Classification and step-by-step supporting method for cross-cut roadway of coal mine affected by repeated mining of close-distance coal seam group

By adopting a graded and step-by-step support method, and taking into account the stress characteristics of different stages of the Shimen roadway, a multi-stage support approach was used to solve the problem of uneven support caused by repeated mining of multiple coal seams in the Shimen roadway, thereby improving the safety and stability of the roadway.

CN118933934APending Publication Date: 2024-11-12PANJIANG COAL & ELECTRICITY GROUP INSITUTE OF COAL MINING DESIGN +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411022981.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In the southwestern mining area, the uneven support strength in the Shimen roadway is caused by repeated mining of multiple coal seams. The existing single support method is difficult to effectively control the mine pressure, increasing the risk of accidents and affecting safe production.

Method used

A graded and step-by-step support method is adopted, including high-strength prestressed pressure relief grouting anchors and cables, pressure relief groove-high prestressed truss-grouting anchor cables, pressure relief groove filling-anchoring and directional drilling rig hole creation pressure relief-grouting, etc., and the support is carried out in stages according to the deformation and stress characteristics of the surrounding rock.

Benefits of technology

By implementing graded and step-by-step support, roadway deformation can be effectively controlled, waste of support materials can be avoided, the safety and stability of the stone gate roadway can be improved, and the risk of accidents can be reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933934A_ABST
    Figure CN118933934A_ABST
Patent Text Reader

Abstract

The invention discloses a grading and step-by-step supporting method for a cross-cut roadway of a coal mine under repeated influence of a close-distance coal seam group, which is characterized in that cross-cut tunneling and the influence of multi-layer coal mining on a cross-cut are considered in multiple stages, different supporting modes are adopted according to the stress characteristics of each stage, and the cross-cut roadway is supported in multiple stages in the cross-cut tunneling or one-time threshold strong mining stage. A high-strength prestress yielding anchor rod or anchor cable supporting method is used for supporting, yielding pipes are arranged at the tails of the anchor rods, the anchor cables and the anchor cables, the larger the influence of rock cross-cut tunneling and mining is, the larger the deformation of the yielding pipes is, the influence stages of rock cross-cut tunneling and mining can be judged through the deformation of the yielding pipes, different supporting modes are adopted for the influence stages, and therefore the rock cross-cut tunneling and mining effect is improved. Large deformation of the roadway in the stage with large influence on tunneling and mining can be avoided, and meanwhile waste of labor and materials in the stage with small influence on tunneling and mining can be avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a hierarchical and step-by-step supporting method for a stone gate tunnel in a coal mine affected by repeated mining of a close-range coal seam group, belonging to the technical field of support. Background Art

[0002] The occurrence state of coal seams in the southwest mining area is generally: there are many coal seams, the distance between coal seams is small, and the geological conditions of coal mines are complex. Figure 1 As shown in the figure, when mining coal seams in close proximity, many mines choose to dig stone gates perpendicular to the direction of the coal seams in multiple layers of coal and rock bodies of different properties. The stone gates have a long service life and are responsible for the main production and transportation tasks of the mine. When the stone gate passes through different types of coal and rock layers, the overall control and maintenance of the stone gate roadway becomes more difficult due to the large differences in the engineering mechanical properties of each coal and rock layer. When multiple coal seams are repeatedly mined, the mining process of different coal seam working faces leads to large differences in the advanced support pressure in different areas of the stone gate roadway, and the mine pressure in different areas of the stone gate roadway is significantly different. The support method of the stone gate roadway in various coal mines in the southwest mining area is mainly scaffolding-anchor injection-grouting. The single support method leads to excessive support strength in some areas of the stone gate roadway and insufficient support strength in some areas. The enhanced support measures adopted in the stone gate roadway are often based on the perceptual cognition of the surrounding rock deformation, and the support quality is difficult to guarantee, which increases the probability of coal mine roof accidents and seriously restricts the safe and efficient production of coal mines. Therefore, the innovation and upgrading of the support technology for stone gate tunnels affected by repeated mining of close-range coal seam groups is one of the most urgent technical needs of coal mines in the southwestern mining area. Summary of the invention

[0003] The purpose of the present invention is to provide a hierarchical and step-by-step support method for stone gate tunnels in a coal mine affected by repeated mining of close-range coal seam groups, so as to solve the technical problems existing in the above-mentioned background technology.

[0004] To achieve the above object, the present invention provides the following technical solutions: A hierarchical and step-by-step support method for a stone gate tunnel in a coal mine affected by repeated mining of a close-range coal seam group, the method comprising the following steps: S01. During the stone gate excavation stage, high-strength prestressed pressure-release grouting anchor rods and high-strength prestressed pressure-release grouting anchor cables are used for support. Pressure-release pipes are installed between the grouting anchor cables and the grouting anchor rod trays and nuts. Grouting begins when the deformation of the pressure-release pipe exceeds the threshold value A and cracks appear in the surrounding rock of the stone gate tunnel. Grouting stops when the grouting pressure reaches 2MPa. S02, when the deformation of the pressure pipe exceeds the threshold value B, where B is greater than A, use the pressure relief groove-high prestressed truss-grouting anchor cable support method or the hollow grouting anchor rod-hollow grouting anchor cable-frame-shotcrete support method for support, and at the same time, grouting is performed through the high-strength prestressed pressure relief anchor rod and anchor cable in step S01 and the grouting anchor rod and anchor cable in this step, and the grouting is stopped after the grouting pressure reaches 2MPa; S03, when the deformation of the pressure relief pipe exceeds the threshold value C, where C is greater than B, the pressure relief groove filling-anchor grouting support method is adopted, and the grouting objects are S01, S02 and the high-strength prestressed pressure relief anchor rods and anchor cables in this step; S04. When the deformation of the pressure-relieving pipe exceeds the threshold value D, where D is greater than C, a support method of directional drilling rig hole-making pressure relief-grouting is adopted, and the objects of grouting are S01, S02, S03 and the high-strength prestressed pressure-relieving anchor rods and anchor cables in this step.

[0005] Furthermore, the high-strength prestressed pressure-release grouting anchor rod and high-strength prestressed pressure-release grouting anchor cable support method are: Through theoretical calculation, the anchoring length and support spacing of the anchor rod or anchor cable are designed. The anchor rod or anchor cable is hollow, and a pressure-yielding pipe is added to the tail of the anchor rod or anchor cable; the thickness of the shotcrete covers the tray of the anchor rod or anchor cable, exposing the pressure-yielding pipe.

[0006] Furthermore, the pressure relief groove-high prestressed truss-grouting anchor support method is: first, a pressure relief groove is excavated in the center of the tunnel bottom plate, or at the bottom corners of the two sides, and grouting anchor rods or grouting anchor cables are installed at the bottom of the pressure relief groove, and then the side and top plate are supported by high prestressed truss-grouting anchor cables.

[0007] Furthermore, the support method of hollow grouting anchor rod + hollow grouting anchor cable + scaffolding + shotcreting is: first erect the scaffolding, then drive the hollow grouting anchor rod and the hollow grouting anchor cable between the two scaffolds, the spacing and anchoring length of the hollow grouting anchor cable are obtained by theoretical calculation, and then shotcrete is performed after the hollow grouting anchor rod and the hollow grouting anchor cable are driven.

[0008] Furthermore, A=10mm.

[0009] Furthermore, B=20mm.

[0010] Furthermore, C=30mm.

[0011] Furthermore, the D=40mm.

[0012] The beneficial effect of the present invention is as follows: compared with the prior art, the present invention divides the stone gate excavation and the influence of multi-layer coal mining on the stone gate into multiple stages for consideration, and adopts different support methods according to the stress characteristics of each stage. In the stone gate excavation or primary threshold strong mining stage, high-strength prestressed yielding grouting anchor rods and high-strength prestressed yielding grouting anchor cable support methods are used for support, and the anchor rods, anchor cables and anchor cable tails are all provided with yielding pipes. The greater the influence of stone gate excavation and mining, the greater the deformation of the yielding pipe. The influence stage of stone gate excavation and mining can be determined by the deformation of the yielding pipe. Different support methods are adopted for each influence stage, which can avoid large deformation of the tunnel in the stage with greater influence of excavation and mining, and also avoid waste of labor and materials in the stage with less influence of excavation and mining. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 A schematic diagram of the relationship between the coal seam structure and the tunnel position in the background technology of the present invention; Figure 2 This is a schematic diagram of the structure of a high-strength prestressed pressure-release grouting anchor rod or grouting anchor cable according to the present invention; Figure 3 It is a schematic diagram of a high-strength prestressed pressure-release grouting anchor rod and a high-strength prestressed pressure-release grouting anchor cable support method in a primary threshold strong mining stage in the present invention; Figure 4 It is a schematic diagram of the pressure relief trough-high prestressed truss-grouting anchor cable support method in the secondary threshold strong mining stage of the present invention; Figure 5 It is a schematic diagram of the support method of the pressure relief groove filling-anchoring in the three-threshold strong mining stage in the present invention; Figure 6 It is a schematic diagram of the directional drilling rig hole making and pressure relief support method in the stage of strong mining with four or more thresholds in the present invention. DETAILED DESCRIPTION

[0014] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0015] Embodiment 1: According to the mechanical properties of the surrounding rock of the stone gate tunnel, the direction of ground stress, and the scope of influence of mining, the stone gate influence stage can be divided into different stages. Figure 1In the above figure, Zone I is the stage with more severe mining impact, which is probably affected by the mining of 4 coal seams; Zone II is the stage with slight mining impact, and the upper coal seam has less impact on the stone gate because of its slightly farther distance; Zone III is basically not affected by coal seam mining. Inspired by this, the present invention divides the stone gate excavation and the impact of multi-layer coal mining on the stone gate into multiple stages, and adopts different support methods according to the stress characteristics of each stage.

[0016] refer to Figure 2-5 A hierarchical and step-by-step support method for a stone gate tunnel in a coal mine affected by repeated mining of a close-range coal seam group, the method comprising the following steps: S01. During the stone gate excavation stage, high-strength prestressed pressure-release grouting anchor rods and high-strength prestressed pressure-release grouting anchor cable support methods are used. Pressure-release pipes are installed between the grouting anchor cable and the grouting anchor rod tray and the nut. Grouting begins when the deformation of the pressure-release pipe exceeds the threshold value A and cracks appear in the surrounding rock of the stone gate tunnel. Grouting stops when the grouting pressure reaches 2MPa. This stage is also called the primary threshold strong mining stage. The schematic diagram of the support method is shown in the figure. Figure 3 shown.

[0017] S02. When the deformation of the pressure pipe exceeds the threshold value B, where B is greater than A, the pressure relief groove-high prestressed truss-grouting anchor cable support method or the hollow grouting anchor rod + hollow grouting anchor cable + scaffolding + shotcrete support method is used for support. At the same time, grouting is performed through the high-strength prestressed pressure grouting anchor rod and anchor cable in step S01 and the grouting anchor rod and anchor cable in this step. Grouting is stopped after the grouting pressure reaches 2MPa. This stage is also called the secondary threshold strong mining stage. The schematic diagram of the support method is shown in FIG. Figure 4 shown.

[0018] S03, when the deformation of the pressure relief pipe exceeds the threshold value C, where C is greater than B, the pressure relief groove filling-anchor grouting support method is adopted. The grouting objects are S01 and S02 and the high-strength prestressed pressure relief anchor rods and anchor cables in this step. This stage is also called the three-threshold strong mining stage. The schematic diagram of the support method is shown in Figure 5 shown.

[0019] S04, when the deformation of the pressure relief pipe exceeds the threshold value D, where D is greater than C, the support method of directional drilling rig hole-making pressure relief-grouting is adopted, and the objects of grouting are S01, S02, S03 and the high-strength prestressed pressure relief anchor rods and anchor cables in this step. This stage is also called the strong mining stage of four times or more thresholds. The schematic diagram of the support method is as follows Figure 6 shown.

[0020] like Figure 2 As shown, the high-strength prestressed yielding anchor rod or anchor cable structure comprises: a main body (grouting anchor rod or grouting anchor cable) 1, a tray 2 and a yielding pipe 3. The yielding pipe 3 is arranged under the tray at the tail of the main body (anchor rod or anchor cable) 1, thereby obtaining a high-strength prestressed yielding anchor rod or anchor cable.

[0021] Furthermore, the high-strength prestressed pressure-release grouting anchor rod and high-strength prestressed pressure-release grouting anchor cable support method are: Through theoretical calculation, the anchoring length and support spacing of the anchor rod or anchor cable are designed. The anchor rod or anchor cable is hollow, and a pressure-yielding pipe is added to the tail of the anchor rod or anchor cable; the thickness of the shotcrete covers the tray of the anchor rod or anchor cable, exposing the pressure-yielding pipe.

[0022] Furthermore, the pressure relief groove-high prestressed truss-grouting anchor support method is: first, a pressure relief groove is excavated in the center of the tunnel bottom plate, or at the bottom corners of the two sides, and grouting anchor rods or grouting anchor cables are installed at the bottom of the pressure relief groove, and then the side and top plate are supported by high prestressed truss-grouting anchor cables.

[0023] Furthermore, the support method of hollow grouting anchor rod + hollow grouting anchor cable + scaffolding + shotcreting is: first erect the scaffolding, then drive the hollow grouting anchor rod and the hollow grouting anchor cable between the two scaffolds, the spacing and anchoring length of the hollow grouting anchor cable are obtained by theoretical calculation, and then shotcrete is performed after the hollow grouting anchor rod and the hollow grouting anchor cable are driven.

[0024] Furthermore, the support method of drilling hole pressure relief-grouting is: at a distance of 5m from the top of the anchor cable, a pressure relief drilling rig is used to drill a hole, the size of the hole is 500-1000mm, and the hole spacing and row spacing are obtained through theoretical calculations. After the hole is drilled, grouting is performed through grouting anchor cables and grouting anchor rods.

[0025] Furthermore, A=10mm.

[0026] Furthermore, B=20mm.

[0027] Furthermore, C=30mm.

[0028] Furthermore, the D=40mm.

[0029] The above contents are further detailed descriptions of the present invention in combination with specific preferred embodiments, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the concept of the present invention, which should be regarded as falling within the protection scope of the present invention.

Claims

1. A step-by-step support method for stone tunnels in coal mines affected by repeated mining of close-range coal seams, characterized in that: The method comprises the following steps: S01. During the stone gate excavation stage, high-strength prestressed pressure-release grouting anchor rods and high-strength prestressed pressure-release grouting anchor cables are used for support. Pressure-release pipes are installed between the grouting anchor cables and the grouting anchor rod trays and nuts. Grouting begins when the deformation of the pressure-release pipe exceeds the threshold value A and cracks appear in the surrounding rock of the stone gate tunnel. Grouting stops when the grouting pressure reaches 2MPa. S02, when the deformation of the pressure-relieving pipe exceeds the threshold value B, where B is greater than A, use the pressure relief groove-high prestressed truss-grouting anchor cable support method or the hollow grouting anchor rod + hollow grouting anchor cable + scaffolding + shotcrete support method, and grouting is performed through the high-strength prestressed pressure-relieving grouting anchor rod and anchor cable in step S01 and the grouting anchor rod and anchor cable in this step at the same time, and the grouting is stopped after the grouting pressure reaches 2MPa; S03. When the deformation of the pressure pipe exceeds the threshold value C, where C is greater than B, the pressure relief groove filling-anchor injection support method is adopted; S04. When the deformation of the pressure pipe exceeds the threshold value D, where D is greater than C, a support method of directional drilling rig hole making and pressure relief-grouting is adopted.

2. The method for supporting the stone gate tunnel in a coal mine affected by repeated mining of a close-range coal seam group according to claim 1 is characterized in that: The high-strength prestressed pressure-release grouting anchor rod and high-strength prestressed pressure-release grouting anchor cable support method are: Through theoretical calculation, the anchoring length and support spacing of the anchor rod or anchor cable are designed. The anchor rod or anchor cable is hollow, and a pressure-yielding pipe is added to the tail of the anchor rod or anchor cable; the thickness of the shotcrete covers the tray of the anchor rod or anchor cable, exposing the pressure-yielding pipe.

3. The method for supporting the stone gate tunnel in a coal mine affected by repeated mining of a close-range coal seam group according to claim 1 is characterized in that: The pressure relief groove-high prestressed truss-grouting anchor cable support method is: first, a pressure relief groove is excavated in the center of the tunnel bottom plate, or at the bottom corners of the two sides, and grouting anchor rods or grouting anchor cables are installed at the bottom of the pressure relief groove, and then the side plate and the top plate are supported by high prestressed truss-grouting anchor cables.

4. The method for supporting the stone gate tunnel in a coal mine affected by repeated mining of a close-range coal seam group according to claim 1 is characterized in that: The support method of hollow grouting anchor rod + hollow grouting anchor cable + scaffolding + shotcreting is: first scaffolding is set up, and then hollow grouting anchor rods and hollow grouting anchor cables are driven between two scaffolds, the spacing and anchoring length of hollow grouting anchor cables are obtained through theoretical calculation, and shotcreting is performed after the hollow grouting anchor rods and hollow grouting anchor cables are driven.

5. The method for supporting the stone gate tunnel in a coal mine affected by repeated mining of a close-range coal seam group according to claim 1 is characterized in that: The support method of drilling hole pressure relief-grouting is as follows: a pressure relief drilling rig is used to drill a hole at a distance of 5m from the top of the anchor cable. The size of the hole is 500-1000mm. The hole spacing and row spacing are obtained through theoretical calculations. After the hole is drilled, grouting is performed through grouting anchor cables and grouting anchor rods.

6. The method for supporting the stone gate tunnel in a coal mine affected by repeated mining of a close-range coal seam group according to claim 1 is characterized in that: Said A=10mm.

7. The method for supporting the stone gate tunnel in a coal mine affected by repeated mining of a close-range coal seam group according to claim 1 is characterized in that: Said B=20mm.

8. The method for supporting the stone gate tunnel in a coal mine affected by repeated mining of a close-range coal seam group according to claim 1 is characterized in that: Said C=30mm.

9. The method for supporting the stone gate tunnel in a coal mine affected by repeated mining of a close-range coal seam group according to claim 1, characterized in that: Said D=40mm.