Automatic grinding ball replacing system and method for engineering glass ball mill
By designing an automatic replacement system in an engineering glass ball mill, using spiral feeders and metal grates to screen and recover grinding balls, the automatic addition of grinding balls is achieved, solving the problem of time-consuming and labor-intensive grinding ball replacement process, and reducing dust pollution and working strength , improves production efficiency and work safety.
Patent Information
- Application Number
- CN202411033964.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-15
AI Technical Summary
The existing engineering glass ball mill replacement process is time-consuming and labor-intensive, affecting production efficiency, and has dust pollution and high-strength working conditions.
An automatic grinding ball replacement system including a screw feeder, feed hopper, metal grate and bucket elevator is designed. The screening of unqualified grinding balls and the recycling and automatic addition of qualified grinding balls are realized through the control unit, and the replacement is shortened. Time, reduce personnel needs, and complete dust treatment within the equipment.
It greatly shortens the time for grinding ball replacement, reduces personnel demand, reduces dust pollution, improves the working environment and health and safety, and reduces the impact on production line production.
Smart Images

Figure CN118950175A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of TFT glass manufacturing, and in particular to an automatic grinding ball replacement system and method for an engineering glass ball mill. Background Art
[0002] In the production process of liquid crystal glass, the batching process will prepare various raw materials into qualified batch materials according to a certain proportion and provide them to the kiln for melting. Among the various raw materials, the cutting scraps and unqualified products in the production line processing process will be processed as engineering glass and crushed into powdered broken glass with qualified particle size and mixed with various raw materials to form the required batch materials. In the current engineering glass processing, horizontal ball mills are used for powdering of engineering glass. The horizontal ball mill adopts a horizontal cylindrical structure, and alumina lining bricks are installed on the inner wall of the cylinder. A certain weight of alumina grinding balls will be added to the horizontal ball mill. A certain amount of engineering glass will be added before running the horizontal ball mill. The motor drives the ball mill cylinder to move. The grinding balls in the cylinder roll and fall in the barrel under the influence of gravity to crush and powder the engineering glass.
[0003] The grinding balls in the horizontal ball mill are made of sintered alumina with a diameter of 60mm to 80mm. The grinding balls will be worn by the erosion of engineering glass and between the grinding balls and the wall of the ball mill. When the diameter of the grinding balls is too small, the powder output rate of the ball mill will be reduced, affecting the processing efficiency of engineering glass. In order to meet production needs, the batching process will regularly replace the grinding balls that are severely worn and too small.
[0004] During the ball mill grinding ball replacement process, all the engineering glass processed in the ball mill will be discharged first, and then all the grinding balls in the ball mill will be discharged. The discharged grinding balls will be manually screened to remove the small and unqualified grinding balls, and then a certain proportion of new grinding balls will be added according to the weight of the remaining qualified grinding balls to meet the ball mill's requirements for the grinding ball installation capacity. The whole process has the following shortcomings:
[0005] 1. The operation process takes a long time, which brings adverse factors to the production control of the production line. The replacement takes about 16 hours. The long operation time has an adverse impact on the normal production order of the production line. It is necessary to arrange overtime before replacing the grinding balls to prepare the amount of engineering glass used during the replacement of the grinding balls.
[0006] 2. The replacement process is labor-intensive. Under normal circumstances, the amount of grinding balls added to the ball mill will be between 2,000 kg and 4,000 kg. Six people are required to screen the old grinding balls and add new grinding balls at the same time. The operation process requires high physical fitness of the operators and consumes a lot of physical energy.
[0007] 3. There is dust pollution problem in the replacement process. In the process of screening old grinding balls, the old grinding balls will still adhere to the engineering glass powder, so there will be dust pollution in the environment of the grinding ball screening project, which will pollute the factory and harm the health of employees. Summary of the invention
[0008] The purpose of the present invention is to provide a system and method for automatically replacing grinding balls of an engineering glass ball mill, so as to solve the problem that the grinding ball replacement process of the ball mill is time-consuming and labor-intensive in the prior art.
[0009] In order to achieve the above object, the present invention adopts the following technical solutions:
[0010] An automatic grinding ball replacement system for an engineering glass ball mill comprises a screw feeder, a feed hopper, a metal grate and a bucket elevator;
[0011] The screw feeder is installed above the feed hopper, a weighing element is installed on the feed hopper, a ball mill is connected below the feed hopper, the ball mill is connected to a bucket elevator, and the metal grate is arranged between the ball mill and the bucket elevator;
[0012] The screw feeder, weighing element, ball mill, metal grate and bucket elevator are all connected to a control unit.
[0013] Furthermore, the screw feeder is installed at the bottom of the grinding ball storage bin through a flange, the screw feeder is connected to the servo motor through a screw shaft, the outer sleeve of the screw shaft is provided with a sleeve, and the servo motor is connected to the control unit.
[0014] Furthermore, an electric gate valve for the grinding ball storage bin is installed between the bottom of the grinding ball storage bin and the screw feeder, and the electric gate valve for the grinding ball storage bin is connected to a servo motor, and the servo motor is connected to a control unit.
[0015] Furthermore, an electric gate valve of the feed hopper is installed at the bottom of the feed hopper through a flange, the electric gate valve of the feed hopper is connected to a servo motor, and the servo motor is connected to a control unit.
[0016] Furthermore, the metal grate is in the shape of a mesh, and the metal grate is installed on one side of the discharge port of the ball mill through a limiting slide rail.
[0017] Furthermore, a driving cylinder is installed on one side of the metal grate, the driving cylinder is connected to a solenoid valve, and the solenoid valve is connected to a control unit.
[0018] Furthermore, the discharge port of the ball mill is connected to a discharge hopper, the discharge hopper is connected to one end of a bucket elevator, and the other end of the bucket elevator is arranged above the feed hopper.
[0019] Furthermore, the bucket elevator is installed on a fixed bracket, a chain of the bucket elevator is connected to a servo motor, and the servo motor is connected to a control unit.
[0020] Furthermore, a directional roller is installed at the bottom of the bucket elevator, a guide rail is arranged on the ground at the bottom of the bucket elevator, and the directional roller cooperates with the guide rail.
[0021] A method for automatically replacing grinding balls of an engineering glass ball mill of the system comprises:
[0022] After all the glass powder in the ball mill is removed, the command to replace the grinding balls is started, the solenoid valve is closed, and the cylinder top holding the metal grate is driven to move from the standby position to the working position;
[0023] After the metal grate reaches the working position, the ball mill starts to operate. Affected by gravity and centrifugal force, the grinding balls in the ball mill roll along the inner wall of the ball mill. The grinding balls with unqualified sizes will be discharged through the gaps of the metal grate and transported to the discharge hopper. The unqualified grinding balls will be collected through the ton bag at the discharge port of the ball mill.
[0024] Position the outlet of the bucket elevator and the discharge hopper, start the grinding ball replacement program, close the solenoid valve, drive the cylinder to pull the metal grate to the standby position, start the ball mill and bucket elevator, and the grinding balls in the ball mill are discharged to the discharge hopper and lifted to the feed hopper by the bucket elevator;
[0025] After all the grinding balls are discharged and lifted to the feed hopper, the control unit weighs the grinding balls through the weighing element, starts the screw feeder according to the difference with the target grinding ball addition amount, adds spare grinding balls until the target addition amount is reached, then the screw feeder stops running and opens the electric gate valve of the feed hopper to complete the addition of grinding balls.
[0026] Compared with the prior art, the present invention has the following beneficial effects:
[0027] The present invention provides an automatic grinding ball replacement system for an engineering glass ball mill. The system adds a metal grate at the discharging position to screen out grinding balls with unqualified sizes. The unqualified grinding balls are collected by using a ton bag, and the qualified grinding balls are lifted to a feed hopper by using a bucket elevator. The grinding balls can re-enter the ball mill, and a weighing element is provided on the feed hopper for weighing the grinding balls. A screw feeder is used to feed spare grinding balls in a grinding ball storage bin into the feed hopper. The feed hopper weighs the qualified grinding balls transported by the bucket elevator and the spare grinding balls added by the screw feeder. When the target addition amount of grinding balls is reached, the screw feeder stops, and the grinding balls in the feed hopper enter the ball mill to complete the automatic replacement of the grinding balls. The present invention realizes the control of each part mechanism through a control unit, and the replacement time is short and the personnel requirement is small. The system realizes the screening and discharge of unqualified grinding balls and the recovery of qualified grinding balls, and the automatic addition of spare grinding balls to the target addition amount and the automatic addition of spare grinding balls to the ball mill to complete the automatic replacement of grinding balls. The replacement time is greatly shortened. The entire process of grinding ball screening and adding is completed by the equipment, which has little impact on the production order of the production line. There is no need to process and store engineering glass in advance before replacing the grinding balls. The entire replacement process only requires 2 people. In addition, the simple operation of operating the control unit to issue instructions, remove the unqualified grinding ball bags, and position the bucket elevator during the replacement process has low requirements on the physical fitness of employees and reduces the employment standards of employees in the position. At the same time, the replacement process is carried out inside the equipment, and there is no dust spillover condition, which effectively ensures the environment in the factory and the health of employees. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0029] Figure 1 The figure is a schematic diagram of the automatic grinding ball replacement system of the engineering glass ball mill of the present invention.
[0030] Figure 2 It is a schematic diagram of a feed hopper of the present invention.
[0031] Figure 3 It is a schematic diagram of a feed hopper of the present invention.
[0032] Among them: 1-grinding ball storage bin, 2-grinding ball storage bin electric gate valve, 3-screw feeder, 4-feed hopper, 5-weighing element, 6-feed hopper electric gate valve, 7-ball mill, 8-metal grate, 9-discharge hopper, 10-bucket elevator. DETAILED DESCRIPTION
[0033] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0034] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0036] In the description of the embodiments of the present invention, it should be noted that if the terms "upper", "lower", "horizontal", "inner", etc. indicate an orientation or positional relationship based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship in which the product of the invention is usually placed when in use, it is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.
[0037] In addition, if the term "horizontal" appears, it does not mean that the component must be absolutely horizontal, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", which does not mean that the structure must be completely horizontal, but can be slightly tilted.
[0038] In the description of the embodiments of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0039] The present invention is further described in detail below in conjunction with the accompanying drawings:
[0040] See also Figure 1 The present invention provides an automatic grinding ball replacement system for an engineering glass ball mill, comprising a grinding ball storage bin 1, an electric gate valve 2 for the grinding ball storage bin, a screw feeder 3, a feed hopper 4, a weighing element 5, an electric gate valve 6 for the feed hopper, a metal grate 8, a discharge hopper 9 and a bucket elevator 10, wherein the electric gate valve 2 for the grinding ball storage bin, the screw feeder 3, the weighing element 5, the electric gate valve 6 for the feed hopper, the metal grate 8 and the bucket elevator 10 are all connected to a control unit.
[0041] like Figure 2 As shown, the grinding ball storage bin 1 is installed above the feed hopper 4, and is made of 1Cr13 material, and is used to store spare grinding balls. The grinding ball storage bin electric gate valve 2 is arranged at the lower part of the grinding ball storage bin 1, and the grinding ball storage bin electric gate valve 2 is connected to a servo motor, and the servo motor is connected to a control unit, and is used to control the grinding balls to enter the screw feeder 3. The screw feeder 3 is installed at the lower part of the grinding ball storage bin 1 through a flange connection. The screw shaft and sleeve in contact with the grinding balls are made of 1Cr13 material. The rear part of the screw feeder 3 is connected to a servo motor through a screw shaft, and the servo motor is connected to the control unit. The screw shaft is driven by the servo motor, and a sleeve is provided on the outside of the screw shaft. The screw shaft drives the grinding balls to move in the sleeve until they enter the feed hopper 4.
[0042] The feed hopper electric gate valve 6 is installed at the bottom of the feed hopper 4 through a flange connection, and the part in contact with the grinding balls is made of 1Cr13 material. The feed hopper electric gate valve 6 is connected to a servo motor, which is connected to a control unit. The servo motor is used to drive the switch action of the feed hopper electric gate valve 6. The feed hopper electric gate valve 6 is normally in a long-closed state and will open when the engineering glass is put in or the grinding balls are added.
[0043] The weighing element 5 is installed on the upper part of the feed hopper 4 to weigh the weight of the grinding balls in the feed hopper 4. After the weighing element 5 is installed, the system will perform a peeling setting to remove the weight of the feed hopper 4 and the feed hopper electric gate valve 6 that are not related to the weighed material. The weight of the material in the feed hopper 4 is fed back truthfully, and the control unit will collect the weighing signal to weigh the grinding balls and calculate the amount of addition.
[0044] like Figure 3 As shown, the metal grate 8 is made of 1Cr13 material, and a rod with a diameter of 20mm to 50mm is processed into a mesh-shaped metal grate 8. The metal grate 8 is installed outside the discharge port of the ball mill 7 and is fixed by limit slide rails on both sides. A driving cylinder is installed on the other side of the metal grate 8, and the driving cylinder is connected to the solenoid valve, and the solenoid valve is connected to the control unit. The metal grate 8 is controlled by the solenoid valve to move forward and backward to the working position or the standby position.
[0045] The discharge port of the ball mill 7 is connected to the discharge hopper 9, which is connected to one end of the bucket elevator 10, and the other end of the bucket elevator 10 is arranged above the feed hopper 4. The contact part between the bucket elevator 10 and the grinding ball is made of 1Cr13 material, and the external seal is installed on the fixed bracket with a transparent PVC plate. The chain of the bucket elevator 10 is connected to the servo motor, which is connected to the control unit. The servo motor drives the chain to complete the conveying of the grinding balls. The bottom of the bucket elevator 10 is equipped with a directional roller, which cooperates with the guide rail on the ground to realize the movement of the bucket elevator 10 and the docking positioning of the lower discharge hopper 9.
[0046] Since iron and carbon foreign matter are not allowed in the raw materials of TFT liquid crystal glass, 1Cr13 material is used for the contact part of the grinding ball. The purpose is to have sufficient strength and magnetism after wear and tear, so that it can be adsorbed by the strong magnetic grid designed on the system, effectively ensuring the content of iron and carbon foreign matter in the original engineering glass.
[0047] The present invention also provides an automatic grinding ball replacement method for an engineering glass ball mill, which controls various parts of the mechanism through a control unit, realizes the screening and discharge of unqualified grinding balls and the recovery of qualified grinding balls, and automatically adds spare grinding balls to the target addition amount, and then automatically adds them to the ball mill 7 to complete the automatic replacement of grinding balls. Specifically, the following steps are included:
[0048] Step 1: After all the glass powder in the ball mill 7 is removed, the operator starts the command to replace the grinding balls through the control unit. After the on-site actuator receives the command, the solenoid valve closes and drives the cylinder top holding the metal grate 8 to move from the standby position to the working position.
[0049] Step 2: After the metal grate 8 reaches the working position, the control unit issues a command to operate the ball mill 7. After the ball mill 7 is in operation, the grinding balls in the ball mill 7 will roll along the inner wall of the ball mill 7 under the influence of gravity and centrifugal force. The grinding balls with unqualified sizes will be discharged through the gaps of the metal grate 8, and transported to the discharge hopper 9 through the vibrating feeder at the bottom of the ball mill 7. The unqualified grinding balls will be collected through the ton bag at the bottom of the discharge port 9.
[0050] Step 3: After the screening of unqualified grinding balls is completed, the unqualified grinding balls are manually removed to collect the ton bags, and the feed port of the bucket elevator 10 and the outlet of the discharge hopper 9 are positioned to connect.
[0051] Step 4: After completing the positioning of the bucket elevator 10, the operator starts the grinding ball replacement program, the solenoid valve is closed, and the driving cylinder pulls the metal grate 8 to the standby position.
[0052] Step 5: After the metal grate 8 reaches the standby position, the control unit starts the ball mill 7 and the bucket elevator 10, and the grinding balls in the ball mill 7 are discharged through the discharge port, transported to the discharge hopper 9 through the vibrating feeder, and lifted to the feed hopper 4 through the bucket elevator 10.
[0053] Step 6: After all the grinding balls are discharged and lifted to the feed hopper 4 , the control unit weighs the grinding balls through the weighing element 5 on the feed hopper 4 .
[0054] Step 7: After obtaining the weight of the grinding balls by weighing, the control unit will issue instructions based on the difference with the target grinding ball addition amount, start the grinding ball storage bin electric gate valve 2 and the screw feeder 3 to add spare grinding balls until the target addition amount is reached, and the screw feeder 3 stops running.
[0055] Step 8: After the grinding ball addition is completed and the grinding ball addition amount is reached, the control unit issues a command to open the feed hopper electric gate valve 6 below the feed hopper 4 to complete the addition of the grinding balls.
[0056] Embodiment 1:
[0057] Assuming that the amount of grinding balls added to the ball mill is 2000Kg, the operator sets the target amount of grinding balls added to 2000Kg in the control unit. After the powder output rate of the ball mill is reduced to the lower limit due to grinding ball wear, the on-site operator issues a grinding ball replacement instruction on the control unit, and the control unit starts the replacement procedure according to the replacement process.
[0058] Step 1: After all the glass powder in the ball mill 7 is removed, the operator starts the command to replace the grinding balls through the control unit. After the on-site actuator receives the command, the solenoid valve closes and drives the cylinder top holding the metal grate 8 to move from the standby position to the working position.
[0059] Step 2: After the metal grate 8 reaches the working position, the control unit automatically issues a command to operate the ball mill 7. After the ball mill 7 is in operation, the magic balls in the ball mill 7 will roll along the inner wall of the ball mill 7 under the influence of gravity and centrifugal force. The grinding balls with unqualified sizes will be discharged through the gaps of the metal grate 8, and transported to the discharge hopper 9 through the vibrating feeder at the bottom of the ball mill 7. The unqualified grinding balls will be collected through the ton bag at the bottom of the discharge port.
[0060] Step 3: After the screening of unqualified grinding balls is completed, the unqualified grinding balls are manually removed and collected in bulk bags, and the feed port of the bucket elevator 10 and the outlet of the discharge hopper 9 are positioned and connected.
[0061] Step 4: After completing the positioning of the bucket elevator 10, the operator starts the grinding ball replacement program, the solenoid valve is closed, and the driving cylinder pulls the metal grate 8 to the standby position.
[0062] Step 5: After the metal grate 8 reaches the standby position, the control unit starts the ball mill 7 and the bucket elevator 10, and the grinding balls in the ball mill 7 are discharged through the discharge port, transported to the discharge hopper 9 through the vibrating feeder, and lifted to the feed hopper 4 through the bucket elevator 10.
[0063] Step 6: After all the grinding balls are discharged and lifted to the feed hopper 4, the control unit weighs the grinding balls through the weighing element 5 on the feed hopper 4 to obtain the weight of the qualified grinding balls, which is less than 1500 kg.
[0064] Step 7: The weight of qualified grinding balls is 1500Kg obtained by weighing. The control unit calculates the difference between the target grinding ball addition of 2000Kg and the actual qualified grinding balls, which is 500Kg. The control unit automatically issues instructions to start the electric gate valve 2 of the grinding ball storage bin and the screw feeder 3 to add spare grinding balls. When the grinding balls in the feed hopper 4 reach the target added weight of 2000Kg, the screw feeder 3 stops running and the addition of spare grinding balls is completed.
[0065] Step 8: After the spare grinding balls are added and the target grinding ball addition amount of 2000 kg is reached, the control unit issues a command to open the feed hopper electric gate valve 6 below the feed hopper 4 to complete the addition of the grinding balls.
[0066] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An automatic grinding ball replacement system for an engineering glass ball mill. It is characterized in that It comprises a screw feeder (3), a feed hopper (4), a metal grate (8) and a bucket elevator (10); The screw feeder (3) is installed above the feed hopper (4), a weighing element (5) is installed on the feed hopper (4), a ball mill (7) is connected below the feed hopper (4), the ball mill (7) is connected to a bucket elevator (10), and the metal grate (8) is arranged between the ball mill (7) and the bucket elevator (10); The screw feeder (3), weighing element (5), ball mill (7), metal grate (8) and bucket elevator (10) are all connected to a control unit.
2. The automatic grinding ball replacement system for an engineering glass ball mill according to claim 1, It is characterized in that The screw feeder (3) is installed at the bottom of the grinding ball storage bin (1) via a flange, the screw feeder (3) is connected to a servo motor via a screw shaft, a sleeve is provided on the outside of the screw shaft, and the servo motor is connected to a control unit.
3. The automatic grinding ball replacement system for an engineering glass ball mill according to claim 2, It is characterized in that A grinding ball storage bin electric gate valve (2) is installed between the bottom of the grinding ball storage bin (1) and the screw feeder (3), and the grinding ball storage bin electric gate valve (2) is connected to a servo motor, and the servo motor is connected to a control unit.
4. The automatic grinding ball replacement system for an engineering glass ball mill according to claim 1, It is characterized in that A feed hopper electric gate valve (6) is installed at the bottom of the feed hopper (4) via a flange, and the feed hopper electric gate valve (6) is connected to a servo motor, and the servo motor is connected to a control unit.
5. The automatic grinding ball replacement system for an engineering glass ball mill according to claim 1, It is characterized in that The metal grate (8) is in the shape of a mesh and is installed on one side of the discharge port of the ball mill (7) via a limiting slide rail.
6. The automatic grinding ball replacement system for an engineering glass ball mill according to claim 1, It is characterized in that A driving cylinder is installed on one side of the metal grate (8), the driving cylinder is connected to a solenoid valve, and the solenoid valve is connected to a control unit.
7. The automatic grinding ball replacement system for an engineering glass ball mill according to claim 1, It is characterized in that The discharge port of the ball mill (7) is connected to a discharge hopper (9), the discharge hopper (9) is connected to one end of a bucket elevator (10), and the other end of the bucket elevator (10) is arranged above the feed hopper (4).
8. The automatic grinding ball replacement system for an engineering glass ball mill according to claim 1, It is characterized in that The bucket elevator (10) is installed on a fixed bracket, a chain of the bucket elevator (10) is connected to a servo motor, and the servo motor is connected to a control unit.
9. The automatic grinding ball replacement system for an engineering glass ball mill according to claim 1, It is characterized in that A directional roller is installed at the bottom of the bucket elevator (10), a guide rail is arranged on the ground at the bottom of the bucket elevator (10), and the directional roller cooperates with the guide rail.
10. A method for automatically replacing grinding balls of an engineering glass ball mill of the system according to any one of claims 1 to 9, It is characterized in that include: After all the glass powder in the ball mill (7) is removed, the command for replacing the grinding balls is started, the solenoid valve is closed, and the cylinder top holding the metal grate (8) is driven to move from the standby position to the working position; After the metal grate (8) reaches the working position, the ball mill (7) starts to operate. Under the influence of gravity and centrifugal force, the grinding balls in the ball mill (7) roll along the inner wall of the ball mill (7). Grinding balls with unqualified sizes are discharged through the gaps of the metal grate (8) and transported to the discharge hopper (9). The unqualified grinding balls are collected through the ton bag at the discharge port of the ball mill (7); Position the outlet of the bucket elevator (10) and the discharge hopper (9), start the grinding ball replacement program, close the solenoid valve, drive the cylinder to pull the metal grate (8) to the standby position, start the ball mill (7) and the bucket elevator (10), and the grinding balls in the ball mill (7) are discharged to the discharge hopper (9) and lifted to the feed hopper (4) by the bucket elevator (10); After all the grinding balls are discharged and lifted to the feed hopper (4), the control unit weighs the grinding balls through the weighing element (5), starts the screw feeder (3) according to the difference between the grinding balls and the target grinding ball addition amount, adds spare grinding balls until the target addition amount is reached, then stops the screw feeder (3) and opens the electric gate valve (6) of the feed hopper to complete the addition of grinding balls.
Citation Information
Patent Citations
Horizontal sand mill with screening function
CN205308467U
A ball mill for paint produce
CN208554421U
Ball mill with milling balls convenient to replace
CN211801282U
Automatic proportioning and adding device for steel balls and steel sections of aerated concrete slurry ball mill
CN214765891U
Glaze ball mill
CN217615090U
