Intelligent power equipment operation and maintenance method and system
Through the analysis of historical data of power equipment and the optimization of operation and maintenance solutions, the problems of low efficiency, high cost and high safety risks in traditional power operation and maintenance methods are solved, and intelligent operation and maintenance are realized, and the operation efficiency of equipment is improved. Security.
Patent Information
- Application Number
- CN202410999569.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-24
AI Technical Summary
Traditional power operation and maintenance methods are inefficient, costly, high safety risks, inaccurate fault diagnosis and irregular maintenance management, which cannot meet the needs of smart grids.
By collecting historical operating status data of power equipment, conducting safe operation cycle attenuation analysis, determining operation and maintenance levels, generating operation and maintenance solutions, and optimizing these solutions through simulation to achieve intelligent operation and maintenance.
It improves the operating efficiency and safety of power equipment, reduces operation and maintenance costs, solves the problems of low efficiency, high cost, high safety risks and inaccurate fault diagnosis, and provides technical support for the smart grid.
Smart Images

Figure CN118941272A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power equipment management, and in particular to an intelligent power equipment operation and maintenance method and system. Background Art
[0002] With the continuous development of communication technology and computer network technology, the power grid has begun to move towards automation and intelligence. With its advantages such as efficient energy utilization, strong defense capabilities, self-healing functions and reduced operating costs, smart grid has gradually become the core development direction of the power industry. Smart grid is composed of a variety of power equipment, such as power transformers, transmission and distribution networks, control and relay protection devices, etc. The stable operation of these devices is crucial to ensure the security and reliability of smart grids.
[0003] Traditional power operation and maintenance methods, such as accident maintenance and regular maintenance, can no longer meet the needs of modern smart grids. Accident maintenance often results in handling the fault only after it occurs, while regular maintenance may cause equipment to be shut down for maintenance at unnecessary times, resulting in a waste of resources.
[0004] In summary, this application aims to solve the problems of low efficiency, high cost, high safety risk, inaccurate fault diagnosis and irregular maintenance management in traditional power operation and maintenance. Summary of the invention
[0005] The present application provides an intelligent power equipment operation and maintenance method and system, aiming to solve the problems of low efficiency, high cost, high safety risk, inaccurate fault diagnosis and irregular maintenance management in the prior art power operation and maintenance.
[0006] In view of the above problems, the present application provides an intelligent power equipment operation and maintenance method and system.
[0007] The first aspect disclosed in the present application provides an intelligent power equipment operation and maintenance method, which includes collecting historical operating status data of multiple power equipment in a target area; performing safe operation cycle attenuation analysis on multiple power equipment based on the historical operating status data to obtain a safe cycle instantaneous trend set; analyzing multiple power equipment according to the safe cycle instantaneous trend set to determine an operation and maintenance level cycle analysis result; generating operation and maintenance plans for multiple power equipment based on the operation and maintenance level cycle analysis result; simulating multiple power equipment based on the multiple power equipment operation and maintenance plans to generate simulation results for multiple power equipment; optimizing multiple power equipment operation and maintenance plans according to the simulation results of multiple power equipment to generate multiple power equipment operation and maintenance optimization plans, wherein the multiple power equipment operation and maintenance optimization plans correspond to the multiple power equipment; executing the multiple power equipment operation and maintenance optimization plans to perform intelligent operation and maintenance on multiple power equipment.
[0008] Another aspect disclosed in the present application provides an intelligent power equipment operation and maintenance system, which includes a historical data acquisition module: used to collect historical operating status data of multiple power equipment in a target area; a period decay analysis module: used to perform safe operation period decay analysis on multiple power equipment based on the historical operating status data to obtain a safe period instant trend set; a period analysis result determination module: used to analyze multiple power equipment according to the safe period instant trend set to determine the operation and maintenance level period analysis result; an operation and maintenance plan generation module: used to generate operation and maintenance plans for multiple power equipment based on the operation and maintenance level period analysis result; a simulation result generation module: used to simulate multiple power equipment based on the multiple power equipment operation and maintenance plans to generate simulation results for multiple power equipment; an operation and maintenance optimization plan generation module: used to optimize the multiple power equipment operation and maintenance plans according to the simulation results of the multiple power equipment to generate multiple power equipment operation and maintenance optimization plans, and the multiple power equipment operation and maintenance optimization plans have a corresponding relationship with the multiple power equipment; an intelligent operation and maintenance module: used to execute the multiple power equipment operation and maintenance optimization plans to perform intelligent operation and maintenance on multiple power equipment.
[0009] One or more technical solutions provided in this application have at least the following technical effects or advantages:
[0010] By collecting historical operating status data of multiple power equipment in the target area, a safe operation cycle attenuation analysis is performed to obtain a safe cycle instant trend set. Based on these trend sets, the operation and maintenance level cycle analysis of the power equipment is performed to determine the priority of operation and maintenance. According to the analysis results, the corresponding operation and maintenance plan is generated, and the feasibility of the plan is verified through simulation. According to the simulation results, the operation and maintenance plan is optimized to form an operation and maintenance optimization plan corresponding to the power equipment, and these optimization plans are executed to realize the intelligent operation and maintenance of the power equipment. It solves the problems of low efficiency, high cost, high safety risk, inaccurate fault diagnosis and irregular maintenance management in the existing power operation and maintenance, so as to improve the operating efficiency, reliability and safety of power equipment, reduce the operation and maintenance cost, and provide strong technical support for the development of smart grids.
[0011] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 A flowchart of an intelligent power equipment operation and maintenance method is provided for an embodiment of the present application;
[0013] Figure 2 A structural schematic diagram of an intelligent power equipment operation and maintenance system is provided for an embodiment of the present application.
[0014] Explanation of the accompanying drawings: historical data collection module 11, periodic attenuation analysis module 12, periodic analysis result determination module 13, operation and maintenance plan generation module 14, simulation result generation module 15, operation and maintenance optimization plan generation module 16, intelligent operation and maintenance module 17. DETAILED DESCRIPTION
[0015] The overall idea of the technical solution provided by this application is as follows:
[0016] The embodiment of the present application provides an intelligent power equipment operation and maintenance method and system. By collecting the historical operating status data of multiple power equipment in the target area, analyzing the attenuation of the safe operation cycle of these equipment, and obtaining the instantaneous trend set of the safe cycle. Subsequently, based on these trend sets, a detailed operation and maintenance level cycle analysis is performed on each power equipment to clarify the operation and maintenance priority of each equipment. Then, based on the analysis results, a targeted operation and maintenance plan is formulated. In order to verify the effectiveness of the operation and maintenance plan, the present application uses simulation technology to simulate the operation of multiple power equipment and generate simulation results. Based on these simulation results, the operation and maintenance plan is optimized to form a more optimized operation and maintenance plan to ensure that the plan matches the specific power equipment. Finally, these optimized operation and maintenance plans are executed to realize intelligent operation and maintenance management of power equipment and ensure the stable operation of the equipment.
[0017] After introducing the basic principles of the present application, various non-limiting implementation methods of the present application will be specifically described below in conjunction with the drawings in the specification.
[0018] Embodiment 1
[0019] like Figure 1 As shown, the embodiment of the present application provides an intelligent power equipment operation and maintenance method, the method comprising:
[0020] Step S100: Collect historical operating status data of multiple power equipment in the target area.
[0021] Specifically: collect historical operating data of all power equipment (such as transformers, circuit breakers, cables, etc.) in the target area. The historical operating status data includes parameters such as voltage, current, temperature, humidity, vibration, as well as equipment operation logs and fault records. Among them, the target area usually refers to a specific geographical range or area where intelligent power equipment operation and maintenance management is required. This area can be a city, an industrial area, a power grid subnet, or any area with clear boundaries and a specific collection of power equipment.
[0022] This step can provide strong data support for subsequent operation and maintenance management by collecting historical operating status data of multiple power equipment in the target area.
[0023] Step S200: performing a safety operation cycle attenuation analysis on a plurality of power equipment based on the historical operation status data to obtain a safety cycle instantaneous trend set.
[0024] Specifically: using the historical operating status data, an in-depth analysis of the operating status of the power equipment is performed, including data preprocessing, feature extraction, data grouping and division, model construction and training, model verification and optimization, performance degradation prediction, and safety cycle instant trend set construction. Among them, the degradation analysis refers to an evaluation process for the gradual decline in the performance of power equipment over time. Its goal is to identify the pattern of changes in power equipment performance over time by analyzing historical data. Including the gradual decline in performance indicators, the increase in failure frequency, or other trends related to equipment aging. The safety cycle instant trend set contains information such as the performance degradation trend and remaining safe operation time of each power equipment, providing support for subsequent operation and maintenance decisions.
[0025] This step conducts a safe operation cycle attenuation analysis on multiple power equipment based on historical operation status data, obtains a safe cycle instant trend set, and provides strong support for subsequent operation and maintenance decisions. This helps to discover potential safety hazards in advance, optimize operation and maintenance plans, and improve the reliability and operation efficiency of power equipment.
[0026] Step S300: Analyze multiple power equipment according to the safety cycle instant trend set to determine the operation and maintenance level cycle analysis result.
[0027] Specifically: First, interpret the instantaneous trend set of the safety cycle to understand the trend, speed, and possible turning points or mutation points of the performance degradation of each power equipment.
[0028] According to the performance degradation trend of power equipment, a series of safety level standards are set. These standards are based on the speed of performance degradation, the remaining safe operation time or other key performance indicators. The operation and maintenance levels include "normal", "attention", "emergency", etc. It reflects the current status of the equipment and the expected maintenance needs. According to the operation and maintenance level of the equipment and the current operating status, a suitable operation and maintenance cycle is formulated for each device. Different levels of operation and maintenance requirements are different. For example, "normal" level equipment may only require routine inspections and maintenance, while "emergency" level equipment requires immediate action to avoid safety accidents.
[0029] The operation and maintenance cycle refers to the frequency or time interval of operation and maintenance operations on power equipment. The operation and maintenance personnel formulate appropriate operation and maintenance cycles based on the operation and maintenance level and performance degradation trend of the power equipment. For equipment with a higher operation and maintenance level, the operation and maintenance cycle may be shortened to ensure that potential safety issues are discovered and resolved in a timely manner; while for equipment with a lower operation and maintenance level, the operation and maintenance cycle can be appropriately extended to reduce unnecessary operation and maintenance costs.
[0030] In this step, multiple power equipment are analyzed based on the safety cycle instant trend set to determine the operation and maintenance level cycle analysis results, which has significant technical effects such as accurate prediction and risk assessment, optimization of operation and maintenance plans, improvement of operation and maintenance efficiency, reduction of safety risks, and improvement of operation and maintenance management level. It helps to ensure the safety and stability of the power system and improve the efficiency and quality of operation and maintenance work.
[0031] Step S400: generating operation and maintenance plans for a plurality of power equipment based on the operation and maintenance level cycle analysis results.
[0032] Specifically: Based on the overall strategy of the power company and the actual status of the power equipment, clarify the goals of the operation and maintenance plan, such as ensuring stable operation of equipment, reducing failure rates, and optimizing operation and maintenance costs.
[0033] For each power equipment, formulate a corresponding operation and maintenance plan based on the analysis results of its operation and maintenance level cycle. The maintenance plan should include maintenance content, maintenance cycle, maintenance method (such as preventive maintenance, post-failure maintenance, etc.) and required resources (such as manpower, materials, tools, etc.). It aims to ensure that the equipment operates in the best condition.
[0034] This step generates operation and maintenance plans for multiple power equipment based on the analysis results of the operation and maintenance level cycle, which helps to improve the operation and maintenance management level of power equipment, ensure the stable operation of equipment and optimize the use of operation and maintenance resources.
[0035] Step S500: simulating a plurality of power equipment based on the plurality of power equipment operation and maintenance solutions to generate simulation results of the plurality of power equipment.
[0036] Specifically: Before the operation and maintenance plan is officially implemented, simulation technology is used to test and verify the plan.
[0037] Select appropriate simulation software or tools based on the characteristics and operation and maintenance requirements of power equipment. Build a simulation model of power equipment, including the physical model, control logic, failure mode, etc. of the equipment. Input parameters such as maintenance plan and monitoring strategy in the operation and maintenance plan into the simulation model.
[0038] According to the actual situation, set the simulation conditions, such as running time, load changes, environmental conditions, etc. Consider the impact of different operation and maintenance solutions on equipment performance and set different simulation scenarios.
[0039] Run the established simulation model in the simulation software to simulate the actual operation of the power equipment. Monitor the changes in the performance parameters of the equipment during the simulation, such as voltage, current, temperature, failure rate, etc. Record the simulation results, including the operating status of the equipment, performance changes, failure occurrence, etc.
[0040] This step can accurately predict the performance changes of equipment under different operation and maintenance strategies by simulating the operation and maintenance plans of multiple power equipment. It can not only improve the efficiency of formulating operation and maintenance plans, but also optimize resource allocation and ensure the efficient and stable operation of power equipment. At the same time, simulation can detect potential problems in advance, reduce the risk of equipment failure, and improve the safety and reliability of the power system.
[0041] Step S600: optimizing a plurality of power equipment operation and maintenance plans according to the simulation results of the plurality of power equipment, and generating a plurality of power equipment operation and maintenance optimization plans, wherein the plurality of power equipment operation and maintenance optimization plans correspond to the plurality of power equipment.
[0042] Specifically: First, collect detailed data generated by simulation, including the operating status, performance changes, fault occurrence, etc. of each power equipment. Conduct in-depth analysis of these data to understand the impact of different operation and maintenance solutions on equipment performance.
[0043] According to the simulation results, the performance of the power equipment under each operation and maintenance scheme is evaluated. For example, it can include cost, efficiency, reliability, safety, etc. The operation and maintenance scheme is optimized using an optimization algorithm (such as a taboo search algorithm). The optimal operation and maintenance scheme can be automatically searched according to the preset objective function (such as minimizing the failure rate, maximizing the equipment life, etc.). Through the optimization algorithm, a corresponding operation and maintenance optimization scheme is generated for each power equipment. The operation and maintenance optimization scheme will fully consider the performance characteristics, operating environment and operation and maintenance requirements of the equipment to ensure that the equipment operates in the optimal state.
[0044] This step optimizes the operation and maintenance solutions based on the simulation results of multiple power equipment, and generates multiple operation and maintenance optimization solutions corresponding to the power equipment, thereby realizing intelligent and efficient operation and maintenance management of power equipment.
[0045] Step S700: Execute the multiple power equipment operation and maintenance optimization solutions to perform intelligent operation and maintenance on the multiple power equipment.
[0046] Specifically: Confirm the operation and maintenance optimization plan for each power equipment and ensure that all details are in line with the actual situation of the equipment and business needs. Prepare the necessary tools, equipment and human resources to ensure that various operation and maintenance tasks can be performed according to the plan.
[0047] According to the specific content of the operation and maintenance optimization plan and the skills of the personnel, the operation and maintenance tasks should be reasonably assigned to the corresponding staff. The goals, requirements and completion time of the tasks should be clarified to ensure that each staff member is clear about his or her responsibilities and tasks.
[0048] The staff began to perform various operation and maintenance tasks according to the assigned tasks and the specific steps of the operation and maintenance optimization plan. During the execution process, they maintained communication and collaboration with the team to promptly resolve problems and difficulties encountered. They monitored the operating status and performance data of the equipment to ensure that the equipment operated stably under the control of the optimization plan.
[0049] During the operation and maintenance process, collect the real-time operation data, performance data and fault information of the equipment. Analyze the collected data, evaluate the actual effect of the operation and maintenance optimization plan, and find possible problems and improvement points. According to the results of data analysis, make necessary adjustments and optimizations to the operation and maintenance optimization plan. Formulate corresponding improvement measures and plans for the problems and improvement points found. Reapply the adjusted operation and maintenance optimization plan to the equipment operation and maintenance to continuously improve the operating status and performance of the equipment.
[0050] Use intelligent monitoring systems to monitor the operating status and performance data of equipment in real time. Set up early warning and alarm mechanisms to promptly notify staff to handle abnormalities or failures of equipment. Through intelligent analysis systems, conduct in-depth analysis of equipment operating data to predict the future operating status and potential risks of equipment. Record various data and events during the operation and maintenance process to form a complete operation and maintenance record. Summarize and evaluate the operation and maintenance work, and analyze the operation and maintenance effects and improvement points. Incorporate operation and maintenance experience and lessons into the company's operation and maintenance management knowledge and database to provide reference for subsequent work.
[0051] This step can ensure that the operation and maintenance optimization plan of multiple power equipment is effectively implemented and the goal of intelligent operation and maintenance is achieved. It can not only improve the operating efficiency and reliability of the equipment, but also reduce the operation and maintenance costs and risks.
[0052] Furthermore, the method described in the present application also includes:
[0053] Based on the historical operating status data, multiple operating hours, multiple equipment performance parameters, and multiple fault maintenance records of multiple power equipment are extracted, and data of the multiple equipment performance parameters and the multiple fault maintenance records are divided into training set, supervision set, and test set according to the multiple operating hours; a safe operation cycle attenuation model is constructed based on the training set and the supervision set, and when the test set passes the verification, the safe operation cycle attenuation model is output; multiple power equipment are analyzed through the safe operation cycle attenuation model to generate multiple performance attenuation speeds, multiple remaining safe operation times, and multiple operation fault prediction information; the safe cycle instantaneous trend set is drawn based on the multiple performance attenuation speeds, the multiple remaining safe operation times, and the multiple operation fault prediction information.
[0054] Specifically, multiple operating times, multiple equipment performance parameters (such as voltage, current, temperature, etc.), and multiple fault maintenance records of multiple power equipment are extracted from the historical operating status data. The operating time refers to the total time from the start of the power equipment to the stop of operation. The fault maintenance record records in detail the maintenance process, results, and related information of the equipment when the fault occurs. For example, date, equipment name, equipment number, fault description, maintenance process, maintenance results, etc.
[0055] According to multiple running times, the extracted multiple equipment performance parameters and multiple fault maintenance records are divided in time to form training sets, supervision sets and test sets. Usually, the training set is used for model training, the supervision set is used for model verification and adjustment, and the test set is used to evaluate the generalization ability of the model.
[0056] Based on the training set and the supervision set, a safe operation cycle attenuation model is constructed using machine learning or statistical methods. The model should be able to describe the attenuation law of power equipment performance over time and predict potential faults. The constructed safe operation cycle attenuation model is verified using the test set. If the performance of the model on the test set meets the predetermined requirements, it means that the model has generalization ability and can be used for actual analysis. When the test set passes the verification, the safe operation cycle attenuation model is output.
[0057] The performance of multiple power equipment is analyzed using the verified safe operation cycle decay model, including calculation of the performance decay rate of multiple power equipment (i.e., how fast the performance decreases over time), multiple remaining safe operation times (i.e., the remaining time for the equipment to maintain a safe operation state), and multiple operation fault prediction information (i.e., predicting the type and time of possible future faults of the equipment).
[0058] Based on the calculated multiple performance degradation rates, multiple remaining safe operation times and multiple operation failure prediction information, a safety cycle instant trend set is drawn. This trend set can intuitively display the performance degradation trend, remaining safe operation time and potential failure risk of each power equipment, providing decision support for operation and maintenance personnel.
[0059] This step achieves quantitative analysis and prediction of the performance degradation trends of multiple power equipment by constructing and running a safe operation cycle attenuation model, providing a scientific basis for preventive maintenance and fault warning of power equipment.
[0060] Furthermore, the method described in the present application also includes:
[0061] Based on the multiple performance decay rates, the multiple remaining safe operating hours, and the multiple operating fault prediction information, a first performance decay rate, a first remaining safe operating time, and a first operating fault prediction information are extracted; based on the first performance decay rate, the first remaining safe operating time, and the first operating fault prediction information, a first comprehensive evaluation index is established for the first power equipment; the operating time of the first power equipment is used as the first coordinate axis, and the first comprehensive evaluation index is used as the second coordinate axis; a first safety period instantaneous coordinate system is constructed according to the first coordinate axis and the second coordinate axis; the first historical operating state of the first power equipment is synchronized to the first safety period instantaneous coordinate system, and a first safety period instantaneous trend is determined; and the first safety period instantaneous trend is added to the safety period instantaneous trend set.
[0062] Specifically: from the performance degradation rates, remaining safe operating time and operating fault prediction information of multiple power devices, the first performance degradation rate, the first remaining safe operating time and the first operating fault prediction information of the first power device are extracted.
[0063] The first performance decay rate refers to the rate at which the performance parameters of the first power device (i.e., a device selected from multiple power devices) decrease over time. This rate is usually obtained by comparing the rate of change of the performance parameters of the device (such as voltage, current, power, efficiency, etc.) at different time points. The faster the performance decay rate, the faster the performance of the device decreases, and more frequent maintenance or earlier replacement may be required.
[0064] The first remaining safe operating time refers to the remaining time that the first power equipment can maintain a safe operating state based on the current performance parameters and the expected performance decay rate. This time is usually estimated based on the performance decay model, historical data and current operating status of the equipment. The shorter the remaining safe operating time, the closer the equipment may be to the end of its life or require more urgent maintenance.
[0065] The first operation fault prediction information refers to information such as the type, time and probability of future equipment failures that may occur based on the historical operation status data, performance parameters and fault maintenance records of the first power equipment, using machine learning, statistical analysis or other prediction methods. This information helps operation and maintenance personnel understand the possible problems of the equipment in advance so as to perform preventive maintenance or formulate response strategies.
[0066] Based on the extracted first performance decay rate, the first remaining safe operation time and the first operation fault prediction information, a first comprehensive evaluation index is established for the first power equipment. The first comprehensive evaluation index is a comprehensive score, index or other form that can reflect the overall safe operation status and trend of the power equipment.
[0067] The operation time of the first power equipment is used as the first coordinate axis (X axis) to represent the change of time. The first comprehensive evaluation index is used as the second coordinate axis (Y axis) to represent the comprehensive level of the safe operation status of the equipment. The first coordinate axis and the second coordinate axis are used to construct the first safety cycle instantaneous coordinate system of the first power equipment. This coordinate system will be used to display the instantaneous trend of the safety cycle of the equipment.
[0068] The first historical operating state of the first power equipment is synchronized to the first safety period instantaneous coordinate system, that is, the historical data points (ie, the comprehensive evaluation index values at different time points) are marked on the coordinate system.
[0069] Based on the historical operating status data points of the first power equipment in the first safety cycle instantaneous coordinate system, a trend line, a fitting curve or other visualization method is used to determine its safety cycle instantaneous trend. This trend reflects the change of equipment performance over time, including possible attenuation, stability or improvement trends.
[0070] For other power equipment, repeat the above steps (from extracting key information to adding to the trend set) to build and display their respective safety cycle instantaneous trends, and add these trends to the safety cycle instantaneous trend set.
[0071] Based on this step, a comprehensive safety cycle instant trend set can be constructed, which can be used to analyze the safety operation status and trends of multiple power equipment, helping operation and maintenance personnel to identify potential problems, formulate maintenance plans and optimize resource allocation.
[0072] Furthermore, the method described in the present application also includes:
[0073] Based on the instantaneous trend of the first safety cycle, the first power equipment is evaluated to generate a first evaluation result; based on the first evaluation result, first safety status information and a first operation development trend of the first power equipment are generated; based on the first safety status information, safety identification is performed, and the operation and maintenance level of the first power equipment is determined according to the safety identification result; according to the operation and maintenance level of the first power equipment and in combination with the first operation development trend, a first operation and maintenance cycle is formulated; based on the operation and maintenance level of the first power equipment, a dynamic analysis is performed within the first operation and maintenance cycle to determine a first operation and maintenance level cycle analysis result; and the first operation and maintenance level cycle analysis result is added to the operation and maintenance level cycle analysis result.
[0074] Specifically: Based on the constructed instantaneous trend of the first safety cycle, a comprehensive analysis is performed on the performance degradation, remaining safe operation time, and operation failure prediction information of the first power equipment. By comparing historical data, industry standards, and expert experience, the current safety status and future development trends of the first power equipment are evaluated to generate the first evaluation result of the first power equipment. The first evaluation result should include information such as the performance status, potential risks, and expected life of the equipment.
[0075] According to the evaluation results, the current safety status information of the first power equipment is extracted, such as status labels such as "safe", "warning", "danger", etc. At the same time, based on the evaluation results and prediction information, the future operation development trend of the equipment is generated, such as the expected time of failure, possible failure type, etc.
[0076] According to the first safety status information, safety identification is performed. This includes determining whether the equipment is in a normal, abnormal or dangerous state. According to the result of safety identification, an operation and maintenance level is determined for the first power equipment. The operation and maintenance level can be divided based on factors such as the risk level and urgency level of the equipment, such as "normal", "concern", "emergency", etc.
[0077] According to the operation and maintenance level of the first power equipment and its operation and development trend, a targeted operation and maintenance cycle is formulated. The operation and maintenance cycle includes inspection frequency, maintenance interval, replacement cycle, etc. Within the determined operation and maintenance cycle, the operation status of the first power equipment is continuously monitored and dynamically analyzed. This includes collecting real-time operation data, analyzing performance indicator changes, predicting potential failures, etc.
[0078] Based on the dynamic analysis results, the operation and maintenance level cycle of the first power equipment is evaluated, which may include adjusting the operation and maintenance level, modifying the operation and maintenance cycle, proposing a new maintenance strategy, etc.
[0079] Furthermore, the method described in the present application also includes:
[0080] Based on the operation and maintenance level of the first power equipment and the first operation and maintenance cycle, multiple simulation operation and maintenance data are set; based on the multiple power equipment operation and maintenance plans, the first power equipment is simulated in combination with the multiple simulation operation and maintenance data to generate an equipment operation and maintenance simulation data set; based on the equipment operation and maintenance simulation data set, the operation simulation data, performance simulation data, and fault simulation data of the first power equipment are determined; based on the operation simulation data, the performance simulation data, and the fault simulation data, the operation and maintenance evaluation is performed on the multiple power equipment operation and maintenance plans to generate multiple operation and maintenance evaluation results; and the multiple operation and maintenance evaluation results are added to the simulation results of the first power equipment.
[0081] Specifically: according to the operation and maintenance level of the first power equipment and the first operation and maintenance cycle, a plurality of simulation operation and maintenance data are set. The simulation operation and maintenance data covers multiple factors such as the equipment's operating time, load changes, environmental conditions (such as temperature, humidity, pressure, etc.), and operation mode. These data will be used to simulate the equipment's operation under different operation and maintenance conditions.
[0082] Using multiple power equipment operation and maintenance plans, combined with the set simulation operation and maintenance data, the first power equipment is simulated. This process will simulate the actual operation of the equipment under different operation and maintenance plans, including the equipment's operating status, performance, and possible faults. After the simulation is completed, an equipment operation and maintenance simulation data set is generated, which contains various simulation data of the equipment under different operation and maintenance plans, such as operating parameters, performance indicators, fault records, etc. Based on the equipment operation and maintenance simulation data set, the operation simulation data, performance simulation data, and fault simulation data of the first power equipment are analyzed and determined. These data will show in detail the performance of the equipment in the simulation, including the equipment's operating efficiency, performance stability, fault frequency and type, etc.
[0083] Based on the operation simulation data, performance simulation data and fault simulation data, multiple power equipment operation and maintenance schemes are evaluated. During the evaluation process, multiple indicators will be considered, such as equipment reliability, economy, safety, etc., to comprehensively evaluate the effects of different operation and maintenance schemes. Through the evaluation, multiple operation and maintenance evaluation results are generated. Each operation and maintenance scheme will receive one or more evaluation results, which will quantitatively show the performance of the scheme in the simulation.
[0084] Finally, the generated multiple operation and maintenance evaluation results are added to the simulation results of the first power equipment. The operation and maintenance managers can easily view the evaluation results of each operation and maintenance plan, compare the advantages and disadvantages of different plans, and select the operation and maintenance plan that best suits the current equipment and operation and maintenance environment.
[0085] Through the above steps, operation and maintenance managers can formulate more scientific and reasonable operation and maintenance plans based on the results of simulation and operation and maintenance evaluation, and improve the operation and maintenance efficiency and safety of power equipment.
[0086] Furthermore, the method described in the present application also includes:
[0087] A taboo table is constructed using a taboo optimization algorithm; a first power equipment operation and maintenance plan is used as an initial solution, and a first operation and maintenance fitness value is calculated based on the simulation result of the first power equipment, and there is a one-to-one correspondence between the first operation and maintenance fitness value and the first power equipment operation and maintenance plan; cross-validation is performed based on the initial solution to generate a candidate solution, and the candidate solution includes the fitness value of the candidate solution; the taboo table is traversed to match the candidate solution, and it is determined whether the candidate solution is in the taboo table according to the matching result; if the candidate solution is not in the taboo table, the candidate solution is added to a candidate solution set, and the initial solution is updated with the candidate solution with the largest fitness value based on the candidate solution set to generate an updated solution; the updated solution is added to the taboo table for updating, and it is iterated until the change in fitness value is less than a preset threshold; an updated value of the taboo table is obtained, and the first power equipment operation and maintenance optimization plan is output according to the updated value of the taboo table.
[0088] Specifically: Use the taboo optimization algorithm (such as the Tabu Search algorithm) to build a taboo table. The taboo table is used to record the solutions that have been searched to prevent the algorithm from falling into the local optimal solution and guide the search process to explore new areas.
[0089] The first power equipment operation and maintenance plan is used as the initial solution, and the first operation and maintenance fitness value is calculated based on the simulation results of the first power equipment. This fitness value reflects the performance of the operation and maintenance plan in the simulation, and it has a one-to-one correspondence with the initial solution (i.e., the first power equipment operation and maintenance plan).
[0090] Based on the initial solution, cross-validation is performed to generate multiple candidate solutions. These candidate solutions represent new operation and maintenance solutions after modifying or adjusting the initial solution. Each candidate solution contains its corresponding fitness value, which is also calculated based on the simulation results.
[0091] Traverse the taboo table to match the candidate solutions and check whether each candidate solution already exists in the taboo table. The purpose of the taboo table is to prevent the algorithm from repeatedly searching for solutions that have already been evaluated, so as to improve the search efficiency.
[0092] If the candidate solution is not in the taboo table (i.e., the solution is new or has not been evaluated), it is added to the candidate solution set. Then, the candidate solution with the largest fitness value is selected from the candidate solution set and used to update the initial solution (i.e., the current optimal solution) to generate a new updated solution.
[0093] The updated solution is added to the taboo table for updating. When updating the taboo table, the length of the taboo table and the update strategy need to be considered to ensure that the algorithm can effectively move in the search space while avoiding falling into the local optimal solution.
[0094] Repeat the above steps to perform iterative search. During the iteration process, the algorithm will continue to generate new candidate solutions, update the candidate solution set and the initial solution, and update the taboo table. When the change in fitness value is less than the preset threshold, the algorithm is considered to have converged to a good enough solution and stops iterating.
[0095] Finally, according to the updated value of the taboo table (i.e., the state of the taboo table when the algorithm stops), the operation and maintenance optimization plan of the first power equipment is output. The operation and maintenance optimization plan is the optimal or approximately optimal operation and maintenance plan searched under given conditions, which can help operation and maintenance managers formulate more scientific and reasonable operation and maintenance plans and improve the safe and stable operation level of equipment.
[0096] Furthermore, the method described in the present application also includes:
[0097] According to the taboo table, extract the initial value of the taboo table, wherein the initial value of the taboo table has a taboo initial fitness; determine whether the fitness value of the candidate solution is greater than or equal to the taboo initial fitness; if the fitness value of the candidate solution is greater than or equal to the taboo initial fitness, replace the initial value of the taboo table with the candidate solution corresponding to the fitness value of the candidate solution, and set it as the updated value of the taboo table; if less than, set the initial value of the taboo table to the updated value of the taboo table.
[0098] Specifically: First, according to the current state of the taboo table, the initial value of the taboo table is extracted. The initial value is usually an evaluated solution recorded in the taboo table and its corresponding taboo initial fitness.
[0099] Next, determine whether the fitness value of the currently generated candidate solution is greater than or equal to the taboo initial fitness. This step is to evaluate whether the candidate solution is better than the solution recorded in the taboo table.
[0100] If the fitness value of the candidate solution is greater than or equal to the initial fitness value of the taboo, it means that the candidate solution is a better solution. At this time, according to the candidate solution corresponding to the fitness value of the candidate solution, the initial value of the taboo table is replaced and set as the updated value of the taboo table. The purpose of this step is to update the taboo table with a better solution so that subsequent searches can be based on this better solution.
[0101] Case 2: If the fitness value of the candidate solution is less than the initial fitness value of the taboo, it means that the candidate solution is not as good as the solution recorded in the taboo table. In this case, keep the taboo table unchanged, that is, set the initial value of the taboo table directly to the updated value of the taboo table. This step is to avoid adding solutions with poor performance to the taboo table and ensure that the solutions recorded in the taboo table are always solutions with good performance.
[0102] Based on this step, the taboo table can be dynamically updated to always record the better solutions encountered during the search process. This helps the algorithm avoid repeated evaluation of poor solutions in subsequent searches, improves search efficiency, and helps find the global optimal solution or a near-optimal solution.
[0103] In summary, the intelligent power equipment operation and maintenance method provided by the embodiment of the present application has the following technical effects:
[0104] 1. Through in-depth analysis of the historical operation data of power equipment, the attenuation trend of its safe operation cycle is accurately predicted, and then targeted operation and maintenance plans are formulated. The application of simulation technology effectively verifies the feasibility of the operation and maintenance plan, and generates an optimized operation and maintenance plan through optimization processing. Finally, the implementation of these optimization plans realizes the intelligent operation and maintenance of power equipment, significantly improving the operation and maintenance efficiency and the stability of equipment operation.
[0105] 2. By constructing and running a safe operation cycle attenuation model, the quantitative analysis and prediction of the performance attenuation trends of multiple power equipment are achieved, providing a scientific basis for the preventive maintenance and fault warning of power equipment.
[0106] 3. By setting multiple simulation operation and maintenance data, the first power equipment is simulated in combination with a specific operation and maintenance plan, and a comprehensive data set containing operation, performance and fault simulation data is generated. Based on these data sets, the operation and maintenance plan is accurately evaluated, and multiple operation and maintenance evaluation results are generated, which provides strong support for the intelligent operation and maintenance of power equipment and improves the scientificity and accuracy of operation and maintenance decisions.
[0107] Embodiment 2
[0108] Based on the same inventive concept as the intelligent power equipment operation and maintenance method in the aforementioned embodiment, Figure 2 As shown, the embodiment of the present application provides an intelligent power equipment operation and maintenance system, the system comprising:
[0109] Historical data collection module 11: used to collect historical operating status data of multiple power equipment in the target area;
[0110] The cycle decay analysis module 12 is used to perform a safe operation cycle decay analysis on a plurality of power equipment based on the historical operation status data to obtain a safe cycle instant trend set;
[0111] The cycle analysis result determination module 13 is used to analyze a plurality of power equipment according to the safety cycle instant trend set to determine the operation and maintenance level cycle analysis result;
[0112] An operation and maintenance plan generating module 14 is used to generate operation and maintenance plans for a plurality of power equipment based on the operation and maintenance level cycle analysis result;
[0113] Simulation result generation module 15: used to simulate multiple power equipment based on the multiple power equipment operation and maintenance solutions to generate simulation results for multiple power equipment
[0114] The operation and maintenance optimization scheme generating module 16 is used to optimize the operation and maintenance schemes of the multiple power equipments according to the simulation results of the multiple power equipments, and generate multiple operation and maintenance optimization schemes of the multiple power equipments, wherein the multiple operation and maintenance optimization schemes of the multiple power equipments correspond to the multiple power equipments;
[0115] Intelligent operation and maintenance module 17: used to execute the multiple power equipment operation and maintenance optimization plans and perform intelligent operation and maintenance on multiple power equipment.
[0116] Furthermore, the system is also used for:
[0117] Extract multiple operating times, multiple equipment performance parameters, and multiple fault maintenance records of multiple power equipment based on the historical operating status data
[0118] According to the multiple operating times, the multiple equipment performance parameters and the multiple fault maintenance records are divided into a training set, a supervision set, and a test set;
[0119] Constructing a safe operation cycle attenuation model based on the training set and the supervision set, and outputting the safe operation cycle attenuation model when the test set passes the verification;
[0120] Analyze multiple power equipment through the safe operation cycle decay model to generate multiple performance decay speeds, multiple remaining safe operation times, and multiple operation fault prediction information;
[0121] The safety period instant trend set is drawn based on the multiple performance decay rates, the multiple remaining safe operation times, and the multiple operation failure prediction information.
[0122] Furthermore, the system is also used for:
[0123] Extracting a first performance decay speed, a first remaining safe operation time, and a first operation fault prediction information based on the multiple performance decay speeds, the multiple remaining safe operation time, and the multiple operation fault prediction information;
[0124] Establishing a first comprehensive evaluation index for the first power equipment based on the first performance decay rate, the first remaining safe operation time, and the first operation fault prediction information;
[0125] Taking the operation time of the first power equipment as the first coordinate axis and taking the first comprehensive evaluation index as the second coordinate axis;
[0126] Constructing a first safety period instantaneous coordinate system according to the first coordinate axis and the second coordinate axis;
[0127] Synchronize the first historical operating state of the first power equipment to the first safety period instantaneous coordinate system to determine the first safety period instantaneous trend;
[0128] The first safety period instant trend is added to the safety period instant trend set.
[0129] Furthermore, the system is also used for:
[0130] Evaluate the first power equipment based on the instantaneous trend of the first safety period to generate a first evaluation result;
[0131] generating first safety status information and a first operation development trend of the first power equipment according to the first evaluation result;
[0132] Performing safety identification based on the first safety status information, and determining an operation and maintenance level of the first power equipment according to a safety identification result;
[0133] Formulate a first operation and maintenance cycle according to the operation and maintenance level of the first power equipment and in combination with the first operation development trend;
[0134] According to the operation and maintenance level of the first power equipment, dynamic analysis is performed within the first operation and maintenance cycle to determine a first operation and maintenance level cycle analysis result;
[0135] The first operation and maintenance level cycle analysis result is added to the operation and maintenance level cycle analysis result.
[0136] Furthermore, the system is also used for:
[0137] Setting a plurality of simulation operation and maintenance data based on the operation and maintenance level of the first power equipment and the first operation and maintenance cycle;
[0138] Based on the multiple power equipment operation and maintenance solutions, and in combination with the multiple simulation operation and maintenance data, the first power equipment is simulated to generate an equipment operation and maintenance simulation data set;
[0139] Determine operation simulation data, performance simulation data, and fault simulation data of the first power equipment based on the equipment operation and maintenance simulation data set;
[0140] Performing operation and maintenance evaluation on the multiple power equipment operation and maintenance solutions based on the operation simulation data, the performance simulation data, and the fault simulation data, and generating multiple operation and maintenance evaluation results;
[0141] The multiple operation and maintenance evaluation results are added to the simulation results of the first electric power equipment.
[0142] Furthermore, the system is also used for:
[0143] Use the taboo optimization algorithm to construct a taboo table;
[0144] Taking the first power equipment operation and maintenance plan as an initial solution, and calculating a first operation and maintenance fitness value based on the simulation result of the first power equipment, wherein the first operation and maintenance fitness value has a one-to-one correspondence with the first power equipment operation and maintenance plan;
[0145] Perform cross validation based on the initial solution to generate a candidate solution, wherein the candidate solution includes a fitness value of the candidate solution;
[0146] Traversing the taboo table to match the candidate solution, and judging whether the candidate solution is in the taboo table according to the matching result;
[0147] If the candidate solution is not in the taboo table, the candidate solution is added to a candidate solution set, and based on the candidate solution set, the candidate solution with the largest fitness value is used to update the initial solution to generate an updated solution;
[0148] Adding the updated solution to the taboo table for updating, thereby iterating until the change in fitness value is less than a preset threshold;
[0149] An updated value of the taboo table is obtained, and a first power equipment operation and maintenance optimization plan is output according to the updated value of the taboo table.
[0150] Furthermore, the system is also used for:
[0151] According to the taboo table, extracting a taboo table initial value, wherein the taboo table initial value has a taboo initial fitness;
[0152] Determining whether the fitness value of the candidate solution is greater than or equal to the taboo initial fitness;
[0153] If the fitness value of the candidate solution is greater than or equal to the taboo initial fitness, then the initial value of the taboo table is replaced according to the candidate solution corresponding to the fitness value of the candidate solution and is set as the updated value of the taboo table;
[0154] If it is less than, the initial value of the taboo table is set as the updated value of the taboo table.
[0155] Any step of the method described above can be stored as a computer instruction or program in an unlimited computer memory, and can be called and recognized by an unlimited computer processor to implement any method in the embodiments of the present application, without any unnecessary restrictions.
[0156] Furthermore, the first or second mentioned above may not only represent an order relationship, but may also represent a specific concept, and / or refer to multiple elements that can be selected individually or in full. Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the present application and its equivalents, the present application intends to include these modifications and variations.
Claims
1. An intelligent power equipment operation and maintenance method, characterized in that: The method comprises: Collect historical operating status data of multiple power equipment in the target area; Based on the historical operation status data, a safe operation cycle attenuation analysis is performed on multiple power equipment to obtain a safe cycle instant trend set; Analyze multiple power equipment according to the safety cycle instant trend set to determine the operation and maintenance level cycle analysis result; Generate an operation and maintenance plan for multiple power equipment based on the operation and maintenance level cycle analysis result; Performing simulation on multiple power equipment based on the multiple power equipment operation and maintenance solutions to generate simulation results for the multiple power equipment; Optimizing multiple power equipment operation and maintenance plans according to the simulation results of the multiple power equipment to generate multiple power equipment operation and maintenance optimization plans, wherein the multiple power equipment operation and maintenance optimization plans correspond to the multiple power equipment; Execute the multiple power equipment operation and maintenance optimization plans to perform intelligent operation and maintenance on the multiple power equipment.
2. The method according to claim 1, characterized in that The method of performing a safe operation cycle attenuation analysis on a plurality of power equipment based on the historical operation status data to obtain a safe cycle instant trend set includes: Extract multiple operating times, multiple equipment performance parameters, and multiple fault maintenance records of multiple power equipment based on the historical operating status data According to the multiple operating times, the multiple equipment performance parameters and the multiple fault maintenance records are divided into a training set, a supervision set, and a test set; Building a safe operation cycle attenuation model based on the training set and the supervision set, and outputting the safe operation cycle attenuation model when the test set passes the verification; Analyze multiple power equipment through the safe operation cycle decay model to generate multiple performance decay speeds, multiple remaining safe operation times, and multiple operation fault prediction information; The safety period instant trend set is drawn based on the multiple performance decay rates, the multiple remaining safe operation times, and the multiple operation failure prediction information.
3. The method according to claim 2, characterized in that Based on the multiple performance decay speeds, the multiple remaining safe operation time, and the multiple operation fault prediction information, the method includes: Extracting a first performance decay speed, a first remaining safe operation time, and a first operation fault prediction information based on the multiple performance decay speeds, the multiple remaining safe operation time, and the multiple operation fault prediction information; Establishing a first comprehensive evaluation index for the first power equipment based on the first performance decay rate, the first remaining safe operation time, and the first operation fault prediction information; Taking the operation time of the first power equipment as the first coordinate axis and taking the first comprehensive evaluation index as the second coordinate axis; Constructing a first safety period instantaneous coordinate system according to the first coordinate axis and the second coordinate axis; Synchronizing the first historical operating state of the first power equipment to the first safety period instantaneous coordinate system to determine the first safety period instantaneous trend; The first safety period instant trend is added to the safety period instant trend set.
4. The method according to claim 3, characterized in that Analyzing multiple power equipment according to the safety cycle instant trend set to determine the operation and maintenance level cycle analysis result, the method includes: Evaluate the first power equipment based on the instantaneous trend of the first safety period to generate a first evaluation result; generating first safety status information and a first operation development trend of the first power equipment according to the first evaluation result; Performing safety identification based on the first safety status information, and determining an operation and maintenance level of the first power equipment according to a safety identification result; Formulate a first operation and maintenance cycle according to the operation and maintenance level of the first power equipment and in combination with the first operation development trend; According to the operation and maintenance level of the first power equipment, dynamic analysis is performed within the first operation and maintenance cycle to determine a first operation and maintenance level cycle analysis result; The first operation and maintenance level cycle analysis result is added to the operation and maintenance level cycle analysis result.
5. The method according to claim 4, characterized in that Based on the multiple power equipment operation and maintenance solutions, multiple power equipment are simulated to generate simulation results of the multiple equipment, the method comprising: Setting a plurality of simulation operation and maintenance data based on the operation and maintenance level of the first power equipment and the first operation and maintenance cycle; Based on the multiple power equipment operation and maintenance solutions, and in combination with the multiple simulation operation and maintenance data, the first power equipment is simulated to generate an equipment operation and maintenance simulation data set; Determine operation simulation data, performance simulation data, and fault simulation data of the first power equipment based on the equipment operation and maintenance simulation data set; Performing operation and maintenance evaluation on the multiple power equipment operation and maintenance solutions based on the operation simulation data, the performance simulation data, and the fault simulation data, and generating multiple operation and maintenance evaluation results; The multiple operation and maintenance evaluation results are added to the simulation results of the first electric power equipment.
6. The method according to claim 5, characterized in that Optimizing the multiple power equipment operation and maintenance solutions according to the simulation results of the multiple power equipment to generate multiple power equipment operation and maintenance optimization solutions, the method comprising: Use the taboo optimization algorithm to construct a taboo table; Taking the first power equipment operation and maintenance plan as an initial solution, and calculating a first operation and maintenance fitness value based on the simulation result of the first power equipment, wherein the first operation and maintenance fitness value has a one-to-one correspondence with the first power equipment operation and maintenance plan; Perform cross validation based on the initial solution to generate a candidate solution, wherein the candidate solution includes a fitness value of the candidate solution; Traversing the taboo table to match the candidate solution, and judging whether the candidate solution is in the taboo table according to the matching result; If the candidate solution is not in the taboo table, the candidate solution is added to a candidate solution set, and based on the candidate solution set, the candidate solution with the largest fitness value is used to update the initial solution to generate an updated solution; Adding the updated solution to the taboo table for updating, thereby iterating until the change in fitness value is less than a preset threshold; An updated value of the taboo table is obtained, and a first power equipment operation and maintenance optimization plan is output according to the updated value of the taboo table.
7. The method according to claim 6, characterized in that The taboo table updating method includes: According to the taboo table, extracting a taboo table initial value, wherein the taboo table initial value has a taboo initial fitness; Determining whether the fitness value of the candidate solution is greater than or equal to the taboo initial fitness; If the fitness value of the candidate solution is greater than or equal to the taboo initial fitness, then the initial value of the taboo table is replaced according to the candidate solution corresponding to the fitness value of the candidate solution and is set as the updated value of the taboo table; If it is less than, the initial value of the taboo table is set as the updated value of the taboo table.
8. An intelligent power equipment operation and maintenance method, characterized in that: For executing the method according to any one of claims 1 to 7, the system comprises: Historical data collection module: used to collect historical operating status data of multiple power equipment in the target area; A cycle decay analysis module: used to perform a safe operation cycle decay analysis on a plurality of power equipment based on the historical operation status data to obtain a safe cycle instant trend set; A cycle analysis result determination module is used to analyze a plurality of power equipment according to the safety cycle instant trend set to determine the operation and maintenance level cycle analysis result; An operation and maintenance plan generating module: used to generate operation and maintenance plans for a plurality of power equipment based on the operation and maintenance level cycle analysis result; Simulation result generation module: used to simulate multiple power equipment based on the multiple power equipment operation and maintenance solutions, and generate simulation results for multiple power equipment An operation and maintenance optimization scheme generating module: used to optimize a plurality of operation and maintenance schemes of the power equipment according to the simulation results of the plurality of power equipment, and generate a plurality of operation and maintenance optimization schemes of the power equipment, wherein the plurality of operation and maintenance optimization schemes of the power equipment correspond to the plurality of power equipment; Intelligent operation and maintenance module: used to execute the multiple power equipment operation and maintenance optimization plans and perform intelligent operation and maintenance on multiple power equipment.
Citation Information
Patent Citations
Method and system for offshore wind power operation and maintenance decision simulation
CN110245795A
Digital twinning-based electric power communication transmission network analysis method, equipment and medium
CN115577548A
Operation and maintenance strategy optimization method and device of equipment, equipment and storage medium
CN115713320A
Distribution network operation and maintenance simulation training system based on big data
CN117523934A
Method for asset management of electric power equipment
US20200134516A1
Cited By
Power load simulation training method and device and storage medium
CN119626048A