Electric reactor fault monitoring system and early warning method

By conducting in-depth analysis of the historical fault data of the reactor, an evaluation index is constructed and an early warning set is established, the problems of low intelligence of reactor fault monitoring and maintenance process efficiency in the existing technology are solved, and efficient early warning and rapid reactor faults are achieved. response.

CN118962293APending Publication Date: 2024-11-15STATE GRID SHAANXI ELECTRIC POWER CO LTD YULIN POWER SUPPLY CO
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202411062779.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In the prior art, reactor fault monitoring lacks full utilization of historical fault data and subtle parameter changes analysis, resulting in low intelligence of early warning and insufficient maintenance process.

Method used

By collecting historical inter-turn short-circuit fault data of reactors, analyzing temperature changes, reactance changes and vibration parameters, building temperature evaluation index, reactance evaluation index and vibration evaluation index, establishing an early warning set, and analyzing it after the set time interval to trigger Early warning signaling, optimize the early warning processing mechanism to quickly select the right maintenance personnel.

Benefits of technology

It realizes a comprehensive evaluation and quantitative early warning of state changes before reactor failure, improves the fault response efficiency and the accuracy of the early warning system, and ensures the safe operation of the power system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118962293A_ABST
    Figure CN118962293A_ABST
Patent Text Reader

Abstract

The invention discloses an electric reactor fault monitoring system and an early warning method, and the method comprises the steps: building a temperature evaluation index, a reactance evaluation index and a vibration evaluation index through analyzing the historical fault data of an electric reactor, thereby constructing an early warning set of each historical fault of the electric reactor, and carrying out the early warning. The indexes can comprehensively reflect the state change of the reactor before the fault, further setting the monitoring time interval of the reactor, and respectively analyzing the temperature change parameter, reactance change parameter and vibration parameter of the reactor in the set time period after the set monitoring time interval is reached; if the analysis result of one group is matched with the parameters in the early warning set, the early warning signaling is triggered, and the problems that in the prior art, historical data of the electric reactor faults are not fully utilized, subtle changes of the parameters before the historical faults occur are not analyzed, accordingly, an electric reactor fault early warning mechanism is established, and the early warning intelligent degree is low are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power system monitoring, and in particular to a reactor fault monitoring system and an early warning method. Background Art

[0002] As an important auxiliary equipment in the power system, the reactor undertakes important functions such as reactive power compensation, short-circuit current limitation and harmonic filtering.

[0003] Turn-to-turn short circuit is one of the common faults of reactors, which may cause overheating, reduced efficiency or even damage to the reactor. However, the reactor fault monitoring in the prior art still has the following deficiencies:

[0004] The historical data of reactor failures are not fully utilized, and the subtle changes in parameters before the historical failures are not analyzed to establish an early warning mechanism for reactor failures. The early warning intelligence level is low;

[0005] At the same time, the scheduling and processing procedures for maintenance personnel after a fault warning is triggered are not efficient enough.

[0006] Therefore, a reactor fault monitoring system and early warning method are introduced. Summary of the invention

[0007] In view of this, the present invention provides a reactor fault monitoring system and an early warning method to solve the problems raised by the above background technology.

[0008] The purpose of the present invention can be achieved through the following technical solutions: A reactor fault monitoring system and early warning method, comprising:

[0009] Data collection: Collect historical turn-to-turn short-circuit fault cases and times of the reactor, and integrate them into historical fault data packets of the reactor;

[0010] Data analysis: Based on the historical fault data packets of the reactor, the temperature change parameters within the set time period before each turn-to-turn short-circuit fault of the reactor are analyzed to obtain the temperature evaluation index Wp; the reactance change parameters within the set time period before each turn-to-turn short-circuit fault of the reactor are analyzed to obtain the reactance evaluation index Dp; the vibration parameters within the set time period before each turn-to-turn short-circuit fault of the reactor are analyzed to obtain the vibration evaluation index Dy;

[0011] The temperature evaluation index Wp is obtained, specifically:

[0012] Obtain the temperature values ​​at each time point in the set time period before the turn-to-turn short-circuit fault occurs, and construct a temperature change line graph based on this; draw the value points of the temperature values ​​at each time point in the line graph, connect two adjacent value points to obtain a value line, calculate the slope of the value line and the angle between the value line and the horizontal line; when the angle between the value line and the horizontal line is an acute angle, mark the slope of the value line as the first slope; when the angle between the value line and the horizontal line is an obtuse angle, mark it as the second slope; sum up all the values ​​of the first slope to obtain a first total value and mark it as P1, sum up all the values ​​of the second slope and take the absolute value to obtain a second total value and mark it as P2;

[0013] Connect the first numerical point in the line chart with the last numerical point in the line chart to obtain a line segment and mark the line segment as the general trend line, calculate the slope of the general trend line and the angle with the horizontal line, when the angle between the general trend line and the horizontal line is an acute angle, mark the slope of the general trend line as the third slope, and the value of the third slope is represented by the symbol K1; when the angle between the previous sequence line and the horizontal line is an obtuse angle, mark the slope of the previous sequence line as the fourth slope, and the absolute value of the fourth slope is represented by the symbol K2;

[0014] Calculate the vertical distance between the highest value point and the lowest value point and mark the value of the vertical distance as P3; use the formula Er = (P2 / P1) × d1 + Ki × d2 + P3 × d3 to obtain the temperature change index Er; where i = 1 or 2; d1, d2 and d3 are all preset influence weight factors;

[0015] Based on the temperature values ​​obtained at each time point, the average of the temperature values ​​at each time point is taken as the temperature average of each fault within the set time period, the maximum value of the temperature values ​​at each time point is taken as the temperature peak of each fault within the set time period, the reference temperature threshold of the reactor is preset, and the ratios between the temperature average, the temperature peak and the reference temperature threshold are calculated respectively as the average ratio index and the peak ratio index of the reactor within the set time period; and recorded as Ew and Eq;

[0016] According to the formula The temperature variation index Er, the average ratio index Ew and the peak ratio index Eq of the reactor within the set time period are weightedly calculated to obtain the temperature evaluation index Wp of the reactor within the set time period; wherein Ex represents the preset reference threshold index corresponding to the reactor temperature variation index Er, and a1, a2 and a3 are all preset influence weight factors;

[0017] The above-mentioned method realizes in-depth analysis and quantitative evaluation of the temperature change before the inter-turn short-circuit fault of the reactor, and provides an evaluation system that comprehensively considers the relationship between the temperature change trend, extreme value and safety threshold. By calculating the sum of the first slope and the second slope, the slope of the total trend line, the temperature extreme value and the ratio with the reference threshold, this method can reveal the key characteristics of the temperature change of the reactor before the fault and convert it into a quantitative temperature evaluation index Wp.

[0018] The reactance evaluation index Dp is obtained, specifically:

[0019] Obtain the reactance value at each time point in the set time period before the turn-to-turn short-circuit fault occurs, calculate the reactance value at each time point using the standard deviation formula, and record the calculated result as the fluctuating reactance index as Ua;

[0020] The reactance value of the preset reactor under normal operating conditions is calculated, and the difference between the reactance value at each time point and the preset reactance value is calculated. After taking the absolute value, the mean of all the differences is calculated, and the ratio of the calculated mean value to the preset reactance value is calculated to obtain the reactance change index Ub;

[0021] According to the formula The fluctuating reactance index Ua and the reactance variation index Ub of the reactor within the set time period are weightedly calculated to obtain the reactance evaluation index Dp of the reactor within the set time period; wherein r1 and r2 are the influence weight factors of the fluctuating reactance index Ua and the reactance variation index Ub respectively;

[0022] By quantitatively analyzing the volatility and change trend of the reactor's reactance value before a turn-to-turn short-circuit fault, combined with the fluctuating reactance index Ua and the reactance change index Ub, the reactor's status can be evaluated more comprehensively, providing a basis for early fault warning.

[0023] The vibration evaluation index Dy is obtained, specifically:

[0024] Obtain the decibel value of the reactor at each time point in the set time period, preset the maximum allowable value of the decibel value during the operation of the reactor, compare the decibel value of each time point with the preset maximum allowable value one by one, and mark the decibel value greater than the preset maximum allowable value as an abnormal decibel value;

[0025] Count the number of abnormal decibel values ​​and record it as Ga, and take the mean of each group of abnormal decibel values ​​and record it as Gb;

[0026] Further obtain the vibration times of the reactor within the set time period and record it as Gc;

[0027] According to the formula The vibration evaluation index Dy is obtained by weighted calculation of the number of abnormal decibel values ​​Ga, the average value of abnormal decibel values ​​Gb and the number of vibrations Gc of the reactor within the set time period; v1, v2 and v3 are the influence weight factors of the number of abnormal decibel values ​​Ga, the average value of abnormal decibel values ​​Gb and the number of vibrations Gc respectively; G 参考 Indicates the preset maximum allowed value;

[0028] Combined with the abnormal decibel value and the number of vibrations, the vibration status of the reactor is comprehensively evaluated, providing an early warning for vibration problems in the reactor, which helps to take timely measures to prevent potential failures.

[0029] Results integration: The temperature evaluation index Wp, reactance evaluation index Dp and vibration evaluation index Dy corresponding to each turn-to-turn short-circuit fault of the reactor are extracted and integrated into the early warning set of each fault of the reactor;

[0030] Early warning triggering: Set the monitoring time interval of the reactor, and after the set monitoring time interval is reached, analyze the temperature change parameters, reactance change parameters and vibration parameters of the reactor within the set time period. If the analysis result of one group matches the parameters in the early warning set, the early warning signal is triggered;

[0031] Warning processing: Execute corresponding steps based on the triggered warning signal;

[0032] Specifically:

[0033] S1: Obtain each maintenance personnel and personnel information corresponding to the current reactor; mark the maintenance personnel's number as f, f=1, ..., n;

[0034] S2: Obtain the distance between the maintenance personnel and the location of the reactor as Mf, record the total number of maintenance times performed by the maintenance personnel as Zf; set the age of the maintenance personnel as Qf;

[0035] S3: The maintenance personnel's employment time is obtained by comparing their employment time with the current system time, and marked as Lf;

[0036] S4: Utilizing the formula The optimal value QG of the maintenance personnel is obtained; among which h1, h2, h3 and h4 are the influencing weight factors of the maintenance personnel's travel distance Mf, total number of maintenance times Zf, length of employment Lf and age Qf respectively;

[0037] S5: Select the maintenance personnel with the largest preferred value QG as the early warning processing personnel; then send the early warning processing instruction to the mobile terminal of the early warning processing personnel; when the early warning processing personnel feedback the confirmation instruction within the preset time range, the total number of maintenance times of the early warning processing personnel increases by one, and at the same time, send the number and location of the reactor to be processed to the mobile terminal of the early warning processing personnel; when the early warning processing personnel does not feedback the confirmation instruction within the preset time range, the maintenance personnel with the next highest preferred value QFG is marked as the early warning processing personnel, and the early warning processing instruction is sent to the mobile terminal of the early warning processing personnel; and so on;

[0038] By setting the monitoring time interval and conducting regular analysis, potential abnormal conditions of the reactor can be discovered in time and a quick response can be achieved. The automated early warning trigger mechanism reduces the need for manual monitoring and improves the efficiency of monitoring and early warning. Based on the specific circumstances of the maintenance personnel, personalized optimization value calculations are performed to ensure that the most appropriate maintenance personnel are selected for fault handling. By calculating the optimization values ​​of maintenance personnel, maintenance resources are reasonably allocated to improve the quality and efficiency of maintenance work. If the preferred maintenance personnel fails to respond in time, the system will automatically select the second-best maintenance personnel to ensure that fault handling is not delayed due to personnel problems.

[0039] Optimized early warning: When the reactor still has a turn-to-turn short-circuit fault, the relevant parameters within the set time period before the fault occurs are analyzed again, and the integrated early warning set is updated based on the analysis results; the relevant parameters include temperature change parameters, reactance change parameters, and vibration parameters;

[0040] By re-analyzing the relevant parameters of subsequent faults, the warning set can be continuously optimized and updated to make the warning system more accurate and effective.

[0041] Compared with the prior art, the present invention has the following beneficial effects:

[0042] The present invention establishes a temperature evaluation index, a reactance evaluation index and a vibration evaluation index by analyzing the historical fault data of the reactor, thereby constructing an early warning set of each historical fault of the reactor. These indexes can fully reflect the state change of the reactor before the fault, further set the monitoring time interval of the reactor, and after reaching the set monitoring time interval, respectively analyze the temperature change parameters, reactance change parameters and vibration parameters of the reactor within the set time period. If the analysis result of one group matches the parameters in the early warning set, the early warning signal is triggered, which solves the problem that the historical data of the reactor fault is not fully utilized in the prior art, and the subtle changes of the parameters before the historical fault occur are analyzed, thereby establishing an early warning mechanism for the reactor fault and the early warning intelligence level is low;

[0043] After triggering the early warning signal, the present invention can quickly select the most suitable maintenance personnel to handle the problem according to the specific situation of the maintenance personnel, thereby ensuring high efficiency of fault response.

[0044] The present invention sets an optimized early warning mechanism, which can continuously update the early warning set according to new fault data, significantly improves the reactor fault monitoring and early warning capabilities, and provides a strong guarantee for the safe operation of the power system. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] Further details, features and advantages of the present application are disclosed in the following description of exemplary embodiments in conjunction with the accompanying drawings, in which:

[0046] Figure 1 It is a flow chart of the present invention. DETAILED DESCRIPTION

[0047] Several embodiments of the present application will be described in more detail below with reference to the accompanying drawings so that those skilled in the art can implement the present application. The present application can be embodied in many different forms and purposes and should not be limited to the embodiments described herein. These embodiments are provided to make the present application comprehensive and complete, and to fully convey the scope of the present application to those skilled in the art. The embodiments do not limit the present application.

[0048] Unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by those of ordinary skill in the art to which this application belongs. It will be further understood that terms such as those defined in commonly used dictionaries should be interpreted as having a meaning consistent with their meaning in the context of the relevant art and / or this specification, and will not be interpreted in an idealized or overly formal sense, unless explicitly defined as such herein.

[0049] See also Figure 1 As shown, a reactor fault monitoring system and early warning method include:

[0050] Data collection: Collect historical turn-to-turn short-circuit fault cases and times of the reactor, and integrate them into historical fault data packets of the reactor;

[0051] Data analysis: Based on the historical fault data packets of the reactor, the temperature change parameters within the set time period before each turn-to-turn short-circuit fault of the reactor are analyzed to obtain the temperature evaluation index Wp; the reactance change parameters within the set time period before each turn-to-turn short-circuit fault of the reactor are analyzed to obtain the reactance evaluation index Dp; the vibration parameters within the set time period before each turn-to-turn short-circuit fault of the reactor are analyzed to obtain the vibration evaluation index Dy;

[0052] The temperature evaluation index Wp is obtained, specifically:

[0053] Obtain the temperature values ​​at each time point in the set time period before the turn-to-turn short-circuit fault occurs, and construct a temperature change line graph based on this; draw the value points of the temperature values ​​at each time point in the line graph, connect two adjacent value points to obtain a value line, calculate the slope of the value line and the angle between the value line and the horizontal line; when the angle between the value line and the horizontal line is an acute angle, mark the slope of the value line as the first slope; when the angle between the value line and the horizontal line is an obtuse angle, mark it as the second slope; sum up all the values ​​of the first slope to obtain a first total value and mark it as P1, sum up all the values ​​of the second slope and take the absolute value to obtain a second total value and mark it as P2;

[0054] Connect the first numerical point in the line chart with the last numerical point in the line chart to obtain a line segment and mark the line segment as the general trend line, calculate the slope of the general trend line and the angle with the horizontal line, when the angle between the general trend line and the horizontal line is an acute angle, mark the slope of the general trend line as the third slope, and the value of the third slope is represented by the symbol K1; when the angle between the previous sequence line and the horizontal line is an obtuse angle, mark the slope of the previous sequence line as the fourth slope, and the absolute value of the fourth slope is represented by the symbol K2;

[0055] Calculate the vertical distance between the highest value point and the lowest value point and mark the value of the vertical distance as P3; use the formula Er = (P2 / P1) × d1 + Ki × d2 + P3 × d3 to obtain the temperature change index Er; where i = 1 or 2; d1, d2 and d3 are all preset influence weight factors;

[0056] Based on the temperature values ​​obtained at each time point, the average of the temperature values ​​at each time point is taken as the temperature average of each fault within the set time period, the maximum value of the temperature values ​​at each time point is taken as the temperature peak of each fault within the set time period, the reference temperature threshold of the reactor is preset, and the ratios between the temperature average, the temperature peak and the reference temperature threshold are calculated respectively as the average ratio index and the peak ratio index of the reactor within the set time period; and recorded as Ew and Eq;

[0057] According to the formula The temperature variation index Er, the average ratio index Ew and the peak ratio index Eq of the reactor within the set time period are weightedly calculated to obtain the temperature evaluation index Wp of the reactor within the set time period; wherein Ex represents the preset reference threshold index corresponding to the reactor temperature variation index Er, and a1, a2 and a3 are all preset influence weight factors;

[0058] It should be noted that the above-mentioned method realizes in-depth analysis and quantitative evaluation of the temperature change before the short-circuit fault of the reactor turn-to-turn, and provides an evaluation system that comprehensively considers the relationship between the temperature change trend, extreme value and safety threshold. By calculating the sum of the first slope and the second slope, the slope of the total trend line, the temperature extreme value and the ratio with the reference threshold, this method can reveal the key characteristics of the temperature change of the reactor before the fault and convert it into a quantitative temperature evaluation index Wp.

[0059] The reactance evaluation index Dp is obtained, specifically:

[0060] Obtain the reactance value at each time point in the set time period before the turn-to-turn short-circuit fault occurs, calculate the reactance value at each time point using the standard deviation formula, and record the calculated result as the fluctuating reactance index as Ua;

[0061] The reactance value of the preset reactor under normal operating conditions is calculated, and the difference between the reactance value at each time point and the preset reactance value is calculated. After taking the absolute value, the mean of all the differences is calculated, and the ratio of the calculated mean value to the preset reactance value is calculated to obtain the reactance change index Ub;

[0062] According to the formula The fluctuating reactance index Ua and the reactance variation index Ub of the reactor within the set time period are weightedly calculated to obtain the reactance evaluation index Dp of the reactor within the set time period; wherein r1 and r2 are the influence weight factors of the fluctuating reactance index Ua and the reactance variation index Ub respectively;

[0063] It should be noted that by quantitatively analyzing the volatility and change trend of the reactor's reactance value before the turn-to-turn short-circuit fault, combined with the fluctuating reactance index Ua and the reactance change index Ub, the reactor's status can be evaluated more comprehensively, providing a basis for early fault warning.

[0064] The vibration evaluation index Dy is obtained, specifically:

[0065] Obtain the decibel value of the reactor at each time point in the set time period, preset the maximum allowable value of the decibel value during the operation of the reactor, compare the decibel value of each time point with the preset maximum allowable value one by one, and mark the decibel value greater than the preset maximum allowable value as an abnormal decibel value;

[0066] Count the number of abnormal decibel values ​​and record it as Ga, and take the mean of each group of abnormal decibel values ​​and record it as Gb;

[0067] Further obtain the vibration times of the reactor within the set time period and record it as Gc;

[0068] According to the formula The vibration evaluation index Dy is obtained by weighted calculation of the number of abnormal decibel values ​​Ga, the average value of abnormal decibel values ​​Gb and the number of vibrations Gc of the reactor within the set time period; v1, v2 and v3 are the influence weight factors of the number of abnormal decibel values ​​Ga, the average value of abnormal decibel values ​​Gb and the number of vibrations Gc respectively; G 参考 Indicates the preset maximum allowed value;

[0069] It should be noted that the vibration status of the reactor is comprehensively evaluated by combining the abnormal decibel value and the number of vibrations, which provides an early warning for the vibration problems of the reactor and helps to take timely measures to prevent the occurrence of potential faults.

[0070] Results integration: The temperature evaluation index Wp, reactance evaluation index Dp and vibration evaluation index Dy corresponding to each turn-to-turn short-circuit fault of the reactor are extracted and integrated into the early warning set of each fault of the reactor;

[0071] Early warning triggering: Set the monitoring time interval of the reactor, and after the set monitoring time interval is reached, analyze the temperature change parameters, reactance change parameters and vibration parameters of the reactor within the set time period. If the analysis result of one group matches the parameters in the early warning set, the early warning signal is triggered;

[0072] Warning processing: Execute corresponding steps based on the triggered warning signal;

[0073] Specifically:

[0074] S1: Obtain each maintenance personnel and personnel information corresponding to the current reactor; mark the maintenance personnel's number as f, f=1, ..., n;

[0075] S2: Obtain the distance between the maintenance personnel and the location of the reactor as Mf, record the total number of maintenance times performed by the maintenance personnel as Zf; set the age of the maintenance personnel as Qf;

[0076] S3: The maintenance personnel's employment time is obtained by comparing their employment time with the current system time, and marked as Lf;

[0077] S4: Utilizing the formula The optimal value QG of the maintenance personnel is obtained; among which h1, h2, h3 and h4 are the influencing weight factors of the maintenance personnel's travel distance Mf, total number of maintenance times Zf, length of employment Lf and age Qf respectively;

[0078] S5: Select the maintenance personnel with the largest preferred value QG as the early warning processing personnel; then send the early warning processing instruction to the mobile terminal of the early warning processing personnel; when the early warning processing personnel feedback the confirmation instruction within the preset time range, the total number of maintenance times of the early warning processing personnel increases by one, and at the same time, send the number and location of the reactor to be processed to the mobile terminal of the early warning processing personnel; when the early warning processing personnel does not feedback the confirmation instruction within the preset time range, the maintenance personnel with the next highest preferred value QFG is marked as the early warning processing personnel, and the early warning processing instruction is sent to the mobile terminal of the early warning processing personnel; and so on;

[0079] It should be noted that by setting the monitoring time interval and conducting regular analysis, potential abnormal conditions of the reactor can be discovered in time and rapid response can be achieved. The automated early warning trigger mechanism reduces the need for manual monitoring and improves the efficiency of monitoring and early warning. It performs personalized optimization value calculations based on the specific circumstances of the maintenance personnel to ensure that the most appropriate maintenance personnel are selected for fault handling. By calculating the optimization values ​​of maintenance personnel, maintenance resources are reasonably allocated to improve the quality and efficiency of maintenance work. If the preferred maintenance personnel fails to respond in time, the system will automatically select the second-best maintenance personnel to ensure that fault handling is not delayed due to personnel problems.

[0080] Optimized early warning: When the reactor still has a turn-to-turn short-circuit fault, the relevant parameters within the set time period before the fault occurs are analyzed again, and the integrated early warning set is updated based on the analysis results; the relevant parameters include temperature change parameters, reactance change parameters, and vibration parameters;

[0081] It should be noted that by re-analyzing the relevant parameters of subsequent faults, the warning set can be continuously optimized and updated to make the warning system more accurate and effective.

[0082] The above formulas are obtained by collecting a large amount of data and performing software simulation, and a formula close to the actual value is selected. The influencing weight factor and specific coefficient value in the formula are set by technical personnel in this field according to actual conditions, and can be adjusted and modified later.

[0083] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A reactor fault monitoring system and early warning method, characterized in that: include: Data collection: Collect historical turn-to-turn short-circuit fault cases and times of the reactor, and integrate them into historical fault data packets of the reactor; Data analysis: Based on the historical fault data packets of the reactor, the temperature change parameters within the set time period before each turn-to-turn short-circuit fault of the reactor are analyzed to obtain the temperature evaluation index Wp; the reactance change parameters within the set time period before each turn-to-turn short-circuit fault of the reactor are analyzed to obtain the reactance evaluation index Dp; the vibration parameters within the set time period before each turn-to-turn short-circuit fault of the reactor are analyzed to obtain the vibration evaluation index Dy; Results integration: The temperature evaluation index Wp, reactance evaluation index Dp and vibration evaluation index Dy corresponding to each turn-to-turn short-circuit fault of the reactor are extracted and integrated into the early warning set of each fault of the reactor; Early warning triggering: Set the monitoring time interval of the reactor, and after the set monitoring time interval is reached, analyze the temperature change parameters, reactance change parameters and vibration parameters of the reactor within the set time period. If the analysis result of one group matches the parameters in the early warning set, the early warning signal is triggered; Warning processing: Execute corresponding steps based on the triggered warning signal.

2. A reactor fault monitoring system and early warning method according to claim 1, characterized in that: The temperature variation parameters in the set time period before each turn-to-turn short-circuit fault of the reactor are analyzed, specifically: Obtain the temperature values ​​at each time point in the set time period before the turn-to-turn short-circuit fault occurs, and construct a temperature change line graph based on this; draw the value points of the temperature values ​​at each time point in the line graph, connect two adjacent value points to obtain a value line, calculate the slope of the value line and the angle between the value line and the horizontal line; when the angle between the value line and the horizontal line is an acute angle, mark the slope of the value line as the first slope; when the angle between the value line and the horizontal line is an obtuse angle, mark it as the second slope; sum up all the values ​​of the first slope to obtain a first total value and mark it as P1, sum up all the values ​​of the second slope and take the absolute value to obtain a second total value and mark it as P2; Connect the first numerical point and the last numerical point in the line graph to get a line segment and mark the line segment as the general trend line, calculate the slope of the general trend line and the angle with the horizontal line, when the angle between the general trend line and the horizontal line is an acute angle, mark the slope of the general trend line as the third slope, and the value of the third slope is represented by the symbol K1; When the angle between the preceding line and the horizontal line is an obtuse angle, the slope of the preceding line is marked as the fourth slope, and the absolute value of the fourth slope is represented by the symbol K2; Calculate the vertical distance between the highest value point and the lowest value point and mark the value of the vertical distance as P3; use the formula Er = (P2 / P1) × d1 + Ki × d2 + P3 × d3 to obtain the temperature change index Er; wherein, i = 1 or 2; d1, d2 and d3 are all preset influencing weight factors.

3. A reactor fault monitoring system and early warning method according to claim 1, characterized in that: The specific steps to obtain the temperature evaluation index Wp are: Based on the temperature values ​​obtained at each time point, the average of the temperature values ​​at each time point is taken as the temperature average of each fault within the set time period, the maximum value of the temperature values ​​at each time point is taken as the temperature peak of each fault within the set time period, the reference temperature threshold of the reactor is preset, and the ratios between the temperature average, the temperature peak and the reference temperature threshold are calculated respectively as the average ratio index and the peak ratio index of the reactor within the set time period; and recorded as Ew and Eq; According to the formula The temperature variation index Er, average ratio index Ew and peak ratio index Eq of the reactor within the set time period are weightedly calculated to obtain the temperature evaluation index Wp of the reactor within the set time period; wherein Ex represents the preset reference threshold index corresponding to the reactor temperature variation index Er, and a1, a2 and a3 are all preset influencing weight factors.

4. A reactor fault monitoring system and early warning method according to claim 1, characterized in that: The specific steps to obtain the reactance evaluation index Dp are: Obtain the reactance value at each time point in the set time period before the turn-to-turn short-circuit fault occurs, calculate the reactance value at each time point using the standard deviation formula, and record the calculated result as the fluctuating reactance index as Ua; The reactance value of the preset reactor under normal operating conditions is calculated, and the difference between the reactance value at each time point and the preset reactance value is calculated. After taking the absolute value, the mean of all the differences is calculated, and the ratio of the calculated mean value to the preset reactance value is calculated to obtain the reactance change index Ub; According to the formula The fluctuating reactance index Ua and the reactance variation index Ub of the reactor within the set time period are weightedly calculated to obtain the reactance evaluation index Dp of the reactor within the set time period; wherein r1 and r2 are the influencing weight factors of the fluctuating reactance index Ua and the reactance variation index Ub, respectively.

5. A reactor fault monitoring system and early warning method according to claim 1, characterized in that: The specific steps to obtain the vibration evaluation index Dy are: Obtain the decibel value of the reactor at each time point in the set time period, preset the maximum allowable value of the decibel value during the operation of the reactor, compare the decibel value of each time point with the preset maximum allowable value one by one, and mark the decibel value greater than the preset maximum allowable value as an abnormal decibel value; Count the number of abnormal decibel values ​​and record it as Ga, and take the mean of each group of abnormal decibel values ​​and record it as Gb; Further obtain the vibration times of the reactor within the set time period and record it as Gc; According to the formula The vibration evaluation index Dy is obtained by weighted calculation of the number of abnormal decibel values ​​Ga, the average value of abnormal decibel values ​​Gb and the number of vibrations Gc of the reactor within the set time period; v1, v2 and v3 are the influence weight factors of the number of abnormal decibel values ​​Ga, the average value of abnormal decibel values ​​Gb and the number of vibrations Gc respectively; G 参考 Indicates the preset maximum allowed value.

6. A reactor fault monitoring system and early warning method according to claim 1, characterized in that: Based on the triggered warning signaling, the corresponding steps are executed, specifically: S1: Obtain each maintenance personnel and personnel information corresponding to the current reactor; mark the maintenance personnel's number as f, f=1, ..., n; S2: Obtain the distance between the maintenance personnel and the location of the reactor as Mf, record the total number of maintenance times performed by the maintenance personnel as Zf; set the age of the maintenance personnel as Qf; S3: The maintenance personnel's employment time is obtained by comparing their employment time with the current system time, and marked as Lf; S4: Utilizing the formula The optimal value QG of the maintenance personnel is obtained; among which h1, h2, h3 and h4 are the influencing weight factors of the maintenance personnel's travel distance Mf, total number of maintenance times Zf, length of employment Lf and age Qf respectively; S5: Select the maintenance personnel with the largest preferred value QG as the early warning processing personnel; then send the early warning processing instruction to the early warning processing personnel's mobile terminal; when the early warning processing personnel feedback the confirmation instruction within the preset time range, the total number of maintenance times of the early warning processing personnel increases by one, and at the same time, the number and location of the reactor to be processed are sent to the mobile terminal of the early warning processing personnel; when the early warning processing personnel does not feedback the confirmation instruction within the preset time range, the maintenance personnel with the next highest preferred value QFG is marked as the early warning processing personnel, and the early warning processing instruction is sent to the mobile terminal of the early warning processing personnel; and so on.

7. A reactor fault monitoring system and early warning method according to claim 1, characterized in that: It also includes optimization warnings, specifically: When the reactor still has a turn-to-turn short-circuit fault, the relevant parameters within the set time period before the fault occurs are analyzed again, and the integrated warning set is updated based on the analysis results; The relevant parameters include temperature change parameters, reactance change parameters and vibration parameters.

Citation Information

Cited By

  • Street lamp monitoring management system integrated with RFID

    CN119831228A

  • Distribution transformer equipment detection and evaluation method based on big data analysis

    CN120049617A

  • Dry-type air-core reactor turn-to-turn short circuit early warning method based on power factor

    CN121477037A