Automatic operation platform for installation of large-diameter high-strength steel pipe of deep shaft and use method

By designing an automated operating platform, using hydraulic cylinder support rods, submerged arc automatic welding machine and locking mechanism, the problems of low manual welding efficiency, large pollution and poor stability of traditional operating platforms are solved, and efficient and safe steel pipe installation is achieved.

CN118933794APending Publication Date: 2024-11-12SINOHYDRO BUREAU 12 CO LTD
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202410826387.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-25
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The traditional vertical shaft steel pipe installation and operation platform has problems such as low manual welding efficiency, high pollution, poor stability and high safety risks, and the lock fixing method is low and the safety is not high.

Method used

Design a deep vertical shaft large diameter high-strength steel pipe installation automatic operation platform, adopting support beams, hydraulic cylinder support rods, submerged arc automatic welding machine, limit adjustment mechanism and locking mechanism, through rotating mechanism, hydraulic cylinder, sliding The tracks and electric hoists realize automated operation, reduce manual labor, and improve installation efficiency and safety.

Benefits of technology

The mechanized construction of the automated operating platform has been realized, the efficiency and quality of steel pipe installation has been improved, pollution has been reduced, the stability and safety of the operating platform has been ensured, and the labor burden of workers has been reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933794A_ABST
    Figure CN118933794A_ABST
Patent Text Reader

Abstract

The automatic operation platform comprises a first supporting beam and a second supporting beam which are vertically arranged in parallel, the top of the first supporting beam is fixedly connected with a seam pressing operation plate, and the center of the seam pressing operation plate is rotatably connected with a hydraulic cylinder supporting rod through a rotating mechanism; first hydraulic cylinders are arranged at the two ends of the hydraulic cylinder supporting rod, a hoisting assembly is connected to the top of the rotating mechanism through an electric chain hoist, a welding operation plate is fixedly connected to the top face of the second supporting beam, a sliding rail is annularly arranged on the welding operation plate with the center of the welding operation plate as the circle center, and a welding operation room is slidably connected to the sliding rail through a walking mechanism. The bottom of each end of the first supporting beam and the bottom of each end of the second supporting beam are each provided with a limiting adjusting mechanism. The problems of low efficiency, high safety risk and the like due to the fact that a traditional operation platform is temporarily fixed through a lock are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of shaft steel pipe installation equipment, and in particular to an automated operation platform for installing large-diameter high-strength steel pipes in deep shafts and a use method thereof. Background Art

[0002] Generally, the height of the water diversion shaft of a hydropower station is from tens to hundreds of meters. When installing the shaft pressure steel pipe, a single section of steel pipe is hoisted and lowered, and assembled and welded in the shaft. Therefore, it is usually necessary to build an operating platform to facilitate the construction in the shaft. However, the traditional operating platform has the following difficulties during underground construction:

[0003] 1. At present, underground steel pipe welding is basically carried out by manual welding. However, due to the relatively thick wall thickness of high-strength steel pipes in deep vertical shafts, the welding workload is large and multiple workers are required for welding. The welding efficiency is low, and a lot of manpower and time are consumed. In addition, the smoke generated by manual welding is difficult to dissipate in deep wells, which is harmful to the health of operators.

[0004] 2. Since workers need to perform high-altitude operations on the working platform, the operating platform is prone to shaking when they are climbing up and down ladders, walking, pressing seams, welding, etc., which affects the stability of the operating platform and may hit the inner wall of the steel pipe and damage the steel pipe. There are also great safety risks. The personal safety of the workers is difficult to guarantee, affecting the progress of construction.

[0005] 3. Since the inner wall of high-strength steel pipes does not allow welding of fixings, the operating platform must be fixed in other ways. The commonly used method is to set a lock (such as a wire rope hook) on the top of the operating platform, and temporarily lock the operating platform to the installed steel pipe mouth through the lock. However, due to the influence of the lock on the installed steel pipe mouth, the steel pipe to be installed cannot be directly dropped and aligned, and it is necessary to stop when there is 20cm left to the pipe mouth alignment. After the worker enters the operating platform and climbs up to switch the lock, the steel pipe to be installed and the installed steel pipe are aligned. Manually switching the lock not only has high safety risks, but also has low efficiency and high labor intensity, which increases the operation time in the shaft and affects the progress of the project. Summary of the invention

[0006] The purpose of the present invention is to provide an automated operating platform for installing large-diameter high-strength steel pipes in deep vertical shafts and a method for using the platform, which solves the problem that the traditional operating platform uses manual welding, which is heavy, inefficient and highly polluting, solves the problem that the operating platform is easy to shake and is highly dangerous, and solves the problem that temporary fixation using locks affects the efficiency of steel pipe installation and has high safety risks.

[0007] An automated operation platform for installing large-diameter high-strength steel pipes in a deep shaft comprises a first support beam and a second support beam arranged in parallel up and down.

[0008] The top of the first support beam is fixedly connected with a seam pressing operation plate, the center of the seam pressing operation plate is provided with a rotating mechanism, the rotating mechanism is rotatably connected with a hydraulic cylinder support rod parallel to the cross section of the steel pipe, both ends of the hydraulic cylinder support rod are fixedly connected with the first hydraulic cylinder, and the top of the rotating mechanism is connected with a hoisting assembly through a chain electric hoist.

[0009] A welding work plate is fixedly connected to the top surface of the second support beam, a connecting column is fixedly connected between the top center of the welding work plate and the bottom of the first support beam, a sliding track is circumferentially arranged on the welding work plate with its center as the center of the circle, a welding operation room is slidably connected to the sliding track through a walking mechanism, a submerged arc automatic welding machine for circumferential welding of steel pipe seams is arranged in the welding operation room, and a limit adjustment mechanism is arranged at the bottom of each end of the first support beam and the second support beam.

[0010] A further technical solution is: a column located in the sliding track circle is arranged between the seam pressing work plate and the welding work plate, a positioning seat is arranged on the column, a positioning push rod is arranged on one side of the top of the welding operation room, a connecting claw for connecting to the positioning seat is arranged on the telescopic end of the positioning push rod, and a supporting wheel is arranged on one side of the top of the welding operation room close to the inner wall of the steel pipe.

[0011] A further technical solution is: the surface of the slide track is a smooth arc surface, the walking mechanism includes an arc groove walking wheel slidably connected to the slide track, and the walking wheel is connected to a driving motor for driving the walking wheel to rotate.

[0012] A further technical solution is that a plurality of lateral limiting wheels are symmetrically arranged on the top of the protective cover.

[0013] A further technical solution is: the limit adjustment mechanism includes a support frame fixedly connected to the bottom surface of the end of the first support beam or the second support beam, the side of the support frame close to the inner wall of the steel pipe is rotatably connected to a roller through a connecting rod, and the other side of the support frame is fixedly connected to a spring through a connecting groove, and the other end of the spring is fixedly connected to the bottom surface of the first support beam or the second support beam.

[0014] A further technical solution is: a triangular connecting rod is hinged at the bottom of the support frame, a support shoe is hinged at one end of the triangular connecting rod close to the inner wall of the steel pipe, a second hydraulic cylinder is hinged at one end of the triangular connecting rod away from the inner wall of the steel pipe, and the other end of the second hydraulic cylinder is fixed to the bottom of the first support beam or the second support beam through a connecting frame.

[0015] A further technical solution is: the lifting assembly includes a locking beam fixedly connected to the top of the chain electric hoist, a protective cover plate is fixedly connected to the top of the locking beam, a locking mechanism is telescopically connected to each end of the locking beam, the locking mechanism includes a locking claw slidably connected to the end of the locking beam, a second limit sensor is provided in the locking claw, a locking slot is provided at the bottom of the locking claw, the locking slot is adapted to the pipe wall of the steel pipe mouth, and a driving assembly is connected to the locking claw to drive the locking claw to extend and retract.

[0016] A further technical solution is: the lifting assembly also includes an automatic grabbing beam, and a plurality of sets of mutually adaptable alignment mechanisms and grabbing mechanisms are arranged between the automatic grabbing beam and the protective cover plate; the alignment mechanism includes an insertion shaft arranged at the bottom of the automatic grabbing beam and an alignment cylinder arranged at the top of the locking beam, and a first limit sensor is arranged in the alignment cylinder; the grabbing mechanism includes a docking ear arranged at the bottom of the automatic grabbing beam, and two grabbing ear plates arranged in parallel at the top of the locking beam, wherein a telescopic push rod is fixedly connected to the outer side of one of the grabbing ear plates, and a through hole and a lifting hole for the telescopic shaft on the telescopic push rod to pass through are respectively provided on the grabbing ear plate and the docking ear.

[0017] A method for using an automated operating platform for installing large-diameter high-strength steel pipes in deep shafts, characterized in that:

[0018] S1: Lift the steel pipe into the shaft and connect it with the previous section of the installed steel pipe;

[0019] S2: The lifting assembly is locked and connected with the top pipe opening of the steel pipe section;

[0020] S3: The chain electric hoist lowers the seam pressing operation plate for a distance, drives the rotating table to rotate, adjusts the first hydraulic cylinder to the offset position between the current section of the steel pipe and the previous section of the steel pipe, drives the second hydraulic cylinder to extend and drive the support shoe to press against the inner wall of the steel pipe, drives the first hydraulic cylinder to extend and then slowly push the pipe wall at the offset position until the offset adjustment is completed, drives the second hydraulic cylinder to retract and drive the support shoe to withdraw from the inner wall of the steel pipe;

[0021] S4: The chain electric hoist lifts the seam pressing work plate for a distance, drives the positioning push rod to extend, and tilts the welding operation room until the wheel leans against the inner wall of the steel pipe. Then the chain electric hoist accurately adjusts the position height of the welding work plate until the welding nozzle of the submerged arc automatic welding machine is at the joint position between the current section of the steel pipe and the previous section of the steel pipe. The worker lifts the connecting claw to separate it from the positioning seat, and drives the positioning push rod to retract, drives the second hydraulic cylinder to extend, and drives the support shoe to press against the inner wall of the steel pipe;

[0022] S5: The worker enters the welding operation room, drives the walking mechanism to drive the welding operation room to move at a constant speed on the sliding track, and starts the submerged arc automatic welding machine to weld the steel pipe joint until the full ring welding operation of the steel pipe joint is completed;

[0023] S6: The worker exits the welding operation room, drives the positioning push rod to extend, and after the worker lifts the connecting claw to connect it with the positioning seat, drives the positioning push rod to retract, thereby driving the position of the welding operation room to return to the correct position, and drives the second hydraulic cylinder to retract and drive the support shoe to retreat from the inner wall of the steel pipe;

[0024] S7: The lifting assembly is unlocked from the top pipe opening of the steel pipe section;

[0025] S8: After hoisting the next section of steel pipe into the shaft and completing the docking with the steel pipe section, repeat steps S2-S7 to install the next section of steel pipe.

[0026] A further technical solution is: in step S2, the locking connection between the lifting assembly and the steel pipe is achieved by hanging the chain electric hoist at the bottom of the locking beam of the lifting assembly, driving the locking mechanisms to extend out of the ends of the locking beam, and then lowering the automatic grab beam through the lifting equipment until the locking mechanism is fitted and connected with the pipe wall of the top pipe opening of the section of steel pipe, the lifting equipment stops lowering, and the automatic grab beam completes the release of the locking beam through the grabbing mechanism, and the lifting equipment lifts the automatic grab beam upward to the specified position; in step S7, the lifting assembly and the steel pipe are unlocked by lowering the automatic grab beam through the lifting equipment, and when the alignment mechanism completes the alignment action between the automatic grab beam and the locking beam, the lifting equipment stops lowering, and the automatic grab beam completes the grabbing action of the locking beam through the grabbing mechanism, the lifting equipment lifts the entire platform upward to the specified height, and drives the locking mechanisms to retract into the ends of the locking beam.

[0027] Beneficial effects of the present invention:

[0028] 1. The automated operation platform has three layers in total. The top layer is the platform locking layer, which is used for the installation and disassembly of the platform as a whole. The middle layer is the steel pipe pressing layer, which is used for adjusting the steel pipe alignment and pressing. The bottom layer is the steel pipe welding layer, which is used for the circumferential welding of the steel pipe section after the pressing. The operation platform integrates the hoisting components, locking mechanism, rotation mechanism, first hydraulic cylinder, submerged arc automatic welding machine and supporting flux automatic recovery machine, electro-hydraulic control system, limit adjustment mechanism and other components. The loading and unloading, steel pipe pressing and welding of the automated operation platform are realized by remote control, which improves the mechanization and automation level of underground steel pipe installation and improves work efficiency and quality.

[0029] 2. Use a rotating mechanism, a hydraulic cylinder support rod and a first hydraulic steel pipe to carry out the steel pipe alignment and seam pressing operation. The hydraulic cylinder support rod is controlled by the rotating mechanism to rotate and adjust the angle, and the first hydraulic cylinder is started to push out and correct the misalignment of the steel pipe mouth. The adjustment efficiency is higher, which reduces the labor burden of workers, ensures the accurate alignment of the steel pipe, and ensures the quality of steel pipe installation.

[0030] 3. A welding operation room equipped with a submerged arc automatic welding machine and an automatic flux recovery machine is used. The welding operation room moves in a circle driven by a sliding track and a walking mechanism. Workers can sit in the welding operation room to perform welding operations, realizing mechanized operations, which greatly reduces the labor burden of welding operations. In addition, the quality of welding using a submerged arc automatic welding machine is better than that of manual welding, and no harmful gases are generated, resulting in less pollution.

[0031] 4. A limit adjustment mechanism is used to adjust the position of the operating platform in the steel pipe. When the operating platform is lifted or lowered, the rollers roll on the inner wall of the steel pipe to ensure the overall stable movement of the operating platform and avoid bumping into the inner wall of the steel pipe. During the construction of the operating platform, the second hydraulic cylinder drives the support shoe to support the inner wall of the steel pipe, and the spring buffers the vibration generated during construction to ensure the overall stability of the operating platform, avoid vibration and shaking of the working platform, and ensure the safety of underground construction.

[0032] 5. A locking mechanism of a locking beam is used to replace traditional locks (such as wire rope hooks). The locking claw of the locking mechanism is provided with a locking slot that matches the wall of the steel pipe. The locking claw can be extended out of the locking beam or retracted into the locking beam under the drive of the telescopic mechanism, and cooperates with the lifting and lowering of the lifting equipment and the hoisting components to achieve locking and unlocking between the locking beam and the steel pipe. The mechanized operation is achieved through the locking mechanism, and there is no need for workers to go down the well to change locks. It has high safety and does not affect the alignment installation of the steel pipe. It is easy to operate, more efficient, and fixed and stable, ensuring the operating platform and safety.

[0033] The invention is particularly suitable for the installation of large-diameter high-strength steel pipes with a vertical shaft chamber depth of more than 50 meters and a strength of 600MPa or more. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 The schematic diagram of the structure is a deep shaft large diameter high strength steel pipe installation automated operation platform.

[0035] Figure 2 It is a structural schematic diagram of the locking beam.

[0036] Figure 3 It is a structural schematic diagram of a seam pressing operation board.

[0037] Figure 4 It is a structural schematic diagram of the locking mechanism.

[0038] Figure 5 It is a structural diagram of the automatic beam grabbing system.

[0039] Figure 6 It is a schematic diagram of a preferred embodiment in which the gripping mechanism and the alignment mechanism are connected to each other.

[0040] Figure 7It is a structural schematic diagram of the limit adjustment mechanism at the bottom of the first support beam.

[0041] Figure 8 This is a schematic diagram of welding operations in the welding operation room.

[0042] Fig. 9 This is a schematic diagram of the welding operation room returning to the correct position.

[0043] In the figure:

[0044] 1. Shaft, 2. First support beam, 201. Pressing seam operation plate, 202. Mounting column, 203. Connecting plate, 204. Hydraulic cylinder support rod, 205. First hydraulic cylinder, 206. Rotating table, 207. Rotating support, 208. Telescopic ladder, 3. Second support beam, 301. Welding operation plate, 302. Connecting column, 303. Sliding track, 304. Walking mechanism, 305. Welding operation room, 306. Seat box, 307. Submerged arc automatic welding machine, 3071. Welding nozzle, 3072. Flux hopper, 308. Flux automatic recovery machine, 309. Wheel, 310. Column, 311. Positioning seat, 312. Positioning push rod, 313. Connecting claw, 314. Up and down ladder, 4. Locking mechanism, 4 01. Locking claw, 402. Locking slot, 403. Driving assembly, 404. Connecting plate, 5. Lifting assembly, 501. Automatic grab beam, 502. Alignment mechanism, 5021. Insert shaft, 5022. Alignment cylinder, 503. Grabbing mechanism, 5031. Docking ear, 5032. Lifting hole, 5033. Grabbing ear plate, 5034. Telescopic push rod, 504. Lifting rope, 505. Monitoring camera, 506. Locking beam, 507. Protective cover, 508. Lateral limit wheel, 6. Limit adjustment mechanism, 601. Support frame, 602. Roller, 603. Spring, 604. Triangular connecting rod, 605. Support shoe, 606. Second hydraulic cylinder, 607. Connecting frame, 7. Electro-hydraulic control system, 8. Steel pipe. DETAILED DESCRIPTION

[0045] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.

[0046] In the description of the present invention, it should be noted that the orientations or positional relationships indicated by terms such as "center", "up", "down", "left", "right", "vertical", "horizontal", "inside" and "outside" are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or device referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the invention.

[0047] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two devices. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0048] Reference Figure 1-Figure 9 As shown, an automated operation platform for installing large-diameter high-strength steel pipes in a deep shaft comprises a first support beam 2 and a second support beam 3 arranged in parallel up and down.

[0049] like Figure 3 As shown, the top of the first support beam 2 is fixedly connected with a press seam operation plate 201, and a rotating mechanism is arranged at the center of the press seam operation plate 201. The rotating mechanism is rotatably connected with a hydraulic cylinder support rod 204 parallel to the cross section of the steel pipe 8, and the two ends of the hydraulic cylinder support rod 204 are fixedly connected with a first hydraulic cylinder 205. The top of the rotating mechanism is connected with a hoisting assembly 5 through a chain electric hoist 209. The hoisting assembly 5 is used to install and disassemble the entire platform. The chain electric hoist 209 is used to lift and lower the press seam operation plate 201 and the welding operation plate 301. Preferably, two chain electric hoists 209 are arranged, one for use and one for backup as double insurance.

[0050] A welding work plate 301 is fixedly connected to the top surface of the second support beam 3, a connecting column 302 is fixedly connected between the top center of the welding work plate 301 and the bottom of the first support beam 2, a sliding track 303 is circumferentially arranged on the welding work plate 301 with the center as the center of the circle, a welding operation room 305 is slidably connected to the sliding track 303 through a walking mechanism 304, and the welding operation room 305 is provided with a submerged arc automatic welding machine 307 for circumferential welding of the steel pipe 8, an automatic flux recovery machine 308 for recovering flux, and a seat box 306 for workers to sit on.

[0051] A limit adjustment mechanism 6 is provided at the bottom of each end of the first support beam 2 and the second support beam 3, which can be used to support the inner wall of the steel pipe and improve the overall stability of the platform.

[0052] The rotating mechanism includes a mounting column 202 fixedly connected to the center of the seam pressing operation plate, a rotating platform 206 is arranged on the top of the mounting column 202, a rotating support 207 is fixedly connected to the rotating platform 206, and a hydraulic cylinder support rod 204 is passed through and fixed in the rotating support 207. Specifically, the rotating platform 206 can be an electric rotating platform or a hydraulic rotating platform in the prior art. By starting the rotating platform 206, the hydraulic cylinder support rod 204 is driven to rotate, and then the first hydraulic cylinder 205 is controlled to rotate, so that the first hydraulic cylinder 205 is adjusted to the staggered position of the steel pipe 8. In one embodiment, the rotating support 207 is U-shaped, including two parallel upper and lower side plates and a side plate connected between the two side plates. The bottom of the lower side plate of the rotating support 207 is fixedly connected to the top table surface of the rotating table 206. The hydraulic cylinder support rod 204 transversely passes through the two side plates of the rotating support 207 and is fixedly connected thereto. The top of the upper side plate of the rotating support 207 is fixedly connected with a connecting plate 203, and the connecting plate 203 is fixedly connected to the bottom end of the chain electric hoist 209.

[0053] like Figure 8 and Fig. 9 As shown, the welding operation room 305 is a square frame beam formed by square steel, the submerged arc automatic welding machine 307 is arranged on one side of the middle part of the square frame beam close to the wall of the steel pipe 8, the flux automatic recovery machine 308 is fixedly connected to the top of the square frame beam, and the seat box 306 is arranged on one side of the bottom of the square frame beam close to the slide track 303. In one embodiment, two groups of welding operation rooms are symmetrically arranged on the slide track, and the two welding operation rooms have the same walking speed, and welding operations can be carried out at the same time, thereby improving construction efficiency.

[0054] Specifically, the welding position of the submerged arc automatic welding machine 307 is horizontal welding, and the welding nozzle 3071 of the submerged arc automatic welding machine 307 corresponds to the joint of the steel pipe 8. A flux recovery tray is provided at the lower part of the welding nozzle 3071. The submerged arc automatic welding machine 307 uses negative pressure to recover the flux at the flux recovery tray and feed it into the flux hopper 3072, which can not only cover and protect the welding molten pool but also prevent flux waste. The submerged arc automatic welding machine 307 and the flux automatic recovery machine 308 use supporting equipment sold on the market, preferably using submerged arc horizontal welding equipment with high welding efficiency, less air and light pollution, and low requirements for the welding environment. Its specific structure and implementation principle belong to the existing mature technology and will not be repeated here.

[0055] A column 310 located in the circle of the sliding track 303 is arranged between the seam pressing operation plate 201 and the welding operation plate 301, and a positioning seat 311 is arranged on the column 310. A positioning push rod 312 is hinged on one side of the top of the welding operation room 305, and a connecting claw 313 for connecting with the positioning seat 311 is arranged on the telescopic end of the positioning push rod 312. Specifically, the positioning push rod 312 uses an electric push rod, and a limit sensor for controlling the stroke is arranged inside the electric push rod. In one embodiment, the positioning seat 311 is a columnar structure adapted to the positioning grip 313, so that the positioning grip 313 can grip the positioning seat 311. A supporting wheel 309 is arranged on one side of the top of the welding operation room 305 close to the inner wall of the steel pipe 8, and the supporting wheel 309 is rollingly connected to the inner wall of the steel pipe 8. Preferably, the supporting wheel 309 is made of rubber material.

[0056] The surface of the slide track 303 is a smooth arc surface, and the travel mechanism 304 includes an arc groove travel wheel slidably connected to the slide track 303, and the travel wheel is connected to a drive motor for driving the travel wheel to rotate, and the drive motor is arranged inside the seat box 306. The smooth arc surface of the slide track 303 allows the travel wheel to always maintain a stable connection with the slide track 303 when the welding operation room 305 is in a tilted or straightened state.

[0057] like Figure 8 As shown, when welding is performed, the telescopic end of the positioning push rod 312 is extended until the supporting wheel 309 on the top of the operating room leans against the inner wall of the steel pipe 8, and then the connecting claw 313 is manually driven to disengage from the locking seat, and the telescopic end of the positioning push rod 312 is controlled to retract, so that the connecting claw 313 is unlocked from the locking seat. The welding nozzle 3071 of the submerged arc automatic welding machine 307 corresponds to the joint of the steel pipe 8, and the travel wheel is driven by the driving motor to move, thereby driving the bottom of the welding operating room 305 to move on the sliding track, and the supporting wheel 309 on the top of the welding operating room 305 rolls around the inner wall of the steel pipe 8 to ensure the stable movement of the welding operating room 305, and the submerged arc automatic welding machine 307 then performs circumferential seam welding, and the welding speed is the travel speed of the travel mechanism 304. Fig. 9 As shown, after the welding operation is completed, the telescopic end of the positioning push rod 312 is controlled to extend, and after the connecting claw 313 is connected to the locking seat, the telescopic end of the positioning push rod 312 is controlled to retract, thereby driving the position of the welding operation room 305 to return to the correct position.

[0058] The position limiting and adjusting mechanism 6 comprises a support frame 601 fixedly connected to the bottom surface of the end of the first support beam 2 or the second support beam 3, and a roller 602 is rotatably connected to the side of the support frame 601 close to the inner wall of the steel pipe 8 through a connecting rod 608, and a spring 603 is fixedly connected to the other side of the support frame 601 through a connecting groove 609, and the other end of the spring 603 is fixedly connected to the bottom surface of the first support beam 2 or the second support beam 3. Preferably, the roller 602 is made of rubber material, and the roller 602 is in close contact with the inner wall of the steel pipe 8, which plays a role of position limiting and protection. The spring 603 is provided to play a role of shock absorption and buffering, thereby improving the overall stability of the platform.

[0059] A triangular connecting rod 604 is hinged at the bottom of the support frame 601, and a shoe 605 is hinged at one end of the triangular connecting rod 604 close to the inner wall of the steel pipe 8, and a second hydraulic cylinder 606 is hinged at one end of the triangular connecting rod 604 away from the inner wall of the steel pipe 8, and the other end of the second hydraulic cylinder 606 is fixed to the bottom of the first support beam 2 or the second support beam 3 through a connecting frame 607. Specifically, the second hydraulic cylinder 606 is a double-acting hydraulic cylinder. When the construction work is carried out on the automated operation platform, the second hydraulic cylinder 606 is controlled to extend and then drive the triangular connecting rod 604 to push out the shoe 605, so that the shoe 605 is tightly pressed against the inner wall of the steel pipe 8, so as to ensure that the automated operation platform is stable and fixed as a whole and avoid shaking. When the operation platform is lifted and moved as a whole, the second hydraulic cylinder 606 is controlled to retract and the triangular connecting rod 604 retracts the shoe 605, so that the shoe 605 is separated from the inner wall of the steel pipe 8, and the roller 602 is used to close the limit position with the pipe wall of the steel pipe 8, so as to ensure that the automated operation platform is stable as a whole and avoid bumping and shaking. Preferably, a rubber pad is provided on one side of the support shoe 605 close to the inner wall of the steel pipe 8 , which can be used to protect the paint on the inner wall of the steel pipe 8 .

[0060] A plurality of lateral limiting wheels 508 are symmetrically arranged on the top of the protective cover plate 507. Specifically, the lateral limiting wheels 508 are composed of a wheel frame and a pulley, and four lateral limiting wheels 508 are symmetrically arranged on the edge of the protective cover plate 507. The pulley is made of rubber material, which can protect the paint on the inner wall of the steel pipe 8 from being damaged when sliding. The pulley is in close contact with the pipe wall and maintains a certain elastic force, which ensures a smooth rise when the automated operating platform is lifted as a whole. When deviation occurs, the lateral limiting wheels 508 can rise along the pipe wall of the steel pipe 8 to avoid collision between the platform and the inner wall of the steel pipe 8.

[0061] like Figure 5 As shown, the lifting assembly 5 includes a locking beam 506 fixedly connected to the top of the chain electric hoist, and a protective cover plate 507 is fixedly connected to the top of the locking beam 506. The protective cover plate 507 can prevent foreign objects from falling from the wellhead and rock wall to protect the operating platform. The protective cover plate 507 is made of steel plate.

[0062] A locking mechanism 4 is telescopically connected to each end of the locking beam 506, and the locking mechanism 4 includes a locking claw 401 slidably connected to the end of the locking beam 506, and a locking slot 402 is provided at the bottom of the locking claw 401. The locking slot 402 is a concave notch, which can make the locking claw 401 fit with the pipe wall of the pipe mouth of the steel pipe 8 to prevent displacement. A second limit sensor is provided in the locking claw 401, and a driving component 403 for driving the locking claw 401 to extend and retract is connected to the locking claw 401.

[0063] The driving assembly 403 includes a driving push rod fixed to the bottom of the locking beam 506, a connecting plate 404 is fixedly connected to the telescopic end of the driving push rod, the top of the connecting plate 404 is fixedly connected to the bottom of the locking claw 401, and a slide groove for sliding through the connecting plate 404 is provided at the bottom of each end of the locking beam 506. Specifically, the driving push rod is an electric push rod, and a limit sensor for controlling the stroke is built into the driving push rod. Its specific structure and electrical connection method are all existing technologies and are not repeated here. By controlling the extension and contraction of the driving push rod to drive the extension or retraction of the locking claw 401, the locking mechanism 4 is located outside or inside the locking beam 506.

[0064] In one embodiment, the lifting assembly 5 further includes a plurality of lifting rings fixedly connected to the protective cover plate 507 and a lifting hook detachably connected to the lifting ring, and the other end of the lifting hook is connected to the lifting equipment through a steel wire rope to lift the locking beam 506. Figure 5 and Figure 6 As shown, the hoisting assembly 5 includes an automatic grab beam 501, the top of the automatic grab beam 501 is connected to the lifting equipment through a lifting rope 504, and multiple sets of mutually adapted alignment mechanisms 502 and grabbing mechanisms 503 are arranged between the automatic grab beam 501 and the protective cover plate 507. The alignment mechanism 502 includes an insertion shaft 5021 arranged at the bottom of the automatic grab beam 501 and an alignment cylinder 5022 arranged at the top of the locking beam 506, the insertion shaft 5021 and the alignment cylinder 5022 are mutually adapted, and a first limit sensor is arranged in the alignment cylinder 5022. Specifically, the first limit sensor is arranged at the bottom of the alignment cylinder 5022. When the insertion shaft 5021 is connected to the alignment cylinder 5022, the automatic grab beam 501 and the locking beam 506 are aligned, the first limit sensor feedbacks a signal, and the lifting equipment stops lowering. Preferably, the mouth of the alignment cylinder 5022 is set to a trumpet-shaped structure that gradually increases from bottom to top, so that the insertion shaft 5021 can be inserted into the interior of the alignment cylinder 5022 along the side wall of the mouth of the alignment cylinder 5022, thereby reducing the influence of the position deviation of the automatic grab beam 501 on the alignment of the automatic grab beam 501 and the locking beam 506 during the lowering process, thereby achieving rapid alignment.

[0065] The grabbing mechanism 503 includes a docking lug 5031 arranged at the bottom of the automatic grabbing beam 501, and two grabbing lug plates 5033 arranged in parallel at the top of the locking beam 506, a telescopic push rod 5034 is fixedly connected to the outer side of one of the grabbing lug plates 5033, and a through hole and a hanging hole 5032 for the telescopic shaft on the telescopic push rod 5034 to pass through are respectively opened on the grabbing lug plate 5033 and the docking lug 5031. Specifically, the telescopic push rod 5034 uses an electric drive screw, and the electric drive screw is built with a limit sensor for controlling the stroke. Its specific structure and electrical connection method are both existing technologies and will not be repeated here.

[0066] In a preferred embodiment, Figure 6 As shown, monitoring cameras 505 are also provided at both ends of the bottom of the automatic grabbing beam 501, through which the action of the grabbing mechanism 503 is monitored, and it is further confirmed whether the telescopic push rod 5034 of the grabbing mechanism 503 passes through the lifting hole 5032 of the docking lifting ear 5031 and the through hole of the grabbing ear plate 5033.

[0067] When lowering the automatic grab beam 501 into the shaft, the alignment cylinder 5022 is inserted through the insertion shaft 5021 to align the automatic grab beam 501 with the locking beam 506, and then the telescopic push rod 5034 is started to pass through the lifting hole 5032 of the docking lifting ear 5031 and the through hole on the grabbing ear plate in sequence, so as to achieve the grabbing action of the automatic grab beam on the locking beam 506. Through the alignment mechanism 502 and the grabbing mechanism 503 of the hoisting assembly 5, the grabbing, locking or releasing connection of the automatic operation platform can be realized by remote control, and the mechanized operation does not require frequent going down the shaft, thereby reducing the labor burden of the workers.

[0068] Specifically, the locking beam 506, the first support beam 2 and the second support beam 3 are square tube cross beams, and the width and length of the cross beam are the same and are both smaller than the diameter of the steel tube.

[0069] A telescopic ladder 208 is provided between the protective cover plate 507 and the seam pressing operation plate 201, and a through hole corresponding to the exit of the telescopic ladder 208 is provided on the protective cover plate 507. Specifically, the telescopic ladder 208 uses a commercially available telescopic ladder, such as an electric remote-controlled telescopic folding ladder, whose bottom can be telescoped and folded upward. When the seam pressing operation is required, the telescopic ladder 208 is controlled to be retracted and folded upward; when it is necessary to move to the protective cover plate 507 on the locking beam 506, the telescopic ladder 208 is started to extend downward, and the worker can reach the protective cover plate 507 through the telescopic ladder 208. An up-down ladder 314 is provided between the seam pressing operation plate 201 and the welding operation plate 301, and a through hole corresponding to the exit of the up-down ladder 314 is provided on the seam pressing operation plate 201.

[0070] The seam pressing operation board 201 is provided with an electro-hydraulic control system 7, including an electric control box, a hydraulic pump station and a mobile power supply. The hydraulic pump station provides hydraulic power for the first hydraulic cylinder 205 and the second hydraulic cylinder 606, etc. The mobile power supply provides power for the telescopic push rod 5034, the driving push rod and other components. The electric control box is provided with a PLC control system and a 5G signal transceiver for processing various feedback signals and issuing command signals to realize remote control operation and signal feedback. The specific implementation and arrangement of the electro-hydraulic control system 7 belong to the prior art and will not be repeated here.

[0071] A method for using an automated operating platform for installing large-diameter high-strength steel pipes in deep shafts is as follows:

[0072] S1: hoisting the steel pipe 8 into the shaft 1 and docking it with the previous section of the installed steel pipe 8;

[0073] S2: The lifting assembly 5 is locked and connected with the top pipe opening of the steel pipe section 8;

[0074] S3: The chain electric hoist lowers one end of the seam pressing operation board 201, drives the rotating table 206 to rotate, adjusts the first hydraulic cylinder 205 to the offset position between the current section of the steel pipe 8 and the previous section of the steel pipe 8, drives the second hydraulic cylinder 606 to extend and drive the support shoe 605 to press against the inner wall of the steel pipe 8, drives the first hydraulic cylinder 205 to extend and then slowly push the pipe wall (the current section of the steel pipe) at the offset position until the offset adjustment is completed, drives the second hydraulic cylinder 606 to retract and drive the support shoe 605 to withdraw from the inner wall of the steel pipe 8;

[0075] S4: The chain electric hoist lifts the seam pressing work plate 201 for a distance, drives the positioning push rod 312 to extend, and tilts the welding operation room 305 until the wheel 309 leans against the inner wall of the steel pipe 8. Then, the chain electric hoist is used to accurately adjust the position height of the welding work plate 301 until the welding nozzle 3071 of the submerged arc automatic welding machine 307 is at the joint position between the current section of the steel pipe 8 and the previous section of the steel pipe 8. The worker lifts the connecting claw 313 to separate it from the positioning seat 311, and drives the positioning push rod 312 to retract, drives the second hydraulic cylinder 606 to extend, and drives the support shoe 605 to press against the inner wall of the steel pipe 8.

[0076] S5: The worker enters the welding operation room 305, drives the walking mechanism 304 to drive the welding operation room 305 to move at a constant speed on the sliding track 303, and starts the submerged arc automatic welding machine 307 to weld the joint of the steel pipe 8 until the full ring welding operation of the joint of the steel pipe 8 is completed;

[0077] S6: The worker exits the welding operation room 305, drives the positioning push rod 312 to extend, and after the worker lifts the connecting claw 313 to connect it with the positioning seat 311, drives the positioning push rod 312 to retract and drive the position of the welding operation room 305 to return to the correct position, drives the second hydraulic cylinder 606 to retract and drives the support shoe 605 to withdraw from the inner wall of the steel pipe 8;

[0078] S7: The lifting assembly 5 and the top pipe opening of the steel pipe section 8 are unlocked;

[0079] S8: After hoisting the next section of steel pipe 8 into the shaft 1 and completing the docking with the section of steel pipe 8, repeat steps S2-S7 to install the next section of steel pipe 8.

[0080] In step S2, the locking connection between the lifting component 5 and the steel pipe 8 is achieved by hanging the chain electric hoist at the bottom of the locking beam 506 of the lifting component 5, driving the locking mechanism 4 to extend out of the end of the locking beam 506, and then lowering the automatic grab beam 501 through the lifting equipment until the locking mechanism 4 is fitted and connected with the pipe wall of the top pipe mouth of the section of steel pipe 8, triggering the second limit sensor to feedback a signal to the electric control box, the lifting equipment stops lowering, and the automatic grab beam 501 completes the release of the locking beam 506 through the grabbing mechanism 503, and the lifting equipment lifts the automatic grab beam 501 upward to the specified position.

[0081] In step S7, the lifting assembly 5 and the steel pipe 8 are unlocked by lowering the automatic grab beam 501 through the lifting equipment. When the alignment mechanism 502 completes the alignment action between the automatic grab beam 501 and the locking beam 506, the lifting equipment stops lowering, and the automatic grab beam 501 completes the grabbing action of the locking beam 506 through the grabbing mechanism 503. The lifting equipment lifts the entire platform upward to the specified height and drives the locking mechanism 4 to retract into the end of the locking beam 506.

[0082] The grabbing mechanism 503 completes the grabbing action of the locking beam 506 by driving the telescopic shaft to extend through the telescopic push rod 5034, and the telescopic shaft passes through the hanging hole 5032 of the docking ear 5031 and the through hole of the grabbing ear plate 5033 in turn; the grabbing mechanism 503 completes the releasing action of the locking beam 506 by driving the telescopic push rod 5034 to retract the telescopic shaft, and the telescopic shaft exits the through hole of the grabbing ear plate 5033 and the hanging hole 5032 of the docking ear 5031 in turn.

[0083] The alignment action of the alignment mechanism 502 is completed by inserting the plug shaft 5021 into the alignment cylinder 5022 and then connecting it to trigger the first limit sensor to feedback a signal to the electric control box, and the lifting equipment stops lowering, thereby realizing the alignment between the automatic grab beam 501 and the locking beam 506.

[0084] Based on the above ideal embodiments of the present invention, the relevant staff can make various changes and modifications without departing from the technical concept of the present invention through the above description. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.

Claims

1. An automated operation platform for installing large-diameter high-strength steel pipes in deep shafts, characterized in that: It includes a first support beam and a second support beam arranged in parallel up and down, The top of the first support beam is fixedly connected with a seam pressing operation plate, the center of the seam pressing operation plate is provided with a rotating mechanism, the rotating mechanism is rotatably connected with a hydraulic cylinder support rod parallel to the cross section of the steel pipe, both ends of the hydraulic cylinder support rod are fixedly connected with the first hydraulic cylinder, and the top of the rotating mechanism is connected with a hoisting assembly through a chain electric hoist. A welding work plate is fixedly connected to the top surface of the second support beam, a connecting column is fixedly connected between the top center of the welding work plate and the bottom of the first support beam, a sliding track is circumferentially arranged on the welding work plate with its center as the center of the circle, a welding operation room is slidably connected to the sliding track through a walking mechanism, a submerged arc automatic welding machine for circumferential welding of steel pipe seams is arranged in the welding operation room, and a limit adjustment mechanism is arranged at the bottom of each end of the first support beam and the second support beam.

2. The deep shaft large diameter high strength steel pipe installation automated operation platform according to claim 1, characterized in that: A column located in the sliding track circle is arranged between the seam pressing work plate and the welding work plate, a positioning seat is arranged on the column, a positioning push rod is arranged on one side of the top of the welding operation room, a connecting claw for connecting the positioning seat is arranged on the telescopic end of the positioning push rod, and a supporting wheel is arranged on one side of the top of the welding operation room close to the inner wall of the steel pipe.

3. The deep shaft large diameter high strength steel pipe installation automated operation platform according to claim 1, characterized in that: The surface of the slide track is a smooth arc-shaped surface, and the walking mechanism comprises an arc groove walking wheel slidably connected to the slide track, and the walking wheel is connected to a driving motor for driving the walking wheel to rotate.

4. The deep shaft large diameter high strength steel pipe installation automated operation platform according to claim 1, characterized in that: The limit adjustment mechanism includes a support frame fixedly connected to the bottom surface of the end of the first support beam or the second support beam, and the support frame is rotatably connected to a roller through a connecting rod on one side close to the inner wall of the steel pipe, and the other side of the support frame is fixedly connected to a spring through a connecting groove, and the other end of the spring is fixedly connected to the bottom surface of the first support beam or the second support beam.

5. The deep shaft large diameter high strength steel pipe installation automated operation platform according to claim 4, characterized in that: A triangular connecting rod is hinged at the bottom of the support frame, a support shoe is hinged at one end of the triangular connecting rod close to the inner wall of the steel pipe, a second hydraulic cylinder is hinged at one end of the triangular connecting rod away from the inner wall of the steel pipe, and the other end of the second hydraulic cylinder is fixed to the bottom of the first support beam or the second support beam through a connecting frame.

6. The deep shaft large diameter high strength steel pipe installation automated operation platform according to claim 1, characterized in that: The lifting assembly includes a locking beam fixedly connected to the top of the chain electric hoist, a protective cover plate is fixedly connected to the top of the locking beam, a locking mechanism is telescopically connected to each end of the locking beam, the locking mechanism includes a locking claw slidably connected to the end of the locking beam, a second limit sensor is provided in the locking claw, a locking slot is provided at the bottom of the locking claw, the locking slot is adapted to the pipe wall of the steel pipe mouth, and a driving assembly is connected to the locking claw to drive the locking claw to retract and retract.

7. The deep shaft large diameter high strength steel pipe installation automated operation platform according to claim 6, characterized in that: A plurality of lateral limiting wheels are symmetrically arranged on the top of the protective cover plate.

8. The automated operation platform for installing large-diameter high-strength steel pipes in deep shafts according to claim 6, characterized in that: The lifting assembly also includes an automatic grab beam, and a plurality of sets of mutually adaptable alignment mechanisms and grabbing mechanisms are arranged between the automatic grab beam and the protective cover plate; the alignment mechanism includes an insertion shaft arranged at the bottom of the automatic grab beam and an alignment cylinder arranged at the top of the locking beam, and a first limit sensor is arranged in the alignment cylinder; the grabbing mechanism includes a docking ear arranged at the bottom of the automatic grab beam, and two grabbing ear plates arranged in parallel at the top of the locking beam, wherein a telescopic push rod is fixedly connected to the outer side of one of the grabbing ear plates, and a through hole and a lifting hole for the telescopic shaft on the telescopic push rod to pass through are respectively provided on the grabbing ear plate and the docking ear.

9. A method for using the automated operation platform for installing large-diameter high-strength steel pipes in deep shafts according to any one of claims 1 to 8, characterized in that: S1: Lift the steel pipe into the shaft and connect it with the previous section of the installed steel pipe; S2: The lifting assembly is locked and connected with the top pipe opening of the steel pipe section; S3: The chain electric hoist lowers the seam pressing operation plate for a distance, drives the rotating table to rotate, adjusts the first hydraulic cylinder to the offset position between the current section of the steel pipe and the previous section of the steel pipe, drives the second hydraulic cylinder to extend and drive the support shoe to press against the inner wall of the steel pipe, drives the first hydraulic cylinder to extend and then slowly push the pipe wall at the offset position until the offset adjustment is completed, drives the second hydraulic cylinder to retract and drive the support shoe to withdraw from the inner wall of the steel pipe; S4: The chain electric hoist lifts the seam pressing work plate for a distance, drives the positioning push rod to extend, and tilts the welding operation room until the wheel leans against the inner wall of the steel pipe. Then the chain electric hoist accurately adjusts the position height of the welding work plate until the welding nozzle of the submerged arc automatic welding machine is at the joint position between the current section of the steel pipe and the previous section of the steel pipe. The worker lifts the connecting claw to separate it from the positioning seat, and drives the positioning push rod to retract, drives the second hydraulic cylinder to extend, and drives the support shoe to press against the inner wall of the steel pipe; S5: The worker enters the welding operation room, drives the walking mechanism to drive the welding operation room to move at a constant speed on the sliding track, and starts the submerged arc automatic welding machine to weld the steel pipe joint until the full ring welding operation of the steel pipe joint is completed; S6: The worker exits the welding operation room, drives the positioning push rod to extend, and after the worker lifts the connecting claw to connect it with the positioning seat, drives the positioning push rod to retract, thereby driving the position of the welding operation room to return to the correct position, and drives the second hydraulic cylinder to retract and drive the support shoe to retreat from the inner wall of the steel pipe; S7: The lifting assembly is unlocked from the top pipe opening of the steel pipe section; S8: After hoisting the next section of steel pipe into the shaft and completing the docking with the steel pipe section, repeat steps S2-S7 to install the next section of steel pipe.

10. A method for using the deep shaft large diameter high strength steel pipe installation automated operation platform according to claim 9, characterized in that: In step S2, the locking connection between the lifting assembly and the steel pipe is achieved by hanging the electric chain hoist at the bottom of the locking beam of the lifting assembly, and the top of the locking beam is fixedly connected to the automatic grab beam through a grabbing mechanism, driving the locking mechanisms to extend out of the ends of the locking beam, and then lowering the automatic grab beam through the lifting equipment until the locking mechanism is connected to the pipe wall of the top pipe opening of the steel pipe section, the lifting equipment stops lowering, and the automatic grab beam completes the release action of the locking beam through the grabbing mechanism, and the lifting equipment lifts the automatic grab beam upward to the specified position; In step S7, the lifting assembly and the steel pipe are unlocked by lowering the automatic grab beam by the lifting equipment. When the alignment mechanism completes the alignment action between the automatic grab beam and the locking beam, the lifting equipment stops lowering, and the automatic grab beam completes the grabbing action of the locking beam through the grabbing mechanism. The lifting equipment lifts the entire platform upward to the specified height, and drives the locking mechanisms to retract into the end of the locking beam.

Citation Information

Cited By

  • A method for pressing a joint of a steel pipe and a device for adjusting the roundness of a steel pipe joint

    CN120715072B

  • Multifunctional installation construction platform for pressure steel pipe

    CN120844783A

  • Multifunctional installation construction platform for pressure steel pipe

    CN120844783B

  • Narrow space vertical pipeline mounting device

    CN122144616A