Power system source network load storage planning method considering power supply adequacy

By constructing a double-layer source grid load storage planning model, considering the power supply margin and the proportion of new energy, and using a multi-objective particle swarm algorithm to solve the problem of insufficient grid planning accuracy in the existing technology, and improving the accuracy of grid planning and dynamic characteristics considerations.

CN118944192APending Publication Date: 2024-11-12STATE GRID ELECTRIC POWER ECONOMIC RES INST IN NORTHERN HEBEI TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410983177.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing technology has insufficient consideration of the dynamic characteristics of the power grid, resulting in low accuracy of grid planning. Especially in the application of high proportion of new energy, the power supply margin factor cannot be effectively considered.

Method used

Build a dual-layer source network load storage planning model, including upper and lower layer planning models, and consider the impact of power supply margin and new energy share on operating costs by setting impact parameters and constraints, and use multi-objective particle swarm algorithm to solve it to obtain the system planning plan.

Benefits of technology

The accuracy of power grid planning is improved, and the impact of changes in the proportion of new energy and the change in power grid abundance on operating costs is considered, which enhances the dynamic characteristics of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118944192A_ABST
    Figure CN118944192A_ABST
Patent Text Reader

Abstract

The invention provides an electric power system source network load storage planning method considering power supply adequacy, which comprises the following steps of: firstly, constructing target planning information under a plurality of scenes, and determining constraint conditions of an electric power system according to the target planning information; then, according to constraint conditions, establishing a target function of a double-layer source network load storage planning model; the model comprises an upper-layer planning model and a lower-layer planning model; the lower-layer planning model takes the minimum operation cost under different new energy proportions and different power supply adequacy as a target; the upper-layer planning model takes the minimum total cost as a target; and finally, solving the double-layer source network load storage planning model according to the target function to obtain a planning scheme of system source network load storage. According to the method, the double-layer planning model is constructed, the influence of the change of the new energy proportion and the change of the power grid adequacy on the operation cost is considered on the premise of minimizing the cost, that is, the influence of the dynamic characteristics of the power grid on the cost is considered to a certain extent, and the accuracy of power grid planning is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of power system planning, and in particular relates to a power system source-grid-load-storage planning method taking power supply margin into consideration. Background Art

[0002] New energy sources, with their advantages of flexibility, economy and environmental protection, have been increasingly widely used in power systems to solve problems such as energy shortages and environmental protection. However, the volatility, randomness and intermittency of the output of new energy sources pose risks to the safety and stability of the power system. With the large-scale application of new energy sources such as wind power and photovoltaics, a new power system with a high proportion of new energy has gradually formed, resulting in increasing fluctuations in the net load of the system and increasing demand for system power supply adequacy. Therefore, system source network planning faces new challenges. How to take the power supply adequacy factor into account, form a source-grid-load-storage collaborative planning model, and support the future morphological evolution research of the new power system in a scientific and quantitative way has become the primary issue facing planning.

[0003] In related technologies, usually only the investment and operation of the power grid's source, grid, load and storage are considered. The factors considered are relatively simple and the dynamic characteristics of the power grid are not considered enough, resulting in low accuracy in power grid planning. Summary of the invention

[0004] In view of this, the present invention provides a power system source-grid-load-storage planning method taking into account power supply adequacy, aiming to solve the problem that the prior art does not take into account the dynamic characteristics of the power grid, resulting in low accuracy in power grid planning.

[0005] A first aspect of an embodiment of the present invention provides a method for planning power system source, grid, load and storage considering power supply adequacy, including:

[0006] Construct target planning information under multiple scenarios, and determine the constraints of the power system based on the target planning information; wherein the proportion of new energy and the abundance index in the target planning information of each scenario are different;

[0007] According to the constraints, the objective function of the double-layer source-grid-load-storage planning model is established; the double-layer source-grid-load-storage planning model includes an upper-layer planning model and a lower-layer planning model; the lower-layer planning model aims to minimize the operating cost under different proportions of new energy and different power supply margins; the upper-layer planning model aims to minimize the total cost;

[0008] The double-layer source-grid-load-storage planning model is solved according to the objective function to obtain the planning scheme of the system source-grid-load-storage.

[0009] In a possible implementation, a first influencing parameter and a second influencing parameter are set in the double-layer source-grid-load-storage planning model. The first influencing parameter is used to indicate the influence of the change of power supply margin on the proportion of new energy; the second influencing parameter is used to indicate the influence of the proportion of new energy on the change of power supply margin.

[0010] In a possible implementation, the constraint condition includes a sufficiency constraint; the sufficiency constraint is:

[0011]

[0012] Among them, d it is the load of the ith node at time t, is the load shedding amount of the i-th node at time t, k2 is the second influencing parameter, α is the maximum margin index, M is the total number of nodes connected to the load, and T is the total number of times.

[0013] In one possible implementation, the new energy constraint is:

[0014]

[0015] Among them, W it is the amount of new energy access to the i-th node at time t, k1 is the first influencing parameter, β is the maximum proportion of new energy, and N is the total number of nodes connected to new energy.

[0016] In one possible implementation, the objective function of the upper-level planning model is:

[0017] minC=C1+C2

[0018]

[0019] Among them, C is the total cost, C1 is the construction cost, and C 1f is the unit investment cost of the source, grid, load and storage equipment related to the fth thermal power plant, C 1n is the unit investment cost of the source, grid, load and storage equipment related to new energy, G f is the investment scale of the source, grid, load and storage equipment related to the fth thermal power plant, G n is the investment scale of the nth renewable energy-related source-grid-load-storage equipment, N1 is the total number of thermal power-related source-grid-load-storage equipment, and N2 is the total number of renewable energy-related source-grid-load-storage equipment.

[0020] In one possible implementation, the objective function of the lower-level planning model is:

[0021]

[0022] Among them, C2 is the operating cost, C 2f is the unit operating cost of thermal power related source, grid, load and storage equipment, C2n is the unit operating cost of the source, grid, load and storage equipment related to new energy, H f is the operating scale of the source, grid, load and storage equipment related to the fth thermal power plant, H n is the operating scale of the source-grid-load-storage equipment related to the nth renewable energy source, λ1 is the first preset coefficient, and λ2 is the second preset coefficient.

[0023] In a possible implementation, the method further includes:

[0024] Establish a power grid simulation operation model based on target planning information;

[0025] Under the premise that the adequacy index remains unchanged, the proportion of new energy is adjusted, and the change in the first cost caused by the change in the proportion of new energy is calculated according to the power grid simulation operation model;

[0026] The first preset coefficient is calculated according to the change in the proportion of new energy and the change in the first cost.

[0027] In a possible implementation, the method further includes:

[0028] Under the premise that the proportion of new energy remains unchanged, the adequacy index is adjusted, and the change in the second cost caused by the change in the adequacy index is calculated according to the power grid simulation operation model;

[0029] A second preset coefficient is calculated according to the change in the sufficiency index and the change in the second cost.

[0030] In a possible implementation, the double-layer source-grid-load-storage planning model is solved according to the objective function to obtain a planning scheme for the system source-grid-load-storage, including:

[0031] A multi-objective particle swarm algorithm is used to solve the double-layer source-grid-load-storage planning model and obtain the planning scheme of the system source-grid-load-storage.

[0032] A second aspect of an embodiment of the present invention provides a power system source-grid-load-storage planning device considering power supply adequacy, including:

[0033] The constraint module is used to construct target planning information under multiple scenarios and determine the constraints of the power system based on the target planning information; wherein the proportion of new energy and the abundance index in the target planning information of each scenario are different;

[0034] Establish a module for establishing the objective function of the double-layer source-grid-load-storage planning model according to the constraint conditions; wherein the double-layer source-grid-load-storage planning model includes an upper-layer planning model and a lower-layer planning model; the lower-layer planning model aims to minimize the operating cost under different proportions of new energy and different power supply adequacy; and the upper-layer planning model aims to minimize the total cost;

[0035] The solution module is used to solve the double-layer source-grid-load-storage planning model according to the objective function to obtain the planning scheme of the system source-grid-load-storage.

[0036] The power system source-grid-load-storage planning method considering power supply adequacy provided by the embodiment of the present invention first constructs target planning information under multiple scenarios, and determines the constraints of the power system according to the target planning information; wherein the proportion of new energy and the adequacy index in the target planning information of each scenario are different; then, according to the constraints, the objective function of the double-layer source-grid-load-storage planning model is established; wherein, the double-layer source-grid-load-storage planning model includes an upper-layer planning model and a lower-layer planning model; the lower-layer planning model takes the minimum operating cost under different proportions of new energy and different power supply adequacy as the goal; the upper-layer planning model takes the minimum total cost as the goal; finally, the double-layer source-grid-load-storage planning model is solved according to the objective function to obtain the planning scheme of the system source-grid-load-storage. The present invention improves the accuracy of power grid planning by constructing a double-layer planning model, and on the premise of minimizing costs, by considering the impact of changes in the proportion of new energy and changes in the adequacy of the power grid on the operating costs, that is, considering the impact of the dynamic characteristics of the power grid on the costs to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0038] Figure 1 It is a flow chart for implementing a method for planning source, grid, load and storage of a power system taking into account power supply adequacy provided by an embodiment of the present invention;

[0039] Figure 2 It is a structural schematic diagram of a power system source-grid-load-storage planning device taking into account power supply adequacy provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0040] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.

[0041] Figure 1 1 is a flow chart of the implementation of the power system source-grid-load-storage planning method considering power supply adequacy provided by an embodiment of the present invention. Figure 1As shown, in some embodiments, a method for planning power system source, grid, load and storage considering power supply adequacy includes:

[0042] S210, constructing target planning information under multiple scenarios, and determining the constraints of the power system according to the target planning information; wherein the proportion of new energy and the abundance index in the target planning information of each scenario are different.

[0043] In the embodiment of the present invention, target planning information in multiple scenarios can be obtained through research and related data. The target planning information may include the installed capacity of the source, grid, load and storage in the region, energy storage regulation, line transmission surplus capacity, load information, etc., which are not limited here.

[0044] S220, based on the constraints, establish the objective function of the double-layer source-grid-load-storage planning model; wherein the double-layer source-grid-load-storage planning model includes an upper-layer planning model and a lower-layer planning model; the lower-layer planning model aims to minimize the operating cost under different proportions of new energy and different power supply adequacy; the upper-layer planning model aims to minimize the total cost.

[0045] In some embodiments, a first influencing parameter and a second influencing parameter are set in the double-layer source-grid-load-storage planning model. The first influencing parameter is used to indicate the impact of changes in power supply margin on the proportion of new energy; the second influencing parameter is used to indicate the impact of the proportion of new energy on changes in power supply margin.

[0046] In the embodiment of the present invention, the proportion of new energy has many effects on the redundancy of the distribution network, mainly including the following aspects:

[0047] Power supply volatility: New energy sources such as wind power and solar power are greatly affected by weather and environmental factors, and have obvious volatility and uncertainty. This may cause the power supply capacity of the distribution network to change in different time periods, affecting the redundancy.

[0048] Power supply reliability: The volatility and unpredictability of renewable energy may affect the reliability of power supply. When renewable energy generation is insufficient, traditional thermal power generation or other energy sources may be needed to supplement it, which requires the distribution network to have sufficient flexibility and regulation capabilities.

[0049] Grid stability: The access to new energy sources may have an impact on the stability of the grid. For example, the intermittent nature of wind and solar power generation may cause fluctuations in grid frequency and voltage, requiring regulatory measures to maintain grid stability.

[0050] Grid load distribution: The distributed characteristics of new energy may change the load distribution of the distribution network. For example, a large number of rooftop photovoltaic power generation may cause the load of the distribution network to decrease during the day and increase at night, which requires the distribution network to be able to adapt to such load changes.

[0051] Grid investment and operating costs: The integration of new energy may require the transformation and upgrading of the distribution network to adapt to the characteristics and needs of new energy. This may increase the investment and operating costs of the grid, but in the long run, it may also reduce overall costs by reducing fuel costs and improving energy efficiency.

[0052] Energy storage system requirements: In order to smooth out the volatility of renewable energy, distribution networks may need to be equipped with energy storage systems. Energy storage systems can store electricity when renewable energy generates excess power and release it when power generation is insufficient, thereby increasing the redundancy of distribution networks.

[0053] In the embodiment of the present invention, the influence of the distribution network adequacy on the proportion of new energy is mainly reflected in the following aspects:

[0054] Grid connection capacity: The redundancy of the distribution network determines whether it can accommodate more renewable energy generation. If the redundancy of the distribution network is high, that is, it has sufficient spare capacity, good regulation ability and stable operation status, then it can more easily accept renewable energy generation, thereby increasing the proportion of renewable energy.

[0055] System stability: The volatility and intermittency of renewable energy generation may affect the stability of the distribution network. If the distribution network is not adequate, it may not be able to effectively cope with these fluctuations, resulting in fluctuations in system frequency and voltage, affecting the quality of power supply. Therefore, a distribution network with high abundance can better support the high proportion of renewable energy access.

[0056] Grid upgrade requirements: As the proportion of renewable energy increases, distribution networks may need to be upgraded to adapt to the characteristics of renewable energy. Distribution networks with high redundancy may only need local optimization and adjustment, while distribution networks with low redundancy may require larger-scale transformation, which will increase the cost and time of renewable energy access.

[0057] The need for energy storage systems: The volatility of new energy requires that distribution networks be equipped with certain energy storage systems to balance supply and demand. Distribution networks with high redundancy may already have sufficient regulation capabilities to cope with these fluctuations, thereby reducing dependence on energy storage systems; while distribution networks with low redundancy may require more energy storage resources to improve stability.

[0058] In an embodiment of the present invention, the adequacy index is a weighted sum of the following indexes: a reserve capacity index, line and transformer load factors, a power generation capacity to demand ratio, and voltage and frequency stability.

[0059] In some embodiments, the access of new energy depends on the grid connection capacity of the power grid. Multiple different sufficientness indicators can be set, and the grid connection capacity corresponding to each sufficientness indicator can be calculated. The amount of new energy access can be calculated accordingly. Then, the sufficientness indicator is used as the independent variable and the amount of new energy access is used as the dependent variable to fit a relationship curve. The normalized value of the slope of the curve is the first influencing parameter.

[0060] In some embodiments, the degree of redundancy depends on the power supply reliability of the power grid. Multiple different new energy access amounts can be set, and the changes in the power supply reliability of the power grid under each new energy access amount can be calculated. The redundancy index can be calculated accordingly. Then, the new energy access amount is used as the independent variable and the redundancy index is used as the dependent variable to fit the relationship curve. The normalized value of the slope of the curve is the second influencing parameter.

[0061] In some embodiments, the constraint condition includes a margin constraint; the margin constraint is:

[0062]

[0063] Among them, d it is the load of the ith node at time t, is the load shedding amount of the i-th node at time t, k2 is the second influencing parameter, α is the maximum margin index, M is the total number of nodes connected to the load, and T is the total number of times.

[0064] In an embodiment of the present invention, the larger the maximum margin index of the planned power grid is, the better the actual margin of the power grid is. At the same time, the margin is affected by the access of new energy sources. If the access of new energy sources makes the margin worse, a smaller second influencing parameter will be obtained, which will correspondingly limit the load shedding amount, thereby reducing the margin index of the power grid.

[0065] In some embodiments, the new energy constraints are:

[0066]

[0067] Among them, W it is the amount of new energy access to the i-th node at time t, k1 is the first influencing parameter, β is the maximum proportion of new energy, and N is the total number of nodes connected to new energy.

[0068] In an embodiment of the present invention, the greater the maximum proportion of new energy in the planned power grid, the higher the grid connection capacity of the power grid, and the greater the actual proportion of new energy. At the same time, the proportion of new energy is affected by the abundance. The smaller the abundance index of the power grid, the smaller the first influencing parameter, and the smaller the actual amount of new energy access.

[0069] In some embodiments, the objective function of the upper-level planning model is:

[0070]

[0071] Among them, C is the total cost, C1 is the construction cost, and C 1f is the unit investment cost of the source, grid, load and storage equipment related to the fth thermal power plant, C 1n is the unit investment cost of the source, grid, load and storage equipment related to new energy, G f is the investment scale of the source, grid, load and storage equipment related to the fth thermal power plant, G n is the investment scale of the nth renewable energy-related source-grid-load-storage equipment, N1 is the total number of thermal power-related source-grid-load-storage equipment, and N2 is the total number of renewable energy-related source-grid-load-storage equipment.

[0072] In the embodiment of the present invention, G f , G n is the variable to be optimized.

[0073] In some embodiments, the objective function of the lower-level planning model is:

[0074]

[0075] Among them, C2 is the operating cost, C 2f is the unit operating cost of thermal power related source, grid, load and storage equipment, C 2n is the unit operating cost of the source, grid, load and storage equipment related to new energy, H f is the operating scale of the source, grid, load and storage equipment related to the fth thermal power plant, H n is the operating scale of the source-grid-load-storage equipment related to the nth renewable energy source, λ1 is the first preset coefficient, and λ2 is the second preset coefficient.

[0076] In the embodiment of the present invention, H f , H n is the variable to be optimized. k1β reflects the change in the proportion of new energy affected by the sufficiency, and multiplied by the first preset coefficient reflecting the reduction of operating costs by new energy, which is the operating cost reduction ratio. k2α reflects the change in the sufficiency index affected by the proportion of new energy, and multiplied by the second preset coefficient reflecting the increase in operating costs by the sufficiency index, which is the operating cost increase ratio.

[0077] In some embodiments, the method also includes: establishing a power grid simulation operation model based on target planning information; adjusting the proportion of new energy on the premise that the sufficiency index remains unchanged, and calculating the first cost change caused by the change in the proportion of new energy according to the power grid simulation operation model; calculating the first preset coefficient based on the change in the proportion of new energy and the first cost change.

[0078] In some embodiments, the method also includes: adjusting the margin index under the premise that the proportion of new energy remains unchanged, and calculating the second cost change caused by the change in the margin index according to the power grid simulation operation model; calculating the second preset coefficient according to the change in the margin index and the second cost change.

[0079] In an embodiment of the present invention, the power grid simulation operation model can be an IEEE 39 node system, which is completed using MATLAB R2014a software and CPLEX solver; the operation simulation is calculated based on a typical day, and the time scale is set to 15 minutes. The slope of the curve fitted by the change in the proportion of new energy and the first cost change is the first preset coefficient. The slope of the curve fitted by the change in the sufficiency index and the second cost change is the second preset coefficient.

[0080] S230, solving the double-layer source-grid-load-storage planning model according to the objective function to obtain a planning scheme for the system source-grid-load-storage.

[0081] In some embodiments, the double-layer source-grid-load-storage planning model is solved according to the objective function to obtain a planning scheme for the system source-grid-load-storage, including:

[0082] A multi-objective particle swarm algorithm is used to solve the double-layer source-grid-load-storage planning model and obtain the planning scheme of the system source-grid-load-storage.

[0083] In the embodiment of the present invention, the particle swarm optimization (PSO) is an optimization tool based on swarm intelligence, which is suitable for solving complex optimization problems.

[0084] The following are the general steps to solve a two-layer model with upper and lower layers using Particle Swarm Optimization:

[0085] The upper model first initializes the particle swarm and randomly generates a group of particles in the search space of the upper problem solution, each particle represents a potential solution; then the fitness of each particle is evaluated according to the objective function of the upper problem; then the speed and position of the particle are updated according to the historical optimal position of each particle and the global optimal position of the entire group; finally, the convergence condition is checked. If the convergence condition is met (such as reaching the maximum number of iterations or the fitness change is less than a certain threshold), the iteration is stopped; otherwise, it returns to continue the iteration.

[0086] The lower model receives the upper decision and passes the position of each particle in the upper model as a parameter to the lower model. Then the objective function of the lower problem is defined, the lower problem is solved, and finally the solution of the lower problem is passed to the upper model as feedback information to update the fitness of the particle.

[0087] Each time the upper model is updated, the lower model needs to be solved again and the results fed back to the upper model. When the solutions of both the upper and lower models tend to be stable, the algorithm is considered to have converged and the final two-layer model solution is obtained.

[0088] It should be understood that the order of execution of the steps in the above embodiment does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.

[0089] Figure 2 Schematic diagram of the structure of the power system source-grid-load-storage planning device considering power supply adequacy provided by an embodiment of the present invention. Figure 2 As shown, in some embodiments, a power system source-grid-load-storage planning device 2 considering power supply adequacy includes:

[0090] The constraint module 210 is used to construct target planning information under multiple scenarios and determine the constraint conditions of the power system according to the target planning information; wherein the proportion of new energy and the abundance index in the target planning information of each scenario are different;

[0091] Establishing module 220, for establishing the objective function of the double-layer source-grid-load-storage planning model according to the constraint conditions; wherein the double-layer source-grid-load-storage planning model includes an upper-layer planning model and a lower-layer planning model; the lower-layer planning model aims to minimize the operating cost under different proportions of new energy and different power supply adequacy; and the upper-layer planning model aims to minimize the total cost;

[0092] The solution module 230 is used to solve the double-layer source-grid-load-storage planning model according to the objective function to obtain a planning scheme for the system source-grid-load-storage.

[0093] Optionally, a first influencing parameter and a second influencing parameter are set in the double-layer source-grid-load-storage planning model, wherein the first influencing parameter is used to indicate the influence of changes in power supply margin on the proportion of new energy; and the second influencing parameter is used to indicate the influence of the proportion of new energy on changes in power supply margin.

[0094] Optionally, the constraint condition includes a sufficiency constraint; the sufficiency constraint is:

[0095]

[0096] Among them, d it is the load of the ith node at time t, is the load shedding amount of the i-th node at time t, k2 is the second influencing parameter, α is the maximum margin index, M is the total number of nodes connected to the load, and T is the total number of times.

[0097] Optionally, the new energy constraint is:

[0098]

[0099] Among them, W it is the amount of new energy access to the i-th node at time t, k1 is the first influencing parameter, β is the maximum proportion of new energy, and N is the total number of nodes connected to new energy.

[0100] Optionally, the objective function of the upper-level planning model is:

[0101] minC=C1+C2

[0102]

[0103] Among them, C is the total cost, C1 is the construction cost, and C 1f is the unit investment cost of the source, grid, load and storage equipment related to the fth thermal power plant, C 1n is the unit investment cost of the source, grid, load and storage equipment related to new energy, G f is the investment scale of the source, grid, load and storage equipment related to the fth thermal power plant, G n is the investment scale of the nth renewable energy-related source-grid-load-storage equipment, N1 is the total number of thermal power-related source-grid-load-storage equipment, and N2 is the total number of renewable energy-related source-grid-load-storage equipment.

[0104] Optionally, the objective function of the lower-level planning model is:

[0105]

[0106] Among them, C2 is the operating cost, C 2f is the unit operating cost of thermal power related source, grid, load and storage equipment, C 2n is the unit operating cost of the source, grid, load and storage equipment related to new energy, H f is the operating scale of the source, grid, load and storage equipment related to the fth thermal power plant, H n is the operating scale of the source-grid-load-storage equipment related to the nth renewable energy source, λ1 is the first preset coefficient, and λ2 is the second preset coefficient.

[0107] Optionally, the device also includes: a simulation module, used to establish a power grid simulation operation model based on target planning information; under the premise that the sufficiency index remains unchanged, adjust the proportion of new energy, and calculate the first cost change caused by the change in the proportion of new energy according to the power grid simulation operation model; calculate the first preset coefficient based on the change in the proportion of new energy and the first cost change.

[0108] Optionally, the simulation module is used to: adjust the margin index under the premise that the proportion of new energy remains unchanged, and calculate the second cost change caused by the change in the margin index according to the power grid simulation operation model; calculate the second preset coefficient based on the change in the margin index and the second cost change.

[0109] Optionally, the solution module 230 is used to: use a multi-objective particle swarm algorithm to solve the double-layer source-grid-load-storage planning model to obtain a planning scheme for the system source-grid-load-storage.

[0110] The power system source-grid-load-storage planning device considering power supply adequacy provided in this embodiment can be used to execute the above method embodiments. Its implementation principles and technical effects are similar, and this embodiment will not be repeated here.

[0111] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0112] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0113] In the embodiments provided by the present invention, it should be understood that the disclosed devices / electronic devices and methods can be implemented in other ways. For example, the device / electronic device embodiments described above are only schematic. For example, the division of modules or units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0114] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0115] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0116] If the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. Computer-readable media may include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electrical carrier signal, telecommunication signal and software distribution medium, etc.

[0117] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention.

Claims

1. A method for planning source, grid, load and storage of a power system considering power supply adequacy, characterized in that: include: Constructing target planning information under multiple scenarios, and determining the constraints of the power system according to the target planning information; wherein the proportion of new energy and the abundance index in the target planning information of each scenario are different; According to the constraint conditions, an objective function of a double-layer source-grid-load-storage planning model is established; wherein the double-layer source-grid-load-storage planning model includes an upper-layer planning model and a lower-layer planning model; the lower-layer planning model aims to minimize the operating cost under different proportions of new energy and different power supply margins; the upper-layer planning model aims to minimize the total cost; The double-layer source-grid-load-storage planning model is solved according to the objective function to obtain a planning scheme for the system source-grid-load-storage.

2. The method for planning power system source, grid, load and storage considering power supply adequacy according to claim 1, characterized in that: The double-layer source-grid-load-storage planning model is provided with a first influencing parameter and a second influencing parameter. The first influencing parameter is used to indicate the influence of the change of power supply margin on the proportion of new energy; the second influencing parameter is used to indicate the influence of the proportion of new energy on the change of power supply margin.

3. The method for planning power system source, grid, load and storage considering power supply adequacy according to claim 2, characterized in that: The constraint condition includes a margin constraint; the margin constraint is: Among them, d it is the load of the ith node at time t, is the load shedding amount of the i-th node at time t, k2 is the second influencing parameter, α is the maximum margin index, M is the total number of nodes connected to the load, and T is the total number of times.

4. The method for planning power system source, grid, load and storage considering power supply adequacy according to claim 3, characterized in that: The new energy constraints are: Among them, W it is the amount of new energy access to the i-th node at time t, k1 is the first influencing parameter, β is the maximum proportion of new energy, and N is the total number of nodes connected to new energy.

5. The method for planning power system source, grid, load and storage considering power supply adequacy according to claim 4, characterized in that: The objective function of the upper-level planning model is: minC=C1+C2 Among them, C is the total cost, C1 is the construction cost, C 1f is the unit investment cost of the source, grid, load and storage equipment related to the fth thermal power plant, C 1n is the unit investment cost of the source, grid, load and storage equipment related to new energy, G f is the investment scale of the source, grid, load and storage equipment related to the fth thermal power plant, G n is the investment scale of the nth renewable energy-related source-grid-load-storage equipment, N1 is the total number of thermal power-related source-grid-load-storage equipment, and N2 is the total number of renewable energy-related source-grid-load-storage equipment.

6. The method for planning power system source, grid, load and storage considering power supply adequacy according to claim 5, characterized in that: The objective function of the lower-level planning model is: Among them, C2 is the operating cost, C 2f is the unit operating cost of thermal power related source, grid, load and storage equipment, C 2n is the unit operating cost of the source, grid, load and storage equipment related to new energy, H f is the operating scale of the source, grid, load and storage equipment related to the fth thermal power plant, H n is the operating scale of the source-grid-load-storage equipment related to the nth renewable energy source, λ1 is the first preset coefficient, and λ2 is the second preset coefficient.

7. The method for planning power system source, grid, load and storage considering power supply adequacy according to claim 1, characterized in that: The method further comprises: Establishing a power grid simulation operation model according to the target planning information; Under the premise that the sufficiency index remains unchanged, the proportion of new energy is adjusted, and the first cost change caused by the change in the proportion of new energy is calculated according to the power grid simulation operation model; The first preset coefficient is calculated according to the change in the proportion of new energy and the change in the first cost.

8. The method for planning power system source, grid, load and storage considering power supply adequacy according to claim 7, characterized in that: The method further comprises: Under the premise that the proportion of new energy remains unchanged, the adequacy index is adjusted, and the second cost change caused by the change of the adequacy index is calculated according to the power grid simulation operation model; A second preset coefficient is calculated according to the change in the sufficiency index and the change in the second cost.

9. The method for planning power system source, grid, load and storage considering power supply adequacy according to claim 1, characterized in that: The double-layer source-grid-load-storage planning model is solved according to the objective function to obtain a planning scheme for the system source-grid-load-storage, including: A multi-objective particle swarm algorithm is used to solve the double-layer source-grid-load-storage planning model to obtain a planning scheme for the system source-grid-load-storage.

10. The method for planning power system source, grid, load and storage considering power supply adequacy according to claim 1, characterized in that: The method further comprises: Multiple different adequacy indicators; Calculate the grid connection capacity corresponding to each adequacy index; Calculate the amount of new energy access under the grid connection capacity; The adequacy index is used as the independent variable and the access amount of new energy is used as the dependent variable. The relationship curve is fitted and the normalized value of the slope of the curve is used as the first influencing parameter. Set up multiple different new energy access amounts; Calculate the power supply reliability of the power grid under each new energy access amount; Calculate the adequacy index corresponding to the power supply reliability of the power grid; With the amount of new energy access as the independent variable and the adequacy index as the dependent variable, the relationship curve is fitted and the normalized value of the slope of the curve is used as the second influencing parameter.