanism (8) for connecting with the positioning unit (6) is installed in the docking plate (7).
2. The super heavy load concrete floor slab built-in lightweight material construction device according to claim 1, Features: The positioning unit (6) comprises a positioning rod (9) which is slidably inserted into the I-shaped tube (5); a docking hook (10) which is compatible with the steel mesh frame (1) is fixed to one end of the positioning rod (9); a connecting hook (11) which is compatible with the locking mechanism (8) is fixed to the other end; and a baffle (12) is fixed to one end of the positioning rod (9) which is close to the connecting hook (11).
3. The super heavy load concrete floor slab built-in lightweight material construction device according to claim 2, Features: The locking mechanism (8) comprises a locking tube (13) fixed on the docking plate (7) and a locking rod (14) inserted in the locking tube (13); a plane structure is provided in the locking tube (13) on one side, and a plurality of oblique teeth (15) are fixed at equal intervals on the other side; the locking rod (14) is slidably inserted in the locking tube (13), and a plurality of oblique plates (16) matched with the oblique teeth (15) are fixed at equal intervals on the outer side of the locking tube (13); the cross-sectional shape of the locking tube (13) is an I-shaped structure, a plurality of oblique plates (16) are fixed on one side of the locking tube (13), and a connecting piece (17) connected to the connecting hook (11) is installed on the other side of the oblique plate (16).
4. The super heavy load concrete floor slab built-in lightweight material construction device according to claim 3, Features: The connecting piece (17) comprises a connecting belt (18), one end of which is fixed to one side of the locking tube (13), and the other end of which is fixed with a docking ring (19), the connecting belt (18) is wound around the outside of the steel mesh frame (1), and the docking ring (19) is sleeved with the connecting hook (11).
5. The super heavy load concrete floor slab built-in lightweight material construction device according to claim 4, Features: An end plate (20) is fixed to the tail end of the connecting belt (18), and the end plate (20) abuts against the tail end of the locking tube (13).
6. The super heavy load concrete floor slab built-in lightweight material construction device according to claim 4, Features: The connecting belt (18) is made of a flexible metal belt.
7. The super heavy load concrete floor slab built-in lightweight material construction device according to claim 3, Features: The positioning rod (9), the docking hook (10) and the connecting hook (11) are all made of metal of the same material as the steel mesh frame (1).
8. The super heavy load concrete floor slab built-in lightweight material construction device according to claim 3, Features: A plurality of the bevel teeth (15) are each provided with a through opening (21).
9. The super heavy load concrete floor slab built-in lightweight material construction device according to claim 1, Features: The filling strip (3) is in the shape of a rectangular strip and is made of a light thermal insulation material.
10. A method for constructing a super-heavy-load concrete slab with built-in lightweight materials, comprising the construction device for constructing a super-heavy-load concrete slab with built-in lightweight materials as claimed in any one of claims 1 to 9, It is characterized in that The following steps are also included: S1. Support the formwork and tie the steel bars; S2. A person pushes a plurality of filling strips (3) into the steel frame at one time. The plurality of filling strips (3) are connected by a connecting rod. A single filling strip is connected by a plurality of connecting rods at an equal spacing of 500-600 mm. After the connecting is completed, the locking mechanism (8) and the positioning unit (6) are used to fix the filling strip to the steel frame. S3. When pouring concrete, workers should vibrate the concrete at the same time when pouring a layer of concrete to avoid problems such as honeycombs, rough surfaces, voids, and vibration leakage in the concrete structure; S4. Maintain the poured floor slab and remove the formwork when the designated time comes.