One-key start-stop control method and device for steam turbine generator unit

By designing the one-click start-stop control method and device of the steam turbine generator set, the start-stop and stop of the steam turbine generator set is automatically controlled, which solves the problem that the domestic steam turbine generator set control system is difficult to achieve one-click start-stop, and improves the safety of operation and efficiency reduce operating costs.

CN118934103APending Publication Date: 2024-11-12SINOSTEEL EQUIP & ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411025422.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

It is difficult to achieve one-click start and stop control systems for domestic steam turbine generator sets, and rely on operators to start and stop manually, limiting the automatic control of the unit.

Method used

A one-click start-stop control method and device for steam turbine generator sets is designed, and the operation instructions are generated by receiving user input information to automatically start and stop the hydrophobic system, oil system, carriage system, steam turbine controller, demagnetization switch and Excitation device realizes automatic control and monitors and alarms when necessary.

Benefits of technology

The control system is optimized to ensure the safe, efficient and stable operation of domestic waste heat generator sets, reduce operating costs, and solve the problem of manual intervention.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118934103A_ABST
    Figure CN118934103A_ABST
Patent Text Reader

Abstract

The invention provides a one-key start-stop control method and device for a steam turbine generator unit, which are applied to a steam turbine generator unit control system. Generating a starting or stopping instruction according to the information input by the user; starting an instruction: starting a drainage system, an oil system and a hanging gate; running time is set after the turning system is started; if the steam turbine starting valve main throttle valve is opened, a steam turbine controller is started, and a field suppression switch is switched on; the excitation device is started, and if the synchronous selection button is triggered, corresponding operation is carried out on the steam turbine generator according to the button value; grid connection is carried out and a steam turbine controller is controlled to be put into cascade; according to the stop instruction, when the load is lower than the threshold value, an outlet switch of the steam-turbine generator is disconnected and a main throttle valve is closed; gradually reducing the rotating speed of the steam turbine generator, and sequentially closing a turning system and an oil system; the problem of one-key start and stop of a domestic unit control system needing manual intervention is solved, the control system is optimized, safe, efficient and stable operation of a domestic waste heat generator set is guaranteed, and the operation cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of steam turbine control, and in particular to a one-button start-stop control method and device for a steam turbine generator set. Background Art

[0002] In the current domestic steam turbine generator control system, due to technical reasons, the supporting mechanical turning device, manual starting valve, and manual remote synchronization cannot meet the technical requirements of full automatic control of the unit control system. Traditionally, the start and stop of the domestic steam turbine generator control system rely on manual operation by the operator, which limits the realization of full automatic control of the unit.

[0003] In order to improve operational efficiency and safety, higher requirements are now placed on the one-button start and stop functions of these units, so that the automated management and safe operation of domestic steam turbine generator sets can be achieved without excessive manual intervention. Summary of the invention

[0004] In view of this, an embodiment of the present invention provides a one-button start and stop control method and device for a steam turbine generator set to solve the problem that it is difficult to achieve one-button start and stop in the current domestic steam turbine generator set control system.

[0005] To achieve the above objectives, the embodiments of the present invention provide the following technical solutions:

[0006] The first aspect of the present invention discloses a one-button start-stop control method for a steam turbine generator set, which is applied to a control system of a steam turbine generator set. The control system is composed of multiple components, specifically including: a steam turbine generator, a drain system, an oil system, a cranking system, a steam turbine start valve, a steam turbine controller, a demagnetization switch, an excitation device and a synchronization selection button. The method includes:

[0007] Receive information input by the user and generate an operation instruction according to the information;

[0008] When the operation instruction is a start instruction, the drain system and the oil system are started in sequence, and the lock operation is performed;

[0009] When it is detected that the turning system is started, the running time of the turning system is set;

[0010] If it is detected that the main steam valve of the steam turbine starting valve is open, the steam turbine controller is started and the demagnetization switch is turned on according to the preset pulse time;

[0011] After detecting that the demagnetization switch is turned on, the excitation device is started, and if the synchronization selection button is triggered, a corresponding operation is performed on the steam turbine generator according to the value corresponding to when the button is triggered;

[0012] Performing a grid-connected operation to connect to the power grid, and controlling the steam turbine controller to start and enter the cascade mode;

[0013] When the operation instruction is a stop instruction, if it is detected that the load is lower than a threshold value, the outlet switch of the steam turbine generator is disconnected, and the main steam valve of the steam turbine starting valve is closed;

[0014] The rotation speed of the steam turbine generator is reduced, and the turning system and the oil system are shut down in sequence.

[0015] Preferably, when a one-key start instruction is received, the drain system and the oil system are started in sequence, and before the gate operation is performed, the method further includes:

[0016] Receive multiple configuration parameters;

[0017] The initial parameters of each component in the steam turbine generator set control system are set according to the multiple configuration parameters.

[0018] Preferably, the method further comprises:

[0019] Monitoring each component in the control system of the steam turbine generator set to obtain monitoring data;

[0020] The monitoring data is output to an interactive interface.

[0021] Preferably, the method further comprises:

[0022] When any component in the control system of the steam turbine generator set starts abnormally, obtaining corresponding abnormal data of the current component;

[0023] generating alarm information according to the abnormal data;

[0024] Output the alarm information according to a preset alarm mode;

[0025] When the reset / set flip-flop is detected to be reset, the current component is restarted.

[0026] Preferably, the method further comprises:

[0027] When it is detected that any component in the control system of the steam turbine generator set is operating abnormally, the steam turbine emergency trip system in the control system of the steam turbine generator set is controlled to perform a trip operation to cut off the operation of the steam turbine generator.

[0028] The second aspect of the present invention discloses a one-button start-stop control device for a steam turbine generator set, which is applied to a control system of a steam turbine generator set. The control system is composed of multiple components, specifically including: a steam turbine generator, a drain system, an oil system, a cranking system, a steam turbine start valve, a steam turbine controller, a demagnetization switch, an excitation device and a synchronization selection button. The device includes:

[0029] A first generating unit, configured to receive information input by a user and generate an operation instruction according to the information;

[0030] A first starting unit, used for starting the drain system and the oil system in sequence and performing a lock operation when the operation instruction is a start instruction;

[0031] A first setting unit is used to set the running time of the turning gear system after detecting that the turning gear system is started;

[0032] A second starting unit is used to start the steam turbine controller and activate the demagnetization switch according to a preset pulse time if it is detected that the main steam valve of the steam turbine starting valve is opened;

[0033] A third starting unit is used to start the excitation device after detecting that the demagnetization switch is turned on, and if the synchronization selection button is triggered, perform a corresponding operation on the steam turbine generator according to the value corresponding to when the button is triggered;

[0034] A control unit, used for performing a grid-connected operation to connect to the grid, and controlling the steam turbine controller to start and enter a cascade mode;

[0035] A first closing unit is used for disconnecting the outlet switch of the steam turbine generator and closing the main steam valve of the steam turbine starting valve when the operating instruction is a stop instruction and the load is detected to be lower than a threshold value;

[0036] The second closing unit is used to reduce the rotation speed of the steam turbine generator and shut down the turning system and the oil system in sequence.

[0037] Preferably, the device further comprises:

[0038] A receiving unit, used for receiving a plurality of configuration parameters;

[0039] The second setting unit is used to set the initial parameters of each component in the steam turbine generator set control system according to the multiple configuration parameters.

[0040] Preferably, the device further comprises:

[0041] A monitoring unit, used to monitor various components in the control system of the steam turbine generator set to obtain monitoring data;

[0042] The first output unit is used to output the monitoring data to an interactive interface.

[0043] Preferably, the device further comprises:

[0044] An acquisition unit, used for acquiring abnormal data corresponding to the current component when any component in the control system of the steam turbine generator set starts abnormally;

[0045] A second generating unit, used to generate alarm information according to the abnormal data;

[0046] A second output unit, used to output the alarm information according to a preset alarm mode;

[0047] The restart unit is used to restart the current component when it is detected that the reset / set trigger is reset.

[0048] Preferably, the device further comprises:

[0049] The trip unit is used to control the steam turbine emergency trip system in the steam turbine generator set control system to perform a trip operation to cut off the operation of the steam turbine generator when it is detected that any component in the steam turbine generator set control system is operating abnormally.

[0050] Based on the above-mentioned embodiment of the present invention, a one-button start and stop control method and device for a steam turbine generator set are provided. The method is applied to the control system of the steam turbine generator set, including: a steam turbine generator, a drain system, an oil system, a cranking system, a turbine starting valve, a turbine controller, a demagnetization switch, an excitation device and a synchronization selection button. Generate operating instructions based on the information input by the user; if the operating instruction is a start instruction, start the drain system and oil system and close the gate; set its operating time after the turning system is started; if the main steam valve of the turbine starting valve is open, start the turbine controller and put the demagnetization switch into operation; start the excitation device, and if the synchronization selection button is triggered, perform corresponding operations on the steam turbine generator according to the value corresponding to when the button is triggered; connect to the grid and control the steam turbine controller to put it into cascade; if the operating instruction is a stop instruction, disconnect the outlet switch of the steam turbine generator and close the main steam valve when the load is lower than the threshold; reduce the speed of the steam turbine generator, and turn off the turning system and oil system in turn; solve the one-button start and stop problem of domestic unit control systems that require manual intervention, optimize the control system, ensure the safe, efficient and stable operation of domestic waste heat power generation units, and reduce operating costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0052] Figure 1 A flow chart of a one-button start-stop control method for a steam turbine generator set provided by an embodiment of the present invention;

[0053] Figure 2 A connection topology diagram between the main control system and the steam turbine generator set control system provided by an embodiment of the present invention;

[0054] Figure 3 A schematic diagram of an interactive interface provided by an embodiment of the present invention;

[0055] Figure 4 A structural block diagram of a one-button start-stop control device for a steam turbine generator set provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0056] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0057] In this application, the terms "comprises", "comprising" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device comprising a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "comprising a ..." does not exclude the presence of other identical elements in the process, method, article or device comprising the element.

[0058] As can be seen from the background technology, the start and stop of the control system of the domestic steam turbine generator set currently relies on the manual operation of the operator, which limits the realization of the full-process automatic control of the unit.

[0059] Therefore, an embodiment of the present invention provides a one-button start and stop control method and device for a steam turbine generator set. The method is applied to the control system of the steam turbine generator set, including: a steam turbine generator, a drain system, an oil system, a cranking system, a turbine starting valve, a turbine controller, a demagnetization switch, an excitation device and a synchronization selection button. Receive information input by the user and generate operation instructions based on the information; when the operation instruction is a start instruction, start the drain system and the oil system and close the gate; when the cranking system is detected to be started, set the running time of the cranking system; if it is detected that the main steam valve of the turbine starting valve is open, start the turbine controller and turn on the demagnetization switch according to the preset pulse time; after detecting that the demagnetization switch is turned on, start the excitation device, and if the synchronization selection button is triggered, perform corresponding operations on the turbine generator according to the value corresponding to when the button is triggered; perform grid-connected operation to connect to the power grid, and control the turbine controller to start and put into cascade mode; when the operation instruction is a stop instruction, if it is detected that the load is lower than the threshold, disconnect the outlet switch of the turbine generator and the main steam valve of the closed turbine starting valve; reduce the speed of the turbine generator, and turn off the cranking system and the oil system in turn; solve the one-button start and stop problem of the domestic unit control system that requires manual intervention, optimize the control system, ensure the safe, efficient and stable operation of the domestic waste heat generator set, and reduce the operating cost, which is of great significance.

[0060] See also Figure 1 , shows a flow chart of a one-button start-stop control method for a steam turbine generator set provided in an embodiment of the present invention, which control method is applied to a steam turbine generator set control system.

[0061] It is understandable that the present invention is based on the waste heat power generation project, which includes three waste heat boilers, a set of domestic steam-assisted condensing steam turbine generator sets, a waste heat power station and a cement plant substation. Among them, the generator of the waste heat power station is not connected to the grid, and the 13.8kV bus is connected to the secondary side of the cement plant substation through a power cable. The electricity generated by the waste heat power generation project is used for the clinker production line.

[0062] The waste heat power station includes the main control system (MCS), the generator integrated protection system, the excitation system and the synchronization system. The connection relationship between the main control system and the steam turbine generator control system is as follows: Figure 2 shown.

[0063] It should be noted that the present invention mainly utilizes Siemens STEP7 configuration software to design the turbine control system (TCS) of the steam turbine generator set.

[0064] It should be noted that the control system of the steam turbine generator set is composed of multiple components, including but not limited to the steam turbine generator, drain system, oil system, turning system, turbine starting valve, turbine controller, demagnetization switch, excitation device and synchronization selection button.

[0065] In practical applications, the control system of a steam turbine generator set may also include a steam seal system, a digital electro-hydraulic control system (Turbine Supervisory Instrumentation, DEH), a turbine safety protection monitoring system (Turbine Supervisory Instrumentation, TSI) and a turbine emergency trip system (EMERGENCY TRIP SYSTEM, ETS).

[0066] In some specific embodiments, the steam turbine generator may be a steam turbine of model BN16.5-2.29 / 0.2, with a rated speed of 3600 r / min, using a worm gear mechanical turning device, and having a manual starting valve.

[0067] The one-button start-stop control method comprises:

[0068] Step S101: receiving information input by a user and generating an operation instruction according to the information.

[0069] In the process of implementing step S101, information input by a user (such as an operator or engineer) in the interactive interface is received, and an operation instruction is generated according to the information. When the operation instruction is a start instruction, step S102 is executed; when the operation instruction is a stop instruction, step S107 is executed.

[0070] It should be noted that the network configuration in the control system of the steam turbine generator set is divided into a lower control network and an upper management network, and the lower control network and the upper management network are connected by PROFIBUSDP fieldbus. Among them, the lower control network is responsible for the collection and processing of field signals and the communication between the master station and the substation. The upper management network is oriented to the operator station or engineer station, so that the operator or engineer can monitor, control and manage the field equipment. Specifically, the upper management network is connected to a ring-type industrial Ethernet through a switch, and redundant Ethernet connection is used to realize data sharing.

[0071] Based on this, the operator or engineer inputs information through the interactive interface of the upper management network to generate operating instructions to control the start or stop of the steam turbine generator set control system.

[0072] In some specific embodiments, the steam turbine generator set control system is pre-integrated with the Siemens STEP7 configuration software, a steam turbine generator set control system project is established in the Siemens STEP7 configuration software, and the hardware, software and communication parts in the steam turbine generator set control system are managed through the SIMATIC manager, such as initialization management of the hardware, software and communication parts.

[0073] For example: perform hardware configuration and parameter setting for the controller CPU412-5H, fieldbus profibus, distributed I / O ET200M and required I / O modules.

[0074] The specific implementation process is as follows: open the hardware catalog SIMATIC 400 folder in the hardware configuration editor, insert the rack UR2-H, insert the power module in the first slot, insert the CPU in the third slot, establish a PROFIBUS master system, build a slave system on the master system, and combine I / O modules and assign parameters.

[0075] Specifically, the process of initializing and managing the software includes: receiving a plurality of configuration parameters; and setting initial parameters of various components in the control system of the steam turbine generator set according to the plurality of configuration parameters.

[0076] The specific implementation process is as follows: Create a program block. Create a Function in the Bock file of the Turbine Control System project and name it FC90. Open the program editor and use the LAD language to write the algorithm.

[0077] It should be noted that the programmer and the controller of the steam turbine generator set control system are connected to the network via the TCP / IP protocol.

[0078] Step S102: When the operation instruction is a start instruction, the drain system and the oil system are started in sequence, and the gate operation is performed.

[0079] In the specific implementation of step S102, when the operation instruction is a start instruction, the drain system in the control system of the steam turbine generator set is turned on, and after the drain system is turned on, the oil system is turned on.

[0080] It should be noted that specifically the lubricating oil system in the oil system is turned on, and after the lubricating oil system is turned on, the gate operation is performed.

[0081] In actual application, after the brake operation is performed, a prompt message may be output to the user to instruct the user to perform subsequent manual operations, such as starting the turning system.

[0082] It is understandable that starting the turning system requires human intervention. The specific intervention process includes: manually pressing the handle on the input device and rotating the handwheel on the worm counterclockwise until the small gear is fully engaged with the large turning gear on the rotor, turning on the turning motor, and starting the turning system.

[0083] Step S103: When it is detected that the turning system is started, the running time of the turning system is set.

[0084] In the specific implementation of step S103, after confirming that the turning system has been started, the running time of the turning system is set according to the site requirements, for example, to 0-4 hours.

[0085] Step S104: If it is detected that the main steam valve of the steam turbine starting valve is open, the steam turbine controller is started and the demagnetization switch is turned on according to the preset pulse time.

[0086] It is understandable that after the cranking system is started, the turbine start valve is manually opened to save the start-up time of the steam turbine generator set control system.

[0087] The specific process of opening the turbine starting valve includes: manually and slowly rotating the starting valve handwheel to open the main steam valve.

[0088] In the specific implementation of step S104, when it is detected that the main steam valve of the turbine starting valve is opened, the turbine controller 505 is started and the demagnetization switch is turned on according to the preset pulse time.

[0089] That is to say, after starting the steam turbine controller 505, the digital electro-hydraulic control system is used to increase the speed of the steam turbine, that is, the demagnetization switch is turned on to quickly reduce the current in the excitation circuit. The pulse time of the demagnetization switch is set to 1s, and the opening and closing of the demagnetization switch are both 1s pulses.

[0090] Step S105: After detecting that the demagnetization switch is turned on, the excitation device is started, and if the synchronization selection button is triggered, a corresponding operation is performed on the steam turbine generator according to the value corresponding to when the button is triggered.

[0091] In the specific implementation of step S105, after the demagnetization switch is detected to be turned on, the excitation device is started. If it is detected that the synchronization selection button is triggered, the corresponding operation is performed on the steam turbine generator according to the value (0 or 1) corresponding to the synchronization selection button being triggered.

[0092] It should be noted that when the excitation device is started, the excitation device automatically increases the voltage according to the set 95% rated voltage.

[0093] It is understandable that the synchronization step requires human intervention. A synchronization selection button is set in advance in the steam turbine generator control system. When the value corresponding to the synchronization selection button is 1, the speed of the steam turbine can be controlled (increase or decrease); when the value corresponding to the synchronization selection button is 0, no operation is performed.

[0094] It should be noted that other speed-up and speed-down switches may be designed redundantly in the control system of the steam turbine generator set.

[0095] Step S106: Execute the grid-connected operation to connect to the grid, and control the steam turbine controller to start the cascade mode.

[0096] In the specific implementation of step S106, the grid connection operation is performed to connect the steam turbine generator set control system to the grid, and the steam turbine controller 505 is controlled to be put into cascade mode; thus, the one-key start of the steam turbine generator set control system is completed.

[0097] Step S107: when the operation instruction is a stop instruction, if it is detected that the load is lower than the threshold, the outlet switch of the generator is disconnected, and the main steam valve of the turbine starting valve is closed;

[0098] In the specific implementation of step S107, when the operation instruction is a stop instruction, the user manually reduces the load. When the load is lower than the threshold (such as the load is reduced to less than 500KW), the turbine generator outlet switch is disconnected, and the main steam valve of the turbine starting valve is closed.

[0099] Step S108: Reduce the speed of the turbine generator and shut down the cranking system and the oil system in sequence.

[0100] In the specific implementation of step S108, the digital electro-hydraulic control system is used to reduce the speed of the steam turbine. First, the user manually turns on the cranking system, and then turns off the cranking system and the oil system in turn, thus completing the one-key stop of the steam turbine generator set control system.

[0101] In some embodiments, turbine startup is a complex and critical process that requires operators to closely monitor operating parameters and sequence changes. Figure 3 As shown in the interactive schematic diagram, the user can monitor whether the operating sequence of each component in the steam turbine generator set control system is normal through the corresponding interactive interface of the steam turbine safety protection monitoring system, and the relationship between each condition and.

[0102] Specifically, each component in the control system of the steam turbine generator set is monitored to obtain monitoring data; and the monitoring data is output to an interactive interface.

[0103] It should be noted that the steam turbine safety protection monitoring system also provides an alarm function, specifically: when any component in the steam turbine generator set control system starts abnormally, the corresponding abnormal data of the current component is obtained; alarm information is generated according to the abnormal data; alarm information is output according to the preset alarm method; when the reset / set trigger is detected to be reset, the current component is restarted.

[0104] For example Figure 3 As shown, when any component starts abnormally, for example, the prerequisites for starting are not met, an alarm message will be displayed on the interactive interface. In some specific embodiments, an alarm sound can also be output in the host computer.

[0105] Specifically, the alarm information may include started components, turbine speed, valve position feedback information, pressure switch feedback, etc., which are used to indicate whether the conditions for participating in logical control are met.

[0106] It is understandable that when any component starts abnormally and outputs alarm information, the program is in a waiting state, a timeout alarm is issued and the sequence control program is stopped. The program can be restarted only after the RS trigger is reset.

[0107] It should be noted that when any component in the steam turbine generator set control system is detected to be operating abnormally, the steam turbine emergency trip system in the steam turbine generator set control system is controlled to perform a trip operation to cut off the operation of the steam turbine generator.

[0108] In an embodiment of the present invention, an operation instruction is generated according to information input by a user; if the operation instruction is a start instruction, the drain system and the oil system are started and the gate is closed; when the turning system is started, its operating time is set; if the main steam valve of the turbine starting valve is opened, the turbine controller is started and the demagnetization switch is turned on; the excitation device is started, and if the synchronization selection button is triggered, the corresponding operation is performed on the steam turbine generator according to the value corresponding to when the button is triggered; the grid is connected and the steam turbine controller is controlled to be put into cascade; if the operation instruction is a stop instruction, when the load is lower than the threshold, the outlet switch of the steam turbine generator is disconnected, and the main steam valve is closed; the speed of the steam turbine generator is reduced, and the turning system and the oil system are turned off in turn; the one-button start and stop problem of the domestic unit control system requiring manual intervention is solved, the control system is optimized, the safe, efficient and stable operation of the domestic waste heat power generation unit is ensured, and the operating cost is reduced.

[0109] Corresponding to the one-button start-stop control method for a steam turbine generator set provided in the above embodiment of the present invention, see Figure 4, showing a structural block diagram of a one-button start-stop control device for a steam turbine generator set provided by an embodiment of the present invention, the device includes: a first generating unit 401, a first starting unit 402, a first setting unit 403, a second starting unit 404, a third starting unit 405, a control unit 406, a first closing unit 407 and a second closing unit 408.

[0110] The first generating unit 401 is used to receive information input by the user and generate an operation instruction according to the information; when the operation instruction is a start instruction, the first starting unit 402 is executed; when the operation instruction is a stop instruction, the first closing unit 407 is executed.

[0111] The first starting unit 402 is used to start the drain system and the oil system in sequence and perform the lock operation when the operation instruction is a start instruction.

[0112] The first setting unit 403 is used to set the running time of the turning system after detecting that the turning system is started.

[0113] The second starting unit 404 is used to start the turbine controller and activate the demagnetization switch according to a preset pulse time if it is detected that the main steam valve of the turbine starting valve is opened.

[0114] The third starting unit 405 is used to start the excitation device after detecting that the demagnetization switch is turned on. If the synchronization selection button is triggered, the corresponding operation is performed on the steam turbine generator according to the value corresponding to when the button is triggered.

[0115] The control unit 406 is used to perform the grid-connected operation to connect to the grid and control the steam turbine controller to start the cascade mode.

[0116] The first closing unit 407 is used to disconnect the outlet switch of the steam turbine generator and close the main steam valve of the steam turbine starting valve if it is detected that the load is lower than the threshold when the operation instruction is a stop instruction.

[0117] The second closing unit 408 is used to reduce the rotation speed of the steam turbine generator and shut down the turning system and the oil system in sequence.

[0118] In an embodiment of the present invention, an operation instruction is generated according to information input by a user; if the operation instruction is a start instruction, the drain system and the oil system are started and the gate is closed; when the turning system is started, its operating time is set; if the main steam valve of the turbine starting valve is opened, the turbine controller is started and the demagnetization switch is turned on; the excitation device is started, and if the synchronization selection button is triggered, the corresponding operation is performed on the steam turbine generator according to the value corresponding to when the button is triggered; the grid is connected and the steam turbine controller is controlled to be put into cascade; if the operation instruction is a stop instruction, when the load is lower than the threshold, the outlet switch of the steam turbine generator is disconnected, and the main steam valve is closed; the speed of the steam turbine generator is reduced, and the turning system and the oil system are turned off in turn; the one-button start and stop problem of the domestic unit control system requiring manual intervention is solved, the control system is optimized, the safe, efficient and stable operation of the domestic waste heat power generation unit is ensured, and the operating cost is reduced.

[0119] Combination Figure 4 The content shown, the device also includes: a receiving unit and a second setting unit.

[0120] The receiving unit is used to receive multiple configuration parameters.

[0121] The second setting unit is used to set the initial parameters of each component in the control system of the steam turbine generator set according to multiple configuration parameters.

[0122] Combination Figure 4 The content shown, the device also includes: the device also includes: a monitoring unit and a first output unit.

[0123] The monitoring unit is used to monitor various components in the control system of the steam turbine generator set and obtain monitoring data.

[0124] The first output unit is used to output the monitoring data to the interactive interface.

[0125] Combination Figure 4 The content shown, the device also includes: the device also includes: an acquisition unit, a second generation unit, a second output unit and a restart unit.

[0126] The acquisition unit is used to acquire the corresponding abnormal data of the current component when any component in the control system of the steam turbine generator set starts abnormally.

[0127] The second generating unit is used to generate alarm information according to the abnormal data.

[0128] The second output unit is used to output alarm information according to a preset alarm mode.

[0129] The restart unit is used to restart the current component when the reset / set flip-flop is detected to be reset.

[0130] Combination Figure 4The content shown, the device also includes: a trip unit, which is used to control the turbine emergency trip system in the steam turbine generator set control system to perform a trip operation to cut off the operation of the steam turbine generator when an abnormal operation of any component in the steam turbine generator set control system is detected.

[0131] In summary, the present invention provides a one-button start-stop control method and device for a steam turbine generator set, which solves the one-button start-stop problem of domestic unit control systems that require manual intervention, optimizes the control system, ensures the safe, efficient and stable operation of domestic waste heat power generation sets, reduces operating costs, and is of great significance.

[0132] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can refer to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system or system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can refer to the partial description of the method embodiment. The system and system embodiments described above are merely schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without creative work.

[0133] Professionals may further appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in the above description according to function. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professionals and technicians may use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0134] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A one-button start-stop control method for a steam turbine generator set, characterized in that: Applied to the control system of a steam turbine generator set, the control system is composed of multiple components, specifically including: a steam turbine generator, a drain system, an oil system, a cranking system, a steam turbine starting valve, a steam turbine controller, a demagnetization switch, an excitation device and a synchronization selection button, the method includes: Receive information input by the user and generate an operation instruction according to the information; When the operation instruction is a start instruction, the drain system and the oil system are started in sequence, and the lock operation is performed; When it is detected that the turning system is started, the running time of the turning system is set; If it is detected that the main steam valve of the steam turbine starting valve is open, the steam turbine controller is started and the demagnetization switch is turned on according to the preset pulse time; After detecting that the demagnetization switch is turned on, the excitation device is started, and if the synchronization selection button is triggered, a corresponding operation is performed on the steam turbine generator according to the value corresponding to when the button is triggered; Performing a grid-connected operation to connect to the power grid, and controlling the steam turbine controller to start and enter the cascade mode; When the operation instruction is a stop instruction, if it is detected that the load is lower than a threshold value, the outlet switch of the steam turbine generator is disconnected, and the main steam valve of the steam turbine starting valve is closed; The rotation speed of the steam turbine generator is reduced, and the turning system and the oil system are shut down in sequence.

2. The method according to claim 1, characterized in that When a one-key start command is received, the drain system and the oil system are started in sequence, and before the gate operation is performed, the method further includes: Receive multiple configuration parameters; The initial parameters of each component in the steam turbine generator set control system are set according to the multiple configuration parameters.

3. The method according to claim 1, characterized in that The method further comprises: Monitoring each component in the control system of the steam turbine generator set to obtain monitoring data; The monitoring data is output to an interactive interface.

4. The method according to claim 1, characterized in that: The method further comprises: When any component in the control system of the steam turbine generator set starts abnormally, obtaining corresponding abnormal data of the current component; generating alarm information according to the abnormal data; Output the alarm information according to a preset alarm mode; When the reset / set flip-flop is detected to be reset, the current component is restarted.

5. The method according to claim 1, characterized in that The method further comprises: When it is detected that any component in the control system of the steam turbine generator set is operating abnormally, the steam turbine emergency trip system in the control system of the steam turbine generator set is controlled to perform a trip operation to cut off the operation of the steam turbine generator.

6. A one-button start-stop control device for a steam turbine generator set, characterized in that: Applied to the control system of steam turbine generator set, the control system is composed of multiple components, including: steam turbine generator, drain system, oil system, turning system, steam turbine starting valve, steam turbine controller, demagnetization switch, excitation device and synchronization selection button, the device includes: A first generating unit, configured to receive information input by a user and generate an operation instruction according to the information; A first starting unit, used for starting the drain system and the oil system in sequence and performing a lock operation when the operation instruction is a start instruction; A first setting unit is used to set the running time of the turning gear system after detecting that the turning gear system is started; A second starting unit is used to start the steam turbine controller and activate the demagnetization switch according to a preset pulse time if it is detected that the main steam valve of the steam turbine starting valve is opened; A third starting unit is used to start the excitation device after detecting that the demagnetization switch is turned on, and if the synchronization selection button is triggered, perform a corresponding operation on the steam turbine generator according to the value corresponding to when the button is triggered; A control unit, used for performing a grid-connected operation to connect to the grid, and controlling the steam turbine controller to start and enter a cascade mode; A first closing unit is used for disconnecting the outlet switch of the steam turbine generator and closing the main steam valve of the steam turbine starting valve when the operating instruction is a stop instruction and the load is detected to be lower than a threshold value; The second closing unit is used to reduce the rotation speed of the steam turbine generator and shut down the turning system and the oil system in sequence.

7. The device according to claim 6, characterized in that The device also includes: A receiving unit, used for receiving a plurality of configuration parameters; The second setting unit is used to set the initial parameters of each component in the steam turbine generator set control system according to the multiple configuration parameters.

8. The device according to claim 6, characterized in that The device also includes: A monitoring unit, used to monitor various components in the control system of the steam turbine generator set to obtain monitoring data; The first output unit is used to output the monitoring data to an interactive interface.

9. The device according to claim 6, characterized in that The device also includes: An acquisition unit, used for acquiring corresponding abnormal data of the current component when any component in the control system of the steam turbine generator set starts abnormally; A second generating unit, used to generate alarm information according to the abnormal data; A second output unit, used to output the alarm information according to a preset alarm mode; The restart unit is used to restart the current component when it is detected that the reset / set trigger is reset.

10. The device according to claim 6, characterized in that The device also includes: The trip unit is used to control the steam turbine emergency trip system in the steam turbine generator set control system to perform a trip operation to cut off the operation of the steam turbine generator when it is detected that any component in the steam turbine generator set control system is operating abnormally.