Overwater structured automatic deployment method

By acquiring data from both above and below water to segment modular areas, and using an improved RRT algorithm and module status monitoring, the problems of low efficiency and poor stability in the deployment of above-water structures were solved, achieving efficient and intelligent automated deployment of above-water structures.

CN118940026APending Publication Date: 2024-11-12JIANGSU MARITIME INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410878823.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Existing methods for deploying structures on water are inefficient, easily affected by dynamic factors in the water environment, and lack effective module status monitoring mechanisms, resulting in unstable path planning and low overall deployment efficiency.

Method used

The system acquires hydrological and underwater geological data for any coherent area on the water, divides it into modular regional units, assembles them using an improved RRT algorithm, sets up module status monitoring, establishes an on-water deployment model, and adjusts the deployment area and robotic arm assembly in real time.

Benefits of technology

It improves the overall performance of automated deployment of water structures, reduces path planning time, and enhances the stability of path planning and the level of intelligence in deployment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118940026A_ABST
    Figure CN118940026A_ABST
Patent Text Reader

Abstract

The invention discloses an overwater structured automatic deployment method, which comprises the following steps: acquiring hydrological data and underwater geological data in any coherent area on the water as a first processing data set, and assembling modular area units by using a mechanical arm based on an improved RRT algorithm to form an overwater structure; module state monitoring is set, an overwater deployment model is established, a first processing data set and a second processing data set serve as an input set and a training set of the model respectively, and readjustment of the data sets is controlled through the module state monitoring, so that the automatic overwater deployment model is achieved. The running efficiency of the RRT algorithm is high, the path planning time is shortened, the application problem of the RRT algorithm in the water environment is solved, and the overall performance of automatic deployment of the water structure is remarkably improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of water deployment, and in particular to an automatic water structured deployment method. Background Art

[0002] The deployment of water structures has a wide range of applications in modern engineering, including bridge construction, offshore platforms, floating houses, and water agriculture. With the advancement of science and technology, automation and intelligent technologies have been increasingly used in the deployment of water structures. For example, drones and unmanned ships are used to survey waters, sensors are used to monitor hydrological data in real time, and robots are used to assemble structures. However, traditional methods for deploying water structures mainly rely on manual operations and static planning, which are inefficient and easily affected by environmental changes. In recent years, the application of the rapid random tree (RRT) algorithm in path planning and robot control has made automated water structure deployment possible. The RRT algorithm can quickly generate collision-free paths in complex environments and is suitable for scenarios of dynamic adjustment and real-time optimization. However, the existing RRT algorithm is mainly used for path planning in land environments, and there are still certain challenges in its application in water environments.

[0003] It can be understood that although the existing technology has made certain progress in the automated deployment of water structures, there are still many shortcomings. First, the existing hydrological and geological data collection methods are mostly carried out independently, and the integration and processing of data are complicated, and it is impossible to form a unified deployment plan. Secondly, when the traditional RRT algorithm is applied in the water environment, it is easily disturbed by dynamic factors such as water flow and waves, resulting in unstable path planning. In addition, the existing technology lacks an effective module status monitoring mechanism, and cannot adjust the deployment area and the structure assembly process in real time, resulting in low overall deployment efficiency. Summary of the invention

[0004] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.

[0005] In view of the above existing problems, the present invention is proposed. Therefore, the present invention provides an automatic deployment method of a water structure to solve the problems raised in the background technology.

[0006] In order to solve the above technical problems, the present invention provides the following technical solutions: a method for automatic deployment of a structure on water, comprising:

[0007] Acquire hydrological data and underwater geological data in any continuous area above water as a first processing data set, and simultaneously determine a deployment area;

[0008] The deployment area is divided into a plurality of modular area units, and the modular area units are assembled using a robotic arm based on an improved RRT algorithm to obtain an above-water structure under the modular area unit, and the above-water structure is used as a second processing data set;

[0009] Module status monitoring is set up and an on-water deployment model is established. The first processed data set and the second processed data set are used as the input set and training set of the model respectively. The module status monitoring is used to control the first processed data set and the second processed data set, and the deployment area and the assembly of the modular area unit by the robotic arm are readjusted to obtain an automated on-water deployment model.

[0010] As a preferred solution of the method for automatic deployment of structures on water of the present invention, the method comprises: obtaining hydrological data and underwater geological data in any continuous area on water as the first processing data set, and determining the deployment area at the same time, including:

[0011] The arbitrary continuous area is represented as a three-dimensional graph, in which the upper half is composed of hydrological data, the lower half is composed of underwater geological data, and the proportion of the hydrological data and the underwater geological data in the three-dimensional graph is defined by the water level in the hydrological data.

[0012] As a preferred solution of the method for automatic deployment of structures on water of the present invention, the deployment area is divided into a plurality of modular area units, including:

[0013] The deployment area is cut horizontally or vertically, and the three-dimensional coordinates of the three-dimensional figure are defined in each modular area unit cut.

[0014] As a preferred solution of the method for automatic deployment of water structures described in the present invention, the modular area units are assembled using a robotic arm based on an improved RRT algorithm to obtain the water structures under the modular area units, and the water structures are used as the second processing data set, including:

[0015] Define the starting node q of the robot st , reaching the target node q of the modular area unit ed , initialize the graph G so that the graph G contains all nodes q of the robot, set the maximum number of iterations K and the step size Δq;

[0016] Randomly sample a 3D coordinate Z from the modular area unit i ;

[0017] Find a distance and 3D coordinate Z in a graph G i The nearest node q i , along q i To another node q j The location is expanded by Δq steps to obtain a new node q1;

[0018] If the collision volume of q1 in the unit does not exceed the volume of the modular area unit, then add q1 to the graph G; otherwise, return to randomly sampling a three-dimensional coordinate Z i ;

[0019] Search for neighboring nodes of q1 to form a neighboring node set The neighboring nodes are nodes in the graph G whose distance from q1 is less than q ed Nodes;

[0020] Each time q1 is added to the graph G or returned to a randomly sampled three-dimensional coordinate Z i , execute once K=K+1.

[0021] As a preferred solution of the method for automatic deployment of a water structure according to the present invention, it further comprises:

[0022] If the neighboring node set contains q ed , then q ed Add to graph G and determine whether the current number of iterations is greater than the maximum number of iterations K; if so, the water structure formed by connecting the nodes is obtained; if not, continue to iterate.

[0023] As a preferred solution of the method for automatic deployment of structures on water of the present invention, wherein: module status monitoring is set and an on-water deployment model is established, and the first processed data set and the second processed data set are used as the input set and training set of the model respectively, including:

[0024] The establishment of the water deployment model is expressed as:

[0025]

[0026] Among them, ||q i -Z i || represents node q i and Z i The Euclidean distance between represents the size of the neighboring node set; q k For nodes that do not meet the distance between graph G and q1, the Heaviside function is used to filter; f(q k ,t) is represented by node q k The change position in the current time interval t; σ represents the distance weight between nodes, and T is the total time interval.

[0027] As a preferred solution of the method for automatic deployment of structures on water of the present invention, the module status monitoring is used to control the first processing data set and the second processing data set, and the deployment area and the assembly of the modular area unit by the robot arm are readjusted to obtain an automatic deployment model on water, including:

[0028] The module status monitoring monitors the first processing data set. If the hydrological data and geological data in the first processing data set change, the proportion of the three-dimensional graph is changed accordingly, and the coordinates of the three-dimensional graph are redefined. The coordinates of the redefined three-dimensional graph are sent to the second processing data set, and the corresponding q is modified. ed .

[0029] Compared with the prior art, the invention has the following beneficial effects: obtaining hydrological data and underwater geological data in any continuous area above water as the first processing data set, and determining the deployment area at the same time; segmenting the deployment area into a number of modular area units, assembling the modular area units using a robotic arm based on an improved RRT algorithm, obtaining the water structure under the modular area unit, and using the water structure as the second processing data set; setting module status monitoring and establishing a water deployment model, using the first processing data set and the second processing data set as the input set and training set of the model respectively, using module status monitoring to control the first processing data set and the second processing data set, re-adjusting the deployment area and the assembly of the modular area unit by the robotic arm, and obtaining an automated water deployment model; the operating efficiency of the RRT algorithm of the present invention reduces the path planning time, and also solves the application problem of the RRT algorithm in the water environment, and significantly improves the overall performance of the automated deployment of the water structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:

[0031] Figure 1 This is a general flow chart of a method for automatic deployment of an aquatic structure according to an embodiment of the present invention;

[0032] Figure 2 This is a flow chart of an improved RRT algorithm of a method for automatic deployment of structures on water according to an embodiment of the present invention;

[0033] Figure 3 This is a performance comparison diagram of various algorithms of the method for automatic deployment of structures on water according to an embodiment of the present invention;

[0034] Figure 4 A comparison chart of the number of collisions in the method for automatic deployment of a water structure according to an embodiment of the present invention;

[0035] Figure 5 This is a comparison chart of model accuracy of the method for automatic deployment of structures on water according to an embodiment of the present invention. DETAILED DESCRIPTION

[0036] In order to make the above-mentioned purposes, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the drawings of the specification. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary persons in the art without creative work should fall within the scope of protection of the present invention.

[0037] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.

[0038] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.

[0039] The present invention is described in detail with reference to schematic diagrams. When describing the embodiments of the present invention, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.

[0040] At the same time, in the description of the present invention, it should be noted that the directions or positional relationships indicated by the terms "upper, lower, inner and outer" are based on the directions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first, second or third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0041] In the present invention, unless otherwise clearly specified and limited, the terms "install, connect, connect" should be understood in a broad sense, for example: it can be a fixed connection, a detachable connection or an integral connection; it can also be a mechanical connection, an electrical connection or a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0042] Example 1

[0043] Reference Figure 1 and Figure 2 , which is the first embodiment of the present invention, and which provides a method for automatic deployment of a water structure, comprising:

[0044] S1. Acquire hydrological data and underwater geological data in any continuous area above water as a first processing data set, and determine a deployment area at the same time;

[0045] Specifically, obtaining hydrological data and underwater geological data in any continuous area on the water, using buoys on the water and sonar equipment carried in the buoys;

[0046] Specifically, hydrological data include water level, water flow, salinity, pollutant concentrations, and algae and microbial biomass;

[0047] Specifically, underwater geological data include water depth, topography, rocks, sediment contamination, and mineral composition;

[0048] Further, any continuous area above water is represented as a three-dimensional graph, in which the upper part is composed of hydrological data, the lower part is composed of underwater geological data, and the proportion of the hydrological data and the underwater geological data in the three-dimensional graph is defined by the water level in the hydrological data;

[0049] Specifically, the three-dimensional graph is defined as: D = (w, l); wherein w represents hydrological data, l represents underwater geological data; the three-dimensional graph is used to represent actual objects;

[0050] Specifically, considering different water levels, the water level and geological proportion of the objects in the actual deployment area need to be adjusted. For example, in deep water areas, the three-dimensional graphics can be adjusted to have a higher proportion of hydrological data and a lower proportion of underwater geological data; in shallow water areas, the three-dimensional graphics can be adjusted to have a lower proportion of hydrological data and a higher proportion of underwater geological data.

[0051] It should be noted that the efficiency of data processing and integration can be improved by combining hydrological data and underwater geological data for unified deployment;

[0052] S2, dividing the deployment area into a number of modular area units, assembling the modular area units using a robotic arm based on the improved RRT algorithm, obtaining the water structures under the modular area units, and using the water structures as the second processing data set;

[0053] Further, the deployment area is cut horizontally or vertically, and the three-dimensional coordinates of the three-dimensional graphics are defined in each modular area unit cut;

[0054] Specifically, the three-dimensional coordinates of the three-dimensional graphics are defined as:

[0055] D{Z1(dx,dy,dz),Z2(dx,dy,dz),…,Z i (dx,dy,dz)}

[0056] Wherein, dx represents the x-axis of the three-dimensional coordinate, dy represents the y-axis of the three-dimensional coordinate, and dz represents the z-axis of the three-dimensional coordinate;

[0057] It should be noted that the three-dimensional coordinates in all modular area units can be reconstructed into a complete three-dimensional figure;

[0058] Further, refer to Figure 2 , the improved RRT algorithm steps are as follows:

[0059] S201, define the starting node q of the robot arm st , reaching the target node q of the modular area unit ed , initialize the graph G so that it contains all nodes q of the robot, set the maximum number of iterations K and the step size Δq;

[0060] Specifically, all nodes q in the robot arm are represented as: q = {q1, q2, ..., q i};

[0061] S202, randomly sample a three-dimensional coordinate Z from the modular area unit i ;

[0062] S203. Find a distance and three-dimensional coordinate Z in graph G i The nearest node q i , along q i To another node q j The location is expanded by Δq steps to obtain a new node q1;

[0063] S204, if the collision volume of q1 in the unit does not exceed the volume of the modular area unit, then q1 is added to the graph G; otherwise, return to S202;

[0064] It should be noted that the collision volume of q1 within the unit refers to the conflict area between the space occupied by the new node q1 and the physical boundary of the modular area unit, including the physical size of the robot itself and the spatial envelope during the movement; not exceeding the modular area unit is to ensure that the new node q1 will not cause the path of the robot to enter the prohibited or restricted area when the unit is assembled;

[0065] S205: Search for neighboring nodes of q1 to form a neighboring node set Among them, the neighboring nodes are the nodes in graph G whose distance from q1 is less than q ed Nodes;

[0066] Specifically, the set of neighboring nodes It can provide multiple optional paths for the new node q1, instead of relying solely on the traditional single nearest node;

[0067] It should be noted that searching for a set of neighboring nodes in graph G The search range of the robot path is further limited, reducing the amount of calculation and search time. Compared with traversing the entire graph G, the search range of the robot path can significantly improve the operating efficiency of the RRT algorithm. In addition, since the collision volume of q1 in the unit does not exceed the volume of the modular area unit, there is no need to consider the path deviation problem.

[0068] Furthermore, each time q1 is added to the graph G or returned to randomly sample a three-dimensional coordinate Z i , execute once K=K+1;

[0069] S206, if the neighboring node set contains q ed , then q ed Add to the graph G, and determine whether the current iteration number is greater than the maximum iteration number K; if it is greater, then the water structure formed by connecting the nodes is obtained; if not, then continue to iterate S201 to S205;

[0070] It should be noted that by checking whether the neighboring node set contains q ed , the algorithm can be terminated early; for example, in a certain iteration, it is found that the neighboring node set contains q ed , indicating that the robot has found a feasible path and can immediately ed Add to graph G to save unnecessary computing time;

[0071] S3, setting module status monitoring and establishing a water deployment model, using the first processing data set and the second processing data set as the input set and training set of the model respectively, using the module status monitoring to control the first processing data set and the second processing data set, re-adjusting the deployment area and the assembly of the modular area unit by the robot arm, and obtaining an automated water deployment model;

[0072] Specifically, the water deployment model is established as follows:

[0073]

[0074] Among them, ||q i -Z i || represents node q i and Z i The Euclidean distance between represents the size of the neighboring node set; q k For nodes that do not meet the distance between graph G and q1, the Heaviside function is used to filter; f(q k ,t) is represented by node q k The change position in the current time interval t; σ represents the distance weight between nodes, and T is the total time interval;

[0075] Furthermore, the module status monitoring monitors the first processing data set. If the hydrological data and geological data in the first processing data set change, the proportion of the three-dimensional graph is changed accordingly, and the coordinates of the three-dimensional graph are redefined. The coordinates of the redefined three-dimensional graph are sent to the second processing data set, and the corresponding q is modified. ed ;

[0076] Specifically, when the hydrological data collected by the surface buoy and the underwater geological data sent back by the sonar device in the buoy change, the proportion of the corresponding three-dimensional graph is modified and the coordinates of the three-dimensional graph are redefined; according to the redefined coordinates, all nodes q in the robotic arm are updated and the original q is adjusted. ed ;

[0077] It should be noted that the use of module condition monitoring to control the readjustment of the data set not only realizes automated deployment, but also makes the model more accurate in the deployment of water structures during the input and training process.

[0078] Example 2

[0079] Reference Figures 3 to 5 , which is the second embodiment of the present invention, and which provides a method for automatic deployment of structures on water, including: establishing an application scenario and conducting experiments to verify and illustrate the beneficial effects of the solution of the present invention;

[0080] An area of ​​328 square kilometers was selected, with an average water depth of 3.4 meters and a maximum depth of about 5.1 meters; it was used as an on-water deployment test site, equipped with on-water buoys and sonar equipment and robotic arms in the buoys; the on-water buoys and sonar equipment in the buoys were used to collect hydrological data and underwater geological data, and the robotic arms were used to perform the assembly of modular regional units; the deployment test site was divided into several modular regional units; 71.4% of the hydrological data (such as water level, water flow, salinity, pollutant concentration, algae and microbial biomass) and 28.6% of the underwater geological data (such as water depth, topography, rock, sediment pollution, mineral composition) were collected; the modular regional units were assembled using robotic arms based on the improved RRT algorithm; the results were sent to the on-water deployment model, module status monitoring was set, and the monitoring results were sent back to the model for adjustment; the results are shown in Table 1; the simulation experiment is shown in Figure 3 As shown;

[0081] Table 1

[0082] Experimental methods Path length (m) Planning time(s) Number of nodes Number of collisions (times) Improved BI-RRT 558.12 1.387 20 2 Improving A* 461.09 3.376 35 4 CDB-RRT 603.43 4.213 15 11 Dijkstra 512.76 2.641 5 7 The present invention 463.86 0.942 10 0

[0083] First, from Table 1, we can see that among the path lengths, only the path length of the improved A* is shorter than that of the present invention, which means that the improved A* is more economical in planning paths than the present invention, but the corresponding planning time and collision times are higher than those of the present invention, and the number of nodes involved is 3.5 times that of our invention; while the planning time of our invention reaches 0 collision times when the number of nodes is small; and combined with Figure 4 It can be seen that in the subsequent collision times, the collision times of the present invention are always between 0 and 2, indicating that the improved RRT algorithm of the present invention can greatly reduce the path deviation problem, thereby improving the operation efficiency of the RRT algorithm and reducing the path planning time;

[0084] Secondly, by Figure 5 It can be seen that the present invention adjusts the proportion of three-dimensional graphics according to the changed hydrological data and underwater geological data through module status monitoring, redefines the three-dimensional coordinates and adjusts the nodes in the RRT algorithm, so that the model of the present invention has a higher accuracy rate than the model without module status monitoring;

[0085] In summary, the present invention not only significantly improves the overall performance of automated deployment of water structures, but also realizes truly efficient, reliable and intelligent deployment of water structures.

[0086] Those skilled in the art will appreciate that the embodiments of the present invention can be provided as methods, systems, or computer program products. Therefore, the application can adopt the form of complete hardware embodiments, complete software embodiments, or embodiments in combination with software and hardware. Moreover, the application can adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program codes. The scheme in the embodiments of the present application can be implemented in various computer languages, for example, object-oriented programming language Java and literal scripting language JavaScript, etc.

[0087] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0088] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0089] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0090] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.

[0091] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.

Claims

1. A method for automatic deployment of structures on water, characterized in that: include: Acquire hydrological data and underwater geological data in any continuous area above water as a first processing data set, and simultaneously determine a deployment area; The deployment area is divided into a plurality of modular area units, and the modular area units are assembled using a robotic arm based on an improved RRT algorithm to obtain an above-water structure under the modular area unit, and the above-water structure is used as a second processing data set; Module status monitoring is set up and an on-water deployment model is established. The first processed data set and the second processed data set are used as the input set and training set of the model respectively. The module status monitoring is used to control the first processed data set and the second processed data set, and the deployment area and the assembly of the modular area unit by the robotic arm are readjusted to obtain an automated on-water deployment model.

2. The method for automatic deployment of a water structure according to claim 1, characterized in that: Obtain hydrological data and underwater geological data in any continuous area above water as the first processing data set, and determine the deployment area, including: The arbitrary continuous area is represented as a three-dimensional graph, in which the upper half is composed of hydrological data, the lower half is composed of underwater geological data, and the proportion of the hydrological data and the underwater geological data in the three-dimensional graph is defined by the water level in the hydrological data.

3. The method for automatic deployment of a water structure according to claim 2, characterized in that: The deployment area is divided into a plurality of modular area units, including: The deployment area is cut horizontally or vertically, and the three-dimensional coordinates of the three-dimensional figure are defined in each modular area unit cut.

4. The method for automatic deployment of a water structure according to claim 2 or 3, characterized in that: Based on the improved RRT algorithm, the modular area units are assembled using a mechanical arm to obtain the water structure under the modular area unit, and the water structure is used as the second processing data set, including: Define the starting node q of the robot st , reaching the target node q of the modular area unit ed , initialize the graph G so that the graph G contains all nodes q of the robot, set the maximum number of iterations K and the step size Δq; Randomly sample a 3D coordinate Z from the modular area unit i ; Find a distance and 3D coordinate Z in a graph G i The nearest node q i , along q i To another node q j The location is expanded by Δq steps to obtain a new node q l ; If q l If the collision volume in the unit does not exceed the volume of the modular area unit, q l Add to graph G; otherwise, return to randomly sampling a 3D coordinate Z i ; Search q l The neighboring nodes constitute the neighboring node set The neighboring nodes are nodes in the graph G that are related to q l The distance is less than q ed Nodes; Among them, each q l Add to graph G or return to randomly sample a 3D coordinate Z i , execute once K=K+1.

5. The method for automatic deployment of a water structure according to claim 4, characterized in that: Also includes: If the neighboring node set contains q ed , then q ed Add to graph G and determine whether the current number of iterations is greater than the maximum number of iterations K; if so, the water structure formed by connecting the nodes is obtained; if not, continue to iterate.

6. The method for automatic deployment of a water structure according to claim 5, characterized in that: Setting module status monitoring and establishing an on-water deployment model, using the first processed data set and the second processed data set as an input set and a training set of the model respectively, including: The establishment of the water deployment model is expressed as: Among them, ||q i ―Z i || represents node q i and Z i The Euclidean distance between represents the size of the neighboring node set; q k does not conform to the graph G and q l The nodes with the closest distance are filtered using the Heaviside function; f(q k ,t) is represented by node q k The change position in the current time interval t; σ represents the distance weight between nodes, and T is the total time interval.

7. The method for automatic deployment of a water structure according to claim 6, characterized in that: The module status monitoring controls the first processing data set and the second processing data set, readjusts the deployment area and the assembly of the modular area unit by the robot arm, and obtains an automated water deployment model, including: The module status monitoring monitors the first processing data set. If the hydrological data and geological data in the first processing data set change, the proportion of the three-dimensional graph is changed accordingly, and the coordinates of the three-dimensional graph are redefined. The coordinates of the redefined three-dimensional graph are sent to the second processing data set, and the corresponding q is modified. ed .