Integrated management method and system for supply chain data
By building an integrated supply chain management platform and using data mining and analysis models to optimize raw material procurement plans, the problem of vague cost control under the production budget approach has been solved, and refined management and flexible procurement of upstream costs in the supply chain have been achieved.
Patent Information
- Application Number
- CN202410944925.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing technologies use production budgets to procure raw materials in the upstream production stage of the supply chain, which leads to unclear production cost control, inability to adjust procurement plans in a timely manner, increased costs, and impact on supply chain stability.
Build an integrated supply chain management platform, including an integrated management cloud and multiple raw material control nodes. Through data mining, aggregation and analysis models, dynamically update procurement information, optimize raw material procurement plans, and achieve refined cost control management.
It improved the precision of cost control for raw materials, enabled effective management of upstream costs in the supply chain, and enhanced the flexibility and stability of procurement plans.
Smart Images

Figure CN118941356A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data processing, and in particular to an integrated management method and system for supply chain data. Background Art
[0002] In the production link upstream of the supply chain, production budgets are usually used to purchase raw materials. However, this method has a flaw, namely, the control of production costs is unclear.
[0003] Specifically, suppose a manufacturing company uses a fixed annual budget to purchase raw materials. If market prices fluctuate or suppliers offer more competitive prices, the company may not be able to adjust its purchasing plan in time, resulting in higher purchasing costs or production interruptions.
[0004] Therefore, adopting production budgets for raw material procurement may limit the flexibility of enterprises, increase costs and affect the stability of the supply chain.
[0005] In summary, existing technologies often use production budgets to purchase production raw materials in the upstream production links of the supply chain, which leads to technical problems such as unclear production cost control. Summary of the invention
[0006] The present application provides a method and system for integrated management of supply chain data, which is used to solve the technical problem that the existing technology often adopts the form of production budget to purchase production raw materials in the upstream production link of the supply chain, resulting in unclear production cost control.
[0007] In view of the above problems, the present application provides a method and system for integrated management of supply chain data.
[0008] In a first aspect of the present application, a method for integrated management of supply chain data is provided, the method comprising: pre-building a supply chain integrated management platform, wherein the supply chain integrated management platform comprises an integrated management cloud and multiple raw material management and control nodes; performing procurement data mining on a target product to obtain historical procurement data, wherein the historical procurement data comprises multiple historical raw material procurement data of multiple historical production batches; performing data aggregation on the historical procurement data to obtain K types of production raw materials, K groups of raw material suppliers, and K groups of raw material scheduling data; mapping and activating K raw material management and control nodes based on the K types of production raw materials on the multiple raw material management and control nodes, and mapping the K groups of raw material scheduling data to the multiple raw material management and control nodes; The K raw material management and control nodes are mapped and synchronized; K groups of procurement information update interfaces are pre-deployed at the K raw material management and control nodes according to the K groups of raw material suppliers, and the K groups of procurement information update interfaces are used to provide raw material suppliers with dynamic updates of procurement information of the K types of production raw materials; a procurement fitness analysis model is pre-built, and the procurement fitness analysis model is synchronized to the integrated management cloud; after the integrated management cloud receives the real-time production demand of the target product, the real-time production demand is used as a constraint, and procurement plan analysis is performed to obtain K groups of real-time raw material procurement information according to the procurement fitness analysis model and the interaction of the K raw material management and control nodes to obtain a target procurement plan.
[0009] According to a second aspect of the present application, there is provided an integrated management system for supply chain data, the system comprising: a management platform construction module for pre-building a supply chain integrated management platform, wherein the supply chain integrated management platform comprises an integrated management cloud and multiple raw material management and control nodes; a data mining execution module for performing procurement data mining on a target product to obtain historical procurement data, wherein the historical procurement data comprises multiple historical raw material procurement data of multiple historical production batches; a data aggregation processing module for performing data aggregation on the historical procurement data to obtain K types of production raw materials, K groups of raw material suppliers and K groups of raw material scheduling data, and activating K raw material management and control nodes based on mapping the K types of production raw materials to the multiple raw material management and control nodes, and mapping the K groups of raw material scheduling data to the multiple raw material management and control nodes. The mapping is synchronized to the K raw material management and control nodes; an update interface layout module is used to pre-layout K groups of procurement information update interfaces at the K raw material management and control nodes according to the K groups of raw material suppliers, and the K groups of procurement information update interfaces are used to supply raw material suppliers with dynamic updates of procurement information of the K kinds of production raw materials; an analysis model construction module is used to pre-build a procurement fitness analysis model and synchronize the procurement fitness analysis model to the integrated management cloud; a procurement plan output module is used for the integrated management cloud to receive the real-time production demand of the target product, and then use the real-time production demand as a constraint to obtain K groups of real-time raw material procurement information according to the procurement fitness analysis model and interact with the K raw material management and control nodes to perform procurement plan analysis to obtain a target procurement plan.
[0010] One or more technical solutions provided in this application have at least the following technical effects or advantages:
[0011] The method provided in the embodiment of the present application pre-builds a supply chain integrated management platform, wherein the supply chain integrated management platform includes an integrated management cloud and multiple raw material management and control nodes; performs procurement data mining on a target product to obtain historical procurement data, wherein the historical procurement data includes multiple historical raw material procurement data of multiple historical production batches; performs data aggregation on the historical procurement data to obtain K types of production raw materials, K groups of raw material suppliers, and K groups of raw material scheduling data; activates K raw material management and control nodes based on the mapping of the K types of production raw materials to the multiple raw material management and control nodes, and synchronizes the mapping of the K groups of raw material scheduling data to the K raw materials. Control nodes; pre-deploy K groups of procurement information update interfaces on the K raw material control nodes according to the K groups of raw material suppliers, and the K groups of procurement information update interfaces are used to provide raw material suppliers with dynamic updates of procurement information of the K types of production raw materials; pre-build a procurement fitness analysis model, and synchronize the procurement fitness analysis model to the integrated management cloud; after the integrated management cloud receives the real-time production demand of the target product, it uses the real-time production demand as a constraint, obtains K groups of real-time raw material procurement information according to the procurement fitness analysis model and interacts with the K raw material control nodes to perform procurement plan analysis, and obtains the target procurement plan. The technical effect of improving the cost control precision of production raw materials and realizing effective management of upstream costs of the supply chain is achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 A schematic diagram of a flow chart of an integrated management method for supply chain data provided in this application;
[0013] Figure 2 A schematic diagram of a process for obtaining a target procurement solution in an integrated supply chain data management method provided in this application;
[0014] Figure 3 A schematic diagram of the structure of an integrated management system for supply chain data provided in this application.
[0015] Explanation of the accompanying drawings: management platform construction module 1, data mining execution module 2, data aggregation processing module 3, update interface layout module 4, analysis model construction module 5, procurement plan output module 6. DETAILED DESCRIPTION
[0016] This application provides an integrated management method and system for supply chain data, which is used to solve the technical problem that the existing technology often uses production budgets to purchase production raw materials in the upstream production link of the supply chain, resulting in unclear production cost control. It achieves the technical effect of improving the cost control precision of production raw materials and realizing effective management of upstream supply chain costs.
[0017] Below, the technical solutions in the present invention will be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments of the present invention. It should be understood that the present invention is not limited to the example embodiments described herein. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. It should also be noted that, for the convenience of description, only the parts related to the present invention are shown in the accompanying drawings, rather than all of them.
[0018] Embodiment 1
[0019] like Figure 1 As shown, the present application provides an integrated management method for supply chain data, including:
[0020] A100: pre-build a supply chain integrated management platform, wherein the supply chain integrated management platform includes an integrated management cloud and multiple raw material management and control nodes;
[0021] Specifically, in this embodiment, the supply chain integrated management platform is an integrated data analysis management platform for determining the optimal upstream supply chain scheduling solution based on real-time procurement cost analysis of various production raw materials of the target product.
[0022] The supply chain integrated management platform includes an integrated management cloud and multiple raw material management and control nodes. Among the multiple raw material management and control nodes, each raw material management and control node enters and stores real-time information and historical information of a raw material to achieve clear storage management of production raw materials by category.
[0023] The integrated management cloud outputs a raw material procurement scheduling plan based on the real-time information and historical information of multiple raw material management and control nodes, thereby achieving effective cost control of the upstream supply chain.
[0024] A200: performing procurement data mining on the target product to obtain historical procurement data, wherein the historical procurement data includes multiple historical raw material procurement data of multiple historical production batches;
[0025] Specifically, it should be understood that the production of each batch of target products requires the scheduling and standby of raw materials required for the production of the target products. Based on this, this embodiment conducts procurement data mining on the target products to obtain historical procurement data, wherein the historical procurement data includes multiple historical raw material procurement data of multiple historical production batches.
[0026] Among them, each historical raw material procurement data includes multiple call quantities of multiple production raw materials required for the production of the target product and one or more raw material supply quantities of one or more raw material suppliers corresponding to each raw material call quantity.
[0027] A300: Aggregate the historical procurement data to obtain K types of production raw materials, K groups of raw material suppliers, and K groups of raw material scheduling data; activate K raw material management and control nodes based on the mapping of the K types of production raw materials to the multiple raw material management and control nodes; and synchronize the mapping of the K groups of raw material scheduling data to the K raw material management and control nodes;
[0028] In one embodiment, data aggregation is performed on the historical procurement data to obtain K types of production raw materials, K groups of raw material suppliers, and K groups of raw material scheduling data. K raw material management and control nodes are activated based on the mapping of the K types of production raw materials to the multiple raw material management and control nodes, and the K groups of raw material scheduling data are mapped and synchronized to the K raw material management and control nodes. Step A300 of the method provided by the present application also includes:
[0029] A310: Aggregate the historical procurement data to obtain K types of production raw materials and H raw material suppliers, where K is a positive integer and H is a positive integer greater than K;
[0030] A320: disassemble the historical procurement data with the K types of production raw materials as constraints to obtain K groups of raw material scheduling data;
[0031] A330: using the H raw material suppliers to traverse the K groups of raw material scheduling data to obtain K groups of raw material suppliers;
[0032] A340: activating K raw material management and control nodes based on the K types of production raw materials mapped to the multiple raw material management and control nodes;
[0033] A350: Synchronize the K groups of raw material scheduling data mapping to the K raw material management and control nodes.
[0034] In one embodiment, the historical procurement data is disassembled with the K types of production raw materials as constraints to obtain K groups of raw material scheduling data. Step A320 of the method provided by the present application further includes:
[0035] A321: obtaining a first production raw material based on the K types of production raw materials;
[0036] A322: Splitting the plurality of historical raw material purchase data with the first production raw material as a constraint to obtain a first set of raw material scheduling data, wherein the first set of raw material scheduling data includes a plurality of first production raw material scheduling data mapped to the plurality of historical production batches, wherein each first production raw material scheduling data has a raw material supplier identifier, a scheduling response cycle identifier, a purchase price identifier, and a purchase quantity discount identifier;
[0037] A323: Grouping the plurality of first production raw material scheduling data based on the raw material supplier identifier and the H raw material suppliers to obtain a plurality of groups of first production raw material scheduling data of the plurality of first raw material suppliers, wherein the plurality of first raw material suppliers constitute a first group of raw material suppliers;
[0038] A324: Similarly, the multiple historical raw material procurement data in the historical procurement data are decomposed with the K types of production raw materials as constraints to obtain the K groups of raw material scheduling data;
[0039] A325: Similarly, the raw material suppliers of group K are determined based on the analysis of the raw material scheduling data of group K.
[0040] Specifically, in this embodiment, data aggregation is performed on the historical procurement data to obtain K types of production raw materials required for the production of the target product, and supplier aggregation is performed on the historical procurement data to obtain H raw material suppliers that can provide the K types of production raw materials.
[0041] A first production raw material is obtained by randomly calling the K kinds of production raw materials, and the multiple historical raw material procurement data are split with the first production raw material as a constraint to obtain a first group of raw material scheduling data. The first group of raw material scheduling data includes multiple first production raw material scheduling data mapped to the multiple historical production batches. Each first production raw material scheduling data has a raw material supplier identifier, a scheduling response cycle identifier, a purchase price identifier and a purchase quantity discount identifier. The scheduling response cycle identifier is the time difference between the purchase order time and the raw material arrival time, for example, 2h. The purchase price identifier is the purchase price per unit mass of the raw material, for example, 231 yuan / kg. The purchase quantity discount identifier is the purchase price per unit mass of the raw material when the raw material procurement mass exceeds a certain limit, for example, 215 yuan / kg for the excess part after the mass exceeds 500Kg.
[0042] The multiple first production raw material scheduling data are grouped based on the raw material supplier identification and the H raw material suppliers to obtain multiple groups of first production raw material scheduling data of multiple first raw material suppliers, wherein the multiple first raw material suppliers constitute a first group of raw material suppliers, and the multiple first raw material suppliers included in the first group of raw material suppliers are suppliers that can supply first production raw materials.
[0043] The first production raw material scheduling data of each first raw material supplier includes multiple sets of scheduling response cycle identifications, purchase price identifications and purchase quantity discount identification records for multiple raw material supply behaviors.
[0044] By analogy, the multiple historical raw material procurement data in the historical procurement data are disassembled with the K types of production raw materials as constraints to obtain the K groups of raw material scheduling data, and by analogy, the K groups of raw material suppliers are determined based on the analysis of the K groups of raw material scheduling data.
[0045] Based on the mapping of the K types of production raw materials on the multiple raw material management and control nodes, K raw material management and control nodes are activated, the K groups of raw material scheduling data are mapped and synchronized to the K raw material management and control nodes, and the scenario-based update of the supply chain integrated management platform is completed.
[0046] This embodiment realizes the decomposition and storage of historical data from the dimensions of raw material suppliers and production raw materials, determines optional raw material suppliers, and provides a reference for the upstream supply chain cost control for subsequent product production.
[0047] A400: pre-deploy K groups of procurement information update interfaces at the K raw material control nodes according to the K groups of raw material suppliers, and the K groups of procurement information update interfaces are used to provide the raw material suppliers with dynamic updates of procurement information of the K types of production raw materials;
[0048] Specifically, in this embodiment, K groups of procurement information update interfaces are pre-set on K raw material management and control nodes. The function of these interfaces is to allow raw material suppliers to dynamically update procurement information related to K types of production raw materials. The procurement information specifically includes real-time procurement prices, real-time procurement quantity discounts and real-time raw material inventory.
[0049] A500: pre-build a procurement fitness analysis model, and synchronize the procurement fitness analysis model to the integrated management cloud;
[0050] In one embodiment, a procurement fitness analysis model is pre-built and synchronized to the integrated management cloud. Step A500 of the method provided in the present application further includes:
[0051] A510: The procurement fitness analysis model includes a supplier fitness evaluation layer and a procurement fitness calculation layer, wherein the supplier fitness evaluation layer and the procurement fitness calculation layer are cascaded;
[0052] A520: Pre-construct a supply fitness evaluation function, the supply fitness evaluation function is as follows:
[0053]
[0054] Among them, R is the supplier fitness coefficient, m is the raw material supply frequency of the raw material supplier, T i is the ith scheduling response cycle, P ij is the purchase price of raw materials when the quantity of raw materials exceeds j during the i-th raw material supply, and n is the i-th raw material purchase quantity;
[0055] A530: Synchronizing the supply fitness evaluation function to the supplier fitness evaluation layer;
[0056] A540: Interactively obtain the H raw material unit price and transportation costs of the H raw material suppliers, and synchronize the H raw material unit price and transportation costs to the procurement fitness calculation layer to complete the construction of the procurement fitness analysis model.
[0057] Specifically, based on step A100, it can be known that the integrated management cloud in this embodiment can output a raw material procurement scheduling plan based on the real-time information and historical information of multiple raw material management and control nodes, thereby realizing effective cost control of the upstream supply chain, and the integrated management cloud realizes cost control of the upstream supply chain by relying on a procurement fitness analysis model.
[0058] The procurement fitness analysis model includes a supplier fitness evaluation layer and a procurement fitness calculation layer, wherein the supplier fitness evaluation layer and the procurement fitness calculation layer are cascaded;
[0059] A supply fitness evaluation function is pre-constructed, and the supply fitness evaluation function is as follows:
[0060]
[0061] Among them, R is the supplier fitness coefficient, m is the raw material supply frequency of the raw material supplier, T i is the ith scheduling response cycle, P ij is the raw material purchase unit price when the quantity of raw materials exceeds j during the i-th raw material supply, n is the i-th raw material purchase quantity, and the supply fitness evaluation function is synchronized to the supplier fitness evaluation layer.
[0062] Interactively obtain the H raw material unit price and transportation costs of the H raw material suppliers, and synchronize the H raw material unit price and transportation costs to the procurement fitness calculation layer to complete the construction of the procurement fitness analysis model. This embodiment describes in detail the data processing process of the procurement fitness calculation layer in the subsequent description.
[0063] This embodiment constructs a procurement fitness analysis model on the integrated management cloud, achieving a technical effect of improving the scientific level of cost control of the upstream supply chain based on the integrated management cloud.
[0064] A600: After the integrated management cloud receives the real-time production demand of the target product, it uses the real-time production demand as a constraint, obtains K groups of real-time raw material procurement information according to the procurement fitness analysis model and interacts with the K raw material control nodes to perform procurement plan analysis and obtain a target procurement plan.
[0065] In one embodiment, Figure 2 As shown, taking the real-time production demand as a constraint, according to the procurement fitness analysis model and the interaction of the K raw material control nodes, K groups of real-time raw material procurement information are obtained to perform procurement plan analysis to obtain a target procurement plan. The method step A600 provided in this application also includes:
[0066] A610: the integrated management cloud interacts with the K raw material management and control nodes to obtain K groups of real-time raw material procurement information;
[0067] A620: enumerating procurement plans according to the real-time production demand and the K groups of real-time raw material procurement information to obtain multiple groups of procurement plans, and using the procurement fitness analysis model to evaluate the fitness of the multiple groups of procurement plans to obtain multiple plan fitness coefficients;
[0068] A630: Serialize the fitness coefficients of the multiple plans and perform extreme value calls to obtain a target procurement plan, and schedule raw materials based on the target procurement plan.
[0069] In one embodiment, the method steps provided by the present application further include:
[0070] A611: Each piece of real-time raw material purchasing information in the K groups of real-time raw material purchasing information includes real-time purchasing price, real-time purchasing quantity discount and real-time raw material inventory.
[0071] In one embodiment, procurement plans are enumerated according to the real-time production demand and the K groups of real-time raw material procurement information to obtain multiple groups of procurement plans, and the procurement fitness analysis model is used to evaluate the fitness of the multiple groups of procurement plans to obtain multiple plan fitness coefficients. The method step A620 provided in the present application also includes:
[0072] A621: The real-time production demand includes K real-time demand quantities of the K types of production raw materials;
[0073] A622: traverse the K groups of real-time raw material procurement information with the K real-time demand quantities to obtain K groups of screened production procurement information and K groups of screened suppliers;
[0074] A623: the integrated management cloud obtains K groups of screening scheduling data by interacting with the K groups of raw material scheduling data of the K raw material management and control nodes according to the K groups of screening suppliers;
[0075] A624: enumerate procurement plans according to the K real-time demand quantities and the K groups of screening production procurement information to obtain multiple groups of procurement plans;
[0076] A625: Synchronize the K groups of screening scheduling data and the multiple groups of procurement plans to the procurement fitness analysis model, perform fitness evaluation on the multiple groups of procurement plans, and obtain multiple plan fitness coefficients.
[0077] Specifically, in this embodiment, the integrated management cloud interacts with the K raw material management and control nodes to obtain K groups of real-time raw material procurement information, and the K groups of real-time raw material procurement information are real-time raw material information uploaded by the K groups of raw material suppliers based on the K groups procurement information update interface.
[0078] Specifically, each piece of real-time raw material purchasing information in the K groups of real-time raw material purchasing information includes a real-time purchasing price, a real-time purchasing quantity discount and a real-time raw material inventory, and each piece of real-time raw material purchasing information corresponds to a specific raw material supplier.
[0079] The real-time production demand includes K real-time demand quantities of the K types of production raw materials. The K groups of real-time raw material inventories of the K groups of real-time raw material procurement information are traversed with the K real-time demand quantities to eliminate raw material suppliers whose real-time raw material inventories do not meet the real-time demand quantities, and obtain K groups of screened production procurement information and K groups of screened suppliers. It should be understood that the real-time raw material inventory of each screened production procurement information in the K groups of screened procurement information meets the real-time demand quantity of the corresponding raw material type.
[0080] The integrated management cloud obtains K groups of screening scheduling data based on the K groups of raw material scheduling data that the K groups of screening suppliers interact with the K raw material management and control nodes. Each screening scheduling data is a record of multiple groups of scheduling response cycle identifiers, purchase price identifiers, and purchase quantity discount identifiers for multiple historical raw material supply behaviors of a screening supplier.
[0081] Procurement plans are enumerated according to the K real-time demands and the K groups of screened production procurement information to obtain the multiple groups of procurement plans, each group of procurement plans includes K supplier selection results of K kinds of production raw materials and K groups of real-time procurement prices and real-time procurement quantity discounts of the K supplier selection results, and the K supplier selection results fall into the K groups of screened suppliers.
[0082] Based on the random calling of the multiple groups of procurement plans, the first group of procurement plans is obtained, and then according to the K supplier selection results of the first procurement plan, the K supplier fitness evaluation source data of the K supplier selection results are obtained by calling the K groups of screening scheduling data, and each supplier fitness evaluation source data is a multiple group of scheduling response cycle identification, procurement price identification and procurement quantity discount identification records of the corresponding supplier in multiple historical raw material supply behaviors.
[0083] The process of synchronizing the fitness evaluation source data of the K suppliers and the first group of procurement plans to the procurement fitness analysis model, performing fitness evaluation on the first group of procurement plans, and obtaining the fitness coefficient of the first plan is as follows:
[0084] The supplier fitness evaluation layer calculates K supplier fitness coefficients of the K supplier fitness evaluation source data based on the supply fitness evaluation function.
[0085] The data processing process of the procurement fitness calculation layer is as follows:
[0086] According to the K supplier selection results, the K groups of screening production procurement information mapping are called to obtain K screening production procurement information. According to the K real-time demand quantities and the K screening production procurement information, K procurement costs are calculated to obtain K.
[0087] According to the K supplier selection results, the H raw material unit price and transportation costs are called to obtain K raw material unit price and transportation costs, and the K real-time demand quantities and the K raw material unit price and transportation costs are multiplied to obtain the K raw material transportation costs.
[0088] Add the K raw material transportation costs and the K procurement costs to obtain K comprehensive procurement costs. Multiply the K supplier fitness coefficients by the K comprehensive procurement cost mappings, and then add the obtained K data as the fitness coefficient of the first solution.
[0089] Similarly, the K groups of screening scheduling data and the multiple groups of procurement plans are synchronized to the procurement fitness analysis model, and the fitness evaluation of the multiple groups of procurement plans is performed to obtain multiple plan fitness coefficients. The multiple plan fitness coefficients are serialized and extreme value calls are performed to obtain the target procurement plan, and raw material scheduling is performed based on the target procurement plan.
[0090] This embodiment achieves the technical effect of improving the precision of cost control of production raw materials and realizing effective management of upstream costs of the supply chain.
[0091] Embodiment 2
[0092] Based on the same inventive concept as the integrated management method of supply chain data in the aforementioned embodiment, Figure 3As shown, the present application provides an integrated management system for supply chain data, wherein the system includes:
[0093] Management platform construction module 1, used to pre-build a supply chain integrated management platform, wherein the supply chain integrated management platform includes an integrated management cloud and multiple raw material management and control nodes;
[0094] The data mining execution module 2 is used to perform procurement data mining on the target product to obtain historical procurement data, wherein the historical procurement data includes multiple historical raw material procurement data of multiple historical production batches;
[0095] A data aggregation processing module 3 is used to aggregate the historical procurement data to obtain K types of production raw materials, K groups of raw material suppliers and K groups of raw material scheduling data, activate K raw material management and control nodes based on the mapping of the K types of production raw materials on the multiple raw material management and control nodes, and synchronize the mapping of the K groups of raw material scheduling data to the K raw material management and control nodes;
[0096] An update interface layout module 4 is used to pre-layout K groups of purchase information update interfaces at the K raw material control nodes according to the K groups of raw material suppliers, and the K groups of purchase information update interfaces are used to provide the raw material suppliers with dynamic update of the purchase information of the K types of production raw materials;
[0097] An analysis model building module 5 is used to pre-build a procurement fitness analysis model and synchronize the procurement fitness analysis model to the integrated management cloud;
[0098] The procurement plan output module 6 is used for the integrated management cloud to receive the real-time production demand of the target product, and then use the real-time production demand as a constraint to perform procurement plan analysis based on the procurement fitness analysis model and the interaction of the K raw material management and control nodes to obtain K groups of real-time raw material procurement information to obtain a target procurement plan.
[0099] In one embodiment, the data aggregation processing module 3 further includes:
[0100] Aggregating the historical procurement data to obtain K types of production raw materials and H raw material suppliers, where K is a positive integer and H is a positive integer greater than K;
[0101] The historical procurement data is disassembled with the K types of production raw materials as constraints to obtain K groups of raw material scheduling data;
[0102] Using the H raw material suppliers to traverse the K groups of raw material scheduling data, to obtain K groups of raw material suppliers;
[0103] Mapping and activating K raw material management and control nodes on the multiple raw material management and control nodes based on the K types of production raw materials;
[0104] The K groups of raw material scheduling data are mapped and synchronized to the K raw material management and control nodes.
[0105] In one embodiment, the data aggregation processing module 3 further includes:
[0106] Obtaining a first production raw material based on the K types of production raw materials;
[0107] Splitting the plurality of historical raw material purchase data with the first production raw material as a constraint to obtain a first set of raw material scheduling data, wherein the first set of raw material scheduling data includes a plurality of first production raw material scheduling data mapped to the plurality of historical production batches, wherein each first production raw material scheduling data has a raw material supplier identifier, a scheduling response cycle identifier, a purchase price identifier, and a purchase quantity discount identifier;
[0108] Grouping the plurality of first production raw material scheduling data based on the raw material supplier identifier and the H raw material suppliers to obtain a plurality of groups of first production raw material scheduling data of the plurality of first raw material suppliers, wherein the plurality of first raw material suppliers constitute a first group of raw material suppliers;
[0109] Similarly, the K types of production raw materials are used as constraints to decompose the multiple historical raw material procurement data in the historical procurement data to obtain the K groups of raw material scheduling data;
[0110] And so on, the raw material suppliers of the K groups are determined based on the analysis of the K groups of raw material scheduling data.
[0111] In one embodiment, the analysis model building module 5 further includes:
[0112] The procurement fitness analysis model includes a supplier fitness evaluation layer and a procurement fitness calculation layer, wherein the supplier fitness evaluation layer and the procurement fitness calculation layer are cascaded;
[0113] A supply fitness evaluation function is pre-constructed, and the supply fitness evaluation function is as follows:
[0114]
[0115] Among them, R is the supplier fitness coefficient, m is the raw material supply frequency of the raw material supplier, T i is the ith scheduling response cycle, P ij is the purchase price of raw materials when the quantity of raw materials exceeds j during the i-th raw material supply, and n is the i-th raw material purchase quantity;
[0116] Synchronizing the supply fitness evaluation function to the supplier fitness evaluation layer;
[0117] Interactively obtain the H raw material unit price transportation costs of the H raw material suppliers, and synchronize the H raw material unit price transportation costs to the procurement fitness calculation layer to complete the construction of the procurement fitness analysis model.
[0118] In one embodiment, the procurement plan output module 6 further includes:
[0119] The integrated management cloud interacts with the K raw material management and control nodes to obtain K groups of real-time raw material procurement information;
[0120] Enumerating procurement plans according to the real-time production demand and the K groups of real-time raw material procurement information to obtain multiple groups of procurement plans, and using the procurement fitness analysis model to evaluate the fitness of the multiple groups of procurement plans to obtain multiple plan fitness coefficients;
[0121] The fitness coefficients of the multiple schemes are serialized and extreme value calls are performed to obtain a target procurement scheme, and raw material scheduling is performed based on the target procurement scheme.
[0122] In one embodiment, the procurement plan output module 6 further includes:
[0123] Each piece of real-time raw material purchasing information in the K groups of real-time raw material purchasing information includes a real-time purchasing price, a real-time purchasing quantity discount and a real-time raw material inventory.
[0124] In one embodiment, the procurement plan output module 6 further includes:
[0125] The real-time production demand includes K real-time demand quantities of the K types of production raw materials;
[0126] Traversing the K groups of real-time raw material procurement information with the K real-time demand quantities to obtain K groups of screened production procurement information and K groups of screened suppliers;
[0127] The integrated management cloud obtains K groups of screening scheduling data by interacting with the K groups of raw material scheduling data of the K raw material management and control nodes according to the K groups of screening suppliers;
[0128] Enumerate procurement plans according to the K real-time demand quantities and the K groups of screened production procurement information to obtain multiple groups of procurement plans;
[0129] The K groups of screening scheduling data and the multiple groups of procurement plans are synchronized to the procurement fitness analysis model, and the fitness of the multiple groups of procurement plans is evaluated to obtain multiple plan fitness coefficients.
[0130] Any of the methods or steps described above may be stored as computer instructions or programs in various types of computer memories, and the computer instructions or programs may be recognized by various types of computer processors to implement any of the methods or steps described above.
[0131] Based on the above specific embodiments of the present invention, any improvements and modifications made to the present invention by those skilled in the art without departing from the principles of the present invention shall fall within the patent protection scope of the present invention.
Claims
1. A method for integrated management of supply chain data, characterized in that: The method comprises: Pre-build a supply chain integrated management platform, wherein the supply chain integrated management platform includes an integrated management cloud and multiple raw material management and control nodes; Performing procurement data mining on the target product to obtain historical procurement data, wherein the historical procurement data includes multiple historical raw material procurement data of multiple historical production batches; Aggregate the historical procurement data to obtain K types of production raw materials, K groups of raw material suppliers, and K groups of raw material scheduling data; activate K raw material management and control nodes based on the mapping of the K types of production raw materials to the multiple raw material management and control nodes; and synchronize the mapping of the K groups of raw material scheduling data to the K raw material management and control nodes; According to the K groups of raw material suppliers, K groups of procurement information update interfaces are pre-deployed at the K raw material control nodes, and the K groups of procurement information update interfaces are used to provide the raw material suppliers with dynamic updates of procurement information of the K types of production raw materials; Pre-building a procurement fitness analysis model, and synchronizing the procurement fitness analysis model to the integrated management cloud; After the integrated management cloud receives the real-time production demand of the target product, it uses the real-time production demand as a constraint, obtains K groups of real-time raw material procurement information according to the procurement fitness analysis model and interacts with the K raw material control nodes to perform procurement plan analysis and obtain a target procurement plan.
2. The method according to claim 1, characterized in that Aggregating the historical procurement data to obtain K types of production raw materials, K groups of raw material suppliers, and K groups of raw material scheduling data, activating K raw material management and control nodes based on the K types of production raw materials mapped on the multiple raw material management and control nodes, and synchronizing the mapping of the K groups of raw material scheduling data to the K raw material management and control nodes, the method further includes: Aggregating the historical procurement data to obtain K types of production raw materials and H raw material suppliers, where K is a positive integer and H is a positive integer greater than K; The historical procurement data is disassembled with the K types of production raw materials as constraints to obtain K groups of raw material scheduling data; Using the H raw material suppliers to traverse the K groups of raw material scheduling data, to obtain K groups of raw material suppliers; Mapping and activating K raw material management and control nodes on the multiple raw material management and control nodes based on the K types of production raw materials; The K groups of raw material scheduling data are mapped and synchronized to the K raw material management and control nodes.
3. The method according to claim 2, characterized in that The historical procurement data is disassembled with the K types of production raw materials as constraints to obtain K groups of raw material scheduling data, and the method further includes: Obtaining a first production raw material based on the K types of production raw materials; Splitting the plurality of historical raw material purchase data with the first production raw material as a constraint to obtain a first set of raw material scheduling data, wherein the first set of raw material scheduling data includes a plurality of first production raw material scheduling data mapped to the plurality of historical production batches, wherein each first production raw material scheduling data has a raw material supplier identifier, a scheduling response cycle identifier, a purchase price identifier, and a purchase quantity discount identifier; Grouping the plurality of first production raw material scheduling data based on the raw material supplier identifier and the H raw material suppliers to obtain a plurality of groups of first production raw material scheduling data of the plurality of first raw material suppliers, wherein the plurality of first raw material suppliers constitute a first group of raw material suppliers; Similarly, the K types of production raw materials are used as constraints to decompose the multiple historical raw material procurement data in the historical procurement data to obtain the K groups of raw material scheduling data; And so on, the raw material suppliers of the K groups are determined based on the analysis of the K groups of raw material scheduling data.
4. The method according to claim 3, characterized in that Pre-building a procurement fitness analysis model, and synchronizing the procurement fitness analysis model to the integrated management cloud, the method further comprising: The procurement fitness analysis model includes a supplier fitness evaluation layer and a procurement fitness calculation layer, wherein the supplier fitness evaluation layer and the procurement fitness calculation layer are cascaded; A supply fitness evaluation function is pre-constructed, and the supply fitness evaluation function is as follows: Among them, R is the supplier fitness coefficient, m is the raw material supply frequency of the raw material supplier, T i is the ith scheduling response cycle, P ij is the purchase price of raw materials when the quantity of raw materials exceeds j during the i-th raw material supply, and n is the i-th raw material purchase quantity; Synchronizing the supply fitness evaluation function to the supplier fitness evaluation layer; Interactively obtain the H raw material unit price transportation costs of the H raw material suppliers, and synchronize the H raw material unit price transportation costs to the procurement fitness calculation layer to complete the construction of the procurement fitness analysis model.
5. The method according to claim 4, characterized in that Taking the real-time production demand as a constraint, obtaining K groups of real-time raw material procurement information according to the procurement fitness analysis model and interacting with the K raw material control nodes to perform procurement plan analysis, and obtaining a target procurement plan, the method further includes: The integrated management cloud interacts with the K raw material management and control nodes to obtain K groups of real-time raw material procurement information; Enumerating procurement plans according to the real-time production demand and the K groups of real-time raw material procurement information to obtain multiple groups of procurement plans, and using the procurement fitness analysis model to evaluate the fitness of the multiple groups of procurement plans to obtain multiple plan fitness coefficients; The fitness coefficients of the multiple schemes are serialized and extreme value calls are performed to obtain a target procurement scheme, and raw material scheduling is performed based on the target procurement scheme.
6. The method according to claim 5, characterized in that Each piece of real-time raw material purchasing information in the K groups of real-time raw material purchasing information includes a real-time purchasing price, a real-time purchasing quantity discount and a real-time raw material inventory.
7. The method according to claim 6, characterized in that According to the real-time production demand and the K groups of real-time raw material procurement information, procurement plans are enumerated to obtain multiple groups of procurement plans, and the procurement fitness analysis model is used to evaluate the fitness of the multiple groups of procurement plans to obtain multiple plan fitness coefficients. The method also includes: The real-time production demand includes K real-time demand quantities of the K types of production raw materials; Traversing the K groups of real-time raw material procurement information with the K real-time demand quantities to obtain K groups of screened production procurement information and K groups of screened suppliers; The integrated management cloud obtains K groups of screening scheduling data by interacting with the K groups of raw material scheduling data of the K raw material management and control nodes according to the K groups of screening suppliers; Enumerate procurement plans according to the K real-time demand quantities and the K groups of screened production procurement information to obtain multiple groups of procurement plans; The K groups of screening scheduling data and the multiple groups of procurement plans are synchronized to the procurement fitness analysis model, and the fitness of the multiple groups of procurement plans is evaluated to obtain multiple plan fitness coefficients.
8. An integrated management system for supply chain data, characterized in that: The steps for implementing the method according to any one of claims 1 to 7 include: A management platform construction module, used to pre-build a supply chain integrated management platform, wherein the supply chain integrated management platform includes an integrated management cloud and multiple raw material management and control nodes; A data mining execution module, used to perform procurement data mining on a target product to obtain historical procurement data, wherein the historical procurement data includes a plurality of historical raw material procurement data of a plurality of historical production batches; A data aggregation processing module is used to aggregate the historical procurement data to obtain K types of production raw materials, K groups of raw material suppliers and K groups of raw material scheduling data, activate K raw material management and control nodes based on the mapping of the K types of production raw materials on the multiple raw material management and control nodes, and synchronize the mapping of the K groups of raw material scheduling data to the K raw material management and control nodes; An update interface deployment module, used to pre-deploy K groups of procurement information update interfaces at the K raw material management and control nodes according to the K groups of raw material suppliers, wherein the K groups of procurement information update interfaces are used to provide the raw material suppliers with dynamic updates of procurement information of the K types of production raw materials; An analysis model building module, used to pre-build a procurement fitness analysis model and synchronize the procurement fitness analysis model to the integrated management cloud; The procurement plan output module is used for the integrated management cloud to receive the real-time production demand of the target product, and then use the real-time production demand as a constraint to perform procurement plan analysis based on the procurement fitness analysis model and the interaction of the K raw material management and control nodes to obtain K groups of real-time raw material procurement information to obtain a target procurement plan.