Power distribution network data management method and device, equipment and storage medium
Through automated data screening and integration methods, the problem of inefficient data management of 10kV feeder is solved, and more accurate and timely data analysis is achieved, ensuring the safe operation of the distribution network.
Patent Information
- Application Number
- CN202411275543.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2024-11-12
AI Technical Summary
In the prior art, the data management of 10kV feeder is inefficient and prone to errors, which leads to the threat of the operational safety of the power grid and is difficult to monitor and count the feeder overload in a timely manner.
After logging in and authenticating through the detection grid system, access the distribution network data access address, filter and process related load data, unify the time format, and integrate data according to the analysis dimension to realize automated data management and analysis.
It improves the efficiency, accuracy and timeliness of data management, ensures the stable operation of the distribution network, reduces manual errors, and improves the reliability of data analysis.
Smart Images

Figure CN118939850A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of computer technology, and in particular to a distribution network data management method, device, equipment and storage medium. Background Art
[0002] In the distribution network, feeder usually refers to the branch connected to any distribution network node, which can be an infeed or outfeed branch. 10kV feeder is an important part of the medium voltage distribution network, which is mainly responsible for transmitting electric energy from the substation to various power load points.
[0003] However, 10kV feeder overload is a common problem. Once a 10kV feeder is overloaded, it may lead to serious consequences such as increased line loss, voltage reduction and equipment damage, posing a threat to the safety and stability of power grid operation. Therefore, it is necessary to strengthen the monitoring and statistical analysis of the 10kV feeder load rate. The current workflow requires distribution network dispatchers to manually export overload data from the system every day, and then perform tedious data screening and format adjustment, and finally compile summary data and detailed lists of 10kV feeder overloads in the distribution network.
[0004] This data management method of manual collection, statistics, analysis and aggregation is not only inefficient, but also prone to errors, posing potential risks to the safety of power grid operations. Summary of the invention
[0005] The present invention provides a distribution network data management method, device, equipment and storage medium to solve the problem that the existing manual 10kV feeder data management operation is inefficient and prone to errors.
[0006] In a first aspect, an embodiment of the present invention provides a distribution network data management method, the distribution network data management method comprising:
[0007] After detecting that the login authentication of the power grid system is completed, accessing the set distribution network data access address to enter the distribution network data display page, the distribution network data display page includes distribution-related load data;
[0008] Screening the power distribution related load data according to the set data screening conditions, and performing time format unified processing on the power distribution related load data according to a unified time format to obtain the valid power distribution related load data;
[0009] According to a given data analysis dimension, data integration is performed on the effective power distribution related load data to obtain a data integration result corresponding to the data analysis dimension.
[0010] In a second aspect, an embodiment of the present invention provides a distribution network data management device, the distribution network data management device comprising:
[0011] An address access module is used to access a set distribution network data access address to enter a distribution network data display page after detecting that the login authentication of the power grid system is completed. The distribution network data display page includes distribution-related load data;
[0012] A data processing module, used to screen the power distribution related load data according to a set data screening condition, and perform time format unified processing on the power distribution related load data according to a unified time format to obtain the valid power distribution related load data;
[0013] The data integration module is used to integrate the effective power distribution related load data according to a given data analysis dimension to obtain a data integration result corresponding to the data analysis dimension.
[0014] In a third aspect, an embodiment of the present invention further provides an electronic device, the electronic device comprising:
[0015] at least one processor;
[0016] and a memory communicatively coupled to the at least one processor;
[0017] The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the distribution network data management method described in any embodiment of the present invention.
[0018] In a fourth aspect, an embodiment of the present invention further provides a computer-readable storage medium, characterized in that the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the distribution network data management method described in any embodiment of the present invention when executed.
[0019] The technical solution of the embodiment of the present invention, after detecting that the login authentication of the power grid system is completed, accesses the set distribution network data access address to enter the distribution network data display page, obtains a series of feeder operation and status information in the distribution network including distribution-related load data; screens the obtained distribution-related load data according to the set data screening conditions, and processes the distribution-related load data according to a unified time format to obtain effective distribution-related load data, ensuring the quality of the distribution-related load data and the consistency in the time dimension, facilitating time series analysis or cross-time comparison, so as to obtain more accurate, reliable and consistent data analysis results; at the same time, according to the given data analysis dimension, the effective distribution-related load data is integrated, and the data integration results corresponding to the data analysis dimension are obtained more efficiently to meet the needs of specific statistical analysis. This technical solution obtains effective data in an automated manner and integrates data according to the data analysis dimension, realizes data analysis refined to specific areas and dates, improves the efficiency and accuracy of distribution network data management and the timeliness of responding to overload conditions, and provides guarantee for the stable operation of the distribution network.
[0020] It should be understood that the contents described in this section are not intended to identify the key or important features of the embodiments of the present invention, nor are they intended to limit the scope of the present invention. Other features of the present invention will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0022] Figure 1 A flow chart of a distribution network data management method provided by an embodiment of the present invention;
[0023] Figure 2 An example diagram of feeder data integration results obtained after integration provided by an embodiment of the present invention;
[0024] Figure 3 This is an example diagram of the distribution transformer overload integration result obtained after integration provided by an embodiment of the present invention;
[0025] Figure 4 An example diagram of feeder overload details integration result obtained after integration provided by an embodiment of the present invention;
[0026] Figure 5 An example diagram of the integrated result of the distribution transformer overload details obtained after integration provided by an embodiment of the present invention;
[0027] Figure 6 A schematic diagram of the structure of a distribution network data management device provided by an embodiment of the present invention;
[0028] Figure 7 The present invention is a schematic diagram of the structure of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0029] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0030] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0031] It should be noted that when managing distribution network data, it is often collected, counted, analyzed and summarized manually. This method is not only inefficient, but also prone to errors, thus posing potential risks to the safety of power grid operation.
[0032] Based on this, an embodiment of the present invention provides a distribution network data management method. Figure 1 A flow chart of a distribution network data management method provided in an embodiment of the present invention. The embodiment of the present invention is suitable for scenarios of statistics, analysis and integration of feeder and distribution transformer overload details in a distribution network. The method can be executed by a distribution network data management device, which can be implemented in the form of software and / or hardware, and optionally, by an electronic device, which is preferably a mobile terminal, a desktop computer, a laptop computer, a server, etc.
[0033] like Figure 1 As shown, the distribution network data management method provided by the embodiment of the present invention may specifically include:
[0034] S101. After detecting that the login authentication of the power grid system is completed, access the set distribution network data access address to enter the distribution network data display page, wherein the distribution network data display page includes distribution-related load data.
[0035] The data access address can be understood as the address of a web page or application interface used to monitor distribution network data. By accessing this address, the information of the corresponding interface can be viewed. The distribution-related load data can be considered to include the real-time or historical load conditions of each feeder (i.e., the line that transmits electricity from the substation to the load point) and each distribution transformer in the distribution network, including key indicators such as current, voltage, power, load rate, date and time, as well as a collection of information such as the unit to which the feeder and distribution transformer belong, and the feeder to which they belong.
[0036] In this embodiment, first, a key or other authentication information for logging into the power grid system is obtained through the application programming interface provided by the power system to log into the power grid system; when it is detected that the login authentication of the power grid system is completed, the distribution network data display page can be entered by accessing the set distribution network data access address. For example, by accessing the set access address of the real-time distribution-related load data of the 10kV feeder of the distribution network, the display page of the real-time distribution-related load data of the 10kV feeder can be entered, and a series of information related to the operation and status of the 10kV feeder in the distribution network can be viewed.
[0037] S102, filtering the power distribution related load data according to the set data filtering conditions, and performing time format unified processing on the power distribution related load data according to a unified time format to obtain the valid power distribution related load data.
[0038] Among them, the effective distribution-related load data can be understood as the distribution-related load data obtained by removing those distribution-related load data that do not meet the conditions or appear repeatedly according to the set rules, and adjusting the time format of all data to a unified format.
[0039] In this embodiment, the acquired power distribution-related load data is finely screened according to predefined screening rules. This process is intended to remove data points that do not meet specific standards or conditions, such as abnormal values, erroneous data, data that does not exceed the load rate threshold corresponding to the overload, and historical data that is irrelevant to the current analysis, to ensure the accuracy and applicability of the data. At the same time, since the power distribution-related load data may come from multiple different data sources, the way these data sources record time may be inconsistent. Therefore, it is necessary to unify the time recording format of all real-time power distribution-related load data into a standard format, which can be a timestamp format.
[0040] S103: According to a given data analysis dimension, data integration is performed on the effective power distribution related load data to obtain a data integration result corresponding to the data analysis dimension.
[0041] Among them, the data analysis dimension can be considered as the data analysis perspective or classification standard, for example, the district bureau in the power system (i.e., each area in the power system), time period, distribution transformer type, etc.
[0042] In this embodiment, the effective power distribution related load data is systematically sorted and summarized according to the predetermined data analysis dimension to obtain the data integration result under the corresponding data analysis dimension, and the integration result can be displayed in the form of charts, images, etc. For example, the data is classified and summarized according to the classification standards such as different district bureaus, days or months to form a data overview according to these classification dimensions, such as the number of daily feeder overloads in each district bureau, the number of days of distribution transformer overloads per month, and other information.
[0043] The technical solution of the embodiment of the present invention, after detecting the completion of the login authentication of the power grid system, accesses the set distribution network data access address to enter the distribution network data display page, and can timely obtain a series of distribution network feeders and distribution transformers including distribution-related load data. The operation and status information; the obtained distribution-related load data is screened according to the set data screening conditions, and the real-time distribution-related load data is processed according to a unified time format to obtain effective distribution-related load data, ensuring the quality of the distribution-related load data and the consistency in the time dimension, facilitating time series analysis or cross-time comparison, so as to obtain more accurate, reliable and consistent data analysis results; at the same time, according to the given data analysis dimension, the effective distribution-related load data is integrated, and the data integration results corresponding to the data analysis dimension are obtained more efficiently to meet the needs of specific statistical analysis. This technical solution obtains effective data in an automated manner and integrates data according to the data analysis dimension, realizes data analysis refined to specific areas and dates, improves the efficiency and accuracy of distribution network data management and the timeliness of responding to overload conditions, and provides a guarantee for the stable operation of the distribution network.
[0044] As a first optional embodiment of this embodiment, on the basis of the above embodiment, the distribution network data access address can be expressed in the form of a uniform resource locator, the distribution network data display page is a hypertext markup language HTML page, and the distribution-related load data is associated with the HTML tags in the HTML page.
[0045] In this embodiment, the uniform resource locator URL can be understood as the address of a resource on the Internet, which is used to uniquely identify the access address of the distribution network data. The distribution network data stored on the server can be accessed through the access address. These data may display distribution-related load data, such as feeder load status, distribution transformer load status, or other related parameter information. Hypertext markup language HTML can be considered as a standard language for building web pages, which is used to build a display page for distribution network data. It can contain various elements, such as tables, charts, etc., to intuitively display the status and performance of the distribution network.
[0046] The above technical solution of this embodiment provides an access address for distribution network data, which is identified by a URL, and displays distribution network-related data through an HTML page. At the same time, the tags in the HTML page correspond to the distribution-related load data, which can effectively realize remote access and visual display of data, while ensuring the real-time and accuracy of the data.
[0047] As a second optional embodiment of this embodiment, on the basis of the above embodiment, the power distribution related load data can be screened according to the set data screening conditions, and the real-time power distribution related load data can be processed in a unified time format according to a unified time format to obtain the effective power distribution related load data, which is specifically optimized into the following steps:
[0048] a1) obtaining a set screening date in the data screening condition, deleting the distribution-related load data of other dates except the set screening date from the distribution-related load data, and obtaining the target distribution-related load data having the set screening date.
[0049] Among them, the screening conditions can be understood as a set of rules or standards for screening, filtering or excluding data sets, which may include date ranges, load value thresholds and data quality, etc. The screening conditions can be obtained from the client or preset in the server. Setting the screening date can be considered as setting one or more specific dates, which are the dates on which you want to keep the data, and are used to obtain the distribution-related load data on a specific date. The target distribution-related load data can be understood as the distribution-related load data on a specific date that meets the screening conditions after screening.
[0050] In this embodiment, the set screening date in the data screening conditions is first obtained, the existing distribution-related load data is checked, the date corresponding to each data point is identified, and all distribution-related load data that are not within the set screening date range are deleted from the distribution-related load data. Finally, after screening, only the target distribution-related load data that meets the set screening date is retained.
[0051] b1) If duplicate power distribution related load data is found from the target power distribution related load data, deduplication processing is performed on the duplicate power distribution related load data to obtain deduplication power distribution related load data.
[0052] The deduplicated power distribution related load data may be considered as power distribution related load data without duplicate entries obtained after deduplication processing.
[0053] In this embodiment, it is first checked whether there are two or more completely identical power distribution related load data records in the target power distribution related load data. If duplicate power distribution related load data records are found in the screened target power distribution related load data, the duplicate power distribution related load data records are processed and only one of the power distribution related load data records is retained, and other identical power distribution related load data records are deleted to obtain a deduplicated power distribution related load data without duplicate entries.
[0054] c1) determining time description information from the de-weighted power distribution related load data, and converting the time description information according to the unified time format to obtain unified time description information.
[0055] Among them, the time description information can be understood as a data field representing time, which may include date, time or timestamp. The unified time description information can be considered as the time description information expressed in the same format after converting the format of all time description information according to a specific and unified time format.
[0056] In this embodiment, first, all fields or records containing time description information are extracted from the deduplicated distribution-related load data, then the format of the time description information is identified and parsed to understand the specific time point it represents, and finally the parsed time description information is converted into a unified format, which may be a timestamp, etc., so as to obtain unified time description information.
[0057] d1) Recording the deduplicated power distribution related load data including the unified time description information as the effective power distribution related load data.
[0058] In this embodiment, the time description information in a unified format is updated to the original deduplicated distribution-related load data, and the distribution-related load data obtained after filtering according to the filtering conditions, removing the duplicate distribution-related load data and containing the unified time description information is considered to be valid distribution-related load data, which is used for the next step of analysis and display.
[0059] The above technical solution of this embodiment obtains the target power distribution-related load data with the set screening date according to the set screening date in the screening condition, and can accurately extract the data of a specific date, so as to more accurately analyze and integrate the power distribution-related load data of a specific date. The target power distribution-related load data is deduplicated to obtain deduplicated power distribution-related load data, which improves the accuracy of the power distribution-related load data, avoids false alarms and omissions caused by duplicate data, and improves the efficiency of distribution network data management. The time description information is converted and processed according to the unified time format to obtain unified time description information, which is helpful for subsequent intuitive analysis and display of effective power distribution-related load data.
[0060] As a third optional embodiment of this embodiment, on the basis of the above embodiment, the power distribution related load data includes feeder load data and distribution transformer load data. Accordingly, the effective power distribution related load data can be integrated according to the given data analysis dimension to obtain the data integration result corresponding to the data analysis dimension, which is specifically implemented in the following steps:
[0061] a2) When the power distribution management area is used as the data analysis dimension, the effective power distribution related load data is divided based on the power distribution management area to obtain the regional effective power distribution related load data corresponding to each power distribution management area.
[0062] The regional effective power distribution related load data may be considered as the effective power distribution related load data belonging to each power distribution management area and corresponding to the area.
[0063] In this embodiment, the entire power network is divided according to different power distribution management areas, and the power distribution management areas can be divided according to different areas of the city or according to the management scope of the power company. When the power distribution management area is used as the data analysis dimension, the previously determined effective power distribution related load data is grouped according to different power distribution management areas, so as to collect and organize the corresponding regional effective power distribution related load data for each power distribution management area.
[0064] b2) determining the heavily overloaded feeder data and distribution transformer overload data corresponding to the corresponding distribution management area according to the feeder load rate and distribution transformer load rate in the effective distribution-related load data of the area.
[0065] Among them, the feeder load rate can be considered as the ratio of the load carried by the feeder to its rated capacity, which is used to measure the load level of the feeder. The distribution transformer load rate can be considered as the ratio of the load carried by the distribution transformer in a certain period of time to the rated capacity of the transformer, which is used to measure the load level of the distribution transformer. Severely overloaded feeder data can be understood as feeder load data whose feeder load rate exceeds the normal safety range (that is, the feeder is severely overloaded and is in an overloaded operating state); distribution transformer overload data can be understood as distribution transformer load data whose distribution transformer load rate exceeds the normal safety range (that is, the distribution transformer is overloaded and is in an overloaded operating state).
[0066] In this embodiment, the feeder load rate data in each effective distribution-related load data is identified from the regional effective distribution-related load data collected from each distribution management area; a threshold value of the feeder load rate is set to represent a normal safety range of the feeder load rate, and by judging whether the feeder load rate in the effective distribution-related load data exceeds the set feeder load rate threshold, the heavily overloaded feeder data of each distribution management area is determined; by judging whether the distribution transformer load rate in the effective distribution-related load data exceeds the distribution transformer load rate threshold, the distribution transformer overload data corresponding to each distribution management area is determined.
[0067] c2) According to the heavily overloaded feeder data of each power distribution management area, the daily overload data of the feeder and the monthly overload data of the feeder in the power distribution management area are obtained.
[0068] Among them, the daily feeder overload data can be understood as data representing the feeder heavy overload situation that occurs within one day, which is used to timely reflect the daily feeder heavy overload situation. The monthly feeder overload data can be considered as data representing the feeder heavy overload situation that occurs within a month, which is used to reflect the feeder overload situation that month in real time.
[0069] In this embodiment, by identifying the heavily overloaded feeders in each distribution management area, the daily feeder overload data of each distribution management area can be obtained on a daily basis, and the monthly feeder overload data of each distribution management area can be obtained on a monthly basis.
[0070] d2) According to the distribution transformer overload data of each distribution management area, daily overload distribution transformer data and monthly overload distribution transformer data under the distribution management area are obtained.
[0071] Among them, the daily overload distribution transformer data can be considered as data representing the distribution transformer overload situation that occurred on that day; the monthly overload distribution transformer data can be understood as data representing the distribution transformer overload situation that occurred in that month.
[0072] In this embodiment, based on the distribution transformer overload data that has been identified in each distribution management area, the daily overload distribution transformer data of each distribution management area can be obtained on a daily basis, and the monthly overload distribution transformer data of each distribution management area can be obtained on a monthly basis.
[0073] e2) Integrate the daily overload data of the feeder and the monthly overload data of the feeder in each of the distribution management areas to form the feeder data integration result of the data analysis dimension, and integrate the daily overload distribution transformer data and the monthly overload distribution transformer data of each of the distribution management areas to form the distribution transformer overload integration result of the data analysis dimension.
[0074] Among them, the feeder data integration result can be considered as the final result obtained by integrating the daily overload data of feeders and the monthly overload data of feeders in different distribution management areas based on the distribution management area, which is used to reflect the feeder heavy overload situation of each distribution management area on the day and the month. The distribution transformer overload integration result can be considered as the final result obtained by integrating the daily overload distribution transformer data and the monthly overload distribution transformer data in different distribution management areas based on the distribution management area, which is used to reflect the distribution overload situation of each distribution management area on the day and the month.
[0075] In this embodiment, the daily feeder overload data and the monthly feeder overload data of each distribution management area are summarized and integrated to obtain a comprehensive feeder data integration result. Similarly, the daily overload distribution transformer data and the monthly overload distribution transformer data in each distribution management area are integrated to obtain a distribution transformer overload integration result that summarizes the distribution transformer overload conditions in different distribution management areas.
[0076] The above technical scheme of this embodiment provides that when the distribution management area is used as the data analysis dimension, the effective distribution-related load data is divided according to the distribution management area as a unit, so as to obtain the regional effective distribution-related load data, so that the distribution data management can perform more refined analysis, statistics, etc.; and according to the feeder load rate in the regional effective distribution-related load data, the heavy overload feeder data corresponding to the corresponding distribution management area is determined, so as to obtain the feeder daily overload data and feeder monthly overload data under each distribution management area, and at the same time, according to the distribution transformer load rate in the regional effective distribution-related load data, the distribution transformer overload data corresponding to the corresponding distribution management area is determined, so as to obtain the daily overload distribution transformer data and monthly overload distribution transformer data under each distribution management area; by statistically analyzing the heavy overload feeder data and distribution transformer overload data scattered in different distribution management areas, and then uniformly arranging and summarizing them according to a certain data analysis dimension, timely monitoring and early warning of feeder heavy overload conditions and distribution transformer overload conditions in the distribution network are realized, and more effective decision support is provided, thereby ensuring the safe operation of the distribution network.
[0077] As one implementation manner, the third optional embodiment may further specify the feeder data integration result and the distribution transformer overload integration result as follows:
[0078] a3) The feeder data integration results include: the daily overload data of the feeders corresponding to each distribution management area and the monthly overload data of the feeders, wherein the daily overload data of the feeders include the total number of daily overloaded feeders, the total number of daily overloaded public lines and the total number of daily overloaded dedicated lines; the monthly overload data of the feeders include the total number of monthly overloaded feeders, the total number of monthly overloaded public lines and the total number of monthly overloaded dedicated lines.
[0079] Among them, the total number of daily overloaded feeders can be considered as the total number of feeders that experience heavy feeder loading on a specific day; the total number of daily overloaded public lines can be understood as the number of public feeders among the feeders that experience heavy feeder loading on a specific day; the total number of daily overloaded dedicated lines can be understood as the number of dedicated feeders among the feeders that experience heavy feeder loading on a specific day; the total number of monthly overloaded feeders can be understood as the total number of feeders that experience heavy feeder loading in that month; the total number of monthly overloaded public lines can be understood as the number of public feeders among the feeders that experience heavy feeder loading in that month; the total number of monthly overloaded dedicated lines can be understood as the number of dedicated feeders among the feeders that experience heavy feeder loading in that month.
[0080] In this embodiment, the feeder data integration result includes the feeder daily overload data and feeder monthly overload data corresponding to each distribution management area. The feeder daily overload data includes the total number of feeders that are overloaded on a specific day, and the number of feeders that are public lines and dedicated lines. The feeder monthly overload data includes the total number of feeders that are overloaded in that month, and the number of feeders that are public lines and dedicated lines.
[0081] For example, Figure 2 This is an example diagram of the feeder data integration result obtained after integration provided by an embodiment of the present invention. Figure 2 As shown, Bureau 1 includes three distribution management areas, namely, Area A, Area B and Area C. Therefore, the value of each column in the row where Bureau 1 is located is the sum of the data in each column of the above three distribution management areas; the value of each row in the column where the daily total number of overloaded feeders is located is the sum of the values in each row in the column where the daily total number of overloaded public lines is located and the values in each row in the column where the daily total number of overloaded special lines is located; the value of each row in the column where the monthly total number of overloaded feeders is located is the sum of the values in each row in the column where the monthly total number of overloaded public lines is located and the values in each row in the column where the daily total number of overloaded special lines is located; the value in each row in the column where the daily total number of overloaded feeders is less than or equal to the corresponding row value in the column where the monthly total number of overloaded feeders is located.
[0082] b3) The distribution transformer overload integration result includes: daily overload distribution transformer data and monthly overload distribution transformer data corresponding to each distribution management area, wherein the daily overload distribution transformer data includes the total number of daily distribution transformer warnings and the total number of distribution transformer overloads exceeding 10 days; the monthly overload distribution transformer data includes the total number of monthly distribution transformer warnings and the total number of monthly distribution transformer overloads exceeding 10 days.
[0083] Among them, the total number of daily distribution transformer warnings can be considered as the number of distribution transformers that have overload conditions on the day and the cumulative number of days when overload conditions have occurred as of that day is less than or equal to 10 days; the total number of distribution transformer overloads for cumulative periods of more than 10 days can be understood as the number of distribution transformers that have overload conditions on the day and the cumulative number of days when overload conditions have occurred as of that day is greater than 10 days; the total number of monthly distribution transformer warnings can be considered as the number of distribution transformers that have overload conditions in the month and the cumulative number of days when overload conditions have occurred in the month is less than or equal to 10 days; the total number of monthly distribution transformer overloads for cumulative periods of more than 10 days can be understood as the number of distribution transformers that have overload conditions in the month and the cumulative number of days when overload conditions have occurred in the month is greater than 10 days.
[0084] In this embodiment, the distribution transformer overload integration result includes the daily overload distribution transformer data and the monthly overload distribution transformer data corresponding to each distribution management area. The daily overload distribution transformer data includes the number of distribution transformers that have experienced overload conditions for no more than 10 days and the number of distribution transformers that have experienced overload conditions for more than 10 days as of that day among all distribution transformers that have experienced overload conditions. The monthly overload distribution transformer data includes the number of distribution transformers that have experienced overload conditions for no more than 10 days and the number of distribution transformers that have experienced overload conditions for more than 10 days among all distribution transformers that have experienced overload conditions in that month.
[0085] For example, Figure 3 This is an example diagram of the distribution transformer overload integration result obtained after integration provided by the embodiment of the present invention. Figure 3 As shown, the value of each column in the row where bureau 1 is located is the sum of the values of each column in the rows where areas a, b and c are located; the value of each row in the column where the total number of daily distribution transformer warnings is located is less than or equal to the corresponding row value in the column where the total number of monthly distribution transformer warnings is located, and the value of each row in the column where the cumulative total number of distribution transformer overloads exceeding 10 days is less than or equal to the corresponding row value in the column where the monthly total number of distribution transformer overloads exceeding 10 days is located.
[0086] The above technical scheme of this embodiment gives the contents of the feeder data integration results and the distribution transformer overload integration results obtained after integration. Through the contents included in the above two integration results, the feeder daily overload data, feeder monthly overload data and distribution transformer overload data in each distribution management area can be intuitively displayed, thereby improving the efficiency of subsequent analysis and the reliability of analysis results.
[0087] As a fourth optional embodiment of this embodiment, based on the above embodiment, data integration can be performed on the effective power distribution related load data according to a given data analysis dimension to obtain a data integration result corresponding to the data analysis dimension, which is specifically optimized into the following steps:
[0088] a4) When any power distribution management area and a day are used as data analysis dimensions, the regional effective power distribution related load data corresponding to the power distribution management area is obtained from the effective power distribution related load data.
[0089] In this embodiment, when any power distribution management area and a day are used as data analysis dimensions, regional effective power distribution related load data in each power distribution management area on a specific day is obtained from the effective power distribution related load data.
[0090] b4) determining feeder overload detail data and distribution transformer overload detail data corresponding to the distribution management area based on the effective power distribution related load data in the area.
[0091] Among them, the feeder overload detail data can be considered as a detailed record of the feeder that has a severe overload during the day's operation; the distribution transformer overload detail data can be understood as a detailed record of the distribution transformer that has an overload during the day's operation.
[0092] In this embodiment, the feeders that are severely overloaded and the distribution transformers that are overloaded are identified from the regional effective power distribution related load data on a specific day, and then the feeder overload detail data and the distribution transformer overload detail data corresponding to the above-identified feeders and distribution transformers are extracted from the regional effective power distribution related load data.
[0093] c4) respectively summarizing the feeder overload detail data and the distribution transformer overload detail data of each distribution management area to form the feeder overload detail integration result and the distribution transformer overload detail integration result of the data analysis dimension.
[0094] Among them, the feeder overload details integration result can be considered as summarizing the feeder overload details data of each distribution management area, sorting them according to the maximum load rate, and sorting them from high to low according to the maximum load rate value, to form a comprehensive result containing all feeder overload details data. The distribution transformer overload details integration result can be understood as summarizing the distribution transformer overload details data of each distribution management area, sorting them according to the maximum current overload days, and sorting them from most to least according to the maximum current overload days, to form a comprehensive result containing all distribution transformer overload details data.
[0095] In this embodiment, the feeder overload detail data and the distribution transformer overload detail data in each distribution management area on a specific day are summarized and integrated respectively to form two detailed integration results based on day and distribution management area, which correspond to all feeder heavy overload conditions and distribution transformer overload conditions on that day respectively.
[0096] The above technical scheme of this embodiment provides an implementation method for determining and respectively summarizing the feeder overload detail data and distribution transformer overload detail data corresponding to each distribution management area when any distribution management area and one day are used as data analysis dimensions, so as to obtain the feeder overload detail integration results of the data analysis dimensions and the distribution transformer overload detail integration results, which helps to realize data analysis refined to specific areas and dates, improve the efficiency and accuracy of distribution network data management and the timeliness of response to overload conditions, and provide guarantee for the stable operation of the distribution network.
[0097] As one implementation manner, the fourth optional embodiment may further specify the feeder data integration result and the distribution transformer overload integration result as follows:
[0098] a5) The feeder overload details integration result includes: the distribution plant station corresponding to each distribution management area, the feeder to which it belongs, whether it is a dedicated line or not, the time when the maximum load rate occurs, and the maximum load rate.
[0099] Among them, the distribution plant can be considered as a power station or substation associated with the feeder; the affiliated feeder can be understood as a specific feeder connected to the distribution transformer in the distribution management area; whether it is a dedicated line or not can be considered as information identifying whether the feeder is a dedicated line or a public line. For example, if it is displayed as yes, it indicates that the corresponding feeder is a dedicated line. If it is displayed as no, it indicates that the corresponding feeder is not a dedicated line; the maximum load rate occurrence time can be understood as recording the specific time point when the feeder reaches the maximum load rate, which is used to analyze the possible causes of overload, etc.; the maximum load rate can be considered as recording the maximum load rate when the feeder is overloaded.
[0100] In this embodiment, the integrated feeder overload details include the distribution management area, distribution plant, feeder, dedicated line, maximum load rate occurrence time and maximum load rate information corresponding to each feeder that experiences a severe feeder overload on a specific day.
[0101] For example, Figure 4 This is an example diagram of the integrated results of feeder overload details obtained after integration according to an embodiment of the present invention. Figure 4 As shown, the feeder overload details integration results are sorted from high to low according to the maximum load rate value; the name of the distribution plant station is filled in according to the actual situation, which can be the same or different; the maximum load occurrence time can be displayed as a combination of time and date, with the time in the form of hours-minutes-seconds and the date in the form of year-month-day.
[0102] b5) The integrated results of the distribution transformer overload details include: the corresponding feeder, distribution transformer name, distribution transformer geographic information identification, distribution transformer type, rated capacity and maximum current overload days for each distribution management area.
[0103] Among them, the distribution transformer name can be understood as the unique name or identification of each distribution transformer, which is used to identify the distribution transformer; the distribution transformer geographic information identification can be considered as an identifier that describes the geographical location information of the distribution transformer, which is used to accurately identify, locate and access data and attribute information related to a specific distribution transformer in the geographic information system. For example, the distribution transformer geographic information identification can be used to quickly retrieve detailed information such as the location, technical parameters, and operating status of the distribution transformer; the distribution transformer type can be understood as the model or category of the distribution transformer, which can be classified according to different characteristics such as insulating medium, usage scenario, cooling method, etc.; the rated capacity can be considered as the maximum electric energy that the distribution transformer can safely transmit under rated working conditions; the maximum current overload days can be understood as the cumulative number of days during a specific time period when the maximum current passing through the distribution transformer exceeds the rated current of the distribution transformer for normal safe operation.
[0104] In this embodiment, the integrated results of the distribution transformer overload details include the distribution management area, the feeder to which it belongs, the distribution transformer name, the distribution transformer geographic information identifier, the distribution transformer type, the rated capacity and the number of days with maximum current overload corresponding to each distribution transformer where the distribution transformer overload occurs on a specific day.
[0105] For example, Figure 5 This is an example diagram of the integrated results of the distribution transformer overload details obtained after integration according to the embodiment of the present invention. Figure 5 As shown in the figure, the distribution transformer overload details integration result shows the details of the distribution transformers that have overload conditions on a specific day.
[0106] The above technical scheme of this embodiment gives the specific contents of the feeder overload details integration result and the distribution transformer overload details integration result. Through the contents included in the above two integration results, the overload details of the specific feeder where the feeder heavy load situation occurs in all distribution management areas within a specific day, and the overload details of the specific distribution transformer where the distribution transformer overload situation occurs in all distribution management areas within a specific day can be intuitively displayed, thereby realizing refined distribution network data management and improving the accuracy and timeliness of subsequent response to overload situations.
[0107] The distribution network data management method further includes:
[0108] The data integration result is displayed, and when the storage requirements are met, the data integration result is stored in a given storage format.
[0109] The data integration results can be understood as all the results obtained after integration, such as feeder data integration results, distribution transformer overload integration results, feeder overload detail integration results and distribution transformer overload detail integration results.
[0110] In this embodiment, the integrated data integration results are first presented in a manner that is easy to understand and analyze, such as in the form of charts, reports, or user interfaces; then the specific conditions under which the data needs to be stored are determined, such as the importance of the data, the availability of storage space, the data retention policy, etc.; then, after confirming that the data meets the storage conditions, a suitable data storage format is selected, such as CSV, XML, or a database system, and the data is saved in the established format.
[0111] The above technical scheme of this embodiment ensures that the data integration results can not only be effectively displayed and understood, but also sets storage requirements to retain high-value data, thereby ensuring the quality of stored data and avoiding storing a large amount of redundant or invalid data, thereby saving storage space. When the data integration results meet specific conditions, the data integration results are securely stored in a suitable format to facilitate future access and analysis, thereby improving the efficiency of distribution network data management through a standardized data storage process.
[0112] Figure 6 The structure diagram of a distribution network data management device provided by an embodiment of the present invention is shown in FIG. Figure 6 As shown, the device includes: an address access module 61, a data processing module 62, and a data integration module 63, wherein
[0113] The address access module 61 is used to access the set distribution network data access address to enter the distribution network data display page after detecting that the login authentication of the power grid system is completed. The distribution network data display page includes distribution-related load data;
[0114] The data processing module 62 is used to filter the power distribution related load data according to the set data filtering conditions, and to perform time format unified processing on the power distribution related load data according to a unified time format to obtain the valid power distribution related load data;
[0115] The data integration module 63 is used to integrate the effective power distribution related load data according to a given data analysis dimension to obtain a data integration result corresponding to the data analysis dimension.
[0116] The technical solution of the embodiment of the present invention, after detecting that the login authentication of the power grid system is completed, accesses the set distribution network data access address to enter the distribution network data display page, obtains a series of feeder operation and status information in the distribution network including distribution-related load data; screens the obtained distribution-related load data according to the set data screening conditions, and processes the real-time distribution-related load data according to a unified time format to obtain effective distribution-related load data, ensuring the quality of the distribution-related load data and the consistency in the time dimension, facilitating time series analysis or cross-time comparison, so as to obtain more accurate, reliable and consistent data analysis results; at the same time, according to the given data analysis dimension, the effective distribution-related load data is integrated, and the data integration results corresponding to the data analysis dimension are obtained more efficiently to meet the needs of specific statistical analysis. This technical solution obtains effective data in an automated manner and integrates data according to the data analysis dimension, realizes data analysis refined to specific areas and dates, improves the efficiency and accuracy of distribution network data management and the timeliness of responding to overload conditions, and provides guarantee for the stable operation of the distribution network.
[0117] Furthermore, in the address access module 61:
[0118] The distribution network data access address is expressed in the form of a uniform resource locator, the distribution network data display page is a hypertext markup language HTML page, and the distribution-related load data is associated with the HTML tags in the HTML page;
[0119] Furthermore, the data processing module 62 may be specifically used for:
[0120] Obtaining a screening date set in the data screening condition, deleting the power distribution related load data of other dates except the set screening date from the power distribution related load data, and obtaining the target power distribution related load data having the set screening date;
[0121] If duplicate power distribution related load data is found from the target power distribution related load data, deduplication processing is performed on the duplicate power distribution related load data to obtain deduplication power distribution related load data;
[0122] Determining time description information from the de-weighted power distribution related load data, and converting the time description information according to the unified time format to obtain unified time description information;
[0123] The deduplicated power distribution related load data including the unified time description information is recorded as the effective power distribution related load data.
[0124] Furthermore, the data integration module 63 can be specifically used for:
[0125] The power distribution related load data includes feeder load data and distribution transformer load data. Accordingly, when the power distribution management area is used as the data analysis dimension, the effective power distribution related load data is divided based on the power distribution management area to obtain the regional effective power distribution related load data corresponding to each power distribution management area;
[0126] Determine the heavily overloaded feeder data and distribution transformer overload data corresponding to the corresponding distribution management area according to the feeder load rate and distribution transformer load rate in the effective power distribution related load data of the area;
[0127] According to the heavily overloaded feeder data of each power distribution management area, the daily overload data of the feeder and the monthly overload data of the feeder under the power distribution management area are obtained;
[0128] According to the distribution transformer overload data of each distribution management area, daily overload distribution transformer data and monthly overload distribution transformer data under the distribution management area are obtained;
[0129] Integrate the daily overload data of the feeder and the monthly overload data of the feeder in each of the distribution management areas to form the feeder data integration result of the data analysis dimension, and integrate the daily overload distribution transformer data and the monthly overload distribution transformer data of each of the distribution management areas to form the distribution transformer overload integration result of the data analysis dimension.
[0130] The feeder data integration results include: feeder daily overload data and feeder monthly overload data corresponding to each distribution management area, wherein the feeder daily overload data includes the total number of daily overloaded feeders, the total number of daily overloaded common lines and the total number of daily overloaded dedicated lines; the feeder monthly overload data includes the total number of monthly overloaded feeders, the total number of monthly overloaded common lines and the total number of monthly overloaded dedicated lines.
[0131] The distribution transformer overload integration result includes: daily overload distribution transformer data and monthly overload distribution transformer data corresponding to each distribution management area, wherein the daily overload distribution transformer data includes the total number of daily distribution transformer warnings and the total number of distribution transformer overloads accumulated for more than 10 days; the monthly overload distribution transformer data includes the total number of monthly distribution transformer warnings and the total number of monthly distribution transformer overloads accumulated for more than 10 days.
[0132] Furthermore, the data integration module 63 can also be used for:
[0133] When any power distribution management area and a day are used as data analysis dimensions, obtaining regional effective power distribution related load data corresponding to the power distribution management area from the effective power distribution related load data;
[0134] Determine feeder overload detail data and distribution transformer overload detail data corresponding to the distribution management area according to the effective power distribution related load data of the area;
[0135] The feeder overload detail data and the distribution transformer overload detail data of each distribution management area are respectively summarized to form the feeder overload detail integration result and the distribution transformer overload detail integration result of the data analysis dimension.
[0136] The feeder overload details integration result includes: the distribution plant station corresponding to each distribution management area, the feeder to which it belongs, whether it is a dedicated line, the maximum load rate occurrence time and the maximum load rate;
[0137] The integrated results of the distribution transformer overload details include: the corresponding feeder, distribution transformer name, distribution transformer geographic information identifier, distribution transformer type, rated capacity and maximum current overload days for each distribution management area.
[0138] Optionally, the distribution network data management device further includes:
[0139] The display and storage module is used to display the data integration result and store the data integration result in a given storage format when the storage requirements are met.
[0140] The distribution network data management device provided in the embodiment of the present invention can execute the distribution network data management method provided in any embodiment of the present invention, and has the corresponding functional modules and beneficial effects of the execution method.
[0141] It is worth noting that the various units and modules included in the above-mentioned device are only divided according to functional logic, but are not limited to the above-mentioned division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the protection scope of the embodiments of the present invention.
[0142] Figure 7 A schematic diagram of the structure of an electronic device 70 provided by an embodiment of the present invention. The electronic device is intended to represent various forms of digital computers, such as laptop computers, desktop computers, workstations, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device may also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices (such as helmets, glasses, watches, etc.) and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present invention described and / or required herein.
[0143] like Figure 7As shown, the electronic device 70 includes at least one processor 71, and a memory connected to the at least one processor 71, such as a read-only memory (ROM) 72, a random access memory (RAM) 73, etc., wherein the memory stores a computer program that can be executed by at least one processor, and the processor 71 can perform various appropriate actions and processes according to the computer program stored in the read-only memory (ROM) 72 or the computer program loaded from the storage unit 78 to the random access memory (RAM) 73. In the RAM 73, various programs and data required for the operation of the electronic device 70 can also be stored. The processor 71, the ROM 72, and the RAM 73 are connected to each other via a bus 74. An input / output (I / O) interface 75 is also connected to the bus 74.
[0144] A number of components in the electronic device 70 are connected to the I / O interface 75, including: an input unit 76, such as a keyboard, a mouse, etc.; an output unit 77, such as various types of displays, speakers, etc.; a storage unit 78, such as a disk, an optical disk, etc.; and a communication unit 79, such as a network card, a modem, a wireless communication transceiver, etc. The communication unit 79 allows the electronic device 70 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks.
[0145] The processor 71 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the processor 71 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (GPU), various dedicated artificial intelligence (AI) computing chips, various processors running machine learning model algorithms, a digital signal processor (DSP), and any appropriate processor, controller, microcontroller, etc. The processor 71 executes the various methods and processes described above, such as a distribution network data management method.
[0146] In some embodiments, the power distribution network data management method may be implemented as a computer program, which is tangibly contained in a computer-readable storage medium, such as a storage unit 78. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 70 via the ROM 72 and / or the communication unit 79. When the computer program is loaded into the RAM 73 and executed by the processor 71, one or more steps of the power distribution network data management method described above may be performed. Alternatively, in other embodiments, the processor 71 may be configured to perform a power distribution network data management method in any other appropriate manner (e.g., by means of firmware).
[0147] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.
[0148] Computer programs for implementing the methods of the present invention may be written in any combination of one or more programming languages. These computer programs may be provided to a processor of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that when the computer program is executed by the processor, the functions / operations specified in the flow chart and / or block diagram are implemented. The computer program may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.
[0149] The embodiment of the present invention provides a computer storage medium. In the context of the present invention, a computer readable storage medium may be a tangible medium that may contain or store a computer program for use by an instruction execution system, device or equipment or used in combination with an instruction execution system, device or equipment. The computer readable storage medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices or equipment, or any suitable combination of the above. Alternatively, the computer readable storage medium may be a machine readable signal medium. A more specific example of a machine readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.
[0150] To provide interaction with a user, the systems and techniques described herein may be implemented on an electronic device having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and a pointing device (e.g., a mouse or trackball) through which the user can provide input to the electronic device. Other types of devices may also be used to provide interaction with the user; for example, the feedback provided to the user may be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user may be received in any form (including acoustic input, voice input, or tactile input).
[0151] The systems and techniques described herein may be implemented in a computing system that includes backend components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes frontend components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such backend components, middleware components, or frontend components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), a blockchain network, and the Internet.
[0152] A computing system may include a client and a server. The client and the server are generally remote from each other and usually interact through a communication network. The client and server relationship is generated by computer programs running on the corresponding computers and having a client-server relationship with each other. The server may be a cloud server, also known as a cloud computing server or cloud host, which is a host product in the cloud computing service system to solve the defects of difficult management and weak business scalability in traditional physical hosts and VPS services.
[0153] It should be understood that the various forms of processes shown above can be used to reorder, add or delete steps. For example, the steps described in the present invention can be executed in parallel, sequentially or in different orders, as long as the desired results of the technical solution of the present invention can be achieved, and this document does not limit this.
[0154] The above specific implementations do not constitute a limitation on the protection scope of the present invention. It should be understood by those skilled in the art that various modifications, combinations, sub-combinations and substitutions can be made according to design requirements and other factors. Any modification, equivalent substitution and improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A distribution network data management method, characterized in that: include: After detecting that the login authentication of the power grid system is completed, accessing the set distribution network data access address to enter the distribution network data display page, the distribution network data display page includes distribution-related load data; Screening the power distribution related load data according to the set data screening conditions, and performing time format unified processing on the power distribution related load data according to a unified time format to obtain the valid power distribution related load data; According to a given data analysis dimension, data integration is performed on the effective power distribution related load data to obtain a data integration result corresponding to the data analysis dimension.
2. The method according to claim 1, characterized in that The distribution network data access address is expressed in the form of a uniform resource locator, the distribution network data display page is a hypertext markup language HTML page, and the distribution-related load data is associated with the HTML tags in the HTML page.
3. The method according to claim 1, characterized in that The step of filtering the power distribution related load data according to the set data filtering condition and performing time format unified processing on the power distribution related load data according to a unified time format to obtain the valid power distribution related load data includes: Obtaining a set screening date in the data screening condition, deleting the power distribution related load data of other dates except the set screening date from the power distribution related load data, and obtaining the target power distribution related load data having the set screening date; If duplicate power distribution related load data is found from the target power distribution related load data, deduplication processing is performed on the duplicate power distribution related load data to obtain deduplication power distribution related load data; Determining time description information from the de-weighted power distribution related load data, and converting the time description information according to the unified time format to obtain unified time description information; The deduplicated power distribution related load data including the unified time description information is recorded as the effective power distribution related load data.
4. The method according to claim 1, characterized in that: The power distribution related load data includes feeder load data and distribution transformer load data. Accordingly, the effective power distribution related load data is integrated according to a given data analysis dimension to obtain a data integration result corresponding to the data analysis dimension, including: When the power distribution management area is used as the data analysis dimension, the effective power distribution related load data is divided based on the power distribution management area, and the regional effective power distribution related load data corresponding to each power distribution management area is obtained; Determine the heavily overloaded feeder data and distribution transformer overload data corresponding to the corresponding distribution management area according to the feeder load rate and distribution transformer load rate in the effective power distribution related load data of the area; According to the heavily overloaded feeder data of each power distribution management area, the daily overload data of the feeder and the monthly overload data of the feeder under the power distribution management area are obtained; According to the distribution transformer overload data of each distribution management area, daily overload distribution transformer data and monthly overload distribution transformer data under the distribution management area are obtained; Integrate the daily overload data of the feeder and the monthly overload data of the feeder in each of the distribution management areas to form the feeder data integration result of the data analysis dimension, and integrate the daily overload distribution transformer data and the monthly overload distribution transformer data of each of the distribution management areas to form the distribution transformer overload integration result of the data analysis dimension.
5. The method according to claim 4, characterized in that The feeder data integration result includes: the feeder daily overload data and the feeder monthly overload data corresponding to each distribution management area, wherein the feeder daily overload data includes the total number of daily overloaded feeders, the total number of daily overloaded public lines and the total number of daily overloaded dedicated lines; the feeder monthly overload data includes the total number of monthly overloaded feeders, the total number of monthly overloaded public lines and the total number of monthly overloaded dedicated lines. The distribution transformer overload integration result includes: daily overload distribution transformer data and monthly overload distribution transformer data corresponding to each distribution management area, wherein the daily overload distribution transformer data includes the total number of daily distribution transformer warnings and the total number of distribution transformer overloads accumulated for more than 10 days; the monthly overload distribution transformer data includes the total number of monthly distribution transformer warnings and the total number of monthly distribution transformer overloads accumulated for more than 10 days.
6. The method according to claim 1, characterized in that According to a given data analysis dimension, data integration is performed on the effective power distribution related load data to obtain a data integration result corresponding to the data analysis dimension, including: When any power distribution management area and a day are used as data analysis dimensions, obtaining regional effective power distribution related load data corresponding to the power distribution management area from the effective power distribution related load data; Determine feeder overload detail data and distribution transformer overload detail data corresponding to the distribution management area according to the effective power distribution related load data of the area; The feeder overload detail data and the distribution transformer overload detail data of each distribution management area are respectively summarized to form the feeder overload detail integration result and the distribution transformer overload detail integration result of the data analysis dimension.
7. The method according to claim 6, characterized in that The feeder overload details integration result includes: the distribution plant station corresponding to each distribution management area, the feeder to which it belongs, whether it is a dedicated line, the maximum load rate occurrence time and the maximum load rate; The integrated results of the distribution transformer overload details include: the corresponding feeder, distribution transformer name, distribution transformer geographic information identifier, distribution transformer type, rated capacity and maximum current overload days for each distribution management area.
8. A distribution network data management device, characterized in that: include: An address access module is used to access a set distribution network data access address to enter a distribution network data display page after detecting that the login authentication of the power grid system is completed. The distribution network data display page includes distribution-related load data; A data processing module, used to screen the power distribution related load data according to a set data screening condition, and perform time format unified processing on the power distribution related load data according to a unified time format to obtain the valid power distribution related load data; The data integration module is used to integrate the effective power distribution related load data according to a given data analysis dimension to obtain a data integration result corresponding to the data analysis dimension.
9. An electronic device, characterized in that: The electronic device comprises: at least one processor; and a memory communicatively coupled to the at least one processor; The memory stores a computer program executable by the at least one processor, and the computer program is executed by the at least one processor so that the at least one processor can execute the distribution network data management method according to any one of claims 1 to 7.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a processor to implement the distribution network data management method according to any one of claims 1 to 7 when executed.