Judgment method suitable for hydraulic tunnel Norway criterion, terminal equipment and storage medium

Through the automatic calculation method of the three-dimensional model, the problem of unclear calculation of rock mass slope and incomplete manual verification in the judgment of hydro-working tunnels was solved, and more efficient and more accurate Norwegian criterion judgment results were achieved.

CN118940377AActive Publication Date: 2024-11-12POWERCHINA ZHONGNAN ENG
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411072635.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-11-12
Estimated Expiration
2044-08-06

AI Technical Summary

Technical Problem

When judging the Norwegian criteria for hydraulic tunnels in the prior art, there is a lack of clear methods for calculating rock mass slope, and manual verification can only select some control points, resulting in the calculation results that are not comprehensive and cumbersome and inaccurate.

Method used

Use a three-dimensional model to create the axis and topographic model of the hydraulic tunnel hole, automatically calculate the minimum distance from any point to the strong weathered geological surface, and make Norwegian criterion judgments based on the determined calculation principles, and accurately calculate the rock mass slope angle through the spherical and cylindrical models. and cover thickness to achieve a comprehensive Norwegian standard judgment.

Benefits of technology

It improves the efficiency and accuracy of Norwegian criterion judgments, reduces the influence of human factors, and ensures the comprehensiveness and reliability of the calculation results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118940377A_ABST
    Figure CN118940377A_ABST
Patent Text Reader

Abstract

The invention discloses a judgment method suitable for a hydraulic tunnel Norway criterion, terminal equipment and a storage medium, based on a three-dimensional hydraulic tunnel axis and a three-dimensional terrain geologic model, the minimum distance from any point to a strong weathering geological surface is automatically calculated along the hydraulic tunnel axis, and the minimum distance is calculated according to a determined calculation principle. The comprehensive slope angle of a certain range of the earth surface corresponding to the minimum distance position is automatically calculated, Norway criterion judgment is carried out, all-directional Norway criterion judgment of any point of the hole axis can be achieved, and the judgment result is more efficient, more accurate and more reliable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a surface rock mass parameter calculation technology, in particular to a determination method, terminal equipment and storage medium applicable to Norwegian standards for hydraulic tunnels. Background Art

[0002] A hydraulic tunnel refers to a water passage excavated in a mountain or underground in a hydropower and water conservancy project. The depth of the tunnel buried in the rock mass, that is, the thickness of the rock mass covering the top of the tunnel or on one side of the mountain bank, is generally referred to as the covering thickness of the surrounding rock. The covering thickness of the tunnel surrounding rock involves the stability of the surrounding rock, the resistance of the surrounding rock, and the anti-seepage capacity of the surrounding rock. Because the rock mass is a special anisotropic material, its physical and mechanical parameters not only change with different directions, but also often change suddenly within a limited range. Therefore, in the design, it is necessary to make a comprehensive analysis based on the specific situation.

[0003] For pressurized tunnels, if the bearing capacity of the surrounding rock is to be utilized, the surrounding rock cover thickness is one of the important issues that should be considered in the design. At present, the internationally accepted criteria for determining the surrounding rock cover thickness of pressurized tunnels include the vertical criterion, the snow mountain criterion, and the Norwegian criterion. Among them, the Norwegian criterion is the recommended method of the "Specification for Design of Hydraulic Tunnels" (NB / T 10391-2020) and is widely used in hydropower projects.

[0004] The Norwegian standard formula is:

[0005]

[0006] Where:

[0007] C RM —Minimum rock mass cover thickness (excluding the thickness of fully and strongly weathered rock mass) (m);

[0008] h s —Hydrostatic head in the cave (m);

[0009] γ W —Water density (N / mm 3 )

[0010] γ R —The density of rock mass (N / mm 3 )

[0011] α—surface rock slope angle (°), when α>60°, α is taken as 60°;

[0012] F is an empirical coefficient, generally between 1.30 and 1.50 and is determined based on the surrounding rock conditions. A higher value is taken when the geological conditions are poor.

[0013] In the application of the Norwegian standard, the longitudinal section is usually obtained by cutting along the tunnel axis (such as Figure 1), estimate the surface rock slope α according to the longitudinal profile, select some control points on the tunnel axis to calculate the minimum cover thickness C RM , and compare it with the actual cover thickness to draw a conclusion on whether it meets the Norwegian standard; if the lateral burial depth of some control points is insufficient, a longitudinal section is cut along the lateral direction and verified in the above manner. The main shortcomings of this method are as follows: 1) The calculation of the rock slope α along the longitudinal section is estimated based on experience, and there is no clear estimation principle method; 2) Manual verification can only select limited control points along the axis of the tunnel for verification, and the results are not comprehensive enough; 3) If the longitudinal section is cut along the axis of the tunnel for verification, if it is necessary to verify whether the lateral burial depth of a certain area is met, it is necessary to cut the longitudinal section again along the lateral direction for verification, and the calculation process is cumbersome and inaccurate. Summary of the invention

[0014] The technical problem to be solved by the present invention is to provide a determination method, terminal device and storage medium applicable to the Norwegian standards for hydraulic tunnels in view of the deficiencies in the prior art, so as to effectively solve the problem that the traditional manual calculation mode can only select some control points for calculation and the calculation results are incomplete.

[0015] In order to solve the above technical problems, the technical solution adopted by the present invention is: a determination method applicable to the Norwegian criteria for hydraulic tunnels, comprising the following steps:

[0016] S1. Create a three-dimensional model of the axis of the hydraulic tunnel, and introduce a three-dimensional terrain surface model and a strongly weathered geological surface model; the three-dimensional terrain surface model is the terrain surface, and the strongly weathered geological surface model is the weathering surface;

[0017] S2. Set the calculation step length ls, unit: m; set the starting point and end point on the tunnel axis, determine the Norwegian standard calculation and analysis range, the tunnel axis length between the starting point and the end point is L; set the spherical radius calculation step length Lr, unit: m; set the rock slope angle calculation radius R α , calculate the height H of the cylindrical surface α , unit: m;

[0018] S3. According to the length of the tunnel axis L and the calculation step length ls, the number of control points Ns required for the Norwegian criteria judgment is calculated as L / ls, rounded down, starting from the starting point of the tunnel axis, traversing according to the calculation step length ls, let N = i, L i =i×ls, i=1,2,3…Ns, from the starting point to the end point of the hole axis, take the length L along the hole axis i Determine the i-th control point K i , the coordinates are (X i ,Y i ,Z i );

[0019] S4, initialization j=1;

[0020] S5. Set the spherical radius R j =j×Lr, with control point K i is the center of the sphere, R j Create a spherical surface for the radius and determine whether the spherical surface intersects with the weathering surface;

[0021] If the result is non-intersecting, the control point is taken as the center of the sphere, R j+1 Create a spherical surface for the radius and determine whether the spherical surface intersects with the weathering surface; if the result is an intersection, the shortest distance C from the control point to the weathering surface is i =R j-1 +R j , extract the intersection curve S of the spherical surface and the weathering surface i , proceed to step S7; C i is the control point K i The corresponding actual rock cover thickness;

[0022] S6, repeat step S5 until the result is determined to be intersection;

[0023] S7, using the intersection curve S i Calculate the rock slope angle α corresponding to the i-th control point i ;

[0024] S8. Calculate the i-th control point K using the Norwegian criterion formula i Corresponding minimum coverage thickness C RM is the minimum cover thickness of the rock mass, in m; h s is the hydrostatic pressure head in the tunnel, in m; γ W is the density of water, in N / mm 3 ; γ R is the density of the rock mass, in N / mm 3 ; α i is the surface rock slope angle corresponding to the i-th control point, α i >60°, α i Take it as 60°; F is the empirical coefficient;

[0025] S9, let N = i + 1, L i+1 =(i+1)×ls, from the starting point to the end point of the hole axis, take the length L along the hole axis i+1 Determine the i+1th control point K i+1 ; Repeat steps S4 to S8 until N=Ns;

[0026] S10. Analyze the Norwegian criteria determination results along the hydraulic tunnel in the form of statistical curves.

[0027] The present invention is based on the three-dimensional hydraulic tunnel axis and the three-dimensional terrain and geological model, and automatically calculates the minimum distance from any point to the strongly weathered geological surface along the hydraulic tunnel axis, and according to a certain calculation principle, automatically calculates the comprehensive slope angle of a certain range of the surface area corresponding to the minimum distance position, and performs Norwegian criteria judgment. It can realize all-round Norwegian criteria judgment of any point on the tunnel axis, making the judgment result more efficient, more accurate and more reliable.

[0028] The specific implementation process of step S5 includes:

[0029] 1) Calculate the intersection curve S i The coordinate range [(X min ,X max ),(Y min ,Y max ),(Z min ,Z max )], set point Ts

[0030] (X S ,Y S ,Z S ) is the curve S i Any point on X min ≤X s ≤X max , Y min ≤Y s ≤Y max , Z min ≤Z s

[0031] ≤Z max ;

[0032] 2) Let the calculation point T i The coordinates are Through the control point K i and calculation point T i Creating a Direction Vector

[0033] 3) T i is the center of the circle, R α With radius as the center, create a circle on the normal plane of the direction vector kt, and stretch it in the direction of vector kt and in the opposite direction to form a cylindrical surface. The unidirectional stretching height H α , determine whether the cylindrical surface and the terrain surface completely intersect; if the result is that they do not intersect or do not completely intersect, continue to stretch H along the direction of vector kt and in the opposite direction α The height of the cylinder surface is used to determine whether the cylinder surface and the terrain surface are completely intersected; this cycle is repeated until the result is completely intersected; if the result is completely intersected, the curve H where the terrain surface and the cylinder surface completely intersect is extracted. i ;

[0034] 4) Calculate the curve H using the third-order unweighted difference method i The slope of all locations on the terrain surface within the range and calculate the average slope slp i , then the rock slope angle α i =atan(slp i ).

[0035] Compared with the traditional method of calculating the shortest distance by cutting a two-dimensional profile, the above step S5 can more accurately calculate the shortest distance from any control point on the tunnel line to the three-dimensional weathering surface, the analysis result is more representative, and the influence of human factors is reduced.

[0036] Step S8 also includes: comparing the i-th control point K i The corresponding minimum rock mass cover thickness C RMi and the actual rock mass cover thickness C i ; If C i >C RMi , then the control point K i Meet the minimum covering thickness requirements determined by the Norwegian guidelines; if C i ≤C RMi , then the control point K i The minimum cover thickness requirement determined by the Norwegian guidelines is not met.

[0037] The specific implementation process of step S10 includes:

[0038] Take the control point K on the hole axis i The length of the tunnel line between the starting point of the tunnel axis is the horizontal coordinate, and the unit of the tunnel line length is m; the control point K on the tunnel axis i The corresponding minimum rock mass cover thickness C RMi and the actual rock mass cover thickness C i is the vertical axis, the minimum rock mass cover thickness C RMi and the actual rock mass cover thickness C i The unit is m; the minimum rock mass coverage thickness C corresponding to each control point RMi and the actual rock mass cover thickness C i Connect the lines to generate statistical curves;

[0039] If the minimum rock mass cover thickness C RMi The ordinate of any point on the curve is lower than the actual rock mass cover thickness C i The vertical coordinate value of the curve determines that the hydraulic tunnel meets the Norwegian standard requirements;

[0040] If there is a minimum rock mass cover thickness C at a certain section of the tunnel axis RMi The vertical coordinate of the curve is higher than the actual rock cover thickness C i The vertical coordinate value of the curve indicates that the hydraulic tunnel does not meet the Norwegian standard requirements in this section.

[0041] As an inventive concept, the present invention also provides a terminal device, including a memory, a processor, and a computer program stored in the memory; the processor executes the computer program to implement the steps of the above method.

[0042] As an inventive concept, the present invention also provides a computer-readable storage medium having a computer program / instruction stored thereon; the computer program / instruction implements the steps of the above method when executed by a processor.

[0043] As an inventive concept, the present invention also provides a computer program product, including a computer program / instruction; when the computer program / instruction is executed by a processor, the steps of the above method are implemented.

[0044] Compared with the prior art, the beneficial effects of the present invention are as follows: based on the three-dimensional hydraulic tunnel axis and the three-dimensional terrain geological model, the present invention automatically calculates the minimum distance from any point to the strongly weathered geological surface along the hydraulic tunnel axis, and automatically calculates the comprehensive slope angle of a certain range of the surface area corresponding to the minimum distance position according to the determined calculation principle, and performs Norwegian criteria judgment, which can realize the full range of Norwegian criteria judgment of any point on the tunnel axis, making the judgment result more efficient, more accurate and more reliable. The present invention proposes a calculation method for the comprehensive slope angle of the surface rock mass, and by developing corresponding software functions, it can effectively solve the problem that the traditional manual calculation mode can only select some control points for calculation and the calculation results are incomplete; and it can calculate the Norwegian criteria judgment of any point along the tunnel in any direction, and obtain the minimum surrounding rock coverage thickness, solving the problems of cumbersome calculation process, low efficiency and inaccuracy of the traditional method. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] Figure 1 It is a schematic diagram of the three-dimensional model of the hydraulic tunnel axis, terrain surface and weathering surface;

[0046] Figure 2 The shortest distance corresponds to the intersection curve S between the spherical surface and the weathering surface i And calculation point T i Schematic diagram;

[0047] Figure 3 It is a schematic diagram of the complete intersection range between the cylindrical surface and the terrain surface;

[0048] Figure 4 It is a schematic diagram of the terrain slope in the intersection range of the cylindrical surface and the terrain surface;

[0049] Figure 5 This is a statistical curve chart for determining the Norwegian standard for hydraulic tunnel axis. DETAILED DESCRIPTION

[0050] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0051] Example 1

[0052] This embodiment provides a Norwegian criteria determination method based on a three-dimensional model, comprising the following steps:

[0053] Step (1): Use 3D design software to create a 3D model of the hydraulic tunnel axis, and introduce a 3D terrain surface model (hereinafter referred to as "terrain surface") and a strongly weathered geological surface model (hereinafter referred to as "weathering surface").

[0054] Step (2): Set the calculation step length ls, unit: m; set the starting point and end point on the tunnel axis, determine the Norwegian standard calculation analysis range, the tunnel axis length between the starting point and the end point is L; set the spherical radius calculation step length lr, unit: m. Set the rock slope angle calculation radius R α , calculate the height H of the cylindrical surface α , unit: m.

[0055] Step (3): Based on the calculated tunnel axis length L and the calculation step length ls, the number of control points Ns required for Norwegian criteria determination can be calculated as L / ls rounded down. Starting from the starting point of the tunnel axis, traverse according to the calculation step length ls. Let N = i, L i =i×ls, (i=1,2,3…Ns), from the starting point to the end point of the hole axis, take the length L along the hole axis i Determine the i-th control point K i , the coordinates are (X i ,Y i ,Z i ).

[0056] Step (4): Lr is the step length for calculating the spherical radius, and the cycle is repeated. When M = j, the spherical radius R j =j×Lr, (j=1.2.3…), with control point K i As the center of the sphere, R j Create a spherical surface for the radius and determine whether the spherical surface intersects with the weathering surface.

[0057] If the result is non-intersection, set M = j + 1, take the control point as the sphere center, R j+1 Create a spherical surface for the radius and determine whether the spherical surface intersects with the weathering surface; repeat the process until the result is that they intersect.

[0058] If the result is an intersection, the shortest distance C from the control point to the weathering surface i =R j-1 +R j ,(When j=1, R j-1 = 0), extract the intersection curve S of the spherical surface and the weathering surface i , and exit the loop. C i That is the control point K i The corresponding actual rock cover thickness.

[0059] Step (5): Calculate the rock slope angle α corresponding to the i-th control point i .

[0060] Step 5.1: Calculate the intersection curve S i The coordinate range [(X min ,X max ),(Y min ,Y max ),(Z min ,Z max )], assuming that point Ts(X S ,Y S ,Z S ) is the curve S i Any point on X min ≤X s ≤X max , Y min ≤Y s ≤Y max , Z min ≤Z s ≤Z max .

[0061] Step 5.2: Let the calculation point T i The coordinates are Through the control point K i and calculation point T i Creating a Direction Vector

[0062] Step 5.3: Take T i is the center of the circle, R α With radius as the center, create a circle on the normal plane of the direction vector kt, and stretch it in the direction of vector kt and in the opposite direction to form a cylindrical surface. The unidirectional stretching height H α , determine whether the cylindrical surface and the terrain surface completely intersect (the intersection line is a closed curve).

[0063] If the result is that they do not intersect or do not completely intersect, continue to stretch H in the direction of vector kt and in the opposite direction. αThe height of the cylindrical surface is used to determine whether the cylindrical surface and the terrain surface are completely intersected (the intersection line is a closed curve); the process is repeated until the result is that they are completely intersected.

[0064] If the result is a complete intersection, the complete intersection curve H between the terrain surface and the cylindrical surface is extracted. i .

[0065] Step 5.4: Use the third-order unweighted difference algorithm (Liu Xuejun, Gong Jianya, Zhou Qiming, et al. Analysis and research on the accuracy of slope and aspect algorithm based on DEM [J]. Acta Geodaetica et Cartographica Sinica, 2004, (03): 258-263.) to calculate the curve H i The slope of all locations on the terrain surface within the range and calculate the average slope slp i Then the rock mass slope angle α i =atan(slp i ).

[0066] Step (6): Calculate the i-th control point K using the Norwegian criterion formula i The corresponding minimum covering thickness C RMi :

[0067]

[0068] Compare the i-th control point K i The corresponding minimum rock mass cover thickness C RMi and the actual rock mass cover thickness C i ,

[0069] If C i >C RMi , then the control point K i Meet the minimum cover thickness requirements determined by the Norwegian guidelines;

[0070] If C i ≤C RMi , then the control point K i The minimum cover thickness requirement determined by the Norwegian guidelines is not met.

[0071] Step (7): Let N = i + 1, L i+1 =(i+1)×ls, (i=1,2,3…Ns), from the starting point to the end point of the hole axis, take the length L along the hole axis i+1 Determine the i+1th control point K i+1 Repeat steps (4) to (6) until N=Ns.

[0072] Step (8): Analyze the Norwegian criteria determination results along the hydraulic tunnel in the form of statistical curves to assist in hydraulic tunnel design decision-making.

[0073] Step 8.1: Generate a statistical curve of the Norwegian criteria judgment results, with the horizontal axis being the control point K on the hole axis. i The length of the tunnel line between the starting point of the tunnel axis, unit: m; the ordinate is the control point K on the tunnel axis i (i=1,2,3…Ns) corresponds to the minimum rock mass cover thickness C RMi and the actual rock mass cover thickness C i , unit: m. The minimum rock mass cover thickness C corresponding to each control point RMi and the actual rock mass cover thickness C i Connect the lines to generate statistical curves.

[0074] Step 8.2: Analyze the relationship between the minimum rock mass coverage thickness curve and the actual rock mass coverage thickness curve:

[0075] If the minimum rock mass cover thickness C RMi The ordinate of any point on the curve is lower than the actual rock mass cover thickness C i The vertical coordinate value of the curve indicates that the hydraulic tunnel meets the Norwegian standard requirements.

[0076] If there is a minimum rock mass cover thickness C at a certain section of the tunnel axis RMi The vertical coordinate of the curve is higher than the actual rock cover thickness C i The vertical coordinate value of the curve determines whether the hydraulic tunnel meets the requirements of the Norwegian standard.

[0077] The beneficial effects of the application of the embodiments of the present invention are as follows:

[0078] 1) Based on the three-dimensional model of the hydraulic tunnel axis and topography and geology, the Norwegian criteria are reviewed and calculated in a three-dimensional scene to realize the calculation of the actual minimum cover thickness of the rock mass at any point on the tunnel axis. Compared with the traditional method of using two-dimensional sections to judge the Norwegian criteria, there is no need for multiple sectioning, the calculation process is more efficient, the analysis range is more comprehensive, and the calculation results are more accurate.

[0079] 2) A calculation and analysis method for the slope angle of terrain rock mass based on three-dimensional terrain is given. Compared with the traditional method of estimating the slope angle of rock mass based on two-dimensional terrain profile, the calculation result is more in line with reality.

[0080] 3) By developing corresponding software functions, the Norwegian criteria determination of all locations along the entire hydraulic tunnel can be realized, and the statistical curve analysis function can be supported, which can effectively solve the problem that the traditional manual calculation mode can only select some control points for calculation and the calculation results are incomplete.

[0081] Example 2

[0082] Embodiment 2 of the present invention provides a terminal device corresponding to the above-mentioned embodiment 1. The terminal device may be a processing device for a client, such as a mobile phone, a laptop computer, a tablet computer, a desktop computer, etc., to execute the method of the above-mentioned embodiment.

[0083] The terminal device of this embodiment includes a memory, a processor, and a computer program stored in the memory; the processor executes the computer program in the memory to implement the steps of the method in the above-mentioned embodiment 1.

[0084] In some implementations, the memory may be a high-speed random access memory (RAM), and may also include a non-volatile memory, such as at least one disk memory.

[0085] In some other implementations, the processor may be a central processing unit (CPU), a digital signal processor (DSP), or other general-purpose processors of various types, which are not limited herein.

[0086] Example 3

[0087] Embodiment 3 of the present invention provides a computer-readable storage medium corresponding to the above embodiment 1, on which a computer program / instruction is stored. When the computer program / instruction is executed by a processor, the steps of the method of the above embodiment 1 are implemented.

[0088] Computer readable storage media can be tangible devices that hold and store instructions used by instruction execution devices. Computer readable storage media can be, for example, but not limited to, electronic storage devices, magnetic storage devices, optical storage devices, electromagnetic storage devices, semiconductor storage devices, or any combination thereof.

[0089] Those skilled in the art will appreciate that the embodiments of the present application can be provided as methods, systems, or computer program products. Therefore, the present application can adopt the form of complete hardware embodiments, complete software embodiments, or embodiments in combination with software and hardware. Moreover, the present application can adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code. The scheme in the embodiments of the present application can be implemented in various computer languages, for example, object-oriented programming language Java and literal scripting language JavaScript, etc.

[0090] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0091] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0092] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.

[0093] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.

Claims

1. A determination method applicable to the Norwegian criteria for hydraulic tunnels, characterized in that: The following steps are involved: S1. Create a three-dimensional model of the axis of the hydraulic tunnel, and introduce a three-dimensional terrain surface model and a strongly weathered geological surface model; the three-dimensional terrain surface model is the terrain surface, and the strongly weathered geological surface model is the weathering surface; S2. Set the calculation step length ls, unit: m; set the starting point and end point on the hole axis, determine the calculation and analysis range of the Norwegian standard, the length of the hole axis between the starting point and the end point is L; set the calculation step length Lr of the spherical radius, unit: m; Set the rock slope angle calculation radius R α , calculate the height H of the cylindrical surface α , unit: m; S3. According to the length of the tunnel axis L and the calculation step length ls, the number of control points Ns required for the Norwegian criteria judgment is calculated as L / ls, rounded down, starting from the starting point of the tunnel axis, traversing according to the calculation step length ls, let N = i, L i =i×ls, i=1,2,3…Ns, from the starting point to the end point of the hole axis, take the length L along the hole axis i Determine the i-th control point K i , the coordinates are (X i ,Y i ,Z i ); S4, initialization j=1; S5. Set the spherical radius R j =j×Lr, with control point K i is the center of the sphere, R j Create a spherical surface for the radius and determine whether the spherical surface intersects with the weathering surface; If the result is non-intersecting, the control point is taken as the center of the sphere, R j+1 Create a spherical surface for the radius and determine whether the spherical surface intersects with the weathering surface; If the result is an intersection, the shortest distance C from the control point to the weathering surface i =R j-1 +R j , extract the intersection curve S of the spherical surface and the weathering surface i , proceed to step S7; C i is the control point K i The corresponding actual rock cover thickness; S6, repeat step S5 until the result is determined to be intersection; S7, using the intersection curve S i Calculate the rock slope angle α corresponding to the i-th control point i ; S8. Calculate the i-th control point K using the Norwegian criterion formula i The corresponding minimum covering thickness C RMi ; C RM is the minimum cover thickness of the rock mass, in m; h s is the hydrostatic pressure head in the tunnel, in m; γ W is the density of water, in N / mm 3 ; γ R is the density of the rock mass, in N / mm 3 ; α i is the surface rock slope angle corresponding to the i-th control point, α i >60°, α i Take it as 60°; F is the empirical coefficient; S9, let N = i + 1, L i+1 =(i+1)×ls, from the starting point to the end point of the hole axis, take the length L along the hole axis i+1 Determine the i+1th control point K i+1 ; Repeat steps S4 to S8 until N=Ns; S10. Analyze the Norwegian criteria determination results along the hydraulic tunnel in the form of statistical curves.

2. The determination method for Norwegian standards applicable to hydraulic tunnels according to claim 1 is characterized in that: The specific implementation process of step S5 includes: 1) Calculate the intersection curve S i The coordinate range [(X min ,X max ),(Y min ,Y max ),(Z min ,Z max )], set point Ts(X S ,Y S ,Z S ) is the curve S i Any point on X min ≤X s ≤X max , Y min ≤Y s ≤Y max , Z min ≤ WITH s ≤Z max ; 2) Let the calculation point T i The coordinates are Through the control point K i and calculation point T i Creating a Direction Vector 3) T i is the center of the circle, R α With radius as the center, create a circle on the normal plane of the direction vector kt, and stretch it in the direction of vector kt and in the opposite direction to form a cylindrical surface. The unidirectional stretching height H α , determine whether the cylindrical surface and the terrain surface completely intersect; if the result is that they do not intersect or do not completely intersect, continue to stretch H along the direction of vector kt and in the opposite direction α The height of the cylinder surface is used to determine whether the cylinder surface and the terrain surface are completely intersected; this cycle is repeated until the result is completely intersected; if the result is completely intersected, the curve H where the terrain surface and the cylinder surface completely intersect is extracted. i ; 4) Calculate the curve H using the third-order unweighted difference method i The slope of all locations on the terrain surface within the range and calculate the average slope slp i , then the rock slope angle α i =atan(slp i ).

3. The determination method applicable to the Norwegian criteria for hydraulic tunnels according to claim 1 is characterized in that: Step S8 also includes: comparing the i-th control point K i The corresponding minimum rock mass cover thickness C RMi and the actual rock mass cover thickness C i ; If C i >C RMi , then the control point K i Meet the minimum cover thickness requirements determined by the Norwegian guidelines; If C i ≤C RMi , then the control point K i The minimum cover thickness requirement determined by the Norwegian guidelines is not met.

4. The determination method applicable to the Norwegian criteria for hydraulic tunnels according to claim 1 is characterized in that: The specific implementation process of step S10 includes: Take the control point K on the hole axis i The length of the tunnel line between the starting point of the tunnel axis is the horizontal coordinate, and the unit of the tunnel line length is m; the control point K on the tunnel axis i The corresponding minimum rock mass cover thickness C RMi and the actual rock mass cover thickness C i is the vertical axis, the minimum rock mass cover thickness C RMi and the actual rock mass cover thickness C i The unit is m; the minimum rock mass coverage thickness C corresponding to each control point RMi and the actual rock mass cover thickness C i Connect the lines to generate statistical curves; If the minimum rock mass cover thickness C RMi The ordinate of any point on the curve is lower than the actual rock mass cover thickness C i The vertical coordinate value of the curve determines that the hydraulic tunnel meets the Norwegian standard requirements; If there is a minimum rock mass cover thickness C at a certain section of the tunnel axis RMi The vertical coordinate of the curve is higher than the actual rock cover thickness C i The vertical coordinate value of the curve indicates that the hydraulic tunnel does not meet the Norwegian standard requirements in this section.

5. A terminal device comprising a memory, a processor and a computer program stored in the memory; characterized in that: The processor executes the computer program to implement the steps of the method according to any one of claims 1 to 4.

6. A computer-readable storage medium having a computer program / instruction stored thereon; characterized in that: When the computer program / instructions are executed by a processor, the steps of the method described in any one of claims 1 to 4 are implemented. A computer program product, comprising a computer program / instructions; characterized in that: When the computer program / instructions are executed by a processor, the steps of the method of any one of claims 1 to 4 are implemented.

Citation Information

Patent Citations

  • Method and system for correcting lateral pressure coefficient of surrounding rock based on three-dimensional geologic model

    CN118332834A

  • Discontinuous deformation analysis method and system for stability of tunnel surrounding rock

    WO2024041057A1