Pipeline sealing element testing device and method
The double-membrane blasting mechanism simulates the leakage of carbon dioxide pipelines. The test device truly reflects the performance of the seal in an instantaneous pressure loss and low temperature environment, solving the problem that the existing technology cannot effectively evaluate the seal, and improving the safety and conveying efficiency of the seal .
Patent Information
- Application Number
- CN202310533681.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-12
- Publication Date
- 2024-11-12
AI Technical Summary
The prior art cannot truly reflect the instantaneous pressure loss process after the carbon dioxide pipeline leakage, and fails to effectively evaluate the seal performance of carbon dioxide gas in different phases, and cannot meet the safe transportation needs of seals in CCUS technology.
A pipeline seal test device was designed, and a double-membrane blasting mechanism was used to simulate the pipeline leakage process. By pumping pressure into the double-membrane blasting mechanism, the test pipeline instantly lost pressure, triggering the Joule-Thomson positive effect of carbon dioxide gas, forming a low temperature. environment, and real-time monitoring of seal performance through multiple flange settings and pressure and temperature sensors.
The performance test of seals in the leakage environment of carbon dioxide pipelines is realized, which can truly simulate leakage scenarios, meet the experimental needs of different pressure relief speeds, and study the impact of impurities on the seals through impurity gas injection, improving the safety of seals and Conveyment efficiency.
Smart Images

Figure CN118936855A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of pipeline transportation, and in particular, relates to a pipeline sealing component testing device and a pipeline sealing component testing method. Background Art
[0002] The low emission and secondary use of carbon dioxide have become a hot topic of extensive research. In this situation, CCUS (carbon dioxide capture, transportation and storage) technology came into being, which collects carbon dioxide and stores it geologically or uses it for carbon dioxide flooding to improve oil recovery.
[0003] The implementation of CCUS technology requires the transportation of carbon dioxide. Currently, pipeline transportation is the most cost-effective and widely used mode of transportation for carbon dioxide. With the continuous development of CCUS technology, the transmission pressure of pipelines is getting higher and higher, and the connections of valves and other components on the pipelines need to be sealed to prevent the leakage of carbon dioxide.
[0004] Once a leak occurs somewhere in the CO2 pipeline, the pressure inside the pipeline will drop instantly. During the rapid decompression of the gas, it is very easy to damage the seals on the pipeline, causing major problems for pipeline operation. In addition, due to the Joule-Thomson positive effect of CO2 gas, a low-temperature environment is very likely to occur during the CO2 leakage process, which also poses a challenge to the normal operation of the seals.
[0005] In the prior art, the testing equipment for seals is mainly for specific test pieces. The seals are clamped on the test bench to study the rapid pressure relief characteristics or low temperature characteristics of the seals. There is no performance evaluation under the dual effects of rapid gas pressure relief and low temperature, and the rapid pressure reduction process is mainly achieved through a valve group. For example, the Chinese patent document CN103512735B discloses a rubber seal rapid pressure relief detection device, including a tool, a test container, a valve group and a pipeline. The tool is composed of a lower cover and an upper cover connected by a first bolt, and the test container is composed of an end cover and a tank body connected by a second bolt. The end cover is provided with an air inlet and an air outlet, and the tank body and the end cover are provided with matching annular grooves, and a sealing gasket ring is built into the annular groove. The air inlet of the end cover is connected to the boost stop valve of the valve group by a boost pipeline, and the air outlet of the end cover is connected to the pressure relief stop valve of the valve group by a pressure relief pipeline. The compression rate of rubber seals can be limited, and the rubber seals can be placed in a sealed environment that can be pressurized and quickly depressurized to complete the rapid pressure relief test of rubber seals. The operation is simple and the cost is low. The pressure relief speed can be controlled during the test, and the released carbon dioxide and methane are confined in the gas protection cover. The ventilation system safely and quickly discharges the harmful gases, which plays a role in protecting the personal safety of operators.
[0006] It can be seen that the seal testing device in the prior art cannot truly reflect the instantaneous pressure loss process after the carbon dioxide pipeline leaks, and there is no seal evaluation device and method for the medium being carbon dioxide in different phases.
[0007] Therefore, there is an urgent need to develop an evaluation device for seals for carbon dioxide transmission pipelines, which can evaluate the performance of seals through environmental simulation that is closer to reality, so as to better achieve the safe transportation of carbon dioxide. Summary of the invention
[0008] In view of the technical problem mentioned above, the present invention aims to provide a pipeline seal testing device, which can test the seals in a carbon dioxide pipeline leakage environment.
[0009] The present invention also proposes a pipeline seal testing method, which uses the pipeline seal testing device proposed by the present invention to test the seal in a carbon dioxide pipeline leakage environment.
[0010] According to the present invention, there is provided a pipeline seal testing device, comprising:
[0011] Double membrane bursting mechanism;
[0012] A test pipe, one end of which is connected to the first air supply mechanism, and the other end of which is connected to the double-membrane blasting mechanism.
[0013] Wherein, at least one flange is arranged on the test pipe, and a sealing member for testing is arranged inside the flange.
[0014] Under this setting, when it is necessary to simulate the process of pipeline leakage, the double-membrane bursting mechanism is burst by pumping pressure into it, so that the right end of the test pipeline is instantly unblocked, and the test gas filled in the test pipeline is quickly sent to the right end to flow out. The test pipeline is instantly depressurized, triggering the Joule-Thomson positive effect of carbon dioxide gas, creating a low temperature environment, and more realistically simulating the leakage scenario of the carbon dioxide pipeline.
[0015] Furthermore, the blasting aperture of the double-membrane blasting mechanism can be adjusted according to actual conditions to meet the experimental requirements of various pressure relief speeds.
[0016] Furthermore, multiple flanges are arranged along the axial direction of the test pipe, and a seal is arranged in each flange. During the test, the seals at different positions away from the leakage point can be tested to obtain the influence of the distance between the leakage point and the seal on the sealing performance of the seal.
[0017] In a preferred embodiment, a pressure sensor and a temperature sensor for measuring the pressure and temperature at the flange position, respectively, are arranged on the test pipe.
[0018] In a preferred embodiment, a vent valve is connected to the test pipeline.
[0019] Before the test, the first electric stop valve and the vent valve are opened simultaneously, so that the first gas supply mechanism purges carbon dioxide into the test pipeline, thereby replacing all the remaining gas in the test pipeline with carbon dioxide.
[0020] When the pressure in the test pipeline exceeds the pressure required for the experiment, the vent valve can be opened to release the pressure in the test pipeline. Or when the pressure in the test pipeline needs to be emptied, the vent valve can be opened to release the pressure in the test pipeline.
[0021] It should be noted that the vent valve is not limited to being installed on the test pipe, as long as the vent valve is located on the left side of the blocking position of the double-membrane bursting mechanism on the test pipe.
[0022] In a preferred embodiment, an impurity gas injection pipe is connected to the test pipeline.
[0023] The impurity gas injection tube can be used to inject other gases besides carbon dioxide into the test pipeline during the test, such as H 2 ,CO,O 2 , CH 4 , H 2 S and other gases, in order to study the effect of pipeline leakage on seals when there are impurities in carbon dioxide.
[0024] In a preferred embodiment, the double-membrane bursting mechanism comprises a bursting tube, one end of which is sealedly connected to the test pipe, and the other end of which is connected to the atmosphere.
[0025] A first bursting disc and a second bursting disc are sequentially and sealedly arranged in the bursting tube along the axial direction.
[0026] In a preferred embodiment, a second air supply mechanism is connected to the wall of the bursting tube, and the second air supply mechanism is used to charge pressure between the first bursting disc and the second bursting disc.
[0027] The blasting principle of the double-membrane blasting mechanism is as follows.
[0028] First, define the pressure in the test pipeline as P1, the pressure between the first bursting disc and the second bursting disc as P2, the pressure on the side of the second bursting disc connected to the atmosphere as P3, the bursting pressure of the first bursting disc as P4, and the bursting pressure of the second bursting disc as P5.
[0029] Before the double - membrane bursting mechanism bursts, P1 - P2 < P4 and P2 - P3 < P5. That is to say, the pressures borne by the first bursting disc and the second bursting disc do not exceed their respective bursting pressures.
[0030] As nitrogen is continuously filled between the first bursting disc and the second bursting disc, P2 continuously increases. When P2 - P3 > P5, the second bursting disc bursts.
[0031] After the second bursting disc bursts, the cavity between the first bursting disc and the second bursting disc is also connected to the atmosphere. That is, at this time, P2 gradually decreases and approaches P3 as the second bursting disc bursts. As P2 decreases, P1 - P2 > P4, and at this time, the first bursting disc bursts, and the carbon dioxide in the test pipeline is instantaneously discharged.
[0032] In a preferred embodiment, a first pressure sensor is provided on the pipe wall of the bursting pipe, and the first pressure sensor is used to measure the pressure between the first bursting disc and the second bursting disc.
[0033] In a preferred embodiment, a second pressure sensor is provided on the pipe wall of the bursting pipe, and the second pressure sensor is used to measure the pressure on the side of the second bursting disc away from the first bursting disc.
[0034] Through each pressure sensor, it is possible to more accurately know the pressures borne by the first bursting disc and the second bursting disc at this time, so as to timely adjust the pressures inside the test pipeline and the bursting pipe, and prevent the first bursting disc or the second bursting disc from bursting in advance.
[0035] In a preferred embodiment, a temperature control system is provided outside the test pipeline.
[0036] In a preferred embodiment, the temperature control system includes an electric heating tape, and the electric heating tape is wrapped around the pipe wall of the test pipeline.
[0037] The temperature control system can control the temperature inside the test pipeline by combining the temperatures measured by each temperature sensor on the test pipeline, so as to better control the phase state of the carbon dioxide inside the test pipeline.
[0038] According to the present invention, a method for testing a pipeline seal is also provided. Using the pipeline seal testing device provided by the present invention, a test gas with a certain pressure is injected into the test pipeline, and then the double - membrane bursting mechanism is pressurized and burst, so that the test gas in the test pipeline is quickly discharged. Finally, the seal on the test pipeline is disassembled and the seal is evaluated.
[0039] In a preferred embodiment, the test gas is carbon dioxide.
[0040] In a preferred embodiment, after carbon dioxide of a certain pressure is injected into the test pipe, the carbon dioxide is allowed to fully blend into the sealing component by standing still, and then the double-membrane blasting mechanism is blasted.
[0041] In a preferred embodiment, before the double-membrane blasting mechanism is pressurized and blasted, the phase state of carbon dioxide in the test pipe is controlled by controlling the pressure and temperature in the test pipe.
[0042] Compared with the prior art, the advantages of the present application are as follows.
[0043] The present invention comprises a test pipe and a double-membrane bursting mechanism which are connected to each other. During operation, carbon dioxide of a certain pressure is firstly injected into the test pipe, and then the first bursting disc and the second bursting disc are burst by pressurizing the double-membrane bursting mechanism, thereby instantly releasing the pressure of the test pipe, inducing the Joule-Thomson positive effect of the carbon dioxide gas, creating a low-temperature environment, and more realistically simulating the leakage scenario of the carbon dioxide pipeline.
[0044] Furthermore, the blasting apertures of the first blasting disc and the second blasting disc of the present invention can be adjusted according to actual conditions to meet the experimental requirements of various pressure relief speeds.
[0045] In addition, a plurality of flanges are sequentially arranged on the test pipe of the present invention along the axis, and a sealing member is arranged in each flange. Through this arrangement, the sealing members at different positions away from the leakage point can be tested.
[0046] The present invention is also provided with an impurity gas injection pipe. In addition to carbon dioxide, other impurity gases, such as H 2 ,CO,O 2 , CH 4 , H 2 S et al. used this to study the effect of rapid decompression of carbon dioxide on the performance of seals in the presence of impurity gases. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] The present invention will be described below with reference to the accompanying drawings.
[0048] Figure 1 A schematic diagram showing an embodiment of a pipeline seal testing device according to the present invention;
[0049] Figure 2 A schematic diagram showing an embodiment of a flange and a seal according to the present invention;
[0050] Figure 3 shows a schematic cut-away view of a seal according to the present invention;
[0051] Figure 4 The release process of carbon dioxide under different carbon dioxide pressures and different double membrane blasting mechanism apertures according to the present invention is shown;
[0052] Figure 5 The temperature variation process at different pipeline positions according to the present invention is shown;
[0053] Figure 6 Phase diagram of pure carbon dioxide.
[0054] In the figure: 1, double membrane bursting mechanism; 11, bursting tube; 12, first bursting disc; 13, second bursting disc; 14, second air supply mechanism; 15, first pressure sensor; 16, second pressure sensor;
[0055] 2. Test pipeline; 21. First pipeline; 22. Second pipeline; 23. Third pipeline;
[0056] 3. The first gas supply mechanism;
[0057] 4. Impurity gas injection pipe;
[0058] 51. a third pressure sensor; 52. a fourth pressure sensor; 53. a fifth pressure sensor; 54. a sixth pressure sensor;
[0059] 61. a third temperature sensor; 62. a fourth temperature sensor; 63. a fifth temperature sensor; 64. a sixth temperature sensor;
[0060] 7. Vent valve;
[0061] 81. First electric stop valve; 82. Second electric stop valve; 83. Third electric stop valve;
[0062] 91. first flange; 92. second flange; 93. third flange; 94. sealing member;
[0063] 100. Pipeline seal testing device.
[0064] In the present application, all drawings are schematic drawings, which are only used to illustrate the principles of the present invention and are not drawn according to the actual scale. DETAILED DESCRIPTION
[0065] The present invention will be described below with reference to the accompanying drawings.
[0066] It should be noted that the directional terms or qualifiers "left", "right", etc. used in this application are all relative to the referenced Figure 1 They are not intended to define the absolute positions of the components involved, but may vary depending on the specific circumstances.
[0067] Figure 1The structure of the pipeline seal testing device 100 according to the present invention is shown. Figure 1 As shown, the pipeline seal testing device 100 includes a double-membrane bursting mechanism 1 and a test pipeline 2 .
[0068] One end of the test pipe 2 is connected to the first air supply mechanism 3, and the other end is connected to the double membrane blasting mechanism 1. Figure 1 As shown, the first gas supply mechanism 3 is connected to the left end of the test pipe 2 through the first electric stop valve 81 . When the first electric stop valve 81 is in an open state, the first gas supply mechanism 3 can fill the test pipe 2 with test gas.
[0069] In this embodiment, the first gas supply mechanism 3 may be a carbon dioxide gas cylinder, so that the first gas supply mechanism 3 can fill the test pipeline 2 with carbon dioxide at a certain pressure to simulate a pipeline for transporting carbon dioxide.
[0070] It should be noted that, although the first gas supply mechanism 3 in the present embodiment fills carbon dioxide into the test pipe 2, the present invention is not limited to filling carbon dioxide into the test pipe 2. According to the needs of actual conditions, the present invention can also replace the gas pumped by the first gas supply mechanism 3 with other gases. Such changes should be within the scope of protection of the present invention.
[0071] The double-film bursting mechanism 1 is coaxially sealed and connected to the right end of the test pipe 2. That is, the left end of the test pipe 2 is blocked by closing the first electric stop valve 81, and the right end of the test pipe 2 is blocked by the double-film bursting mechanism 1.
[0072] Under this setting, when it is necessary to simulate the process of pipeline leakage, the double-membrane bursting mechanism 1 is burst by pumping pressure into the double-membrane bursting mechanism 1, so that the right end of the test pipe 2 is instantly unblocked, and the test gas filled in the test pipe 2 is quickly sent to the right end to flow out, and the test pipe 2 is instantly depressurized, triggering the Joule-Thomson positive effect of the carbon dioxide gas, creating a low temperature environment, and more realistically simulating the leakage scenario of the carbon dioxide pipeline.
[0073] Furthermore, the blasting aperture of the double-membrane blasting mechanism 1 can be adjusted according to actual conditions to meet the experimental requirements of various pressure relief speeds.
[0074] The use of the double-membrane bursting mechanism 1 can achieve a bursting hole diameter equal to the inner diameter of the test pipe 2 .
[0075] According to the present invention, at least one flange is arranged on the test pipe 2, and a sealing member for testing is arranged inside the flange.
[0076] Specifically, in this embodiment, Figure 1As shown, the test pipeline 2 includes a first pipeline 21, a second pipeline 22 and a third pipeline 23 which are coaxially connected from right to left. The first pipeline 21 is coaxially sealed and connected to the double-membrane bursting mechanism 1 through a first flange 91, the first pipeline 21 is coaxially sealed and connected to the second pipeline 22 through a second flange 92, and the second pipeline 22 is coaxially sealed and connected to the third pipeline 23 through a third flange 93.
[0077] A sealing member 94 for testing is provided in each of the first flange 91, the second flange 92 and the third flange 93. Figure 2 shown.
[0078] During the carbon dioxide release process, the temperature drop changes at different positions in the test pipeline 2 are different, such as Figure 5 As shown, Figure 5 The temperature variation process at different positions in the test pipe 2 during the test process is shown, wherein X is the distance from the first bursting disc 12 in the test pipe 2.
[0079] The present invention sets multiple flanges along the axial direction of the test pipe 2 and sets a seal 94 in each flange. During the test, the seals 94 at different positions away from the leakage point can be tested, so as to obtain the influence of the distance between the leakage point and the seal 94 on the sealing performance of the seal 94.
[0080] It should be noted that, although three flanges are provided in this embodiment, the present invention is not limited to providing three flanges, and flanges may be further installed along the axial direction of the test pipe 2 according to actual needs, and a seal 94 may be provided in each flange.
[0081] In one embodiment of the present invention, a pressure sensor and a temperature sensor for measuring the pressure and temperature at the flange position are respectively arranged on the test pipe 2 .
[0082] Specifically, a third pressure sensor 51, a fourth pressure sensor 52 and a fifth pressure sensor 53 are respectively arranged on the pipe walls of the first pipe 21, the second pipe 22 and the third pipe 23. In addition, a third temperature sensor 61, a fourth temperature sensor 62 and a fifth temperature sensor 63 are also respectively arranged on the first pipe 21, the second pipe 22 and the third pipe 23.
[0083] like Figure 1As shown, the third pressure sensor 51 and the third temperature sensor 61 are both arranged at a position close to the first flange 91 of the first pipeline 21. Similarly, the fourth pressure sensor 52 and the fourth temperature sensor 62 are both arranged at a position close to the second flange 92 of the second pipeline 22. The fifth pressure sensor 53 and the fifth temperature sensor 63 are both arranged at a position close to the third flange 93 of the third pipeline 23. This ensures that the temperature of the corresponding flange position measured by each pressure sensor and temperature sensor is accurate.
[0084] In a preferred embodiment, a sixth pressure sensor 54 and a sixth temperature sensor 64 are further provided at the end of the test pipe 2 close to the first gas supply mechanism 3. That is, the sixth pressure sensor 54 and the sixth temperature sensor 64 are provided on the end pipe wall of the third pipe 23 close to the first gas supply mechanism 3.
[0085] In a preferred embodiment, a vent valve 7 is connected to the test pipeline 2. Before the test, the first electric stop valve 81 and the vent valve 7 are opened simultaneously, so that the first gas supply mechanism 3 purges carbon dioxide into the test pipeline 2, thereby replacing all the remaining gas in the test pipeline 2 with carbon dioxide.
[0086] When the pressure in the test pipe 2 exceeds the pressure required for the experiment, the vent valve 7 can be opened to release the pressure in the test pipe 2. Or when the pressure in the test pipe 2 needs to be emptied, the vent valve 7 can be opened to release the pressure in the test pipe 2.
[0087] It should be noted that the vent valve 7 is not limited to being installed on the test pipe 2 , as long as the vent valve 7 is located on the left side of the blocking position of the double-membrane bursting mechanism 1 on the test pipe 2 .
[0088] Specifically, Figure 1 As shown, in this embodiment, the vent valve 7 is arranged on the pipeline between the first flange 91 and the first bursting disc 12 of the double-membrane bursting mechanism 1. At the same time, in order to completely replace the gas in the test pipeline 2 during the purging process, the vent valve 7 should be arranged as close to the first bursting disc 12 as possible.
[0089] According to the present invention, in a preferred embodiment, an impurity gas injection pipe 4 is connected to the test pipe 2. Through the impurity gas injection pipe 4, other gases besides carbon dioxide can be injected into the test pipe 2 during the test, such as H 2 ,CO,O 2 , CH 4 , H 2 S and other gases, in order to study the effect of pipeline leakage on seal 94 when there are impurities in carbon dioxide.
[0090] like Figure 1As shown, the impurity gas injection pipe 4 is connected to the pipe wall of the first pipeline 21 , and a second electric stop valve 82 is provided on the impurity gas injection pipe 4 , so that the impurity gas injection pipe 4 is controlled to be on and off by the second electric stop valve 82 .
[0091] It should be noted that, although the impurity gas injection tube 4 in this embodiment is arranged on the tube wall of the first pipe 21, the impurity gas injection tube 4 of the present invention is not limited to being arranged only in the first pipe 21, as long as the gas can be injected into the test pipe 2 through the impurity gas injection tube 4.
[0092] According to the present invention, in a specific embodiment, the double membrane bursting mechanism 1 includes a bursting tube 11, one end of which is sealed and connected to the test pipe 2, and the other end of the bursting tube 11 is connected to the atmosphere. Figure 1 shown.
[0093] Furthermore, a first bursting disc 12 and a second bursting disc 13 are sequentially and sealedly arranged in the axial direction in the bursting tube 11. In this embodiment, the first bursting disc 12 is located on the left side of the second bursting disc 13.
[0094] When the blasting aperture of the double-membrane blasting mechanism 1 needs to be changed, it is only necessary to replace the first blasting disc 12 and the second blasting disc 13 with different blasting apertures.
[0095] In a specific embodiment, a second air supply mechanism 14 is connected to the tube wall of the bursting tube 11 , and the second air supply mechanism 14 is connected to the tube wall of the bursting tube 11 between the first bursting disc 12 and the second bursting disc 13 .
[0096] The second air supply mechanism 14 is used to charge pressure between the first bursting disc 12 and the second bursting disc 13, so as to cause the first bursting disc 12 and the second bursting disc 13 to explode, release the blockage of the test pipe 2 by the double-membrane bursting mechanism 1, and simulate the scene of rapid leakage of the test pipe 2.
[0097] A third electric stop valve 83 is provided between the second air supply mechanism 14 and the bursting tube 11 , and the opening and closing of the third electric stop valve 83 controls the on-off of the second air supply mechanism 14 charging the bursting tube 11 .
[0098] In this embodiment, the second gas supply mechanism 14 fills nitrogen into the bursting tube 11. It is easy to understand that the gas filled into the second gas supply mechanism 14 is only used to burst the first bursting disc 12 and the second bursting disc 13. Therefore, the gas filled into the bursting tube 11 by the second gas supply mechanism 14 can be replaced with other gases according to the actual needs, and such replacement should be within the protection scope of the present invention.
[0099] In a preferred embodiment, a first pressure sensor 15 is disposed on the tube wall of the bursting tube 11 , and the first pressure sensor 15 is connected to the tube wall of the bursting tube 11 between the first bursting disc 12 and the second bursting disc 13 .
[0100] The first pressure sensor 15 is used to measure the pressure between the first bursting disc 12 and the second bursting disc 13 .
[0101] Furthermore, a second pressure sensor 16 is provided on the wall of the bursting tube 11. The second pressure sensor 16 is connected to the wall of the bursting tube 11 on the side of the second bursting disc 13 away from the first bursting disc 12. Figure 1 The right side of the first bursting disc 12 in the middle.
[0102] The second pressure sensor 16 is used to measure the pressure on the side of the second bursting disc 13 away from the first bursting disc 12 .
[0103] Since the right end of the double-membrane bursting mechanism 1 in this embodiment is connected to the atmosphere, before the double-membrane bursting mechanism 1 bursts, the second pressure sensor 16 can be understood as measuring the atmospheric pressure.
[0104] After the double-membrane bursting mechanism 1 bursts, the pressure value measured by the second pressure sensor 16 will be affected by the pressure of the leaked gas from the direction of the test pipeline 2 .
[0105] In a preferred embodiment, a temperature control system (not shown in the figure) is arranged outside the test pipe 2 .
[0106] Specifically, the temperature control system includes an electric heating belt, which is wrapped around the wall of the test pipe 2. The temperature control system can control the temperature in the test pipe 2 in combination with the temperature measured by each temperature sensor on the test pipe 2, thereby better controlling the phase state of carbon dioxide in the test pipe 2.
[0107] According to the present invention, in a preferred embodiment, the pipeline sealing component testing device 100 further includes a data acquisition control system (not shown in the figure).
[0108] The first pressure sensor 15, the second pressure sensor 16, the third pressure sensor 51, the fourth pressure sensor 52, the fifth pressure sensor 53, the sixth pressure sensor 54, the third temperature sensor 61, the fourth temperature sensor 62, the fifth temperature sensor 63, the sixth temperature sensor 64, the vent valve 7, the first electric stop valve 81, the second electric stop valve 82 and the third electric stop valve 83 are all communicatively connected to the data acquisition and control system.
[0109] The first pressure sensor 15, the second pressure sensor 16, the third pressure sensor 51, the fourth pressure sensor 52, the fifth pressure sensor 53, the sixth pressure sensor 54, the third temperature sensor 61, the fourth temperature sensor 62, the fifth temperature sensor 63 and the sixth temperature sensor 64 can transmit pressure or temperature data to the data acquisition control system.
[0110] The data acquisition control system can control the opening and closing of the vent valve 7 , the first electric stop valve 81 , the second electric stop valve 82 and the third electric stop valve 83 .
[0111] It is easy to understand that the specific structure of the data acquisition and control system is the prior art and is not the technical point of the present invention, so it will not be repeated here.
[0112] In the description of the present invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0113] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0114] In one embodiment of the present invention, a pipeline seal testing method is provided, using the pipeline seal testing device 100 provided by the present invention, a test gas of a certain pressure is injected into the test pipe 2, and then the double-membrane blasting mechanism 1 is pressurized and blasted, so that the test gas in the test pipe 2 is quickly released, and finally the seal on the test pipe 2 is disassembled and evaluated.
[0115] Specifically, in this embodiment, the test gas is carbon dioxide, the first electric stop valve 81 is opened, and carbon dioxide with a certain pressure is charged into the test pipeline 2 through the first gas supply mechanism 3. The final carbon dioxide pressure in the test pipeline 2 is determined according to the pressure in the actual simulated carbon dioxide delivery pipeline, and can also be freely set according to actual conditions.
[0116] In a preferred embodiment, after carbon dioxide of a certain pressure is injected into the test pipe 2, the carbon dioxide is allowed to fully blend into the sealing member 94 by standing still, and then the double-membrane blasting mechanism 1 is blasted.
[0117] By leaving the test piece 94 in a static state, the state of the seal 94 can be made closer to the actual working condition, thereby improving the accuracy of the test.
[0118] Furthermore, before the double-membrane blasting mechanism 1 blasts, the second electric stop valve 82 can be opened to inject other gases except carbon dioxide into the test pipeline 2 through the impurity gas injection pipe 4 to test the effect of rapid decompression of carbon dioxide on the performance of the seal 94 in the presence of impurity gas.
[0119] According to the present invention, a specific pipeline seal testing method includes the following steps.
[0120] Step 1, device integrity check: check the air tightness of the pipeline sealing test device 100, check whether the vent valve 7, the first electric stop valve 81, the second electric stop valve 82 and the third electric stop valve 83 can operate normally, check whether the first bursting disc 12 and the second bursting disc 13 are intact, check whether the temperature control system can operate normally, and check whether each pressure and temperature sensor, each temperature sensor and the data acquisition control system are normal.
[0121] Furthermore, before the test, the blasting aperture of the double membrane blasting mechanism 1 is first determined according to the required carbon dioxide pressure and release rate in the test pipeline 2. Figure 4 As shown, Figure 4 The purpose is to test the change of the release pressure over time under different carbon dioxide pressures in the pipeline 2 and different blasting apertures of the double-membrane blasting mechanism 1.
[0122] In the figure, D is the blasting aperture of the double-membrane blasting mechanism 1 , and P is the carbon dioxide pressure in the test pipe 2 .
[0123] Step 2: Open the vent valve 7 and the first electric stop valve 81, use the carbon dioxide cylinder to purge and empty the test pipe 2, and after removing the impurities in the test pipe 2, close the vent valve 7, inject liquid carbon dioxide into the test pipe 2, and after the filling is completed, close all valves. At the same time, open the third electric stop valve 83, and inject a certain amount of nitrogen into the cavity between the first bursting disc 12 and the second bursting disc 13 through the second gas supply mechanism 14. The pressure of this part of nitrogen on the first bursting disc 12 interacts with the pressure of the carbon dioxide in the test pipe 2 on the first bursting disc 12, thereby preventing the pressure of the carbon dioxide in the test pipe 2 on the first bursting disc 12 from being too large, causing the first bursting disc 12 to burst prematurely.
[0124] It is easy to understand that the pressure of the filled nitrogen should be less than the bursting pressure of the second rupture disk 13.
[0125] Step 3: Heat the test pipeline 2 by using the temperature control system, and measure the medium pressure and temperature in the test pipeline 2 by using the temperature sensor and pressure sensor on the test pipeline 2, so as to determine the phase state of carbon dioxide. After the temperature and pressure of carbon dioxide meet the experimental requirements, fully statically place the test pipeline 2 for 72 - 76 h to enable carbon dioxide to fully dissolve into the seal 94.
[0126] It should be noted that although the static placement time in this embodiment is 72 - 76 h, the present invention is not limited to static placement for 72 - 76 h, as long as carbon dioxide can fully dissolve into the seal 94.
[0127] Step 4: Burst the double - membrane bursting mechanism 1. According to the present invention, the bursting aperture discharge rate of the double - membrane bursting mechanism 1 should be greater than the pressure reduction rate of 2 - 4 MPa / min in the NORSOK - M710 standard for controlling the discharge rate by using a valve in the prior art.
[0128] When bursting the double - membrane bursting mechanism 1, first open the third electric stop valve 83 to fill the cavity between the first rupture disk 12 and the second rupture disk 13 with nitrogen.
[0129] The bursting principle of the double - membrane bursting mechanism 1 is as follows.
[0130] First, define the pressure in the test pipeline 2 as P1, the pressure between the first rupture disk 12 and the second rupture disk 13 as P2, the pressure on the side of the second rupture disk 13 communicating with the atmosphere as P3, the bursting pressure of the first rupture disk 12 as P4, and the bursting pressure of the second rupture disk 13 as P5.
[0131] Before the double - membrane bursting mechanism 1 bursts, P1 - P2 < P4 and P2 - P3 < P5. That is to say, the pressures borne by the first rupture disk 12 and the second rupture disk 13 do not exceed their respective bursting pressures.
[0132] As nitrogen is continuously filled between the first rupture disk 12 and the second rupture disk 13, P2 continuously increases. When P2 - P3 > P5, the second rupture disk 13 bursts.
[0133] After the second rupture disk 13 bursts, the cavity between the first rupture disk 12 and the second rupture disk 13 also communicates with the atmosphere, that is, at this time, P2 gradually decreases and approaches P3 as the second rupture disk 13 bursts. As P2 decreases, P1 - P2 > P4, and at this time, the first rupture disk 12 bursts, and the carbon dioxide in the test pipeline 2 is instantaneously discharged.
[0134] Step 5: After the discharge is completed, wait until the static pressure of the pipeline seal testing device 100 drops to atmospheric pressure, replace the seal 94, repeat the above operation, and test at least three times.
[0135] Step 6: Remove the test seal 94 from the flange and observe the changes in the appearance of the seal 94 with the naked eye within 30 minutes.
[0136] When observing the appearance changes of the seal 94, refer to the evaluation method in the NORSOK-M710 standard and follow the Figure 3 The test seal 94 is cut into four equal parts in the manner shown, and the cross section of the cut seal 94 is magnified more than 10 times with a microscope or other tools to check for cracks on the cross section, and the cross section is photographed and recorded. The rating is based on the provisions of the standard and a report is issued.
[0137] Specifically, the seal 94 test result rating is as follows:
[0138]
[0139]
[0140] Record the rating of each seal 94, and list the rating of each seal 94 from high to low. The overall evaluation is evaluated by the worst of the three ratings. When the rating exceeds 4, it is an unacceptable rating, indicating that the seal 94 does not meet the usage regulations.
[0141] Step 7: Use an electronic universal testing machine and a hardness tester to test the compression, resilience and hardness of the sealing member 94 respectively.
[0142] According to the present invention, another embodiment of the operation steps of a pipeline seal testing method is also provided. This embodiment intends to study the effect of supercritical carbon dioxide leakage on the performance of the pipeline seal 94.
[0143] Different carbon dioxide phases have different characteristics under rapid decompression. Figure 6 As shown, carbon dioxide mainly includes three phases: gas phase, liquid phase and supercritical phase. This embodiment intends to study supercritical carbon dioxide. Figure 6 To determine the temperature and pressure, the carbon dioxide temperature in the test pipe 2 should be greater than 31.1°C and the pressure should be greater than 7.38MPa.
[0144] The specific steps are as follows.
[0145] Step 1, device integrity check: check the air tightness of the pipeline sealing test device 100, check whether the vent valve 7, the first electric stop valve 81, the second electric stop valve 82 and the third electric stop valve 83 can operate normally, check whether the first bursting disc 12 and the second bursting disc 13 are intact, check whether the temperature control system can operate normally, and check whether each pressure and temperature sensor, each temperature sensor and the data acquisition control system are normal.
[0146] Step 2: Open the vent valve 7 and the first electric stop valve 81, and use a carbon dioxide cylinder to purge and empty the test pipe 2. The emptying process lasts at least 5 minutes to fully replace the air in the test pipe 2 and remove the impurity gas in the test pipe 2.
[0147] Step 3: After removing impurities from the test pipe 2, close the vent valve 7, inject carbon dioxide into the test pipe 2, and observe the pressure and temperature in the test pipe 2. After the pressure in the test pipe 2 reaches 6MPa and the pipe wall is filled, close all valves.
[0148] At the same time, the third electric stop valve 83 is opened, and a certain amount of nitrogen is injected into the cavity between the first bursting disc 12 and the second bursting disc 13 through the second air supply mechanism 14 to ensure that the difference between the nitrogen pressure between the first bursting disc 12 and the second bursting disc 13 and the carbon dioxide pressure in the test pipe 2 does not exceed the bursting pressure of the first bursting disc 12.
[0149] It is easy to understand that the pressure of the filling nitrogen should be lower than the bursting pressure of the second bursting disc 13 .
[0150] Step 4: Use the temperature control system to heat the test pipe 2, and use the temperature sensor and pressure sensor on the test pipe 2 to measure the pressure and temperature of the medium in the test pipe 2, so as to determine the phase state of carbon dioxide.
[0151] Since the pressure in the test pipe 2 will continue to rise during the heating process, on the one hand, it is necessary to always pay attention to whether there is a leak in the test pipe 2, and on the other hand, it is necessary to pay special attention to the rate of increase of pressure with temperature. When the temperature requirement is not met and the pressure in the test pipe 2 is too high, it is necessary to release part of the pressure by opening the vent valve 7 to prevent overpressure in the test pipe 2. When the temperature of carbon dioxide is greater than 31.1°C and the pressure is greater than 7.38MPa, the heating system is turned off and the test pipe 2 is left standing. In this embodiment, the standing time is 15 minutes.
[0152] Step 5: blasting the double membrane blasting mechanism 1.
[0153] When the double-membrane blasting mechanism 1 is blasted, the third electric stop valve 83 is first opened to fill the cavity between the first blasting disc 12 and the second blasting disc 13 with nitrogen.
[0154] The blasting principle of the double-membrane blasting mechanism 1 is as follows.
[0155] First, define the pressure in the test pipeline 2 as P1, the pressure between the first bursting disc 12 and the second bursting disc 13 as P2, the pressure on the side of the second bursting disc 13 communicating with the atmosphere as P3, the bursting pressure of the first bursting disc 12 as P4, and the bursting pressure of the second bursting disc 13 as P5.
[0156] Before the double-membrane blasting mechanism 1 blasts, P1 - P2 < P4 and P2 - P3 < P5. That is to say, the pressures borne by the first bursting disc 12 and the second bursting disc 13 do not exceed their respective bursting pressures.
[0157] As nitrogen is continuously filled between the first bursting disc 12 and the second bursting disc 13, P2 continuously increases. When P2 - P3 > P5, the second bursting disc 13 blasts.
[0158] After the second bursting disc 13 blasts, the cavity between the first bursting disc 12 and the second bursting disc 13 also communicates with the atmosphere. That is, at this time, P2 gradually decreases and approaches P3 with the blasting of the second bursting disc 13. As P2 decreases, P1 - P2 > P4. At this time, the first bursting disc 12 blasts, and the carbon dioxide in the test pipeline 2 is instantaneously discharged.
[0159] Step Six: After the discharge is completed, wait for the static pressure of the pipeline seal testing device 100 to drop to atmospheric pressure, then replace the seal 94, and repeat the above operations at least three times.
[0160] Step Seven: Remove the experimental seal 94 from the flange and visually observe the change in the appearance of the seal 94 within 30 minutes.
[0161] When observing the change in the appearance of the seal 94, refer to the evaluation method in the NORSOK-M710 standard. Cut the experimental seal 94 into four equal parts in the manner shown in Figure 3 , magnify the cross-section of the cut seal 94 by more than 10 times with a microscope or other tools to check for cracks on the cross-section, and photograph the cross-section for recording. The rating is based on the regulations in the standard, and a report is issued.
[0162] Specifically, the rating of the test results of the seal 94 refers to the following table:
[0163]
[0164] Record the rating of each seal 94 and list the evaluation grades of each seal 94 from high to low. The overall evaluation is determined by the three worst grades. When the rating exceeds 4, it is an unacceptable rating, indicating that this type of seal 94 does not meet the usage requirements.
[0165] Step 8: Use an electronic universal testing machine and a hardness tester to test the compression, resilience and hardness of the sealing member 94 respectively.
[0166] Step 9. Issue a test report based on the test results. The test report should record the carbon dioxide release rate, the temperature drop at the location of the seal 94, whether there is impurity gas in the test pipe 2, the instantaneous decompression damage rating, and the hardness and resilience of the seal 94 initially and after release.
[0167] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0168] Finally, it should be noted that the above is only a preferred embodiment of the present invention and does not constitute any limitation to the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for a person skilled in the art to modify the technical solutions described in the aforementioned embodiments or to replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A pipeline seal testing device, characterized in that: include: Double membrane bursting mechanism (1); A test pipe (2), one end of the test pipe (2) is connected to the first air supply mechanism (3), and the other end is connected to the double membrane bursting mechanism (1). Wherein, at least one flange is arranged on the test pipe (2), and a sealing member for testing is arranged inside the flange.
2. The pipeline seal testing device according to claim 1, characterized in that: A pressure sensor and a temperature sensor are arranged on the test pipe (2) for measuring the pressure and temperature at the flange position respectively.
3. The pipeline seal testing device according to claim 1, characterized in that: The test pipe (2) is connected to a vent valve (7).
4. The pipeline seal testing device according to claim 1, characterized in that: The test pipeline (2) is connected to an impurity gas injection pipe (4).
5. The pipeline seal testing device according to any one of claims 1 to 4, characterized in that: The double-membrane bursting mechanism (1) comprises a bursting tube (11), one end of which is sealedly connected to the test pipe (2), and the other end of which is connected to the atmosphere. A first bursting disc (12) and a second bursting disc (13) are sequentially and sealedly arranged in the axial direction in the bursting tube (11).
6. The pipeline seal testing device according to claim 5, characterized in that: The tube wall of the bursting tube (11) is connected to a second air supply mechanism (14), and the second air supply mechanism (14) is used to charge pressure between the first bursting disc (12) and the second bursting disc (13).
7. The pipeline seal testing device according to claim 5, characterized in that: A first pressure sensor (15) is arranged on the wall of the bursting tube (11), and the first pressure sensor (15) is used to measure the pressure between the first bursting disc (12) and the second bursting disc (13).
8. The pipeline seal testing device according to claim 7, characterized in that: A second pressure sensor (16) is arranged on the wall of the bursting tube (11), and the second pressure sensor (16) is used to measure the pressure of the second bursting disc (13) at a side away from the first bursting disc (12).
9. The pipeline seal testing device according to any one of claims 1 to 4, characterized in that: A temperature control system is arranged outside the test pipe (2).
10. The pipeline seal testing device according to claim 9, characterized in that: The temperature control system comprises an electric heating belt, which is wrapped around the wall of the test pipe (2).
11. A pipeline seal testing method, characterized in that: Using the pipeline seal testing device according to any one of claims 1 to 10, a test gas of a certain pressure is injected into the test pipeline (2), and then the double-membrane blasting mechanism (1) is pressurized and blasted, so that the test gas in the test pipeline (2) is quickly released, and finally the seal on the test pipeline (2) is disassembled and evaluated.
12. The pipeline seal testing method according to claim 11, characterized in that: The test gas is carbon dioxide.
13. The pipeline seal testing method according to claim 12, characterized in that: After carbon dioxide at a certain pressure is injected into the test pipe (2), the carbon dioxide is allowed to fully blend into the sealing component by standing still, and then the double-membrane blasting mechanism (1) is blasted.
14. The pipeline seal testing method according to claim 12, characterized in that: Before the double-membrane blasting mechanism (1) is subjected to pressurized blasting, the phase state of carbon dioxide in the test pipe (2) is controlled by controlling the pressure and temperature in the test pipe (2).
