Electric power system anti-misoperation method and device based on safety tool
By identifying and automatically prompting the voltage level and operating position of the tool, the safety hazards caused by the lack of auxiliary means by the factory station duty officer in equipment operation are solved, the accurate selection and use of tools is realized, and the safety of the power grid is improved. stability.
Patent Information
- Application Number
- CN202411025026.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-11-12
AI Technical Summary
The factory station duty officer lacks auxiliary means when operating the equipment, which leads to safety risks in the selection and use of tools, and cannot ensure the correctness of the voltage level and the accuracy of the operation.
By obtaining the target work task operation ticket, identifying keywords and sending them to the tool cabinet, using the tool cabinet's identification code and positioning function, we automatically prompt and release the corresponding tool to ensure that the tool matches the operation task, and perceive the operation in real time Accuracy of intervals and electrical test positions.
It improves the safety and accuracy of operations, reduces the risk of misoperation, and ensures the stable operation of the power grid and personnel safety.
Smart Images

Figure CN118940952A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of on-site information identification, and in particular to a method and device for preventing misoperation of an electric power system based on safety tools. Background Art
[0002] When the plant operator is operating a primary device, which involves switching the primary device between cold standby and maintenance status, the safety tools required include: insulating gloves, insulating boots, testers, grounding wires, etc. Among them, the testers and grounding wires have different voltage levels, and different voltage levels require corresponding testers and grounding wires, so the correctness of the voltage level is particularly important.
[0003] At present, the whole process of picking up tools and using them on site is only completed by the duty officer on his own initiative, without any system prompts, which greatly increases the danger. At present, the operation process of the plant duty officer, including the selection and use of tools, is completely supported by the duty officer's skills, without any auxiliary means for further reminders and guarantees. When the operation involves the grounding wire, the duty officer needs to take the initiative to pick up the corresponding voltage level of the tester and grounding wire from the tool cabinet. When testing the electricity and grounding wires on site, the duty officer also needs to find the correct position for testing and grounding wires. During this whole process, there is only a guardian to monitor nearby, and there is no auxiliary means to help the duty officer select and use tools and establish a protective barrier.
[0004] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention
[0005] The embodiment of the present invention provides a method and device for preventing misoperation of an electric power system based on safety tools, so as to at least solve the technical problem in the related art that when a plant or station attendant takes over an equipment operation, he can only rely on his own initiative to complete it, and there is no auxiliary means to help the on-duty staff in the selection and use of tools, which poses a safety hazard.
[0006] According to one aspect of an embodiment of the present invention, a method for preventing misoperation of an electric power system based on safety tools is provided, comprising: obtaining a target work task operation ticket, wherein the target work task operation ticket is an operation ticket generated according to a target operation to be performed on the electric power system as needed; performing keyword recognition on the target work task operation ticket to obtain a target keyword in the target work task operation ticket, wherein the target keyword includes at least: a voltage level of the area where the electric power system is located, a tool type of a target tool required to perform the target operation on the electric power system, an operation interval name, and an operation device number; and sending the target keyword to a to a tool cabinet, so that after the identification code pasted on the tool cabinet is scanned by a predetermined terminal device, the target tool is transported to a tool extraction location through the tool cabinet, wherein the tool cabinet stores the target tool; after the target tool is taken out from the tool extraction location, the target tool is triggered to start a positioning function to obtain the current operating interval and the position to be tested of the target tool; prompt information is generated according to at least one of the operating interval, the grounding line voltage level and the position to be tested; and whether the actual operation performed on the power system is consistent with the target operation according to the prompt information.
[0007] Optionally, obtaining the target work task operation ticket includes: obtaining work plan information of the power system, wherein the work plan information includes: the target operation that needs to be performed on the power system, task allocation, time schedule and resources required to perform the target operation; generating the target work task operation ticket according to the work plan information.
[0008] Optionally, keyword recognition is performed on the target work task operation ticket to obtain target keywords in the target work task operation ticket, including: keyword recognition is performed on the target work task operation ticket by natural speech recognition to obtain the target keywords.
[0009] Optionally, the target keyword is sent to a tool cabinet so that after the identification code pasted on the tool cabinet is scanned by a predetermined terminal device, the target tool is transported to a tool retrieval location through the tool cabinet, including: after the predetermined terminal scans the identification code, obtaining input information of the predetermined terminal; determining the target tool that needs to be shipped out of the tool cabinet based on the input information and the target keyword; and transporting the target tool to the tool retrieval location.
[0010] Optionally, the method for preventing misoperation of an electric power system based on safety tools further includes: detecting the actual tools at the tool extraction point to obtain a detection result; when the detection result indicates that the actual tools are inconsistent with the target tools, generating an abnormal outbound delivery prompt message to detect an abnormality in the outbound delivery operation of the tool cabinet.
[0011] Optionally, after the target tool is taken out from the tool extraction site, the target tool is triggered to start the positioning function to obtain the operating interval and the position to be tested electrically where the target tool is currently located, including: after determining that the target tool is taken out from the tool extraction site and transported to the target electrical interval, the target tool is triggered to start the positioning function to sense the operating interval and the position to be tested electrically where it is currently located.
[0012] Optionally, prompt information is generated based on at least one of the operation interval, the grounding wire voltage level and the position to be tested, including: when the operation interval is inconsistent with the preset operation interval, or the actual test position is inconsistent with the position to be tested, or the grounding wire voltage level is inconsistent with the actual grounding voltage level, a first prompt information is generated, wherein the first prompt information indicates abnormal operation; when the operation interval is consistent with the preset operation interval, and the actual test position is consistent with the position to be tested, and the grounding wire voltage level is consistent with the actual grounding voltage level, a second prompt information is generated, wherein the second prompt information indicates normal operation.
[0013] According to another aspect of an embodiment of the present invention, there is also provided an anti-misoperation device for an electric power system based on safety tools, comprising: an acquisition module, used to acquire a target work task operation ticket, wherein the target work task operation ticket is an operation ticket generated according to a target operation to be performed on the electric power system as needed; a first processing module, used to perform keyword recognition on the target work task operation ticket to obtain a target keyword in the target work task operation ticket, wherein the target keyword includes at least: a voltage level of the area where the electric power system is located, a tool type of a target tool required to perform the target operation on the electric power system, an operation interval name, and an operation device number; a sending module, used to send the target keyword to A tool cabinet, so that after the identification code pasted on the tool cabinet is scanned by a predetermined terminal device, the target tool is transported to the tool extraction site through the tool cabinet, wherein the tool cabinet stores the target tool; a second processing module, for triggering the target tool to start the positioning function after the target tool is taken out from the tool extraction site, so as to obtain the current operating interval and the position to be tested of the target tool; a third processing module, for generating prompt information according to at least one of the operating interval, the grounding line voltage level and the position to be tested; a determination module, for determining whether the actual operation performed on the power system is consistent with the target operation according to the prompt information.
[0014] Optionally, the acquisition module includes: a first acquisition unit, used to acquire work plan information of the power system, wherein the work plan information includes: the target operation that needs to be performed on the power system, task allocation, time schedule and resources required to perform the target operation; a first processing unit, used to generate the target work task operation ticket according to the work plan information.
[0015] Optionally, the first processing module includes: a second processing unit, used to perform keyword recognition on the target work task operation ticket through natural speech recognition to obtain the target keyword.
[0016] Optionally, the sending module includes: a second acquisition unit, used to acquire the input information of the predetermined terminal after the predetermined terminal scans the identification code; a determination unit, used to determine the target tools that need to be shipped out of the tool cabinet based on the input information and the target keywords; and a third processing unit, used to transport the target tools to the tool extraction location.
[0017] Optionally, the power system anti-misoperation device based on safety tools further includes: a detection module, used to detect the actual tools at the tool extraction point to obtain the detection result; a fourth processing module, used to generate a warehouse abnormality prompt information when the detection result indicates that the actual tool is inconsistent with the target tool, so as to take advantage of the abnormality of the warehouse operation of the tool cabinet.
[0018] Optionally, the second processing module includes: a fourth processing unit, which is used to trigger the target tool to start the positioning function after determining that the target tool is taken out from the tool extraction location and transported to the target electrical interval, so as to sense the current operating interval and the position to be tested.
[0019] Optionally, the third processing module includes: a fifth processing unit, used to generate a first prompt message when the operation interval is inconsistent with the preset operation interval, or the actual electrical test position is inconsistent with the position to be tested, or the grounding wire voltage level is inconsistent with the actual grounding voltage level, wherein the first prompt message indicates abnormal operation; a sixth processing unit, used to generate a second prompt message when the operation interval is consistent with the preset operation interval, the actual electrical test position is consistent with the position to be tested, and the grounding wire voltage level is consistent with the actual grounding voltage level, wherein the second prompt message indicates normal operation.
[0020] According to another aspect of an embodiment of the present invention, there is also provided an electric power system anti-misoperation system based on safety tools, the electric power system anti-misoperation system based on safety tools using any one of the above-mentioned electric power system anti-misoperation methods based on safety tools.
[0021] According to another aspect of an embodiment of the present invention, a computer program product is provided, comprising computer instructions, which, when executed by a processor, execute any one of the above-mentioned methods for preventing misoperation of a power system based on safety tools.
[0022] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is provided, the computer-readable storage medium comprising a stored program, wherein the program executes any one of the above-mentioned methods for preventing misoperation of a power system based on safety tools.
[0023] According to another aspect of an embodiment of the present invention, a processor is provided, the processor being used to run a program, wherein when the program is run, any one of the above-mentioned methods for preventing misoperation of a power system based on safety tools is executed.
[0024] In an embodiment of the present invention, a target work task operation ticket is obtained, wherein the target work task operation ticket is an operation ticket generated according to the target operation to be performed on the power system as needed; keyword recognition is performed on the target work task operation ticket to obtain the target keyword in the target work task operation ticket, wherein the target keyword at least includes: the voltage level of the area where the power system is located, the tool type of the target tool required to perform the target operation on the power system, the operation interval name, and the operation device number; the target keyword is sent to the tool cabinet, so that after the identification code pasted on the tool cabinet is scanned by the predetermined terminal device, the target tool is transported to the tool extraction location through the tool cabinet, wherein the tool cabinet stores the target tool; after the target tool is taken out from the tool extraction location, the target tool is triggered to start the positioning function to obtain the current operation interval and the position to be tested for electricity where the target tool is located; prompt information is generated according to at least one of the operation interval, the grounding line voltage level, and the position to be tested for electricity; and whether the actual operation performed on the power system is consistent with the target operation is determined according to the prompt information. Through the above-mentioned technical scheme provided by the present invention, the natural language processing technology information recognition system can be used to identify the target keywords. At the same time, the tool cabinet system automatically prompts and releases the corresponding tools, and the positioning recognition system perceives and intelligently judges the accuracy of the operation interval, grounding point and electrical test position in real time, thereby achieving the purpose of accurately executing operation tasks, improving work efficiency, and ensuring the safety and stability of the power grid, thereby realizing the technical effect of automatically identifying the positions of tools, electrical testers and grounding wires and giving error prompts, improving the safety of operations, and further solving the technical problem in the related technology that when the plant and station attendants receive an equipment operation, they can only rely on their own initiative to complete it, and there is no auxiliary means to help the on-duty employees in the selection and use of tools, which poses a safety hazard. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0026] Figure 1 It is a hardware structure block diagram of a mobile terminal of a method for preventing misoperation of a power system based on a safety tool according to an embodiment of the present invention;
[0027] Figure 2 is a flow chart of a method for preventing misoperation of a power system based on a safety tool according to an embodiment of the present invention;
[0028] Figure 3 is a flow chart of an optional method for preventing misoperation of a power system based on safety tools according to an embodiment of the present invention;
[0029] Figure 4Schematic diagram of a power system misoperation prevention device based on a safety tool according to an embodiment of the present invention. DETAILED DESCRIPTION
[0030] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0031] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0032] As introduced in the background technology, in the related technology, when the plant and station attendants receive a piece of equipment for operation, they can only rely on their own initiative to complete it, and there is no auxiliary means to help the on-duty staff to select and use the equipment, which has a technical problem of potential safety hazards. In view of the above defects, in the embodiments of the present invention, a method and device for preventing misoperation of an electric power system based on safety tools, a system for preventing misoperation of an electric power system based on safety tools, a computer-readable storage medium, a processor, and a computer program product are provided.
[0033] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0034] The method embodiments provided in the embodiments of the present invention can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 1 1 is a hardware structure block diagram of a mobile terminal of a method for preventing misoperation of a power system based on a safety tool according to an embodiment of the present invention. Figure 1 As shown, the mobile terminal may include one or more ( Figure 1Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the mobile terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations shown.
[0035] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the method for preventing misoperation of the power system based on safety tools in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, to implement the above method. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories can be connected to the mobile terminal via a network. Examples of the above network include but are not limited to the Internet, an intranet, a local area network, a mobile communication network, and a combination thereof. The transmission device 106 is used to receive or send data via a network. The specific example of the above network may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.
[0036] According to an embodiment of the present invention, a method embodiment of a method for preventing misoperation of an electric power system based on safety tools is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0037] Figure 2 FIG. 1 is a flow chart of a method for preventing misoperation of a power system based on a safety tool according to an embodiment of the present invention. Figure 2 As shown, the method comprises the following steps:
[0038] Step S202 , obtaining a target work task operation ticket, wherein the target work task operation ticket is an operation ticket generated according to a target operation to be performed on the power system as required.
[0039] Optionally, the target operations performed by the above-mentioned power system may include: replacing equipment, performing maintenance, adjusting parameters, etc.
[0040] In this embodiment, a target work task operation ticket can be obtained, wherein the role of the target work task operation ticket is to ensure the correct and safe operation of the power system, and provide the detailed steps and instructions required for the staff to perform the operation to ensure the accuracy and reliability of the operation. By using the target work task operation ticket, operational errors and accidents can be avoided, thereby maximizing the stability of the power system and the safety of the staff.
[0041] Step S204, perform keyword recognition on the target work task operation ticket to obtain the target keywords in the target work task operation ticket, wherein the target keywords include at least: the voltage level of the area where the power system is located, the tool type of the target tool required to perform the target operation on the power system, the operation interval name, and the operation equipment number.
[0042] It should be noted that the above-mentioned keyword recognition is achieved by performing text analysis on the target work task operation ticket to identify the keywords or key phrases therein. These words can accurately describe and summarize the requirements and content of the work task. Keyword recognition can be achieved through natural language processing technology, and the keywords can be extracted based on the text content of the operation ticket. Generally speaking, the target keywords in the target work task operation ticket are usually keywords related to the work task itself.
[0043] Optionally, the above-mentioned target keywords may include: specific work content, operating steps, equipment name, safety precautions, etc. In addition, the target keywords include at least: the voltage level of the area where the power system is located, the tool type of the target tools required to perform the target operation on the power system (grounding wire and tester of the corresponding voltage level), the operation interval name, and the operation equipment number.
[0044] In this embodiment, keyword recognition can be performed on the target work task operation ticket to obtain corresponding target keywords, which can help staff quickly understand the content of the target work task operation ticket, thereby effectively improving the accuracy and execution efficiency of the operation.
[0045] Step S206, sending the target keyword to the tool cabinet, so that after the identification code pasted on the tool cabinet is scanned by the predetermined terminal device, the target tool is transported to the tool retrieval location through the tool cabinet, wherein the tool cabinet stores the target tool.
[0046] It should be noted that the above-mentioned tool cabinet is a cabinet used to store and organize tools, usually used in workplaces such as workshops, factories or garages, usually has a locking mechanism to ensure the safety of the tools, and can be moved or fixed to the ground as needed; the above-mentioned tool extraction area refers to a place for storing and extracting various tools and equipment, usually located in production or maintenance places such as factories, workshops, warehouses, etc.
[0047] In this embodiment, it can ensure that workers can use the correct tools and equipment safely and efficiently when performing electrical work. By scanning the identification code affixed to the tool cabinet to receive the tools, it can ensure that the tools and equipment received by the workers match the work tasks, avoiding safety accidents or operation failures caused by using the wrong tools, ensuring the safety and effectiveness of electrical work, and reducing the possibility of accidents.
[0048] It should be noted that, in the embodiment of the present invention, the safety tool can be an insulating safety tool, the tester can be a test pen, the tester can be a capacitive tester, and the tool cabinet can be an intelligent tool cabinet.
[0049] Step S208, after the target tool is taken out from the tool extraction location, trigger the target tool to start the positioning function to obtain the current operating interval and the position to be tested of the target tool.
[0050] It should be noted that the above-mentioned operation interval refers to the time interval between two operations. The setting of the operation interval can effectively control the frequency of operations and ensure the normal operation of the system; the above-mentioned location to be tested refers to the location that requires electrical safety inspection and acceptance, usually including circuits, sockets, switches, electrical equipment, etc.
[0051] In this embodiment, when the operator moves the tools to the corresponding electrical interval according to the operation task, the preset positioning and identification system in the tools can identify the operation interval. Before performing the grounding and electrical testing operations, it is necessary to use a mobile phone to scan the QR code at the corresponding position for position identification to obtain the current operation interval and the position to be tested of the target tool. This can help the staff track the location of the target tool, save time and energy, and improve work efficiency.
[0052] Step S210, generating prompt information according to at least one of the operation interval, the voltage level of the grounding line, and the position to be tested.
[0053] In this embodiment, prompt information can be generated based on at least one of the operating interval, the grounding line voltage level, and the position to be tested, to ensure that the tools are correctly returned to the designated electrical interval, and to provide accurate location information when performing grounding and electrical testing operations, to help the on-duty personnel avoid the risk of misoperation caused by going to the wrong interval.
[0054] Step S212: determining whether the actual operation performed on the power system is consistent with the target operation according to the prompt information.
[0055] In this embodiment, it can be determined based on the prompt information whether the actual operation performed on the power system is consistent with the target operation, which can ensure that the tools are accurately returned to the designated electrical interval, and provide accurate position information during grounding and electrical testing operations, which is conveyed to the operator on duty through the light prompt system. If the operation position is correct, the light displays a green signal, indicating that the operation can continue; if the position is incorrect, the light displays a red signal, which requires immediate verification and correction, which can effectively avoid the risk of misoperation and ensure the safe and stable operation of the power grid and personal safety.
[0056] From the above, it can be seen that in the embodiment of the present invention, the information recognition system can identify the target keywords using natural language processing technology. At the same time, the tool cabinet system automatically prompts and releases the corresponding tools. The positioning recognition system perceives and intelligently judges the accuracy of the operation interval, grounding point and electrical test position in real time, thereby achieving the purpose of accurately executing operation tasks, improving work efficiency, and ensuring the safety and stability of the power grid, thereby realizing the technical effect of automatically identifying the positions of tools, electrical testers and grounding wires and giving error prompts, thereby improving the safety of operations.
[0057] The technical solution provided by the embodiment of the present invention solves the technical problem in the related art that when a plant or station attendant takes over an equipment operation, he or she can only rely on his or her own initiative to complete it, and there is no auxiliary means to help the attendant select and use the equipment, which poses a safety hazard.
[0058] According to the above-mentioned embodiment of the present invention, obtaining a target work task operation ticket includes: obtaining work plan information of the power system, wherein the work plan information includes: target operations that need to be performed on the power system, task allocation, time schedule, and resources required to perform the target operations; generating a target work task operation ticket based on the work plan information.
[0059] It should be noted that the above work plan information includes: the target operations that need to be performed on the power system, a detailed description of the work content, task allocation, time schedule, and planning of resources (such as manpower, materials, equipment, etc.) required to perform the target operations.
[0060] In this embodiment, the dispatching system fills out the operation ticket, dispatches the work on the power grid management platform according to the work plan, associates the dispatching plan, and fills out the work task operation ticket (platform screenshot). That is, when a work plan needs to be executed, the corresponding dispatching plan must first be created or associated in the dispatching system. After the dispatching is completed, the on-duty staff fills out the operation ticket according to the work plan.
[0061] Among them, the work dispatching system is a key component used to allocate and track work tasks in the power grid management platform.
[0062] According to the above embodiment of the present invention, keyword recognition is performed on the target work task operation ticket to obtain the target keyword in the target work task operation ticket, including: keyword recognition is performed on the target work task operation ticket by natural speech recognition to obtain the target keyword.
[0063] It should be noted that the above-mentioned natural speech recognition method is an advanced information recognition system that can automatically process and extract key information from the completed operation ticket.
[0064] In this embodiment, the system (i.e., the information identification system) identifies the keywords involved in the operation ticket based on the completed operation ticket, and after completion, transmits the above-mentioned relevant information to the tool cabinet through the mobile phone system. That is, by applying natural language processing technology, the system can accurately identify the core content of the operation ticket. After the identification process is completed, the system will transmit these key information to the tool cabinet in real time through the mobile phone application, which not only improves work efficiency, but also ensures the accuracy of the information required during the operation, and further ensures the safety and accuracy of power operations.
[0065] Optionally, the core content may include but is not limited to: regional voltage level, type of operating tools required for specific voltage level (such as grounding wires and testers of different voltage levels), specific names of operating intervals, and dual numbering of operating equipment.
[0066] According to the above embodiment of the present invention, the target keyword is sent to the tool cabinet so that after the identification code pasted on the tool cabinet is scanned by the predetermined terminal device, the target tool is transported to the tool retrieval point through the tool cabinet, including: after the predetermined terminal scans the identification code, the input information of the predetermined terminal is obtained; the target tool that needs to be shipped out of the tool cabinet is determined based on the input information and the target keyword; and the target tool is transported to the tool retrieval point.
[0067] In this embodiment, after the system's intelligent task identification and allocation stage is completed, the operator on duty can go to the tool room to collect the safety tools needed for the operation. Before arriving at the tool cabinet, the operator can scan the QR code on the tool cabinet through the mobile phone application. At this time, the system in the tool cabinet has received the work task. The tool cabinet system will provide the operator with a tester and grounding wire of the corresponding voltage level according to the requirements of the work task (which should also include insulating gloves, insulating boots, ladders and other tools required for the operation), prompt the type of tools and release the corresponding tools. The system can accurately determine the target tools that need to be shipped out, thereby improving work efficiency.
[0068] Optionally, the above-mentioned tools may include but are not limited to: testers of corresponding voltage levels, grounding wires, and personal protective safety tools such as insulating gloves and insulating boots, which are used to protect operators from the risk of electric shock caused by direct contact with high voltage in a high-voltage environment; at the same time, it may also include auxiliary tools such as ladders, so that workers can complete their work safely and conveniently when they need to climb or enter confined spaces.
[0069] According to the above embodiment of the present invention, the method for preventing misoperation of the power system based on safety tools also includes: detecting the actual tools at the tool extraction point to obtain the detection results; when the detection results indicate that the actual tools are inconsistent with the target tools, generating abnormal outbound operation prompt information to detect abnormalities in the outbound operation of the tool cabinet.
[0070] In this embodiment, the actual tools can be tested to timely discover and solve the problem of abnormal tool delivery. That is, when picking up tools, the duty officer must carefully check and confirm that each tool and its voltage level are fully consistent with the actual task requirements to avoid problems such as incorrect filling out of the operation ticket or abnormal system information recognition. If it is found that the tool cabinet fails to be delivered normally according to the preset process, that is, the corresponding tools cannot be successfully collected, the duty officer must immediately find out the reason and take corresponding measures to solve it, such as re-scanning the QR code to trigger the recognition mechanism, or performing manual intervention operations according to the emergency plan to ensure that the required various tools are successfully obtained under the premise of meeting safety requirements and task requirements, which can ensure the correct use and management of tools and improve the utilization rate and management efficiency of tools.
[0071] Figure 3 is a flow chart of an optional method for preventing misoperation of a power system based on a safety tool according to an embodiment of the present invention, such as Figure 3 As shown, after going to the tool room and scanning the QR code on the tool cabinet to collect the required tools, the duty officer should identify whether the type and voltage level of the tools collected are correct. If the tool cabinet cannot be shipped out normally, it is necessary to scan the QR code again to extract it. Otherwise, if the tool cabinet is shipped out normally, proceed to the next step.
[0072] According to the above embodiment of the present invention, after the target tool is taken out from the tool extraction site, the target tool is triggered to start the positioning function to obtain the current operating interval and the position to be tested electrically of the target tool, including: after determining that the target tool is taken out from the tool extraction site and transported to the target electrical interval, the target tool is triggered to start the positioning function to sense its current operating interval and the position to be tested electrically.
[0073] In this embodiment, before starting the operation task, the operator can transport the safety tools collected from the tool cabinet to the corresponding electrical interval according to the operation task, and then trigger the target tool to start the positioning function to sense its current operation interval and the position to be tested. That is, the high-tech positioning and identification system integrated inside the tool can sense in real time and intelligently determine whether the current operation interval is accurate.
[0074] According to the above embodiment of the present invention, prompt information is generated according to at least one of the operation interval, the grounding wire voltage level and the position to be tested, including: when the operation interval is inconsistent with the preset operation interval, or the actual test position is inconsistent with the position to be tested, or the grounding wire voltage level is inconsistent with the actual grounding voltage level, a first prompt information is generated, wherein the first prompt information indicates abnormal operation; when the operation interval is consistent with the preset operation interval, and the actual test position is consistent with the position to be tested, and the grounding wire voltage level is consistent with the actual grounding voltage level, a second prompt information is generated, wherein the second prompt information indicates normal operation.
[0075] In this embodiment, once the interval is successfully identified and consistent with the preset instructions, the green signal light of the corresponding interval lights up, which is clearly conveyed to the attendant through visual prompts, indicating that the tools have been accurately returned to the designated electrical interval and the subsequent operations can be carried out safely. Before implementing the grounding and electrical testing operations, the electrical tester performs real-time comparison based on the position information pre-stored in the device and the actual position to be tested. When the electrical testing position is confirmed to be correct, the electrical test light turns green (i.e., the second prompt information mentioned above), otherwise it turns red (i.e., the first prompt information mentioned above); similarly, for grounding operations, when the grounding position is correct, the grounding light shows green; if the position is incorrect, it turns to a red light warning.
[0076] In addition, if all steps are correct, the green light on the tool lights up, sending a clear signal to the operator that the current operating position fully meets the preset standards and that subsequent operating tasks can be performed safely and accurately. However, when a red light signal appears in any link, the operator needs to immediately recheck the current operating position, find out the problem and correct it, thereby effectively avoiding the risk of misoperation caused by going to the wrong interval and ensuring the safe and stable operation of the power grid and personal safety.
[0077] like Figure 3 As shown, the method may include: step 1, plan the dispatch of work on the power grid management platform, and fill in the operation ticket in association with the dispatch plan. Step 2, the system identifies the keywords involved in the operation ticket according to the operation ticket; the system pre-sets the type of tools and equipment to be collected, the voltage level and other information, and accurately identifies the core content of the operation ticket; the operation compartment, grounding point and other information are transmitted to the tool cabinet through the mobile phone. Step 3, go to the tool room, scan the QR code on the tool cabinet to collect the required tools; the duty officer identifies whether the type and voltage level of the tools are correct; if correct, the tools are shipped out, otherwise re-scan the QR code of the tools to extract. Step 4, carry the tools to the site, locate and identify the operation compartment, grounding point and power test position; when the three lights are all green, it means that the interval, grounding point and power test operation position are correct and the operation can be performed; if any red light appears, the duty officer should immediately check the operation position to avoid misoperation.
[0078] Among them, the specific lighting conditions of the three lights are as follows: if the operation interval identification is correct, the interval light will light up green, if it is wrong, the interval light will light up red; if the electrical test position is correct, the electrical test light will light up green, if it is wrong, the electrical test light will light up red; if the grounding position is correct, the grounding light will light up green, if it is wrong, the grounding light will light up red.
[0079] As can be seen from the above, in order to prevent the wrong voltage level of the tester and the grounding wire, and the inaccurate location of the tester and grounding point, which may lead to equipment damage caused by misoperation, affect the safe and stable operation of the power grid, and even cause personal injury. Through the above technical solution provided by the embodiment of the present invention, it is proposed to automatically identify the type of tools and the required voltage level and the accurate location of the tester and grounding point according to the operation content, improve the safety and accuracy of the operation, and the use and use of tools can be completely completed by the on-duty personnel. In order to reduce equipment damage or personal injury caused by personnel errors, reminders when tools are used and reminders of the location of the tester and grounding wire are added.
[0080] Here, the operation task is to install a set of grounding wires on the line side of the 220kV Jiaqinjia line lightning arrester as an example. The operation process is as follows: 1) Plan and dispatch work according to the operation plan power grid management platform; 2) Fill in the operation ticket in conjunction with the dispatch plan, where the operation steps are shown in Table 1:
[0081] Table 1
[0082]
[0083]
[0084] 3) The information recognition system extracts the keywords "220kV", "verification", "no voltage", and "grounding wire"; 4) The information recognition system identifies that the tools to be collected include: 220kV tester, 220kV grounding wire, insulating gloves, and insulating boots; 5) Scan the QR code on the tool cabinet through the mobile application. At this time, the tool cabinet system will prompt the type of tools and release the corresponding tools according to the needs of the work task; 6) Check whether the collected tools are correct. If not, manual intervention is required to collect them again; 7) The tool cabinet transmits the test and grounding wire position information of the operation ticket to the tester and grounding wire device; 8) The tools are transported to the operation site, and the tester and grounding wire are compared in real time according to the pre-stored position information of the device "220kV Jiaqinjia line lightning arrester is on the line side" and the actual location of the test and grounding. When the test position and grounding position are confirmed to be correct, the tester indicator light and the grounding wire indicator light will light up green, otherwise they will light up red.
[0085] Through the technical solution provided by the above-mentioned embodiment of the present invention, the dispatching system, information identification system and high-tech positioning and identification system integrated in the tools in the power grid management platform are utilized to identify and analyze factors such as the content points of the operation tasks and the risks of the operation tasks. In addition, the system can also identify and confirm the operation interval and the operation (electricity testing, grounding) position. Comprehensive consideration is given to various factors such as identifying the corresponding tools and determining the location of the grounding point, effectively avoiding problems such as personal injury caused by inaccurate operation and misoperation. The tool cabinet can automatically identify the type of tools, the required voltage level, and the exact location of the electricity testing and grounding points, and provide corresponding safety tools. At the same time, the tool cabinet can also store the information of the test and grounding points in the tester and grounding wire device to ensure that the tools are collected accurately before operation. By adding reminders when the tools are collected and the tester and grounding wire position reminders, the degree of automation of the work process can be improved, and equipment damage or personal injury caused by human errors can be reduced. It can avoid casualties caused by operators going to the wrong interval or accidentally touching live equipment, and prevent wrong tester and grounding wire voltage levels and inaccurate test and grounding point positions, which can cause equipment damage due to misoperation and affect the safe and stable operation of the power grid.
[0086] That is, the above technical solution provided by the embodiment of the present invention comprehensively considers various factors, adopts a suitable tool verification method, and an advanced information identification system, which provides an additional protection mechanism for power operation, avoids the shortcomings of the traditional method in which the collection and use of tools are completely dependent on the on-duty personnel, and the high risk of human operation, thereby improving the safety and accuracy of the operation.
[0087] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.
[0088] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method according to the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, computer, server, or network device, etc.) to execute the methods of each embodiment of the present application.
[0089] According to an embodiment of the present invention, there is also provided a power system misoperation prevention device based on a safety tool for implementing the above-mentioned power system misoperation prevention method based on a safety tool. Figure 4 is a schematic diagram of a power system misoperation prevention device based on a safety tool according to an embodiment of the present invention, such as Figure 4 As shown, the device includes: an acquisition module 401, a first processing module 403, a sending module 405, a second processing module 407, a third processing module 409 and a determination module 411. The power system misoperation prevention device based on safety tools is described below.
[0090] The acquisition module 401 is used to acquire a target work task operation ticket, wherein the target work task operation ticket is an operation ticket generated according to the target operation to be performed on the power system.
[0091] The first processing module 403 is used to perform keyword recognition on the target work task operation ticket to obtain the target keywords in the target work task operation ticket, wherein the target keywords include at least: the voltage level of the area where the power system is located, the tool type of the target tool required to perform the target operation on the power system, the operation interval name, and the operation equipment number.
[0092] The sending module 405 is used to send the target keyword to the tool cabinet, so that after the identification code pasted on the tool cabinet is scanned by the predetermined terminal device, the target tool is transported to the tool retrieval location through the tool cabinet, wherein the tool cabinet stores the target tool.
[0093] The second processing module 407 is used to trigger the target tool to start the positioning function after the target tool is taken out from the tool extraction location, so as to obtain the current operating interval and the position to be tested of the target tool.
[0094] The third processing module 409 is used to generate prompt information according to at least one of the operation interval, the voltage level of the ground line and the position to be tested.
[0095] The determination module 411 is used to determine whether the actual operation performed on the power system is consistent with the target operation according to the prompt information.
[0096] It should be noted here that the above-mentioned acquisition module 401, first processing module 403, sending module 405, second processing module 407, third processing module 409 and determination module 411 correspond to steps S202 to S212 in the above-mentioned embodiments, and the six modules are the same as the instances and application scenarios implemented by the corresponding steps, but are not limited to the contents disclosed in the above-mentioned embodiments.
[0097] As can be seen from the above, in the scheme recorded in the above-mentioned embodiment of the present invention, first, the acquisition module can be used to acquire the target work task operation ticket, wherein the target work task operation ticket is an operation ticket generated according to the target operation to be performed on the power system as needed; then the first processing module can be used to perform keyword recognition on the target work task operation ticket to obtain the target keyword in the target work task operation ticket, wherein the target keyword at least includes: the voltage level of the area where the power system is located, the tool type of the target tool required to perform the target operation on the power system, the operation interval name, and the operation equipment number; then the sending module can be used to send the target keyword to the tool cabinet, so that after the identification code pasted on the tool cabinet is scanned by the predetermined terminal device, the target tool is transported to the tool extraction location through the tool cabinet, wherein the tool cabinet stores the target tool; secondly, the second processing module can be used to perform keyword recognition on the target After the tool is taken out from the tool extraction place, the target tool is triggered to start the positioning function to obtain the current operating interval and the position to be tested of the target tool; the third processing module can also be used to generate prompt information according to at least one of the operating interval, the grounding line voltage level and the position to be tested; finally, the determination module can be used to determine whether the actual operation performed on the power system is consistent with the target operation according to the prompt information, and the information recognition system can identify the target keywords using natural language processing technology. At the same time, the tool cabinet system automatically prompts and releases the corresponding tool, and the positioning recognition system perceives and intelligently judges the accuracy of the operating interval, grounding point and test position in real time, so as to achieve the purpose of accurately executing the operation task, improving work efficiency and ensuring the safety and stability of the power grid, thereby realizing the technical effect of automatically identifying the position of tools, testers and grounding wires and giving error prompts, thereby improving the safety of operation.
[0098] The technical solution provided by the embodiment of the present invention solves the technical problem in the related art that when a plant or station attendant takes over an equipment operation, he or she can only rely on his or her own initiative to complete it, and there is no auxiliary means to help the attendant select and use the equipment, which poses a safety hazard.
[0099] In an optional embodiment, the acquisition module includes: a first acquisition unit, used to acquire work plan information of the power system, wherein the work plan information includes: target operations that need to be performed on the power system, task allocation, time schedule, and resources required to perform the target operations; a first processing unit, used to generate a target work task operation ticket based on the work plan information.
[0100] In an optional embodiment, the first processing module includes: a second processing unit, which is used to perform keyword recognition on the target work task operation ticket through natural speech recognition to obtain target keywords.
[0101] In an optional embodiment, the sending module includes: a second acquisition unit, used to obtain input information of the predetermined terminal after the predetermined terminal scans the identification code; a determination unit, used to determine the target tools that need to be shipped out of the tool cabinet based on the input information and the target keywords; and a third processing unit, used to transport the target tools to the tool retrieval location.
[0102] In an optional embodiment, the power system anti-misoperation device based on safety tools also includes: a detection module, which is used to detect the actual tools at the tool extraction point to obtain the detection results; a fourth processing module, which is used to generate a warehouse out abnormality prompt information when the detection result indicates that the actual tools are inconsistent with the target tools, so as to use the abnormality of the warehouse out operation of the tool cabinet.
[0103] In an optional embodiment, the second processing module includes: a fourth processing unit, which is used to trigger the target tool to start the positioning function after determining that the target tool is taken out from the tool extraction point and transported to the target electrical interval, so as to sense its current operating interval and the position to be tested.
[0104] In an optional embodiment, the third processing module includes: a fifth processing unit, which is used to generate a first prompt message when the operation interval is inconsistent with the preset operation interval, or the actual test position is inconsistent with the position to be tested, or the grounding wire voltage level is inconsistent with the actual grounding voltage level, wherein the first prompt message indicates abnormal operation; a sixth processing unit, which is used to generate a second prompt message when the operation interval is consistent with the preset operation interval, the actual test position is consistent with the position to be tested, and the grounding wire voltage level is consistent with the actual grounding voltage level, wherein the second prompt message indicates normal operation.
[0105] According to another aspect of an embodiment of the present invention, there is also provided an electric power system anti-misoperation system based on safety tools, and the electric power system anti-misoperation system based on safety tools uses any of the above-mentioned electric power system anti-misoperation methods based on safety tools.
[0106] According to another aspect of an embodiment of the present invention, there is also provided a computer program product, comprising computer instructions, which, when executed by a processor, execute any one of the above-mentioned methods for preventing misoperation of a power system based on safety tools.
[0107] According to another aspect of an embodiment of the present invention, a processor is provided, and the processor is used to run a program, wherein when the program is run, any one of the above-mentioned methods for preventing misoperation of a power system based on safety tools is executed.
[0108] According to another aspect of an embodiment of the present invention, a computer-readable storage medium is provided, the computer-readable storage medium including a stored program, wherein the program executes any one of the above-mentioned methods for preventing misoperation of a power system based on safety tools.
[0109] Optionally, in this embodiment, the computer-readable storage medium may be located in any one of the computer terminals in a computer terminal group in a computer network, or in any one of the communication devices in a communication device group.
[0110] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: obtaining a target work task operation ticket, wherein the target work task operation ticket is an operation ticket generated according to the target operation to be performed on the power system as needed; performing keyword recognition on the target work task operation ticket to obtain a target keyword in the target work task operation ticket, wherein the target keyword includes at least: the voltage level of the area where the power system is located, the tool type of the target tool required to perform the target operation on the power system, the operation interval name, and the operation device number; sending the target keyword to the tool cabinet, so that after the identification code pasted on the tool cabinet is scanned by a predetermined terminal device, the target tool is transported to the tool extraction location through the tool cabinet, wherein the tool cabinet stores the target tool; after the target tool is taken out from the tool extraction location, triggering the target tool to start the positioning function to obtain the current operation interval and the position to be tested for electricity where the target tool is located; generating prompt information according to at least one of the operation interval, the grounding line voltage level, and the position to be tested for electricity; and determining whether the actual operation performed on the power system is consistent with the target operation according to the prompt information.
[0111] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for performing the following steps: obtaining work plan information of the power system, wherein the work plan information includes: target operations to be performed on the power system, task allocation, time schedule, and resources required to perform the target operations; generating a target work task operation ticket based on the work plan information.
[0112] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: performing keyword recognition on the target work task operation ticket by natural speech recognition to obtain target keywords.
[0113] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: obtaining input information of the predetermined terminal after the predetermined terminal scans the identification code; determining the target tools that need to be shipped out of the tool cabinet based on the input information and target keywords; and transporting the target tools to the tool retrieval location.
[0114] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: detecting the actual tools at the tool extraction location to obtain detection results; when the detection results indicate that the actual tools are inconsistent with the target tools, generating a warehouse out exception prompt message to indicate that an abnormality has occurred in the warehouse out operation of the tool cabinet.
[0115] Optionally, in this embodiment, the computer-readable storage medium is configured to store program code for executing the following steps: after determining that the target tool is taken out from the tool extraction location and transported to the target electrical interval, trigger the target tool to start the positioning function to sense its current operating interval and the position to be tested.
[0116] Optionally, in this embodiment, the computer-readable storage medium is configured to store program codes for executing the following steps: when the operation interval is inconsistent with the preset operation interval, or the actual electrical test position is inconsistent with the position to be tested, or the grounding wire voltage level is inconsistent with the actual grounding voltage level, a first prompt message is generated, wherein the first prompt message indicates abnormal operation; when the operation interval is consistent with the preset operation interval, and the actual electrical test position is consistent with the position to be tested, and the grounding wire voltage level is consistent with the actual grounding voltage level, a second prompt message is generated, wherein the second prompt message indicates normal operation.
[0117] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0118] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0119] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0120] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0121] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0122] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.
[0123] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A method for preventing misoperation of a power system based on safety tools, characterized in that: include: Obtaining a target work task operation ticket, wherein the target work task operation ticket is an operation ticket generated according to a target operation to be performed on the power system as required; Perform keyword recognition on the target work task operation ticket to obtain target keywords in the target work task operation ticket, wherein the target keywords at least include: the voltage level of the area where the power system is located, the tool type of the target tool required to perform the target operation on the power system, the name of the operation interval, and the operation equipment number; Sending the target keyword to a tool cabinet, so that after the identification code attached to the tool cabinet is scanned by a predetermined terminal device, the target tool is transported to a tool extraction location through the tool cabinet, wherein the tool cabinet stores the target tool; After the target tool is taken out from the tool extraction location, triggering the target tool to start a positioning function to obtain the current operating interval and the position to be tested of the target tool; Generate prompt information according to at least one of the operation interval, the grounding line voltage level and the position to be tested; Determine whether the actual operation performed on the power system is consistent with the target operation according to the prompt information.
2. The method for preventing misoperation of a power system based on safety tools according to claim 1, characterized in that: Obtain the target work task operation ticket, including: Acquire work plan information of the power system, wherein the work plan information includes: the target operation to be performed on the power system, task allocation, time schedule, and resources required to perform the target operation; Generate the target work task operation ticket according to the work plan information.
3. The method for preventing misoperation of a power system based on safety tools according to claim 1, characterized in that: Perform keyword recognition on the target work task operation ticket to obtain target keywords in the target work task operation ticket, including: The target work task operation ticket is subjected to keyword recognition by means of natural speech recognition to obtain the target keyword.
4. The method for preventing misoperation of a power system based on safety tools according to claim 1, characterized in that: The target keyword is sent to a tool cabinet, so that after the identification code attached to the tool cabinet is scanned by a predetermined terminal device, the target tool is transported to a tool extraction location through the tool cabinet, including: After the predetermined terminal scans the identification code, obtaining input information of the predetermined terminal; Determine the target tool that needs to be shipped out of the tool cabinet according to the input information and the target keyword; The target tool is transported to the tool extraction location.
5. The method for preventing misoperation of a power system based on a safety tool according to claim 1 or 4, characterized in that: Also includes: Testing the actual tools at the tool extraction location to obtain a test result; When the detection result indicates that the actual tool is inconsistent with the target tool, a storage-out abnormality prompt message is generated to indicate that the storage-out operation of the tool cabinet is abnormal.
6. The method for preventing misoperation of a power system based on safety tools according to claim 1, characterized in that: After the target tool is taken out from the tool extraction location, triggering the target tool to start a positioning function to obtain the current operating interval and the position to be tested of the target tool, including: After determining that the target tool is taken out from the tool extraction location and transported to the target electrical compartment, the target tool is triggered to start the positioning function to sense the current operating compartment and the position to be tested.
7. The method for preventing misoperation of a power system based on safety tools according to claim 1, characterized in that: Generating prompt information according to at least one of the operation interval, the grounding line voltage level, and the position to be tested includes: When the operation interval is inconsistent with the preset operation interval, or the actual electrical inspection position is inconsistent with the position to be inspected, or the grounding line voltage level is inconsistent with the actual grounding voltage level, a first prompt message is generated, wherein the first prompt message indicates abnormal operation; When the operation interval is consistent with the preset operation interval, the actual electrical test position is consistent with the position to be tested, and the grounding line voltage level is consistent with the actual grounding voltage level, a second prompt information is generated, wherein the second prompt information indicates that the operation is normal.
8. A power system anti-misoperation device based on safety tools, characterized in that: include: An acquisition module, used for acquiring a target work task operation ticket, wherein the target work task operation ticket is an operation ticket generated according to a target operation to be performed on the power system as required; The first processing module is used to perform keyword recognition on the target work task operation ticket to obtain target keywords in the target work task operation ticket, wherein the target keywords at least include: the voltage level of the area where the power system is located, the tool type of the target tool required to perform the target operation on the power system, the name of the operation interval, and the operation equipment number; A sending module, used for sending the target keyword to a tool cabinet, so that after the identification code attached to the tool cabinet is scanned by a predetermined terminal device, the target tool is transported to a tool extraction location through the tool cabinet, wherein the tool cabinet stores the target tool; A second processing module is used to trigger the target tool to start a positioning function after the target tool is taken out from the tool extraction location, so as to obtain the current operating interval and the position to be tested of the target tool; A third processing module, configured to generate prompt information according to at least one of the operation interval, the voltage level of the grounding line and the position to be tested; A determination module is used to determine whether an actual operation performed on the power system is consistent with the target operation according to the prompt information.
9. A power system error-proof operation system based on safety tools, characterized in that: The electric power system misoperation prevention system based on safety tools uses the electric power system misoperation prevention method based on safety tools described in any one of claims 1 to 7 above.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein the program executes the method for preventing incorrect operation of a power system based on a safety tool as described in any one of claims 1 to 7.