Underground layered water taking structure based on bank slope and construction method

By setting up a subsurface layered water intake structure with vertical shafts and multi-layer water intake pipes in the reservoir shore slope, the distance between the reservoir water intake port and infrastructure and sewage pollution problems are solved, and safety and environmental protection are improved, and the project is reduced Investment and environmental damage.

CN118958437APending Publication Date: 2024-11-15CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411181199.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

When building reservoirs in alpine canyons, due to the limited width of the water area, the water intake is difficult to stay away from the important infrastructure that has been built, resulting in the inability to meet the requirements of the water source protection area. It is difficult to quickly close the water intake when the reservoir is contaminated to prevent sewage from entering the water transport system.

Method used

Adopt a subsurface layered water intake structure based on shore slope, including a vertical shaft and multi-layer water intake pipe located inside the reservoir shore slope. The water intake pipe extends from the vertical shaft to the reservoir shore slope, and a maintenance valve and working valve are installed, and the bottom end of the shaft is Connect the water diversion tunnel, and reduce the excavation project volume and slope support workload through drilling and explosion or mechanical excavation construction.

Benefits of technology

It improves the safety of the water intake, meets the distance requirements of the water source protection area, and can quickly close the water intake when the reservoir is polluted, prevent sewage from entering the water transportation system, reduces project investment and environmental damage, and is suitable for reservoir construction of alpine canyon reservoirs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118958437A_ABST
    Figure CN118958437A_ABST
Patent Text Reader

Abstract

The invention discloses an underground layered water taking structure based on a bank slope and a construction method. The layered water taking structure comprises a vertical shaft located in a reservoir bank slope mountain, the vertical shaft extends from the top of the mountain to the bottom of the mountain, water taking vertical pipes are vertically arranged in the vertical shaft, the water taking vertical pipes communicate with multiple layers of water taking transverse pipes from top to bottom at intervals, and the water taking end of each layer of water taking transverse pipe transversely penetrates through the reservoir bank slope to the interior of the reservoir. A maintenance valve and a working valve are sequentially arranged on the pipeline of each layer of water taking transverse pipe in the water inlet direction, and the maintenance valves and the working valves are located on a floor slab in the vertical shaft; and the bottom end of the water taking vertical pipe is communicated with a diversion tunnel flowing to a downstream water receiving area. The problem that the water intake does not meet the standard is solved, the water intake valve can be rapidly closed under the condition that a reservoir water source is polluted, and sewage is prevented from entering a water conveying system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of water conservancy and hydropower engineering, and in particular to an underground layered water intake structure based on a bank slope and a construction method. Background Art

[0002] According to Article 6.2.1.1 of the Technical Specifications for the Demarcation of Drinking Water Source Protection Areas (HJ338-2018), the water area of ​​the first-level protection area is "the protection area of ​​small lakes and medium-sized reservoirs is the area within a radius of not less than 300m from the water intake"; according to Article 6.2.2.1, the land area of ​​the first-level protection area is "small lakes and reservoirs with a single water supply function. First-level small and medium-sized reservoirs are land areas within a radius of not less than 200m outside the water area of ​​the first-level protection area, but cannot exceed the watershed range." However, with the maturity of domestic infrastructure and people's increasingly convenient lives, there are currently many important infrastructures around newly built reservoirs, such as highways, high-speed railways, oil pipelines, etc. Once an accident occurs, sewage, oil pollution, etc. may pollute the reservoir water source.

[0003] This means that the delineation of water source protection areas must take into account the important infrastructure that has been built around the reservoir, and the water intake should be set as far away from the important infrastructure as possible. However, in order to reduce flooding investment, reservoirs are generally built in high mountain valleys. Therefore, due to the limited width of the water area of ​​some reservoirs, it is difficult to keep the water intake away from the important infrastructure, resulting in the water intake setting not meeting the requirements of the water source protection area. Summary of the invention

[0004] In view of the shortcomings of the prior art, the present invention proposes an underground layered water intake structure and construction method based on a bank slope, which not only solves the distance requirement problem between the water intake and the surrounding important infrastructure, but also greatly reduces the problem of excavation and slope support project investment not meeting the specifications caused by the water intake arrangement. In addition, when the reservoir water source is polluted, the water intake valve can be quickly closed to prevent sewage from entering the water supply system.

[0005] In order to achieve the above-mentioned purpose, the present invention proposes an underground layered water intake structure based on a bank slope, which is special in that:

[0006] It includes a vertical shaft located inside the mountain body of the reservoir bank slope, and the vertical shaft extends from the top of the mountain to the bottom of the mountain. The vertical shaft is provided with vertical water intake pipes arranged up and down. The vertical water intake pipes are connected with multiple layers of horizontal water intake pipes from top to bottom. The water intake end of each layer of the horizontal water intake pipe crosses the reservoir bank slope to the inside of the reservoir. Inspection valves and working valves are sequentially arranged on the pipeline of each layer of the horizontal water intake pipe in the water inlet direction, and the inspection valves and working valves are all located on the floor slab inside the vertical shaft; the bottom end of the vertical water intake pipe is connected with a water diversion tunnel flowing to the downstream water receiving area.

[0007] Furthermore, the shaft is a cylindrical reinforced concrete structure, a control room is arranged at the top of the reinforced concrete structure, and a reinforced concrete staircase for vertical traffic is arranged on the inner wall of the reinforced concrete structure.

[0008] Furthermore, the water intake horizontal pipe crosses along the diameter of the vertical shaft to the inner wall of the vertical shaft away from the reservoir, and the water intake vertical pipe is arranged in close contact with the inner wall of the vertical shaft away from the reservoir.

[0009] Furthermore, the water intake horizontal pipe is a JPCCP pipe, or a steel pipe, or a reinforced concrete lined pipe, and the water intake vertical pipe is a JPCCP pipe, or a steel pipe, or a reinforced concrete lined pipe.

[0010] Furthermore, the water intake transverse pipe is provided with grouting holes on the pipe wall located inside the reservoir bank slope mountain.

[0011] Furthermore, a fixed dirt-blocking cover is provided at the water intake end of the water intake transverse pipe.

[0012] Furthermore, the inspection valve is a butterfly valve, and the working valve is an eccentric hemispherical valve.

[0013] Furthermore, the water diversion tunnel is a diversion tunnel during the reservoir construction period.

[0014] The present invention also proposes a construction method of a bank-slope-based underground layered water intake structure, which is particularly characterized in that it comprises the following steps:

[0015] S1) A vertical shaft is excavated from the top of the reservoir bank slope, and a water diversion tunnel entrance is excavated from the bottom of the bank slope, and excavation and support are carried out simultaneously;

[0016] S2) When the vertical shaft is excavated to the depth of the first-layer water intake horizontal pipe, the vertical shaft is used as a working shaft, a receiving well is arranged at the water intake of the first-layer water intake horizontal pipe, and the water intake horizontal pipe is pushed from the inside of the vertical shaft to the outside of the vertical shaft. After the pushing, the grouting work of the first-layer water intake horizontal pipe is carried out;

[0017] S3) When the vertical shaft is excavated to the depth of the second layer of water intake horizontal pipe, repeat step S2), ..., until the construction of the last layer of water intake horizontal pipe is completed;

[0018] S4) When the shaft is excavated to the designed elevation, the concrete lining construction is completed;

[0019] S5) Complete the installation of inspection valves and working valves on the water intake horizontal pipes on each floor, and complete the construction and installation of the water intake vertical pipes in the vertical shaft;

[0020] S6) Connect each layer of water intake horizontal pipe with the water intake vertical pipe, set the outlet end of the water intake vertical pipe inside the water diversion tunnel, and divert the reservoir water to the downstream water receiving area through the water diversion tunnel.

[0021] Furthermore, in S1), the vertical shaft is formed by drilling and blasting, mechanical excavation, or caisson.

[0022] The advantages of the present invention are:

[0023] 1. The present invention arranges a new water intake structure consisting of horizontally arranged water intake transverse pipes and vertical wells in the mountain. Compared with the traditional design, the water intake tower is moved from the reservoir to the bank slope mountain, and a layered water intake transverse pipe leading to the reservoir area is added. This method moves the water intake to the bank slope mountain of the reservoir, improves the safety of water intake, and solves the problem that the water width of the high mountain canyon reservoir is limited, there are important existing infrastructures around, and the water intake setting does not meet the requirements of the water source protection area;

[0024] 2. When the water source of the reservoir is polluted, the working valve in the shaft is far away from the pollution source, so the water intake valve can be quickly closed to prevent sewage from entering the water delivery system, and the water intake method meets the regulatory requirements;

[0025] 3. The water intake structure of the present invention can reduce the amount of mountain excavation engineering, reduce the construction risk of high slopes formed by mountain excavation and the workload of high slope support, and save engineering investment;

[0026] 4. The construction method of the present invention has significant ecological benefits. First, it reduces mountain excavation and the damage of reservoir construction to surrounding vegetation. The water intake buildings are integrated with the surrounding mountains, which is more environmentally friendly. Secondly, by setting up layered water intake horizontal pipes, surface water of the reservoir can be obtained, which can meet the water temperature requirements of irrigation, breeding, etc.

[0027] The present invention is based on a bank slope type underground layered water intake structure and construction method, which not only solves the distance requirement problem between the water intake and surrounding important infrastructure, but also greatly reduces the investment in excavation and slope support projects caused by the arrangement of the water intake. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the arrangement of the bank slope-based underground layered water intake structure in the present invention;

[0029] Figure 2 A plan view of the vertical shaft in the present invention;

[0030] Figure 3 It is a large-scale drawing of the water intake horizontal pipe in the present invention;

[0031] Figure 4 It is a cross-sectional view of the pipe laying in the water diversion tunnel of the present invention;

[0032] In the figure: water intake horizontal pipe 1, vertical shaft 2, water intake vertical pipe 3, maintenance valve 4, working valve 5, water diversion tunnel 6, control room 7, fixed pollution cover 8, grouting hole 9. DETAILED DESCRIPTION

[0033] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0034] like Figure 1 As shown, the present invention proposes an underground layered water intake structure based on a bank slope, including a vertical shaft 2 located inside the mountain of the reservoir bank slope, and the vertical shaft 2 extends from the top of the mountain to the bottom of the mountain, and the vertical shaft 2 is fixed with water intake vertical pipes 3 arranged up and down, and the water intake vertical pipes 3 are connected with multiple layers of water intake horizontal pipes 1 from top to bottom, and the water intake end of each layer of the water intake horizontal pipe 1 crosses the reservoir bank slope to the inside of the reservoir, and the water intake direction of each layer of the water intake horizontal pipe 1 is sequentially arranged on the pipeline of each layer of the water intake horizontal pipe 1, and the inspection valve 4 and the working valve 5 are both located on the floor slab inside the vertical shaft 2; the bottom end of the water intake vertical pipe 3 is connected with a water diversion tunnel 6 flowing to the downstream water receiving area.

[0035] The underground stratified water intake structure consists of a water intake shaft 2 and a stratified water intake horizontal pipe 1 leading to the reservoir, and the water intake building is located in the bank slope mountain. According to the topography, geology and construction conditions, the shaft 2 is mostly a cylindrical reinforced concrete structure, with a control room 7 at the top of the reinforced concrete structure, and a reinforced concrete staircase for vertical traffic on the inner wall of the reinforced concrete structure.

[0036] It can also be a square or other special-shaped structure, and the concrete thickness is calculated and determined based on the structure and construction needs.

[0037] Specifically, the water intake horizontal pipe 1 is a JPCCP pipe, or a steel pipe, or a reinforced concrete lined pipe, and the water intake vertical pipe 3 is a JPCCP pipe, or a steel pipe, or a reinforced concrete lined pipe. In this embodiment, the water intake vertical pipe 3 is a steel pipe.

[0038] The layout of the stratified water intake transverse pipe 1 in the vertical shaft 2 takes into account ecological, structural and maintenance requirements, and is equipped with multi-layer water intakes and multi-layer floors. The floors are provided with hanging holes, and reinforced concrete stairs are used for vertical transportation in the shaft.

[0039] Specifically, the water intake horizontal pipe 1 crosses along the diameter of the vertical shaft 2 to the inner wall of the vertical shaft 2 away from the reservoir, and the water intake vertical pipe 3 is arranged in close contact with the inner wall of the vertical shaft 2 away from the reservoir. Figure 2 shown.

[0040] The water intake horizontal pipe 1 is located inside the reservoir bank slope mountain body and is provided with a grouting hole 9 for grouting operation, so that the water intake horizontal pipe 1 is integrated with the bank slope mountain body. Figure 3 shown.

[0041] The water intake end of the water intake transverse pipe 1 is provided with a fixed dirt blocking cover 8 for intercepting debris in the water to prevent the debris from entering the water delivery pipeline.

[0042] Specifically, the inspection valve 4 is a butterfly valve, and the working valve 5 is an eccentric hemispherical valve. When the water source of the reservoir is polluted, since the working valve 5 in the shaft 2 is far away from the pollution source, the working valve 5 can be quickly closed to prevent sewage from entering the water delivery system. The water intake method meets the requirements of the specification, which not only solves the problem that the water intake does not meet the specification, but also can quickly close the water intake valve to prevent sewage from entering the water delivery system when the water source of the reservoir is polluted.

[0043] The outlet end of the water intake vertical pipe 3 in the vertical shaft 2 is connected to the water diversion tunnel 6, which can be rebuilt from the diversion tunnel during the reservoir construction period to save investment. Figure 4 shown.

[0044] The present invention arranges a new water intake structure consisting of a horizontally arranged water intake transverse pipe 1 and a vertical shaft 2 in the mountain. Compared with the traditional design, the water intake tower is moved from the reservoir to the bank slope mountain, and a layered water intake transverse pipe 1 leading to the reservoir area is added. This method moves the water intake to the bank slope mountain of the reservoir, improves the safety of water intake, and solves the problem that the water area width of the high mountain canyon reservoir is limited, there are existing important infrastructure around, and the water intake setting does not meet the requirements of the water source protection area.

[0045] The water intake structure of the present invention can reduce the amount of mountain excavation engineering, reduce the construction risk of forming high slopes by excavating mountains and the workload of high slope support, and save engineering investment and construction period.

[0046] The present invention also proposes a construction method of a bank-slope-based underground stratified water intake structure, which is applicable to the above-mentioned underground stratified water intake structure and comprises the following steps:

[0047] S1) A vertical shaft 2 is excavated from the top of the reservoir bank slope, and at the same time, an inlet of a water diversion tunnel 6 is excavated from the bottom of the bank slope, and excavation and support are carried out simultaneously.

[0048] The diversion tunnel 6 is constructed simultaneously with the shaft 2, and the purpose is to reduce the construction period. Of course, the diversion tunnel during the reservoir construction period can also be converted into the diversion tunnel 6, saving engineering investment and construction period.

[0049] Specifically, according to the topography, geology and construction conditions, the vertical shaft 2 is formed by drilling and blasting, mechanical excavation, or caisson.

[0050] S2) When the vertical shaft 2 is excavated to the depth of the first layer of water intake horizontal pipe 1, the vertical shaft 2 is used as a working shaft, and a receiving well is arranged at the water intake of the first layer of water intake horizontal pipe 1. The water intake horizontal pipe 1 is pushed forward from the inside of the vertical shaft 2 toward the outside of the vertical shaft 2. After pushing forward, the grouting work of the first layer of water intake horizontal pipe 1 is carried out.

[0051] According to the topography, geology and construction conditions, the horizontal water intake lateral pipe 1 can also be excavated by drilling and blasting or other methods.

[0052] The water intake horizontal pipe 1 in this embodiment adopts a JPCCP pipe, and grouting work is performed after the construction of the JPCCP pipe is completed.

[0053] S3) When the vertical shaft 2 is excavated to the depth of the second layer of water intake horizontal pipes 1, step S2) is repeated, ..., until the construction of the last layer of water intake horizontal pipes 1 is completed.

[0054] S4) When the shaft 2 is excavated to the designed elevation, the concrete lining construction is completed.

[0055] S5) Complete the installation of the inspection valve 4 and the working valve 5 on the water intake horizontal pipe 1 on each floor, and complete the construction and installation of the water intake vertical pipe 3 in the vertical shaft 2.

[0056] S6) Connect each layer of water intake horizontal pipe 1 with water intake vertical pipe 3, set the outlet end of water intake vertical pipe 3 inside the water diversion tunnel 6, and lead the reservoir water to the downstream water receiving area through the water diversion tunnel 6.

[0057] The construction method of the present invention has significant ecological benefits. First, it reduces mountain excavation and the damage to surrounding vegetation caused by reservoir construction. The water intake buildings are integrated with the surrounding mountains, which is more environmentally friendly. Secondly, by setting up layered water intake transverse pipes, surface water of the reservoir can be obtained to meet the water temperature requirements of irrigation, aquaculture, etc.

[0058] The bank slope-based underground layered water intake structure and construction method of the present invention not only solves the distance requirement problem between the water intake and surrounding important infrastructure, but also greatly reduces the investment in excavation and slope support projects caused by the arrangement of the water intake.

[0059] The above embodiments are preferred implementation modes of the present invention, but the implementation modes of the present invention are not limited to the above embodiments. Any other changes, modifications, substitutions, combinations, and simplifications that do not deviate from the spirit and principles of the present invention should be equivalent replacement methods and are included in the protection scope of the present invention.

Claims

1. An underground layered water intake structure based on a bank slope, characterized by: The invention comprises a vertical shaft (2) located inside a mountain on a bank slope of a reservoir, and the vertical shaft (2) extends from the top of the mountain to the bottom of the mountain. A water intake vertical pipe (3) arranged vertically and horizontally is fixed in the vertical shaft (2). The water intake vertical pipe (3) is connected to multiple layers of water intake horizontal pipes (1) at intervals from top to bottom. The water intake end of each layer of the water intake horizontal pipe (1) crosses the bank slope of the reservoir to the inside of the reservoir. A maintenance valve (4) and a working valve (5) are sequentially arranged on the pipeline of each layer of the water intake horizontal pipe (1) along the water inlet direction, and the maintenance valve (4) and the working valve (5) are both located on the floor slab inside the vertical shaft (2); the bottom end of the water intake vertical pipe (3) is connected to a water diversion tunnel (6) flowing to a downstream water receiving area.

2. The bank slope-based underground stratified water intake structure according to claim 1 is characterized in that: The vertical shaft (2) is a cylindrical reinforced concrete structure, a control room (7) is arranged at the top of the reinforced concrete structure, and a reinforced concrete staircase for vertical traffic is arranged on the inner wall of the reinforced concrete structure.

3. The bank slope-based underground stratified water intake structure according to claim 2 is characterized in that: The water intake horizontal pipe (1) crosses along the diameter of the vertical shaft (2) to the inner wall of the vertical shaft (2) away from the reservoir, and the water intake vertical pipe (3) is arranged in close contact with the inner wall of the vertical shaft (2) away from the reservoir.

4. The bank slope-based underground stratified water intake structure according to claim 3 is characterized in that: The water intake horizontal pipe (1) is a JPCCP pipe, or a steel pipe, or a reinforced concrete lined pipe, and the water intake vertical pipe (3) is a JPCCP pipe, or a steel pipe, or a reinforced concrete lined pipe.

5. The bank slope-based underground stratified water intake structure according to claim 4 is characterized in that: The water intake transverse pipe (1) is provided with grouting holes (9) on the pipe wall located inside the reservoir bank slope mountain.

6. The bank slope-based underground stratified water intake structure according to claim 5 is characterized in that: A fixed dirt-blocking cover (8) is provided at the water intake end of the water intake transverse pipe (1).

7. The bank slope-based underground stratified water intake structure according to claim 1 is characterized in that: The inspection valve (4) is a butterfly valve, and the working valve (5) is an eccentric hemispherical valve.

8. The bank slope-based underground stratified water intake structure according to claim 1 is characterized by: The water diversion tunnel (6) is a diversion tunnel during the reservoir construction period.

9. A construction method for a bank-slope-based underground stratified water intake structure, applicable to the bank-slope-based underground stratified water intake structure according to any one of claims 1 to 8, characterized in that: The steps include: S1) excavating a vertical shaft (2) from the top of the reservoir bank slope, and at the same time excavating the inlet of the water diversion tunnel (6) from the bottom of the bank slope, and the excavation and support are carried out simultaneously; S2) when the vertical shaft (2) is excavated to the depth of the first-layer water intake horizontal pipe (1), the vertical shaft (2) is used as a working shaft, a receiving well is arranged at the water intake of the first-layer water intake horizontal pipe (1), and the water intake horizontal pipe (1) is pushed forward from the inside of the vertical shaft (2) toward the outside of the vertical shaft (2), and after the pushing forward, grouting work of the first-layer water intake horizontal pipe (1) is carried out; S3) when the vertical shaft (2) is excavated to the depth of the second layer of water intake horizontal pipe (1), repeat step S2), ..., until the construction of the last layer of water intake horizontal pipe (1) is completed; S4) when the shaft (2) is excavated to the designed elevation, the concrete lining construction is completed; S5) Complete the installation of the inspection valve (4) and the working valve (5) on the water intake horizontal pipe (1) on each floor, and complete the construction and installation of the water intake vertical pipe (3) in the vertical shaft (2); S6) connecting each layer of water intake horizontal pipe (1) with the water intake vertical pipe (3), arranging the outlet end of the water intake vertical pipe (3) inside the water diversion tunnel (6), and diverting the reservoir water to the downstream water receiving area through the water diversion tunnel (6).

10. The construction method of the bank slope-based underground stratified water intake structure according to claim 9, characterized in that: In S1), the vertical shaft (2) is formed by drilling and blasting, mechanical excavation, or caisson.