Voltage regulation method and device for power distribution network comprising photovoltaic inverter

By determining the position of the grid-type photovoltaic inverter based on electrical distance and voltage sensitivity in the distribution network, building a hybrid model and performing double-layer optimization, the mixed connection down-regulation of the grid-type and grid-type inverters is solved. The problem of insufficient capacity has achieved effective voltage regulation and economic operation of the distribution network.

CN118944101APending Publication Date: 2024-11-12HEILONGJIANG ELECTRIC POWER SCIENCE RESEARCH INSTITUTE +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410967335.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing voltage regulation method cannot fully coordinate the voltage regulation capability when the grid-type and grid-type photovoltaic inverters are mixed, resulting in poor voltage regulation effect in the distribution network and frequent voltage fluctuations, affecting the reliability of power supply.

Method used

By determining the installation location of the grid-type photovoltaic inverter based on electrical distance and comprehensive voltage sensitivity, a hybrid distribution network model is constructed, and the two-layer optimization model is solved under the conditions of active and reactive coupling, and the backup capacity is determined to participate in the voltage Adjust to achieve joint optimization and voltage regulation of multiple devices.

Benefits of technology

Effectively adjust the distribution network voltage, reduce the amount of light abandonment, improve the system operation economy, ensure voltage quality, and reduce network loss and operating costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118944101A_ABST
    Figure CN118944101A_ABST
Patent Text Reader

Abstract

The invention provides a voltage regulation method and device for a power distribution network comprising a photovoltaic inverter, and belongs to the technical field of electric power. The method comprises the following steps: based on electrical distances among installation nodes of all network-following type photovoltaic inverters, determining installation positions of network-constructing type photovoltaic inverters in a power distribution network, and constructing a series-parallel power distribution network model based on the installation positions; wherein the series-parallel power distribution network model comprises installation positions of a network-constructing type photovoltaic inverter and a network-following type photovoltaic inverter; determining the standby capacity of the grid-forming type photovoltaic inverter; solving a pre-constructed double-layer optimization model of the power distribution network under the condition of active and reactive coupling, and regulating the voltage of the power distribution network based on a solving result; wherein the double-layer optimization model comprises an upper-layer active optimization model and a lower-layer reactive optimization model. According to the invention, the voltage of the power distribution network can be well regulated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of electric power technology, and in particular to a voltage regulation method and device for a distribution network including a photovoltaic inverter. Background Art

[0002] With the continuous development of new power systems based on new energy, distributed photovoltaics have been vigorously developed. However, distributed photovoltaics are inherently random and volatile. After being connected to the grid, they will change the unidirectional flow characteristics of active power flow in the distribution network, and are prone to problems such as power flow reversal, which will increase the risk of network voltage exceeding the limit and seriously affect the reliability of power supply. At the same time, the access of distributed photovoltaics increases the uncertainty of the power grid, node voltage fluctuations become more frequent, and the complexity of voltage regulation also increases.

[0003] At present, the regulation capability of photovoltaic inverters in distribution networks with a high proportion of distributed photovoltaic access is mainly utilized to coordinate various types of voltage regulation equipment to jointly regulate the voltage of distribution networks with high photovoltaic penetration rates. Current inverter equipment adopts a grid-following control method, which relies on a phase-locked loop to obtain the voltage phase of the grid connection point and keep it synchronized with the grid. Because it can achieve maximum power tracking, it can effectively improve the utilization rate of new energy. There are also grid-building control methods. When the grid fluctuates, the grid-building inverter can provide stable voltage support for the system by changing the output voltage to adjust the active / reactive power output, and the adjustment process has a short delay and fast response.

[0004] As the proportion of distributed photovoltaic grid-connected devices gradually increases, the inverter control strategy in the system will no longer be single, and there will be a situation where grid-building and grid-following inverters are mixed and connected to the grid. However, the current voltage regulation model does not consider the voltage regulation of the distribution network under the hybrid connection of grid-building and grid-following photovoltaic inverters, so it is impossible to fully coordinate the voltage regulation capabilities of each device and achieve a good voltage regulation effect. Summary of the invention

[0005] The embodiments of the present invention provide a voltage regulation method and device for a distribution network including a photovoltaic inverter, so as to solve the problem that the current voltage regulation method has a large voltage regulation deviation and a poor voltage regulation effect.

[0006] In a first aspect, an embodiment of the present invention provides a voltage regulation method for a distribution network including a photovoltaic inverter, comprising:

[0007] Based on the electrical distances between the installation nodes of all grid-following photovoltaic inverters, the installation positions of the grid-building photovoltaic inverters in the distribution network are determined, and a hybrid distribution network model is constructed based on the installation positions; wherein the hybrid distribution network model includes the installation positions of the grid-building photovoltaic inverters and the grid-following photovoltaic inverters;

[0008] Determine the spare capacity of grid-connected photovoltaic inverters;

[0009] The pre-constructed two-layer optimization model of the distribution network is solved under the condition of active and reactive coupling, and the voltage of the distribution network is adjusted based on the solution results; wherein, the two-layer optimization model includes an upper-layer active optimization model and a lower-layer reactive optimization model, the upper-layer active optimization model is constructed based on the minimum daily comprehensive operating cost, the lower-layer reactive optimization model is constructed based on the minimum daily operating network loss of the hybrid distribution network model, and the standby capacity constrains the two-layer optimization model based on the photovoltaic capacity constraint.

[0010] In a possible implementation, based on the electrical distances between the installation nodes of all the grid-following photovoltaic inverters, the installation position of the grid-forming photovoltaic inverter in the distribution network is determined, including:

[0011] Based on the comprehensive voltage sensitivity of each installation node, a sensitivity matrix is ​​constructed; wherein each element in the sensitivity matrix is ​​the relationship between the voltage amplitude change of each installation node and the injected active power and reactive power;

[0012] Determine the electrical distance between each installation node in the sensitivity matrix and construct an electrical distance matrix;

[0013] Regional division of distribution network based on electrical distance matrix;

[0014] The installation location of the grid-connected photovoltaic inverter is determined based on the comprehensive voltage sensitivity of each installation node in different areas.

[0015] In a possible implementation, the installation location of the grid-connected photovoltaic inverter is determined based on the comprehensive voltage sensitivity of each installation node in different areas, including:

[0016] Based on the comprehensive voltage sensitivity of each installation node in different areas, a low sensitivity set is determined; wherein the low sensitivity set includes a plurality of first sensitivities, the first sensitivity is determined based on the minimum value of the comprehensive sensitivity of each installation node in the first area relative to each installation node in the second area, and the first area and the second area are any two different areas in different areas;

[0017] The position of the installation node corresponding to the largest first sensitivity in the low sensitivity set is determined as the installation position of the grid-building photovoltaic inverter.

[0018] In one possible implementation, the electrical distance matrix is ​​determined based on the Euclidean distances between the installation nodes in the sensitivity matrix;

[0019] The distribution network is divided into regions based on the electrical distance matrix, including:

[0020] The electrical distance matrix is ​​used as the similarity matrix;

[0021] The similarity matrix is ​​solved based on the density peak fast search clustering algorithm, and the distribution network is divided into regions based on the solution results.

[0022] In a possible implementation, a pre-constructed two-layer optimization model of a distribution network is solved under the condition of active and reactive coupling, and the distribution network is adjusted based on the solution, including:

[0023] Solving the pre-built two-layer optimization model under the condition of active and reactive coupling to obtain a first solution result; wherein the first solution result includes a continuous result of a continuous quantity device and a continuous result of a discrete quantity device;

[0024] Discretize the continuous results of discrete quantity equipment based on the optimal segmentation method to obtain dynamically optimized discrete results;

[0025] The distribution network is regulated based on the continuous results of the continuous quantity devices in the first solution results and the discrete results of the dynamic optimization.

[0026] In a possible implementation, a pre-built two-layer optimization model is solved under the condition of active and reactive coupling to obtain a first solution result, including:

[0027] Initialize the objective function and constraints of the upper-level active power optimization model, and solve to obtain the initialized active power decision variables; the active power decision variables include the power purchased by the distribution network, the user demand response, the energy storage charging and discharging, the active power output by the grid-following photovoltaic inverter, and the active power output by the grid-building photovoltaic inverter;

[0028] Determine the remaining capacity of the grid-following photovoltaic inverter and the remaining capacity of the grid-building photovoltaic inverter based on the active power output by the grid-following photovoltaic inverter and the active power output by the grid-building photovoltaic inverter;

[0029] The initialized active decision variables, the remaining capacity of the grid-following photovoltaic inverter and the remaining capacity of the grid-building photovoltaic inverter are transferred to the lower-layer reactive power optimization model, and the reactive power output of the grid-building photovoltaic inverter is optimized and solved based on the output voltage of the grid-building inverter as the installation node voltage, and the reactive power output of the grid-building photovoltaic inverter and the reactive power output of the grid-following photovoltaic inverter are obtained;

[0030] Based on the remaining capacity of the grid-following photovoltaic inverter, the remaining capacity of the grid-building photovoltaic inverter, the reactive power output by the grid-building photovoltaic inverter, and the reactive power output by the grid-following photovoltaic inverter, the first solution result is determined; wherein the continuous results of the continuous quantity equipment in the first solution result include the demand response power, the energy storage charging and discharging amount, the active power and reactive power output by the grid-following photovoltaic inverter, and the active power and reactive power output by the grid-building photovoltaic inverter; the continuous results of the discrete quantity equipment in the first solution result include the number of parallel capacitor groups and the gear position of the on-load tap changer.

[0031] In a second aspect, an embodiment of the present invention provides a voltage regulating device for a distribution network including a photovoltaic inverter, comprising:

[0032] The first determination module is used to determine the installation position of the grid-building photovoltaic inverter in the distribution network based on the electrical distance between the installation nodes of all grid-following photovoltaic inverters, and to construct a hybrid distribution network model based on the installation position; wherein the hybrid distribution network model includes the installation positions of the grid-building photovoltaic inverter and the grid-following photovoltaic inverter;

[0033] The second determination module is used to determine the spare capacity of the grid-connected photovoltaic inverter;

[0034] A solution module is used to solve a pre-constructed two-layer optimization model of a distribution network under the condition of active and reactive coupling, and adjust the voltage of the distribution network based on the solution result; wherein, the two-layer optimization model includes an upper-layer active optimization model and a lower-layer reactive optimization model, the upper-layer active optimization model is constructed based on the minimum daily comprehensive operating cost, the lower-layer reactive optimization model is constructed based on the minimum daily operating network loss of the hybrid distribution network model, and the standby capacity constrains the two-layer optimization model based on the photovoltaic capacity constraint.

[0035] The embodiment of the present invention provides a voltage regulation method and device for a distribution network including a photovoltaic inverter. First, based on the electrical distance between the installation nodes of all grid-following photovoltaic inverters, the installation position of the grid-building photovoltaic inverter in the distribution network is determined, and a hybrid distribution network model is constructed based on the installation position. By determining the position of the grid-building photovoltaic inverter, a hybrid distribution network model is established to provide a theoretical model for the joint optimization of voltage regulation of multiple devices. Then, the spare capacity of the grid-building photovoltaic inverter is determined for the voltage fluctuation caused by the prediction deviation, so as to retain this part of the capacity to participate in the voltage regulation in the intraday stage. Finally, the pre-constructed double-layer optimization model of the distribution network is solved under the condition of active and reactive coupling, and the voltage of the distribution network is adjusted based on the solution result. Thereby, not only can the voltage of the distribution network be effectively regulated, but also the amount of abandoned light can be reduced under the premise of ensuring the voltage quality, the economy of the system operation is improved, and a solution is provided for the voltage problem in the hybrid power grid of the grid-building / grid-following type equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0037] Figure 1 A distribution network voltage regulating device provided by an embodiment of the present invention;

[0038] Figure 2 is a flow chart of a method for implementing a voltage regulation method of a distribution network including a photovoltaic inverter provided in an embodiment of the present invention;

[0039] Figure 3 is a block diagram of a method for determining spare capacity provided by an embodiment of the present invention;

[0040] Figure 4 is a block diagram of the optimization process of the double-layer optimization model provided by an embodiment of the present invention;

[0041] Figure 5 is the daily active and reactive power curve of photovoltaic and load provided by the embodiment of the present invention;

[0042] Figure 6 This is a distribution network area division result diagram provided by an embodiment of the present invention;

[0043] Figure 7 It is a configuration node diagram of a grid-connected / grid-following photovoltaic inverter provided in an embodiment of the present invention;

[0044] Figure 8 It is a 24-hour grid-connected photovoltaic inverter backup capacity diagram provided by an embodiment of the present invention;

[0045] Fig. 9 is an OLTC optimization result diagram provided by an embodiment of the present invention;

[0046] Fig.10 is a SCB optimization result diagram provided by an embodiment of the present invention;

[0047] Fig.11 This is a diagram showing the minimum and maximum voltage distribution of the three distribution network solutions provided by the embodiments of the present invention;

[0048] Fig.12 It is a structural schematic diagram of a voltage regulating device of a distribution network including a photovoltaic inverter provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0049] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.

[0050] In order to make the purpose, technical solutions and advantages of the present invention more clear, specific embodiments will be described below in conjunction with the accompanying drawings.

[0051] As introduced in the background technology, distributed photovoltaics have been vigorously developed. However, they are inherently random and volatile. After being connected to the grid, they will change the unidirectional flow characteristics of the active power flow in the distribution network, and are prone to problems such as power flow reverse transmission, which will increase the risk of network voltage exceeding the limit and seriously affect the reliability of power supply.

[0052] When a high proportion of distributed photovoltaics is connected to the distribution network, it is necessary to use multiple devices such as inverters, on-load tap changers (OLTCs) and shunt capacitor banks (SCBs) to suppress voltage over-limit and voltage fluctuations. Due to the high degree of wear of traditional voltage regulating devices such as OLTCs and SCBs, their operation times should be reduced as much as possible. Inverters are regulated through power electronics technology and can be adjusted frequently.

[0053] Most existing inverter devices adopt the Grid Following control (GFL) method, which relies on the Phase Locked Loop (PLL) to obtain the voltage phase of the grid connection point and keep it synchronized with the grid because it can achieve maximum power tracking. However, as the proportion of distributed power sources continues to increase, when the photovoltaic output changes, the voltage and frequency are very likely to fluctuate. The grid following inverter can adjust the voltage of the grid connection point by controlling the active and reactive output, but its regulation ability is limited by the control method and economic constraints. In addition, because it cannot provide voltage support by itself, it cannot adjust the voltage to a normal level under extreme conditions. On this basis, the Grid Forming control (GFM) method was proposed. Its external characteristic is a voltage source. Through the differential flow of active and reactive power, it independently determines the reference value of the voltage amplitude without relying on PLL, thereby outputting a voltage with constant amplitude and frequency. When the power grid fluctuates, the grid-connected inverter can provide stable voltage support for the system by changing the output voltage to adjust the active / reactive power output. The adjustment process has short delay and fast response, which makes up for the shortcomings of grid-connected equipment.

[0054] like Figure 1 As the proportion of distributed photovoltaic grid-connected devices gradually increases, the inverter control strategy in the system will no longer be single, and there will be a situation where grid-building inverters and grid-following inverters are mixed and connected to the grid. How to make full use of the ability of grid-building devices to quickly adjust and support voltage while taking into account the economy of grid-following devices, and make full use of the different characteristics of grid-building inverters, grid-following inverters and traditional voltage regulation equipment to coordinately achieve voltage regulation has become an urgent problem to be solved.

[0055] Figure 2 The implementation flow chart of the voltage regulation method of the distribution network including the photovoltaic inverter provided by the embodiment of the present invention is described in detail as follows:

[0056] S210: Determine the installation location of the grid-forming photovoltaic inverter in the distribution network based on the electrical distances between the installation nodes of all grid-following photovoltaic inverters, and construct a hybrid distribution network model based on the installation location.

[0057] The distribution of distribution network voltage is relatively complex. The installation location of reactive equipment directly affects the voltage regulation effect of the distribution network. In order to take into account both the voltage regulation effect and economy, it is necessary to select appropriate grid-following equipment and configure it as grid-building equipment to establish a distribution network model with two types of equipment in hybrid connection. The hybrid distribution network model includes the installation locations of grid-building photovoltaic inverters and grid-following photovoltaic inverters.

[0058] In some embodiments, a sensitivity matrix may be constructed based on the comprehensive voltage sensitivity of each installation node. Each element in the sensitivity matrix is ​​the relationship between the voltage amplitude change of each installation node and the injected active power and reactive power.

[0059] Then, the electrical distances between the installation nodes in the sensitivity matrix are determined and the electrical distance matrix is ​​constructed.

[0060] Next, the distribution network is divided into regions based on the electrical distance matrix.

[0061] Finally, the installation location of the grid-connected photovoltaic inverter is determined based on the comprehensive voltage sensitivity of each installation node in different areas.

[0062] In this embodiment, the sensitivity matrix L is constructed as follows:

[0063] The Jacobian matrix is ​​obtained by performing power flow calculation based on the node voltage power value and the impedance between nodes.

[0064] The power flow calculation in the distribution network meets the following requirements:

[0065]

[0066] Where ΔP and ΔQ are the changes in injected active power and injected reactive power of the node, respectively; Δδ and ΔU are the changes in the phase angle and amplitude of the node voltage, respectively; J is the Jacobian matrix, which represents the relationship between the node injected power change and the voltage change.

[0067] Performing the inverse transformation on the above formula gives:

[0068]

[0069] Where, L Pδ and L Qδ They represent the relationship between the node voltage phase angle change and the node injected active and reactive power changes respectively; L PU and L QU They respectively represent the relationship between the change of node voltage amplitude and the change of active and reactive power injected into the node.

[0070] The electrical distance is defined based on the comprehensive voltage sensitivity, which is the sum of the voltage-active sensitivity and the voltage-reactive sensitivity, i.e., L = L PU +L QU .

[0071] In some embodiments, the electrical distance matrix is ​​constructed by:

[0072] Each element in the electronic distance matrix D is calculated by calculating the Euclidean distance in the sensitivity matrix.

[0073]

[0074] Where n is the number of nodes, d ij is the element in the i-th row and j-th column of the matrix D, which represents the electrical distance between nodes i and j. ik and L jk are all elements of the matrix L.

[0075] In some embodiments, the method of dividing the regions is:

[0076] The electrical distance matrix D between nodes is used as the similarity matrix, and the distribution network is divided into regions based on the CFSFDP algorithm.

[0077] The CFSFDP algorithm is a density-based clustering algorithm that can divide a data set into several clusters based on a similarity matrix. The algorithm is characterized by being able to automatically identify and determine the cluster center, achieving efficient clustering of data of any shape, and having a good clustering effect for radial node distribution in the distribution network. By conducting an in-depth analysis of the regional division results of the distribution network, the node locations that need to be configured with networking devices can be further determined.

[0078] The steps of regional division are:

[0079] 1) Calculate the electrical distance between nodes based on the integrated voltage sensitivity.

[0080] 2) Construct a similarity matrix between nodes based on electrical distance.

[0081] 3) The similarity matrix is ​​used as the input of the CFSFDP algorithm to calculate the local density and distance of each node.

[0082] 4) Determine the cluster center based on local density and distance.

[0083] 5) Classify other non-cluster center data points into the class with the closest distance and higher density data points.

[0084] In some embodiments, the process of determining the installation location of the grid-connected photovoltaic inverter is as follows:

[0085] When determining the configuration location of the grid-building photovoltaic inverter, it is first necessary to identify the relatively vulnerable nodes in the grid, that is, the nodes with low comprehensive voltage sensitivity between nodes. Such nodes are less sensitive to grid fluctuations and are not easily affected by changes in the electrical quantity of adjacent nodes, so they become the key nodes in the grid that need to be directly regulated.

[0086] In this embodiment, first, a low sensitivity set can be determined based on the comprehensive voltage sensitivity of each installation node in different areas. The low sensitivity set includes multiple first sensitivities, and the first sensitivity is determined based on the minimum value of the comprehensive sensitivity of each installation node in the first area relative to each installation node in the second area. The first area and the second area are any two different areas in different areas.

[0087] Then, the position of the installation node corresponding to the largest first sensitivity in the low sensitivity set is determined as the installation position of the grid-building photovoltaic inverter.

[0088] Specifically, in order to accurately identify such nodes, the minimum value f(i) of the comprehensive voltage sensitivity of the grid-connected photovoltaic inverter installation node relative to other nodes in a region can be calculated. The smaller the value of f(i), the higher the priority of configuring the grid-connected photovoltaic inverter at node i in this region.

[0089] f(i)=min(L ij )i≠j;

[0090] Where, f(i) represents the minimum comprehensive voltage sensitivity of the ith grid-connected photovoltaic inverter installation node, L ij Represents the comprehensive voltage sensitivity of nodes i and j, where i = 1, 2, ..., n1, n1 is the number of grid-connected PV inverters in the area; j = 1, 2, ..., n2, n2 is the number of nodes in the area.

[0091] In addition, in order to maximize the use of the equipment's control capabilities, when determining the configuration node, not only the priority of the control should be considered, but also the impact of the node's electrical quantity change on the surrounding node voltage should be fully considered to ensure that when the node device is controlled, the neighboring node voltage changes accordingly to achieve the optimal control effect. Therefore, based on the minimum value of the comprehensive voltage sensitivity of all nodes in the evaluation area, the node corresponding to the maximum value in f(i) is selected as the final configuration node.

[0092] Specifically, α x =max[f(i)]i=1,2,…,n1 and x=1,2,…,ω;

[0093] α x is the maximum value of f(i), f(i) represents the minimum value of the comprehensive voltage sensitivity of the i-th node, and ω represents the number of regions.

[0094] Through the above process, it can be determined that the node x in the xth area is the configuration node of the grid-forming inverter. These positions not only take into account the weak nodes of the system voltage regulation, but also meet the overall demand for voltage regulation of other nodes in the area, making full use of the regulation capability of the grid-forming equipment.

[0095] S220. Determine the backup capacity of the grid-connected photovoltaic inverter.

[0096] Grid-building photovoltaic inverters need to provide additional active power to respond to frequency changes when the grid frequency drops, so they can achieve autonomous response to insufficient active power by configuring a certain proportion of energy storage. Therefore, when configuring the nodes of grid-building devices, configure energy storage with sufficient capacity to ensure that the node can output sufficient active power to support the frequency in extreme scenarios. At the same time, the peak-shaving and valley-filling capabilities of energy storage can reduce the overall operating costs to a certain extent.

[0097] The day-ahead forecast deviation will lead to voltage fluctuations. The intraday voltage fluctuations caused by the forecast deviation need to be adjusted by the reactive power output of the grid-connected photovoltaic inverter with fast response capability. For this purpose, the grid-connected photovoltaic inverter needs to reserve margin to participate in the intraday stage regulation. This part of capacity is called spare capacity. In addition to the spare capacity, the capacity will also participate in the day-ahead stage regulation.

[0098] The reserve capacity is formulated based on the maximum difference between the day-ahead control plan and the reactive output of grid-connected equipment under extreme intraday fluctuations, ensuring that even in extreme cases, the grid still has sufficient capacity to participate in voltage regulation to ensure that the voltage does not exceed the limit.

[0099] The calculation strategy for the settlement method of the intraday reserve capacity of the grid-connected photovoltaic inverter is as follows: Figure 3 As shown,

[0100] First, referring to the photovoltaic output and load in typical scenarios, a preliminary decision is made on the day-ahead control plan for each day-ahead control device based on the goal of minimizing the daily comprehensive operating cost, providing a reference value for calculating the extreme value of intraday voltage fluctuations.

[0101] Then, an uncertainty model is established for the uncertainty of photovoltaic output and load. The intraday fluctuation (photovoltaic output, load) of each node at each moment is used as the control quantity, and the node voltage extreme value is used as the objective function. Through the voltage amplitude constraint, the voltage extreme value of each node within 24 hours of the intraday stage and the reactive output value of each grid-type photovoltaic inverter are optimized under the condition that the day-ahead control plan remains unchanged.

[0102] Finally, the reactive output value of each grid-type photovoltaic inverter under each voltage extreme value condition is subtracted from the reactive output value obtained in the day-ahead control optimization model, and the case with the largest difference at each moment is found as the minimum backup capacity of each grid-type photovoltaic inverter at each moment within 24 hours.

[0103] In some embodiments, the objective function of the day-ahead control model is to minimize the daily comprehensive operating cost:

[0104] f total =f buy +f ESS +f DR ;

[0105] Among them, F total is the comprehensive operation cost of the distribution network on the next day, f buy is the electricity purchase cost of the distribution network, f ESS is the energy storage regulation cost, f DR The cost of responding to user demand.

[0106] Constraints include active power constraints, reactive power constraints, power flow constraints, energy storage constraints, user demand response constraints, power purchase constraints, etc.

[0107] The intraday fluctuation optimization model is a fluctuation model established based on the uncertainty of the photovoltaic output and load forecasts on the day before. It is assumed that the intraday fluctuation follows a normal distribution, and the expectation is set as the day-ahead forecast value, and the variance is 10% of the expected value. According to the 3σ criterion, the upper and lower limits of the intraday fluctuation (photovoltaic output, load) at each node at each moment are obtained, and this is used as the decision-making quantity. On the basis of the day-ahead control plan, the voltage extreme value (max, min) of each node at each moment in the intraday stage and the reactive output value of each grid-type photovoltaic inverter under the corresponding situation are optimized.

[0108] The objective function is the voltage extreme value of the node at each moment:

[0109] U max,it =max[U it ]Umin,it =min[U it ];

[0110] Where: U it is the voltage value of node i in time period t, i=1,2,…,n represents the i-th node, and t=1,2,…,24 represents the t-th moment.

[0111] Constraints include active power constraints, reactive power constraints, power flow constraints, user demand response constraints, power purchase constraints, photovoltaic capacity constraints, etc.

[0112] The process of determining the spare capacity is as follows:

[0113] The calculation formula for grid-connected photovoltaic reserve capacity is as follows:

[0114]

[0115] Among them, Q γ,t is the minimum backup capacity of the γth grid-connected photovoltaic inverter in time period t, are the reactive power output value of the γth grid-connected photovoltaic inverter when the voltage extreme value of node i in period t is maximum and minimum in the solution result of the intraday fluctuation optimization model, Q PVGW,γ,t It is the reactive power output value of the γth grid-connected photovoltaic inverter in period t in the solution of the day-ahead control optimization model.

[0116] S230, solving a pre-constructed two-layer optimization model of the distribution network under the condition of active and reactive coupling, and adjusting the voltage of the distribution network based on the solution result.

[0117] Among them, the two-layer optimization model includes an upper-layer active power optimization model and a lower-layer reactive power optimization model. The upper-layer active power optimization model is constructed based on the minimum daily comprehensive operating cost, and the lower-layer reactive power optimization model is constructed based on the minimum daily operating network loss of the hybrid distribution network model. The backup capacity constrains the two-layer optimization model based on the photovoltaic capacity constraint.

[0118] The traditional voltage regulation model combines the active and reactive control costs into the same objective function for optimization and solution, resulting in the low-cost reactive control equipment being ignored in the optimization search, affecting the effect of reactive optimization and voltage regulation. This application optimizes the active and reactive power in the distribution network separately for regulation, with the active part targeting the minimum operating cost and the reactive part targeting the minimum network loss. The two are coupled and transmit the corresponding decision quantities, which not only ensures the economic efficiency of operation, but also gives full play to the regulation effect of reactive resources.

[0119] The voltage regulation strategy in this application is as follows Figure 4 As shown, after the reserve capacity has been determined in S220, the active and reactive double-layer model can be optimized, and the optimization strategy is:

[0120] Based on the photovoltaic output and load curve in typical scenarios, a two-layer optimization model is used to optimize the cost and voltage of the next day. The upper layer is active power optimization. Under the condition of satisfying the active power balance of the distribution network, the optimization is carried out with the goal of minimizing the daily comprehensive operation cost of the distribution network, and the optimized active power decision quantity is passed to the lower layer. The lower layer strategy is reactive power optimization considering the participation of grid-connected / grid-following photovoltaic inverters, and the optimization goal is to minimize network loss. The lower layer optimization includes both the decision on the reactive output of grid-connected / grid-following photovoltaic inverters and the optimization of SCB and OLTC, and the optimized reactive power decision quantity is passed to the upper layer.

[0121] Through the mutual transmission and iteration of active and reactive decision quantities between the upper and lower layers, the day-ahead regulation result of the distribution network considering active-reactive coupling is obtained.

[0122] Dynamic reactive power optimization is based on the results of the joint two-layer optimization. Considering the limitation of the number of actions, the Fisher optimal partitioning method is used to optimize the action time and the optimal gear position of the transformer tap position and the number of capacitor switching groups respectively, and the discrete optimization results are obtained, thereby obtaining the day-ahead control plan for all equipment.

[0123] In some embodiments, the objective function of the upper active power optimization model in the two-layer optimization model is to minimize the comprehensive operation cost of the distribution network on the next day:

[0124] f total =f buy +f PV +f ESS +f DR ;

[0125] Among them, F total is the comprehensive operating cost of the distribution network on the next day; buy The cost of purchasing electricity from the distribution network; PV is the cost of photovoltaic power abandonment; f ESS is the energy storage adjustment cost; f DR The cost of responding to user demand.

[0126] The cost of purchasing electricity from the distribution network can be expressed as:

[0127]

[0128] Where n is the total number of nodes connecting the distribution network to the external power grid, is the electricity purchase price of the distribution network during period t, is the power purchased by node i from the external power grid during period t.

[0129] The cost of photovoltaic power curtailment can be expressed as:

[0130]

[0131] Where: n PV is the number of photovoltaic nodes in the distribution network, is the amount of abandoned light at the ith PV node in period t, a q 、b q and c q is the power abandonment cost coefficient.

[0132] The energy storage regulation cost model is:

[0133]

[0134] Where: n ESS is the total number of energy storage devices in the distribution network, is the comprehensive operating cost coefficient of the i-th energy storage device, is the charging and discharging power of the i-th energy storage device in period t, where: For charging, For discharge.

[0135] The user demand response cost model is:

[0136]

[0137] Where: n level is the graded value of the step compensation electricity price, n DR is the total number of users participating in demand response, is the compensation electricity price of the jth level, It is the demand response quantity of the i-th user participating in the j-th level compensation electricity price in period t.

[0138] The constraints of the upper-level active optimization model include:

[0139] Power Constraints:

[0140]

[0141] Power flow constraints:

[0142]

[0143] Where: P it , Q it are the active power and reactive power injected into node i during period t, U it , U jt are the voltage values ​​of nodes i and j in period t, G ij , B ij are the conductance and susceptance between nodes i and j respectively; θ ij is the voltage phase angle difference between nodes; are the active power output by node i and grid-connected photovoltaic inverter in period t respectively; are the active power abandoned by the node i and the grid-connected photovoltaic power source in period t respectively; is the charging power of the energy storage device at node i during period t; is the active power consumed by the load at node i during period t; is the active power of user i at node i participating in demand response during period t; is the active power purchased by node i from the grid during period t.

[0144] Energy storage constraints:

[0145]

[0146] in, is the maximum charging and discharging power allowed by the energy storage in user i; is a 0-1 variable, indicating the charging and discharging state of the energy storage in node i during period t. 1 means the energy storage is in charging state, otherwise it is 0. 1 indicates that the energy storage is in the discharge state, otherwise it is 0; are the state of charge of the energy storage in user i during period t and period t-1 respectively; The upper and lower limits of the energy storage charge state of user i; η ESSc , η ESSd They are the charging and discharging efficiency of energy storage respectively; They are respectively the initial and final charge states of energy storage i in a regulation cycle, where energy storage charging is positive and discharging is negative.

[0147] PV abandonment constraints:

[0148]

[0149] Where: are the active power output by node i and grid-connected photovoltaic inverter in time period t respectively; is the active power abandoned by the grid-connected photovoltaic power source at node i in time period t.

[0150] User demand response constraints:

[0151]

[0152] in, Active power of user node i participating in demand response in time period t; is the maximum active power of user node i participating in demand response in time period t.

[0153] Power purchase constraints:

[0154]

[0155] in, is the active power purchased by node i from the grid during period t, P gridmax is the maximum amount of electricity purchased by the node.

[0156] In some embodiments, the lower layer reactive power optimization model is a reactive power optimization model that considers the participation of grid-connected / grid-following photovoltaic inverters. The lower layer optimization includes both the decision on reactive power output of grid-connected / grid-following photovoltaic inverters and the optimization of SCB and OLTC. The reactive power decision amount obtained by optimization is transmitted to the upper layer. The objective function is to minimize the network loss:

[0157]

[0158] Among them, Q loss are the power loss of the distribution network during the whole day; n is the total number of nodes; U it , U jt are the voltage values ​​of nodes i and j in period t respectively; θ ij is the voltage phase angle difference between nodes, G ij is the conductance between nodes i and j.

[0159] The constraints of the underlying model include:

[0160] Power Constraints:

[0161]

[0162] Among them, Q it is the reactive power injected into node i during period t; is the reactive power output by the grid-connected photovoltaic inverter at node i during period t; is the output value of the reactive power compensation capacitor group at node i during period t; is the reactive power consumed by the load at node i during period t.

[0163] Photovoltaic capacity constraints:

[0164]

[0165] in, are the upper and lower limits of reactive power that can be output by the grid-connected / grid-following photovoltaic inverter at node i in time period t; is the reactive power output by the grid-connected / grid-following photovoltaic inverter at node i during period t.

[0166] SCB equipment operation constraints:

[0167]

[0168] in, is the switching capacity of the i-th reactive compensation capacitor group in period t, is the maximum adjustment capacity of the i-th reactive compensation capacitor.

[0169] OLTC equipment operation constraints:

[0170] U Omin ≤U it ≤U Omax ;

[0171] Among them, [U Omin ,U Omax ] is the maximum allowable adjustment range of the OLTC tap, U it is the voltage value of node i during period t, where i is the node where the OLTC equipment is installed.

[0172] Node voltage constraints:

[0173] U min ≤U i ≤U max ;

[0174] Among them, U min and U max They are the upper and lower limits of the voltage safe operating range respectively.

[0175] Through the mutual transmission and iteration of the active and reactive decision quantities of the upper and lower layers, the first solution of the day-ahead regulation of the distribution network considering the active-reactive coupling is obtained.

[0176] The first solution result includes continuous results of continuous quantity devices and continuous results of discrete quantity devices. The continuous results of continuous quantity devices in the first solution result include demand response power, energy storage charging and discharging, active power and reactive power output by grid-following photovoltaic inverters, and active power and reactive power output by grid-building photovoltaic inverters; the continuous results of discrete quantity devices in the first solution result include the number of parallel capacitor groups and the gear position of the on-load tap changer.

[0177] Since the obtained SCB and OLTC are continuous quantity results, but SCB and OLTC are discrete devices, discrete data is required.

[0178] As discrete decision variables, SCB and OLTC have strict restrictions on the number of operations within a dispatch cycle. Therefore, the number of actions of reactive compensation equipment is limited for optimal segmentation, which means that the process of discretized dynamic optimization is added. The specific constraints are as follows:

[0179] SCB equipment action times constraints:

[0180]

[0181] Among them, γ CB,max is the upper limit of the number of operations of the capacitor bank within the entire optimization cycle, is the maximum number of switching groups of the i-th reactive compensation capacitor, is the number of reactive compensation capacitor switching groups in the i-th period t; is the switching capacity of the i-th reactive compensation capacitor group in period t, is the switching capacity of a single group of reactive compensation capacitors of the i-th capacitor.

[0182] OLTC equipment adjustment times constraints:

[0183]

[0184] Where: γ O,max The maximum number of adjustments of the OLTC tap in the entire optimization cycle. Omin ,N Omax ] is the maximum allowable adjustment range of the OLTC tap; and the position N of the OLTC tap O,t Always take integers; ΔU O is the voltage regulation step of OLTC; U it is the voltage value of node i at time period t, U 0,i is the rated voltage value of node i.

[0185] After determining the two-level optimization model and constraints, the model can be solved:

[0186] S2310, initialization: Active power optimization is performed according to the objective function and constraints in the upper-level active power optimization model. In the initialization stage, only active power balance is considered, that is, the optimization solution is performed without considering the power flow constraints to obtain the initial active power decision quantity. Among them, the active power decision variables include the power purchase amount of the distribution network, the user demand response amount, the energy storage charging and discharging amount, the active power output of the grid-following photovoltaic inverter, and the active power output of the grid-building photovoltaic inverter.

[0187] S2320, calculate the remaining capacity of the grid-connected / grid-following photovoltaic inverter according to the obtained active power output by the grid-connected / grid-following photovoltaic inverter, where the remaining capacity of the grid-following photovoltaic inverter is for:

[0188]

[0189] Where: is the remaining capacity of the grid-connected PV inverter in node i during period t; is the rated capacity of the grid-connected PV inverter in node i.

[0190] Remaining capacity of grid-connected photovoltaic inverters for:

[0191]

[0192] is the remaining capacity of the grid-connected PV inverter in node i during period t, is the rated capacity of the grid-connected photovoltaic inverter in node i, It is the spare capacity of grid-connected photovoltaic inverters.

[0193] S2330, the initialized active decision variables, the remaining capacity of the grid-following photovoltaic inverter and the remaining capacity of the grid-building photovoltaic inverter are transferred to the lower layer reactive power optimization model, and the reactive power output of the grid-building photovoltaic inverter is optimized and solved based on the output voltage of the grid-building inverter as the installation node voltage, and the reactive power output of the grid-building photovoltaic inverter and the reactive power output of the grid-following photovoltaic inverter are obtained. And other reactive equipment control quantities.

[0194] S2340, the reactive power output of the grid-following photovoltaic inverter Remaining capacity of grid-connected photovoltaic inverters For comparison, if satisfied Then output the upper and lower layer solution results. If they are not satisfied, proceed to the next step.

[0195] S2350, based on the rated capacity of the grid-connected photovoltaic inverter, the spare capacity of the grid-connected photovoltaic inverter and the reactive power output of the grid-connected photovoltaic inverter Determine the upper limit of active power output of grid-connected photovoltaic inverters The reactive power output by the grid-connected photovoltaic inverter and the upper limit of the active power output by the grid-connected photovoltaic inverter are input into the upper-level active power optimization model to redetermine the solution result.

[0196]

[0197] In some embodiments, an improved forward back-substitution algorithm can be used to calculate the power flow of the distribution network of the hybrid photovoltaic inverter of the configuration / grid type. The branch current is used instead of the branch power as the variable in the back-substitution process, and the case where the node type is a photovoltaic power source of different forms and capacities is added.

[0198] For grid-following photovoltaic inverter access nodes that can be regarded as PQ node types, the processing method is basically the same as the method for processing ordinary loads, that is, the photovoltaic output value is taken as a negative load value in the power flow calculation and is processed in the general calculation steps. For grid-building photovoltaic inverter access nodes that can be regarded as PV node types, the reactive power correction equation method is used to convert the PV node into a PQ node that can be processed by the traditional algorithm during the iteration process. In each iteration process, the difference in the change of voltage amplitude is used to correct the reactive power, and the expression is:

[0199] Q t+1 =Q t +f(ΔV t ).

[0200] In some embodiments, the dynamic reactive power optimization steps are:

[0201] First, define the segment diameter. The ordered sample of the adjustment plan of each discrete device within the previous 24 hours is {x1,x2,…,x 24}, and segment it to obtain one of the sample segments as {x i ,x i+1 ,…,x j}, the segment mean is:

[0202]

[0203] The segment diameter is:

[0204]

[0205] Then, calculate the loss function. The optimal segmentation recursive formula is:

[0206]

[0207] Where b(n,k) is a method of clustering n ordered samples of discrete equipment adjustment plans into k categories; L[b(n,k)] is the loss function under the b(n,k) method.

[0208] According to the above formula, the loss function L[b(n,k)] value with a segment number of 2-k can be calculated, where the maximum number of segments is limited by the maximum number of actions of the discrete device.

[0209] Next, determine the optimal number of segments. The position where the inflection point appears in the trend graph of L[b(n,k)] changing with the number of segments k is the optimal number of segments.

[0210] Finally, the discrete equipment action time and optimal gear position are determined. Each action period is obtained according to the optimal number of segments, and the discrete equipment control amount in each action period is averaged, and the gear position closest to it is found as the optimal gear position for the action period, thereby obtaining the control plan for each discrete equipment within 24 hours.

[0211] The method provided by the present invention first determines the installation position of the grid-building photovoltaic inverter in the distribution network based on the electrical distance between the installation nodes of all grid-following photovoltaic inverters, and constructs a hybrid distribution network model based on the installation position. By determining the position of the grid-building photovoltaic inverter, a hybrid distribution network model is established to provide a theoretical model for the joint optimization and voltage regulation of multiple devices. Then, the spare capacity of the grid-building photovoltaic inverter is determined in view of the voltage fluctuation caused by the prediction deviation, so as to retain this part of the capacity to participate in the voltage regulation in the intraday stage. Finally, the double-layer optimization model of the pre-constructed distribution network is solved under the condition of active and reactive coupling, and the voltage of the distribution network is adjusted based on the solution result. Thereby, not only can the voltage of the distribution network be effectively regulated, but also the amount of abandoned light can be reduced under the premise of ensuring the voltage quality, and the economy of the system operation is improved, which provides a solution to the voltage problem in the hybrid power grid of the grid-building / grid-following type equipment.

[0212] In order to verify the accuracy of the method provided by the present invention, the IEEE33 node system is selected as a simulation example to verify the effectiveness of the optimization strategy proposed by the present invention.

[0213] An on-load tap-changing transformer is connected between nodes 0 and 1, with a transformation ratio range of 0.95pu to 1.05pu and an adjustment step of 0.005pu. Reactive compensation capacitor groups with a capacity of 80kVar×5 are connected at nodes 17 and 32 respectively. The upper limit of the daily adjustment times of the on-load tap-changing transformer and each capacitor group is set to 16 times and 10 times respectively. A grid-following photovoltaic inverter is connected at nodes 2, 3, 9, 12, 15, 19, 27, and 28 respectively, and the installed capacity of each grid-following photovoltaic inverter is 500KW. The daily active and reactive power of photovoltaic and load generated according to typical scenarios is simulated. The specific values ​​are as follows: Figure 5 As shown. Set up three different scenarios as follows:

[0214] Solution 1: Only grid-connected photovoltaic inverters are considered to participate in the regulation. The conventional multi-objective optimization method is used to minimize the daily comprehensive operating cost and minimize the network loss as the objective function. The multi-objective is converted into a single objective through the weight method to solve the optimization result.

[0215] Scheme 2: Considering the participation of two types of photovoltaic inverters, grid-connected and grid-following, the conventional multi-objective optimization method is used to take the lowest daily comprehensive operating cost and the smallest grid loss as the objective function. The multi-objective is converted into a single objective through the weight method to solve and obtain the optimization result.

[0216] Solution 3: Considering the participation of two types of photovoltaic inverters, grid-connected and grid-following, the active and reactive joint double-layer optimization model proposed in the present invention is used to obtain the optimization result through the mutual iterative solution of the upper layer active optimization and the lower layer reactive optimization.

[0217] according to Figure 6 The distribution network area division result diagram shows that the distribution network is divided into three areas. Then, according to the partition results, the configuration node selection method is used to calculate the configuration position of the grid-building photovoltaic inverter in each partition, and finally a distribution network model containing grid-building / grid-following photovoltaic inverters is established. The specific configuration positions are as follows: Figure 7 shown.

[0218] In view of the voltage fluctuation caused by the forecast deviation, the backup capacity of the grid-connected photovoltaic inverter is calculated by considering the extreme scenario of intraday deviation, and the backup capacity of the three grid-connected photovoltaic inverters within 24 hours of Scheme 3 is obtained as follows: Figure 8 shown.

[0219] According to the active and reactive dual-layer optimization model and the optimal partitioning method, the one-day control plan of OLTC and SCB equipment in Scheme 3 can be obtained as follows: Fig. 9 , 10 shown.

[0220] The distribution of the lowest and highest voltages of the distribution network in the three schemes is as follows Fig.11 As shown. It can be seen that the node voltage fluctuation range of Scheme 1 is [0.937, 1.059] pu. In the 11-13 period, there is a situation where the voltage exceeds the upper limit. During this period, the photovoltaic output is large and the voltage at the end of the distribution network is high; in the 16-19 period, there is a situation where the voltage exceeds the lower limit. During this period, the photovoltaic output drops sharply, but the load increases. The imbalance between supply and demand leads to a high voltage at the end of the distribution network. The node voltage fluctuation ranges of Scheme 2 and Scheme 3 are [0.951, 1.049] pu and [0.960, 1.036] pu respectively. There is no voltage over-limit problem within 24 hours, indicating that the introduction of a grid-type photovoltaic inverter can effectively reduce the voltage fluctuation range. In addition, it can be seen that the voltage fluctuation range of the voltage regulation method proposed in the present invention is better than that of Scheme 2, and the overall fluctuation is small, which verifies the effectiveness of the active and reactive double-layer optimization model proposed in the present invention. Compared with the traditional multi-objective optimization model, the voltage can be further regulated in a targeted manner.

[0221] The comparison of the optimization results of the three schemes is shown in Table 1.

[0222] Table 1

[0223]

[0224] Compared with Scheme 1, the daily active network loss of Scheme 2 is reduced by 7.64%, and the daily active network loss of Scheme 3 is reduced by 11.05%. It is verified that the introduction of a grid-type photovoltaic inverter can effectively reduce network losses. It can directly regulate the voltage at the access point and reduce the voltage drop between nodes, thereby effectively reducing the active network loss of the distribution network; compared with Scheme 2, the optimization model proposed in the present invention has a more superior adjustment ability and can further reduce the active network loss of the distribution network. Compared with Scheme 1, the daily comprehensive operating costs of Schemes 2 and 3 are relatively small, and the introduction of a grid-type photovoltaic inverter reduces part of the electricity cost; compared with Scheme 2, the daily comprehensive operating cost of Scheme 3 has increased, because the optimization model proposed in the present invention considers both the daily comprehensive operating cost and the daily active network loss. Compared with Scheme 2, the weight of the daily active network loss in the model solution is increased in disguised form without increasing the operating cost as much as possible, which will lead to an increase in abandoned light and a slight increase in operating costs.

[0225] The above simulation results verify the effectiveness of the active and reactive double-layer voltage regulation method for the distribution network proposed in the present invention considering the hybrid connection of the grid-connected / grid-following photovoltaic inverters in reducing operating costs, network losses and voltage fluctuation range.

[0226] The present invention establishes a hybrid distribution network model including grid-connected / grid-following photovoltaic inverters, comprehensively considers the voltage regulation capabilities of traditional voltage regulation equipment and grid-connected / grid-following photovoltaic inverters, and uses a two-layer optimization model of active and reactive power to optimize the voltage and cost of the distribution network to obtain a daily operation control plan for the distribution network, which effectively reduces the daily comprehensive operation cost of the distribution network. Compared with only considering the participation of grid-connected photovoltaic inverters in voltage regulation, the cost is reduced by 5.77%; and the voltage regulation capability of the grid-connected photovoltaic inverter is fully utilized. Compared with only considering the participation of grid-connected photovoltaic inverters in voltage regulation, the network loss is reduced by 11.05%, and the voltage fluctuation amplitude range is reduced by 9.52%, which has a good voltage regulation effect. The present invention can solve the problems of high voltage regulation cost and large voltage deviation in the existing high photovoltaic penetration distribution network.

[0227] It should be understood that the order of execution of the steps in the above embodiment does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.

[0228] The following is an embodiment of the device of the present invention. For details not described in detail therein, reference may be made to the corresponding method embodiment described above.

[0229] Fig.12 The schematic diagram of the structure of the voltage regulating device of the power distribution network including the photovoltaic inverter provided by the embodiment of the present invention is shown. For the convenience of explanation, only the part related to the embodiment of the present invention is shown, which is described in detail as follows:

[0230] like Fig.12As shown, a voltage regulating device 1200 for a distribution network including a photovoltaic inverter includes:

[0231] The first determination module 1210 is used to determine the installation position of the grid-building photovoltaic inverter in the distribution network based on the electrical distance between the installation nodes of all the grid-following photovoltaic inverters, and to construct a hybrid distribution network model based on the installation position; wherein the hybrid distribution network model includes the installation positions of the grid-building photovoltaic inverter and the grid-following photovoltaic inverter;

[0232] The second determination module 1220 is used to determine the spare capacity of the grid-connected photovoltaic inverter;

[0233] The solution module 1230 is used to solve the pre-constructed two-layer optimization model of the distribution network under the condition of active and reactive coupling, and adjust the voltage of the distribution network based on the solution result; wherein the two-layer optimization model includes an upper-layer active optimization model and a lower-layer reactive optimization model, the upper-layer active optimization model is constructed based on the minimum daily comprehensive operating cost, the lower-layer reactive optimization model is constructed based on the minimum daily operating network loss of the hybrid distribution network model, and the spare capacity constrains the two-layer optimization model based on the photovoltaic capacity constraint.

[0234] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0235] Those of ordinary skill in the art will appreciate that the templates, units, and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0236] If the module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. The computer program includes computer program code, which can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, USB flash drive, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory, random access memory, electric carrier signal, telecommunication signal and software distribution medium.

[0237] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included in the protection scope of the present invention.

Claims

1. A voltage regulation method for a distribution network including a photovoltaic inverter, It is characterized in that include: Based on the electrical distances between the installation nodes of all grid-following photovoltaic inverters, the installation positions of the grid-building photovoltaic inverters in the distribution network are determined, and a hybrid distribution network model is constructed based on the installation positions; wherein the hybrid distribution network model includes the installation positions of the grid-building photovoltaic inverters and the grid-following photovoltaic inverters; Determining the spare capacity of the grid-connected photovoltaic inverter; A two-layer optimization model of a pre-constructed distribution network is solved under the condition of active and reactive coupling, and the voltage of the distribution network is adjusted based on the solution result; wherein the two-layer optimization model includes an upper-layer active optimization model and a lower-layer reactive optimization model, the upper-layer active optimization model is constructed based on the minimum daily comprehensive operating cost, the lower-layer reactive optimization model is constructed based on the minimum daily operating network loss of the hybrid distribution network model, and the backup capacity constrains the two-layer optimization model based on the photovoltaic capacity constraint.

2. The voltage regulation method for a distribution network including a photovoltaic inverter according to claim 1, It is characterized in that The method of determining the installation position of the grid-forming photovoltaic inverter in the distribution network based on the electrical distances between the installation nodes of all the grid-following photovoltaic inverters includes: Based on the comprehensive voltage sensitivity of each installation node, a sensitivity matrix is ​​constructed; wherein each element in the sensitivity matrix is ​​the relationship between the voltage amplitude change of each installation node and the injected active power and reactive power; Determining the electrical distances between the installation nodes in the sensitivity matrix and constructing an electrical distance matrix; Dividing the distribution network into regions based on the electrical distance matrix; The installation position of the grid-connected photovoltaic inverter is determined based on the comprehensive voltage sensitivity of each installation node in different areas.

3. The voltage regulation method for a distribution network including a photovoltaic inverter according to claim 2, It is characterized in that The step of determining the installation location of the grid-connected photovoltaic inverter based on the comprehensive voltage sensitivity of each installation node in different areas includes: Based on the comprehensive voltage sensitivity of each installation node in different areas, a low sensitivity set is determined; wherein the low sensitivity set includes a plurality of first sensitivities, the first sensitivity is determined based on the minimum value of the comprehensive sensitivity of each installation node in the first area relative to each installation node in the second area, and the first area and the second area are any two different areas in different areas; The position of the installation node corresponding to the largest first sensitivity in the low sensitivity set is determined as the installation position of the grid-type photovoltaic inverter.

4. The voltage regulation method for a distribution network including a photovoltaic inverter according to claim 2, It is characterized in that The electrical distance matrix is ​​determined based on the Euclidean distances between the installation nodes in the sensitivity matrix; The dividing the distribution network into regions based on the electrical distance matrix includes: Using the electrical distance matrix as a similarity matrix; The similarity matrix is ​​solved based on a density peak fast search clustering algorithm, and the distribution network is divided into regions based on the solution result.

5. The voltage regulation method for a distribution network including a photovoltaic inverter according to claim 1, It is characterized in that The pre-built two-layer optimization model of the distribution network is solved under the condition of active and reactive coupling, and the distribution network is adjusted based on the solution result, including: Solving the pre-built two-layer optimization model under the condition of active and reactive coupling to obtain a first solution result; wherein the first solution result includes a continuous result of a continuous quantity device and a continuous result of a discrete quantity device; Discretizing the continuous results of the discrete quantity equipment based on the optimal segmentation method to obtain dynamically optimized discrete results; The power distribution network is regulated based on the continuous result of the continuous quantity device in the first solution result and the discrete result of the dynamic optimization.

6. The voltage regulation method for a distribution network including a photovoltaic inverter according to claim 5, It is characterized in that The pre-built two-layer optimization model is solved under the condition of active and reactive coupling to obtain a first solution result, including: Initialize the objective function and constraint conditions of the upper-level active power optimization model, and solve to obtain the initialized active power decision variables; wherein the active power decision variables include the power purchase amount of the distribution network, the user demand response amount, the energy storage charging and discharging amount, the active power output by the grid-following photovoltaic inverter, and the active power output by the grid-building photovoltaic inverter; Determine the remaining capacity of the grid-following photovoltaic inverter and the remaining capacity of the grid-building photovoltaic inverter based on the active power output by the grid-following photovoltaic inverter and the active power output by the grid-building photovoltaic inverter; The initialized active decision variables, the remaining capacity of the grid-following photovoltaic inverter and the remaining capacity of the grid-building photovoltaic inverter are transferred to the lower-layer reactive power optimization model, and the reactive power output by the grid-building photovoltaic inverter is optimized and solved based on the output voltage of the grid-building inverter as the installation node voltage, so as to obtain the reactive power output by the grid-building photovoltaic inverter and the reactive power output by the grid-following photovoltaic inverter; Based on the remaining capacity of the grid-following photovoltaic inverter, the remaining capacity of the grid-building photovoltaic inverter, the reactive power output by the grid-building photovoltaic inverter and the reactive power output by the grid-following photovoltaic inverter, a first solution result is determined; wherein the continuous results of the continuous quantity devices in the first solution result include demand response power, energy storage charging and discharging capacity, active power and reactive power output by the grid-following photovoltaic inverter, and active power and reactive power output by the grid-building photovoltaic inverter; the continuous results of the discrete quantity devices in the first solution result include the number of parallel capacitor groups and the gear position of the on-load tap changer.

7. The voltage regulation method for a distribution network including a photovoltaic inverter according to claim 6, It is characterized in that The determining of the first solution result based on the remaining capacity of the grid-following photovoltaic inverter, the remaining capacity of the grid-building photovoltaic inverter, the reactive power output by the grid-building photovoltaic inverter, and the reactive power output by the grid-following photovoltaic inverter comprises: If the absolute value of the difference between the absolute value of the reactive power output by the grid-connecting photovoltaic inverter and the remaining capacity of the grid-connecting photovoltaic inverter is less than the preset error, and the absolute value of the difference between the absolute value of the reactive power output by the grid-following photovoltaic inverter and the remaining capacity of the grid-following photovoltaic inverter is less than the preset error, then output the first solution result; Otherwise, based on the rated capacity of the grid-type photovoltaic inverter, the backup capacity of the grid-type photovoltaic inverter and the reactive power output by the grid-type photovoltaic inverter, the upper limit of the active power output by the grid-type photovoltaic inverter is determined; and the reactive power output by the grid-type photovoltaic inverter and the upper limit of the active power output by the grid-type photovoltaic inverter are input into the upper-level active power optimization model to redetermine the first solution result.

8. The voltage regulation method for a distribution network including a photovoltaic inverter according to claim 1 or 5, It is characterized in that The decision variables of the lower layer reactive power optimization model include the gear position of the on-load tap changer of the transformer, the switching amount of the reactive compensation capacitor, the output reactive power of the grid-following photovoltaic inverter and the output reactive power of the grid-building photovoltaic inverter.

9. The voltage regulation method for a distribution network including a photovoltaic inverter according to claim 1, It is characterized in that The determining of the spare capacity of the grid-connected photovoltaic inverter comprises: The backup capacity of the grid-connected photovoltaic inverter is determined based on the maximum difference between the day-ahead control plan and the reactive power output by the grid-connected photovoltaic inverter under extreme intraday fluctuation conditions.

10. A voltage regulating device for a distribution network comprising a photovoltaic inverter, It is characterized in that include: A first determination module is used to determine the installation position of the grid-building photovoltaic inverter in the distribution network based on the electrical distance between the installation nodes of all grid-following photovoltaic inverters, and to construct a hybrid distribution network model based on the installation position; wherein the hybrid distribution network model includes the installation positions of the grid-building photovoltaic inverter and the grid-following photovoltaic inverter; A second determination module is used to determine the spare capacity of the grid-connected photovoltaic inverter; A solution module is used to solve a pre-constructed two-layer optimization model of a distribution network under the condition of active and reactive coupling, and adjust the voltage of the distribution network based on the solution result; wherein the two-layer optimization model includes an upper-layer active optimization model and a lower-layer reactive optimization model, the upper-layer active optimization model is constructed based on the minimum daily comprehensive operating cost, the lower-layer reactive optimization model is constructed based on the minimum daily operating network loss of the hybrid distribution network model, and the backup capacity constrains the two-layer optimization model based on the photovoltaic capacity constraint.

Citation Information

Cited By

  • Photovoltaic power distribution network voltage stability control method and system

    CN120933987A