Automatic sample loading device and method for high pressure experiment in diamond pressure chamber
By designing automatic sample devices, the cooperation of cylinders, screws and sliding racks is used to realize the high -precision automatic loading samples of the sample in the diamond pressure cavity experiment, solving the problem of waste and time stretching the sample during the manual sample.
Patent Information
- Application Number
- CN202411425956.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-14
- Publication Date
- 2025-01-28
- Estimated Expiration
- 2044-10-14
AI Technical Summary
In diamond pressing chamber experiments, due to the large shaking of the hand position during manual sample loading, it is difficult to load the sample into the sample chamber, especially for volatile liquid samples, resulting in sample waste and prolonged experimental time.
Design a type of automatic sample device, through the cooperation of cylinder, screw and sliding racks to realize the high -precision position adjustment of liquid pipes and ducts, automatically control the installation process of liquid and solid samples to avoid errors of manual operations. Essence
The high -precision samples of liquid and solid samples are realized, the sample waste is reduced, the experimental time is shortened, and the degree of automation of the sample process process is increased.
Smart Images

Figure CN118961356B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of diamond pressure chamber experiments, in particular to an automatic sample loading device and method for diamond pressure chamber high pressure experiments. Background Art
[0002] The diamond pressure cell experiment is an important scientific method to study the properties of matter under extremely high pressure conditions. In order to simulate the extremely high pressure environment inside the earth and other celestial bodies, the matter will show different phases and properties under normal pressure. Through the diamond pressure cell experiment, scientists can simulate these conditions and study the high-pressure phase transitions of elements and compounds.
[0003] In the diamond pressure chamber experiment, the diamond needs to be installed in the upper anvil and the lower anvil so that the diamond tips are opposite to each other, and the gasket with a center hole is placed on the upper side of the lower anvil and bonded to form a sample chamber between the gasket hole and the diamond of the lower anvil. Then the liquid sample or solid sample is loaded into the sample chamber of the gasket, and finally the upper anvil and the lower anvil are pressed together to form a sealed sample chamber between the diamond between the upper and lower anvils and the gasket hole. Finally, pressure is applied to the upper anvil to transfer the pressure to the sample chamber to simulate a high-pressure environment. In the process of loading the above-mentioned samples into the sample chamber, due to the small hole position of the gasket hole, the hand position shakes greatly during the manual loading process, making it difficult to load the sample into the sample chamber. In particular, when facing volatile liquid samples, the liquid sample evaporates before it is loaded into the sample chamber in time, resulting in sample waste. At the same time, the manual loading causes the experimental time to be abnormally prolonged. Summary of the invention
[0004] In order to overcome the disadvantage that during manual sample loading, the hand position shakes greatly and it is difficult to load the sample into the sample chamber, the present invention provides an automatic sample loading device and method for diamond pressure chamber high pressure experiment.
[0005] The technical scheme is as follows: an automatic sample loading device for a diamond pressure chamber high pressure experiment comprises a base, a cylinder is fixedly connected to the base, a blocking rod is fixedly connected to one end of the cylinder, a first sliding frame is slidably connected to the base, one side of the first sliding frame is slidably connected to the blocking rod, the first sliding frame is slidably connected to the second sliding frame, a first screw is rotatably connected to the side of the first sliding frame close to the second sliding frame, the first screw is threadedly connected to the second sliding frame, the second sliding frame is slidably connected to the third sliding frame, the second sliding frame is rotatably connected to the second screw, the second screw is threadedly connected to the third sliding frame, and the third The sliding frame is rotatably connected to a rotating frame on one side of the sliding frame away from the second screw, and a cover plate is rotatably connected to a side wall of one side of the rotating frame. The rotating frame is slidably connected to a first lifting frame, and a liquid outlet pipe is fixedly connected to the lower side of the rotating frame cavity, and a symmetrically arranged bellows is fixedly connected to the side wall of the liquid outlet pipe. The symmetrically arranged bellows cooperate with a first spring to squeeze the liquid sample in the liquid outlet pipe to discharge it. A first spring is sleeved between the first lifting frame and the liquid outlet pipe, and a diamond lower anvil for diamond pressure chamber experiment is placed on the base, and a gasket with a circular hole in the middle is glued to the top of the diamond lower anvil.
[0006] Preferably, the blocking rod is in an I-shape and is used to support the first sliding frame to move up and down.
[0007] Preferably, one side of the first lifting frame is a cylindrical protrusion for squeezing the bellows to discharge the liquid sample.
[0008] Preferably, a liquid-blocking protrusion is provided inside the bellows on the left side of the liquid outlet pipe to prevent liquid from flowing out.
[0009] Preferably, a protruding triangular portion is provided on a side of the rotating frame close to the first sliding frame, for assisting in calibrating the angle between the rotating frame and the first sliding frame.
[0010] Preferably, a U-shaped stopper is provided on one side of the first sliding frame to prevent dust from falling into the air outlet pipe and causing blockage.
[0011] Preferably, it also includes an air outlet duct, which is fixedly connected to a side of the rotating frame away from the first lifting frame, a motor is fixedly installed in the upper chamber of the rotating frame, the rotating frame is rotatably connected to blades, the blades are fixedly connected to the output shaft end of the motor, a side of the rotating frame adjacent to the blades is slidably connected to a second lifting frame, a second spring is sleeved between the second lifting frame and the rotating frame, a contact switch is fixedly connected to a side of the rotating frame close to the air outlet duct, and the contact switch is electrically connected to the motor through a control module.
[0012] Preferably, a worm wheel is further included, which is fixedly connected to one end of the first screw and the second screw respectively, the first sliding frame and the second sliding frame are rotatably connected to the worm, the worm and the worm wheel are meshed, and one end of the worm is fixedly connected to a knob.
[0013] Preferably, a motor is further included, the motor is fixedly connected to the base, the output shaft end of the motor is fixedly connected to a rotating disk, the rotating disk has guide grooves around it, a clamping block is movably connected in the guide groove of the rotating disk, and the clamping block is slidably connected to the base.
[0014] Preferably, a fourth sliding frame is further included, the fourth sliding frame is slidably connected to the base, one end of the fourth sliding frame is fixedly connected to a connecting frame, and a side of the connecting frame away from the fourth sliding frame is fixedly connected to an observation mirror.
[0015] The automatic sample loading method for the diamond anvil cell high pressure experiment includes:
[0016] The gasket is bonded to the lower anvil, and then the cover is opened to pour the liquid sample into the liquid outlet tube;
[0017] Start the cylinder, which slowly descends, driving the liquid outlet pipe to descend to a position near the gasket;
[0018] By turning the first screw rod, the position of the liquid outlet tube is calibrated with the position of the sample chamber;
[0019] When the liquid outlet tube is aligned with the center of the sample chamber, the cylinder is started again, so that the blocking rod, the first sliding frame, the second sliding frame and other components are synchronously lowered, and the liquid sample enters the sample chamber through the bottom of the liquid outlet tube to complete the sample loading;
[0020] When solid samples need to be loaded, rotate the rotating frame to 180° so that the air outlet pipe faces downward;
[0021] Then the motor is started, which drives the blades to rotate counterclockwise at high speed, so that the air outlet pipe absorbs the solid sample;
[0022] The cylinder is started to descend, and the cylinder drives the stopper rod and the first sliding frame and other components to descend, so that the solid sample is placed in the sample chamber to complete the sample loading.
[0023] The present invention has the following advantages: the present invention realizes high-precision adjustment of the position of the liquid outlet tube through the cooperation of the first screw and the second screw. During the sample loading process, when the liquid outlet tube deviates from the sample chamber, the liquid outlet tube will be controlled to automatically stop discharging liquid to prevent waste of liquid samples.
[0024] Automatic loading of solid samples is achieved through the cooperation of the contact switch and the blades. When the position of the air outlet pipe and the sample bin deviates, the loading is automatically stopped through the cooperation of the air outlet pipe and the second lifting frame, avoiding loading failure and the need to repeat the loading steps, thereby reducing the time spent on loading.
[0025] Through the cooperation of the turbine and the worm, high-precision adjustment of the second sliding frame and the third sliding frame is achieved, reducing the difficulty of placing the sample in the sample chamber.
[0026] The cooperation between the motor and the clamping block realizes the automatic clamping of the lower anvil, preventing the lower anvil from displacement during the sample loading process, thus ensuring the smoothness of the experiment.
[0027] The coordination of the fourth sliding frame and the observation mirror improves the efficiency of calibrating the liquid outlet pipe and the air outlet pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the structure of the first viewing angle of the present invention.
[0029] Figure 2 It is a three-dimensional structural cross-sectional view of the present invention.
[0030] Figure 3 It is a schematic diagram of the three-dimensional structure of the second sliding frame, the first screw rod and the third sliding frame of the present invention.
[0031] Figure 4 It is a three-dimensional structural cross-sectional view of the second screw rod, the rotating frame and the cover plate of the present invention.
[0032] Figure 5 It is a three-dimensional structural schematic diagram of components such as the liquid outlet pipe, the bellows and the first spring of the present invention.
[0033] Figure 6 It is a schematic diagram of the three-dimensional structure of the motor, blades and the second lifting frame of the present invention.
[0034] Figure 7 It is a schematic diagram of the three-dimensional structure of the worm wheel, worm, knob and other components of the present invention.
[0035] Figure 8 It is a schematic diagram of the three-dimensional structure of the base, rotating disk, clamping block and other components of the present invention.
[0036] Fig. 9 It is a three-dimensional structural schematic diagram of the motor, rotating disk, clamping block and other components of the present invention.
[0037] Fig.10 It is a three-dimensional structural schematic diagram of the base, the fourth sliding frame, the connecting frame and other components of the present invention.
[0038] Fig.11 It is a schematic diagram of the three-dimensional structure of the fourth sliding frame, the connecting frame, the observation mirror and other components of the present invention.
[0039] Description of the accompanying drawings: 101_base, 102_cylinder, 1021_blocking rod, 103_first sliding frame, 104_second sliding frame, 105_first screw, 106_third sliding frame, 107_second screw, 108_rotating frame, 109_cover plate, 110_first lifting frame, 111_liquid outlet pipe, 112_bellows, 113_first spring, 114_diamond lower anvil, 115_gasket, 201_air outlet pipe, 202_motor, 203_blade, 204_second lifting frame, 205_second spring, 206_contact switch, 301_worm gear, 302_worm, 303_knob, 401_motor, 402_rotating disk, 403_clamping block, 501_fourth sliding frame, 502_connecting frame, 503_observation mirror. DETAILED DESCRIPTION
[0040] The following descriptions are merely preferred embodiments of the present invention and are not intended to limit the protection scope of the present invention.
[0041] Example 1
[0042] Automatic sample loading device for diamond pressure chamber high pressure experiment, such as Figure 1-Figure 5As shown, it includes a base 101, a cylinder 102 is fixedly connected to the top of the base 101, a stopper 1021 is fixedly connected to the telescopic end of the cylinder 102, the stopper 1021 is I-shaped, and is used to support the first sliding frame 103 to move up and down, the first sliding frame 103 is slidably connected to the front side of the top of the base 101, and the back side of one side of the first sliding frame 103 is slidably connected to the stopper 1021, and a U-shaped stopper is provided on the front side of the upper part of the first sliding frame 103 to prevent dust from falling into the air outlet pipe 201 and causing blockage. A second sliding frame 104 is slidably connected to the middle of the bottom of the first sliding frame 103, a first screw 105 is rotatably connected to the middle of the bottom of the first sliding frame 103, the first screw 105 is threadedly connected to the second sliding frame 104, a third sliding frame 106 is slidably connected to the middle of the second sliding frame 104, a second screw 107 is rotatably connected to the upper part of the second sliding frame 104, the second screw 107 is threadedly connected to the third sliding frame 106, the front side of the third sliding frame 106 is rotatably connected to a rotating frame 108, and the top of the rotating frame 108 A protruding triangular portion is provided at the rear side of the rotating frame 108 to assist in calibrating the angle between the rotating frame 108 and the first sliding frame 103. A cover plate 109 is rotatably connected to the side wall on the right side of the rotating frame 108. A first lifting frame 110 is slidably connected to the bottom of the rotating frame 108. The left and right sides of the top of the first lifting frame 110 are cylindrical protrusions for squeezing the bellows 112 to discharge the liquid sample. A liquid outlet pipe 111 is fixedly connected to the lower side of the rotating frame 108 cavity. The side wall of the liquid outlet pipe 111 is fixedly connected to symmetrically arranged The bellows 112, which is symmetrically arranged, cooperates with the first spring 113 and is used to squeeze the liquid sample in the liquid outlet pipe 111 to discharge it. A liquid blocking protrusion is provided on the lower side of the bellows 112 on the left side of the liquid outlet pipe 111 to prevent the liquid from flowing out. The first spring 113 is sleeved between the first lifting frame 110 and the liquid outlet pipe 111. The base 101 is placed with a diamond lower anvil 114 for diamond pressure chamber experiment, and a gasket 115 with a circular hole in the middle is glued to the top of the diamond lower anvil 114.
[0043] First, the gasket 115 is bonded to the lower anvil, and then the cover 109 is opened, and the liquid sample is poured into the liquid outlet tube 111, and then the cover 109 is closed, and the cylinder 102 is started, and the cylinder 102 slowly descends, thereby driving the blocking rod 1021 to descend, so that the first sliding frame 103 is slowly descended under the influence of gravity, and then drives the second sliding frame 104, the first screw 105, the third sliding frame 106, the second screw 107, the rotating frame 108, the cover 109, the first lifting frame 110, and the liquid outlet tube 111. 11, the bellows 112 and the first spring 113 are synchronously lowered, and then when the blocking rod 1021 drives the liquid outlet pipe 111 to descend to the position near the gasket 115, the first screw 105 is screwed to drive the second sliding frame 104 and the corresponding components connected to the second sliding frame 104 to move forward and backward, so that the liquid outlet pipe 111 moves forward and backward, and the position of the liquid outlet pipe 111 is calibrated with the position of the sample chamber, and then the second screw 107 is screwed, and the second screw 107 drives the third sliding frame 106 and the corresponding components connected to the second sliding frame 104 to move forward and backward. The corresponding parts of the third sliding frame 106 move left and right, so that the liquid outlet pipe 111 is adjusted left and right, and further aligned with the sample chamber. When the liquid outlet pipe 111 is aligned with the center of the sample chamber, the cylinder 102 is started again, so that the blocking rod 1021, the first sliding frame 103 and the second sliding frame 104 and other parts are synchronously lowered. When the first lifting frame 110 is lowered, it first contacts the upper surface of the gasket 115. Since the first lifting frame 110 is blocked by the gasket 115, it stops moving downward, and the rotating frame 108, The cover plate 109, the liquid outlet pipe 111 and the bellows 112 are affected by their own gravity and continue to descend in the sample chamber. The first spring 113 is stretched and deformed, so that the cylindrical protrusion of the first lifting frame 110 applies pressure to the bellows 112. The bellows 112 is forced to contract inwardly, thereby squeezing the liquid sample inside the liquid outlet pipe 111. At the same time, the bellows 112 drives the liquid blocking protrusion to move to the right, no longer blocking the liquid outlet pipe 111, and the liquid sample enters the sample chamber through the bottom of the liquid outlet pipe 111 to complete the sample loading.
[0044] When the liquid outlet pipe 111 deviates from the sample chamber, the liquid outlet pipe 111 deviates from the position of the sample chamber in the gasket 115. When the blocking rod 1021 supports the rotating frame 108 to descend, the first lifting frame 110 and the liquid outlet pipe 111 are in contact with the gasket 115 at the same time during the descent. Then the liquid outlet pipe 111 cannot continue to descend, resulting in the bellows 112 being unable to contact the cylindrical protrusion of the first lifting frame 110, so that the liquid sample cannot be discharged through the liquid outlet pipe 111, thereby avoiding the waste of the liquid sample. Subsequently, the position between the liquid outlet pipe 111 and the sample chamber is readjusted by the first screw 105 and the second screw 107 until it is aligned with the middle of the sample chamber.
[0045] After the liquid sample is loaded, the cylinder 102 is started to reset, and the cylinder 102 drives the blocking rod 1021 to move upward, so that the blocking rod 1021 supports the first sliding frame 103, the second sliding frame 104, the first screw 105, the third sliding frame 106, the second screw 107, the rotating frame 108, the cover plate 109, the first lifting frame 110, the liquid outlet pipe 111, the bellows 112 and the first spring 113 to rise and reset synchronously. When the liquid outlet pipe 111 rises, the first spring 113 is reset. , thereby causing the cylindrical protrusion of the first lifting frame 110 to disengage from the bellows 112, and the bellows 112 is deformed and reset under force, so that the liquid blocking protrusion blocks the liquid outlet tube 111 again. In summary, through the cooperation of the first screw 105 and the second screw 107, the position of the liquid outlet tube 111 can be adjusted with high precision. During the sample loading process, when the liquid outlet tube 111 deviates from the sample chamber, the liquid outlet tube 111 will be controlled to automatically stop discharging liquid to prevent waste of liquid samples.
[0046] like Figure 2 and Figure 6 As shown, it also includes an air outlet pipe 201, which is fixedly connected to one side of the top of the rotating frame 108. A motor 202 is fixedly installed in the upper chamber of the rotating frame 108. A blade 203 is rotatably connected to the upper side of the rotating frame 108. The blade 203 is fixedly connected to the output shaft end of the motor 202. A second lifting frame 204 is slidably connected to the top of the rotating frame 108. A second spring 205 is sleeved between the second lifting frame 204 and the rotating frame 108. A contact switch 206 is fixedly connected to one side of the rotating frame 108 close to the air outlet pipe 201, and the contact switch 206 is electrically connected to the motor 202 through a control module.
[0047] In order to reduce the time of loading solid samples, the specific operation is as follows: when it is necessary to load solid samples, the rotating frame 108 is rotated to 180° so that the air outlet pipe 201 faces downward, and then the motor 202 is started. The motor 202 drives the blades 203 to rotate counterclockwise at high speed to accelerate the flow of air or gas inside the rotating frame 108. The high-speed airflow around the blades 203 will cause a central low-pressure area, causing the air in the air outlet pipe 201 to move quickly into the rotating frame 108, generating suction, and then the solid sample is placed near the air outlet pipe 201, so that the air outlet pipe 201 absorbs the solid sample, and then the cylinder 102 is started to descend, and the cylinder 102 drives the blocking rod 1021, the first sliding frame 103, the rotating frame 108, the air outlet pipe 201, the motor 202, the blades 203, the second lifting frame 204, the second spring 205 and the contact switch 206 components to descend synchronously. During the descent, the second lifting frame 204 first aligns with the pad After the sheet 115 contacts the upper surface, it stops descending, while the air outlet pipe 201, the motor 202, the blade 203 and the contact switch 206 continue to descend in the sample chamber, and the second spring 205 is deformed by force. As the contact switch 206 contacts the second lifting frame 204 during the descending process, the contact switch 206 sends an electrical signal, and the control module receives the electrical signal to control the motor 202 to stop rotating, thereby stopping the blade 203 from rotating. The solid sample is then separated from the air outlet pipe 201 and placed in the sample chamber to complete the sample loading. When the sample chamber is placed, the cylinder 102 is started to reset, and the cylinder 102 drives the blocking rod 1021 to move upward and reset, thereby driving the first sliding frame 103 and the corresponding components on the rotating frame 108 to move upward, and the second spring 205 is deformed and reset, so that the contact switch 206 is separated from the second lifting frame 204. After 5 seconds of separation, the motor 202 resumes rotation, so that the blade 203 continues to rotate;
[0048] When the position of the air outlet 201 deviates from that of the sample bin, the air outlet 201 and the second lifting frame 204 simultaneously abut against the upper surface of the gasket 115 during the process of descending, so that the contact switch 206 cannot continue to descend and contact the second lifting frame 204, and thus the solid sample cannot be separated from the air outlet 201. Subsequently, the position of the air outlet 201 is readjusted by the first screw 105 and the second screw 107 until the air outlet 201 is aligned with the sample bin. In summary, automatic loading of solid samples is achieved through the cooperation of the contact switch 206 and the blade 203. When the position of the air outlet 201 deviates from that of the sample bin, loading is automatically stopped through the cooperation of the air outlet 201 and the second lifting frame 204, thereby avoiding loading failure, which requires repeated loading steps, and reducing the time spent on loading.
[0049] Embodiment 2: Based on embodiment 1, Figure 1 , Figure 2 and Figure 7 As shown, a worm gear 301 is also included, which is fixedly connected to the front side of the first screw 105 and the right side of the second screw 107 respectively. The front side of the first sliding frame 103 and the right side of the second sliding frame are rotatably connected with a worm 302, the worm 302 is meshed with the worm gear 301, and one end of the worm 302 is fixedly connected to a knob 303.
[0050] Since the diameter of the sample chamber is relatively small, in order to further improve the accuracy of sample loading and reduce the time required for sample loading adjustment, the specific operation is as follows: when the front and rear positions of the second sliding frame 104 need to be adjusted, the knob 303 at the front right side of the first sliding frame 103 is turned, and the knob 303 controls the worm 302 to rotate, thereby driving the turbine and the first screw 105 to rotate, so that the first screw 105 drives the second sliding frame 104 to move forward and backward;
[0051] When the left and right position of the third sliding frame 106 needs to be adjusted, the knob 303 on the upper right side of the second sliding frame 104 is turned, and the knob 303 drives the worm 302 to rotate, thereby driving the worm wheel 301 and the second screw 107 to move left and right, and then driving the third sliding frame 106 to move left and right. In summary, through the cooperation of the worm wheel 301 and the worm 302, high-precision adjustment of the second sliding frame 104 and the third sliding frame 106 is achieved, reducing the difficulty of placing the sample in the sample chamber.
[0052] Embodiment 3: Based on embodiment 2, Figure 2 , Figure 8 and Fig. 9 As shown, it also includes a motor 401, which is fixedly connected to the bottom of the base 101. The output shaft end of the motor 401 is fixedly connected to a rotating disk 402. The rotating disk 402 has guide grooves in the circumference. A clamping block 403 is movably connected in the guide groove of the rotating disk 402. The clamping block 403 is slidably connected to the base 101.
[0053] In order to avoid the deviation of the position of the lower anvil due to accidental touch or vibration caused by human intervention after the lower anvil is placed, the specific operation is as follows: the lower anvil is placed on the base 101, and then the motor 401 is started. The motor 401 drives the rotating disk 402 to rotate, and the clamping block 403 is driven to move inward through the guide groove of the rotating disk 402 to limit the lower anvil to prevent it from moving. After the entire diamond pressure chamber is loaded, the motor 401 is started again to reverse, and the motor 401 drives the rotating disk 402 to reverse and reset, thereby driving the clamping block 403 to move outward to complete the reset. In summary, through the cooperation of the motor 401 and the clamping block 403, the lower anvil is automatically clamped to prevent the lower anvil from being displaced during the loading process, thereby ensuring the smoothness of the experiment.
[0054] like Figure 1 , Figure 2 , Fig.10 and Fig.11 As shown, it also includes a fourth sliding frame 501, which is slidably connected to the front side of the base 101, one end of the sliding frame 501 is fixedly connected to a connecting frame 502, and the side of the connecting frame 502 away from the fourth sliding frame 501 is fixedly connected to an observation mirror 503.
[0055] In order to better align the liquid outlet pipe 111 and the air outlet pipe 201 with the sample chamber of the gasket 115, the specific operations are as follows: move the fourth sliding frame 501 forward and backward according to observation needs, and the second sliding frame 104 thereby drives the connecting frame 502 and the observation mirror 503 to move forward and backward. Then, observe the position of the liquid outlet pipe 111 and the air outlet pipe 201 and the sample chamber of the gasket 115 through the observation mirror 503, and make adjustments. In summary, the coordination of the fourth sliding frame 501 and the observation mirror 503 improves the efficiency of the calibration of the liquid outlet pipe 111 and the air outlet pipe 201.
[0056] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. Automatic sample loading device for diamond pressure chamber high pressure experiment, characterized in that: The invention comprises a base (101), wherein the base (101) is fixedly connected to a cylinder (102), one end of the cylinder (102) is fixedly connected to a stop rod (1021), the base (101) is slidably connected to a first sliding frame (103), one side of the first sliding frame (103) is slidably connected to the stop rod (1021), the first sliding frame (103) is slidably connected to a second sliding frame (104), a side of the first sliding frame (103) close to the second sliding frame (104) is rotatably connected to a first screw rod (105), the first screw rod (105) is threadedly connected to the second sliding frame (104), the second sliding frame (104) is slidably connected to a third sliding frame (106), the second sliding frame (104) is rotatably connected to a second screw rod (107), the second screw rod (107) is threadedly connected to the third sliding frame (106), the third sliding frame (106) A rotating frame (108) is rotatably connected to a side away from the second screw rod (107), a cover plate (109) is rotatably connected to a side wall of one side of the rotating frame (108), a first lifting frame (110) is slidably connected to the rotating frame (108), a liquid outlet pipe (111) is fixedly connected to the lower side of the rotating frame (108) cavity, a symmetrically arranged bellows (112) is fixedly connected to the side wall of the liquid outlet pipe (111), the symmetrically arranged bellows (112) cooperate with a first spring (113) and are used to squeeze the liquid sample in the liquid outlet pipe (111) to discharge it, a first spring (113) is sleeved between the first lifting frame (110) and the liquid outlet pipe (111), a diamond lower anvil (114) for diamond pressure chamber experiment is placed on the base (101), and a gasket (115) with a circular hole in the middle is adhered to the top of the diamond lower anvil (114); It also includes an air outlet pipe (201), which is fixedly connected to a side of the rotating frame (108) away from the first lifting frame (110), a motor (202) is fixedly installed in the upper chamber of the rotating frame (108), a blade (203) is rotatably connected to the rotating frame (108), the blade (203) is fixedly connected to the output shaft end of the motor (202), a second lifting frame (204) is slidably connected to the side of the rotating frame (108) adjacent to the blade (203), a second spring (205) is sleeved between the second lifting frame (204) and the rotating frame (108), and a contact switch (206) is fixedly connected to the side of the rotating frame (108) close to the air outlet pipe (201), and the contact switch (206) is electrically connected to the motor (202) through a control module; It also includes a worm wheel (301), which is fixedly connected to one end of the first screw rod (105) and one end of the second screw rod (107), respectively; the first sliding frame (103) and the second sliding frame (104) are rotatably connected to a worm (302), the worm (302) and the worm wheel (301) are meshed, and one end of the worm (302) is fixedly connected to a knob (303); The machine also comprises a motor (401), the motor (401) is fixedly connected to the base (101), the output shaft end of the motor (401) is fixedly connected to a rotating disk (402), the rotating disk (402) has guide grooves in the circumference, a clamping block (403) is movably connected in the guide groove of the rotating disk (402), and the clamping block (403) is slidably connected to the base (101); The device also includes a fourth sliding frame (501), which is slidably connected to the base (101), one end of the fourth sliding frame (501) is fixedly connected to a connecting frame (502), and a side of the connecting frame (502) away from the fourth sliding frame (501) is fixedly connected to an observation mirror (503).
2. The automatic sample loading device for diamond pressure chamber high pressure experiment according to claim 1, characterized in that: The blocking rod (1021) is in an I-shape and is used to support the first sliding frame (103) to move up and down.
3. The automatic sample loading device for diamond pressure chamber high pressure experiment according to claim 2, characterized in that: One side of the first lifting frame (110) is a cylindrical protrusion, which is used to squeeze the bellows (112) to discharge the liquid sample.
4. The automatic sample loading device for diamond pressure chamber high pressure experiment according to claim 3, characterized in that: A liquid-blocking protrusion is provided inside the bellows (112) on the left side of the liquid outlet pipe (111) to prevent liquid from flowing out.
5. The automatic sample loading device for diamond pressure chamber high pressure experiment according to claim 4, characterized in that: A protruding triangular portion is provided on one side of the rotating frame (108) close to the first sliding frame (103) for assisting in calibrating the angle between the rotating frame (108) and the first sliding frame (103).
6. The automatic sample loading device for diamond pressure chamber high pressure experiment according to claim 5, characterized in that: A U-shaped stopper is provided on one side of the first sliding frame (103) to prevent dust from falling into the air outlet pipe (201) and causing blockage.
7. An automatic sample loading method for a diamond anvil cell high pressure experiment, using the automatic sample loading device for a diamond anvil cell high pressure experiment as claimed in any one of claims 1 to 6, characterized in that: include: The gasket (115) is bonded to the lower anvil, and then the cover plate (109) is opened to pour the liquid sample into the liquid outlet tube (111); The cylinder (102) is started, and the cylinder (102) slowly descends, driving the liquid outlet pipe (111) to descend to a position near the gasket (115); By turning the first screw rod (105), the position of the liquid outlet tube (111) is calibrated with the position of the sample chamber; When the liquid outlet pipe (111) is aligned with the center of the sample chamber, the cylinder (102) is started again, so that the blocking rod (1021), the first sliding frame (103) and the second sliding frame (104) are synchronously lowered, and the liquid sample enters the sample chamber through the bottom of the liquid outlet pipe (111) to complete the sample loading; When a solid sample needs to be loaded, the rotating frame (108) is rotated to 180 degrees so that the air outlet pipe (201) faces downward; Then, the motor (202) is started, and the motor (202) drives the blade (203) to rotate counterclockwise at a high speed, so that the air outlet pipe (201) absorbs the solid sample; The cylinder (102) is started to descend, and the cylinder (102) thereby drives the blocking rod (1021) and the first sliding frame (103) to descend, so that the solid sample is placed in the sample chamber, and the sample loading is completed.
Citation Information
Patent Citations
Multifunctional workbench for ER50-6 welding wire steel production research and using method thereof
CN114406134A
Geological mineral exploration drilling machine
CN117738586A