Quality evaluation and measurement visa method and system for unit project

By decomposing and defining unit projects, establishing construction process inspection standards and quality inspection standards, combining fuzzy set theory and multi-level fuzzy pattern recognition model, the information lag problem in unit projects' quality assessment and monitoring is solved, and the engineering project is realized Information management and construction safety guarantee.

CN118966860AInactive Publication Date: 2024-11-15CHINA THREE GORGES CORPORATION
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410928481.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In engineering construction management, there is information lag in quality assessment and monitoring of unit projects, and existing management methods are difficult to adapt to the actual needs of construction quality, and the dispersion of on-site personnel has led to a large amount of statistical and audit workload.

Method used

A method for quality assessment and measurement visa for unit projects is proposed. By decomposing and defining unit projects, a construction process inspection standard and quality inspection standard are established, inspection is carried out and visa judgment is carried out, the project quality evaluation results are obtained, and construction quality problems are determined. Visa management and evaluation acceptance are carried out, and fuzzy set theory and multi-level fuzzy pattern recognition model are used for quantitative and qualitative evaluation.

Benefits of technology

It realizes information management of engineering projects, supports comprehensive safety and quality management, and reviews and inquiries of project information in real time, effectively reduces the workload of staff and ensures construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118966860A_ABST
    Figure CN118966860A_ABST
Patent Text Reader

Abstract

The invention discloses a quality evaluation and metering visa method, system and device of a unit project and a medium, and belongs to the technical field of project quality evaluation. The method comprises the following steps: decomposing and defining unit projects, and establishing a construction process detection standard and a quality detection standard for at least one unit project; detecting a specified construction process according to the construction process detection standard, and performing visa judgment on the quality of the construction process to obtain a project quality evaluation result; determining whether an engineering construction quality problem exists or not according to the engineering quality evaluation result; performing visa management on the engineering construction quality problem; the project quality is evaluated and accepted, the evaluation and acceptance data is subjected to metering statistical analysis and display, and qualified projects are subjected to passing visa. Therefore, informatization management of the engineering project is realized, comprehensive safety and quality management of the project is supported, project information is retrieved and inquired in real time, the workload of workers is effectively reduced, and meanwhile, safe project construction is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of engineering quality assessment, and in particular relates to a method, system, equipment and medium for quality assessment and metrological certification of a unit project. Background Art

[0002] At present, in the engineering construction management, the project construction generally has the problem that the on-site construction personnel and equipment are dispersed over a wide range, there are many construction sites, especially the scattered projects in the unit project are rather chaotic to be manually counted, and the workload of the staff is heavy; there is a lack of quality assessment and monitoring methods for the unit project, and the existing personnel statistics and audits have the phenomenon of lagging data and information. The existing management methods can no longer meet the actual needs of project construction quality. Summary of the invention

[0003] In view of the above problems, the present disclosure proposes a method, system, equipment and medium for quality assessment and metrological certification of a unit project.

[0004] The present application embodiment provides a method for quality assessment and measurement certification of a unit project, see Figure 1 ,include:

[0005] Decompose and define unit projects, and establish construction process inspection standards and quality inspection standards for at least one of the unit projects;

[0006] Perform inspection on the designated construction process according to the construction process inspection standard, make a certification judgment on the quality of the construction process, and obtain the project quality evaluation result;

[0007] Determine whether there are any quality problems in the construction of the project based on the project quality evaluation results; and conduct visa management on the quality problems in the construction of the project;

[0008] The project quality is assessed and accepted, and the assessment and acceptance data are analyzed and displayed quantitatively and statistically. Qualified projects are given a pass visa.

[0009] Furthermore, the construction process detection according to the construction process detection standard includes:

[0010] Construction process inspection, construction material inspection and test piece inspection shall be carried out according to the construction process inspection standards.

[0011] Furthermore, the detection of the construction process according to the construction process detection standard includes:

[0012] Conduct inspection for each process according to one of several types of construction units;

[0013] Among them, the actual detection value of one type of process is obtained, and the actual detection value is compared with the standard value in the detection standard.

[0014] Furthermore, the quality of the construction process is assessed and the project quality evaluation result is obtained, including:

[0015] Conduct quantitative and qualitative evaluation of project quality;

[0016] Among them, the quantitative evaluation of project quality includes:

[0017] Assume that a unit project consists of multiple sub-projects;

[0018] Compare and analyze the sub-projects in the section project with the entire project in the unit project.

[0019] Furthermore, the comparative analysis of the sub-projects in the sub-project and the entire project in the unit project includes:

[0020] Through the "non-structured decision fuzzy set analysis unit system theory" in fuzzy set theory, the binary quantitative comparison quantitative scale of the entire project in the sub-project and the unit project is determined.

[0021] Furthermore, the method also includes: dividing the unit project into m evaluation ranges according to n classification types to determine a scoring matrix; determining the standard scores of evaluation indicators according to c levels, then there is an m×c-order indicator standard score matrix Y; wherein n and m are positive integers.

[0022] The data are listed and normalized according to the standard score matrix, and the comprehensive evaluation matrix of the quantitative part is solved through the multi-level fuzzy pattern recognition model;

[0023] A quantitative comprehensive evaluation vector is determined according to the quantitative partial comprehensive evaluation matrix.

[0024] Furthermore, the qualitative evaluation of the project quality includes:

[0025] Set the project evaluation level; the level evaluation matrix can be obtained by evaluating the project level according to the scoring items.

[0026] Furthermore, the method further comprises: calculating the relative membership of the conformity between the level eigenvalue vector H of the quantitative evaluation part scoring matrix and the qualitative evaluation matrix V;

[0027] Determine the relative affiliation of the reviewer’s familiarity with the project;

[0028] Establish a relative membership matrix of conformity and familiarity;

[0029] Furthermore, the method also includes: determining the weights of the relative membership of the degree of compliance and the relative membership of the degree of familiarity according to project characteristics.

[0030] Furthermore, the method further comprises: multiplying the weight of the degree of conformity and the degree of familiarity by the relative membership matrix of the degree of conformity and the degree of familiarity, obtaining the unnormalized weight vector of the reviewer, and normalizing the weight vector;

[0031] The normalized weight vector is multiplied by the transposed matrix of the relative membership matrix of the quantitative evaluation part to obtain the evaluation matrix of the quantitative part;

[0032] Multiply the normalized weight vector by the transpose of the evaluation matrix V of the qualitative part to obtain the evaluation matrix of the qualitative part.

[0033] Furthermore, the method also includes: obtaining a qualitative evaluation weight vector and a quantitative review weight vector, and determining the relative membership of the project comprehensive evaluation grade according to the qualitative evaluation weight vector and the quantitative review weight vector.

[0034] Based on the same inventive concept, the embodiment of the present application also provides a unit project quality assessment and measurement certification system, including:

[0035] A standard establishment unit is used to decompose and define unit projects, and establish construction process inspection standards and quality inspection standards for at least one of the unit projects;

[0036] A process evaluation unit is used to perform detection on the specified construction process according to the construction process detection standard, to make a certification judgment on the quality of the construction process, and to obtain a project quality evaluation result;

[0037] A visa management unit is used to determine whether there are any problems with the construction quality of the project according to the project quality evaluation results; and to perform visa management on the construction quality problems of the project;

[0038] The assessment and acceptance unit is used to assess and accept the quality of the project, conduct metrological statistical analysis and display of the assessment and acceptance data, and issue a pass visa to qualified projects.

[0039] Based on the same inventive concept, another aspect of the embodiment of the present application further provides an electronic device, comprising: a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other via the communication bus;

[0040] a memory storing a computer program;

[0041] The processor, when executing the program stored in the memory, implements the quality assessment and metrological certification methods for the unit project.

[0042] Based on the same inventive concept, on the other hand, an embodiment of the present application further provides a computer-readable storage medium, characterized in that a computer program is stored therein, and when the computer program is executed by a processor, a quality assessment and metrological certification method for a unit project is implemented.

[0043] Beneficial effects of the present disclosure: This application decomposes and defines unit projects, establishes construction process inspection standards and quality inspection standards for at least one of the unit projects; performs inspections on designated construction processes according to the construction process inspection standards, and visas the quality of the construction processes to obtain project quality evaluation results; determines whether there are quality problems in project construction according to the project quality evaluation results; visas the quality problems in project construction; evaluates and accepts the quality of the project, performs metrological statistical analysis and displays the evaluation and acceptance data, and gives visas to qualified projects. It can be seen that the information management of engineering projects is realized, comprehensive safety and quality management of projects is supported, and real-time access to project information is realized, effectively reducing the workload of staff, while ensuring the safe progress of project construction.

[0044] Other features and advantages of the present disclosure will be described in the following description, and partly become apparent from the description, or be understood by implementing the present disclosure. The purpose and other advantages of the present disclosure can be realized and obtained by the structures indicated in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] In order to more clearly illustrate the embodiments of the present disclosure or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0046] Figure 1 This is a flow chart of a method for quality assessment and measurement certification of a unit project according to an embodiment of the present application;

[0047] Figure 2 This is a schematic diagram of a quality assessment and measurement certification system for a unit project according to an embodiment of the present application;

[0048] Figure 3 A schematic diagram of an electronic device according to an embodiment of the present application. DETAILED DESCRIPTION

[0049] In order to make the purpose, technical solution and advantages of the embodiments of the present disclosure clearer, the technical solution in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings in the embodiments of the present disclosure. Obviously, the described embodiments are part of the embodiments of the present disclosure, not all of the embodiments. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present disclosure.

[0050] It should be noted that the terms "first", "second" etc. in the present application are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged in appropriate circumstances, so that the embodiments of the present application described here. In the present application, the orientation or positional relationship indicated by the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inside", "outside", "middle", "vertical", "horizontal", "lateral", "longitudinal" etc. are based on the orientation or positional relationship shown in the accompanying drawings.

[0051] The acceptance of major projects is carried out in accordance with relevant national regulations, which is reflected in the necessary data entry. All construction quality inspections and project acceptance must be carried out after the construction unit first conducts self-inspection and submits an acceptance application. The supervision unit inspects and approves the acceptance application of the construction unit and conducts quality assessment. The design unit participates in the project acceptance organized by the supervision unit and the owner and signs their opinions.

[0052] During the acceptance of contract engineering projects or the completion acceptance organized by the state, the owner, supervisor, design, construction and operation units can conduct evaluations and provide inspection and certification opinions on existing problems and their treatment results. Document registration of various acceptance and evaluation documents.

[0053] This application provides a powerful modern management means for the entry, query, and tabulation of quality control tracking information in all links of construction quality, from raw materials, semi-finished products to finished products. The system also provides an extremely practical module - tracking the actual progress of the project and the actual main indicator of the project quantity. Quality tracking and quality evaluation require a comparison standard. These inspection indicators and inspection standards need to be established once before the implementation of actual quality tracking or in stages and batches according to the progress of the project. The operation of the quality management subsystem can be divided into three parts, namely the establishment of quality standards (including material or test piece standards and process inspection standards), the collection of actual quality tracking information, and the output of quality reports. It is mainly used to ensure and implement construction quality management. The implementation of construction quality management mainly involves the following aspects: construction quality testing, including: engineering materials, semi-finished products, finished products, concrete material grading ratio and mix ratio test before concrete pouring, sampling test of engineering materials in any construction project or part, etc. Quality control and management in construction preparation, including the formulation and management of construction specifications, standards and coding, as well as some process tests and process tests before construction. Quality control and management during the construction process include: construction material certification management, construction process inspection and assurance; construction quality inspection certification and project acceptance; and project quality accident management.

[0054] The present application embodiment provides a method for quality assessment and measurement certification of a unit project, see Figure 1 ,include:

[0055] S101: Decompose and define the unit projects, and establish construction process inspection standards and quality inspection standards for at least one of the unit projects;

[0056] S102: Performing inspection on the designated construction process according to the construction process inspection standard, making a certification judgment on the quality of the construction process, and obtaining a project quality evaluation result;

[0057] S103: Determine whether there are any quality problems in the construction of the project according to the project quality evaluation results; and perform visa management on the quality problems in the construction of the project;

[0058] S104: Assess and accept the project quality, conduct quantitative statistical analysis and display of the assessment and acceptance data, and issue a pass visa to qualified projects.

[0059] In some embodiments, in step S101, the detecting of the construction process according to the construction process detection standard includes:

[0060] According to the construction process inspection standards, the construction process, construction materials and test pieces are inspected.

[0061] Specifically, construction process inspection standards are established. Quality inspection standards are the core of quality on-site management, including two parts: construction process inspection standards and material and test piece inspection standards. The construction process inspection standards are determined by the construction unit, and the owner's quality and safety department is generally responsible for the data maintenance of daily inspection standards.

[0062] The unit project in step S101 is decomposed and defined below with reference to an example for detailed description.

[0063] Take D8502 unit project as an example, in the quality management process and the project contract related project decomposition code (including the entry, query, modification and deletion of the project decomposition code). During the entry process, the user only needs to enter the relevant contract code (can be selected and entered through LOV) and enter the project decomposition code of the contract according to the project decomposition code rules (the existing project decomposition code can be queried through LOV). After confirming that the project decomposition code entered this time is valid, it will automatically decompose it into unit project number, sub-project number, sub-item project number and unit project number and display it on the screen. At the same time, the code is automatically identified to determine its level and displayed on the screen. This greatly reduces the amount of code entry for users.

[0064] During the query process, users can query by contract code, contract code + project breakdown code or contract code + unit project number, etc. If you want to query the specific quality of the part corresponding to the project breakdown code, you can navigate to other modules of the quality management system using the navigation keys below.

[0065] The following is a description of the fields in this application operation interface:

[0066] Contract code - The contract code can be entered manually but must exist in the data on screen D4001 and its contract status must be '3'. It can also be entered and queried using the value list LOV or by code input (CodeInput).

[0067] Contract Name - This field is the display item of the contract code description, which is automatically entered by the system. If the description you see is incomplete, you can click it with the mouse, and then move the cursor to see the complete description of the contract code.

[0068] Project code - that is, the project decomposition code corresponding to the contract entered previously. The maximum length of this code is 9 characters long. It can also be entered as 1, 3, 5, or 9 digits, which are unit project code, sub-project code, sub-item project code, and unit project code. When other digits are entered, the system reports an error and provides the correct entry format. In the entry state, the project code entered first must be a new code for the contract. The value list LOV can be used to query the existing project code for the contract or the value list LOV can be used to enter and then modify it to a new project code. In the query state, you can perform an unconditional query, or perform an unconditional query for a certain contract, or enter symbols '>', '<', '=', '>=', '<=', etc. in this field for conditional query, or perform a combined query by contract code + project code. You can enter the following query conditions for a comprehensive query of the code: enter the query condition to query all unit project codes; enter the query condition to query all sub-project codes; enter the query condition '1' to query all sub-projects with unit project codes of 1. Other code query methods are similar to the above. When entering codes, you should make full use of the above query methods. Code description - the Chinese explanation of the project code, which can be entered up to 30 characters. In the query state, if the code description you see is not complete, you can click it with the mouse, and then move the cursor to see the complete description of the project code.

[0069] Level - This field is a description of the level code, which is automatically generated by the system based on the project code. In the quality management system, there are four levels of project code (i.e. unit, division, sub-item, unit, etc.).

[0070] Unit Project - This field is a description of the unit project number, which is automatically generated by the system based on the project code. This field can be scrolled.

[0071] Branch Project - This field is a description of the branch project number, which is automatically generated by the system based on the project code. This field can be scrolled.

[0072] Unit Project - This field is a description of the unit project number, which is automatically generated by the system based on the project code. This field can be scrolled.

[0073] D8502 unit project definition mainly defines the detailed information of the unit project, such as pile number, construction type, construction status (planned, under construction, completed), unit, etc. The unit project corresponds to the unit project in D8501 project decomposition code.

[0074] Contract Code - The contract code (12 characters) can be entered manually but must exist in the data on screen D4001 and have a contract status of '3'.

[0075] Contract Name - This field is the display item of the contract code description, which is automatically entered by the system. If the description you see is incomplete, you can click it with the mouse, and then move the cursor to see the complete description of the contract code.

[0076] Unit Project - This field is the unit project number, 1 character, which can be entered manually or using the value list LOV. Once the entry is completed, the description of the field will be automatically displayed afterwards.

[0077] Branch Project - This field is the branch project number, 2 characters, which can be entered manually or through the value list LOV. Once the entry is completed, the description of the field will be automatically displayed afterwards.

[0078] Sub-project - This field is the sub-project number, 2 characters, which can be entered manually or through the value list LOV. Once the entry is completed, the description of the field will be automatically displayed afterwards.

[0079] Unit Project - This field is the unit project number, 4 characters, which can be entered manually or using the value list LOV. Once the entry is completed, the description of the field will be automatically displayed afterwards.

[0080] Project code - the maximum length of this code is 9 characters. If the codes of each level are entered hierarchically, the project code is automatically generated by combining the codes of each level that have been entered; if the codes of the previous levels have not been entered, you can manually enter the existing project code or select it from the value list LOV. In the query state, you can perform an unconditional query, or perform an unconditional query for a certain contract, or enter the symbols '>', '<', '=', '>=', '<=', etc. in this field for conditional query, or perform a combined query by contract code + project code.

[0081] Construction type - that is, the construction type code, 3-digit character type, can be entered manually or in the value list LOV, and its description will be automatically displayed after entry.

[0082] Project quantity - that is, the size of the project quantity of this unit project.

[0083] Unit of quantity - selected and entered by LOV.

[0084] Start date, start time - that is, the start date of the unit project construction. The date type can be LOV or user-entered. The time format is hour, minute, and second format, where HH uses the 24-hour system.

[0085] Completion Date, Completion Time - the date and time when the construction of the unit project is completed.

[0086] The starting and ending coordinates of the starting pile number X - The coordinates of the starting and ending pile number X are composed of two parts, namely the cardinality and the fraction, which are input by the user. The unit of the cardinality is 1000, that is, KM, so the total value is 1000X cardinality + fraction, which represents the position in the geodetic coordinate system.

[0087] The starting and ending coordinates of the starting pile number Y - The coordinates of the starting and ending pile number Y are also composed of two parts, namely the cardinality and the fraction, which are input by the user's keyboard. The unit of the cardinality is 1000, that is, KM, so the total value is 1000X cardinality + fraction. Represents the position in the geodetic coordinate system.

[0088] Starting and ending elevations - that is, the starting and ending elevations of the pile number, are input by the user's keyboard respectively.

[0089] Warehouse number refers to the artificial numbering of the construction warehouse.

[0090] Remarks - A brief description of the unit project. Up to 120 characters can be entered. This field is scrollable and will automatically wrap at the end of the line.

[0091] In some embodiments, in step S103, the detecting of the construction process according to the construction process detection standard includes:

[0092] Conduct inspection for each process according to one of several types of construction units;

[0093] Among them, the actual detection value of one type of process is obtained, and the actual detection value is compared with the standard value in the detection standard.

[0094] Furthermore, the quality of the construction process is assessed and the project quality evaluation result is obtained, including:

[0095] Conduct quantitative and qualitative evaluation of project quality;

[0096] Among them, the quantitative evaluation of project quality includes:

[0097] Assume that a unit project consists of multiple sub-projects;

[0098] Compare and analyze the sub-projects in the divisional project with the entire project in the unit project;

[0099] Furthermore, the comparative analysis of the sub-projects in the sub-project and the entire project in the unit project includes:

[0100] Through the "non-structured decision fuzzy set analysis unit system theory" in fuzzy set theory, the binary quantitative comparison quantitative scale of the entire project in the sub-project and the unit project is determined.

[0101] Furthermore, the method also includes: dividing the unit project into m evaluation ranges according to n classification types to determine a scoring matrix; determining the standard scores of evaluation indicators according to c levels, then there is an m×c-order indicator standard score matrix Y; wherein n and m are positive integers.

[0102] The data are listed and normalized according to the standard score matrix, and the comprehensive evaluation matrix of the quantitative part is solved through the multi-level fuzzy pattern recognition model;

[0103] A quantitative comprehensive evaluation vector is determined according to the quantitative partial comprehensive evaluation matrix.

[0104] Specifically, suppose a project is composed of several sub-projects, and each sub-project has a different position in the whole project. According to the commonly used description, there are nine kinds of descriptions. The sub-project and the whole project are compared and analyzed. The "non-structured decision fuzzy set analysis unit system theory" in fuzzy set theory can be used to determine the binary quantitative comparison quantitative scale. The corresponding membership calculation formula is:

[0105]

[0106] in: k γ is the relative membership of the quantitative scale μ 1j is the quantitative scale value corresponding to the fuzzy concept.

[0107] Assume that n classification types divide a project into m evaluation ranges, then the project has an m×n-order scoring matrix X, and the evaluation indicators are given standard scores according to c levels, so there is an m×c-order indicator standard score matrix Y:

[0108]

[0109] and

[0110] The actual test value of one type of process is obtained, and the actual test value is compared with the standard value in the test standard. The relative membership of each evaluation index is different. According to the above table, the relevant data are listed and normalized, and the multi-level fuzzy pattern recognition model is applied to solve the quantitative part comprehensive evaluation matrix, and the quantitative comprehensive evaluation vector of the process by the reviewer can be obtained.

[0111] In some embodiments, the qualitative evaluation of the project quality includes:

[0112] Set the project evaluation level; the level evaluation matrix can be obtained by evaluating the project level according to the scoring items.

[0113] Specifically, the project evaluation is set to five levels: excellent, excellent, good, fair, and poor. Based on the comprehensive evaluation of a project by n reviewers, the matrix V can be obtained: Reviewer: (1) (2)… (n) Level:

[0114]

[0115] Furthermore, the method further comprises: calculating the relative membership of the conformity between the level eigenvalue vector H of the quantitative evaluation part scoring matrix and the qualitative evaluation matrix V;

[0116] Determine the relative affiliation of the reviewer's familiarity with the project;

[0117] Establish a relative membership matrix of conformity and familiarity;

[0118] According to the characteristics of the project, the weights of the relative degree of compliance and the relative degree of familiarity are determined.

[0119] The product of the weight of the degree of conformity and the degree of familiarity and the relative membership matrix of the degree of conformity and the degree of familiarity is calculated to obtain the unnormalized weight vector of the reviewer, and the weight vector is normalized;

[0120] Multiply the normalized weight vector by the transposed matrix of the relative membership matrix of the quantitative evaluation part to obtain the evaluation matrix of the quantitative part;

[0121] Multiply the normalized weight vector by the transpose of the evaluation matrix V of the qualitative part, and obtain the evaluation matrix of the qualitative part.

[0122] Specifically, the above comprehensive evaluation includes the following steps:

[0123] 1) Calculate the relative degree of conformity between the level eigenvalue vector H of the quantitative evaluation part and the project qualitative evaluation matrix V;

[0124] 2) Determine the relative degree of familiarity of the reviewers with the project;

[0125] 3) Establish the relative membership matrix of conformity and familiarity;

[0126] 4) According to the characteristics of different projects, determine the weight of compliance and familiarity in determining the weight of reviewers;

[0127] 5) Calculate the unnormalized weight vector of the reviewer by multiplying the weight of the degree of conformity and the degree of familiarity by the relative membership matrix of the degree of conformity and the degree of familiarity, and normalize the weight vector;

[0128] 6) Multiplying the normalized weight vector by the transposed matrix of the relative membership matrix of the quantitative evaluation part to obtain the evaluation matrix of the quantitative part;

[0129] 7) Multiply the normalized weight vector by the transpose of the evaluation matrix V of the qualitative part to obtain the evaluation matrix of the qualitative part;

[0130] 8) Take qualitative and quantitative weight vectors according to standards or conventions to determine the relative degree of subordination of the project's comprehensive evaluation level;

[0131] 9) n peer experts will review the quality of the project and make a comprehensive evaluation of the quality level.

[0132] In some embodiments, the method further includes: obtaining a qualitative evaluation weight vector and a quantitative review weight vector, and determining the relative membership of the project comprehensive evaluation grade according to the qualitative evaluation weight vector and the quantitative review weight vector.

[0133] Specifically, the quality problems of project construction are determined based on the quantitative and qualitative evaluation results of the project quality. The quality problems are managed by the on-site supervision personnel of the supervision unit. The on-site supervision records the quality problems found on site through means such as project quality inspections.

[0134] Specifically, the tracking and management of the entire process of engineering quality accidents, the review of preliminary accident handling measures, and the handling of engineering quality accidents is divided into three parts:

[0135] The first part is the initial report information of the engineering quality accident, including the number and name of the quality accident, contract number, construction unit, design unit, supervision unit, time of the accident, location of the accident, preliminary judgment of the type of accident, preliminary situation and cause analysis of the accident, emergency measures, reporting unit and reporting time, etc.

[0136] Specifically, the quality accident number is entered by the keyboard, must be unique, and cannot be empty. It can be queried using the list of values ​​LOV, and this field cannot be modified;

[0137] Quality incident name - input by keyboard. If the incident status changes to "2" (already reviewed), this field cannot be empty. If the incident status is "2" (already reviewed) or "3" (already handled), this field cannot be modified;

[0138] Contract number - If the accident status changes to "2" (reviewed), this field cannot be empty. When entering, the corresponding "Construction Unit Code" will be automatically filled in. If the "Contract Number" is modified, the "Unit Engineering Code", "Sub-project Code", "Sub-item Engineering Code", and "Unit Engineering Code" will be automatically cleared. It can be input and queried using the value list LOV. If the accident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0139] Status code - cannot be empty. It can be input and queried using the value list LOV. When the cursor reaches this field, if the field is empty, "1" (initial report) is automatically filled in. If the accident status is empty, it can only be changed to "1"; if the accident status is "1", it can only be changed to "2"; if the accident status is "2", it can only be changed to "3"; if the accident status is "3", it cannot be changed; the unit engineering code must be the "unit engineering" that actually exists under the entered contract. If the "unit engineering code" is modified, the "sub-project code", "sub-item engineering code" and "unit engineering code" will be automatically cleared. It can be input and queried using the value list LOV. If the accident status is "2" (reviewed) or "3" (processed), this field cannot be modified;

[0140] Sub-project code - must be the "sub-project" that actually exists under the "contract" and "unit project" that are entered. If the "sub-project code" is modified, the "sub-project code" and "unit project code" will be automatically cleared. It can be input and queried using the value list LOV. If the accident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0141] Sub-project code - must be the "sub-project" that actually exists under the "contract", "unit project" or "sub-project" that is entered. If the "sub-project" is modified, the "unit project code" will be automatically cleared. You can use the value list LOV to input and query. If the accident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0142] Unit Project Code - The unit project code must be the actual "unit project" under the "contract", "unit project", "sub-project" and "sub-project" entered. You can use the value list LOV to enter and query. If the accident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0143] Design unit number - can be input and queried using the list of values ​​LOV. If the accident status changes to "2" (reviewed), this field cannot be empty. If the accident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0144] Supervision unit number - can be input and queried using the value list LOV. If the accident status changes to "2" (reviewed), this field cannot be empty. If the accident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0145] Construction unit number - automatically entered when "Contract code" is entered. It can be entered and queried using the list of values ​​LOV. If the accident status changes to "2" (reviewed), this field cannot be empty. If the accident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0146] Quality inspection department of the construction company - input by keyboard. If the accident status is "2" (already reviewed) or "3" (already handled), this field cannot be modified;

[0147] Incident date - the format is the default date format of the system. You can use the value list LOV or code to enter and query. If the incident status becomes "2" (reviewed), this field cannot be empty. If the incident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0148] Accident occurrence time - input by keyboard. The format is the default time format of the system. If the accident status changes to "2" (examined), this field cannot be empty. If the accident status is "2" (examined) or "3" (handled), this field cannot be modified;

[0149] Accident Discovery Date - The format is the default date format of the system, and a date earlier than the "accident occurrence date" is not allowed. It can be entered and queried using the value list LOV or code. If the accident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0150] Accident discovery time - input by keyboard. The format is the system default time format (i.e. HH:MM or HH:MM:SS). If the accident status is "2" (examined) or "3" (handled), this field cannot be modified;

[0151] Location of the accident - input by keyboard. If the accident status changes to "2" (examined), this field cannot be empty. If the accident status is "2" (examined) or "3" (handled), this field cannot be modified;

[0152] Incident Preliminary Type - If the incident status changes to "2" (reviewed), this field cannot be empty. It can be entered and queried using a list of values ​​LOV or code. If the incident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0153] Preliminary accident situation and cause - input by keyboard. If the accident status changes to "2" (already reviewed), this field cannot be empty. If the accident status is "2" (already reviewed) or "3" (already handled), this field cannot be modified;

[0154] Emergency measures and preliminary handling opinions - input by keyboard. If the accident status changes to "2" (already reviewed), this field cannot be empty. If the accident status is "2" (already reviewed) or "3" (already handled), this field cannot be modified;

[0155] Reporting Unit Number - It can be entered and queried using the List of Values ​​(LOV). If the incident status changes to "2" (reviewed), this field cannot be empty. If the incident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0156] Report date - The format is the default date format of the system. It is not allowed to enter a date earlier than the accident time. If the accident status becomes "2" (reviewed), this field cannot be empty. You can use the value list LOV to input and query. If the accident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0157] Reporting time - Entered by keyboard. The format is the system default time format (i.e. HH:MM or HH:MM:SS). If the incident status changes to "2" (reviewed), this field cannot be left blank. If the incident status is "2" (reviewed) or "3" (handled), this field cannot be modified.

[0158] The second part is the review opinion information of the engineering quality accident, including the signing unit, the person signing and the signing time, the opinions of the supervision unit and the signature of the chief supervision engineer, the opinions of the project manager and the signature of the project manager, the signature of the technical supervisor and other information.

[0159] Specifically, the signing unit number - can be input and queried using the value list LOV. If the incident status changes to "2" (reviewed), this field cannot be empty. If the incident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0160] Signatory - can be entered and queried using the list of values ​​LOV. If the incident status changes to "2" (reviewed), this field cannot be empty. If the incident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0161] Receipt date - the format is the default date format of the system. It is not allowed to enter a date earlier than the report date. If the accident status changes to "2" (reviewed), this field cannot be empty. You can use the value list LOV or value list maintenance function to enter and query. If the accident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0162] Receipt time - input by keyboard. The format is the default time format of the system (i.e. HH:MM or HH:MM:SS). If the incident status changes to "2" (examined), this field cannot be left blank. If the incident status is "2" (examined) or "3" (handled), this field cannot be modified.

[0163] Supervision unit review opinion - input by keyboard. If the accident status changes to "2" (already reviewed), this field cannot be empty. If the accident status is "2" (already reviewed) or "3" (already handled), this field cannot be modified;

[0164] Chief Supervisor Engineer Number - can be entered and queried using the value list LOV. If the accident status changes to "2" (reviewed), this field cannot be empty. If the accident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0165] Director Signature Date - The format is the default date format of the system. It is not allowed to enter a date earlier than the receipt date. If the incident status changes to "2" (reviewed), this field cannot be empty. You can use the value list LOV to input and query. If the incident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0166] Director Signature Time - Entered by keyboard. The format is the system default time format (i.e. HH:MM or HH:MM:SS). If the incident status changes to "2" (reviewed), this field cannot be left blank. If the incident status is "2" (reviewed) or "3" (handled), this field cannot be modified.

[0167] Project manager review comments - input by keyboard. If the accident status changes to "2" (already reviewed), this field cannot be empty. If the accident status is "2" (already reviewed) or "3" (already handled), this field cannot be modified;

[0168] Project Manager Number - can be entered and queried using the list of values ​​LOV. If the incident status changes to "2" (reviewed), this field cannot be empty. If the incident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0169] Project Manager Signature Date - The format is the default date format of the system. It is not allowed to enter a date earlier than the Director Signature Date. If the incident status changes to "2" (reviewed), this field cannot be empty. You can use the value list LOV to input and query. If the incident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0170] Project Manager Signature Time - Entered by keyboard. If the incident status changes to "2" (reviewed), this field cannot be left blank. The format is the system's default time format (i.e. HH:MM or HH:MM:SS). If the incident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0171] Technical Supervisor Number - can be entered and queried using the list of values ​​LOV. If the incident status changes to "2" (reviewed), this field cannot be empty. If the incident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0172] Technical Supervisor Signature Date - The format is the default date format of the system. It is not allowed to enter a date earlier than the Project Manager Signature Date. If the incident status changes to "2" (reviewed), this field cannot be empty. You can use the value list LOV to input and query. If the incident status is "2" (reviewed) or "3" (handled), this field cannot be modified;

[0173] Technical Supervisor Signature Time - Entered by keyboard. The format is the system default time format (i.e. HH:MM or HH:MM:SS). If the incident status changes to "2" (reviewed), this field cannot be left blank. If the incident status is "2" (reviewed) or "3" (handled), this field cannot be modified.

[0174] The third part is the information on the handling results of the project quality accident, including the cause analysis of the quality accident, construction period and economic losses, the main responsible units and persons, the final type of accident, the date of accident handling, the party handling the accident, the results and the impact on the project, and the documents related to the quality accident and their numbers.

[0175] Specifically, process issues - if the incident status changes to "3" (already handled), this field cannot be empty. You can use the value list LOV or code input (Codeinput) to enter and query. If the incident status is "3" (already handled), this field cannot be modified;

[0176] Survey Problem - If the incident status changes to "3" (handled), this field cannot be empty. You can use the value list LOV or code input Codeinput to enter and query. If the incident status is "3" (handled), this field cannot be modified;

[0177] Design issue - If the incident status changes to "3" (handled), this field cannot be empty. You can use the value list LOV or code input Codeinput to enter and query. If the incident status is "3" (handled), this field cannot be modified;

[0178] Construction Issues - If the incident status changes to "3" (handled), this field cannot be left blank. You can use the list of values ​​LOV or code input Codeinput to enter and query. If the incident status is "3" (handled), this field cannot be modified;

[0179] Equipment Problem - If the incident status changes to "3" (handled), this field cannot be empty. You can use the value list LOV or code input Codeinput to enter and query. If the incident status is "3" (handled), this field cannot be modified;

[0180] Material Issue - If the incident status changes to "3" (handled), this field cannot be left blank. You can use the list of values ​​LOV or code input Codeinput to enter and query. If the incident status is "3" (handled), this field cannot be modified;

[0181] Other issues - If the incident status changes to "3" (handled), this field cannot be empty. You can use the value list LOV or code input Codeinput to enter and query. If the incident status is "3" (handled), this field cannot be modified;

[0182] Detailed description of other issues - input by keyboard. If other issues is "Y" (there are other issues), this field cannot be empty. If other issues is "N" (no other issues), this field must be empty. If the incident status is "3" (already handled), this field cannot be modified;

[0183] Time loss - the format is an integer. Entered by keyboard. If the accident status changes to "3" (already handled), this field cannot be empty. If the accident status is "3" (already handled), this field cannot be modified;

[0184] Economic loss (ten thousand) - the format is an integer. Entered by keyboard. If the accident status changes to "3" (already handled), this field cannot be empty. If the accident status is "3" (already handled), this field cannot be modified;

[0185] Main responsible unit number - can be input and queried using the value list LOV. If the incident status changes to "3" (handled), this field cannot be empty. If the incident status is "3" (handled), this field cannot be modified;

[0186] Main responsible person number - can be input and queried using the value list LOV. If the incident status changes to "3" (handled), this field cannot be empty. If the incident status is "3" (handled), this field cannot be modified;

[0187] Finally, determine the type of accident - if the accident status changes to "3" (already handled), this field cannot be empty. You can use the value list LOV or value list maintenance function to enter and query. If the accident status is "3" (already handled), this field cannot be modified;

[0188] The date of completion of the incident handling is the default date format of the system. It is not allowed to enter a date earlier than the date of signature of the technical supervisor. If the incident status changes to "3" (handled), this field cannot be empty. You can use the value list LOV to enter and query. If the incident status is "3" (handled), this field cannot be modified;

[0189] Accident handling plan, results and impact on the project - input by keyboard. If the accident status changes to "3" (handled), this field cannot be empty. If the accident status is "3" (handled), this field cannot be modified.

[0190] The following is an explanation of quality acceptance and assessment using the D8524 unit project as an example.

[0191] The entire process of tracking and managing the application for project quality acceptance and assessment, the opinions of the acceptance units, and the acceptance conclusions is divided into three parts.

[0192] The first part is the self-inspection and application information of project quality acceptance and assessment, including project quality acceptance and assessment number, acceptance type, acceptance organization, contract number, project decomposition code, design unit, supervision unit, construction unit, operation unit, initial inspector and initial inspection date, re-inspector and re-inspection date, final inspector and final inspection date, self-evaluation opinion and self-evaluation level, acceptance application number and application content (acceptance name), application unit and application time, etc.

[0193] The second part is the opinion information of project quality acceptance and evaluation, including acceptance time, construction unit opinion, supervision unit opinion, design unit opinion, operation unit opinion, owner unit opinion and acceptance organization unit opinion.

[0194] The third part is the conclusion information of the project quality acceptance and assessment, including existing problems and their treatment opinions, acceptance conclusion, acceptance certification level, signature of the construction unit representative, signature of the supervision unit representative, signature of the design unit representative, signature of the operation unit representative, signature of the owner unit representative, signature of the acceptance organization representative, documents related to this acceptance and their numbers, etc.

[0195] Based on the same inventive concept, the present application also provides a unit engineering quality assessment and measurement certification system, see Figure 2 ,include:

[0196] A standard establishing unit 201 is used to decompose and define the unit projects, and establish a construction process inspection standard and a quality inspection standard for at least one of the unit projects;

[0197] The process evaluation unit 202 is used to perform detection on the specified construction process according to the construction process detection standard, to check and determine the quality of the construction process, and to obtain a project quality evaluation result;

[0198] The visa management unit 203 is used to determine whether there is a project construction quality problem according to the project quality evaluation result; and perform visa management on the project construction quality problem;

[0199] The evaluation and acceptance unit 204 is used to evaluate and accept the project quality, conduct quantitative statistical analysis and display of the evaluation and acceptance data, and issue a pass visa to qualified projects.

[0200] Based on the same inventive concept, the present disclosure also provides an electronic device 161, see Figure 3 , including a processor 164, a communication interface 165, a memory 162 and a communication bus, wherein the processor 164, the communication interface 165 and the memory 162 communicate with each other through the communication bus;

[0201] A memory 162 storing a computer program 163;

[0202] When the processor 164 executes the program stored in the memory 162, it implements the quality assessment and measurement certification method of the unit project.

[0203] The above communication bus may be a Peripheral Component Interconnect (PCI) bus or an Extended Industry Standard Architecture (EISA) bus, etc. The communication bus may be divided into an address bus, a data bus, a control bus, etc.

[0204] The communication interface 165 is used for communication between the electronic device 161 and other devices.

[0205] The memory 162 may include a random access memory 162 (RAM), or may include a non-volatile memory 162 (non-volatile memory), such as at least one disk memory 162. Optionally, the memory 162 may also be at least one storage device located away from the processor 164.

[0206] The above-mentioned processor 164 can be a general-purpose processor 164, including a central processing unit 164 (CPU), a network processor 164 (NP), etc.; it can also be a digital signal processor 164 (DSP), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components.

[0207] Based on the same inventive concept, the embodiment of the present disclosure further provides a computer-readable storage medium on the other hand, storing a computer program 163, which implements a quality assessment and metrology certification method for a unit project when executed by a processor 164.

[0208] The computer-readable storage medium may be included in the device / apparatus described in the above embodiment; or it may exist independently without being assembled into the device / apparatus. The above computer-readable storage medium carries one or more programs, and when the above one or more programs are executed, the quality assessment and metrology certification method of the unit project according to the embodiment of the present disclosure is implemented.

[0209] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. A method for quality assessment and measurement certification of unit projects. It is characterized in that include: Decompose and define unit projects, and establish construction process inspection standards and quality inspection standards for at least one of the unit projects; Perform inspection on the designated construction process according to the construction process inspection standard, make a certification judgment on the quality of the construction process, and obtain the project quality evaluation result; Determine whether there are any quality problems in the construction of the project based on the project quality evaluation results; and conduct visa management on the quality problems in the construction of the project; The project quality is assessed and accepted, and the assessment and acceptance data are analyzed and displayed quantitatively and statistically. Qualified projects are given a pass visa.

2. The method according to claim 1, It is characterized in that The construction process detection according to the construction process detection standard includes: Construction process inspection, construction material inspection and test piece inspection shall be carried out according to the construction process inspection standards.

3. The method according to claim 1 or 2, It is characterized in that The construction process detection according to the construction process detection standard includes: The actual detection value of one type of process is obtained, and the actual detection value is compared with the standard value in the detection standard.

4. The method according to claim 1, It is characterized in that The quality of the construction process is assessed by the certification to obtain the project quality evaluation results, including: Conduct quantitative and qualitative evaluation of project quality; Quantitative evaluation of project quality includes: Assume that a unit project consists of multiple sub-projects; Compare and analyze the sub-projects in the section project with the entire project in the unit project.

5. The method according to claim 4, It is characterized in that The comparative analysis of the sub-projects in the divisional project and the entire project in the unit project includes: The binary quantitative comparison quantitative scale of the whole project in the sub-project and the unit project is determined through the unit system theory of unstructured decision fuzzy set analysis.

6. The method according to claim 5, It is characterized in that The method further comprises: According to n classification types, the unit project is divided into m evaluation ranges to determine the scoring matrix; the evaluation indicators are determined according to c levels to determine the standard scores, so there is an m×c-order indicator standard score matrix Y; where n and m are positive integers; The data are listed and normalized according to the standard score matrix, and the comprehensive evaluation matrix of the quantitative part is solved through the multi-level fuzzy pattern recognition model; A quantitative comprehensive evaluation vector is determined according to the quantitative partial comprehensive evaluation matrix.

7. The method according to claim 6, It is characterized in that The qualitative evaluation of project quality includes: Set the project evaluation level; the level evaluation matrix can be obtained by evaluating the project level according to the scoring items.

8. The method according to claim 7, It is characterized in that The method further comprises: Calculate the relative membership of the level eigenvalue vector H of the quantitative evaluation part scoring matrix and the degree of conformity of the qualitative evaluation matrix V; Determine the relative affiliation of the reviewer’s familiarity with the project; Establish a relative membership matrix of conformity and familiarity.

9. The method according to claim 8, It is characterized in that The method further comprises: According to the characteristics of the project, the weights of the relative degree of compliance and the relative degree of familiarity are determined.

10. The method according to claim 9, It is characterized in that The method further comprises: The product of the weight of the degree of conformity and the degree of familiarity and the relative membership matrix of the degree of conformity and the degree of familiarity is calculated to obtain the unnormalized weight vector of the reviewer, and the weight vector is normalized; Multiply the normalized weight vector by the transposed matrix of the relative membership matrix of the quantitative evaluation part to obtain the evaluation matrix of the quantitative part; Multiply the normalized weight vector by the transpose of the evaluation matrix V of the qualitative part to obtain the evaluation matrix of the qualitative part.

11. The method according to claim 10, It is characterized in that The method further comprises: A qualitative evaluation weight vector and a quantitative review weight vector are obtained, and the relative membership of the project comprehensive evaluation grade is determined according to the qualitative evaluation weight vector and the quantitative review weight vector.

12. A quality assessment and measurement certification system for unit projects. It is characterized in that include: A standard establishment unit is used to decompose and define unit projects, and establish construction process inspection standards and quality inspection standards for at least one of the unit projects; A process evaluation unit is used to perform detection on the specified construction process according to the construction process detection standard, to make a certification judgment on the quality of the construction process, and to obtain a project quality evaluation result; A visa management unit is used to determine whether there are any problems with the construction quality of the project according to the project quality evaluation results; and to perform visa management on the construction quality problems of the project; The assessment and acceptance unit is used to assess and accept the quality of the project, conduct metrological statistical analysis and display of the assessment and acceptance data, and issue a pass visa to qualified projects.

13. An electronic device, It is characterized in that include: A processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory communicate with each other via the communication bus; a memory storing a computer program; The processor, when executing the program stored in the memory, implements the quality assessment and measurement certification method of the unit project as described in any one of claims 1 to 11.

14. A computer-readable storage medium, It is characterized in that A computer program is stored, and when the computer program is executed by a processor, the quality assessment and measurement certification method of the unit project described in any one of claims 1 to 11 is implemented.

Citation Information

Patent Citations

  • Highly roller compacted concrete dam construction procedure quality evaluation system and method

    CN105976273A

  • Communication supervision project quality detection method

    CN113592353A