Main line priority space-time cooperative control method for highway ramp confluence area
Through the priority space-time and coordinated control method of the main line in the ramp confluence area, the vehicle driving trajectory is pre-programmed, and the safety distance and conflict criticality are calculated, the conflict problem when the ramp vehicles are merged into the main line is solved, and efficient and safe traffic flow management is achieved. Significantly reduces delay time and fuel consumption.
Patent Information
- Application Number
- CN202411043830.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-12
AI Technical Summary
The prior art is difficult to accurately sense the real-time status and driving intention of surrounding vehicles in the ramp confluence area, resulting in increased traffic conflicts and energy consumption, and lack effective coordinated control of space-time trajectory in space, affecting road safety and traffic efficiency.
A method of priority space-time and coordinated control for the main line in the highway ramp confluence area is proposed. Vehicle position and speed information are collected through vehicle intelligent units, and the vehicle driving trajectory is pre-organized to ensure that the ramp vehicles are safely transferred into the main line and utilize safe distances. and the calculation formula for the criticality of conflicts, adjust the vehicle acceleration and avoid conflicts.
It improves the efficiency and safety of traffic flow, significantly reduces the delay time of ramps and main lines, reduces fuel consumption, and improves the combined flow efficiency and stability of traffic flow.
Smart Images

Figure CN118942280A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of vehicle networking, and in particular relates to a main line priority spatiotemporal coordinated control method for a highway ramp merging area. Background Art
[0002] The vehicle-road collaboration system is an effective way to improve road safety, traffic efficiency, traffic capacity, and reduce energy loss and environmental pollution caused by vehicle acceleration and deceleration, and stop-and-go traffic. Vehicle-road collaboration is based on communication between vehicles and roadside infrastructure to achieve two-way data exchange and information sharing. The core principle of this technology is to enable vehicles to receive information from roadside facilities through advanced communication technology, and roadside facilities can also obtain vehicle status information, thereby achieving more intelligent and efficient traffic management and control.
[0003] In order to fully realize the potential of intelligent connected vehicles in ramp merging areas, it is crucial to study new collaborative control frameworks. A reasonable framework design should efficiently track and plan vehicle trajectories, while reducing the amount of data transmission and cycle time during system operation, further improving the safety of the system. Through such a system, vehicles can travel in coordination according to the precise instructions of the control center, forming an orderly traffic flow and reducing travel time, conflicts and energy consumption.
[0004] At present, the existing manual driving and automatic driving technologies are not able to accurately perceive the real-time status of surrounding vehicles and their future driving intentions. There is no quantitative evaluation method for the severity and urgency of collisions between vehicles, and it is impossible to coordinate the spatiotemporal trajectories of vehicles involved in traffic in advance. Therefore, the improvement of road traffic safety is not sufficient, and it is difficult to significantly improve the road's traffic capacity.
[0005] It not only responds to the rapid development trend of autonomous vehicles, but also provides innovative ideas for traffic management in ramp merging areas. Summary of the invention
[0006] The purpose of the present invention is to propose a main line priority spatiotemporal coordinated control method for a highway ramp merging area, so as to eliminate conflicts before vehicles have conflicts, so as to solve the problems raised in the above-mentioned background technology.
[0007] A mainline priority collaborative control model is proposed. Based on this collaborative control method, the on-board intelligent unit collects the position and speed information of the ramp and mainline vehicles, and transmits these data to the section management unit. The section management unit is a vehicle in a wireless access device environment. It is only in a stationary state and cannot move forward, backward, left, or right. It supports the on-board intelligent unit to exchange information with other section management units. Usually, it is installed in the environment around the road. The section management unit pre-compiles the vehicle's driving trajectory according to the mainline priority and ramp priority collaborative control strategies, taking into account the safety distance between vehicles and the degree of conflict. Then the section management unit sends the compiled trajectory to the on-board intelligent unit of each vehicle, and the vehicle will drive according to the predetermined trajectory.
[0008] At the merging point of the highway ramp, if the networked autonomous driving ramp vehicle wants to merge into the main lane safely and without conflict, it first needs to find the mainline vehicle that conflicts with the ramp vehicle. After finding the vehicle, the acceleration of the ramp vehicle is adjusted according to the collaborative control idea of mainline priority so that it can just merge into the gap of the mainline vehicle. The selected gap may be greater than or equal to the minimum gap that the ramp vehicle can merge into, or it may be less than the minimum gap that the ramp vehicle can merge into. When the selected mainline gap is less than the minimum gap that the ramp vehicle can merge into, it is also necessary to adjust the vehicle before the target gap so that it is just equal to the minimum gap that the ramp vehicle can merge into, and then determine the acceleration of the ramp vehicle that can merge into the adjusted gap based on the positional relationship between the mainline vehicle and the ramp vehicle.
[0009] Step 1: Calculate the safe distance between vehicles
[0010] The safety distance includes the speed difference between the ramp vehicle and the main line vehicle when entering the main line, the positioning error of the global positioning system (GPS), and the time synchronization error between the autonomous driving vehicle and the national time service center. The formula for calculating the safety distance between the front and rear vehicles is:
[0011] L safe =2L1+L2+L3
[0012] Among them: L1 is the GPS positioning error, m; L2 is the clock synchronization error distance between the autonomous driving vehicle clock and the National Time Service Center, m; L3 is the distance that the speed difference between the autonomous driving vehicle and the vehicle needs to maintain, m.
[0013] Step 2: Calculate the severity of the conflict;
[0014] The severity of the collision of the vehicle can be obtained by multiplying the collision acceleration and the urgency acceleration. When the collision acceleration is large and the urgency is large, the severity of the collision of the vehicle is high. However, when the collision acceleration is large and the urgency is small or the collision acceleration is small and the urgency is large, the severity of the collision of the vehicle is not high.
[0015] Step 3: Vehicle conflict identification;
[0016] The premise of vehicle coordination is that if there is no coordinated control, the ramp vehicles will conflict with the main line vehicles when merging. Therefore, it is necessary to identify the vehicle conflicts first. Only after the conflicting vehicles are identified can the conflicting vehicles be coordinated and controlled to allow the ramp vehicles to merge safely into the main line.
[0017] Adjustment starts only when the current urgency is greater than a certain value, ensuring that each vehicle can safely and comfortably adjust to the same speed as the vehicle that may collide. The closer you are to the other vehicle, the faster you need to keep up with it. When you are very close to the other vehicle, there is basically no risk if you keep the same speed as it.
[0018] Step 4, determining the target clearance of ramp vehicles;
[0019] Calculate the gaps between the front and rear vehicles of the mainline vehicle that conflicts with the ramp vehicle and the ramp vehicle at the merging point.
[0020] After determining the vehicle that conflicts with the ramp vehicle, the designated position of the vehicle is determined according to the position where the ramp vehicle merges into the main line, so that it accelerates or decelerates to the designated position, and then the ramp vehicle can merge into the main line safely without conflict. The designated position is: when the ramp vehicle accelerates to the same speed as the main line on the acceleration lane, the ramp vehicle will merge into the main line at this position, so a distance greater than or equal to the minimum merging gap needs to be left on the main line. At this time, the position of the vehicle before and after the target gap on the main line is the designated position.
[0021] Step 5, establish a mainline priority collaborative control method;
[0022] Under free driving conditions, ramp vehicles in the highway ramp merging area are prone to conflict with mainline vehicles when merging into the mainline. Therefore, the key to allowing ramp vehicles to merge into the mainline safely is to find the mainline vehicles that conflict with ramp vehicles and resolve the conflict between them. The first step to resolve conflicts between ramp vehicles and mainline vehicles is to determine which vehicle on the mainline will conflict with the ramp vehicle. Then, based on the size of the gap between the vehicles around the mainline vehicle that conflicts with the ramp vehicle, select the gap as the target gap that the ramp vehicle is about to merge into.
[0023] Preferably, the method described in step 1 is characterized in that in step 1, when the main line vehicle speed is v0 and the ramp vehicle speed is v R0 Even if the ramp vehicle accelerates to the same speed as the main line vehicle, there is still a speed difference between the main line vehicle and the ramp vehicle, because the ramp vehicle has speed in both the lateral and longitudinal directions when merging. Assuming that the inclination angle of the ramp vehicle when merging is 30°, the lateral speed of the ramp vehicle is v Rx =v0cos30°km / h, so there is a speed difference between ramp vehicles and mainline vehicles.
[0024] Preferably, the method described in step 1 is characterized in that, in step 1, when the ramp vehicle merges into the main line, the minimum gap that needs to be left between the two vehicles on the main line is equal to the body length of the ramp vehicle plus the safety distance between the ramp vehicle and the two vehicles in front and behind:
[0025] L mins =L v +L r-X +L r-Y
[0026] Among them, L mins The minimum gap that should be left between the front and rear vehicles of the ramp vehicle when the ramp vehicle merges into the main line, L v is the length of the vehicle body, take 5m, L r-X is the safe distance that should be maintained between the ramp vehicle and the target gap vehicle ahead, L r-Y It is the safe distance that should be maintained between the ramp vehicle and the vehicle behind it at the target gap.
[0027] Preferably, the method described in step 2 is characterized in that the calculation formula of the conflict severity is as follows:
[0028] J=a·a p
[0029] J is the severity of potential collision between vehicles, a is the collision acceleration, and a p For critical acceleration.
[0030] A threshold should be set for the severity of vehicle conflict. When the severity of vehicle conflict exceeds the threshold, the driving trajectory of the cooperative vehicle needs to be pre-programmed. When the acceleration is between 0.15g and 0.35g, it can ensure that the passengers have a certain degree of comfort and are not too nervous. Therefore, the threshold range of the severity of conflict is set to J1~J2, where J1=(0.15g) 2 =0.0225g 2 , J2=(0.35g) 2 =0.1225g 2 (Take g = 9.8m / s 2 ).
[0031] Preferably, the method described in step 3 is characterized in that, in the conflict identification method, the time during which the ramp vehicle travels at a constant speed on the ramp is determined to be t1, The time for uniform acceleration in the acceleration lane is t2.
[0032] Preferably, the method described in step 3 is characterized in that, in determining the conflict identification method, the judgment is made according to the specific relationship of the pile numbers;
[0033] When the ramp vehicle and the main line vehicle are at the stake positions at time t1+t2 that satisfy the following equation, a conflict will occur when merging:
[0034] S main (t1+t2)-L v -0.04≤S R (t1+t2)≤S main (t1+t2)+L v +0.04
[0035] Among them, Smain(t1+t2) is the pile number position of the main line vehicle at time t1+t2, m; Sramp(t1+t2) is the pile number position of the ramp vehicle at time t1+t2, m; L v is the length of the vehicle body, take 5m, m;
[0036] If there are two mainline vehicles that meet the formula, the mainline vehicle with the larger pile number is selected as the vehicle that conflicts with the ramp vehicle.
[0037] Preferably, the method described in step 4 is characterized by comprising two kinds of gaps: the first kind is greater than or equal to the minimum gap L that ramp vehicles can merge into. mins The gap is taken as the target gap for ramp vehicles to merge in. The vehicles do not need to be adjusted before and after the selected gap, and ramp vehicles can merge in directly. The second is that the gap is smaller than the minimum merging gap L for ramp vehicles. mins The gap is used as the target gap for ramp vehicles to merge into.
[0038] Preferably, the method described in step 4 is characterized in that the gaps between the vehicle that will collide with the ramp vehicle and the vehicles in front and behind it are S and front , S behind . Calculate the size of the two gaps and compare them; if both gaps are larger than the minimum merging gap for ramp vehicles, the gap of the vehicle with the larger gap is selected as the target gap for ramp vehicles to merge in; if the gaps between the two mainline vehicles are the same, then the gap between vehicle A and its preceding vehicle B is selected as the target gap;
[0039] When Sfront ≥L mins , S behind ≥L mins When S front >S behind or S front =S behind , then the gap between the vehicle that will collide with the ramp vehicle and the vehicle in front of it is selected as the target gap, and the acceleration of the ramp vehicle needs to be adjusted to merge into the gap; if S front behind , then the gap between the vehicle that will collide with the ramp vehicle and the vehicle behind it is selected as the target gap.
[0040] Preferably, the method described in step 5 is characterized in that when L mins ≤S behind ≤S front When the target gap is selected, the gap between the vehicle that will collide with the ramp vehicle and the vehicle in front of it is selected as the target gap, and the acceleration of the ramp vehicle needs to be adjusted to merge into the gap;
[0041] When L mins ≤S front behind , then the gap between the vehicle that will collide with the ramp vehicle and the vehicle behind it is selected as the target gap;
[0042] After the target gap is selected, the vehicle in front of the target gap is used as the vehicle for calculating ramp acceleration when merging on the ramp;
[0043] If one of the calculated ramp vehicle acceleration and merging point does not meet the requirements, then the gap greater than or equal to the minimum merging gap is not selected as the target gap, and a gap less than the minimum merging gap L is selected. mins The gap is used as the target gap for ramp vehicles to merge into.
[0044] Then, the running trajectory of the adjusted vehicle is compiled based on the calculated data, that is, the functional relationship between the vehicle's pile number and time. The unadjusted vehicle continues to travel at a constant speed at the previous speed.
[0045] Preferably, in step 5, the functional relationship between the vehicle's stake number and time is:
[0046]
[0047] Among them, r is the initial stake number of the ramp vehicle, m; v R0 is the speed of the ramp vehicle, km / h.
[0048] Compared with the prior art, the present invention has the following beneficial effects:
[0049] It can simultaneously ensure the safety and traffic efficiency of vehicle driving, and maximize the efficiency of the overall traffic flow. It effectively reduces congestion and improves traffic safety and efficiency, greatly reduces delays on ramps and main lines, and improves merging efficiency and traffic flow stability. The solution proposed by the present invention can reduce the average delay time of the two vehicles by up to 97.96% and reduce fuel consumption by up to 6.01%. This not only responds to the rapid development trend of self-driving cars, but also provides innovative ideas for traffic management in ramp merging areas. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] Figure 1 This is the basic architecture diagram of deep vehicle-road collaboration;
[0051] Figure 2 This is a schematic diagram of the ramp vehicle merging angle;
[0052] Figure 3 (a) is a schematic diagram of the vehicle position when the front ramp vehicle collides with the main line vehicle;
[0053] Figure 3 (b) is a schematic diagram of the vehicle position when the ramp vehicle merges into the main line after adjustment;
[0054] Figure 4 A flowchart for specific implementation. DETAILED DESCRIPTION
[0055] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:
[0056] Prerequisites for this implementation: The ramp merging area has a single main lane and a single ramp lane; all vehicles traveling in the ramp merging area are cars and self-driving cars, which can communicate with the edge computing server through V2I; on roads with only one lane, vehicles are prohibited from overtaking; V2I communication is coordinated through section managers and on-board intelligent control computers.
[0057] The system includes a road section management unit, an on-board intelligent unit such as Figure 1 All vehicles are driven according to the predetermined space-time trajectory under the control of the on-board intelligent unit. All on-board intelligent units share the space, driving status and driving intention of the vehicle with the section management unit in real time. The section management unit calculates the running space-time trajectory of each vehicle based on the status and driving intention of all vehicles in the managed section and sends it to the corresponding vehicle. All vehicles and section management units are synchronized with the same standard clock.
[0058] Assume that the inclination angle of the ramp vehicle when merging is 30 degrees, and the angle diagram is shown in Figure 2. Select a value greater than or equal to the minimum ramp merging gap L. minsThe gap is used as the target gap for ramp vehicles to merge into. Seven mainline vehicles and one ramp vehicle are selected as shown in Figure 3, where the mainline vehicles all travel at a speed of 100km / h, and the ramp vehicles travel at a speed of 60km / h on the ramp. When they accelerate to the same speed as the mainline vehicles at an acceleration of 2m / s2 on the acceleration lane, they directly merge into the mainline. The adjustment is performed by the method described in the claims, and a schematic diagram of the position of the vehicles before and after the adjustment is obtained, as shown in Figure 3. Figure 3 .
[0059] The application scenarios of this embodiment are as follows Figure 4 , in the highway traffic scenario, the road traffic safety is improved by controlling the vehicles on the road section between the main line and the ramp, and the vehicle-road collaboration is realized. The outermost lane of the main line of the highway and the entrance section of the ramp single lane in the networked environment are selected. It is assumed that the maximum speed of the ramp vehicle on the ramp is 17m / s, the main line vehicle speed is between 15 and 20m / s, and the acceleration lane length is 200 meters. Since the ratio of the maximum driving speed of the main line vehicle to the maximum driving speed of the ramp vehicle is approximately 1:3, the main line and ramp detection areas are set at 130m and 100m upstream of the ramp nose, and the ratio of the length from the starting point of the detection area to the ramp nose is also set to 1:3. The main line traffic volume is 800veh / h / lane, 1200veh / h / lane, 1800veh / h / lane, and the ramp traffic volume is 200veh / h / lane, 300veh / h / lane, and 500veh / h / lane for simulation. The main line traffic flow and ramp traffic flow are randomly matched to form a simulation scenario.
[0060] This example provides a mainline priority spatiotemporal coordinated control method for a highway ramp merging area, including the following steps:
[0061] In step 1: Assume that when the ramp vehicle merges into the main line, the main line vehicle in front of the target gap is X, and its initial stake number is S X (t=0)=x; the main line vehicle behind the target gap is Y, and its initial pile number is S Y (t=0)=y, when merging, the safe distance between the ramp vehicle and the target gap vehicle ahead should be:
[0062]
[0063] When merging, the safe distance between the ramp vehicle and the vehicle behind the target gap should be:
[0064]
[0065] Among them, L r-X is the safe distance between the ramp vehicle and the preceding vehicle with target gap, m, L r-Yis the safe distance between the ramp vehicle and the rear vehicle of the target gap, m, L1 is the GPS positioning error, which is 0.02 m, v X is the speed of the vehicle ahead of the target gap when the ramp vehicle merges into the main line, km / h, v Y is the speed of the vehicle behind the target gap when the ramp vehicle merges into the main line, km / h, v Rx is the lateral speed of the ramp vehicle when merging into the main line, km / h, φ is the adhesion coefficient between the road surface and the tire, which is 0.40, is the road resistance coefficient, which is taken as 0.11.
[0066] In step 2: The calculation formula for urgent acceleration is as follows, given that the distance between the two vehicles is S m , the speed difference between the two vehicles is Δv. When a vehicle decelerates from a higher speed to the same speed as the vehicle in front, the acceleration is:
[0067]
[0068] Among them, a p is the emergency acceleration, m / s2; v1 is the speed of the vehicle with higher speed, m / s; v2 is the speed of the vehicle with lower speed, m / s; S is the distance between the two vehicles, m;
[0069] In step 3: when the ramp vehicle accelerates to the same speed as the main line vehicle in the acceleration lane, it merges into the main line at time t1+t2. At this time, the pile number position of the ramp vehicle is:
[0070]
[0071] Among them, S ramp (t1+t2) is the pile number position of the ramp vehicle at time t1+t2, m; a r is the acceleration of the ramp vehicle in the acceleration lane, m / s2; t1 is the time required for the ramp vehicle to travel at a constant speed from the initial pile number to pile number 0, s; t2 is the time required for the ramp vehicle to accelerate from pile number 0 to the same speed as the main line (i.e., the merging point), s; the pile number position of the main line vehicle at time t1+t2 is:
[0072] In step 4: The acceleration and merging point of the ramp vehicle must meet the requirements at the same time to merge into the selected ramp greater than or equal to the minimum merging gap L mins If the following two requirements cannot be met at the same time, then the minimum merging gap L of the ramp will be selected. mins The gap is used as the target gap for ramp vehicles to merge into.
[0073] If the ramp vehicle accelerates only in the acceleration lane, since the acceleration lane is only 200m long, the ramp vehicle needs to merge into the main line within the length of the acceleration lane, so the acceleration needs to meet the following conditions:
[0074]
[0075] Among them, a r is the acceleration of the ramp vehicle when traveling on the acceleration lane, m / s 2 ; v0 is the speed of the main line vehicle, km / h; v R0 is the speed of the ramp vehicle, km / h; S a is the length of the acceleration lane, take 200m,m;
[0076] In step 5: establish the main line priority cooperative control method. After selecting the target gap, the vehicle in front of the target gap is used as the vehicle for calculating the ramp acceleration when the ramp merges. The initial pile number of the vehicle is set as S X (t=0)=x, the initial stake number of the ramp vehicle is: S R (t=0)=r.
[0077] After adjustment, the time variation of the uniform acceleration of the ramp vehicle is:
[0078]
[0079] The stake position of vehicle X in front of the target gap at time t1+t2 is:
[0080]
[0081] The pile number position of the ramp vehicle at time t1+t2 is:
[0082]
[0083] In order for ramp vehicles to merge safely into the selected target gap, the following requirements need to be met:
[0084] S X (t1+t2)-L v -L r-X =S' ramp (t1+t2)
[0085] The acceleration of the ramp vehicle after adjustment can be solved as:
[0086]
[0087] Among them, a' r To adjust the acceleration of the ramp vehicle in the acceleration lane, m / s 2; r is the initial stake number of the ramp vehicle, m; b is the initial stake number of the main line vehicle B, m; v0 is the driving speed of the main line vehicle, km / h; v R0 is the speed of the ramp vehicle, km / h; L v is the length of the vehicle body, take 5m, m; L r-B is the safe distance that should be maintained between ramp vehicles and mainline vehicles when merging, m;
[0088] The time required to travel at a constant speed from the initial pile number to pile number 0 is still
[0089] The functional relationship between the ramp vehicle pile number and time in the first stage after adjustment is:
[0090]
[0091] After adjustment, the second stage is when the vehicle starts from pile number 0 with acceleration a' r Accelerate in the acceleration lane to the same speed as the main line, and when it reaches the same speed as the main line, merge directly into the main line.
[0092] The functional relationship between the ramp vehicle pile number and time during this period is:
[0093]
[0094] The third stage after adjustment is that the ramp vehicle merges into the main line and continues to travel at a constant speed of v0. During this period, the functional relationship between the ramp vehicle pile number and time is:
[0095]
[0096] According to the deep reinforcement learning model, in order to obtain the final decision model, in this example, first in the simulation environment, assume that the inclination angle of the ramp vehicle when merging is 30 degrees, and the angle diagram is shown in Figure 2. Select a minimum merging gap L greater than or equal to the ramp mins The gap is taken as the target gap for ramp vehicles to merge. Seven mainline vehicles and one ramp vehicle are selected as shown in Figure 3, where the mainline vehicles all travel at a speed of 100 km / h, the ramp vehicles travel at a speed of 60 km / h on the ramp and 2 m / s on the acceleration lane. 2 When the acceleration speed is accelerated to the same as the main line vehicle speed, it will directly merge into the main line. By adjusting the vehicle position diagram before and after the adjustment, the vehicle position diagram before and after the adjustment is obtained, as shown in FIG. Figure 3 .
[0097] Step 6: Model and parameter setting. Since previous studies have not proposed to pre-program the vehicle's driving trajectory under the mainline priority and ramp priority collaborative control methods, non-cooperative control is selected for comparison with the mainline priority collaborative control method proposed in this paper. The non-cooperative control uses the Krauss following model and the LC2013 lane changing model in SUMO. Therefore, in the following text, the non-cooperative control that uses the Krauss model as the following model and the LC2013 model as the lane changing decision model in the SUMO software will be named the Kraus / LC2013 model. The mainline priority collaborative control method proposed in the present invention is to pre-program the vehicle's driving trajectory, without a following model and a lane changing model.
[0098] The Krauss model is a following model based on spacing and speed difference. It takes into account factors such as the interaction between vehicles and the density of traffic flow, as well as the desired speed and acceleration limit of vehicles. In the SUMO simulation software, the Krauss model is selected as its following model to guide vehicle behavior based on physical laws and safe driving principles. The model ensures that the vehicle can stop within a safe distance by calculating the vehicle's current speed, acceleration and distance to the vehicle in front, thereby preventing collision with the vehicle in front. The LC2013 model is a newer lane-changing model in SUMO. It combines factors such as the spacing between vehicles, speed difference, desired speed and the density of traffic flow to determine the best lane-changing time and target lane. In the SUMO simulation software, the LC2013 model is selected as its lane-changing decision model. It formulates lane-changing strategies based on multiple factors such as safety, road capacity and travel time optimization. This enables vehicles to make the best route selection based on real-time traffic conditions and the dynamics of surrounding vehicles.
[0099] Step 7: Main line priority parameter setting.
[0100] Some parameters are set in the main line priority collaborative control method, and the values of these parameters are shown in Table 1 below:
[0101] Table 1: Main line priority parameter setting table
[0102]
[0103] Finally, simulate the model. First, create the road network file. Then, create the .add.xml file to generate the detector. Write the .rou.xml file to generate the traffic flow. Create the .gui.xml file to visualize the simulation.
[0104] Result analysis:
[0105] Table 2 Average delay schedule for main lines with different traffic flows
[0106]
[0107] Table 2 Total fuel consumption under different coordinated control methods with different traffic flows
[0108]
[0109] From the perspective of average delay: Under the same traffic volume, compared with the average delay time of the main line using the Krauss / LC2013 model in SUMO, the improvement rate of the main line priority strategy is always higher than that of the ramp priority strategy. The average delay of main line vehicles can be improved by up to 97.48% in the main line priority strategy; under all traffic flow conditions, the average ramp delay time of the main line priority strategy is always lower than that of the Krauss / LC2013 model and the ramp priority strategy; with the increase of main line flow and ramp flow, the average ramp delay time under the Krauss / LC2013 model increases significantly, indicating that higher traffic pressure will lead to longer delays. Under the condition of constant main line flow, as the ramp flow increases, the average ramp delay time of the main line priority also gradually increases, indicating that higher ramp flow will lead to longer delay time; under the conditions of high main line flow and low ramp flow, the main line priority strategy can significantly reduce the delay time, and the effect is most obvious. From the perspective of average speed: the KRAUSS / LC2013 model leads to the lowest average speed and the largest fluctuation in the main line, which indicates that the strategy fails to effectively integrate the flow of ramps and the main line, resulting in frequent speed adjustments of vehicles on the main line, increasing traffic instability and accident risks. In contrast, the main line priority collaborative control strategy shows similarly high average speeds, indicating that they are superior to the KRAUSS / LC2013 model in merging efficiency. The main line priority control strategy performs more balanced in reducing speed fluctuations and maintaining traffic stability, providing a better balance between improving efficiency and ensuring safety.
[0110] From the perspective of total fuel consumption: the total fuel consumption of the mainline priority strategy is lower than that of the Krauss / LC2013 model, indicating that the mainline priority strategy is more effective in reducing fuel consumption. In particular, when the mainline flow is 1800 veh / h / lane and the ramp flow is 500 veh / h / lane, the improvement rate of the mainline priority strategy reaches the highest value of 6.10%. This shows that under the conditions of high mainline flow and high ramp flow, the fuel consumption optimization effect of the mainline priority strategy is particularly significant.
Claims
1. A mainline priority spatiotemporal coordinated control method for highway ramp merging areas, It is characterized in that Mainline priority means that when merging at the ramp merging area, ramp vehicles are allowed to merge into the mainline without adjusting the mainline vehicles as much as possible, including the following steps: Step 1: Calculate the safe distance between vehicles The safety distance includes the speed difference between the ramp vehicle and the main line vehicle when entering the main line, the positioning error of the global positioning system (GPS), and the time synchronization error between the autonomous driving vehicle and the national time service center. The calculation formula for the safety distance between the front and rear vehicles is: L safe =2L 1 +L 2 +L 3 Where: L 1 is GPS positioning error, m; L 2 is the clock synchronization error distance between the autonomous driving vehicle clock and the National Time Service Center, m; L 3 is the speed difference between the autonomous driving vehicle and the vehicle that needs to be maintained, m; Step 2: Calculate the severity of the conflict; The severity of the collision of the vehicle can be obtained by multiplying the collision acceleration and the urgency acceleration. When the collision acceleration is large and the urgency is large, the severity of the collision of the vehicle is high. However, when the collision acceleration is large and the urgency is small or the collision acceleration is small and the urgency is large, the severity of the collision of the vehicle is not high. Step 3: Vehicle conflict identification; The premise of vehicle coordination is that if there is no coordinated control, the ramp vehicles will conflict with the main line vehicles when merging. Therefore, it is necessary to identify the vehicle conflicts first. Only after the conflicting vehicles are identified can the conflicting vehicles be coordinated and controlled to allow the ramp vehicles to merge safely into the main line. Adjustment starts only when the current urgency is greater than a certain value, ensuring that each vehicle can safely and comfortably adjust to the same speed as the vehicle that may collide. The closer you are to the other vehicle, the faster you need to keep up with it. When you are very close to the other vehicle, there is basically no risk if you keep the same speed as it. Step 4, determining the target clearance of ramp vehicles; Calculate the gaps between the front and rear vehicles of the mainline vehicle that conflicts with the ramp vehicle and the ramp vehicle at the merging point; After determining the vehicle that conflicts with the ramp vehicle, the designated position of the vehicle is determined according to the position where the ramp vehicle merges into the main line, so that the vehicle accelerates or decelerates to the designated position, and then the ramp vehicle can merge into the main line safely without conflict. The designated position is: when the ramp vehicle accelerates to the same speed as the main line on the acceleration lane, the ramp vehicle will merge into the main line at this position, so a distance greater than or equal to the minimum merging gap needs to be left on the main line. At this time, the position of the vehicle before and after the target gap on the main line is the designated position; Step 5, establish a mainline priority collaborative control method; Under free driving conditions, ramp vehicles in the highway ramp merging area are prone to conflict with mainline vehicles when merging into the mainline. Therefore, the key to allowing ramp vehicles to merge into the mainline safely is to find the mainline vehicles that conflict with ramp vehicles and resolve the conflict between them. The first step to resolve the conflict between ramp vehicles and mainline vehicles is to determine which vehicle on the mainline will conflict with the ramp vehicle, and then select the gap as the target gap that the ramp vehicle is about to merge into based on the size of the vehicle gap around the mainline vehicle that conflicts with the ramp vehicle.
2. The method according to claim 1, It is characterized in that In step 1, when the main line vehicle speed is v 0 , the vehicle speed on the ramp is v R0 Even if the ramp vehicle accelerates to the same speed as the main line vehicle, there is still a speed difference between the main line vehicle and the ramp vehicle, because the ramp vehicle has speed in both the lateral and longitudinal directions when merging. Assuming that the inclination angle of the ramp vehicle when merging is 30°, the lateral speed of the ramp vehicle is v Rx =v 0 cos30°km / h, so there is a speed difference between ramp vehicles and mainline vehicles.
3. The method according to claim 1, It is characterized in that In step 1: When the ramp vehicle merges into the main line, the minimum gap between the two vehicles on the main line is equal to the body length of the ramp vehicle plus the safety distance between the ramp vehicle and the two vehicles in front and behind: L mins =L v +L r-X +L r-Y Among them, L mins The minimum gap that should be left between the front and rear vehicles of the ramp vehicle when the ramp vehicle merges into the main line, L v is the length of the vehicle body, take 5m, L r-X is the safe distance that should be maintained between the ramp vehicle and the target gap vehicle ahead, L r-Y It is the safe distance that should be maintained between the ramp vehicle and the vehicle behind it at the target gap.
4. The method according to claim 2, It is characterized in that The calculation formula for conflict severity is as follows: J=a·ap J is the severity of potential collision between vehicles, a is the collision acceleration, and a p For critical acceleration; A threshold should be set for the severity of vehicle conflict. When the severity of vehicle conflict exceeds the threshold, the driving trajectory of the cooperative vehicle needs to be pre-programmed. When the acceleration is between 0.15g and 0.35g, it can ensure that the passengers have a certain degree of comfort and are not too nervous. Therefore, the threshold range of the severity of conflict is set to J. 1 ~J 2 , where J 1 =(0.15g) 2 =0.0225g 2 , J 2 =(0.35g) 2 =0.1225g 2 (Take g=9.8m / s2).
5. The method according to claim 1, It is characterized in that In step 3, the conflict identification method determines that the time that the ramp vehicle travels at a constant speed on the ramp is t 1 , The time for uniform acceleration in the acceleration lane is t 2 , 6. The method according to claim 1, It is characterized in that In step 3, the conflict identification method is determined by judging the specific relationship between the pile numbers; When the ramp vehicle and the main line vehicle are at t 1 +t 2 When the pile number position at the time satisfies the following formula, a conflict will occur during merging: S main (t 1 +t 2 )-L v -0.04≤S R (t 1 +t 2 )≤S main (t 1 +t 2 )+L v +0.04 Among them, Smain(t1+t2) is the main line vehicle at t 1 +t 2 Slope position at time t, m; Sramp(t1+t2) is the ramp vehicle at t 1 +t 2 The pile position at the time, m; L v is the length of the vehicle body, take 5m, m; If there are two mainline vehicles that meet the formula, the mainline vehicle with the larger pile number is selected as the vehicle that conflicts with the ramp vehicle.
7. The method according to claim 1, It is characterized in that In step 4, there are two types of gaps: the first type is greater than or equal to the minimum gap L that ramp vehicles can merge into. mins The gap is taken as the target gap for ramp vehicles to merge in. The vehicles do not need to be adjusted before and after the selected gap, and ramp vehicles can merge in directly. The second is that the gap is smaller than the minimum merging gap L for ramp vehicles. mins The gap is used as the target gap for ramp vehicles to merge into.
8. The method according to claim 1, It is characterized in that In step 4, the gaps between the vehicle that will collide with the ramp vehicle and the vehicles in front and behind it are S and front , S behind , calculate the size of the two gaps and compare them; if both gaps are larger than the minimum merging gap for ramp vehicles, then the gap of the vehicle with the larger gap is selected as the target gap for ramp vehicles to merge in; if the gaps between the two mainline vehicles are the same, then the gap between vehicle A and its preceding vehicle B is selected as the target gap; When S front ≥L mins , S behind ≥L mins When S front >S behind or S front =S behind , then the gap between the vehicle that will collide with the ramp vehicle and the vehicle in front of it is selected as the target gap, and the acceleration of the ramp vehicle needs to be adjusted to merge into the gap; if S front behind , then the gap between the vehicle that will collide with the ramp vehicle and the vehicle behind it is selected as the target gap. 9. The method according to claim 1, It is characterized in that In step 5, when L mins ≤S behind ≤S front When the target gap is selected, the gap between the vehicle that will collide with the ramp vehicle and the vehicle in front of it is selected as the target gap, and the acceleration of the ramp vehicle needs to be adjusted to merge into the gap; When L mins ≤S front behind , then the gap between the vehicle that will collide with the ramp vehicle and the vehicle behind it is selected as the target gap; After the target gap is selected, the vehicle in front of the target gap is used as the vehicle for calculating ramp acceleration when merging on the ramp; If the calculated acceleration of the ramp vehicle and the merging point do not meet the requirements, then the gap that is greater than or equal to the minimum merging gap is not selected as the target gap, and a gap that is less than the minimum merging gap L is selected. mins The gap is used as the target gap for ramp vehicles to merge into; Then, the running trajectory of the adjusted vehicle is compiled based on the calculated data, that is, the functional relationship between the vehicle's pile number and time. The unadjusted vehicle continues to travel at a constant speed at the previous speed.
10. The method according to claim 9, It is characterized in that The functional relationship between the vehicle's pile number and time is: Among them, r is the initial stake number of the ramp vehicle, m; v R0 is the speed of the ramp vehicle, km / h.