Oilfield fracturing operation fracturing equipment full-process control method and system
By dividing the operation stages and automated switching based on real-time data, the problem of low control efficiency of oil field fracturing operation process in the existing technology is solved, intelligent control of fracturing equipment is realized, and operation efficiency is improved.
Patent Information
- Application Number
- CN202411015528.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-26
AI Technical Summary
The control of the existing oilfield fracturing operation process depends on manual monitoring and adjustment, resulting in inefficiency and seriously affecting the efficiency of fracturing operation.
By dividing the operation stages and setting the corresponding sub-operation stage serial numbers, the automatic switching is carried out based on the real-time cumulative sand carrying liquid and the cumulative stage sand loading data to realize intelligent control of the fracturing equipment.
It realizes intelligent control of fracturing operation process, improves operation efficiency, reduces manual intervention, and improves the level of operation automation.
Smart Images

Figure CN118933694A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of fracturing operations, and in particular relates to a full-process control method and system for fracturing equipment in oilfield fracturing operations. Background Art
[0002] Since the shale gas revolution in North America, horizontal well volume fracturing has been widely promoted and applied, and the "10,000 cubic meters of liquid, 1,000 cubic meters of sand" fracturing construction plan has become the norm in the industry; in order to convert energy storage into production capacity in the shortest time, oil fields generally adopt a "man-stop but machine-stop" factory-style fracturing operation mode; however, the control switching of the fracturing process still relies on manual work, requiring construction personnel to monitor and adjust the operating parameters of the fracturing equipment at all times, which seriously affects the efficiency of the fracturing operation. Summary of the invention
[0003] The object of the present invention is to provide a method and system for controlling the entire process of fracturing equipment in oilfield fracturing operations, so as to solve the drawbacks of the existing fracturing operation process control proposed in the above background technology.
[0004] To achieve the above object, the present invention provides the following technical solution: a method for controlling the entire process of fracturing equipment in oilfield fracturing operations, comprising:
[0005] The operation phases are divided based on the operation content. A single operation phase includes at least one sub-operation phase. The sub-operation phase numbers are set based on the order of the operation content. The sub-operation phase numbers have an initial number and an end number. The difference between the numbers of adjacent sub-operation phases is n, and n is a positive integer.
[0006] Setting an operation parameter set, wherein the operation parameter set includes a reference value of the cumulative sand-carrying liquid volume and a reference value of the cumulative sand volume in each sub-operation stage;
[0007] Start the fracturing operation, use the initial sequence number as the current sequence number, control the action of the fracturing equipment based on the operation parameter set, and obtain the real-time cumulative sand-carrying fluid volume and cumulative stage sand volume data;
[0008] The real-time cumulative sand-carrying liquid volume and the cumulative stage sand volume data are compared with the cumulative sand-carrying liquid volume reference value and the cumulative stage sand volume reference value of the sub-operation stage corresponding to the current sequence number. When the real-time cumulative sand-carrying liquid volume is not less than the cumulative sand-carrying liquid volume reference value and / or the real-time cumulative stage sand volume data is not less than the cumulative stage sand volume reference value, the holding state of the operation stage to which the sub-operation stage corresponding to the current sequence number belongs and whether the operation stage to which it belongs is switched are determined, and when the operation stage is in the holding state and the operation stage is switched or the operation stage is not in the holding state, the current operation sequence number is increased by n;
[0009] The current sequence number is compared with the end sequence number, and the fracturing operation is stopped when the current sequence number is equal to the end sequence number.
[0010] Preferably, the operation stages include ball delivery, trial extrusion, working condition A pre-fluid, sand-carrying fluid and displacement.
[0011] Preferably, the fracturing equipment includes an intelligent water and sand supply module with a sand mixing device, a compounding device, a liquid storage device, and a sand transporting device, and an intelligent cruise fracturing control module with a diesel-driven pumping device and an electric-driven pumping device. The control of the fracturing equipment action based on the operation parameter set includes controlling the coordinated operation of the pumping device, the sand mixing device, the compounding device, the liquid storage device, and the sand transporting device based on the operation parameters in the sub-operation stage corresponding to the current sequence number.
[0012] Preferably, the operation parameter set further includes the net liquid volume, total displacement, sand concentration and proppant type corresponding to each sub-operation stage.
[0013] Preferably, the method further comprises:
[0014] When the job phase is in the hold state and the job phase is not switched, the current job state is maintained.
[0015] Preferably, the method further comprises:
[0016] Before starting the fracturing operation, the safety of the high-pressure area is confirmed through well site information feedback.
[0017] Preferably, the well site information feedback includes monitoring information feedback and operator information feedback.
[0018] Preferably, the method further comprises, after starting the fracturing operation:
[0019] Obtain the previous construction pressure P. When the current construction pressure is less than the safety threshold of the construction pressure, calculate the first derivative α of the current construction pressure with respect to time and the second derivative λ of the first derivative with respect to time, and adjust the construction displacement and construction sand concentration based on the first derivative α and the second derivative λ.
[0020] Preferably, when λ≤0, and 0<α<1, the construction displacement and the construction sand concentration are adjusted based on the following formula:
[0021] V=Va(1-Kα), S=Sa(1-Kα), where Va represents the set construction displacement, Sa represents the set sand concentration, V represents the actual construction displacement after adjustment, S represents the actual construction sand concentration after adjustment, and K is the safety adjustment coefficient of fracturing construction, which is the set value.
[0022] Preferably, when λ>0, and 0<α<1, the construction displacement and construction sand concentration are adjusted by the following formula:
[0023] V=Vaλ(1-Kα), S=Saλ(1-Kα), where Va represents the set construction displacement, Sa represents the set sand concentration, V represents the actual construction displacement after adjustment, S represents the actual construction sand concentration after adjustment, and K is the safety adjustment coefficient of fracturing construction, which is the set value.
[0024] Preferably, when α≥1, the construction sand concentration is reduced to 0, the operation phase enters the displacement phase, and displacement fluid metering begins.
[0025] On the other hand, the present application discloses a full-process control system for fracturing equipment in oilfield fracturing operations, including:
[0026] A division module is configured to divide the operation phases based on the operation content, wherein a single operation phase includes at least one sub-operation phase, and the sub-operation phase sequence numbers are set based on the operation content sequence, wherein the sub-operation phase sequence numbers have an initial sequence number and an end sequence number, and the difference between adjacent sub-operation phase sequence numbers is n, and n is a positive integer;
[0027] A setting module configured to set an operation parameter set, wherein the operation parameter set includes a reference value of the cumulative sand-carrying liquid volume and a reference value of the cumulative sand volume in each sub-operation stage;
[0028] An operation module is configured to start a fracturing operation, use the initial sequence number as the current sequence number, control the action of the fracturing equipment based on the operation parameter set, and simultaneously obtain real-time cumulative sand-carrying fluid volume and cumulative stage sand volume data;
[0029] A comparison module is configured to compare the real-time cumulative sand-carrying liquid volume and the cumulative stage sand volume data with the cumulative sand-carrying liquid volume reference value and the cumulative stage sand volume reference value of the sub-operation stage corresponding to the current sequence number, and when the real-time cumulative sand-carrying liquid volume is not less than the cumulative sand-carrying liquid volume reference value and / or the real-time cumulative stage sand volume data is not less than the cumulative stage sand volume reference value, determine the holding state of the operation stage to which the sub-operation stage corresponding to the current sequence number belongs and whether the operation stage to which it belongs is switched, and when the operation stage is in a holding state and the operation stage is switched or the operation stage is not in a holding state, add n to the current operation sequence number;
[0030] The termination module is configured to compare the current sequence number with the termination sequence number, and stop the fracturing operation when the sequence number reaches the termination sequence number.
[0031] Compared with the prior art, the present invention has the following beneficial effects:
[0032] The present application divides the workflow in advance to form an operation stage with multiple sub-operation stages, sets an operation parameter set corresponding to the sub-operation stages, and realizes automatic switching of the sub-operation stages by determining the accumulated sand-carrying fluid volume and the accumulated stage sand volume data, thereby realizing intelligent control of the fracturing operation process. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 This is a flow chart of the application method;
[0034] Figure 2 A schematic diagram of the job parameter set. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] A method for controlling the entire process of fracturing equipment in oilfield fracturing operations is used to realize intelligent fracturing operations. Specifically, the fracturing equipment includes a control module, a data acquisition module, a wellhead process control module, a water supply and sand supply module, and a cruise control module. The data acquisition module is used for collecting, storing, and displaying software and hardware systems for real-time data of fracturing operations (such as proppant type, sand position data, and fracturing fluid flow, etc.), and exemplarily may include a data acquisition PLC system installed inside a fracturing instrument vehicle, real-time data storage, and display software (such as a display screen).
[0037] The main body of the wellhead and manifold control module consists of a multi-channel hydraulic centralized control station and a control system.
[0038] The intelligent water supply and sand supply module mainly includes a sand mixing device, a mixing device, a liquid storage device and a sand conveying device, wherein the sand mixing device is a mixing device for liquid and sand body (proppant), and is configured to supply the required fracturing fluid to the fracturing unit, that is, the liquid and the proppant are mixed in the sand mixing device to form the fracturing fluid, correspondingly, the mixing device is configured to supply the required liquid to the sand mixing device, the sand conveying device is configured to supply the required proppant to the sand mixing device, and the liquid storage device includes, for example, a flexible water tank and a transition tank, wherein the flexible water tank is configured to supply the required liquid ( For example, water), the transition tank is constructed as an intermediate tank body between the mixing equipment and the sand mixing equipment, that is, the water supplied by the flexible water tank is mixed with the powder in the mixing equipment to form a liquid and then stored in the transition tank body, and is supplied to the sand mixing equipment as needed. Furthermore, the above-mentioned sand mixing equipment, mixing equipment, liquid storage equipment, and sand conveying equipment are equipped with monitoring equipment, such as online monitoring of the liquid level of the flexible water tank, the liquid level of the transition tank, the sand level of the sand mixing vehicle, and the sand level of the sand conveying equipment, thereby realizing the intelligent control of the coordinated operation of the sand mixing equipment, mixing equipment, liquid storage equipment, and sand conveying equipment.
[0039] The intelligent cruise control module of the fracturing unit has diesel-driven pumping equipment and electric-driven pumping equipment, and is used to realize the automatic control of the fracturing unit. It is compatible with diesel-driven and electric-driven fracturing pumping systems, such as controlling the automatic start and stop operation of the fracturing pumping equipment, and has active safety protection and other functions.
[0040] The main function of the control module is to store the design parameters of the fracturing operation in stages (such as the design parameters of the subsequent sub-operation stages), and to issue construction operation instructions to the intelligent water and sand supply module and the intelligent cruise control module of the fracturing unit based on the set parameters to realize intelligent control of the fracturing operation.
[0041] Specifically, refer to Figure 1 , the above control method includes:
[0042] S100: Divide the operation phases based on the operation content, wherein a single operation phase includes at least one sub-operation phase, and set the sub-operation phase sequence numbers based on the operation content sequence, wherein the sub-operation phase sequence numbers have an initial sequence number and an end sequence number, and the difference between adjacent sub-operation phase sequence numbers is n, and n is a positive integer;
[0043] S200: Setting an operation parameter set, wherein the operation parameter set includes a reference value of the cumulative sand-carrying liquid volume and a reference value of the cumulative sand volume in each sub-operation stage;
[0044] S300: Start the fracturing operation, use the initial sequence number as the current sequence number, and control the action of the fracturing equipment based on the operation parameter set, while obtaining real-time cumulative sand-carrying fluid volume and cumulative stage sand volume data;
[0045] S400: Compare the real-time cumulative sand-carrying liquid volume and the cumulative stage sand volume data with the cumulative sand-carrying liquid volume reference value and the cumulative stage sand volume reference value of the sub-operation stage corresponding to the current sequence number. When the real-time cumulative sand-carrying liquid volume is not less than the cumulative sand-carrying liquid volume reference value and / or the real-time cumulative stage sand volume data is not less than the cumulative stage sand volume reference value, determine the holding state of the operation stage to which the sub-operation stage corresponding to the current sequence number belongs and whether the operation stage to which it belongs is switched, and when the operation stage is in the holding state and the operation stage is switched or the operation stage is not in the holding state, add n to the current operation sequence number;
[0046] S500: Compare the current sequence number with the end sequence number, and stop the fracturing operation when the sequence number reaches the end sequence number.
[0047] In some embodiments, for step S100, refer to Figure 2, is a table of operation content parameter sets. The operation stages include ball delivery, trial extrusion, working condition A pre-fluid, sand-carrying fluid and displacement. Different operation stages include at least one sub-operation stage. The working parameters of different sub-operation stages are different, that is, different sub-operation stages correspond to different working parameters, and the work content is designed in sequence. Correspondingly, different sub-operation stages have different serial numbers and are arranged according to the order of the operation content, that is, they are arranged in the order of the operation, and the difference between adjacent sub-operation stages is 1, that is, n is 1.
[0048] In some embodiments, in step S200, the operation parameter set includes, in addition to the cumulative sand-carrying liquid reference value and the cumulative stage sand reference value data, also parameters required for the fracturing equipment operation, such as net liquid volume, total displacement, sand concentration and proppant type. For example, the proppant type and sand concentration data are parameter data required for the operation of the sand mixing equipment and the sand transporting equipment.
[0049] In step S300, the action of the fracturing equipment is controlled based on the operation parameter set, mainly to control the action of the intelligent water supply and sand supply module, such as controlling the liquid supply amount of the mixing equipment to the sand mixing equipment, the sand body (proppant) supply amount of the sand conveying equipment to the sand mixing equipment, and the outlet sand concentration of the sand mixing equipment. Furthermore, controlling the action of the fracturing equipment also includes distributing the total displacement data to each fracturing pump group through the fracturing group cruise control module to realize the displacement distribution operation.
[0050] Furthermore, in step S300, the real-time cumulative sand-carrying liquid volume and the real-time cumulative stage sand volume data are mainly collected and measured by the instrument collection software inside the instrument equipment. The collection data source comes from the discharge pump metering of the sand mixing equipment and the sand conveying auger metering, and the direct collection data of the instrument is corrected by the software to improve the stability of the parameters.
[0051] In some embodiments, the above method also includes: before starting the fracturing operation, confirming the safety of the high-pressure area through well site information feedback, that is, determining whether there are any personnel staying in the high-pressure area, wherein the well site information feedback includes monitoring information feedback and operator information feedback, that is, determining whether there are personnel staying in the high-pressure area through monitoring data and personnel call data. Furthermore, this step also includes the on-site command sending the fracturing construction operation process to the wellhead and high-pressure manifold control module through the intelligent cluster control module, controlling and confirming that the current wellhead process and high-pressure manifold process have switched to the fracturing construction process.
[0052] In some embodiments, the above method further comprises:
[0053] When the job phase is in the hold state and the job phase is not switched, the current job state is maintained.
[0054] Specifically, in this step, maintaining the current operating state means controlling the fracturing operation process with the operating parameter set corresponding to the current serial number; at the same time, since the operation stage is in a holding state, the cumulative sand-carrying liquid volume and the cumulative stage sand volume will continue to increase, which will cause the current operating pressure to increase. In order to reduce the risk of sand blockage, the on-site operation commander will choose stage maintenance, that is, continue pumping in the low sand concentration stage to ensure construction safety. Correspondingly, the general result at this time is that the cumulative sand-carrying liquid volume exceeds the designed sand-carrying liquid volume, and the cumulative sand volume remains unchanged.
[0055] The above method also includes, after the fracturing operation is started:
[0056] Set a safe threshold for construction pressure;
[0057] Obtain the previous construction pressure P. When the current construction pressure is less than the safety threshold of the construction pressure, calculate the first derivative α of the current construction pressure with respect to time and the second derivative λ of the first derivative with respect to time, and adjust the construction displacement and construction sand concentration based on the first derivative α and the second derivative λ.
[0058] In some embodiments, when λ≤0, and 0<α<1, the construction displacement and the construction sand concentration are adjusted based on the following formula:
[0059] V=Va(1-Kα), S=Sa(1-Kα), where Va represents the set construction displacement, Sa represents the set sand concentration, K is the fracturing construction safety adjustment coefficient, which is the set value, V represents the actual construction displacement after adjustment, and S represents the actual construction sand concentration after adjustment, that is, at this time, the construction displacement and sand concentration will decrease proportionally with the increase of construction pressure.
[0060] In some embodiments, when λ≤0 and α≥1, the construction sand concentration is reduced to 0, and the set displacement pressure is used as the actual construction pressure after adjustment.
[0061] In some embodiments, when λ>0, and 0<α<1, the construction displacement and the construction sand concentration are adjusted by the following formula:
[0062] V=Vaλ(1-Kα), S=Saλ(1-Kα), where Va represents the set construction displacement, Sa represents the set sand concentration, K is the fracturing construction safety adjustment coefficient, which is the set value, V represents the actual construction displacement after adjustment, and S represents the actual construction sand concentration after adjustment; that is, at this time, the construction displacement and sand concentration will decrease with the increase of pressure and fluctuation.
[0063] In some embodiments, when λ>0 and α≥1, the construction sand concentration is reduced to 0, and the set displacement pressure is used as the actual construction pressure after adjustment, that is, the operation stage enters the following state: Figure 2 The displacement phase in the table and the metering of the displacement fluid are started simultaneously.
[0064] On the other hand, the present application discloses a full-process control system for fracturing equipment of oilfield fracturing operation, including: a division module, which is configured to divide the operation phase based on the operation content, a single operation phase includes at least one sub-operation phase, and the sub-operation phase sequence number is set based on the operation content sequence, the sub-operation phase sequence number has an initial sequence number and an end sequence number, and the difference between adjacent sub-operation phase sequence numbers is n, and n is a positive integer;
[0065] A setting module configured to set an operation parameter set, wherein the operation parameter set includes a reference value of the cumulative sand-carrying liquid volume and a reference value of the cumulative sand volume in each sub-operation stage;
[0066] An operation module is configured to start a fracturing operation, use the initial sequence number as the current sequence number, control the action of the fracturing equipment based on the operation parameter set, and simultaneously obtain real-time cumulative sand-carrying fluid volume and cumulative stage sand volume data;
[0067] A comparison module is configured to compare the real-time cumulative sand-carrying liquid volume and the cumulative stage sand volume data with the cumulative sand-carrying liquid volume reference value and the cumulative stage sand volume reference value of the sub-operation stage corresponding to the current sequence number, and when the real-time cumulative sand-carrying liquid volume is not less than the cumulative sand-carrying liquid volume reference value and / or the real-time cumulative stage sand volume data is not less than the cumulative stage sand volume reference value, determine the holding state of the operation stage to which the sub-operation stage corresponding to the current sequence number belongs and whether the operation stage to which it belongs is switched, and when the operation stage is in a holding state and the operation stage is switched or the operation stage is not in a holding state, add n to the current operation sequence number;
[0068] The termination module is configured to compare the current sequence number with the termination sequence number, and stop the fracturing operation when the sequence number reaches the termination sequence number.
[0069] In the description of the present invention, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In the present invention, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine different embodiments or examples described in the present invention and features of different embodiments or examples without contradiction.
[0070] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein; and these modifications or substitutions do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for controlling the entire process of fracturing equipment in oilfield fracturing operations. It is characterized in that include: The operation phases are divided based on the operation content. A single operation phase includes at least one sub-operation phase. The sub-operation phase numbers are set based on the operation content sequence. The sub-operation phase numbers have an initial number and an end number. The difference between adjacent sub-operation phase numbers is n, and n is a positive integer. Setting an operation parameter set, wherein the operation parameter set includes a reference value of the cumulative sand-carrying liquid volume and a reference value of the cumulative sand volume in each sub-operation stage; Start the fracturing operation, use the initial sequence number as the current sequence number, control the action of the fracturing equipment based on the operation parameter set, and obtain the real-time cumulative sand-carrying fluid volume and cumulative stage sand volume data; The real-time cumulative sand-carrying liquid volume and the cumulative stage sand volume data are compared with the cumulative sand-carrying liquid volume reference value and the cumulative stage sand volume reference value of the sub-operation stage corresponding to the current sequence number. When the real-time cumulative sand-carrying liquid volume is not less than the cumulative sand-carrying liquid volume reference value and / or the real-time cumulative stage sand volume data is not less than the cumulative stage sand volume reference value, the holding state of the operation stage to which the sub-operation stage corresponding to the current sequence number belongs and whether the operation stage to which it belongs is switched are determined, and when the operation stage is in the holding state and the operation stage is switched or the operation stage is not in the holding state, the current operation sequence number is increased by n; The current sequence number is compared with the end sequence number, and the fracturing operation is stopped when the current sequence number is equal to the end sequence number.
2. A method for controlling the entire process of fracturing equipment in an oilfield fracturing operation according to claim 1, Features: The operation stages include ball delivery, trial squeezing, working condition A pre-fluid, sand-carrying fluid and displacement.
3. A method for controlling the entire process of fracturing equipment in an oilfield fracturing operation according to claim 1 or 2, Features: The fracturing equipment includes an intelligent water and sand supply module with a sand mixing device, a compounding device, a liquid storage device, and a sand transporting device, and an intelligent cruise fracturing control module with a diesel-driven pumping device and an electric-driven pumping device. The control of the fracturing equipment action based on the operation parameter set includes controlling the coordinated operation of the pumping device, the sand mixing device, the compounding device, the liquid storage device, and the sand transporting device based on the operation parameters in the sub-operation stage corresponding to the current sequence number.
4. A method for controlling the entire process of fracturing equipment in an oilfield fracturing operation according to claim 1, Features: The operation parameter set also includes the net liquid volume, total displacement, sand concentration and proppant type corresponding to each sub-operation stage.
5. The method for controlling the whole process of fracturing equipment in oilfield fracturing operation according to claim 1, Features: The method further comprises: When the job phase is in the hold state and the job phase is not switched, the current job state is maintained.
6. A method for controlling the entire process of fracturing equipment in oilfield fracturing operations according to claim 1, Features: The method further comprises: Before starting the fracturing operation, the safety of the high-pressure area is confirmed through well site information feedback.
7. A method for controlling the entire process of fracturing equipment in oilfield fracturing operations according to claim 6, Features: The well site information feedback includes monitoring information feedback and operator information feedback.
8. The method for controlling the whole process of fracturing equipment in oilfield fracturing operation according to claim 1, Features: The method further comprises, after initiating the fracturing operation: Obtain the previous construction pressure P. When the current construction pressure is less than the safety threshold of the construction pressure, calculate the first derivative α of the current construction pressure with respect to time and the second derivative λ of the first derivative with respect to time, and adjust the construction displacement and construction sand concentration based on the first derivative α and the second derivative λ.
9. A method for controlling the entire process of fracturing equipment in oilfield fracturing operations according to claim 8, Features: When λ≤0 and 0<α<1, the construction displacement and construction sand concentration are adjusted based on the following formula: V=Va(1-Kα), S=Sa(1-Kα), where Va represents the set construction displacement, Sa represents the set sand concentration, V represents the actual construction displacement after adjustment, S represents the actual construction sand concentration after adjustment, and K is the safety adjustment coefficient of fracturing construction, which is the set value.
10. A method for controlling the entire process of fracturing equipment in oilfield fracturing operations according to claim 8, Features: When λ>0 and 0<α<1, the construction displacement and construction sand concentration are adjusted by the following formula: V=Vaλ(1-Kα), S=Saλ(1-Kα), where Va represents the set construction displacement, Sa represents the set sand concentration, V represents the actual construction displacement after adjustment, S represents the actual construction sand concentration after adjustment, and K is the safety adjustment coefficient of fracturing construction, which is the set value.
11. A method for controlling the entire process of fracturing equipment in oilfield fracturing operations according to claim 8, Features: When α≥1, the construction sand concentration is reduced to 0, the operation phase enters the displacement phase, and the displacement fluid metering begins.
12. A full-process control system for fracturing equipment in oilfield fracturing operations. Features: include: A division module is configured to divide the operation phases based on the operation content, wherein a single operation phase includes at least one sub-operation phase, and the sub-operation phase sequence numbers are set based on the operation content sequence, wherein the sub-operation phase sequence numbers have an initial sequence number and an end sequence number, and the difference between adjacent sub-operation phase sequence numbers is n, and n is a positive integer; A setting module configured to set an operation parameter set, wherein the operation parameter set includes a reference value of the cumulative sand-carrying liquid volume and a reference value of the cumulative sand volume in each sub-operation stage; An operation module is configured to start a fracturing operation, use the initial sequence number as the current sequence number, control the action of the fracturing equipment based on the operation parameter set, and simultaneously obtain real-time cumulative sand-carrying fluid volume and cumulative stage sand volume data; A comparison module is configured to compare the real-time cumulative sand-carrying liquid volume and the cumulative stage sand volume data with the cumulative sand-carrying liquid volume reference value and the cumulative stage sand volume reference value of the sub-operation stage corresponding to the current sequence number, and when the real-time cumulative sand-carrying liquid volume is not less than the cumulative sand-carrying liquid volume reference value and / or the real-time cumulative stage sand volume data is not less than the cumulative stage sand volume reference value, determine the holding state of the operation stage to which the sub-operation stage corresponding to the current sequence number belongs and whether the operation stage to which it belongs is switched, and when the operation stage is in a holding state and the operation stage is switched or the operation stage is not in a holding state, add n to the current operation sequence number; The termination module is configured to compare the current sequence number with the termination sequence number, and stop the fracturing operation when the sequence number reaches the termination sequence number.
Citation Information
Patent Citations
Hydraulic fracturing method
CN106567701A
Step displacement increasing fracturing automatic control method used for hole opening
CN111997579A
Automatic pump injection control method and system for fracturing well site
CN113818857A
Technological method for integrating slug filling hydraulic fracturing and well wall sand prevention
CN118148598A
Hydraulic fracturing job plan real-time revisions utilizing detected response feature data
US20220027538A1