Method for monitoring subsection sinkage of long shaft system
By measuring reflectors inside and outside the long shaft system segments of the ship, combined with the total station and public measurement points, the precise monitoring of the sinking volume is achieved, solving the problem of insufficient measurement accuracy of the sinking volume in ship construction. , provides reliable anti-deformation data and improves the accuracy of the construction process.
Patent Information
- Application Number
- CN202410885271.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-03
- Publication Date
- 2024-11-15
AI Technical Summary
During the construction of ships, the sinking amount of long shaft system segments is difficult to accurately measure due to their own weight, weight loading and welding deformation. The existing finite element analysis methods have poor accuracy and heavy workload, making it difficult to accurately find neutralization and retract reverse Deformation.
By posting reflectors inside and outside the long axis segment, using a total station to perform height measurement, combining the settings of public measurement points and temporary common measurement points, joint internal and external monitoring is realized, and the sinking of long axis segments is accurately calculated. quantity.
The accuracy of sinking data is improved, and a reliable basis for reverse deformation is provided, which solves the problem of insufficient data accuracy in the prior art, and avoids subsequent repeated measurements.
Smart Images

Figure CN118960638A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of shipbuilding, and in particular to a method for monitoring the sinking amount of a long shaft system segment and a long shaft system segment. Background Art
[0002] During the construction of ships with long axis sections, the long axis sections need to be centered. Due to factors such as the long axis section's own weight, the weight loading of the upper sections of the long axis section, and welding deformation, the long axis section often sinks. The closer to the stern, the greater the sinking. Therefore, in order to ensure accurate centering of the long axis sections, anti-deformation needs to be added when the long axis sections are installed to offset the subsequent sinking. The deviation between the sinking amount and the added anti-deformation is required to be within ±4mm. Therefore, the precise addition of anti-deformation is a difficult problem that needs to be overcome at present.
[0003] At present, the commonly used method is to use the design software finite element analysis to simulate the sinking of the long axis segment. The sinking data obtained by this method is purely theoretical data. The weight of scaffolding, tools and other equipment outside the hull structure cannot be accurately increased, and the weight of the uninstalled electrical system, piping system, and outfitting parts cannot be accurately deducted. The influence of welding deformation cannot be accurately simulated. The data obtained by this method has poor accuracy and the workload of finite element analysis is also heavy. Summary of the invention
[0004] In order to solve the above technical problems, the present invention provides a method for monitoring the sinking of long axis segments, which accurately obtains the real data of the sinking of the long axis segments by performing internal and external joint monitoring of the sinking of the long axis segments, providing a reliable basis for anti-deformation release.
[0005] The technical objectives of the present invention are achieved through the following technical solutions:
[0006] A method for monitoring the sinking amount of a long shaft system segment, wherein the long shaft system segment includes a main engine pit segment, a cabin segment, and a stern shaft segment, and the method comprises:
[0007] Step 1: After the mainframe pit segment is installed, several reflective sheets are posted inside and outside the mainframe pit segment as measurement data collection points;
[0008] Step 2: Set a height reference point on the dock wall on the side of the main engine pit section, and post a reflective sheet at the height reference point; set up a total station inside and outside the main engine pit section respectively, and measure and record the height of the reflective sheets inside and outside the main engine pit section with the same height reference point as the measurement reference;
[0009] Step 3: Carry the cabin section and the stern shaft section in sequence, and reflective sheets are posted inside and outside the stern shaft section as measurement data collection points; each time a section is carried, the height data of the stored measurement data collection point is collected and recorded;
[0010] Step 4: Calculate the actual sinking amount of the long axis segment based on the collected and recorded data.
[0011] Furthermore, the cabin segment is mounted on top of the main engine pit segment to seal the top of the main engine pit segment; after the cabin segment is mounted, a transfer station target is set at the stern of the cabin segment, and a reflective sheet is posted on the transfer station target as a temporary public measurement point.
[0012] Furthermore, after the cabin section is loaded, the height data of the reflective sheet outside the main engine pit section and the reflective sheet on the transfer target are measured by a total station outside the main engine pit section, and then the transfer target is rotated, and the height data of the reflective sheet inside the main engine pit and the reflective sheet on the transfer target are measured by the total station inside the main engine pit; the data measured by the total station inside the main engine pit section is converted into a height reference consistent with the height data of the reflective sheet outside the main engine pit section through the height data measured by the reflective sheet on the transfer target; and the transfer target is removed.
[0013] Furthermore, before the stern shaft segment is mounted, reflective sheets are respectively posted on the outside and inside of the stern shaft segment as measurement data collection points, and a common measurement point is set at the hub of the stern of the stern shaft segment.
[0014] Furthermore, after the stern shaft segment is mounted, the height data of the external data collection points of the main engine pit segment, the external data collection points of the stern shaft segment and the common measurement points are measured by a total station outside the long axis segment; the height data of the internal data collection points of the main engine pit segment, the internal data collection points of the stern shaft segment and the common measurement points are measured by a total station inside the long axis segment; the height data obtained by measuring the internal data collection points of the main engine pit segment and the internal data collection points of the stern shaft segment are converted into a height reference consistent with the measurement data of the external data collection points of the main engine pit segment and the external data collection points of the stern shaft segment through the height data of the common measurement points.
[0015] Furthermore, the common measuring point includes a cross bull's eye structure arranged in parallel, a transparent cylinder is arranged between the parallel cross bull's eye structures, both ends of the transparent cylinder are supported in the hub by the cross bull's eye structure respectively, and reflective sheets are posted on both ends of the transparent cylinder respectively, the reflective sheet at one end of the transparent cylinder is close to the inside of the long axis segment, and the reflective sheet at the other end of the transparent cylinder is close to the outside of the long axis segment.
[0016] Furthermore, the cross bull's eye structure includes a circular ring, a bull's eye clamping structure, and a bull's eye supporting structure. At least three bull's eye clamping structures are evenly installed in one circle of the circular ring. The bull's eye clamping structure is arranged along the radial direction of the circular ring and passes through the circular ring. The bull's eye clamping structure and the circular ring are threadedly connected; the bull's eye supporting structure is evenly distributed along the outer circle of the circular ring, and the bull's eye supporting structure and the bull's eye clamping structure are alternately distributed along the circumferential direction of the circular ring.
[0017] Furthermore, the bull's eye support structure includes a mounting seat, a screw, an internally threaded sleeve, and a protective sleeve. The mounting seat is fixed to the outside of the circular ring and is provided with an internally threaded blind hole. One end of the screw is fitted and installed in the mounting seat, and the other end of the screw is threadably connected to the internally threaded sleeve. An adjustment space is provided inside the internally threaded sleeve for adjusting the end of the screw to move forward and backward in the internally threaded sleeve; the protective sleeve is mounted on the end of the internally threaded sleeve away from the screw.
[0018] Furthermore, a monitoring platform is provided in the main engine pit of the main engine pit section, the monitoring platform is located on the center line of the hull of the long axis section, and a total station is set up on the monitoring platform to measure internal data.
[0019] Furthermore, when setting the common measurement point, the center of the reflective sheets at both ends of the transparent cylinder is adjusted to be collinear with the axis of the transparent cylinder, then the axis of the cylinder is adjusted to be collinear with the center of the ring, and then the center of the reflective sheet is adjusted to be collinear with the axis of the hub.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] 1. The present invention replaces finite element analysis data with measured data, thereby improving the accuracy of the sinking data; the data accuracy of the sinking amount during the segmented construction of the long shaft system is improved by means of internal and external combined measurement, providing reliable data support for the subsequent installation of the stern shaft system.
[0022] 2. The present invention solves the problem that the internal total station cannot observe the external height reference point after the cabin section and the stern shaft section are installed by setting up public measurement points and temporary public measurement points. The height reference points of internal and external measurements are kept unified through the conversion of height position data of public measurement points and temporary public measurement points, which provides a guarantee for the accuracy of the data.
[0023] 3. By monitoring the sinking amount after each section is loaded, it can provide a basis for adding and anti-deformation at each stage of loading of the long stern shaft sections of other ships of the same type, and provide a basis for the construction of the subsequent long stern shaft sections of the same type, thus avoiding the problem of repeated measurements in the subsequent construction of ships of the same type. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of posting the segmented external side reflective sheet of the long axis system in the present invention.
[0025] Figure 2 It is a top view schematic diagram of the posting of the segmented internal reflective sheet of the long axis system in the present invention.
[0026] Figure 3 This is a schematic diagram of the segmented mounting of the stern shaft in the present invention.
[0027] Figure 4 It is a schematic diagram of setting common measurement points in the present invention.
[0028] In the figure, 1. total station; 2. reflector; 3. height reference point; 4. main engine pit segment; 5. cabin segment; 6. stern shaft segment; 7. transfer station target; 8. public measuring point; 9. main engine pit; 10. monitoring platform; 11. ring; 12. bull's eye clamping structure; 13. bull's eye supporting structure; 14. hub; 15. transparent cylinder; 131. mounting seat; 132. screw; 133. internal threaded sleeve; 134. protective cover. DETAILED DESCRIPTION
[0029] The technical solution of the present invention is further described below in conjunction with specific embodiments:
[0030] A method for monitoring the subsidence of a long shaft system in sections, such as Figure 1 and Figure 2 As shown, the long shaft system segment includes a main engine pit segment 4, a cabin segment 5, and a stern shaft segment 6. The method includes:
[0031] Step 1: After the main engine pit segment 4 is installed, several reflective sheets 2 are posted inside and outside the main engine pit segment 4 as measurement data collection points, and reflective sheets are posted outside the main engine pit segment 4 at the intersection of the rib position and the middle longitudinal hard stop.
[0032] Step 2: Set a height reference point 3 on the dock wall on the side of the main engine pit segment, and also post a reflective sheet 2 at the height reference point 3; set up total stations inside and outside the main engine pit segment 4, respectively. Here, one total station can be set up inside and outside the main engine pit segment 4, respectively, or one total station can be set up inside and outside the main engine pit segment 4 in sequence; measure and record the height of the reflective sheets inside and outside the main engine pit segment 4 using the same height reference point as the measurement reference. The external total station of the main engine pit segment 4 is placed between the main engine pit segment 4 and the height reference point 3.
[0033] A monitoring platform 10 is provided in the main engine pit 9 of the main engine pit section 4. The monitoring platform 10 is located on the center line of the hull of the long axis section. A total station is set up on the monitoring platform 10 to measure internal data.
[0034] Step 3, sequentially carrying the cabin segment 5 and the stern shaft segment 6, with reflective sheets 2 posted inside and outside the stern shaft segment 6 as measurement data collection points; each time a segment is carried, the height data of the stored measurement data collection points is collected and recorded.
[0035] Specifically as follows:
[0036] First, the cabin segment 5 is loaded, and the cabin segment 5 is loaded on the top of the main engine pit segment 4 to close the top of the main engine pit segment 4; after the cabin segment 5 is loaded, a transfer station target 7 is set at the stern of the cabin segment 5, such as Figure 1 As shown, the transfer station target 7 has a bull's eye that can rotate 360° in the horizontal direction. The transfer station target 7 is erected on a tire frame or the ground, and a reflective sheet is posted on the bull's eye of the transfer station target 7 as a temporary public measurement point. After the cabin segment 5 is loaded, the height data of the reflective sheet outside the main engine pit segment 4 and the reflective sheet on the transfer station target 7 are measured by the total station 1 outside the main engine pit segment 4, and then the transfer station target 7 is rotated so that the total station inside the main engine pit 9 can see the reflective sheet on the transfer station target, and the height data of the reflective sheet inside the main engine pit 9 and the reflective sheet on the transfer station target 7 are measured by the total station 1 inside the main engine pit; the data measured by the total station inside the main engine pit segment is converted into the height reference consistent with the height data of the reflective sheet outside the main engine pit segment through the height data measured by the reflective sheet on the transfer station target; after the detection is completed, the transfer station target is removed. When performing data conversion, for example, the height of the height reference point is 0m, and the external total station 1 measures the height of the reflector on the transfer target 7 to be 3m; the transfer target is rotated horizontally, and the total station on the monitoring platform 10 measures the height on the transfer target 7 to be 2.9m. Then the total station on the monitoring platform 10 adds 0.1m to the height measurement data of the reflector in the main engine pit segment 4 as the height data of the reflector inside the main engine pit segment after the cabin segment is installed.
[0037] Then carry the stern shaft segment 6, such as Figure 3 and Figure 4As shown, before the stern shaft segment 6 is mounted, reflective sheets are respectively posted on the outside and inside of the stern shaft segment 6 as measurement data collection points, and a common measurement point 8 is set at the hub 14 of the stern of the stern shaft segment 6. After the stern shaft segment 6 is mounted, the height data of the external data collection points of the main engine pit segment 4, the external data collection points of the stern shaft segment 6, and the common measurement point 8 are measured by a total station outside the long axis segment; the height data of the internal data collection points of the main engine pit segment 4, the internal data collection points of the stern shaft segment 6, and the common measurement point 8 are measured by a total station 1 inside the long axis segment; the height data obtained by measuring the internal data collection points of the main engine pit segment 4 and the internal data collection points of the stern shaft segment 6 are converted into the height data consistent with the height reference of the measurement data of the external data collection points of the main engine pit segment 4 and the external data collection points of the stern shaft segment 6 through the height data of the common measurement point 8. The public reference point has the same function as the transfer target. During measurement, if the height of the height reference point is 0m, the height of the public measurement point measured by the external total station is 2.5m, and the height of the public measurement point measured by the total station on the monitoring platform is 2.53m, then the height data of the data measurement point in the stern shaft segment 6 and the height data of the data measurement point inside the main engine pit segment measured by the total station on the monitoring platform are uniformly subtracted by 0.03m as the height data of the data measurement point in the stern shaft segment 6 and the height data of the data measurement point inside the main engine pit segment.
[0038] The common measuring point 8 of the stern shaft segment 6 includes a cross bull's eye structure arranged in parallel, and a transparent cylinder 15 is arranged between the parallel cross bull's eye structures. The two ends of the transparent cylinder 15 are respectively supported in the hub 14 through the cross bull's eye structure, and the two ends of the transparent cylinder 15 are respectively posted with a reflective sheet 2. The reflective sheet at one end of the transparent cylinder 15 is close to the inside of the long axis segment and is used for the total station on the monitoring platform to measure. The reflective sheet at the other end of the transparent cylinder 15 is close to the outside of the long axis segment and is used for the external total station to measure.
[0039] The cross bull's eye structure includes a circular ring 11, a bull's eye clamping structure 12, and a bull's eye supporting structure 13. At least three bull's eye clamping structures 12 are evenly installed in one circle of the circular ring 11. In this embodiment, four bull's eye clamping structures 12 are arranged in one circle of the outer circumference of the circular ring 11. The bull's eye clamping structure 12 is arranged along the radial direction of the circular ring and passes through the circular ring 11. The bull's eye clamping structure 12 is threadedly connected to the circular ring 11, and the transparent cylinder 15 is clamped in the circular ring 11 by the bull's eye clamping structure 12; the bull's eye supporting structure 13 is evenly distributed along the outer circle of the circular ring 11, and the bull's eye supporting structure 13 and the bull's eye clamping structure 12 are alternately distributed along the circumferential direction of the circular ring 11.
[0040] The bull's eye support structure 13 includes a mounting seat 131, a screw rod 132, an internally threaded sleeve 133, and a protective sleeve 134. The mounting seat 131 is fixed on the outside of the ring 11 and is provided with an internally threaded blind hole. One end of the screw rod 132 is fitted and installed in the mounting seat 131, and the other end of the screw rod 132 is threadedly connected to the internally threaded sleeve 133. An adjustment space is provided inside the internally threaded sleeve 133 for adjusting the advance and retreat of the end of the screw rod 132 in the internally threaded sleeve 133. By rotating the internally threaded sleeve 133, the length of the screw rod 132 inserted into the internally threaded sleeve 133 is changed, so that the bull's eye support structure is supported in the shaft hub 14; the protective sleeve 134 is sleeved on the outside of one end of the internally threaded sleeve 133 away from the screw rod to prevent the end of the internally threaded sleeve 133 from damaging the inner wall of the shaft hub 14. Polytetrafluoroethylene material, rubber material, etc. can be selected.
[0041] When the common measuring point 8 is set, the center of the reflective sheets at both ends of the transparent cylinder 15 is adjusted to be collinear with the axis of the transparent cylinder 15, and then the axis of the transparent cylinder 15 is adjusted to be collinear with the center of the ring 11 through the bull's eye clamping structure, and then the center of the reflective sheet is adjusted to be collinear with the axis of the hub 14 through the bull's eye support structure 13.
[0042] Step 4: Calculate the actual sinking amount of the long axis segment based on the collected and recorded data.
[0043] This embodiment is only a further explanation of the present invention, not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to this embodiment as needed, but as long as it is within the scope of the claims of the present invention, it will be protected by the patent law.
Claims
1. A method for monitoring the subsidence of a long shaft system, characterized in that: The long shaft system segment includes a main engine pit segment, a cabin segment, and a stern shaft segment. The method includes: Step 1: After the mainframe pit segment is installed, several reflective sheets are posted inside and outside the mainframe pit segment as measurement data collection points; Step 2, setting a height reference point on the dock wall on the side of the main engine pit segment, and posting a reflective sheet at the height reference point; setting up a total station inside and outside the main engine pit segment respectively, and measuring and recording the height of the reflective sheets inside and outside the main engine pit segment with the same height reference point as the measurement reference; Step 3: Carry the cabin section and the stern shaft section in sequence, and reflective sheets are posted inside and outside the stern shaft section as measurement data collection points; each time a section is carried, the height data of the stored measurement data collection point is collected and recorded; Step 4: Calculate the actual sinking amount of the long axis segment based on the collected and recorded data.
2. A method for monitoring the subsidence of a long shaft system in sections according to claim 1, characterized in that: The cabin segment is mounted on top of the main engine pit segment to seal the top of the main engine pit segment; after the cabin segment is mounted, a transfer station target is arranged at the stern of the cabin segment, and a reflective sheet is posted on the transfer station target as a temporary public measurement point.
3. A method for monitoring the subsidence of a long shaft system in sections according to claim 2, characterized in that: After the cabin sections are loaded, the height data of the reflective sheet outside the main engine pit section and the reflective sheet on the transfer station target are measured by a total station outside the main engine pit section, and then the transfer station target is rotated, and the height data of the reflective sheet inside the main engine pit and the reflective sheet on the transfer station target are measured by a total station inside the main engine pit; the data measured by the total station inside the main engine pit section is converted into a height reference consistent with the height data of the reflective sheet outside the main engine pit section by the height data measured by the reflective sheet on the transfer station target; Remove the transfer target.
4. A method for monitoring the subsidence of a long shaft system in sections according to claim 1, 2 or 3, characterized in that: Before the stern shaft segment is mounted, reflective sheets are respectively posted on the outside and inside of the stern shaft segment as measurement data collection points, and a common measurement point is set at the hub of the stern of the stern shaft segment.
5. A method for monitoring the subsidence of a long shaft system in sections according to claim 4, characterized in that: After the stern shaft segment is mounted, the height data of the external data collection points of the main engine pit segment, the external data collection points of the stern shaft segment and the common measurement points are measured by a total station outside the long axis segment; the height data of the internal data collection points of the main engine pit segment, the internal data collection points of the stern shaft segment and the common measurement points are measured by a total station inside the long axis segment; the height data obtained by measuring the internal data collection points of the main engine pit segment and the internal data collection points of the stern shaft segment are converted into the height reference consistent with the measurement data of the external data collection points of the main engine pit segment and the external data collection points of the stern shaft segment through the height data of the common measurement point.
6. A method for monitoring the subsidence of a long shaft system in sections according to claim 4, characterized in that: The common measurement point includes a cross bull's eye structure arranged in parallel, a transparent cylinder is arranged between the parallel cross bull's eye structures, both ends of the transparent cylinder are respectively supported in the hub through the cross bull's eye structure, and reflective sheets are respectively posted on both ends of the transparent cylinder, the reflective sheet at one end of the transparent cylinder is close to the inside of the long axis system segment, and the reflective sheet at the other end of the transparent cylinder is close to the outside of the long axis system segment.
7. A method for monitoring the subsidence of a long shaft system in sections according to claim 6, characterized in that: The cross bull's eye structure includes a circular ring, a bull's eye clamping structure, and a bull's eye supporting structure. At least three bull's eye clamping structures are evenly installed in one circle of the circular ring. The bull's eye clamping structure is arranged along the radial direction of the circular ring and passes through the circular ring. The bull's eye clamping structure and the circular ring are threadedly connected; the bull's eye supporting structure is evenly distributed along the outer circle of the circular ring, and the bull's eye supporting structure and the bull's eye clamping structure are alternately distributed along the circumferential direction of the circular ring.
8. A method for monitoring the subsidence of a long shaft system according to claim 7, characterized in that: The bull's eye support structure includes a mounting seat, a screw, an internally threaded sleeve, and a protective sleeve. The mounting seat is fixed to the outside of the circular ring and is provided with an internally threaded blind hole. One end of the screw is mounted in the mounting seat, and the other end of the screw is threadedly connected to the internally threaded sleeve. An adjustment space is provided inside the internally threaded sleeve for adjusting the end of the screw to move forward and backward in the internally threaded sleeve; the protective sleeve is mounted on the end of the internally threaded sleeve away from the screw.
9. A method for monitoring the subsidence of a long shaft system in sections according to claim 1, characterized in that: A monitoring platform is arranged in the main engine pit of the main engine pit section, and the monitoring platform is located on the center line of the hull of the long axis section. The total station is set up on the monitoring platform to measure internal data.
10. A method for monitoring the subsidence of a long shaft system in sections according to claim 8, characterized in that: When setting the common measuring point, adjust the center of the reflective sheets at both ends of the transparent cylinder to be collinear with the axis of the transparent cylinder, then adjust the axis of the cylinder to be collinear with the center of the ring, and then adjust the center of the reflective sheet to be collinear with the axis of the hub.