Ballast bed smudginess rate calculation method and device, storage medium and computer program

By segmenting the vehicle-mounted ground penetrating radar data by unit mileage intervals and calculating the power spectrum characteristics of the average road data, the problem of real-time processing of vehicle-mounted ground penetrating radar data is solved, real-time road bed dirty rate analysis on microcomputers is realized, and the The algorithm and improves the computational efficiency.

CN118939933APending Publication Date: 2024-11-12SHUOHUANG RAILWAY DEV +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411035428.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The large amount of dirty railway bed data collected by vehicle-mounted ground penetrating radar is difficult to analyze and process in real time on site. The existing algorithms are complex and difficult to implement real-time calculations on portable computers, resulting in inefficiency and inability to achieve real-time analysis.

Method used

By segmenting the radar data in unit miles per unit interval at equal intervals, the power spectrum characteristics of the average channel data in each interval are calculated, the parameters of the dirty indicators on the road bed are determined based on these characteristics, and the dirty indicator correlation table is used to calculate the dirtyness of the entire line The pollution rate is to process small data in real time segments to avoid the reading of massive data, and realize real-time analysis on microcomputers.

Benefits of technology

The algorithm is simplified, the calculation efficiency is improved, the sleeper diffraction wave interference is avoided, and the calculation results are ensured, so that the dirty state of the road bed can be monitored and evaluated in real time on site, providing a decision-making basis for the road bed cleaning and screening plan.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118939933A_ABST
    Figure CN118939933A_ABST
Patent Text Reader

Abstract

The invention discloses a ballast bed smudginess rate calculation method and device, a storage medium and a computer program, and the method comprises the steps: obtaining a mapping table used for reflecting the corresponding relation between radar data and train mileage, and obtaining a plurality of unit mileage intervals obtained by segmenting the train mileage at equal intervals according to a preset mileage; determining radar data corresponding to the unit mileage interval in the mapping table according to the unit mileage interval; calculating an average value of the radar data corresponding to each unit mileage interval to obtain a plurality of average channel data; obtaining power spectrum characteristics corresponding to the average channel data; determining ballast bed dirt index parameters of the whole line based on the power spectrum characteristics; acquiring a smudginess index association table used for reflecting the corresponding relation between the track bed smudginess index parameters and the track bed smudginess rate; and determining the track bed smudginess rate corresponding to the track bed smudginess index parameters of the whole line based on the smudginess index rate association table. The smudginess rate is calculated in real time, and the algorithm is simple and efficient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the technical field of railway maintenance, and in particular to a method, device, storage medium and computer program for calculating a ballast contamination rate. Background Art

[0002] The vehicle-mounted ground penetrating radar is an instrument used to quickly detect the status of railway track bed and roadbed. It passes through the railway at a speed of about 80 km per hour, quickly and densely collecting high-frequency electromagnetic wave signal excitation response. These corresponding signals are almost 512 or 1024 data collected at one time at each centimeter interval, and often multiple antenna signals from the left, middle and right are collected and recorded at the same time. The amount of data is extremely large. For a 10km long line, the amount of data can reach dozens of GB, which is difficult to achieve real-time processing. The data is stored in the hard disk of the detection instrument; later, it is necessary to return to the base, open the file through the computing center server, use relevant software to read the radar corresponding signals stored on the hard disk one by one, and analyze and calculate the dirty state of the track bed or structural defects. Among them, the extraction of the dirty state of the track bed is achieved by analyzing the waveform characteristics or frequency characteristics of the radar signal through the software algorithm. The analysis results reflect the dirty state of the railway track bed ballast and provide a decision-making basis for the track bed cleaning plan.

[0003] Due to the long mileage of the railway, the vehicle-mounted ground-penetrating radar is out for at least a week, and the amount of radar signal data collected quickly and intensively is extremely large, with hundreds of GB of data being common. When calculating through software, it is extremely difficult to open such a large amount of data on a general computer or portable laptop at one time, and it is impossible to analyze and process the data collected on site in real time. If the test results are needed on site to evaluate the contamination of the roadbed, the on-site data is often processed at the base, and the calculation and analysis are performed on the server or computing station, and then transmitted back to the site after the base has processed it. This is very inconvenient, cannot achieve real-time analysis, and is inefficient.

[0004] In addition, most of the existing algorithms for calculating the dirtiness rate of radar signals require that after obtaining the radar recording signal, a relatively complex filtering algorithm be used to eliminate the interference of reflected waves from the rails and diffracted waves from the sleepers. Conventional algorithms include time-space filtering, multi-channel average subtraction, etc. The relevant algorithms need to be developed for the global signal, which is difficult to implement on ordinary portable computers. Summary of the invention

[0005] Based on the above technical problems, the present disclosure provides a method, device, storage medium and computer program for calculating the roadbed contamination rate.

[0006] In a first aspect, the present disclosure provides a method for calculating a roadbed contamination rate, comprising:

[0007] Obtaining a mapping table for reflecting the corresponding relationship between radar data and train mileage, and obtaining a plurality of unit mileage intervals obtained by equally dividing the train mileage according to a preset mileage;

[0008] According to the unit mileage interval, determining the radar data corresponding to the unit mileage interval in the mapping table;

[0009] Calculate the average value of the radar data corresponding to each unit mileage interval to obtain a plurality of average track data;

[0010] Obtaining power spectrum features corresponding to each of the average channel data;

[0011] Determining the ballast contamination index parameters of the entire line based on the power spectrum characteristics;

[0012] Obtaining a dirtiness index association table for reflecting the corresponding relationship between the dirtiness index parameter of the roadbed and the dirtiness rate of the roadbed;

[0013] The ballast bed contamination rate corresponding to the ballast bed contamination index parameter of the entire line is determined based on the contamination index rate association table.

[0014] In some embodiments, the step of determining, in the mapping table, radar data corresponding to the unit mileage interval according to the unit mileage interval includes:

[0015] According to the unit mileage interval, determining the starting track number and the ending track number of the radar data corresponding to the unit mileage interval in the mapping table;

[0016] Calculate the data length of the radar data corresponding to the unit mileage interval and the physical offset corresponding to the starting road number according to the starting road number, the ending road number and the structural parameters of the radar data;

[0017] Radar data corresponding to the unit mileage interval is determined based on the data length and the physical offset.

[0018] In some embodiments, the calculation formula of the physical offset corresponding to the starting track number is:

[0019] P=F+(T+L)×(S 起 -1);

[0020] Among them, P is the physical offset; F is the number of bytes occupied by the file header; T is the number of bytes occupied by the track header; L is the number of bytes occupied by the track data length; S 起 The starting track number.

[0021] In some embodiments, the data length is calculated as:

[0022] D=(T+L)×(S 止 -S 起+1)

[0023] Among them, D is the data length, T is the number of bytes occupied by the header; L is the number of bytes occupied by the data length; Sstart is the starting track number; Send is the starting track number.

[0024] In some embodiments, the power spectrum characteristics include the amplitude of the characteristic frequency and the size of the envelope area of ​​each characteristic frequency.

[0025] In some embodiments, before the step of obtaining a pollution index association table reflecting the corresponding relationship between the roadbed pollution index parameter and the roadbed pollution rate, the step further includes:

[0026] Get the calibration line of the whole line;

[0027] The calibration line is tested, and the corresponding relationship between the dirt index parameter and the dirt rate is obtained by statistics to obtain the dirt index association table.

[0028] In some embodiments, the calculation formula of the average channel data is:

[0029]

[0030] Wherein, j is the time acquisition serial number of a radar record; i is the serial number of the radar record associated with each mileage unit interval; D j is the average data; S 止 S is the end track number; 起 The starting track number.

[0031] In a second aspect, the present disclosure provides a computer device, including a memory, a processor, and a computer program stored in the memory, wherein the processor executes the computer program to implement the following steps:

[0032] Obtaining a mapping table for reflecting the corresponding relationship between radar data and train mileage, and obtaining a plurality of unit mileage intervals obtained by equally dividing the train mileage according to a preset mileage;

[0033] According to the unit mileage interval, determining the radar data corresponding to the unit mileage interval in the mapping table;

[0034] Calculate the average value of the radar data corresponding to each unit mileage interval to obtain a plurality of average track data;

[0035] Obtaining power spectrum features corresponding to each of the average channel data;

[0036] Determining the ballast contamination index parameters of the entire line based on the power spectrum characteristics;

[0037] Obtaining a dirtiness index association table for reflecting the corresponding relationship between the dirtiness index parameter of the roadbed and the dirtiness rate of the roadbed;

[0038] The ballast bed contamination rate corresponding to the ballast bed contamination index parameter of the entire line is determined based on the contamination index rate association table.

[0039] In a third aspect, the present disclosure provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the following steps:

[0040] Obtaining a mapping table for reflecting the corresponding relationship between radar data and train mileage, and obtaining a plurality of unit mileage intervals obtained by equally dividing the train mileage according to a preset mileage;

[0041] According to the unit mileage interval, determining the radar data corresponding to the unit mileage interval in the mapping table;

[0042] Calculate the average value of the radar data corresponding to each unit mileage interval to obtain a plurality of average track data;

[0043] Obtaining power spectrum features corresponding to each of the average channel data;

[0044] Determining the ballast contamination index parameters of the entire line based on the power spectrum characteristics;

[0045] Obtaining a dirtiness index association table for reflecting the corresponding relationship between the dirtiness index parameter of the roadbed and the dirtiness rate of the roadbed;

[0046] The ballast bed contamination rate corresponding to the ballast bed contamination index parameter of the entire line is determined based on the contamination index rate association table.

[0047] In a fourth aspect, the present disclosure provides a computer program product, including a computer program, which implements the following steps when executed by a processor:

[0048] Obtaining a mapping table for reflecting the corresponding relationship between radar data and train mileage, and obtaining a plurality of unit mileage intervals obtained by equally dividing the train mileage according to a preset mileage;

[0049] According to the unit mileage interval, determining the radar data corresponding to the unit mileage interval in the mapping table;

[0050] Calculate the average value of the radar data corresponding to each unit mileage interval to obtain a plurality of average track data;

[0051] Obtaining power spectrum features corresponding to each of the average channel data;

[0052] Determining the ballast contamination index parameters of the entire line based on the power spectrum characteristics;

[0053] Obtaining a dirtiness index association table for reflecting the corresponding relationship between the dirtiness index parameter of the roadbed and the dirtiness rate of the roadbed;

[0054] The ballast bed contamination rate corresponding to the ballast bed contamination index parameter of the entire line is determined based on the contamination index rate association table.

[0055] The present invention provides a method, device, storage medium and computer program for calculating the contamination rate of the roadbed. By taking the average channel data of multiple-channel radar wave signals in a unit mileage interval as the radar wave representative signal in the unit mileage interval, on the one hand, the interference of the diffraction wave of the sleepers can be avoided, and the reliability of the subsequent analysis and calculation results can be ensured; on the other hand, a small amount of radar data for solving is retrieved in real time and segmented according to the physical address of the data, so that in the whole calculation and analysis process, there is no need to open and read a large amount of data files at one time. Only a very small amount of radar data is used in the calculation process, which can be completed in the on-site detection process of the vehicle-mounted ground penetrating radar, thereby making it possible to calculate and analyze the contamination rate of the roadbed on a microcomputer, and the algorithm is simple and efficient. BRIEF DESCRIPTION OF THE DRAWINGS

[0056] The present disclosure will be described in more detail below based on embodiments and with reference to the accompanying drawings:

[0057] Figure 1 A schematic diagram of a flow chart of a method for calculating a roadbed contamination rate provided in an embodiment of the present disclosure;

[0058] Figure 2 A flow chart of a method for calculating the dirtiness rate of a roadbed provided in an embodiment of the present disclosure;

[0059] Figure 3 A flowchart of a method for calculating the dirtiness rate of a roadbed provided in an embodiment of the present disclosure;

[0060] Figure 4 A schematic diagram of a radar data and mileage mapping table provided in an embodiment of the present disclosure;

[0061] Figure 5 A schematic diagram of the data structure of radar data provided by an embodiment of the present disclosure;

[0062] Figure 6 A schematic diagram of a unit mileage interval and a first wave signal in each unit mileage interval provided in an embodiment of the present disclosure;

[0063] Figure 7 An internal structural diagram of a computer device provided in an embodiment of the present disclosure.

[0064] In the drawings, the same reference numerals are used for the same components, and the drawings are not drawn to scale. DETAILED DESCRIPTION

[0065] In order to enable those skilled in the art to better understand the technical solution of the present disclosure, and to fully understand and implement how the present disclosure applies technical means to solve technical problems and achieve the corresponding technical effects, the technical solution in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings in the embodiments of the present disclosure. Obviously, the described embodiments are only embodiments of a part of the present disclosure, not all of the embodiments. The embodiments of the present disclosure and the various features in the embodiments can be combined with each other without conflict, and the technical solutions formed are all within the scope of protection of the present disclosure. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in this field without making creative work should fall within the scope of protection of the present disclosure.

[0066] It should be noted that the terms "first", "second", etc. in the specification and claims of the present disclosure and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present disclosure described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product, or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products, or devices.

[0067] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0068] Embodiment 1

[0069] Figure 1 The following is a flow chart of a method for calculating the roadbed contamination rate provided in an embodiment of the present disclosure. Figure 1 As shown, a method for calculating the roadbed contamination rate includes:

[0070] Step 110, obtaining a mapping table reflecting the correspondence between radar data and train mileage, and obtaining a plurality of unit mileage intervals obtained by equally-interval segmenting the train mileage according to a preset mileage.

[0071] In one embodiment, the mapping table reflecting the corresponding relationship between radar data and train mileage is a tool for associating and verifying the radar track number corresponding to the radar data detected by the radar with the mileage position of the train itself. Because the vehicle-mounted ground penetrating radar does not travel at a uniform speed, a mapping table of the relationship between the instantaneous mileage and the corresponding radar recorded track number will be synchronously established every time it travels a certain distance (not necessarily an equal distance), and the mapping table is stored separately in real time in the form of a file.

[0072] In one embodiment, radar data and a mapping table reflecting the correspondence between radar data and train mileage are obtained by vehicle-mounted ground-penetrating radar equipment, wherein the vehicle-mounted ground-penetrating radar equipment gives a start and end radar track number every tens or hundreds of meters of mileage to verify or calibrate the radar monitoring signal position.

[0073] In one embodiment, after the inspection of the entire railway section is completed, a mapping table of a certain track number of the original radar data and the corresponding mileage value of the train is formed, which is used for later inspection of the radar track number. The radar data track number refers to the number or code used to uniquely identify the radar data record. During the radar scanning process, the radar will scan the target area at a certain time interval and angle interval, and store the scanned data as a series of data records. These data records are sorted in a certain order, and each record corresponds to a unique data track number.

[0074] In one embodiment, the minimum mileage unit for the railway line roadbed contamination analysis is preset to be d, which is defined as a preset mileage unit. The radar data is segmented at equal intervals according to the preset mileage units to obtain multiple unit mileage intervals for the entire line, and the multiple unit mileage intervals are numbered sequentially starting from 1.

[0075] In one embodiment, the minimum mileage unit d for railway track ballast pollution analysis is 5 m. In other embodiments, d may be assigned different values ​​according to actual conditions, such as 10 m, etc., which is not limited herein.

[0076] Step 120: According to the unit mileage interval, determine the radar data corresponding to the unit mileage interval in the mapping table.

[0077] In one embodiment, in the mapping table, the starting road number and the ending road number of the radar data associated with each unit mileage interval can be determined according to the mapping relationship between the radar road number and the mileage data; based on the starting road number and the ending road number, the radar data corresponding to each unit mileage interval can be determined.

[0078] Step 130, calculating the average value of the radar data corresponding to each unit mileage interval to obtain a plurality of average channel data.

[0079] In this embodiment, based on the radar data corresponding to each unit mileage interval, the radar data corresponding to the unit mileage interval is read in sequence, and the average value of the radar data corresponding to each unit mileage interval is calculated to obtain the average road data, and the average road data is used as the dirtiness evaluation data of the unit mileage interval.

[0080] Step 140: Obtain power spectrum features corresponding to each of the average channel data.

[0081] In this embodiment, the power spectrum is calculated by using the average channel data of the radar data corresponding to each unit mileage interval, and the power spectrum features are obtained on the power spectrum.

[0082] Among them, power spectrum is the abbreviation of power spectrum density function, which is defined as the signal power within a unit frequency band, which represents the change of signal power with frequency; the power spectrum characteristics mainly involve the power distribution of the signal in the frequency domain, which describes the energy distribution characteristics of the signal at different frequencies.

[0083] In one embodiment, the step of calculating the power spectrum through the average track data of the associated radar data in each unit mileage interval includes: removing the interference of the rails and the direct wave interference of the receiving-transmitting radar antenna by first wave removal; the first wave removal refers to setting the radar wave signal within 1, 1.5 or 2 cycles of the first wave to zero; the radar record after zeroing is used to calculate the power spectrum, and the power spectrum characteristics are used to perform subsequent calculations of the roadbed contamination index parameters.

[0084] The sleeper diffraction wave signal is staggered in time on the radar recording profile, and each unit interval spans the same number of sleepers, because the spacing between sleepers is almost fixed for a section of the line. Therefore, the real-time dirt calculation method itself implies that it is fair to all unit mileage intervals in space. In this embodiment, the average track data of the radar data associated with the unit mileage interval, that is, the average (radar wave) of the associated radar wave signal is used as the radar wave representative signal of the unit mileage interval. Because the first wave is cut off, the interference of the sleeper diffraction wave can be greatly avoided, and the reliability of the subsequent analysis and calculation results is guaranteed.

[0085] Step 150: determining the ballast bed contamination index parameters of the entire line based on the power spectrum characteristics.

[0086] In this embodiment, based on the power spectrum characteristics corresponding to each of the average track data, the track bed contamination index parameters of each unit mileage interval are determined, and the contamination index parameters of each unit mileage interval are read and calculated in sequence according to the numbering order of each unit mileage interval, so as to obtain the track bed contamination index parameters of the entire line.

[0087] The contamination of the roadbed is mainly caused by the accumulation and deposition of fine particles on the roadbed. The dielectric constant of the dirty roadbed is positively correlated with its contamination process, which provides a physical premise for extracting the contamination level of the roadbed using radar signals. When the radar signal passes through the roadbed, its reflection and scattering characteristics will be affected by the degree of contamination of the roadbed, thereby changing the power spectrum characteristics of the signal. When using vehicle-mounted ground penetrating radar equipment to collect radar signals of the roadbed on a railway line, the vehicle-mounted ground penetrating radar can continuously and quickly obtain geological information under the roadbed. Characteristic parameters that can reflect the contamination process of the roadbed can be extracted from the power spectrum curve.

[0088] Step 160, obtaining a contamination index association table for reflecting the correspondence between the contamination index parameters of the ballast bed and the contamination rate of the ballast bed.

[0089] The dirt index rate correlation table is used to reflect the correlation between the dirt index parameters and the dirt rate of the roadbed. The correlation is a functional relationship expression established through regression or cluster analysis. The correlation between the dirt index parameters and the dirt rate of the roadbed varies for different line conditions, such as passenger lines, freight lines, or bridges and tunnels. It may be a linear function relationship, an exponential function relationship, etc. According to the correlation between the dirt index parameters and the dirt rate of the roadbed, the dirt rate of the roadbed of the entire line can be converted and determined.

[0090] In one embodiment, the functional relationship expression between the contamination index parameter and the contamination rate of the ballast bed is obtained through radar detection and corresponding line excavation test.

[0091] In one embodiment, the functional relationship expression between the dirt index parameter and the dirt rate of the roadbed is obtained through a calibration line test. The construction of the calibration line is to establish a test field according to the segmented laying of ballast with different dirt flows, and the vehicle-mounted radar is used to detect and analyze the data on the test field to establish a correlation between the dirt index parameter analyzed by the radar and the dirt rate.

[0092] Step 170: Determine the ballast bed contamination rate corresponding to the ballast bed contamination index parameter of the entire line based on the contamination index rate association table.

[0093] In this embodiment, the conversion relationship between the contamination index parameter and the contamination rate of the ballast bed is determined based on the contamination index rate association table, and the contamination rate of the ballast bed of the entire line can be determined by conversion.

[0094] In the above embodiment, by taking the average channel data of the multi-channel radar wave signal in the unit mileage interval as the radar wave representative signal of the unit mileage interval, on the one hand, the interference of the diffraction wave of the sleeper can be avoided, and the reliability of the subsequent analysis and calculation results can be ensured; on the other hand, a small amount of radar data used for solving is retrieved in real time according to the physical address of the data, and the dirtiness of the roadbed of the entire line is evaluated in real time, providing a decision-making basis for the roadbed cleaning plan, so that in the entire calculation and analysis process, there is no need to open and read a large amount of data files at one time, and only a very small amount of radar data is used in the calculation process, which can be completed in the on-site detection process of the vehicle-mounted ground penetrating radar, thereby making it possible to calculate and analyze the roadbed dirtiness rate on a microcomputer, and the algorithm is simple and efficient.

[0095] Embodiment 2

[0096] On the basis of the above embodiment, the step of determining the radar data corresponding to the unit mileage interval in the mapping table according to the unit mileage interval includes:

[0097] According to the unit mileage interval, determining the starting track number and the ending track number of the radar data corresponding to the unit mileage interval in the mapping table;

[0098] Calculate the data length of the radar data corresponding to the unit mileage interval and the physical offset corresponding to the starting road number according to the starting road number, the ending road number and the structural parameters of the radar data;

[0099] Radar data corresponding to the unit mileage interval is determined based on the data length and the physical offset.

[0100] In one embodiment, based on a mapping table used to reflect the correspondence between radar data and train mileage, the starting track number and the ending track number of the radar data associated with each unit mileage interval are determined by interpolation calculation. The interpolation calculation method refers to assuming that the train runs at a constant speed between two verification mileages, and the radar track number increments uniformly at the verification mileage. Define a unit mileage interval numbered n where the starting point [(n-1)×d] of the mileage corresponds to mileages M1 and M2 in the mapping table, and the corresponding radar track numbers on the mapping table are N1 and N2 respectively; the end point [n×d] ​​corresponds to mileages M3 and M4 in the mapping table, and the corresponding radar track numbers on the mapping table are N3 and N4 respectively; then the radar starting track number S corresponding to the unit mileage interval 起 and the end track number S 终 They are:

[0101] S 起 =N1+[(n-1)×d-M1]×(N2-N1) / (M2-M1), the calculated value is an integer;

[0102] S 止=N3+[n×d-M3]×(N4-N3) / (M4-M3), the calculated value is an integer.

[0103] In one embodiment, the interpolation calculation method further includes obtaining the acceleration of the train between the verification mileages, introducing the acceleration parameter to calculate the radar starting track number S corresponding to the unit mileage interval. 起 and the end track number S 终 Perform calculations.

[0104] In this embodiment, the data length of the radar data corresponding to the unit mileage interval and the physical offset corresponding to the starting road number are calculated according to the starting road number, the ending road number and the structural parameters of the radar data.

[0105] Among them, the data length of the radar data corresponding to each unit mileage interval refers to the size of the data volume of the radar data contained in the unit mileage interval, which is usually measured in bytes. The size of the data length depends on the content, format and encoding method of the file. The physical offset corresponding to the starting track number of the radar data of each unit mileage interval refers to the position offset of the starting track number relative to the starting position of the file or a certain reference point. This offset is expressed in bytes. The physical deviation corresponding to the starting track number is used to locate the starting position of the radar data corresponding to the unit mileage interval in the data file. In one embodiment, the structural parameters of the radar data include the file header and the track header and the data length corresponding to each track number.

[0106] In this embodiment, the radar data corresponding to the unit mileage interval is determined based on the data length and the physical offset, so that the radar data corresponding to the unit mileage interval in the radar data can be quickly located, so that there is no need to traverse the entire data file, and the radar data in the interval can be quickly read and calculated.

[0107] In one embodiment, a radar signal is transmitted and received to obtain a data channel, and the radar channel data length refers to a time-varying radar signal sampled at equal time intervals, recording and storing 512 data points or 1024 data points, and each data point is stored in 2-4 bytes.

[0108] In this embodiment, based on the mapping table of the correspondence between radar data track numbers and train mileage, the data length of the radar data corresponding to each unit mileage and the physical offset corresponding to the starting track number of the radar data are determined, thereby overcoming the influence of uneven train speed on the precise mileage position determination, correcting the actual mileage position recorded by the radar, and making the calculated mileage position of dirty track bed more accurate.

[0109] Embodiment 3

[0110] Based on the above embodiment, the calculation formula of the physical offset corresponding to the starting track number is:

[0111] P=F+(T+L)×(S 起 -1);

[0112] Among them, P is the physical offset; F is the number of bytes occupied by the file header; T is the number of bytes occupied by the track header; L is the number of bytes occupied by the track data length; S 起 The starting track number.

[0113] In this embodiment, the physical offset of each unit mileage interval associated radar data is calculated based on the structural parameters of the unit mileage interval associated radar data, the starting track number and the ending track number. Specifically, physical offset = file header + (track header + track data length) * (S 起 -1); correspondingly, the number of bytes occupied by the physical offset in the data file is: P = F + (T + L) × (S 起 -1); where P is the physical offset; F is the number of bytes occupied by the file header; T is the number of bytes occupied by the track header; L is the number of bytes occupied by the track data length; S 起 The starting track number.

[0114] Furthermore, the number of bytes occupied by the track data length L is the product of the track data length and the number of bytes occupied by the single track data.

[0115] The radar channel data length refers to a time-varying radar signal sampled at equal time intervals, which records and stores 512 data points or 1024 data points, with each data point stored in 2-4 bytes.

[0116] Embodiment 4

[0117] Based on the above embodiment, the calculation formula of the data length is:

[0118] D=(T+L)×(S 止 -S 起 +1)

[0119] Where D is the data length, T is the number of bytes occupied by the header, L is the number of bytes occupied by the data length, S 起 is the starting track number; S 止 The starting track number.

[0120] In this embodiment, based on the structural parameters of the unit mileage interval associated radar data, the starting track number and the ending track number, the data length of each unit mileage interval associated radar data is calculated. Wherein, data length = (track header + track data length) * (ending track number - starting track number + 1); that is, correspondingly, the number of bytes occupied by the data length in the data file is: D = (T + L) × (S 止 -S 起+1); where D is the data length, T is the number of bytes occupied by the header; L is the number of bytes occupied by the data length; S 起 is the starting track number; S 止 The starting track number.

[0121] Furthermore, the number of bytes occupied by the track data length L is the product of the track data length and the number of bytes occupied by the single track data.

[0122] The radar channel data length refers to a time-varying radar signal sampled at equal time intervals, which records and stores 512 data points or 1024 data points, with each data point stored in 2-4 bytes.

[0123] Embodiment 5

[0124] Based on the above embodiment, the power spectrum characteristics include the amplitude of the characteristic frequency and the size of the envelope area of ​​each characteristic frequency.

[0125] In this embodiment, the power spectrum is calculated by the average track data of the radar data associated with each unit mileage interval, and the power spectrum characteristics are obtained on the power spectrum. The power spectrum characteristics include the amplitude of the characteristic frequency and the size of the envelope area of ​​each characteristic frequency. The dirtiness index parameters of each unit mileage interval are determined based on the amplitude of the characteristic frequency and the size of the envelope area of ​​each characteristic frequency. Then, the dirtiness index parameters of each unit mileage interval are read and calculated one by one in sequence to obtain the dirtiness index parameters of the roadbed of the entire line covered by the original radar data.

[0126] Embodiment 6

[0127] On the basis of the above embodiment, before the step of obtaining the contamination index association table reflecting the corresponding relationship between the contamination index parameter of the ballast bed and the contamination rate of the ballast bed, the step further includes:

[0128] Get the calibration line of the whole line;

[0129] The calibration line is tested, and the corresponding relationship between the dirt index parameter and the dirt rate is obtained by statistics to obtain the dirt index association table.

[0130] In this embodiment, the mapping table used to reflect the corresponding relationship between radar data and train mileage includes the functional relationship expression between the dirtiness index parameter and the dirtiness rate of the roadbed. The functional relationship expression between the dirtiness index parameter and the dirtiness rate of the roadbed is obtained through the calibration line test. The calibration line is a section of railway line that artificially physically simulates the dirtiness of the roadbed. On this section of railway line, the construction is carried out according to the dirtiness rate level subsections. The roadbed dirtiness index parameter is obtained after detection by ground penetrating radar, and the corresponding relationship between the roadbed dirtiness index parameter calculated by radar and the dirtiness rate set in actual construction is established.

[0131] Embodiment 7

[0132] Based on the above embodiment, the calculation formula of the average channel data is:

[0133]

[0134] Wherein, j is the time acquisition serial number of a radar record; i is the serial number of the radar record associated with each mileage unit interval; D j is the average data; S 止 S is the end track number; 起 The starting track number.

[0135] In this embodiment, after the radar data corresponding to the unit mileage interval is calculated, the radar data of the unit mileage interval is read into the microcomputer memory in sequence, and the horizontal superposition calculation (1+S 止 -S 起 ) channel radar data to obtain the average channel data.

[0136] It should be understood that although Figure 1 The steps in the flowchart are shown in sequence as indicated by the arrows, but these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders. Moreover, Figure 1 At least part of the steps may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily executed at the same time, but can be executed at different times. The execution order of these sub-steps or stages is not necessarily sequential, but can be executed in turn or alternately with other steps or at least part of the sub-steps or stages of other steps.

[0137] Embodiment 8

[0138] Based on the above embodiments, this embodiment provides an application example.

[0139] In this embodiment, refer to Figures 2 to 6 As shown, a method for calculating the roadbed contamination rate is provided.

[0140] like Figures 2 to 3 As shown, the method includes:

[0141] Step 161, given the minimum mileage unit d for railway track ballast contamination analysis, the entire line is divided into equally spaced sections according to the minimum mileage unit, and the sections are numbered in ascending order starting from 1.

[0142] In one embodiment, the line to be detected is 60 Km long. The minimum mileage unit d for analyzing the dirtiness of the track bed is defined as 5 m. Then, the entire line is equally spaced and segmented at intervals of 5 m, creating 12,000 unit segments of mileage. These segments are numbered sequentially from 1 to 12,000, and each number corresponds to the position of its own unit mileage segment.

[0143] When the vehicle-mounted ground penetrating radar conducts the detection of the dirtiness of the track bed, the detection vehicle starts slowly and begins radar monitoring. The line is 60 Km long. When the detection is nearly complete, it decelerates and stops, and the file recording is completed. Each radar record contains 1,024 data, each data having a length of 4 bytes, resulting in a total of 60 GB of data.

[0144] In one embodiment, the obtained mapping table of radar trace numbers and mileage is as Figure 4 shown.

[0145] Step 162: Compare the original radar data with the train mileage verification mapping table. Through interpolation and segmentation, determine the starting and ending radar trace numbers S 起 and S 止 .

[0146] In this embodiment, the mapping table used to reflect the correspondence between radar data and train mileage is a tool for associating and verifying the trace numbers of radar data detected by the radar with the mileage position of the train itself. Since the vehicle-mounted ground penetrating radar does not travel at a constant speed, every time it travels a certain distance (not necessarily an equal distance), a relationship mapping table between the instantaneous mileage and the corresponding radar record trace number is established synchronously. The mapping table is stored separately in real-time in the form of a file. After the detection of the entire section is completed, a mapping table of the trace number of a certain radar data and the corresponding train mileage value is formed for use in later verifying the radar trace number.

[0147] In one embodiment, interpolation calculation means that assuming the train travels at a constant speed between two calibration mileage numbers, the increment of the radar trace number is also uniform within this calibration mileage range. The starting mileage [(n - 1)×d] of a certain unit mileage number n is between the mapping table mileages M1 and M2, and N1 and N2 are the corresponding radar trace numbers on the mapping table respectively; the ending mileage [n×d] is between the mapping table mileages M3 and M4, and N3 and N4 are the corresponding radar trace numbers on the mapping table respectively. Then the starting and ending radar trace numbers corresponding to this mileage number are:

[0148] S_start = N1 + [(n - 1)×d - M1]×(N2 - N1) / (M2 - M1), and the calculated value is taken as an integer;

[0149] S_end = N3 + [n×d - M3]×(N4 - N3) / (M4 - M3), and the calculated value is taken as an integer.

[0150] In one embodiment, when the acceleration between two calibration mileages is known, an acceleration parameter is introduced to more accurately calculate the values ​​of Sstart and Sstop.

[0151] In this embodiment, the mapping table of radar track number and mileage is opened, the start and end track numbers of the radar data in the unit mileage interval are found, and the start track number and track number of each unit segment of the radar data contained in the interval are calculated by interpolation. For example, the mileage corresponding to the serial number 1205 is 6025m~6030m, and the corresponding radar track number is 968912~969401.

[0152] Step 163, according to the radar data structure parameters, refer to Figure 5 As shown in the figure, the physical offset and data length of the associated radar data corresponding to the mileage segment to be analyzed in the original radar data are calculated, and the original radar data of the range is read to the server in turn, and the horizontal superposition calculation (1+S 止 -S 起 ) track radar data is averaged, and the power spectrum characteristics of the average track data are used to extract the track bed contamination index parameters.

[0153] In this embodiment, the calculation formula of the physical offset is: physical offset = number of bytes occupied by file header + (number of bytes occupied by track header + track data length × number of bytes occupied by single track data) × (S 起 -1);

[0154] The formula for calculating the data length is: Data length = (number of bytes occupied by the header + number of bytes occupied by the single-channel data) × (S 止 -S 起 +1).

[0155] In one embodiment, by horizontal superposition calculation (1+S 止 -S 起 ) channel radar data average channel data; the calculation formula of average channel data is:

[0156]

[0157] Wherein, j is the time acquisition serial number of a record, 1 to 512 or 1 to 1024; i is the radar record channel serial number within the segment unit mileage.

[0158] In this embodiment, the roadbed contamination index parameter can be calculated by using the radar signal power spectrum characteristics, and the roadbed contamination index parameter is converted into the roadbed contamination rate by using the conversion relationship obtained by the test on the calibration line. The calibration line is a section of railway line that artificially physically simulates the roadbed contamination. On this section of railway line, the construction is carried out according to the contamination rate level subsections, and the roadbed contamination index parameter is obtained after detection by ground penetrating radar, and the corresponding relationship between the roadbed contamination index parameter calculated by radar and the contamination rate set in the actual construction is established.

[0159] In one embodiment, the power spectrum characteristics of the average track data extract the roadbed contamination index parameters including the amplitude of the characteristic frequency on the power spectrum and the size of the envelope area on a frequency range on the power spectrum. The roadbed contamination index is reflected by the above two characteristics.

[0160] In one embodiment, rail interference and direct wave interference of the transmitting and receiving radar antenna are removed by first wave cutting; see Figure 6 As shown, the excision method is to fill the radar wave signal within 1, 1.5 or 2 full cycles of the first wave to zero; the radar record after filling to zero is used to calculate the power spectrum, and the roadbed contamination index is extracted through the power spectrum characteristics. The power spectrum characteristics include: the amplitude of the characteristic frequency on the power spectrum, and the size of the envelope area on a frequency section on the power spectrum.

[0161] In this embodiment, the unit mileage interval of sequence number 1205 is used as an example to explain, the original radar data file is opened, and the physical offset corresponding to the starting track number of the radar data associated with the unit mileage interval is calculated according to the file data structure parameters, and the radar data to be calculated is extracted into the computer memory through the offset and the radar track number. Figure 5 As shown in the figure, the file header length is 8192 bytes, and the header length of each radar recording track is 512 bytes. Then the data area of ​​mileage section 1205 is located at the physical offset of the data file: [8192+(512+1024*4)*968912] bytes, and the length of the read data is [(969401-968912+1)*4] bytes. The average track record is obtained by arithmetic averaging the data of (969401-968912+1); the power spectrum is calculated using the record, and the roadbed contamination index parameters are obtained from the power spectrum using an algorithm.

[0162] Step 164, sequentially read and calculate the pollution index parameters of different unit mileage sections from the original radar data, obtain the pollution index parameters of the entire line covered by the original radar data, and use the correlation between the pollution index parameters and the roadbed pollution rate to convert them into the roadbed pollution rate of the entire line.

[0163] In this embodiment, the correlation between the dirtiness index parameter and the dirtiness rate of the roadbed is a functional relationship expression established through regression or cluster analysis, which is obtained through radar detection and corresponding line excavation tests, and can also be obtained through calibration online tests; different line conditions, such as passenger lines, freight lines, or bridges, tunnels, and line conditions, have different correlations.

[0164] In one embodiment, the correlation between the dirtiness index parameter and the dirtiness rate of the roadbed is obtained through a calibration line test. The construction of the calibration line is to establish a test field according to the segmented laying of ballast with different dirtiness rates, and the vehicle-mounted radar is used to detect the test field and analyze the data to establish the correlation between the dirtiness rate index parameter analyzed by the radar and the dirtiness rate.

[0165] In one embodiment, through excavation experiments, the conversion relationship between the radar-calculated pollution index parameters and the roadbed pollution rate is obtained, such as a linear function relationship, an exponential function relationship, etc. According to the conversion relationship, the pollution index parameters are converted into pollution rates one by one.

[0166] In one embodiment, the dirtiness index calculation can be performed during the vehicle-mounted ground penetrating radar signal collection process, slightly later than the radar transmission-collection time, so that the radar signal dirtiness index analysis and calculation can be completed nearly synchronously.

[0167] The specific technical effects of this embodiment are as follows: First, a small amount of radar data for solution can be retrieved in real time by segmenting according to the physical address of the data, which can be completed on a portable computer, making it possible to monitor and evaluate the dirty state of the ballast track in real time, solving the problem of on-site dirty state evaluation of ballasted track; second, the average value of multi-channel radar signal levels over a section of mileage is used instead of single-channel radar calculation and analysis, which suppresses the interference signal of the sleepers and ensures the accuracy of the calculation results; third, the processing method of cutting off the radar direct coupled wave (air coupling and rail reflection) is adopted to suppress the influence of strong interference factors to a large extent, and improve the resolution of the calculation results for the dirty state of the ballast bed; fourth, according to the mapping table of train mileage and radar track number, the influence of uneven train speed on the determination of accurate mileage position is overcome, the actual mileage position recorded by the radar is corrected, and the solved mileage position of the ballast bed dirt is more accurate.

[0168] Embodiment 9

[0169] Based on the above embodiments, this embodiment provides a computer device, referring to Figure 7 As shown, it includes a memory, a processor and a computer program stored in the memory, and the processor executes the computer program to implement the following steps:

[0170] Obtaining a mapping table for reflecting the corresponding relationship between radar data and train mileage, and obtaining a plurality of unit mileage intervals obtained by equally dividing the train mileage according to a preset mileage;

[0171] According to the unit mileage interval, determining the radar data corresponding to the unit mileage interval in the mapping table;

[0172] Calculate the average value of the radar data corresponding to each unit mileage interval to obtain a plurality of average track data;

[0173] Obtaining power spectrum features corresponding to each of the average channel data;

[0174] Determining the ballast contamination index parameters of the entire line based on the power spectrum characteristics;

[0175] Obtaining a dirtiness index association table for reflecting the corresponding relationship between the dirtiness index parameter of the roadbed and the dirtiness rate of the roadbed;

[0176] The ballast bed contamination rate corresponding to the ballast bed contamination index parameter of the entire line is determined based on the contamination index rate association table.

[0177] In one embodiment, the processor executes the computer program to further implement the following steps:

[0178] According to the unit mileage interval, determining the starting track number and the ending track number of the radar data corresponding to the unit mileage interval in the mapping table;

[0179] Calculate the data length of the radar data corresponding to the unit mileage interval and the physical offset corresponding to the starting road number according to the starting road number, the ending road number and the structural parameters of the radar data;

[0180] Radar data corresponding to the unit mileage interval is determined based on the data length and the physical offset.

[0181] In one embodiment, the processor executes the computer program to further implement the following steps:

[0182] Get the calibration line of the whole line;

[0183] The calibration line is tested, and the corresponding relationship between the dirt index parameter and the dirt rate is obtained by statistics to obtain the dirt index association table.

[0184] The computer device includes a processor, a memory, a network interface, a display screen and an input device connected through a system bus. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program, and the non-volatile storage medium is deployed with a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with other computer devices that have deployed application software. When the computer program is executed by the processor, a method for calculating the dirtiness rate of the roadbed is implemented. The display screen of the computer device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covered on the display screen, or a key, trackball or touchpad set on the computer device housing, or an external keyboard, touchpad or mouse, etc.

[0185] Those skilled in the art will understand that Figure 7The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0186] In some implementations of this embodiment, a computer-readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:

[0187] Obtaining a mapping table for reflecting the corresponding relationship between radar data and train mileage, and obtaining a plurality of unit mileage intervals obtained by equally dividing the train mileage according to a preset mileage;

[0188] According to the unit mileage interval, determining the radar data corresponding to the unit mileage interval in the mapping table;

[0189] Calculate the average value of the radar data corresponding to each unit mileage interval to obtain a plurality of average track data;

[0190] Obtaining power spectrum features corresponding to each of the average channel data;

[0191] Determining the ballast contamination index parameters of the entire line based on the power spectrum characteristics;

[0192] Obtaining a dirtiness index association table for reflecting the corresponding relationship between the dirtiness index parameter of the roadbed and the dirtiness rate of the roadbed;

[0193] The ballast bed contamination rate corresponding to the ballast bed contamination index parameter of the entire line is determined based on the contamination index rate association table.

[0194] In one embodiment, the computer program, when executed by a processor, implements the following steps:

[0195] According to the unit mileage interval, determining the starting track number and the ending track number of the radar data corresponding to the unit mileage interval in the mapping table;

[0196] Calculate the data length of the radar data corresponding to the unit mileage interval and the physical offset corresponding to the starting road number according to the starting road number, the ending road number and the structural parameters of the radar data;

[0197] The radar data corresponding to the unit mileage interval is determined based on the data length and the physical offset to obtain the dirt index association table.

[0198] In one embodiment, the computer program, when executed by a processor, implements the following steps:

[0199] Get the calibration line of the whole line;

[0200] The calibration line is tested to obtain the corresponding relationship between the dirt index parameter and the dirt rate by statistics.

[0201] In some implementations of this embodiment, a computer program product is provided, including a computer program / instruction, and when the computer program is executed by a processor, the following steps are implemented:

[0202] Obtaining a mapping table for reflecting the corresponding relationship between radar data and train mileage, and obtaining a plurality of unit mileage intervals obtained by equally dividing the train mileage according to a preset mileage;

[0203] According to the unit mileage interval, determining the radar data corresponding to the unit mileage interval in the mapping table;

[0204] Calculate the average value of the radar data corresponding to each unit mileage interval to obtain a plurality of average track data;

[0205] Obtaining power spectrum features corresponding to each of the average channel data;

[0206] Determining the ballast contamination index parameters of the entire line based on the power spectrum characteristics;

[0207] Obtaining a dirtiness index association table for reflecting the corresponding relationship between the dirtiness index parameter of the roadbed and the dirtiness rate of the roadbed;

[0208] The ballast bed contamination rate corresponding to the ballast bed contamination index parameter of the entire line is determined based on the contamination index rate association table.

[0209] In one embodiment, the computer program, when executed by a processor, implements the following steps:

[0210] According to the unit mileage interval, determining the starting track number and the ending track number of the radar data corresponding to the unit mileage interval in the mapping table;

[0211] Calculate the data length of the radar data corresponding to the unit mileage interval and the physical offset corresponding to the starting road number according to the starting road number, the ending road number and the structural parameters of the radar data;

[0212] Radar data corresponding to the unit mileage interval is determined based on the data length and the physical offset.

[0213] In one embodiment, the computer program, when executed by a processor, implements the following steps:

[0214] Get the calibration line of the whole line;

[0215] The calibration line is tested, and the corresponding relationship between the dirt index parameter and the dirt rate is obtained by statistics to obtain the dirt index association table.

[0216] The processor may include, but is not limited to, one or more processors or microprocessors. Each processor may be an application specific integrated circuit (ASIC), a digital signal processor (DSP), a digital signal processing device (DSPD), a programmable logic device (PLD), a field programmable gate array (FPGA), a controller, a microcontroller, a microprocessor or other electronic components to execute the method in the above embodiments.

[0217] The computer-readable storage medium may be implemented by any type of volatile or non-volatile storage device or a combination thereof, and the computer-readable storage medium may include but is not limited to, for example, random access memory (RAM), read-only memory (ROM), flash memory, EPROM memory, EEPROM memory, registers, computer storage media (e.g., hard disk, floppy disk, solid-state drive, removable disk, CD-ROM, DVD-ROM, Blu-ray disc, etc.).

[0218] The computer-readable storage medium may also store at least one computer executable program / instruction, which may be, for example, a computer-readable instruction. The computer-readable storage medium includes, but is not limited to, for example, a volatile memory and / or a non-volatile memory. The volatile memory may include, for example, a random access memory (RAM) and / or a cache memory (cache), etc. The computer-readable storage medium may include, for example, a read-only memory (ROM), a hard disk, a flash memory, etc. For example, a non-transitory computer-readable storage medium may be connected to a computing device such as a computer, and then, when the computing device runs the computer-readable instructions stored on the computer-readable storage medium, the various methods described above may be performed.

[0219] In addition, the computer device may also include (but not limited to) a data bus, an input / output (I / O) bus, a display, and input / output devices (eg, keyboard, mouse, speaker, etc.), etc.

[0220] The processor may communicate with external devices via an I / O bus via a wired or wireless network.

[0221] In one embodiment, the at least one computer executable instruction may also be compiled into or constitute a software product / computer program product, wherein one or more computer executable instructions are executed by a processor to perform the various functions and / or method steps in the embodiments described in the present technology.

[0222] In the embodiments provided in the present disclosure, it should be understood that the disclosed devices and methods can also be implemented in other ways. The device embodiments described above are merely schematic. For example, the flowcharts and block diagrams in the accompanying drawings show the possible architecture, functions and operations of the devices, methods and computer program products according to multiple embodiments of the present disclosure. In this regard, each box in the flowchart or block diagram can represent a module, a program segment or a part of a code, and the above-mentioned module, program segment or a part of the code contains one or more executable instructions for implementing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram and / or flowchart, and the combination of boxes in the block diagram and / or flowchart can be implemented with a dedicated hardware-based system that performs a specified function or action, or can be implemented with a combination of dedicated hardware and computer instructions.

[0223] It should be noted that in the present disclosure, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element limited by the sentence "includes a ..." does not exclude the existence of other identical elements in the process, method, article or device including the element.

[0224] Although the embodiments disclosed in the present disclosure are as above, the above contents are only embodiments adopted for facilitating the understanding of the present disclosure and are not intended to limit the present disclosure. Any technician in the technical field to which the present disclosure belongs can make any modifications and changes in the form and details of the implementation without departing from the spirit and scope disclosed in the present disclosure, but the scope of patent protection of the present disclosure shall still be subject to the scope defined in the attached claims.

Claims

1. A method for calculating the dirtiness rate of a roadbed, characterized in that: include: Obtaining a mapping table for reflecting the corresponding relationship between radar data and train mileage, and obtaining a plurality of unit mileage intervals obtained by equally dividing the train mileage according to a preset mileage; According to the unit mileage interval, determining the radar data corresponding to the unit mileage interval in the mapping table; Calculate the average value of the radar data corresponding to each unit mileage interval to obtain a plurality of average track data; Obtaining power spectrum features corresponding to each of the average channel data; Determining the ballast contamination index parameters of the entire line based on the power spectrum characteristics; Obtaining a dirtiness index association table for reflecting the corresponding relationship between the dirtiness index parameter of the roadbed and the dirtiness rate of the roadbed; The ballast bed contamination rate corresponding to the ballast bed contamination index parameter of the entire line is determined based on the contamination index rate association table.

2. The method for calculating the roadbed contamination rate according to claim 1, characterized in that: The step of determining the radar data corresponding to the unit mileage interval in the mapping table according to the unit mileage interval comprises: According to the unit mileage interval, determining the starting track number and the ending track number of the radar data corresponding to the unit mileage interval in the mapping table; Calculate the data length of the radar data corresponding to the unit mileage interval and the physical offset corresponding to the starting road number according to the starting road number, the ending road number and the structural parameters of the radar data; Radar data corresponding to the unit mileage interval is determined based on the data length and the physical offset.

3. The method for calculating the roadbed contamination rate according to claim 2, characterized in that: The calculation formula of the physical offset corresponding to the starting track number is: P=F+(T+L)×(S 起 -1); Among them, P is the physical offset; F is the number of bytes occupied by the file header; T is the number of bytes occupied by the track header; L is the number of bytes occupied by the track data length; S 起 The starting track number.

4. The method for calculating the roadbed contamination rate according to claim 2, characterized in that: The calculation formula of the data length is: D=(T+L)×(S 止 -S 起 +1) Where D is the data length, T is the number of bytes occupied by the header, L is the number of bytes occupied by the data length, S 起 is the starting track number; S 止 The starting track number.

5. The method for calculating the roadbed contamination rate according to claim 1, characterized in that: The power spectrum characteristics include the amplitude of the characteristic frequency and the size of the envelope area of ​​each characteristic frequency.

6. The method for calculating the roadbed contamination rate according to claim 1, characterized in that: Before the step of obtaining a pollution index association table reflecting the corresponding relationship between the roadbed pollution index parameter and the roadbed pollution rate, the step further includes: Get the calibration line of the whole line; The calibration line is tested, and the corresponding relationship between the dirt index parameter and the dirt rate is obtained by statistics to obtain the dirt index association table.

7. The method for calculating the roadbed contamination rate according to claim 1, characterized in that: The calculation formula of the average channel data is: Wherein, j is the time acquisition serial number of a radar record; i is the serial number of the radar record associated with each mileage unit interval; D j is the average data; S 止 S is the end track number; 起 The starting track number.

8. A computer device comprising a memory, a processor and a computer program stored in the memory, characterized in that: The processor executes the computer program to implement the steps of the method according to any one of claims 1 to 7.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.