Method and system for calculating limit distance of reserved empty roof of tunneling roadway

By dividing the roadway into four zones and constructing a mechanical model, and combining the tensile strength of the roof rock to calculate the unsupported roof distance, the problem of large errors in the existing technology was solved, and more accurate unsupported roof distance calculation and safe support optimization were achieved.

CN118940470APending Publication Date: 2024-11-12CCTEG CHINA COAL RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410933306.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Existing technologies fail to effectively consider factors such as roadway width, height, and coal seam properties when calculating the unsupported roof distance during coal roadway excavation, resulting in large calculation errors and potential safety hazards.

Method used

The roadway is divided into four zones: stable zone, unstable zone, unsupported roof zone, and coal seam plastic zone. The rock load is calculated based on the elastic modulus, thickness, and block density of the overlying strata. A mechanical model of the four zones is constructed by combining the anchor cable tension and the coal seam support force. The critical bending moment is determined by the tensile strength of the roof rock, and the maximum unsupported roof distance is solved.

Benefits of technology

It improved the accuracy of calculating the ultimate distance of the roof, reduced safety hazards, optimized the support scheme, and improved tunneling efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118940470A_ABST
    Figure CN118940470A_ABST
Patent Text Reader

Abstract

The invention provides a method and system for calculating the limit distance of a reserved empty roof of a tunneling roadway, the roadway is divided into a stable area, an unstable area, an empty roof area and a coal seam plastic area according to the tunneling direction, and the method comprises the following steps: for the four areas, calculating the load of overlying strata based on the elastic modulus, thickness and block density of each overlying strata; aiming at a stable area and an unstable area, determining direct top pulling force of an anchor cable based on deformation characteristics of a composite roof, obtaining head-on coal seam supporting force aiming at a coal seam plastic area, and obtaining coal supporting force aiming at two sides of a roadway to drive two sides of the roadway; constructing a four-region mechanical model on the basis of overlying rock load, anchor cable direct jacking force, head-on coal seam supporting force and roadway driving two-side coal supporting force so as to obtain the total bending moment of each point in the four regions; obtaining critical bending moment based on roof rock tensile strength; and when the total bending moment of each point in the four areas is equal to the corresponding critical bending moment, solving the total bending moment of each point in the four areas to obtain the maximum empty top distance. According to the method, the accuracy of the empty roof limit distance is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of coal tunneling construction measures and safety technology, and in particular to a calculation method and system for a limit distance of an empty top left in a tunneling tunnel. Background Art

[0002] In the process of coal seam coal roadway excavation, a certain area needs to be reserved for construction work, and a certain length of empty top area will inevitably be formed. It can be seen from the structural characteristics of the coal roadway that the empty top area will be in a suspended state for a certain period of time. Even if the empty top area has not yet produced delamination or damage, there are still certain safety hazards. The results of engineering practice show that the empty top distance affects the cycle work efficiency of roadway excavation, and the maximum empty top distance should be reasonably used. Underground roadway excavation and support measures are carried out simultaneously, and workers and machinery will be under a section of empty top structure. The reasonable reservation of the empty top distance and the use of the maximum empty top distance are of great significance to the construction period and engineering safety. The safety of the empty top distance is closely related to the structural characteristics of the roof and roadway.

[0003] The existing technology mostly uses the simplified model of thin plates and the simplified model of rods as the theoretical basis for calculating the empty top distance. For example, a company in Shanxi Province, based on the rectangular cross-section model of the top rock layer during large-section trench excavation, converted the bending-torsion model into a tension-compression model and added a bending-torsion correction coefficient, obtained the theoretical maximum empty top distance during large-section trench excavation in a certain coal seam, and provided a reference range for subsequent stress measurement. According to the geological measurement results of the coal seam and the known excavation parameters, and considering the influence of the safety factor, the calculated theoretical maximum empty top distance is 6.59m. On the basis of the theoretical calculation of the maximum empty top distance during large-section trench excavation in the coal seam, field measurements are used to ensure the rationality of the empty top distance optimization results. The measured results of the empty top distance optimization show that the reasonable empty top distance during large-section trench excavation in the coal seam should be selected as 6m. For example, a company in Shaanxi Province conducted a study on the optimization of coal roadway comprehensive excavation support parameters based on the empty top theory. In order to study the deformation and failure law of surrounding rock during tunnel excavation and the influence of reasonable empty top distance on tunnel excavation efficiency, the geological conditions of Mengcun Mine were taken as the engineering background. Theoretical calculation and FLAC3D numerical simulation were used to propose a reasonable empty top distance and optimization scheme for tunnel support parameters suitable for the 4# coal seam of a village mine. Based on the numerical simulation results, the damage of tunnel surrounding rock and its influence on excavation efficiency under different support schemes were discussed. The results show that during tunnel excavation, the deformation of tunnel surrounding rock is relatively small. Under ideal conditions, the empty top distance of the transport tunnel of the 401104 working face is 3.14m. Considering the actual production geological conditions of Mengcun Mine, the empty top distance is 2m. By optimizing the existing support parameters, a support scheme with a row spacing of 800mm×1000mm and 7 bolts per row is proposed. The monthly advance is increased by 3.8 times, and the number of top bolts consumed in 100-meter tunnel support is reduced by 63.3%. The optimized support scheme can save support time and improve tunnel excavation efficiency.

[0004] The existing calculation and design of the empty top distance simplifies the three-dimensional stress structure of the roof into two dimensions, without considering the influence of the tunnel width, height, coal seam properties, and support mechanical properties. In addition, the maximum value of the empty top distance is associated with the deflection, ignoring the size effect. The existing technology is prone to errors in calculating the empty top limit distance. If construction is carried out based on the existing empty top distance maximum safety distance algorithm, major safety accidents are very likely to occur. Summary of the invention

[0005] The present invention aims to solve one of the technical problems in the related art at least to a certain extent.

[0006] To this end, the first purpose of the present invention is to provide a method for calculating the limit distance of the empty top left in an excavation tunnel to improve the accuracy of the limit distance of the empty top.

[0007] The second object of the present invention is to provide a calculation system for the limit distance of the empty top left in the excavation tunnel.

[0008] A third objective of the present invention is to provide an electronic device.

[0009] A fourth object of the present invention is to provide a computer-readable storage medium.

[0010] To achieve the above-mentioned purpose, the first aspect of the present invention proposes a method for calculating the limit distance of the empty top of a tunnel, wherein the tunnel is divided into four zones: a stable zone, an unstable zone, an empty top zone, and a coal seam plastic zone according to the tunneling direction, and the calculation method comprises the following steps:

[0011] For the four zones, the overburden loads are calculated based on the elastic modulus, thickness and block density of each overburden stratum;

[0012] For the stable area and the unstable area, the direct top tension of the anchor cable is determined based on the deformation characteristics of the composite roof, the head coal seam support force is obtained for the coal seam plastic zone, and the coal support force on both sides of the tunnel is obtained for both sides of the tunnel;

[0013] A four-zone mechanical model is constructed based on the overlying rock load, the direct top tension of the anchor cable, the supporting force of the head coal seam, and the supporting force of the coal on both sides of the tunnel to obtain the total bending moment of each point in the four zones;

[0014] The critical bending moment is obtained based on the tensile strength of the roof rock;

[0015] When the total bending moment of each point in the four zones is equal to the corresponding critical bending moment, the total bending moment of each point in the four zones is solved to obtain the maximum empty top distance.

[0016] In the method of the first aspect of the present invention, the critical bending moment satisfies Where σ t is the tensile strength of roof rock, Ma is the critical bending moment, h a is the neutral axis distance, and I is the moment of inertia.

[0017] In the method of the first aspect of the present invention, a four-zone mechanical model is constructed based on the overlying stratum load, the direct top tension of the anchor cable, the supporting force of the facing coal seam, and the supporting force of the coal on both sides of the tunnel to obtain the total bending moment of each point in the four zones, including: for each point of the four-zone mechanical model, the bending moments of the overlying stratum load, the direct top tension of the anchor cable, the supporting force of the facing coal seam, and the supporting force of the coal on both sides of the tunnel are calculated at the point respectively, and then the total bending moment of the point is obtained by summing them up.

[0018] In the method of the first aspect of the present invention, if the deformation characteristic of the composite roof is that the anchor cables provide tension on the direct roof, the tension of the anchor cables on the direct roof is determined based on the tension of each anchor cable and the anchoring area.

[0019] To achieve the above-mentioned purpose, the second aspect of the present invention proposes a calculation system for the limit distance of the empty top of the tunnel, wherein the tunnel is divided into four zones: a stable zone, an unstable zone, an empty top zone and a coal seam plastic zone according to the tunneling direction, and the calculation system comprises:

[0020] A four-zone mechanical model modeling module is used to calculate the overburden load for the four zones based on the elastic modulus, thickness and block density of each overburden rock layer; for the stable zone and the unstable zone, determine the direct top tension of the anchor cable based on the deformation characteristics of the composite roof, obtain the head coal seam support force for the coal seam plastic zone, and obtain the coal support force on both sides of the tunnel for both sides of the tunnel; construct a four-zone mechanical model based on the overburden load, the direct top tension of the anchor cable, the head coal seam support force, and the coal support force on both sides of the tunnel to obtain the total bending moment of each point in the four zones;

[0021] Critical bending moment calculation module, used to obtain critical bending moment based on the tensile strength of roof rock;

[0022] The maximum empty top distance solving module is used to solve the total bending moment of each point in the four zones to obtain the maximum empty top distance when the total bending moment of each point in the four zones is equal to the corresponding critical bending moment.

[0023] In the system of the second aspect of the present invention, in the critical bending moment calculation module, the critical bending moment satisfies Where σ t is the tensile strength of roof rock, M a is the critical bending moment, h a is the neutral axis distance, and I is the moment of inertia.

[0024] In the system of the second aspect of the present invention, the four-zone mechanical model modeling module, when used to construct a four-zone mechanical model based on the overlying rock load, the direct top tension of the anchor cable, the supporting force of the facing coal seam, and the supporting force of the coal on both sides of the tunnel to obtain the total bending moment of each point in the four zones, is specifically used to: for each point of the four-zone mechanical model, calculate the bending moments of the overlying rock load, the direct top tension of the anchor cable, the supporting force of the facing coal seam, and the supporting force of the coal on both sides of the tunnel respectively at the point, and then sum them up to obtain the total bending moment of the point.

[0025] In the system of the second aspect of the present invention, in the four-zone mechanical model building module, if the deformation characteristic of the composite roof is that the anchor cables provide tension on the direct roof, the tension of the anchor cables on the direct roof is determined based on the tension of each anchor cable and the anchoring area.

[0026] To achieve the above-mentioned purpose, the third aspect of the present invention proposes an electronic device, comprising: a processor, and a memory communicatively connected to the processor; the memory stores computer-executable instructions; the processor executes the computer-executable instructions stored in the memory to implement the method proposed in the first aspect of the present invention.

[0027] To achieve the above-mentioned purpose, the fourth aspect of the present invention proposes a computer-readable storage medium, in which computer-executable instructions are stored. When the computer-executable instructions are executed by a processor, they are used to implement the method proposed in the first aspect of the present invention.

[0028] The present invention provides a calculation method, system, electronic device and storage medium for setting a maximum distance of an empty roof in an excavation tunnel. The tunnel is divided into four zones according to the excavation direction, namely, a stable zone, an unstable zone, an empty roof zone and a coal seam plastic zone. The calculation method comprises the following steps: for the four zones, the overlying rock stratum load is calculated based on the elastic modulus, thickness and block density of the overlying rock strata; for the stable zone and the unstable zone, the direct top tension of the anchor cable is determined based on the deformation characteristics of the composite roof, the head coal seam support force is obtained for the coal seam plastic zone, and the coal support force on both sides of the tunnel is obtained for both sides of the tunnel; a four-zone mechanical model is constructed based on the overlying rock stratum load, the direct top tension of the anchor cable, the head coal seam support force and the coal support force on both sides of the tunnel to obtain the total bending moment of each point in the four zones; the critical bending moment is obtained based on the tensile strength of the roof rock; when the total bending moment of each point in the four zones is equal to the corresponding critical bending moment, the total bending moment of each point in the four zones is solved to obtain the maximum empty roof distance. In this case, considering the dimensional parameters such as thickness, the critical bending moment obtained by comprehensively considering the overlying rock load in the four zones of stable zone, unstable zone, empty top zone and coal seam plastic zone, the direct top tension of anchor cables, the supporting force of the facing coal seam, and the supporting force of coal on both sides of the tunnel, combined with the tensile strength of the roof rock, can better obtain the empty top limit distance.

[0029] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0031] Figure 1 The empty roof site structure diagram provided by the embodiment of the present invention;

[0032] Figure 2 A schematic flow chart of a method for calculating the limit distance of an empty roof for a tunneling tunnel provided by an embodiment of the present invention;

[0033] Figure 3 A schematic diagram of the anchor cable and overlying rock structure provided by an embodiment of the present invention;

[0034] Figure 4 A schematic diagram of a four-zone mechanical model provided by an embodiment of the present invention;

[0035] Figure 5 A schematic diagram of the forces acting on each zone in the four-zone mechanical model provided by an embodiment of the present invention;

[0036] Figure 6 A side view of the forces acting on each zone in the four-zone mechanical model provided by an embodiment of the present invention;

[0037] Figure 7 A front view of the forces acting on each zone in the four-zone mechanical model provided by an embodiment of the present invention;

[0038] Figure 8 A block diagram of a calculation system for setting a maximum distance of an empty top in a tunneling tunnel provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0039] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0040] The following describes a method and system for calculating the limit distance of an empty top for an excavation tunnel according to an embodiment of the present invention with reference to the accompanying drawings.

[0041] In the process of coal seam coal roadway excavation, a certain area needs to be reserved for construction work, and a certain length of empty top area will inevitably be formed. It can be seen from the structural characteristics of the coal roadway that the empty top area will be in a suspended state for a certain period of time. Even if the empty top area has not yet produced separation or damage, there are still certain safety hazards. The results of engineering practice show that the empty top distance affects the cycle work efficiency of roadway excavation, and the maximum empty top distance should be reasonably used. The excavation of underground tunnels and support measures are carried out simultaneously, and workers and machinery will be under a section of empty top structure. The reasonable reservation of the empty top distance and the use of the maximum empty top distance are of great significance to the construction period and engineering safety.

[0042] Based on this, the embodiment of the present invention provides a calculation method for the empty top limit distance of the tunneling to improve the accuracy of the empty top limit distance. In the present invention, the tunnel is divided into four zones according to the tunneling direction: stable zone, unstable zone, empty top zone and coal seam plastic zone.

[0043] Figure 1 This is a diagram of the empty roof structure provided by the embodiment of the present invention. Figure 1 As shown, Figure 1 Middle (a) is the main view along the excavation direction. There are coal seams on both sides of the excavation tunnel, the upper side of the excavation tunnel is the direct roof, the upper side of the direct roof is the basic roof, the anchor cable is fixed in the basic roof through the direct roof, and the lower side of the excavation tunnel is the bottom plate. Figure 1 Middle (b) is a side cross-sectional view along the excavation direction. According to the excavation direction, the tunnel is divided into four stress structure characteristic sections (referred to as four zones), namely, the stable zone, the unstable zone, the empty top zone and the coal seam plastic zone. Among them, anchor cables are arranged in the stable zone and the unstable zone. The coal seam plastic zone is mainly the coal seam. The stable zone and the unstable zone are named based on the roof, that is, the stable zone and the unstable zone are also called the stable section of the roof and the unstable section of the roof. The roof refers to the direct roof. The stable zone has already sunk and deformed, and the roof and support are basically stable, and no displacement or breakage will occur. The unstable zone is in a state where the support has just been completed and has not yet stabilized. The roof still has a certain deformation space and tendency. The support generates a supporting force on the roof according to the different stress structure characteristics of the roof.

[0044] Figure 2 A schematic flow chart of a method for calculating the limit distance of an empty top left in an excavation tunnel provided in an embodiment of the present invention.

[0045] like Figure 2 As shown, the calculation method of the limit distance of the empty top of the excavation tunnel includes the following steps:

[0046] Step S101, for the four zones, the overlying strata load is calculated based on the elastic modulus, thickness and block density of each overlying stratum.

[0047] In step S101, the overlying rock strata cover four stress structure characteristic sections (hereinafter referred to as four zones) of stable zone, unstable zone, empty top zone and coal seam plastic zone. For the four zones, the dimension parameters of the tunneling tunnel are obtained, and the dimension parameters include the thickness of the overlying rock strata. The overlying rock strata include direct top and basic top. The basic top includes multiple rock strata. If the direct top is regarded as overlying rock strata 1, the basic top on the direct top is divided into overlying rock strata 2, overlying rock strata 3, overlying rock strata 4...overlying rock strata N in sequence. N is the number of overlying rock strata.

[0048] In step S101, the elastic modulus and block density of each overlying rock layer are also obtained.

[0049] In step S101, for tunnels of various shapes, the simplified differences in the stress of the roof (i.e., the direct roof) are small, which mainly affects the stress of the coal wall and is not considered in the calculation of the empty roof distance. The anchor rods and cables are driven into the basic roof through the direct roof. According to the stratification and thickness of the basic roof, the overburden pressure is classified and calculated. The overburden load is calculated from the coal seam roof from bottom to top (i.e., the direct roof is regarded as overburden 1, the basic roof is regarded as overburden 2, overburden 3, overburden 4, etc. from bottom to top), according to formula (1):

[0050]

[0051] Where:

[0052] q is the overburden load per unit width, in megapascals (MPa);

[0053] E i (i = 1, 2, ..., n) —— elastic modulus of each overlying rock layer, in megapascals (MPa);

[0054] h i (i=1, 2, ..., n) —— thickness of the overlying rock layers, in meters (m);

[0055] ρ i (i = 1, 2, ..., n) - the mass density of the overlying rock layers, in kilograms per cubic meter (kg / m 2 );

[0056] g – acceleration due to gravity, measured in Newtons per kilogram (N / kg).

[0057] Wherein, formula (1) is the load q on the first layer (i.e., overburden stratum 1) under the action of a total of n layers. The load on the first layer under the action of a total of n+1 layers is calculated with reference to formula (1). When the load on the first layer under the action of a total of n+1 layers is less than the load on the first layer under the action of a total of n layers, the calculation is terminated. The calculation result of the load on the first layer under the action of a total of n layers at this time is taken, and the calculation result is the required overburden pressure (i.e., overburden load) q0.

[0058] Step S102, for the stable area and the unstable area, determine the direct top tension of the anchor cable based on the deformation characteristics of the composite roof, obtain the head coal seam support force for the coal seam plastic zone, and obtain the coal support force on both sides of the tunnel for both sides of the tunnel.

[0059] Specifically, in step S102, for the direct top tension of the anchor cable, Figure 3 Schematic diagram of the anchor cable and overburden structure type provided by the embodiment of the present invention. When the anchor cable does not pass through the overburden stratum 2 of the basic top, the basic top and the direct top are deformed together ( Figure 3 In (a)), the deformation characteristics of the composite roof are that the anchor cable force is the internal force of the system. In the case of separation deformation of the basic roof and the direct roof ( Figure 3 In (b)), the deformation characteristic of the composite roof is that the anchor cable forms tension on the direct roof. When the anchor cable passes through the overburden stratum 2 of the basic roof, tension is formed on the direct roof. The simplified model is established as follows: when the anchor cable is part of the roof deformation system, only the internal force of the system is formed, and there is no upward tension on the roof. When the anchor cable is not part of the roof deformation system, tension is formed on the deformed roof. When the anchor cable does not pass through the overburden stratum 2, the overburden stratum 2 and the direct roof (which can be regarded as the overburden stratum 1) are connected by the anchor cable. When the basic roof and the direct roof are displaced together, the anchor cable is the internal force of the system and does not provide tension to the direct roof. When the overburden stratum 2 and the direct roof are separated and displaced, it is mainly the direct roof that collapses. At this time, the anchor cable provides tension to the direct roof. When the anchor cable passes through the overburden stratum 2 and is anchored into the overburden stratum 3, whether the overburden stratum 2 displaces together with the direct roof does not affect the anchor cable providing tension to the direct roof. Therefore, the deformation characteristics of the composite roof are determined to determine the direct top tension of the anchor cable (i.e. the anchor cable support load characteristics)

[0060] In this embodiment, it is also necessary to obtain the number of anchor cables in the excavation tunnel, the tension of each anchor cable and the anchoring area.

[0061] In step S102, if the deformation characteristic of the composite roof is that the anchor cable provides tension to the direct roof, the tension of the anchor cable to the direct roof is determined based on the tension of each anchor cable and the anchoring area. That is, the tension of the anchor cable to the direct roof is converted into a uniformly distributed anchor cable support load by the formula q1=ΣF / A, where F is the tension of a single anchor cable, A is the anchoring area, and ΣF is the sum of the tension of all anchor cables.

[0062] In step S102, the supporting force of the head coal seam is obtained for the coal seam plastic zone. Specifically, the supporting force q2 of the head coal seam is calculated based on the length of the head coal limit equilibrium zone, or can be obtained based on the head coal body stress monitoring.

[0063] In step S102, the coal support force on both sides of the tunnel is obtained for both sides of the tunnel. Specifically, during the tunneling process, the coal bodies on both sides support the suspended roof and are transmitted to the empty roof area to form a supporting shear force. That is, the coal support force q3 on both sides of the tunnel can be obtained based on the longitudinal stress monitoring of the coal on both sides.

[0064] Step S103, constructing a four-zone mechanical model based on the overlying rock load, the direct top tension of the anchor cable, the head coal seam support force, and the coal support force on both sides of the tunnel to obtain the total bending moment of each point in the four zones.

[0065] In step S103, a four-zone mechanical model is constructed based on the overlying rock load, the direct top tension of the anchor cable, the supporting force of the facing coal seam, and the supporting force of the coal on both sides of the tunnel to obtain the total bending moment of each point in the four zones, including: for each point in the four-zone mechanical model, the bending moments of the overlying rock load, the direct top tension of the anchor cable, the supporting force of the facing coal seam, and the supporting force of the coal on both sides of the tunnel are calculated at the point respectively, and then the total bending moment of the point is obtained by summing them up.

[0066] In this embodiment, the obtained dimensional parameters of the excavation tunnel also include the width of the coal seam on either side of the tunnel, the length of the unstable zone, the length of the empty top zone, the length of the plastic zone of the coal seam, and the tunnel width.

[0067] Specifically, Figure 4 Schematic diagram of a four-zone mechanical model provided in an embodiment of the present invention. Figure 5 A schematic diagram of the forces acting on each zone in the four-zone mechanical model provided in an embodiment of the present invention.

[0068] like Figure 4 As shown, the four-zone mechanical model of the empty top distance constructed by the present invention includes four zones along the excavation direction, namely, a stable zone, an unstable zone, an empty top zone and a coal seam plastic zone, wherein a boundary point of the stable zone is taken as the origin of the three-dimensional coordinate system, the X-axis direction is the excavation direction, the Z-axis direction is the tunnel width direction, and the Y-axis direction is the direct top thickness direction. In the excavation direction, the length of the unstable zone is L1, the length of the empty top zone is L2, and the length of the coal seam plastic zone is L3. The tunnel width is L4. All four zones have overburden pressure (i.e., overburden load) and coal support force on both sides of the tunnel (i.e., support shear force), the coal seam plastic zone has the support force of the head coal seam, and the stable zone and the unstable zone have anchor cable tension (i.e., anchor cable tension on the direct top).

[0069] Considering that the stable area is empty, the top distance has little effect on Figure 4 After simplification, we get Figure 5 , Figure 5The four stresses considered are the overburden pressure q0 in the unstable zone, empty top zone and coal seam plastic zone, the anchor cable tension q1 on the direct top, the head coal seam support q2 and the coal support q3 on both sides of the tunnel. The overburden pressure q0 is calculated according to formula (1), and the anchor cable tension q1 is converted into a uniformly distributed load according to the anchor cable distribution by the formula q1 = ΣF / A based on the anchor cable stress test. The head coal seam support q2 is obtained by calculating the length of the head coal limit equilibrium zone, or by monitoring the head coal body stress. The support shear force q3 is obtained by monitoring the longitudinal stress of the coal on both sides. Based on the above content, a simplified Figure 5 The four-zone mechanical model is shown.

[0070] for Figure 5 The four-zone mechanical model shown in FIG. 1 is a four-zone mechanical model in which the total bending moment of each point is the sum of the bending moments of the four stresses at a certain point (x, y, z), expressed as formula (2). Among them, the bending moment of the four stresses at a certain point is calculated according to the uniformly distributed load calculation formula.

[0071]

[0072] Where M(x,y,z) is the total bending moment of the four stresses at a certain point (x,y,z). is the bending moment of the overburden pressure q0 on a certain point (x, y, z), is the bending moment of the anchor cable to a certain point (x, y, z) due to the direct top tension q1, is the bending moment of the head coal seam support force q2 on a certain point (x, y, z), It is the bending moment of the coal support force q3 on both sides of the tunnel at a certain point (x, y, z).

[0073] Figure 6 A side view of the forces acting on each zone in the four-zone mechanical model provided in an embodiment of the present invention. Figure 7 This is a front view of the forces acting on each zone in the four-zone mechanical model provided in an embodiment of the present invention. Figure 6 and Figure 7 for Figure 5 The side view and front view of the tunnel. Where l is the width of the coal seam on either side of the tunnel. The simplified side view is Figure 6 As shown, h0 is the tunnel height, the model boundary is hinged in the empty area, and the area to be excavated is fixed. Figure 7 , with fixed supports at both ends.

[0074] Let L = L1 + L2 + L3, we can get:

[0075]

[0076]

[0077]

[0078]

[0079]

[0080]

[0081]

[0082] The bending moments corresponding to the four stresses at a certain point (x, y, z) can be obtained by equations (3) to (6). According to the above bending moment calculation formula, when z is the center of the empty top width, the bending moment is the largest, so only the case where the z value is the middle axis of the top plate's suspended width is considered. That is, only the bending moment corresponding to (x, y) when the z value is the middle axis of the top plate's suspended width is considered. If the thickness effect is considered, the bending moment at different positions z in the top plate of thickness h1 is determined by the cross-section beam bending model.

[0083] Step S104, obtaining the critical bending moment based on the tensile strength of the roof rock.

[0084] Specifically, in step S104, the physical and mechanical parameters of the tunnel are also measured. The physical and mechanical parameters include the tensile strength of the roof rock σ t , determine the uniaxial compressive strength R of the roof rock c , determine the triaxial compressive strength of roof rock under ground stress conditions σ c All measurements are carried out in accordance with the national standard GB / T-23561. The stability of the top plate can be judged based on the value of the top plate bending moment by combining the elastic modulus, moment of inertia, etc.

[0085] Considering that the compressive strength of general rocks is much greater than their tensile strength, the tensile strength is used to obtain the critical bending moment. The critical bending moment satisfies Where σ t is the tensile strength of roof rock, M a is the critical bending moment, h a is the neutral axis distance, h a Half the thickness of the top plate (h a =h1 / 2), I is the moment of inertia. I = bh 3 / 12; h is the thickness of the immediate roof rock layer (i.e. h=h1), and b is the width of the immediate roof (i.e. b=L4). Thus, the reasonable limit design range of the empty roof distance is comprehensively judged in combination with the physical and mechanical parameters.

[0086] Step S105, when the total bending moment of each point in the four zones is equal to the corresponding critical bending moment, the total bending moment of each point in the four zones is solved to obtain the maximum empty top distance.

[0087] Specifically, in step S105, considering that the critical bending moment is related to the neutral axis distance, and the neutral axis distance is related to the y in the coordinate point, there are multiple critical bending moments, among which the critical bending moment is taken as h at the neutral axis distance. a When the critical bending moment is the largest, the neutral axis distance h a The corresponding critical bending moment M a As the required critical bending moment, it is used to calculate the maximum empty roof distance. In addition, although there are many coordinate points in the four zones, the empty roof distance along the mining direction is mainly considered. Generally, the bending moments in other directions are smaller than those in the mining direction, and any bending moment (x, y) reaching the critical value indicates that the roof is unstable. Therefore, the total bending moment of each point in the mining direction is judged to be equal to the critical bending moment M. a As long as there is a point in the mining direction where the total bending moment is equal to the critical bending moment M a , it is considered that the limit design is reached. At this time, based on equations (2)-(6) and the critical bending moment M a The calculated length L2 is the maximum empty head distance, which is the required empty head limit distance.

[0088] In order to realize the above embodiment, the present invention also proposes a calculation system for the limit distance of the empty top left in the tunnel, wherein the tunnel is divided into four zones according to the tunneling direction: a stable zone, an unstable zone, an empty top zone and a coal seam plastic zone.

[0089] Figure 8 A block diagram of a calculation system for setting a maximum distance of an empty top in a tunneling tunnel provided by an embodiment of the present invention.

[0090] like Figure 8 As shown, the calculation system for setting the empty top limit distance of the excavation tunnel includes a four-zone mechanical model building module 11, a critical bending moment calculation module 12 and a maximum empty top distance solution module 13, wherein:

[0091] The four-zone mechanical model modeling module 11 is used to calculate the overburden load for the four zones based on the elastic modulus, thickness and block density of the overburden rock layers; for the stable zone and the unstable zone, determine the direct top tension of the anchor cable based on the deformation characteristics of the composite roof, obtain the head coal seam support force for the coal seam plastic zone, and obtain the coal support force on both sides of the tunnel for both sides of the tunnel; construct a four-zone mechanical model based on the overburden load, the direct top tension of the anchor cable, the head coal seam support force, and the coal support force on both sides of the tunnel to obtain the total bending moment of each point in the four zones;

[0092] A critical bending moment calculation module 12 is used to obtain a critical bending moment based on the tensile strength of the roof rock;

[0093] The maximum top-void distance solving module 13 is used to solve the total bending moment of each point in the four zones to obtain the maximum top-void distance when the total bending moment of each point in the four zones is equal to the corresponding critical bending moment.

[0094] Further, in a possible implementation of the embodiment of the present invention, in the critical bending moment calculation module 12, the critical bending moment satisfies Where σ t is the tensile strength of roof rock, M a is the critical bending moment, h a is the neutral axis distance, and I is the moment of inertia.

[0095] Furthermore, in a possible implementation of an embodiment of the present invention, the four-zone mechanical model modeling module 11, when used to construct a four-zone mechanical model based on the overlying rock load, the direct top tension of the anchor cable, the supporting force of the facing coal seam, and the supporting force of the coal on both sides of the tunnel to obtain the total bending moment of each point in the four zones, is specifically used to: for each point in the four-zone mechanical model, calculate the bending moments of the overlying rock load, the direct top tension of the anchor cable, the supporting force of the facing coal seam, and the supporting force of the coal on both sides of the tunnel respectively at the point, and then sum them up to obtain the total bending moment of the point.

[0096] Furthermore, in a possible implementation of an embodiment of the present invention, in the four-zone mechanical model building module 11, if the deformation characteristic of the composite roof is that the anchor cables provide tension to the direct roof, the tension of the anchor cables on the direct roof is determined based on the tension of each anchor cable and the anchoring area.

[0097] It should be noted that the above explanation of the embodiment of the method for calculating the maximum distance of the empty top left in the tunneling tunnel is also applicable to the calculation system of the maximum distance of the empty top left in the tunneling tunnel of this embodiment, and will not be repeated here.

[0098] In an embodiment of the present invention, the tunnel is divided into four zones according to the excavation direction, namely, a stable zone, an unstable zone, an empty top zone and a coal seam plastic zone. The calculation method includes the following steps: for the four zones, the overlying rock stratum load is calculated based on the elastic modulus, thickness and block density of the overlying rock strata; for the stable zone and the unstable zone, the direct top tension of the anchor cable is determined based on the deformation characteristics of the composite roof, the supporting force of the facing coal seam is obtained for the coal seam plastic zone, and the supporting force of the coal on both sides of the tunnel is obtained for both sides of the tunnel; a four-zone mechanical model is constructed based on the overlying rock stratum load, the direct top tension of the anchor cable, the supporting force of the facing coal seam, and the supporting force of the coal on both sides of the tunnel to obtain the total bending moment of each point in the four zones; the critical bending moment is obtained based on the tensile strength of the roof rock; when the total bending moment of each point in the four zones is equal to the corresponding critical bending moment, the total bending moment of each point in the four zones is solved to obtain the maximum empty top distance. In this case, considering the dimensional parameters such as thickness, the critical bending moment obtained by comprehensively considering the overlying rock load in the four zones of stable zone, unstable zone, empty top zone and coal seam plastic zone, the direct top tension of anchor cables, the supporting force of the facing coal seam, and the supporting force of coal on both sides of the tunnel, combined with the tensile strength of the roof rock, can better obtain the empty top limit distance.

[0099] The existing calculation of the empty top distance simplifies the stress and structural characteristics of the roof and the support properties of anchor rods and cables, which poses a great safety hazard. In addition, the existing empty top distance measurement and design simplifies the three-dimensional stress structure of the roof into two dimensions, without considering the influence of the tunnel width, height, coal seam properties, and support mechanical properties. Moreover, the maximum value of the empty top distance is associated with the deflection, ignoring the size effect. The existing technology is prone to errors in calculation. If construction is carried out according to the existing empty top distance maximum safety distance algorithm, it is very easy to cause major safety accidents. Considering that the safety of the empty top distance is closely related to the structural characteristics of the roof and the tunnel, the present invention aims to propose a calculation and control method for the maximum empty top distance of the tunneling tunnel, specifically considering the stress and structural relationship between the roof and the anchor cable, considering the overall stress and structural characteristics of the roof and the coal tunnel, and comprehensively considering the mechanical properties of the roof rock layer, a judgment standard based on tensile strength is proposed, and finally the maximum reserved value of the empty top distance is defined. The maximum safety value of the empty top distance under engineering conditions is obtained, and at the same time, according to the support and protection measures, the optimal empty top distance and support control scheme are obtained. It can shorten the construction period and accelerate the strain stability under the premise of ensuring the safety of the roof. It is beneficial to the economy and safety of tunnel excavation. The method of the invention is conducive to optimizing the excavation support construction design, and is conducive to improving the support plan, and occupies a leading position in the industry in theory in tunnel excavation construction measures.

[0100] In order to implement the above embodiments, the present invention also proposes an electronic device, comprising: a processor, and a memory communicatively connected to the processor; the memory stores computer-executable instructions; the processor executes the computer-executable instructions stored in the memory to implement the method provided by the above embodiments.

[0101] In order to implement the above embodiments, the present invention further proposes a computer-readable storage medium, in which computer-executable instructions are stored. When the computer-executable instructions are executed by a processor, they are used to implement the methods provided by the above embodiments.

[0102] In order to implement the above embodiments, the present invention further provides a computer program product, including a computer program, which implements the methods provided by the above embodiments when executed by a processor.

[0103] In the description of the aforementioned embodiments, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.

[0104] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0105] Any process or method description in a flowchart or otherwise described herein may be understood to represent a module, segment or portion of code comprising one or more executable instructions for implementing the steps of a custom logical function or process, and the scope of the preferred embodiments of the present invention includes alternative implementations in which functions may not be performed in the order shown or discussed, including performing functions in a substantially simultaneous manner or in reverse order depending on the functions involved, which should be understood by technicians in the technical field to which the embodiments of the present invention belong.

[0106] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute the instructions), or in combination with these instruction execution systems, devices or apparatuses. For the purpose of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in combination with these instruction execution systems, devices or apparatuses. More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk box (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), a fiber optic device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium and then editing, interpreting or processing in other suitable ways if necessary, and then stored in a computer memory.

[0107] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, a plurality of steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0108] A person skilled in the art may understand that all or part of the steps in the method for implementing the above-mentioned embodiment may be completed by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, which, when executed, includes one or a combination of the steps of the method embodiment.

[0109] In addition, each functional unit in each embodiment of the present invention may be integrated into a processing module, or each unit may exist physically separately, or two or more units may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of a software functional module. If the integrated module is implemented in the form of a software functional module and sold or used as an independent product, it may also be stored in a computer-readable storage medium.

[0110] The storage medium mentioned above may be a read-only memory, a magnetic disk or an optical disk, etc. Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limiting the present invention. A person of ordinary skill in the art may change, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A method for calculating the limit distance of the empty top of a tunnel, characterized in that: The tunnel is divided into four zones according to the excavation direction: a stable zone, an unstable zone, an empty top zone and a coal seam plastic zone. The calculation method includes the following steps: For the four zones, the overburden loads are calculated based on the elastic modulus, thickness and block density of each overburden stratum; For the stable area and the unstable area, the direct top tension of the anchor cable is determined based on the deformation characteristics of the composite roof, the head coal seam support force is obtained for the coal seam plastic zone, and the coal support force on both sides of the tunnel is obtained for both sides of the tunnel; A four-zone mechanical model is constructed based on the overlying rock load, the direct top tension of the anchor cable, the supporting force of the head coal seam, and the supporting force of the coal on both sides of the tunnel to obtain the total bending moment of each point in the four zones; The critical bending moment is obtained based on the tensile strength of the roof rock; When the total bending moment of each point in the four zones is equal to the corresponding critical bending moment, the total bending moment of each point in the four zones is solved to obtain the maximum empty top distance.

2. The method for calculating the limit distance of the empty top of the tunnel according to claim 1 is characterized in that: The critical bending moment satisfies Where σ t is the tensile strength of roof rock, M a is the critical bending moment, h a is the neutral axis distance, and I is the moment of inertia.

3. The method for calculating the limit distance of the empty top of the tunnel according to claim 1 is characterized in that: Based on the overlying rock load, the direct top tension of the anchor cable, the supporting force of the head coal seam, and the supporting force of the coal on both sides of the tunnel, a four-zone mechanical model is constructed to obtain the total bending moment of each point in the four zones, including: For each point of the four-zone mechanical model, the bending moments of the overlying rock load, the direct top tension of the anchor cable, the supporting force of the facing coal seam, and the supporting force of the coal on both sides of the tunnel are calculated, and then the total bending moment of the point is obtained by summing them up.

4. The method for calculating the limit distance of the empty top of the tunnel according to claim 1 is characterized in that: If the deformation characteristic of the composite roof is that the anchor cables provide tension on the direct roof, the tension of the anchor cables on the direct roof is determined based on the tension of each anchor cable and the anchoring area.

5. A calculation system for the limit distance of empty top left in tunneling, characterized in that: The tunnel is divided into four zones according to the excavation direction: stable zone, unstable zone, empty top zone and coal seam plastic zone. The calculation system includes: A four-zone mechanical model modeling module is used to calculate the overburden load for the four zones based on the elastic modulus, thickness and block density of each overburden rock layer; for the stable zone and the unstable zone, determine the direct top tension of the anchor cable based on the deformation characteristics of the composite roof, obtain the head coal seam support force for the coal seam plastic zone, and obtain the coal support force on both sides of the tunnel for both sides of the tunnel; construct a four-zone mechanical model based on the overburden load, the direct top tension of the anchor cable, the head coal seam support force, and the coal support force on both sides of the tunnel to obtain the total bending moment of each point in the four zones; Critical bending moment calculation module, used to obtain critical bending moment based on the tensile strength of roof rock; The maximum empty top distance solving module is used to solve the total bending moment of each point in the four zones to obtain the maximum empty top distance when the total bending moment of each point in the four zones is equal to the corresponding critical bending moment.

6. The calculation system for the limit distance of the empty top left in the tunneling tunnel according to claim 5 is characterized in that: In the critical bending moment calculation module, the critical bending moment satisfies Where σ t is the tensile strength of roof rock, M a is the critical bending moment, h a is the neutral axis distance, and I is the moment of inertia.

7. The calculation system for the limit distance of the empty top left in the tunneling tunnel according to claim 5 is characterized in that: The four-zone mechanical model modeling module, when used to construct a four-zone mechanical model based on the overlying rock load, the direct top tension of the anchor cable, the supporting force of the facing coal seam, and the supporting force of the coal on both sides of the tunnel to obtain the total bending moment of each point in the four zones, is specifically used to: for each point of the four-zone mechanical model, calculate the bending moments of the overlying rock load, the direct top tension of the anchor cable, the supporting force of the facing coal seam, and the supporting force of the coal on both sides of the tunnel respectively at the point, and then sum them up to obtain the total bending moment of the point.

8. The calculation system for the limit distance of the empty top left in the tunneling tunnel according to claim 5, characterized in that: In the four-zone mechanical model modeling module, if the deformation characteristic of the composite roof is that the anchor cables provide tension on the direct roof, the tension of the anchor cables on the direct roof is determined based on the tension of each anchor cable and the anchoring area.

9. An electronic device, characterized in that: include: A processor, and a memory communicatively connected to the processor; The memory stores computer-executable instructions; The processor executes the computer-executable instructions stored in the memory to implement the method according to any one of claims 1 to 4.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer-executable instructions, which are used to implement the method according to any one of claims 1 to 4 when executed by a processor.