Deep-buried long tunnel geological environment preprocessing method, recording medium and system

By using directional drilling technology to pretreat geological environment in the construction of deep buried long tunnels, the problems of geological disaster risk and low work efficiency during construction are solved, and construction efficiency and safety are improved.

CN118933570APending Publication Date: 2024-11-12CHANGJIANG GEOTECHNICAL ENG CORP

Patent Information

Application Number
CN202410976660.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-21
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During the construction of deep buried long tunnels, it is difficult for the existing technology to effectively pretreat the geological environment during the survey and design stage, resulting in an increase in the risk of geological disasters such as water gushing, gas outbursts, and rock bursts during the construction process, and the workers' work efficiency is low and labor intensity is high. , and the reinforcement treatment is not timely or insufficient, resulting in frequent accidents.

Method used

Directional drilling technology is used to design the drilling trajectory during the survey and design stage. The surrounding rocks of the tunnel are centered and grouted and reinforced through the directional drilling rig, comprehensive tests are carried out in the holes, pre-reinforcement plans are determined, and grouting is carried out before excavation to ensure reinforcement. Location accuracy and security.

Benefits of technology

It improves construction efficiency and safety, reduces the risk of geological disasters during the construction process, and avoids increasing difficulty in excavation after reinforcement. Workers can concentrate on excavation, shorten the construction period, and improve construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933570A_ABST
    Figure CN118933570A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of water conservancy and hydropower engineering, and particularly relates to a deep-buried long tunnel geological environment pretreatment method, which is characterized in that a directional drilling machine is used for coring tunnel surrounding rock with enough length, and the position precision of tunnel geological environment sampling, measurement and integral reinforcement and the consistency of integral data acquisition modes are ensured. Pre-reinforcement is carried out according to the adopted rock core and the follow-up in-hole comprehensive test condition, the safety of tunnel construction into the reinforced rock stratum is enhanced, the grouting pressure and the slurry diffusion range are strictly controlled in the reinforcement process before tunnel tunneling, the difficulty of tunnel tunneling is not increased, meanwhile, the reinforced tunnel wall base layer is more convenient for post-treatment, and the construction efficiency is improved. And the construction period is effectively shortened, and the method is suitable for being applied to deep-buried tunnel construction with complex geological conditions. The invention also provides a non-transitory readable recording medium storing the program of the method and a system comprising the medium, and the program can be called through a processing circuit to execute the method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of water conservancy and hydropower engineering, and discloses a geological environment pretreatment method for a deep-buried long tunnel, a recording medium and a system. Background Art

[0002] The advanced geological prediction of tunnels is to provide guidance for further construction. After the survey and design of deep buried long tunnels are completed, in order to avoid geological disasters such as water gushing, gas outburst, rock burst, large deformation, etc. during construction and operation, and to ensure the safety and smooth progress of construction, it is necessary to detect the geotechnical structure of the upcoming excavation section and reinforce the position of the tunnel wall before each tunnel construction operation. Each section must carry out geological prediction-reinforcement-excavation work in a cycle. Since the operators in different sections are not the same, it is difficult to uniformly control the scale, and this method reduces the work efficiency of workers and increases the labor intensity. Due to incomplete prediction, untimely reinforcement treatment or insufficient reinforcement treatment intensity, accidents are difficult to avoid during tunnel construction, resulting in personnel and economic losses.

[0003] If the geological environment preprocessing of each work section is completed in the survey and design stage, it will not only ensure professionalism, but also improve work efficiency due to integrated processing, and it will be convenient for designers to coordinate from an overall perspective. However, in the survey and design stage, the tunnel has not yet started to be excavated, and it is impossible to dig a section, measure a section, and reinforce a section. How to ensure the location of the tunnel geological environment measurement and overall reinforcement, and whether the reinforcement will increase the difficulty of excavation during tunnel excavation have always plagued technical personnel in this field. Summary of the invention

[0004] In view of the above problems, the present invention provides a method for preprocessing the geological environment of a deep buried long tunnel, and the specific scheme includes the following steps:

[0005] S1. According to the tunnel design data, determine the position distribution of multiple drilling holes parallel to the excavation direction on the wall of the tunnel to be excavated, and design the drill bit movement path from the ground to the drilling holes; level the drilling site, cast the drilling rig base and install the directional drilling rig, and determine the azimuth and inclination from the ground excavation point to the inclination point according to the drill bit movement trajectory; install the casing at the ground excavation point according to the azimuth and inclination and fix it with cement slurry;

[0006] S2. Drill straight to the deflection point, smoothly transition through the pre-designed deflection section curve path, and drill to the position of each drilling hole for directional coring until the final hole depth; coring is performed throughout the hole during directional drilling, and the natural geological environment of the deep-buried long tunnel to be excavated is predicted based on the composition of the cores taken;

[0007] S3. After completing the core sampling, clean the hole, conduct a comprehensive working condition test in the hole, and determine the pre-reinforcement plan; prepare the grouting material according to the geological environment, inject grouting into each drill hole, and after verifying that the grouting effect is satisfactory, close the drill hole.

[0008] Preferably, the coring method includes a directional drilling / coring alternating operation method and a core barrel wireline coring method.

[0009] Preferably, the contents of the comprehensive working condition test include but are not limited to sound waves, video recording, hydrogeological testing, apparent resistivity, and transient electromagnetic.

[0010] Preferably, the grouting process steps include: under the designed maximum grouting pressure, the grouting flow rate is not greater than 1L / min, and the pressure is stabilized for 28-32 minutes before the grouting is completed.

[0011] Preferably, the slurry diffusion radius is determined within the range of 2.0-25.0 m according to the geological conditions of the surrounding rock and the development of fractures, and the thickness of the tunnel surrounding rock grouting reinforcement ring formed by the diffusion of slurry from multiple drill holes circumferentially distributed around the tunnel center is in the range of 0.5-2.0 times the tunnel diameter.

[0012] Preferably, the grouting process determined according to geological conditions and grouting range includes one or more of the top-down segmented grouting method, the bottom-up segmented grouting method and the orifice closed grouting method.

[0013] Another solution of the present invention is to provide a non-transitory readable recording medium for storing one or more programs containing multiple instructions. When the instructions are executed, the processing circuit will execute the above-mentioned deep-buried long tunnel geological environment preprocessing method.

[0014] Another embodiment of the present invention is to provide a deep-buried long tunnel geological environment preprocessing system, including a processing circuit and a memory electrically coupled thereto, wherein the memory is configured to store at least one program, wherein the program includes multiple instructions, and the processing circuit runs the program to execute the above-mentioned deep-buried long tunnel geological environment preprocessing method.

[0015] Compared with the prior art, the present invention produces the following beneficial effects:

[0016] Directional drilling technology has the advantages of controllable trajectory, high drilling accuracy, and long effective drilling distance. It can be applied to the survey of deep buried long tunnels and can accurately and efficiently survey the surrounding rock of the tunnel. In order to effectively improve the construction efficiency and safety of deep buried long tunnels during construction, the advance prediction and pre-reinforcement process of the tunnel can be advanced to the survey and design stage. In the survey and design stage, based on directional drilling technology, a drilling trajectory that meets the survey purpose is designed, and the surrounding rock of the tunnel of sufficient length is cored by a directional drill, which ensures the location accuracy of the sampling, measurement and overall reinforcement of the tunnel geological environment and the consistency of the overall data acquisition method. Pre-reinforcement is carried out according to the cores taken and the subsequent comprehensive tests in the hole, which enhances the safety of the tunnel construction to the reinforced rock layer. Since the grouting pressure and slurry diffusion range are strictly controlled during the reinforcement process before tunnel excavation, the difficulty of tunnel excavation will not be increased. At the same time, the reinforced tunnel wall base is more convenient for later processing. After the tunnel construction starts, the workers can concentrate on tunnel excavation, which improves the construction efficiency and effectively shortens the construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 A schematic diagram of geological prediction by directional drilling in an embodiment of the present invention;

[0018] Figure 2 A schematic diagram of a cross section of drilling and grouting in an embodiment of the present invention;

[0019] Figure 3 This is a schematic diagram of grouting reinforcement in an embodiment of the present invention;

[0020] Among them, 1. Tunnel; 2. Directional drilling rig; 3. Casing; 4. Directional drilling; 5. Branch drilling 6. Inclined section; 7. Section where geological environment needs to be pretreated; 8. Slurry diffusion range; 9. Effective reinforcement ring; 10. Grouting pipe; 11. Grouting plug; 12. Grouting gun; 13 Grouting pump. DETAILED DESCRIPTION

[0021] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be described below in conjunction with the drawings in the embodiments of the present invention. The described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making innovative efforts are within the scope of protection of the present invention.

[0022] like Figure 1-Figure 3 As shown, an embodiment of a method for preprocessing a geological environment of a deep-buried long tunnel provided by the present invention is as follows:

[0023] According to the previous geological data, determine the section 7 where the geological environment needs to be pre-processed, the drilling trajectory of the directional drilling hole 4, and the distribution of the branch drilling hole 5 (i.e., the drilling hole in the invention content). Level the drilling site, cast the drilling rig base and install the directional drilling rig 2, and adjust the azimuth and inclination of the directional drilling rig 2 according to the designed drilling trajectory. After the directional drilling rig 2 is installed, open a hole according to the designed inclination, and lower the casing 3 into the opening section and fix it with cement slurry.

[0024] Directional drilling is carried out along the designed trajectory of the borehole. When approaching the buried depth of tunnel 1, the inclined section 6 is entered. The borehole trajectory is adjusted to the horizontal section of the buried depth of tunnel 1 through directional inclined drilling. Directional coring drilling is carried out on the surrounding rock at the buried depth of tunnel 1 until the final hole depth. The whole hole is cored during the directional drilling process to ensure the core sampling rate, providing sufficient basis for geological engineers to judge the geological conditions.

[0025] After drilling to the final hole depth, the drilling tool is pulled to the surface to clean the impurities such as drill cuttings in the hole. After the hole is cleaned, the necessary comprehensive tests in the hole are completed according to the design requirements of directional drilling 4.

[0026] Repeat the above steps to complete the drilling and coring of branch holes around the main hole according to the drilling construction design, clean the branch borehole 5, and complete the comprehensive test in the hole.

[0027] Combined with the core and in-hole comprehensive test results, the pre-reinforcement plan for Tunnel 1 was determined. The type of grouting material was selected according to the geological conditions, and the grouting material was prepared according to the mix ratio.

[0028] Connect the grouting pump 13, grouting gun 12, grouting pipe 10 and other grouting equipment in sequence, and test the patency of the grouting equipment pipeline. After the test, start the grouting work. Put the grouting pipe 10 into the planned grouting position in the directional drilling hole 4. To ensure the grouting effect, a valve pipe can be used to protect the hole. After the grouting pipe 10 is in place, put the grouting stopper 11 and start grouting. Under the designed maximum grouting pressure, after the grouting flow rate is no more than 1L / min, the grouting can be ended after stabilizing the pressure for 30 minutes. The slurry diffusion range 8 and the effective reinforcement circle 9 formed can be seen in Figure 2 .

[0029] After the grouting of the main hole of directional drilling 4 is completed, the grouting material in the main hole solidifies and meets the design requirements, and the grouting process in the above steps is repeated to complete the grouting of each branch hole in turn. After the grouting of the main hole of directional drilling 4 and all branch holes is completed and the grouting effect is verified to be qualified, the directional drilling 4 at the front end of the tunnel surrounding rock pre-reinforcement section is sealed.

[0030] A preferred embodiment is: in the above scheme, the directional drilling rig coring method adopts short core tube directional coring drilling to ensure full-section coring of the tunnel for advance prediction.

[0031] A preferred embodiment is: in the above scheme, comprehensive testing in the hole after directional drilling includes sonic, video and hydrogeological testing to find out the geological conditions of the tunnel surrounding rock, the development of fractures, etc.

[0032] A preferred embodiment is: the tunnel pre-reinforcement grouting method adopts a bottom-up segmented grouting method, the thickness of the grouting reinforcement ring is 0.5-2.0 times the tunnel diameter, and the slurry diffusion radius is 2.0-25.0m.

[0033] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computers, available storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer usable program codes.

[0034] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0035] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0036] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0037] Compiling the above method steps into a program and then storing it on a hard disk or other non-transitory storage medium constitutes the technical solution of "a non-transitory readable recording medium" of the present invention; and electrically connecting the storage medium to a computer processor to complete the geological environment preprocessing of a deep buried long tunnel through data processing constitutes the technical solution of "a deep buried long tunnel geological environment preprocessing system" of the present invention.

[0038] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for pretreatment of geological environment of a deep buried long tunnel, characterized in that The following steps are involved: S1. According to the tunnel design data, determine the position distribution of multiple drilling holes parallel to the excavation direction on the wall of the tunnel to be excavated, and design the drill bit movement path from the ground to the drilling holes; level the drilling site, cast the drilling rig base and install the directional drilling rig, and determine the azimuth and inclination from the ground excavation point to the inclination point according to the drill bit movement trajectory; install the casing at the ground excavation point according to the azimuth and inclination and fix it with cement slurry; S2. Drill straight to the deflection point, smoothly transition through the pre-designed deflection section curve path, and drill to the position of each drilling hole for directional coring until the final hole depth; coring is performed throughout the hole during directional drilling, and the natural geological environment of the deep-buried long tunnel to be excavated is predicted based on the composition of the cores taken; S3. After completing the core sampling, clean the hole, conduct a comprehensive working condition test in the hole, and determine the pre-reinforcement plan; prepare the grouting material according to the geological environment, inject grouting into each drill hole, and after verifying that the grouting effect is satisfactory, close the drill hole.

2. A method for pretreatment of geological environment of a deep buried long tunnel according to claim 1, characterized in that The coring methods include directional drilling / coring alternating operation and core tube wireline coring.

3. A method for pretreatment of geological environment of a deep buried long tunnel according to claim 2, characterized in that: The contents of the comprehensive working condition test include but are not limited to sound waves, video recording, hydrogeological testing, apparent resistivity, and transient electromagnetic.

4. A method for preprocessing the geological environment of a deep buried long tunnel according to claim 3, characterized in that: The grouting process steps include: under the designed maximum grouting pressure, the grouting flow rate is not more than 1L / min, and the pressure is stabilized for 28-32 minutes before the grouting is completed.

5. A method for preprocessing geological environment of a deep buried long tunnel according to claim 4, characterized in that: The slurry diffusion radius is determined within the range of 2.0-25.0m according to the geological conditions of the surrounding rock and the development of cracks. The thickness of the tunnel surrounding rock grouting reinforcement ring formed by the diffusion of slurry from multiple drill holes distributed circumferentially with the tunnel center as the center is in the range of 0.5-2.0 times the tunnel diameter.

6. A method for preprocessing geological environment of a deep buried long tunnel according to claim 5, characterized in that: The grouting technology determined according to geological conditions and grouting scope includes one or more of the top-down segmented grouting method, the bottom-up segmented grouting method and the orifice closed grouting method.

7. A non-transitory readable recording medium for storing one or more programs including a plurality of instructions, characterized in that: When the instruction is executed, the processing circuit will be caused to execute a deep-buried long tunnel geological environment preprocessing method as described in any one of claims 1-6.

8. A deep-buried long tunnel geological environment preprocessing system, comprising a processing circuit and a memory electrically coupled thereto, characterized in that: The memory configuration stores at least one program, the program includes a plurality of instructions, and the processing circuit runs the program to execute a deep-buried long tunnel geological environment preprocessing method as described in any one of claims 1-6.

Citation Information

Patent Citations

  • Grouting reinforcement method for outer circle of surrounding rock

    CN110924976A

  • Small-section water conservancy tunnel TBM tunneling sedimentation and water burst section treatment method

    CN113833492A

  • Tunnel and underground engineering surrounding rock fissure water grouting treatment design method

    CN114151110A

  • Advanced pre-treatment method for unfavorable geological stratum ground of deep-buried long and large tunnel

    CN116291483A

  • Advanced grouting method for deep-buried tunnel earth surface directional drilling high-pressure sleeve valve pipe

    CN116877136A

Cited By

  • Precise targeted advanced treatment method for unfavorable geological tunnel section of deep-buried long tunnel

    CN119957229A