Tunnel intelligent water pumping and sewage purification control device

By adopting a multi-stage water collection tank and filter separation design in the tunnel reverse slope drainage system, combined with chemical treatment and liquid level sensor control, the problem of water pump blockage caused by rock slag settlement in wastewater is solved, and efficient sewage purification and Drainage to ensure construction safety and progress.

CN118934029APending Publication Date: 2024-11-12四川路航建设工程有限责任公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411225311.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In the existing tunnel reverse slope drainage system, the rock slag and impurities settle or return after wastewater treatment, resulting in the water pump pump pipe blockage, affecting the construction progress and safety.

Method used

A tunnel intelligent water pumping and sewage purification control device was designed, using a multi-stage water collection tank and a filter net to separate it into a wastewater treatment tank and a clean water tank. The wastewater is filtered through the filter net, and the sedimentation agent and softener are added in combination with the chemical cartridge, and the stirring mechanism forms a slurry. , use liquid level sensor and a check valve to control drainage to avoid blockage.

Benefits of technology

Effectively filter wastewater, avoid blockage of drainage pipes, improve drainage efficiency, extend the service life of the equipment, and ensure construction safety and progress.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118934029A_ABST
    Figure CN118934029A_ABST
Patent Text Reader

Abstract

The invention discloses a tunnel intelligent water pumping and sewage purification control device, and relates to the technical field of tunnel reverse slope drainage, the tunnel intelligent water pumping and sewage purification control device comprises a plurality of water collection tanks arranged along the length direction of a tunnel slope, the water collection tanks are divided into wastewater treatment pools and clean water pools through partition plates, and filter screens are arranged at the upper ends of the partition plates; the drainage pipe is arranged in the length direction of the tunnel slope and communicated with the clean water ponds, one end of the water collecting pipe is close to the tunnel face, and the other end of the water collecting pipe extends into the wastewater treatment pond close to the tunnel face. The tunnel face waste water filtered by the filter screen flows into the clean water tank, and the filtered tunnel face waste water is free of rock muck, so that the blockage of the drainage pipe in the drainage process can be avoided. According to the scheme that the multiple stages of clean water basins are used for draining water simultaneously, the lower-stage clean water basin close to the tunnel face and the upper-stage clean water basin close to the tunnel portal can directly drain water in the clean water basins into the drainage pipe, and the upper-stage clean water basin and the lower-stage clean water basin do not interfere with each other.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel reverse slope drainage, and in particular to a tunnel intelligent water pumping and sewage purification control device. Background Art

[0002] Tunnel reverse slope drainage refers to the situation in which the drainage direction in the tunnel is opposite to the longitudinal slope direction of the tunnel during tunnel construction. In tunnel reverse slope drainage, since water will naturally gather at the construction working face (heading face), if it is not discharged in a timely and effective manner, it will cause many adverse effects on the construction, such as affecting the construction progress, reducing the construction quality, and threatening the construction safety.

[0003] At present, the drainage system of reverse slope tunnel is mainly to set up water collection wells and pumping stations according to the length of the tunnel, and pump the accumulated water near the face out of the tunnel in stages. In the process of collecting, the accumulated water near the face will carry a large amount of rock debris or impurities, which can easily block the pumping pipe during the pumping process, causing the pumping and drainage operation to fail.

[0004] To solve this problem, patent CN 113931689 A discloses a reverse slope tunnel drainage and purification system and method. The drainage process of water inside the tunnel is realized by a multi-level sump. The sump near the face pumps the water in the clear water tank to the upper sump, and the water in the tunnel is discharged out of the tunnel by pumping water step by step; the water intake pump pumps the construction wastewater at the face into the wastewater treatment tank of the sump, and the wastewater treatment agent is added through the movable medicine box. After the wastewater is treated, it flows into the clear water tank, and then it is discharged out of the tunnel step by step by the water pump together with the mountain water flowing into the central drainage ditch. However, the technical solution disclosed in the patent still has the following technical problems: after the wastewater is treated in the wastewater treatment tank, the rock debris and impurities in the wastewater will settle at the bottom of the wastewater treatment tank or flow into the adjacent clean water tank; and when the clean water flows from the clean water tank into the upper-level sump, it needs to first flow into the wastewater treatment tank of the upper-level sump and then flow into the clean water tank. In this step-by-step drainage mode, the rock debris in the upper-level clean water tank will increase, and there is a hidden danger of clogging the water pump pipe during the water pumping process, causing the water pumping and drainage operation to fail.

[0005] In view of this, how to provide a tunnel reverse slope drainage device that can purify wastewater and avoid clogging of the pumping pipe is a problem that technical personnel in this field urgently need to solve. Summary of the invention

[0006] The purpose of the present invention is to provide a tunnel intelligent pumping and sewage purification control device to solve the problems existing in the prior art and realize the purification of wastewater from the heading face. The purified wastewater is filtered and discharged from the tunnel together with the mountain water to avoid the problem of blockage of the pumping pipe.

[0007] To achieve the above object, the present invention provides the following solution: The present invention provides a tunnel intelligent pumping and sewage purification control device, comprising:

[0008] A water collecting tank, wherein a plurality of water collecting tanks are arranged along the length direction of the tunnel slope, and the water collecting tanks are divided into a wastewater treatment tank and a clean water tank by a partition, and the mountain water can flow into the clean water tank;

[0009] A filter screen, the filter screen is arranged at the upper end of the partition, when the liquid level of the wastewater treatment tank is higher than the upper end of the partition, the water in the wastewater treatment tank flows through the filter screen and enters the clean water tank;

[0010] A drainage pipe, which is arranged along the length direction of the tunnel slope and is connected to the plurality of clear water tanks respectively;

[0011] A water collecting pipe, one end of which is close to the tunnel face, and the other end of which extends into a wastewater treatment pool close to the tunnel face.

[0012] Preferably, the water collecting tanks are evenly spaced along the length direction of the tunnel slope, with an interval of 300m.

[0013] Furthermore, it also includes:

[0014] A drainage branch pipe, one end of which is connected to the drainage pipe and the other end of which extends into the clean water tank, and a drainage pump is provided on the drainage branch pipe;

[0015] A one-way valve is arranged on the drainage pipe, the one-way valve is located between two adjacent drainage pumps, or the one-way valve is located between the tunnel entrance and the drainage pump close to the tunnel entrance.

[0016] Furthermore, it also includes:

[0017] A medicine barrel, wherein the medicine barrel is fixedly arranged on the water collecting pipe, wherein a sedimentation agent and a softener are arranged in the medicine barrel, and are discharged through a sedimentation agent liquid outlet end and a softener liquid outlet end respectively, and the sedimentation agent liquid outlet end and the softener liquid outlet end correspond to a wastewater treatment pool close to the palm face.

[0018] Furthermore, it also includes:

[0019] A mud pipe, one end of which extends into a wastewater treatment pool close to the tunnel face, and the other end of which extends beyond the tunnel opening. A mud pump is provided on the mud pipe.

[0020] Furthermore, it also includes:

[0021] A stirring mechanism is arranged in a wastewater treatment pool close to the tunnel face, and the stirring mechanism is spaced apart from one end of the mud pipe.

[0022] Furthermore, one end of the mud pipe is close to or fixedly arranged on the partition, a gap is provided between the stirring mechanism and the partition, and a vibrator is provided on one side of the partition corresponding to the clean water tank.

[0023] Furthermore, it also includes:

[0024] A first liquid level sensor, the first liquid level sensor is arranged in the clean water tank, and the first liquid level sensor is close to the upper end of the partition;

[0025] a second liquid level sensor, the second liquid level sensor being disposed in the wastewater treatment tank, the second liquid level sensor being close to an upper edge of the wastewater treatment tank;

[0026] A controller is electrically connected to the first liquid level sensor, the second liquid level sensor and the drainage pump respectively.

[0027] Furthermore, the medicine cartridge is fixed on the water collecting pipe via a support frame.

[0028] Furthermore, the upper edges of the wastewater treatment tank and the clean water tank are covered with mesh panels.

[0029] The present invention discloses the following technical effects:

[0030] 1. The face wastewater is filtered through the filter screen and flows into the clean water tank. The filtered face wastewater is free of rock and debris, which can avoid blockage in the drainage pipe during drainage.

[0031] 2. This application adopts a solution of simultaneous drainage of multiple clear water tanks. The lower clear water tank near the face and the upper clear water tank near the tunnel entrance can directly discharge the water in the clear water tank into the drainage pipe, and the upper and lower clear water tanks do not interfere with each other; in addition, compared with the traditional multi-stage drainage structure, the lower clear water tank in this application directly drains water to the drainage pipe, which can also improve the drainage efficiency and avoid circulation between multiple clear water tanks. A one-way valve is set between adjacent drainage pumps in the drainage pipe to prevent the backflow of clean water.

[0032] 3. A reagent barrel is installed on the water collecting pipe, which can discharge sedimentation agent and softener into the wastewater treatment tank. The sedimentation agent is used to purify the wastewater, turn the wastewater into clean water and discharge it into the clean water tank, and filter and settle the rock debris in the wastewater to the bottom of the wastewater treatment tank. The softener is used to soften the rock debris accumulated at the bottom of the wastewater treatment tank. Combined with the stirring mechanism, it can be mixed with the residual water in the wastewater treatment tank that cannot flow into the clean water tank to form mud. When the tunnel progress is carried out to the corresponding position of the next-level water collecting tank, the mud in the previous-level wastewater treatment tank can be used as a clean water tank after being discharged by the mud pump, which expands the volume of the clean water tank, reduces the start-stop frequency of the corresponding pump of the clean water tank, and extends the service life of the equipment. In addition, the present application is provided with a first liquid level sensor and a second liquid level sensor. The first liquid level sensor is close to the upper end of the partition. Its function is to monitor the liquid level of the clean water tank close to the heading face, discharge the clean water in time, and prevent the clean water from overflowing into the wastewater treatment tank. The second liquid level sensor is close to the upper edge of the wastewater treatment tank. When the tunnel progresses to the next-level water collecting tank, the wastewater treatment tank originally close to the heading face discharges the mud and becomes the clean water tank of the upper level. At this time, the liquid level of the clean water tank can be monitored by the second liquid level sensor, and the clean water can be discharged in time.

[0033] 4. After softener is added to the wastewater treatment pool, some rock debris may adhere to the partition and the inner wall of the wastewater treatment pool when settling. The present application sets a vibrator on the side of the partition corresponding to the clean water pool, which can vibrate this part of the adhered rock debris into the wastewater treatment pool, and form mud after sufficient stirring to ensure that the rock debris in the wastewater treatment pool can be discharged. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0035] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0036] Figure 2 This is a schematic diagram of the water collecting tank near the tunnel face;

[0037] Figure 3 It is a schematic diagram of the structure of the upper water collecting tank;

[0038] Among them, 1. water collecting tank; 101. wastewater treatment tank; 102. clean water tank; 103. partition; 104. filter screen; 2. drainage pipe; 3. water collecting pipe; 4. heading face; 5. tunnel slope; 6. tunnel entrance; 7. drainage branch pipe; 8. one-way valve; 9. drainage pump; 10. reagent cylinder; 1001. liquid outlet of sedimentation agent; 1002. liquid outlet of softener; 11. mud pipe; 12. mud pump; 13. stirring mechanism; 14. vibrator; 15. first liquid level sensor; 16. second liquid level sensor; 17. mesh plate; 18. support frame; 19. automatic filter press. DETAILED DESCRIPTION

[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0041] like Figure 1-Figure 3 The embodiment of the present invention provides a tunnel intelligent pumping and sewage purification control device, comprising:

[0042] Water collecting tank 1, multiple water collecting tanks 1 are arranged along the length direction of tunnel slope 5, water collecting tank 1 is prefabricated before or during tunnel construction, water collecting tank 1 is made of waterproof material, or waterproof cloth is laid on the inner surface of water collecting tank 1. The bottom of water collecting tank 1 is leveled by pads, and the bottom of pads is adapted to the shape of tunnel slope 5. Water collecting tank 1 has a rectangular cavity, in the middle of which a waterproof and wear-resistant partition 103 is vertically arranged, and is divided into wastewater treatment tank 101 and clean water tank 102 by partition 103, as shown in FIG. Figure 1 As shown, the left side of the water collecting tank 1 is a wastewater treatment tank 101, and the right side is a clean water tank 102. The mountain water flows into the clean water tank 102 through the longitudinal drainage pipe 2, the transverse drainage pipe 2 and the central drainage ditch in the tunnel. The way of introducing the mountain water into the clean water tank 102 is not limited and can be flexibly adjusted according to the actual situation of the tunnel. In some other embodiments, drainage concealed pipes, seepage troughs, etc. can also be used; the upper edges of the wastewater treatment tank 101 and the clean water tank 102 are covered with mesh plates 17 to prevent large-diameter stones in the tunnel from falling into the clean water tank 102 and the wastewater treatment tank 101;

[0043] The filter screen 104 has the same width as the partition 103. The filter screen 104 is vertically arranged on the upper end of the partition 103. At the same time, the top of the filter screen 104 is at a certain distance from the plane where the left end of the water collecting tank 1 is located. When the liquid level of the wastewater treatment tank 101 is higher than the upper end of the partition 103, the water in the wastewater treatment tank 101 flows through the filter screen 104 and enters the clean water tank 102. The function of the filter screen 104 is to filter the rock debris in the wastewater. The mesh number of the filter screen 104 is adjusted according to the size of the rock debris generated during the construction process. The filter screen 104 should be made of corrosion-resistant and wear-resistant materials;

[0044] Drain pipe 2, which is arranged along the length direction of tunnel slope 5, water collecting tank 1 is located on both sides of the tunnel, and drain pipe 2 is also arranged on both sides of the tunnel, and drain pipe 2 is respectively connected to a plurality of clear water tanks 102;

[0045] A water collecting pipe 3 , one end of which is close to the tunnel face 4 , and the other end of which extends into a wastewater treatment pool 101 close to the tunnel face 4 . A water collecting pump is provided on the water collecting pipe 3 .

[0046] like Figure 1 As shown, in this embodiment, the water collecting tanks 1 are evenly spaced along the length direction of the tunnel slope 5. Figure 1 The water collecting tank 1 near the tunnel face 4 is called the lower water collecting tank 1, and the wastewater treatment tank 101 and the clean water tank 102 in the water collecting tank 1 are called the lower wastewater treatment tank 101 and the lower clean water tank 102; Figure 1 The other water collecting tank 1 located at a higher level is called the upper water collecting tank 1, the wastewater treatment tank 101 and the clean water tank 102 in the water collecting tank 1 are called the upper wastewater treatment tank 101 and the upper clean water tank 102, and the distance between the upper water collecting tank 1 and the lower water collecting tank 1 is 300m.

[0047] like Figure 1-Figure 3 As shown, in this embodiment, it also includes:

[0048] Drainage branch pipe 7, one end of the drainage branch pipe 7 corresponding to the lower clear water tank 102 is connected to the drainage pipe 2, and the other end extends into the clear water tank 102, one end of the drainage branch pipe 7 corresponding to the upper clear water tank 102 is connected to the drainage pipe 2 through a three-way connector, and the other end extends into the clear water tank 102, and each drainage branch pipe 7 is provided with a drainage pump 9;

[0049] The one-way valve 8 is arranged on the drainage pipe 2, and the one-way valve 8 is located between two adjacent drainage pumps 9, or the one-way valve 8 is located between the tunnel opening 6 and the drainage pump 9 near the tunnel opening 6, such as Figure 1 As shown, a one-way valve 8 is provided near the upper clean water tank 102 , and another one-way valve 8 is provided near the tunnel opening 6 . The one-way valve 8 can prevent the clean water in the drainage pipe 2 from flowing back.

[0050] like Figure 2 As shown, in this embodiment, it also includes:

[0051] The medicine barrel 10 is fixed on the water collecting pipe 3 through the support frame 18. The barrel of the medicine barrel 10 protrudes forward. The medicine barrel 10 is provided with a sedimentation agent and a softener, and the sedimentation agent liquid outlet 1001 and the softener liquid outlet 1002 at the bottom of the medicine barrel 10 are discharged respectively. The sedimentation agent liquid outlet 1001 and the softener liquid outlet 1002 correspond to the wastewater treatment tank 101 close to the face 4. The sedimentation agent is selected from polyacrylamide. Polyacrylamide is an organic macromolecular polymer with good flocculation effect. It can make the suspended particles in the water quickly condense and settle, thereby achieving the effect of separation and clarification. In the reverse slope drainage of the tunnel, polyacrylamide can effectively remove the slag in the water, improve the drainage efficiency, and reduce the pollution to the environment. In addition to polyacrylamide, there are some other sedimentation agents that can also be used for reverse slope drainage of tunnels, such as polyaluminum chloride, polyferric sulfate, etc. The softener uses a surfactant, which can reduce the surface tension of water and make it easier for water to penetrate into the slag, thereby achieving a softening effect.

[0052] like Figure 1 and Figure 2 As shown, in this embodiment, it also includes:

[0053] A mud pipe 11, one end of which extends into a wastewater treatment pool 101 near the tunnel face 4, and the other end extends beyond the tunnel opening 6. A mud pump 12 is provided on the mud pipe 11, and the other end of the mud pipe 11 is connected to an automatic filter press 19. The discharged mud can be formed into a mud cake after being processed by the automatic filter press 19, and can be collected and reused.

[0054] The stirring mechanism 13 is arranged in the wastewater treatment tank 101 near the tunnel face 4, and the stirring mechanism 13 is spaced apart from one end of the mud pipe 11. One end of the mud pipe 11 is close to or fixedly arranged on the partition 103, and there is a gap between the stirring mechanism 13 and the partition 103. A vibrator 14 is arranged on one side of the partition 103 corresponding to the clear water tank 102.

[0055] A first liquid level sensor 15, which is disposed in the clean water tank 102, and is close to an upper end of the partition 103;

[0056] A second liquid level sensor 16, which is disposed in the wastewater treatment tank 101, and is close to an upper edge of the wastewater treatment tank 101;

[0057] A controller is electrically connected to the first liquid level sensor 15 , the second liquid level sensor 16 and the drainage pump 9 , respectively.

[0058] The working process of this embodiment is described in detail below. The working process is described based on the upper water collecting tank 1 and the lower water collecting tank 1, and is specifically as follows:

[0059] 1. As Figure 1 As shown, the wastewater generated by the construction of the tunnel face 4 is sent to the wastewater treatment tank 101 through the water collecting pipe 3, and the reagent barrel 10 adds a sedimentation agent to the wastewater treatment tank 101 through the sedimentation agent liquid outlet 1001, and the suspended particles, impurities and rock debris in the wastewater settle to the bottom of the wastewater treatment tank 101. As the wastewater sent into the water collecting pipe 3 continues to increase, the liquid level of the wastewater treatment tank 101 exceeds the upper end of the partition 103, flows through the filter screen 104 and enters the clean water tank 102. During the process, the impurities remaining in the wastewater can be filtered out by the filter screen 104, and these impurities and the rock debris settled to the bottom are accumulated to form a sedimentation debris layer.

[0060] 2. Mountain water and treated wastewater continuously enter the clean water tank 102. When the liquid level of the clean water tank 102 reaches the first liquid level sensor 15, the first liquid level sensor 15 sends a signal to the controller, and the controller controls the drainage pump 9 corresponding to the lower clean water tank 102 to start, and introduce the clean water in the clean water tank 102 into the drainage pipe 2 through the drainage branch pipe 7, and finally discharge it from the tunnel opening 6.

[0061] 3. After the tunnel is constructed further to the lower left for a distance, it reaches the construction point of the next-level water collecting tank 1 (the third water collecting tank 1 located at the lower left of the lower water collecting tank 1, not shown in the figure). After the construction of the next-level water collecting tank 1 is completed, the stirring mechanism 13 in the lower-level wastewater treatment tank 101 is started, and at the same time, the reagent barrel 10 adds a softener into the wastewater treatment tank 101, and the vibrator 14 is started. The settled soil layer in the lower-level wastewater treatment tank 101 and the wastewater that has not flowed into the clean water tank 102 are fully stirred and mixed to form mud. The mud pump 12 is started to discharge all the mud in the lower-level wastewater treatment tank 101 from the tunnel opening 6 through the mud pipe 11. After all the mud is discharged, the first liquid level sensor 15, the vibrator 14 and the stirring mechanism 13 in the lower-level water collecting tank 1 are removed, reused, and installed in the next-level water collecting tank 1, and the installation position remains unchanged. At this time, the state of the lower-level water collecting tank 1 becomes the same as that of the upper-level water collecting tank 1, such as Figure 3 As shown, the upper water collecting tank 1 only includes the water collecting tank 1, the large clean water tank 102 formed by the upper clean water tank 102 and the upper wastewater treatment tank 101. In the upper water collecting tank 1, when the liquid level of the mountain water reaches the second liquid level sensor 16, the second liquid level sensor 16 sends a signal to the controller, and the controller controls the drainage pump 9 corresponding to the upper clean water tank 102 to start, and introduce the clean water into the drainage pipe 2 through the drainage branch pipe 7, and finally discharge it from the tunnel opening 6.

[0062] 4. Lengthen the length of the mud pipe 11 and the drain pipe 2, and seal and connect the extended part with the original part through a flange, introduce the mud pipe 11 into the wastewater treatment tank 101 of the next-level water collecting tank 1, and introduce the drain pipe 2 into the clean water tank 102 of the next-level water collecting tank 1 through the drainage branch pipe 7, and repeat the above working process.

[0063] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0064] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. Tunnel intelligent pumping and sewage purification control device, characterized in that: include: A water collecting tank (1), wherein a plurality of the water collecting tanks (1) are arranged along the length direction of the tunnel slope (5), and the water collecting tank (1) is divided into a wastewater treatment tank (101) and a clean water tank (102) by a partition (103), and mountain water can flow into the clean water tank (102); A filter screen (104), wherein the filter screen (104) is arranged at the upper end of the partition (103), and when the liquid level of the wastewater treatment tank (101) is higher than the upper end of the partition (103), the water in the wastewater treatment tank (101) flows through the filter screen (104) and enters the clean water tank (102); A drainage pipe (2), the drainage pipe (2) being arranged along the length direction of the tunnel slope (5), and the drainage pipe (2) being respectively connected to the plurality of clear water tanks (102); A water collecting pipe (3), one end of which is close to the tunnel face (4) and the other end of which extends into a wastewater treatment pool (101) close to the tunnel face (4).

2. The tunnel intelligent pumping and sewage purification control device according to claim 1 is characterized in that: The water collecting tanks (1) are evenly spaced along the length direction of the tunnel slope (5), with a spacing of 300 m.

3. The tunnel intelligent pumping and sewage purification control device according to claim 1 is characterized in that: Also includes: A drainage branch pipe (7), one end of which is connected to the drainage pipe (2) and the other end of which extends into the clear water tank (102); a drainage pump (9) is provided on the drainage branch pipe (7); A one-way valve (8), wherein the one-way valve (8) is arranged on the drainage pipe (2), and the one-way valve (8) is located between two adjacent drainage pumps (9), or the one-way valve (8) is located between a tunnel opening (6) and a drainage pump (9) close to the tunnel opening (6).

4. The tunnel intelligent pumping and sewage purification control device according to claim 3 is characterized in that: Also includes: A medicine cartridge (10) is fixedly mounted on the water collecting pipe (3), wherein a sedimentation agent and a softener are arranged in the medicine cartridge (10) and are discharged through a sedimentation agent liquid outlet (1001) and a softener liquid outlet (1002) respectively, wherein the sedimentation agent liquid outlet (1001) and the softener liquid outlet (1002) correspond to a wastewater treatment tank (101) close to the face (4).

5. The tunnel intelligent pumping and sewage purification control device according to claim 4 is characterized in that: Also includes: A mud pipe (11), one end of which extends into a wastewater treatment pool (101) close to the tunnel face (4), and the other end of which extends outside the tunnel opening (6). A mud pump (12) is provided on the mud pipe (11).

6. The tunnel intelligent pumping and sewage purification control device according to claim 5 is characterized in that: Also includes: A stirring mechanism (13), wherein the stirring mechanism (13) is arranged in a wastewater treatment tank (101) close to the tunnel face (4), and the stirring mechanism (13) is spaced apart from one end of the mud pipe (11).

7. The tunnel intelligent pumping and sewage purification control device according to claim 6 is characterized in that: One end of the mud pipe (11) is close to or fixedly arranged on the partition (103), a gap is provided between the stirring mechanism (13) and the partition (103), and a vibrator (14) is provided on one side of the partition (103) corresponding to the clean water tank (102).

8. The tunnel intelligent pumping and sewage purification control device according to claim 7 is characterized in that: Also includes: A first liquid level sensor (15), the first liquid level sensor (15) being arranged in the clean water tank (102), the first liquid level sensor (15) being close to an upper end of the partition (103); a second liquid level sensor (16), the second liquid level sensor (16) being arranged in the wastewater treatment tank (101), the second liquid level sensor (16) being close to an upper edge of the wastewater treatment tank (101); A controller is electrically connected to the first liquid level sensor (15), the second liquid level sensor (16) and the drainage pump (9) respectively.

9. The tunnel intelligent pumping and sewage purification control device according to claim 4 is characterized in that: The medicine cartridge (10) is fixed on the water collecting pipe (3) via a support frame (18).

10. The tunnel intelligent pumping and sewage purification control device according to claim 1 is characterized in that: The upper edges of the wastewater treatment tank (101) and the clean water tank (102) are covered with mesh plates (17).