By laying the rotary compressive base plate and installing the hoisting system in a deep, long and narrow space, the jack and oil cylinder are used to realize the translation and rotation of the shield machine, the problem of the difficult construction of the shield machine in a narrow space is solved, and the construction is improved Efficiency and safety reduce construction costs.

CN118959004APending Publication Date: 2024-11-15CHINA RAILWAY GUANGZHOU ENG GRP CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411157211.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In the deep and narrow space, there is a problem that the shield machine is difficult to construct during the assembly and translation of the rotary body, cannot directly reach the starting position, and the narrow and long working space cannot be used to lift mechanical auxiliary rotary body.

Method used

By laying the rotary compressive base plate at the rotary body, hoisting the starting bracket, installing the hoisting system and adjustment support, the translation and rotation of the shield machine are achieved by combining the translation jack and the hoisting jack, and adjusting the support in real time Position for stability and safety.

Benefits of technology

It reduces the construction difficulty of the shield machine to reach the starting position, improves construction efficiency, saves construction period of about 18 days, reduces construction costs, and improves the safety and stability of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118959004A_ABST
    Figure CN118959004A_ABST
Patent Text Reader

Abstract

The invention discloses a TBM translation swivel method in a deep, long and narrow space. The TBM translation swivel method comprises the steps that construction preparation is conducted, a swivel compression-resistant bottom plate is laid at a shield tunneling machine swivel, a starting bracket is hoisted, shield tunneling machine components are sequentially hoisted from an air pavilion to a well, and shield tunneling machine assembling is completed on the starting bracket; a shield tunneling machine jacking system is installed, and translation jacking is achieved through cooperation of a translation jack and a jacking jack till the position of a shield tunneling machine rotating body; a plurality of steel plate supports are mounted on a pressure-resistant bottom plate, a plurality of adjusting supports are arranged on the starting bracket, a position adjusting device is mounted between each steel plate and the corresponding adjusting support, and the positions of the steel plate supports are continuously adjusted, so that the starting bracket is rotated. According to the method, targeted checking calculation is conducted on jacking, translation and rotation mechanisms, it can be ensured that in the translation and rotation process, the position of an adjusting support is adjusted in real time according to the state of the shield tunneling machine so as to change the jacking force applying point position, and stability and safety in the translation and rotation process are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of tunnel construction, and in particular relates to a TBM translation and rotation method in a deep, long and narrow space. Background Art

[0002] Tunnel Boring Machine (TBM), also known as shield machine, is a professional equipment used to dig tunnels with a high degree of automation and intelligence.

[0003] The structure of the shield machine is complex. In the existing technology, the shield machine is composed of many different functional components, which need to be lowered into the well in sequence and assembled in the well, which is an important process in subway shield construction. However, when the components of the shield machine are lowered into the well, they may not be able to directly reach the starting position of the shield machine.

[0004] For example, the inventor is working on the Chonglong section of Chongqing Rail Transit Line 15, which mainly passes through medium-weathered sandy mudstone and sandstone strata with a cover depth of 2.4m-109.7m. However, the Chonglong section of Chongqing Rail Transit Line 15 has a long and narrow construction operation space for the shield machine to be assembled in the shaft, and the shield machine cannot directly reach the shield starting position after it is lowered into the shaft. After the shield machine is lowered from the vertical shaft, it needs to be translated about 120m in the horizontal passage of the 5# wind pavilion of the station, and then perform the first 43° rotation and translation at the turning position of the horizontal passage to make the shield machine reach the starting tunnel section, and then perform a second 90° in-situ rotation at the sinking section at the large mileage end of the station, so that the shield machine can reach the mining method excavation section and translate to the shield starting area. In addition, due to the long and narrow working space, it is impossible to use hoisting machinery to assist in the rotation, and the construction of the shield machine's underground translation and rotation is difficult. Summary of the invention

[0005] The purpose of the present invention is to provide a method for TBM translation and rotation in a deep, long and narrow space. By performing targeted calculations on each jacking, translation and rotation mechanism, it is possible to ensure that during the translation and rotation process, the support position is adjusted in real time according to the state of the shield machine to change the thrust application point, thereby ensuring the stability and safety of the translation and rotation process.

[0006] In order to achieve the above object, the technical solution adopted by the present invention is specifically as follows: A method for translation and rotation of a TBM in a deep, long and narrow space, comprising the following steps: A. Carry out construction preparation, lay the rotating body compression bottom plate at the rotating body of the shield machine, hoist the starting bracket, and then hoist the shield machine components from the wind pavilion into the well in sequence and complete the assembly of the shield machine on the starting bracket; B. Install the shield machine jacking system, which includes a plurality of load-bearing brackets installed at the middle shield position and the front shield position of the shield machine, and jacking jacks installed on the load-bearing brackets; and a translation jack is arranged between the starting bracket and the shield machine; C. The translation jack and the lifting jack are used to realize translation and jacking until the shield machine rotates; D. Install multiple steel plate supports on the compression bottom plate, and set multiple corresponding adjustment supports on the starting bracket, and install a position adjustment device between each steel plate production and adjustment support, and realize the rotation of the starting bracket by continuously adjusting the position of the steel plate supports.

[0007] Furthermore, in step A, the compression-resistant bottom plate is an integral bottom plate formed by welding multiple steel plates, and is laid at the turning position of the ventilation shaft transverse passage and the station rotation area.

[0008] Furthermore, in step B, a first reaction support is fixed on both sides of the starting bracket, a second reaction support is fixed on both sides of the front shield of the shield machine, and the translation jack is connected between the first reaction support and the second reaction support.

[0009] Furthermore, the load-bearing brackets and the lifting jacks are respectively arranged on both sides of the shield machine.

[0010] Furthermore, in step C, when performing translational jacking, first, retract the jacking jack to lift it, and use the translation jack to push the shield machine body to move on the starting bracket; secondly, translate the starting bracket, drop the jacking jack and lift the shield machine, and then retract the translation jack to drive the starting bracket to translate forward, and repeat this process until it translates to the specified position.

[0011] Furthermore, in step D, multiple steel plate supports are fixed at different corners of the compression-resistant base plate by welding. During the rotation operation, the welding positions of the steel plate supports are continuously adjusted to adjust the position of the starting bracket so as to maintain the force direction of the adjustment device after the starting bracket position is turned.

[0012] Furthermore, in the step D, the adjustment device is a rotating jacking cylinder, and multiple jacking cylinders work to form a rotating force couple, so that the starting bracket rotates according to a predetermined rotation trajectory, thereby realizing the rotation of the shield machine.

[0013] Furthermore, in step D, during the rotation operation, a total station is used to accurately measure the central axis of the key parts of the shield machine to obtain its three-dimensional coordinates; by performing multiple measurements and comparisons of the obtained three-dimensional coordinates with the channel axis, it is accurately determined whether the moving direction and distance of the shield machine deviate from the predetermined trajectory.

[0014] Furthermore, in the step D, the position and posture of the shield machine are adjusted and corrected based on the measurement comparison results.

[0015] Furthermore, in the step D, after the shield machine rotates twice, the shield machine posture is checked and corresponding adjustments are made, and then the shield machine is translated to the starting hole through the cooperation of the translation jack and the lifting jack.

[0016] Compared with the prior art, the advantages of the present invention are: the present invention reduces the construction difficulty of installing the shield machine to the starting position in a deep, long and narrow underground environment, enables the shield machine to smoothly reach the shield starting position, improves the construction efficiency of the shield machine in translating and rotating to reach the starting position in a deep, long and narrow space, saves the overall construction period of about 18 days, and thus reduces the investment in construction costs.

[0017] Secondly, during the translation process, the present invention conducts targeted verification calculations on each jacking, translation, and rotation mechanism, and each structural form and force magnitude meet the construction requirements, and the shield machine translation and rotation system has extremely high safety performance. At the same time, during the translation and rotation process, the position of the reaction force support is adjusted in real time according to the shield machine state to change the thrust application point, ensuring the stability and safety of the translation and rotation process. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0019] Figure 1 It is a schematic diagram of the process structure of the TBM translation and rotation method in a deep, long and narrow space provided by the present invention.

[0020] Figure 2 It is a schematic diagram of the construction preparation state of the TBM translation and rotation method in a deep, long and narrow space provided by the present invention.

[0021] Figure 3 The present invention provides a method for the translation and rotation of a TBM in a long and narrow space. Figure 1 .

[0022] Figure 4 The present invention provides a method for the translation and rotation of a TBM in a long and narrow space. Figure 2 .

[0023] Figure 5 The present invention provides a method for the translation and rotation of a TBM in a long and narrow space. Figure 3 .

[0024] Figure 6 It is a structural schematic diagram of the rotation state of the TBM translation and rotation method in a deep, long and narrow space provided by the present invention.

[0025] Reference numerals: 1. Shield machine; 2. Compression-resistant bottom plate; 3. Wind pavilion; 4. Starting bracket; 5. Steel plate support; 6. Rotating jacking cylinder; 7. Lifting jack; 8. Second reaction support; 9. Load-bearing corbel. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0027] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0028] In the description of the present invention, it should be noted that if the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside" and the like appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the accompanying drawings, or is the orientation or position relationship in which the product of the invention is usually placed when used. It is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0029] In addition, the terms “first”, “second”, “third”, etc., if used, are merely used to distinguish between the descriptions and should not be understood as indicating or implying relative importance.

[0030] In addition, the terms "horizontal", "vertical", "overhanging", etc. do not mean that the components are required to be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0031] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", "connection", etc. should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0032] It should be noted that, in the absence of conflict, the features in the embodiments of the present invention may be combined with each other.

[0033] like Figure 1-Figure 6 As shown, a method for translating and rotating a TBM in a deep, long and narrow space includes the following steps: A. Carry out construction preparation, lay the rotating body compression bottom plate 2 at the rotating body of the shield machine 1, hoist the starting bracket 4, and then hoist the shield machine 1 components from the wind pavilion 3 to the well and complete the assembly of the shield machine 1 on the starting bracket 4; Specifically, during construction preparation, the cylinders, supports and other materials and equipment used for the translation and rotation of the shield machine 1 need to be arranged for processing in advance, and the pressure gauges used in the pump station need to be calibrated as required and can only be put into use after meeting the requirements; during construction, according to the plan and actual conditions, personnel, equipment and materials are organized to enter the site in advance to ensure that the on-site construction needs are met; the site in the translation area is leveled, low-lying areas are backfilled and leveled with concrete, and high areas are broken down to ensure that the translation area is at the same elevation to meet the shield translation needs.

[0034] Before the shield equipment is hoisted down the shaft, a compression-resistant bottom plate 2 needs to be laid at the interface between the wind pavilion 3 transverse passage and the station and in the station access passage to the mine. Specifically, the compression-resistant bottom plate 2 is an integral bottom plate welded from multiple steel plates, which serves as the operating platform for the shield main unit to rotate. Before laying the steel plate, the low-lying areas in the channel need to be backfilled and leveled, and the flatness of the channel bottom plate is controlled at 1mm / m. After the channel bottom plate is leveled, a 6m×2.2m×30mm thick steel plate is fully laid in the channel with a length of about 41m and a width of about 16m as a rotating operating platform. The steel plates are fully welded and fixed, and the welding quality is inspected on site. Ensure that the steel plate platform forms a whole to ensure that the steel plate is laid flat and to ensure that the overall force is applied during rotation.

[0035] Then the shield machine 1 is hoisted down the shaft. A 500t crawler crane and a 200t truck crane are used to hoist the various components of the shield machine 1 to the bottom of the shaft at the shaft mouth. Then the shield machine 1 is assembled on site at a position about 5m away from the left side wall at the bottom of the shaft.

[0036] B. Installing the jacking system of the shield machine 1, the jacking system includes a plurality of stressed bull legs 9 respectively installed at the middle shield position and the front shield position of the shield machine 1, and a jacking jack 7 installed on the stressed bull legs 9; and a translation jack is arranged between the starting bracket 4 and the shield machine 1; After the shield machine 1 is assembled, two brackets are welded on both sides of the middle and front shield positions of the shield machine 1 using 30mm thick steel plates as reaction supports for the lifting jack 7. The center distance between the two supports is about 5m. After welding, the welding slag is knocked off and flaw detection is performed. Then, 4 groups of 350t jacks are installed under the brackets on both sides, and 2 angle steels with a size of 50mm×50mm×5mm and a length of 50cm are welded under the lifting brackets. The support of the lifting jack 7 is embedded in the middle of the two angle steels. To prevent the jack from slipping, 2 connecting steel bars with a diameter of φ20 are welded on both sides of the jack base as limit devices.

[0037] In addition, a first reaction support is fixed on both sides of the starting bracket 4, and a second reaction support 8 is fixed on both sides of the front shield of the shield machine 1, and the translation jack is connected between the first reaction support and the second reaction support 8. Specifically, the first reaction support and the second reaction support 8 are made by double-sided welding of 40mm steel plates at the corresponding positions of the bracket and the shield machine 1 with E55 welding rods, as translation reaction supports, and flaw detection is performed on the welding parts to ensure the welding quality of the translation reaction supports. Then, 40mm thick steel plates are used to weld and connect the semicircular steel plates at both ends of the translation jack, and connected to the reaction support through a bayonet pin. The translation of the shield machine 1 and the bracket is realized by using the translation jack as the power output and the reaction support as the basis for applying the thrust of the translation jack.

[0038] C. The translation jack and the lifting jack 7 cooperate to realize translation and jacking until the shield machine 1 rotates; In the step C, before performing translational jacking, it is necessary to test the performance of the jacking system. After the cylinder is installed and fixed, start connecting the hydraulic pump station system pipeline, and perform performance testing and debugging. The cylinder is connected to the same pump station. The main debugging contents are: calibration of the power distribution system, hydraulic system, lubrication system, control system and instrumentation to ensure that the equipment working system reaches a working state that meets the normal jacking requirements. Cylinder requirements: stroke ≤2000mm, oil inlet ≤8H, oil return port ≤12H, pressure ≤50MPa; extension speed (under working state) 300mm / min, recovery speed (under no-load state) 2000mm / min. Only when the overall jacking system is debugged and qualified can the shield machine 1 cycle jacking construction be carried out.

[0039] When performing translational jacking, first, retract the lifting jack 7 to lift it, and use the translation jack to push the shield machine 1 body to move on the starting bracket 4. During this process, the translation jack cylinder is extended through the hydraulic pump station, so that the shield machine 1 moves forward along the bracket guide rail on the bracket. When the jack cylinder stroke reaches 80% of the maximum stroke, it stops, and the translation travel stroke is 1.2m each time. Secondly, the starting bracket 4 is translated, and the lifting jack 7 is used to drop and lift the shield machine 1. During this process, the hydraulic pump station is used to provide power to extend all four lifting jacks 7, so that the starting bracket 4 is separated from the concrete surface by about 5cm in height to eliminate the friction during the translation of the bracket and prepare for the translation of the lower bracket. After the shield machine 1 is lifted, it is in a stationary state. The hydraulic pump station is used to retract the translation jack cylinder, and then the jack is used to translate the bracket forward. After the cylinder is completely retracted, the next cycle operation is carried out, and the operation is repeated repeatedly until it is translated to the specified position.

[0040] D. Install multiple steel plate supports 5 on the compression bottom plate 2, and set multiple corresponding adjustment supports on the starting bracket 4, and install a position adjustment device between each steel plate production and adjustment support, and realize the rotation of the starting bracket 4 by continuously adjusting the position of the steel plate supports 5.

[0041] Multiple steel plate supports 5 are fixed at different corners of the compression bottom plate 2 by welding. During the rotation operation, the welding position of the steel plate supports 5 is continuously adjusted to adjust the position of the starting bracket 4 so as to maintain the force direction of the adjustment device after the position is turned.

[0042] The adjusting device is a swivel jacking cylinder 6. Multiple jacking cylinders work to form a rotating force couple, so that the starting bracket 4 rotates according to a predetermined rotation trajectory, thereby realizing the rotation of the shield machine 1.

[0043] During the rotation operation, a total station is used to accurately measure the central axis of the key parts of the shield machine 1 to obtain its three-dimensional coordinates; by performing multiple measurements and comparisons between the obtained three-dimensional coordinates and the channel axis, it is accurately determined whether the moving direction and distance of the shield machine 1 deviate from the predetermined trajectory.

[0044] At the same time, according to the measurement comparison results, the position and posture of the shield machine 1 are adjusted and corrected.

[0045] After the shield machine 1 rotates twice, the posture of the shield machine 1 is checked and corresponding adjustments are made. Then, the shield machine 1 is translated to the starting hole through the cooperation of the translation jack and the lifting jack 7.

[0046] In the actual rotation process, when the shield machine 1 is completely pushed forward and translated to the interface between the transverse passage and the station, due to the existence of a small radius curve of 19m long and 7.5m in radius between the passage and the station, the shield machine 1 is at a 43° angle to the dark excavation section. The shield machine 1 needs to be rotated and translated to enter the station, where the shield machine 1 is rotated for the first time. When the shield machine 1 rotates and pushes forward to the station, the shield machine 1 is at an angle of about 90° to the dark excavation section. At this time, the shield machine 1 needs to be rotated a second time and translated a short distance to keep the center line of the shield machine 1 coincident with the center line of the mining tunnel.

[0047] The reaction force of the shield machine 1 rotation is provided by welding a 30mm thick steel plate with a size of 400mm×400mm on the laid pressure-resistant bottom plate 2 as the shield machine 1 rotation steel plate support 5. The steel plate support 5 is double-sided welded with E55 high-performance welding rods. After welding, the welding slag is knocked off, the welding quality is checked and the welding is repaired, and then each steel plate support 5 is subjected to non-destructive testing.

[0048] After passing the inspection, install a 300t, 1500mm stroke oil cylinder to push the bracket, so that the starting base and the shield machine 1 rotate to the predetermined direction. Weld the steel support at the corner of the starting base's rotation center, apply butter on the bottom steel plate, and use a jack to push near the optimal pushing position of the starting base to form a rotating couple, so that the base rotates according to the predetermined rotation trajectory with the fixed rotation axis as the rotation center, and realize the rotation of the shield machine 1.

[0049] During the rotation of the shield machine 1, the total station is used to accurately measure the central axis of the key parts of the shield machine 1 (such as the cutter head, front shield, middle shield, etc.) to obtain its three-dimensional coordinates. By performing multiple measurements and comparisons with the channel axis, it is accurately determined whether the moving direction and distance of the shield machine 1 deviates from the predetermined trajectory. At the same time, according to the measurement and comparison results, the position and posture of the shield machine 1 are adjusted and corrected.

[0050] Since the rotating support point changes at any time, the welding of the reaction steel plate support 5 should be adjusted continuously according to the actual situation on site. After the first shield machine 1 rotates, the reaction steel plate support 5 is cut and the welding point is ground and smoothed with a grinder to provide position conditions for the second shield machine to rotate. When the second shield machine rotates at the corresponding position, it should avoid the original welded parts to avoid repeated welding at the same position to reduce the welding quality.

[0051] As described above, the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. A method for TBM translation and rotation in a deep, long and narrow space. It is characterized in that The following steps are involved: A. Carry out construction preparation, lay the rotating body compression bottom plate at the rotating body of the shield machine, hoist the starting bracket, and then hoist the shield machine components from the wind pavilion into the well in sequence and complete the assembly of the shield machine on the starting bracket; B. Install the shield machine jacking system, which includes a plurality of load-bearing brackets installed at the middle shield position and the front shield position of the shield machine, and jacking jacks installed on the load-bearing brackets; and a translation jack is arranged between the starting bracket and the shield machine; C. The translation jack and the lifting jack are used to realize translation and jacking until the shield machine rotates; D. Install multiple steel plate supports on the compression bottom plate, and set multiple corresponding adjustment supports on the starting bracket, and install a position adjustment device between each steel plate production and adjustment support, and realize the rotation of the starting bracket by continuously adjusting the position of the steel plate supports.

2. The method for TBM translation and rotation in a deep, long and narrow space according to claim 1, It is characterized in that In step A, the compression-resistant bottom plate is an integral bottom plate formed by welding multiple steel plates, and is laid at the turning position of the air shaft transverse passage and the station rotation area.

3. The method for TBM translation and rotation in a deep, long and narrow space according to claim 1, It is characterized in that In the step B, a first reaction support is fixed on both sides of the starting bracket, a second reaction support is fixed on both sides of the front shield of the shield machine, and the translation jack is connected between the first reaction support and the second reaction support.

4. The method for TBM translation and rotation in a deep, long and narrow space according to claim 1, It is characterized in that The load-bearing brackets and lifting jacks are respectively arranged on both sides of the shield machine.

5. The method for TBM translation and rotation in a deep, long and narrow space according to claim 1, It is characterized in that In step C, when performing translational jacking, first, retract the jacking jack to lift it, and use the translation jack to push the shield machine body to move on the starting bracket; secondly, translate the starting bracket, drop the jacking jack and lift the shield machine, and then retract the translation jack to drive the starting bracket to translate forward, and repeat this process until it translates to the specified position.

6. The method for TBM translation and rotation in a deep, long and narrow space according to claim 1, It is characterized in that In step D, multiple steel plate supports are fixed at different corners of the compression bottom plate by welding. During the rotation operation, the welding positions of the steel plate supports are continuously adjusted to adjust the position of the starting bracket so as to maintain the force direction of the adjustment device after the position is turned.

7. The method for TBM translation and rotation in a deep, long and narrow space according to claim 1, It is characterized in that In the step D, the adjusting device is a rotating jacking cylinder, and multiple jacking cylinders work to form a rotating force couple, so that the starting bracket rotates according to a predetermined rotation trajectory to realize the rotation of the shield machine.

8. The method for TBM translation and rotation in a deep, long and narrow space according to claim 6, It is characterized in that In step D, during the rotation operation, a total station is used to accurately measure the central axis of the key parts of the shield machine to obtain its three-dimensional coordinates; by performing multiple measurements and comparisons of the obtained three-dimensional coordinates with the channel axis, it is accurately determined whether the moving direction and distance of the shield machine deviate from the predetermined trajectory.

9. The method for TBM translation and rotation in a deep, long and narrow space according to claim 8, It is characterized in that In the step D, the position and posture of the shield machine are adjusted and corrected according to the measurement comparison results.

10. The method for TBM translation and rotation in a deep, long and narrow space according to claim 1, It is characterized in that In the step D, after the shield machine has rotated twice, the shield machine posture is checked and corresponding adjustments are made, and then the shield machine is translated to the starting hole through the cooperation of the translation jack and the lifting jack.