Electricity price data scheduling method and terminal based on new energy consumption

By calculating the kilowatt-hour of electricity consumed by new energy, we can avoid the difference between the fixed cost and kilowatt-hour of electricity, build an electricity price data scheduling model, optimize the charging and discharging behavior of new energy vehicles, and solve the problem of mismatch between the output time of new energy vehicles and photovoltaics in rural areas. , improving the consumption rate and economic benefits of new energy.

CN118941316AActive Publication Date: 2024-11-12STATE GRID FUJIAN ELECTRIC POWER CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410974307.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-12
Estimated Expiration
2044-07-19

AI Technical Summary

Technical Problem

The output time of new energy vehicles and photovoltaics in rural areas does not match, resulting in low efficiency of new energy consumption, and there are problems with insufficient theory and optimization of existing demand response mechanisms and electric vehicle scheduling methods.

Method used

Adopt the electricity price data scheduling method based on new energy consumption, and calculate the difference between the cost and the fixed cost of kilowatt-hour of electricity, build an electricity price data scheduling model, use the new energy demand response mechanism to obtain the expected electricity price data, and optimize the new energy vehicle Charging and discharge behavior to improve the consumption rate of new energy.

Benefits of technology

It effectively improves the consumption rate of new energy, maximizes economic benefits, and promotes on-site consumption of new energy by reducing the costs of power generation, transmission and distribution and carbon emissions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118941316A_ABST
    Figure CN118941316A_ABST
Patent Text Reader

Abstract

The invention discloses an electricity price data scheduling method based on new energy consumption and a terminal, which fully considers new energy consumption factors by equivalently quantifying power generation cost, power transmission and distribution cost and carbon emission cost which are avoided by new energy consumption into cost which can be avoided by kilowatt-hour electricity. And meanwhile, the fixed cost per kilowatt-hour is determined based on the first operation and maintenance cost, the first investment cost and the incentive cost prediction value required by new energy consumption. And when the kilowatt-hour electricity avoidable cost exceeds the kilowatt-hour electricity fixed cost, that is, representing that the income of the current new energy consumption exceeds the cost, acquiring expected electricity price data of the user through a new energy demand response mechanism to guide the user to use electricity in the new energy output peak period. Besides, an electricity price data scheduling model is constructed by taking maximization of a difference value between a kilowatt-hour electricity avoidance cost and a kilowatt-hour electricity fixed cost as a target, and expected electricity price data winning a bid is determined based on a model solving result, so that maximization of economic benefits is realized while the new energy consumption rate is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric power dispatching, and in particular to an electricity price data dispatching method and terminal based on new energy consumption. Background Art

[0002] At present, the domestic photovoltaic installed capacity and charging infrastructure construction are showing a rapid growth trend. However, with the large-scale photovoltaic grid connection, there is a phenomenon of difficulty in consumption, especially in rural areas. At present, the country has introduced a series of favorable policies to encourage new energy vehicles to go to the countryside, in order to speed up the filling of the gap in the consumption and use of new energy vehicles in rural areas, thereby adding new vitality to the growth of new energy vehicles in rural areas.

[0003] As an important adjustable resource for absorbing new energy such as photovoltaics in rural areas, new energy vehicles have great potential, but the current new energy in rural areas has the problem of poor overall matching between photovoltaic output and charging load. Photovoltaic output is mainly concentrated at noon, while the use of electric vehicles in rural areas is mainly for travel during the day and charging at night. This time mismatch makes it difficult to fully realize the synergy between the two.

[0004] The demand response mechanism and orderly charging and discharging strategy of new energy vehicles provide a new solution to this challenge. Through the incentive signal of demand response, the charging and discharging behavior of new energy vehicles can be effectively guided and optimized to better match the photovoltaic output. However, the current demand response mechanism and electric vehicle scheduling method still have theoretical and optimization deficiencies in promoting the consumption of new energy. First, the demand response mechanism fails to fully consider the factors of new energy consumption and lacks a clear value transfer mechanism; second, the electric vehicle scheduling method fails to closely combine the characteristics of photovoltaic output, resulting in limitations in the coordinated optimization of the two. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide an electricity price data scheduling method and terminal based on new energy consumption, which can effectively utilize the output characteristics of new energy and promote the new energy consumption rate.

[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0007] The electricity price data dispatching method based on new energy consumption includes:

[0008] Calculate the avoidable cost per kilowatt-hour based on renewable energy consumption based on the power generation cost, transmission and distribution cost, and carbon emission cost of non-renewable energy power generation methods;

[0009] Calculate the fixed cost per kWh based on the new energy demand response according to the first operation and maintenance cost, the first investment cost and the predicted value of the incentive cost of the new energy power generation mode;

[0010] If the avoidable cost per kilowatt-hour is greater than or equal to the fixed cost per kilowatt-hour, obtaining the user's expected electricity price data through a new energy demand response mechanism, wherein the expected electricity price data includes the amount of electricity and the electricity price per kilowatt-hour;

[0011] Taking maximizing the difference between the avoidable cost per kilowatt-hour and the fixed cost per kilowatt-hour as a goal, constructing an electricity price data scheduling model based on the expected electricity price data;

[0012] The electricity price data scheduling model is solved based on the operating constraints, and the expected electricity price data for the winning bid is determined according to the solution results.

[0013] In order to solve the above technical problems, another technical solution adopted by the present invention is:

[0014] An electricity price data scheduling terminal based on new energy consumption includes a memory, a processor, and a computer program stored in the memory and running on the processor. When the processor executes the computer program, each step of the above-mentioned electricity price data scheduling method based on new energy consumption is implemented.

[0015] The beneficial effects of the present invention are as follows: by quantifying the power generation cost, transmission and distribution cost and carbon emission cost avoided by the local consumption of new energy as the avoidable cost per kilowatt-hour, the new energy consumption factor is fully considered. At the same time, the fixed cost per kilowatt-hour required for the local consumption of new energy is determined based on the first operation and maintenance cost, the first investment cost and the predicted value of the incentive cost required for the local consumption of new energy. When the avoidable cost per kilowatt-hour is greater than or equal to the fixed cost per kilowatt-hour, that is, it indicates that the current benefit of the new energy consumption is greater than or equal to the cost, the user's expected electricity price data is obtained through the new energy demand response mechanism at this time to guide the user to use electricity during the peak period of new energy output. In addition, an electricity price data scheduling model is constructed with the goal of maximizing the difference between the avoidable cost per kilowatt-hour and the fixed cost per kilowatt-hour, and the expected electricity price data of the winning bid is determined based on the model solution results, so as to maximize the economic benefits while improving the new energy consumption rate. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A flowchart of the steps of the electricity price data scheduling method based on new energy consumption provided by an embodiment of the present invention;

[0017] Figure 2 A schematic diagram of a quantification process of the avoidable cost per kilowatt-hour of electricity provided by an embodiment of the present invention;

[0018] Figure 3 Another flow chart of the electricity price data scheduling method based on new energy consumption provided by an embodiment of the present invention;

[0019] Figure 4A schematic diagram of the structure of an electricity price data dispatching terminal based on new energy consumption provided by an embodiment of the present invention;

[0020] Description of labels:

[0021] 100. Electricity price data dispatching terminal based on new energy consumption; 101. Memory; 102. Processor. DETAILED DESCRIPTION

[0022] In order to explain the technical content, achieved objectives and effects of the present invention in detail, the following is an explanation in combination with the implementation modes and the accompanying drawings.

[0023] An embodiment of the present invention provides a method for dispatching electricity price data based on new energy consumption, comprising:

[0024] Calculate the avoidable cost per kilowatt-hour based on renewable energy consumption based on the power generation cost, transmission and distribution cost, and carbon emission cost of non-renewable energy power generation methods;

[0025] Calculate the fixed cost per kWh based on the new energy demand response according to the first operation and maintenance cost, the first investment cost and the predicted value of the incentive cost of the new energy power generation mode;

[0026] If the avoidable cost per kilowatt-hour is greater than or equal to the fixed cost per kilowatt-hour, obtaining the user's expected electricity price data through a new energy demand response mechanism, wherein the expected electricity price data includes the amount of electricity and the electricity price per kilowatt-hour;

[0027] Taking maximizing the difference between the avoidable cost per kilowatt-hour and the fixed cost per kilowatt-hour as a goal, constructing an electricity price data scheduling model based on the expected electricity price data;

[0028] The electricity price data scheduling model is solved based on the operating constraints, and the expected electricity price data for the winning bid is determined according to the solution results.

[0029] From the above description, it can be seen that the beneficial effect of the present invention is that: by quantifying the power generation cost, transmission and distribution cost and carbon emission cost avoided by the local consumption of new energy as the avoidable cost per kilowatt-hour, the new energy consumption factor is fully considered. At the same time, the fixed cost per kilowatt-hour required for the local consumption of new energy is determined based on the first operation and maintenance cost, the first investment cost and the predicted value of the incentive cost required for the local consumption of new energy. When the avoidable cost per kilowatt-hour is greater than or equal to the fixed cost per kilowatt-hour, it means that the current benefit of the new energy consumption is greater than or equal to the cost. At this time, the user's expected electricity price data is obtained through the new energy demand response mechanism to guide the user to use electricity during the peak period of new energy output. In addition, an electricity price data scheduling model is constructed with the goal of maximizing the difference between the avoidable cost per kilowatt-hour and the fixed cost per kilowatt-hour, and the expected electricity price data of the winning bid is determined based on the model solution results, so as to maximize the economic benefits while improving the new energy consumption rate.

[0030] Furthermore, the power generation cost of the non-renewable energy power generation method includes fuel cost, second operation and maintenance cost and second investment cost, and the power transmission and distribution cost of the non-renewable energy power generation method includes power transmission investment cost and power distribution investment cost;

[0031] The avoidable costs of electricity consumption based on renewable energy consumption calculated based on the power generation costs, transmission and distribution costs, and carbon emission costs of non-renewable energy power generation methods include:

[0032] Calculate the avoidable cost of energy consumption based on new energy consumption according to the fuel cost, the second operation and maintenance cost, and the second investment cost;

[0033] Calculate the avoidable costs of power transmission and distribution based on the consumption of new energy according to the power transmission investment cost and the power distribution investment cost;

[0034] Calculate the avoided cost of carbon emissions based on new energy consumption according to the avoided cost of power transmission and distribution and the carbon emission cost;

[0035] The avoidable cost per kilowatt-hour of electricity based on new energy consumption is calculated based on the avoidable cost of energy consumption, the avoidable cost of power transmission and distribution, and the avoidable cost of carbon emissions.

[0036] From the above description, we can see that from the perspective of power generation, by reducing the abandonment of solar and wind power, we can avoid the consumption of other energy sources such as thermal power, hydropower and nuclear power; from the perspective of power transmission and distribution, by promoting the local consumption of new energy, we can reduce the investment in power transmission and distribution capacity of the power grid; from the perspective of environmental benefits, the use of new energy replaces high-carbon emission power generation output such as thermal power, reducing carbon reduction costs. Therefore, based on the costs avoided by new energy power generation in the power generation link, power transmission and distribution link and environmental benefits, we determine the avoidable cost per kilowatt-hour brought by the consumption of new energy, that is, the benefits, so as to maximize economic benefits while realizing the consumption of new energy.

[0037] Furthermore, the avoidable cost of energy consumption based on new energy consumption is calculated based on the fuel cost, the second operation and maintenance cost, and the second investment cost as follows:

[0038]

[0039] Among them, C ener represents the avoided cost of energy consumption, n1 represents the number of non-renewable energy generation methods, j represents the type of non-renewable energy generation methods, j=1 represents thermal power generation, j=2 represents nuclear power generation, j=3 represents hydropower generation, j=4 represents other non-renewable energy generation methods, α represents the power generation ratio of different power generation methods, C fuelj represents the fuel cost of the jth non-renewable energy generation method, C opj represents the second operation and maintenance cost of the jth non-renewable energy generation mode, Cgenj Represents the second investment cost of the j-th non-renewable energy power generation method.

[0040] From the above description, we can know that in the power generation process, the avoided cost of energy consumption represents the fuel cost, generator set operation and maintenance cost and construction investment cost avoided per kilowatt-hour when using new energy power generation methods such as wind power and photovoltaic power generation instead of other power generation methods such as thermal power, hydropower and nuclear power. When the user's electricity consumption is determined, the energy consumption benefits brought by the current new energy power generation can be known based on the avoided cost of energy consumption.

[0041] Furthermore, the avoidable cost of power transmission and distribution based on new energy consumption is calculated based on the power transmission investment cost and the power distribution investment cost as follows:

[0042]

[0043] Among them, C tr_dis represents the avoided cost of transmission and distribution, α represents the power generation ratio of different power generation modes, C transj represents the transmission investment cost of the jth non-renewable energy generation mode, C disj It represents the distribution investment cost of the jth non-renewable energy generation mode.

[0044] From the above description, we can know that in the transmission and distribution link, the avoidable cost of transmission and distribution represents the investment cost of power transmission and distribution facilities avoided per kilowatt-hour when using photovoltaic power generation, wind power and other new energy power generation methods for local consumption instead of thermal power, hydropower, nuclear power and other power generation methods. When the power generation and power consumption of users are determined, the transmission and distribution benefits brought by the current new energy power generation can be known based on the avoidable cost of transmission and distribution.

[0045] Furthermore, the avoided carbon emission cost based on new energy consumption is calculated based on the avoided transmission and distribution cost and the carbon emission cost as follows:

[0046]

[0047] Among them, C car represents the avoided cost of carbon emissions, C tr_dis represents the avoided cost of transmission and distribution, m represents the calculation period, δ j,a represents the carbon emission intensity of the jth non-renewable energy generation method in year a, C cj,a It represents the carbon emission cost of the j-th non-renewable energy generation method in year a.

[0048] Furthermore, the avoidable cost per kilowatt-hour based on new energy consumption is calculated based on the avoidable cost of energy consumption, the avoidable cost of power transmission and distribution, and the avoidable cost of carbon emissions as follows:

[0049] CACC =C ener +C tr_dis +C car ;

[0050] Among them, C ACC Indicates the avoided cost per kWh, C ener represents the avoided cost of energy consumption, C tr_dis represents the avoided cost of transmission and distribution, C car Indicates avoided costs of carbon emissions.

[0051] From the above description, we can see that in environmental benefits, the avoided cost of carbon emissions represents the avoided carbon emission cost per kilowatt-hour when using photovoltaic power generation, wind power and other new energy power generation methods for local consumption instead of thermal power, hydropower, nuclear power and other power generation methods. When the user's power generation and electricity consumption are determined, the environmental benefits brought by the current new energy power generation can be known based on the avoided cost of carbon emissions.

[0052] Furthermore, the fixed cost per kWh based on the new energy demand response is calculated according to the first operation and maintenance cost, the first investment cost and the predicted value of the incentive cost of the new energy power generation mode as follows:

[0053]

[0054] Among them, C DE represents the fixed cost per kWh, n2 represents the number of renewable energy power generation methods, k represents the type of renewable energy power generation method, k = 1 represents photovoltaic power generation method, k = 2 represents wind power generation method, α represents the power generation ratio of different power generation methods, C opk represents the first operation and maintenance cost of the kth renewable energy generation mode, C genk represents the first investment cost of the kth renewable energy generation method, R de Represents the predicted value of incentive cost.

[0055] From the above description, it can be seen that the fixed cost per kWh represents the total cost of operation and maintenance of new energy generators, construction investment, and incentive costs for users participating in the new energy consumption demand response, which is converted to each kWh of new energy power generation. Among them, the incentive cost is calculated based on the predicted value of the fixed cost per kWh, which is used as a condition for determining whether to start the new energy demand response to obtain the expected electricity price data, thereby promoting the new energy consumption rate based on the user's expected electricity price data while ensuring economic benefits.

[0056] Furthermore, the electricity price data scheduling model is constructed based on the expected electricity price data with the goal of maximizing the difference between the avoidable cost per kilowatt-hour and the fixed cost per kilowatt-hour as the goal, specifically as follows:

[0057]

[0058] Where f represents the electricity price data dispatch model, P j represents the power generated by the jth non-renewable energy generation method in time period t, P k represents the power generation of the kth renewable energy generation method in time period t, C ACC Indicates the avoided cost per kWh, C opk represents the first operation and maintenance cost of the kth renewable energy generation mode, C genk represents the first investment cost of the kth renewable energy generation method, P EV represents the charging load of the electric vehicle charging station node, R de_ac represents the actual value of the user's incentive cost, which is obtained based on the expected electricity price data, and t represents the clearing time period.

[0059] From the above description, it can be seen that the avoidable cost per kilowatt-hour represents the benefit of the new energy consumption in the power grid, the fixed cost per kilowatt-hour represents the cost of the new energy consumption in the power grid, and the maximization of the difference between the avoidable cost per kilowatt-hour and the fixed cost per kilowatt-hour represents the maximization of the economic benefit of the new energy consumption in the power grid. The scheduling model based on the electricity price data can solve the electricity quantity when the economic benefit is maximized, and the final winning electricity quantity and electricity price can be determined based on the solved electricity quantity and the actual value of the user's incentive cost, thereby promoting the new energy consumption rate while maximizing the economic benefit.

[0060] Further, the operation constraints include power constraints, output constraints and safety constraints of the electric vehicle charging station;

[0061] The power constraint is specifically:

[0062]

[0063] Among them, P l represents the active power flowing into the electric vehicle charging station node, n1 represents the number of non-renewable energy generation methods, n2 represents the number of renewable energy generation methods, P EV Represents the charging load of the electric vehicle charging station node;

[0064] The output constraints are specifically:

[0065] 0≤P l ≤P ra_gen ;

[0066] 0≤P EV ≤P ra_EV ;

[0067] Among them, P ra_gen Indicates the rated power of the first power generation method, P ra_EV Indicates the maximum charging power of an electric vehicle;

[0068] The security constraints are specifically:

[0069] U min ≤U pu ≤U max ;

[0070] f min ≤f l ≤f max ;

[0071] Among them, U pu Indicates the per unit value of the voltage amplitude at the node of the electric vehicle charging station, U min and U max They represent the lower and upper limits of the allowable voltage deviation, f1 represents the node frequency of the electric vehicle charging station, and f min and f max They respectively represent the lower and upper limits of the allowed frequency deviation.

[0072] From the above description, it can be seen that in order to maximize economic benefits, electric vehicles are scheduled to charge in an orderly manner to reasonably absorb new energy. When declaring prices, in order to ensure clearing and profitability, users usually declare prices close to the cost of power generation. Therefore, the use of lower-cost new energy power generation methods to replace other higher-cost power generation methods can reduce the cost of purchasing electricity from users, help reduce carbon emissions, and increase environmental benefits. At the same time, priority is given to incentives for electric vehicle users with lower expectations to reduce the cost of incentive users and promote their local consumption of new energy.

[0073] Another embodiment of the present invention provides an electricity price data scheduling terminal based on new energy consumption, including a memory, a processor, and a computer program stored in the memory and running on the processor. When the processor executes the computer program, each step of the above-mentioned electricity price data scheduling method based on new energy consumption is implemented.

[0074] From the above description, it can be seen that the beneficial effect of the present invention is that: by quantifying the power generation cost, transmission and distribution cost and carbon emission cost avoided by the local consumption of new energy as the avoidable cost per kilowatt-hour, the new energy consumption factor is fully considered. At the same time, the fixed cost per kilowatt-hour required for the local consumption of new energy is determined based on the first operation and maintenance cost, the first investment cost and the predicted value of the incentive cost required for the local consumption of new energy. When the avoidable cost per kilowatt-hour is greater than or equal to the fixed cost per kilowatt-hour, it means that the current benefit of the new energy consumption is greater than or equal to the cost. At this time, the user's expected electricity price data is obtained through the new energy demand response mechanism to guide the user to use electricity during the peak period of new energy output. In addition, an electricity price data scheduling model is constructed with the goal of maximizing the difference between the avoidable cost per kilowatt-hour and the fixed cost per kilowatt-hour, and the expected electricity price data of the winning bid is determined based on the model solution results, so as to maximize the economic benefits while improving the new energy consumption rate.

[0075] An electricity price data scheduling method and terminal based on new energy consumption provided in an embodiment of the present invention can be applied to a scenario of optimizing and scheduling a new energy power system, can effectively utilize the output characteristics of new energy, and promote the new energy consumption rate. The following is an explanation through a specific embodiment:

[0076] Please refer to Figures 1 to 3 , Embodiment 1 of the present invention is:

[0077] like Figure 1 and Figure 3 As shown, a method for dispatching electricity price data based on new energy consumption includes:

[0078] S1. Calculate the avoidable cost of electricity per kWh based on the consumption of new energy according to the power generation cost, power transmission and distribution cost and carbon emission cost of the non-new energy power generation mode. The power generation cost of the non-new energy power generation mode includes fuel cost, second operation and maintenance cost and second investment cost, and the power transmission and distribution cost of the non-new energy power generation mode includes power transmission investment cost and power distribution investment cost.

[0079] Specifically, Figure 2 As shown, the step S1 includes:

[0080] S11. Calculate the avoidable cost of energy consumption based on new energy consumption according to the fuel cost, the second operation and maintenance cost, and the second investment cost.

[0081] It should be noted that with the development of new power systems, the future energy structure will be dominated by non-fossil fuels, and new energy will be absorbed through new energy consumption demand response mechanisms to reduce the investment and operation and maintenance costs of thermal power, hydropower and nuclear power units, and even further reduce the investment in peak power generation units during peak power consumption. Therefore, the avoidable electricity costs of promoting new energy consumption through new energy demand response in the power generation link include fuel costs Cfuelj 2. Operation and maintenance cost C opj and the second investment cost C genj .

[0082] The step S11 is specifically as follows:

[0083]

[0084] Among them, C ener represents the avoided cost of energy consumption, n1 represents the number of non-renewable energy generation methods, j represents the type of non-renewable energy generation methods, j=1 represents thermal power generation, j=2 represents nuclear power generation, j=3 represents hydropower generation, j=4 represents other non-renewable energy generation methods, α represents the power generation ratio of different power generation methods, C fuelj represents the fuel cost of the jth non-renewable energy generation method, C opj represents the second operation and maintenance cost of the jth non-renewable energy generation mode, C genj Represents the second investment cost of the j-th non-renewable energy power generation method.

[0085] In some embodiments, α satisfies

[0086] In some embodiments, C fuelj Specifically: C fuelj =β j C βj , where β j represents the energy consumption of the jth non-renewable energy generation method, C βj Represents the unit fuel cost of the j-th non-renewable energy generator set.

[0087] In some embodiments, C opj Specifically: Where m represents the calculated life cycle, C pj,a represents the annual operating cost and maintenance cost per unit power of the jth non-renewable energy generation method in year a, h j,a It represents the annual utilization hours of the jth non-renewable energy generation method in year a.

[0088] In some embodiments, C genj Specifically: Among them, C inj,a It represents the unit power investment cost of the j-th non-renewable energy generator set in year a.

[0089] S12. Calculate the avoidable costs of power transmission and distribution based on new energy consumption according to the power transmission investment cost and the power distribution investment cost.

[0090] It should be noted that promoting the local consumption of new energy can reduce the long-distance transmission of electricity, thereby significantly reducing the capacity of transmission and distribution lines. On the other hand, it can improve the local power balance of the power grid, reduce power allocation, improve the operation efficiency of the power grid, reduce dependence on large and centralized power grid facilities, and help reduce the investment cost of power grid transmission and distribution facilities. Therefore, the cost of electricity that can be avoided by promoting the consumption of new energy through new energy demand response in the transmission and distribution link includes the transmission investment cost C transj and distribution investment cost C disj .

[0091] The step S12 is specifically as follows:

[0092]

[0093] Among them, C tr_dis represents the avoided cost of transmission and distribution, α represents the power generation ratio of different power generation modes, C transj represents the transmission investment cost of the jth non-renewable energy generation mode, C disj It represents the distribution investment cost of the jth non-renewable energy generation mode.

[0094] In some embodiments, C transj Specifically: Among them, C tj,a It represents the unit power transmission investment cost of the jth non-renewable energy generation method in year a.

[0095] In some embodiments, C disj Specifically: Among them, C dj,a It represents the unit power distribution investment cost of the j-th non-renewable energy generation method in year a.

[0096] S13. Calculate the avoidable cost of carbon emissions based on new energy consumption according to the avoidable cost of power transmission and distribution and the carbon emission cost.

[0097] It should be noted that the use of new energy for power generation does not produce greenhouse gases, while thermal power generation is one of the main sources of greenhouse gas emissions. Burning fossil fuels will produce a large amount of carbon dioxide. Replacing thermal power generation with new energy can significantly reduce greenhouse gas emissions, thereby reducing carbon reduction costs. Therefore, in the environmental benefit part, the cost of electricity that can be avoided by promoting the consumption of new energy through new energy demand response includes carbon emission costs C cj,a .

[0098] The step S13 is specifically as follows:

[0099]

[0100] Among them, C carrepresents the avoided cost of carbon emissions, C tr_dis represents the avoided cost of transmission and distribution, m represents the calculation period, δ j,a represents the carbon emission intensity of the jth non-renewable energy generation method in year a, C cj,a It represents the carbon emission cost of the j-th non-renewable energy generation method in year a.

[0101] S14. Calculate the avoidable cost per kilowatt-hour based on new energy consumption according to the avoidable cost of energy consumption, the avoidable cost of power transmission and distribution, and the avoidable cost of carbon emissions.

[0102] The step S14 is specifically as follows:

[0103] C ACC =C ener +C tr_dis +C car ;

[0104] Among them, C ACC Indicates the avoided cost per kWh, C ener represents the avoided cost of energy consumption, C tr_dis represents the avoided cost of transmission and distribution, C car Indicates avoided costs of carbon emissions.

[0105] It should be noted that the C ener , C tr_dis and C car They represent the avoided cost of energy consumption per kilowatt-hour, the avoided cost of transmission and distribution, and the avoided cost of carbon emissions respectively.

[0106] S2. Calculate the fixed cost per kilowatt-hour based on the new energy demand response according to the first operation and maintenance cost, the first investment cost and the predicted value of the incentive cost of the new energy power generation mode.

[0107] The step S2 is specifically as follows:

[0108]

[0109] Among them, C DE represents the fixed cost per kWh, n2 represents the number of renewable energy power generation methods, k represents the type of renewable energy power generation method, k = 1 represents photovoltaic power generation method, k = 2 represents wind power generation method, α represents the power generation ratio of different power generation methods, C opk represents the first operation and maintenance cost of the kth renewable energy generation mode, C genk represents the first investment cost of the kth renewable energy generation method, R de Represents the predicted value of incentive cost.

[0110] In some embodiments, C opk The calculation principle of Copj The calculation principle is the same, specifically: Where m represents the calculated life cycle, C pk,a represents the annual operating cost and maintenance cost per unit power of the kth renewable energy generation method in year a, h k,a It represents the annual utilization hours of the kth renewable energy power generation mode in year a.

[0111] In some embodiments, C genk The calculation principle of C genj The calculation principle is the same, specifically: Among them, C ink,a It represents the unit power investment cost of the k-th new energy power generation equipment in the a-th year.

[0112] In some embodiments, R de Indicates the predicted value of the incentive cost per kWh for users participating in the new energy demand response mechanism. If the user is participating in the new energy demand response mechanism for the first time, the average of the past ten winning bids of the new energy demand response mechanism is used as the predicted value of the incentive cost per kWh. If the user is not participating in the new energy demand response mechanism for the first time, the predicted value of the incentive cost per kWh is determined by the average of the past five winning bids of the user.

[0113] S3. If the avoidable cost per kilowatt-hour is greater than or equal to the fixed cost per kilowatt-hour, obtaining the user's expected electricity price data through a new energy demand response mechanism, wherein the expected electricity price data includes electricity quantity and electricity price per kilowatt-hour.

[0114] In some embodiments, when the electricity consumed by renewable energy can avoid the cost C ACC The fixed cost of electricity consumption exceeding the new energy consumption C DE When the revenue from renewable energy power generation is higher than its power generation cost, it is beneficial to reduce the social power generation cost. At this time, the new energy demand response mechanism is activated, and relevant requirements and notifications are issued to load aggregators such as new energy power generation users and electric vehicle users. New energy power generation users shall independently declare the new energy power generation and power generation price according to the invitation of the power grid company, and at the same time, electric vehicle users shall independently declare the electric vehicle power consumption and expected per-kilowatt-hour incentive price according to the invitation of the power grid company. The power grid company shall determine the final winning new energy power generation, power generation price, electric vehicle power consumption and expected per-kilowatt-hour incentive price through market bidding, taking into account the price, quotation time and load forecast in the area, that is, through the electricity price data scheduling model of steps S5 to S6 of the present invention, to promote the consumption of new energy.

[0115] It should be noted that the final winning bid of renewable energy power generation, power generation price, electric vehicle power consumption and expected per-kilowatt-hour incentive price will affect the per-kilowatt-hour fixed cost C based on renewable energy demand response. DE .

[0116] S4. With the goal of maximizing the difference between the avoidable cost per kilowatt-hour and the fixed cost per kilowatt-hour, construct an electricity price data scheduling model based on the expected electricity price data.

[0117] S5. Solve the electricity price data scheduling model based on the operation constraints, and determine the expected electricity price data for the winning bid according to the solution results.

[0118] Embodiment 2 of the present invention is:

[0119] A method for dispatching electricity price data based on new energy consumption is different from the first embodiment in that the specific steps of step S4 and step S5 are limited.

[0120] The step S4 is specifically as follows:

[0121]

[0122] Where f represents the electricity price data dispatch model, P j represents the power generated by the jth non-renewable energy generation method in time period t, P k represents the power generation of the kth renewable energy generation method in time period t, C ACC Indicates the avoided cost per kWh, C opk represents the first operation and maintenance cost of the kth renewable energy generation mode, C genk represents the first investment cost of the kth renewable energy generation method, P EV represents the charging load of the electric vehicle charging station node, R de_ac represents the actual value of the user's incentive cost, which is obtained based on the expected electricity price data, and t represents the clearing time period, which is generally 15 minutes.

[0123] It should be noted that electric vehicle users usually declare electricity prices close to the cost of power generation in order to ensure that they are cleared and profitable when declaring prices. Therefore, it is preferred to use lower-cost new energy power generation methods to replace other higher-cost power generation methods to reduce the cost of purchasing electricity from power generation users, which will help reduce carbon emissions and increase environmental benefits. In addition, electric vehicle users with lower expected electricity incentive prices are given priority to reduce the cost of incentive users and promote their local consumption of new energy. In summary, the costs of power grid companies are minimized from the power purchasing side and the power consumption side, and the consumption of new energy vehicles is promoted.

[0124] In step S5, the operation constraints include power constraints, output constraints and safety constraints of the electric vehicle charging station.

[0125] (1) The power constraints are specifically:

[0126]

[0127] Among them, P l represents the active power flowing into the electric vehicle charging station node, n1 represents the number of non-renewable energy generation methods, n2 represents the number of renewable energy generation methods, P EV Represents the charging load of the electric vehicle charging station node;

[0128] (2) The output constraints are specifically:

[0129] 0≤P l ≤P ra_gen ;

[0130] 0≤P EV ≤P ra_EV ;

[0131] Among them, P ra_gen Indicates the rated power of the first power generation method, P ra_EV Indicates the maximum charging power of an electric vehicle;

[0132] (3) The security constraints are specifically:

[0133] U min ≤U pu ≤U max ;

[0134] f min ≤f l ≤f max ;

[0135] Among them, U pu Indicates the per unit value of the voltage amplitude at the node of the electric vehicle charging station, U min and U max They represent the lower and upper limits of the allowable voltage deviation, respectively. l represents the node frequency of the electric vehicle charging station, f min and f max They respectively represent the lower and upper limits of the allowed frequency deviation.

[0136] In some embodiments, the electricity price data scheduling model is solved based on the above-mentioned operating constraints, and the winning electric vehicle electricity consumption and expected electricity price can be determined according to the solution results. The electric vehicle scheduling curve can be determined according to the electric vehicle electricity consumption and the expected electricity price, wherein the electric vehicle scheduling curve includes data such as the charging time and charging load of the electric vehicle.

[0137] Please refer to Figure 4 , Embodiment 3 of the present invention is:

[0138] A terminal 100 for dispatching electricity price data based on new energy consumption includes a memory 101, a processor 102, and a computer program stored in the memory 101 and running on the processor 102. When the processor 102 executes the computer program, each step of the electricity price data dispatching method based on new energy consumption in the above-mentioned embodiments 1 and 2 is implemented.

[0139] In summary, the present invention provides a method and terminal for dispatching electricity price data based on new energy consumption, which fully considers the factors of new energy consumption by quantifying the power generation cost, transmission and distribution cost and carbon emission cost avoided by local consumption of new energy into the avoidable cost per kWh. At the same time, the fixed cost per kWh required for new energy consumption is determined based on the first operation and maintenance cost, the first investment cost and the predicted value of incentive cost required for local consumption of new energy. When the avoidable cost per kWh is greater than or equal to the fixed cost per kWh, it means that the benefit of current new energy consumption is greater than or equal to the cost. At this time, the user's expected electricity price data is obtained through the new energy demand response mechanism, and the electricity price data dispatching model is constructed with the goal of maximizing the difference between the avoidable cost per kWh and the fixed cost per kWh as the goal. Based on the electricity price data dispatching model, it is possible to consider the use of a lower-cost new energy power generation method on the electricity purchasing side to reduce the user's electricity purchasing cost, and consider the incentive cost of electric vehicle users in the electric vehicle to reduce the user's incentive cost, thereby ensuring the maximization of the economic benefits of the power grid. In addition, the electricity price data dispatching model guides some users to charge at the peak of new energy output based on the incentive price per kWh actually declared by the user, further promoting the new energy consumption rate.

[0140] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent transformations made using the contents of the present invention's specification and drawings, or directly or indirectly applied in related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. The electricity price data scheduling method based on new energy consumption is characterized by: include: Calculate the avoidable cost per kilowatt-hour based on renewable energy consumption based on the power generation cost, transmission and distribution cost, and carbon emission cost of non-renewable energy power generation methods; Calculate the fixed cost per kWh based on the new energy demand response according to the first operation and maintenance cost, the first investment cost and the predicted value of the incentive cost of the new energy power generation mode; If the avoidable cost per kilowatt-hour is greater than or equal to the fixed cost per kilowatt-hour, obtaining the user's expected electricity price data through a new energy demand response mechanism, wherein the expected electricity price data includes the amount of electricity and the electricity price per kilowatt-hour; Taking maximizing the difference between the avoidable cost per kilowatt-hour and the fixed cost per kilowatt-hour as a goal, constructing an electricity price data scheduling model based on the expected electricity price data; The electricity price data scheduling model is solved based on the operating constraints, and the expected electricity price data for the winning bid is determined according to the solution results.

2. The method according to claim 1, characterized in that The power generation cost of the non-renewable energy power generation method includes fuel cost, second operation and maintenance cost and second investment cost, and the power transmission and distribution cost of the non-renewable energy power generation method includes power transmission investment cost and power distribution investment cost; The avoidable costs of electricity consumption based on renewable energy consumption calculated based on the power generation costs, transmission and distribution costs, and carbon emission costs of non-renewable energy power generation methods include: Calculate the avoidable cost of energy consumption based on new energy consumption according to the fuel cost, the second operation and maintenance cost, and the second investment cost; Calculate the avoidable costs of power transmission and distribution based on the consumption of new energy according to the power transmission investment cost and the power distribution investment cost; Calculate the avoided cost of carbon emissions based on new energy consumption according to the avoided cost of power transmission and distribution and the carbon emission cost; The avoidable cost per kilowatt-hour of electricity based on new energy consumption is calculated based on the avoidable cost of energy consumption, the avoidable cost of power transmission and distribution, and the avoidable cost of carbon emissions.

3. The method according to claim 2, characterized in that The avoidable cost of energy consumption based on new energy consumption calculated according to the fuel cost, the second operation and maintenance cost and the second investment cost is specifically: Among them, C ener represents the avoided cost of energy consumption, n1 represents the number of non-renewable energy generation methods, j represents the type of non-renewable energy generation methods, j=1 represents thermal power generation, j=2 represents nuclear power generation, j=3 represents hydropower generation, j=4 represents other non-renewable energy generation methods, α represents the power generation ratio of different power generation methods, C fuelj represents the fuel cost of the jth non-renewable energy generation method, C opj represents the second operation and maintenance cost of the jth non-renewable energy generation mode, C genj Represents the second investment cost of the j-th non-renewable energy generation method.

4. The method according to claim 2, characterized in that: The avoidable cost of power transmission and distribution based on new energy consumption calculated according to the power transmission investment cost and the power distribution investment cost is specifically: Among them, C tr_dis represents the avoided cost of transmission and distribution, α represents the power generation ratio of different power generation modes, C transj represents the transmission investment cost of the jth non-renewable energy generation mode, C disj It represents the distribution investment cost of the jth non-renewable energy generation mode.

5. The method according to claim 2, characterized in that: The avoided carbon emission cost based on new energy consumption calculated according to the avoided transmission and distribution cost and the carbon emission cost is specifically: Among them, C car represents the avoided cost of carbon emissions, C tr_dis represents the avoided cost of power transmission and distribution, m represents the calculation period, δ j,a represents the carbon emission intensity of the jth non-renewable energy generation method in year a, C cj,a It represents the carbon emission cost of the j-th non-renewable energy generation method in year a.

6. The method according to claim 2, characterized in that The avoidable cost per kilowatt-hour based on new energy consumption is calculated based on the avoidable cost of energy consumption, the avoidable cost of power transmission and distribution, and the avoidable cost of carbon emissions as follows: C ACC =C ener +C tr_dis +C car ; Among them, C ACC Indicates the avoided cost per kWh, C ener represents the avoided cost of energy consumption, C tr_dis represents the avoided cost of transmission and distribution, C car Indicates avoided costs of carbon emissions.

7. The method according to claim 1, characterized in that The fixed cost per kWh based on the new energy demand response is calculated according to the first operation and maintenance cost, the first investment cost and the predicted value of the incentive cost of the new energy power generation mode as follows: Among them, C DE represents the fixed cost per kWh, n2 represents the number of renewable energy power generation methods, k represents the type of renewable energy power generation method, k = 1 represents photovoltaic power generation method, k = 2 represents wind power generation method, α represents the power generation ratio of different power generation methods, C opk represents the first operation and maintenance cost of the kth renewable energy generation mode, C genk represents the first investment cost of the kth renewable energy generation method, R de Represents the predicted value of incentive cost.

8. The method according to claim 7, characterized in that The goal of maximizing the difference between the avoidable cost per kWh and the fixed cost per kWh is to construct the electricity price data scheduling model based on the expected electricity price data as follows: Where f represents the electricity price data dispatch model, P j represents the power generated by the jth non-renewable energy generation method in time period t, P k represents the power generation of the kth renewable energy generation method in time period t, C ACC Indicates the avoided cost per kWh, C opk represents the first operation and maintenance cost of the kth renewable energy generation mode, C genk represents the first investment cost of the kth renewable energy generation method, P EV represents the charging load of the electric vehicle charging station node, R de_ac represents the actual value of the user's incentive cost, which is obtained based on the expected electricity price data, and t represents the clearing time period.

9. The method according to claim 1, characterized in that: The operation constraints include power constraints, output constraints and safety constraints of the electric vehicle charging station; The power constraint is specifically: Among them, P l represents the active power flowing into the electric vehicle charging station node, n1 represents the number of non-renewable energy generation methods, n2 represents the number of renewable energy generation methods, P EV Represents the charging load of the electric vehicle charging station node; The output constraints are specifically: 0≤P l ≤P ra_gen ; 0≤P EV ≤P ra_EV ; Among them, P ra_gen Indicates the rated power of the first power generation method, P ra_EV Indicates the maximum charging power of an electric vehicle; The security constraints are specifically: IN min ≤U pu ≤U max ; f min ≤f l ≤f max ; Among them, U pu Indicates the per unit value of the voltage amplitude at the node of the electric vehicle charging station, U min and U max They represent the lower and upper limits of the allowable voltage deviation, f1 represents the node frequency of the electric vehicle charging station, and f min and f max They respectively represent the lower and upper limits of the allowed frequency deviation.

10. An electricity price data dispatching terminal based on new energy consumption, comprising a memory, a processor, and a computer program stored in the memory and running on the processor, characterized in that: When the processor executes the computer program, each step of the electricity price data scheduling method based on new energy consumption as described in any one of claims 1 to 9 is implemented.

Citation Information

Patent Citations

  • An orderly charging control method for electric vehicles considering new energy consumption

    CN109217310A

  • Scheduling decision optimization adjustment method and system based on new energy priority consumption

    CN111242383A

  • Energy storage response control method guided by consumption of hindered new energy excitation electricity price

    CN114463058A

  • Optimized scheduling method and device considering new energy guarantee consumption requirement

    CN116542373A

  • Contract power optimization device

    JP2017173945A