Engineering project cost calculation method and device, storage medium and electronic equipment

Through the combination of inference analysis model and conversion coefficients, the problem of price fluctuations of talent machines in engineering project cost estimation and auditing is solved, the accuracy and fairness of estimation and auditing are improved, and efficient cost calculation is achieved.

CN118967051APending Publication Date: 2024-11-15GRG BANKING IT
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411144235.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

In the cost estimation and audit of engineering project, the estimation accuracy and audit fairness caused by fluctuations in the price of human-made machines, especially in the differences in project information in different years or months, it is difficult to accurately match historical project data, resulting in estimation. Deviation and audit inaccurate.

Method used

The inference analysis model is used to input target project information and quota information, match historical engineering projects, and use conversion coefficients to eliminate the influence of time factors, calculate the initial and final personnel costs, ensuring the accuracy and fairness of estimation and audit.

Benefits of technology

It improves the accuracy of project cost calculation and audit fairness, overcomes the price fluctuations caused by irregular information writing and time differences, and achieves efficient and accurate cost estimation and auditing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118967051A_ABST
    Figure CN118967051A_ABST
Patent Text Reader

Abstract

The invention discloses an engineering project cost calculation method and device, a storage medium and electronic equipment. The method comprises the following steps: inputting target project information and target quota information of a to-be-estimated / audited engineering project into a pre-trained reasoning analysis model; the inference analysis model performs inference analysis according to the target project information and the target quota information, selects a matched target historical engineering project, and calculates the initial human / material / machine cost of the to-be-estimated / audited engineering project according to the target quota information and the matched target historical engineering project; and according to the current period number of the to-be-estimated / audited engineering project, the target historical period number of the target historical engineering project and a pre-stored conversion coefficient of each unit period, converting the initial human / material / machine cost to obtain a converted final human / material / machine cost. The price fluctuation caused by time difference is eliminated, and the cost estimation accuracy is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the field of engineering cost technology, and in particular, relates to a method, device, storage medium and electronic equipment for calculating the cost of an engineering project. Background Art

[0002] At present, most engineering construction companies and engineering consulting companies will accumulate their own engineering project indicator data. When estimating the project cost of a new project, they can refer to the accumulated project indicator data for quick estimation. However, due to the large price fluctuations of human resources and equipment in different years and even months, directly using the indicator data of historical projects for estimation or comparative analysis will cause estimation deviations and lead to low accuracy of project cost estimation.

[0003] Similarly, when conducting an engineering project cost audit, indicator data from similar historical engineering projects will also be used for comparison. However, due to different construction times, the prices of project personnel, materials, and equipment will fluctuate greatly. Directly using historical engineering projects for comparison will result in inaccurate comparison and analysis, affecting the accuracy and fairness of the audit. Summary of the invention

[0004] The present application aims to solve at least one of the technical problems existing in the related art. To this end, the present application proposes a method, device, storage medium and electronic device for calculating the cost of an engineering project to improve the accuracy of the cost calculation of the engineering project.

[0005] In a first aspect, the present application provides a method for calculating the cost of an engineering project, the method comprising:

[0006] Inputting the target project information and target quota information of the engineering project to be estimated / audited into the reasoning analysis model, wherein the reasoning analysis model is pre-trained based on the project information and standard quota information of historical engineering projects;

[0007] The inference analysis model performs inference analysis based on the target project information and the target quota information, selects a matching target historical engineering project, and calculates the initial manpower / material / machine costs of the engineering project to be estimated / audited based on the target quota information and the matched target historical engineering project;

[0008] According to the current cycle number of the engineering project to be estimated / audited, the target historical cycle number of the target historical engineering project and the pre-stored conversion coefficients of each unit cycle, the initial labor / material / machine costs are converted to obtain the converted final labor / material / machine costs.

[0009] According to the project cost calculation method provided in the embodiment of the present application, the target historical project that best matches the project to be estimated / audited is inferred through an inference analysis model, and then the initial manpower / material / machine costs of the project to be estimated / audited are calculated based on the target historical project, thereby overcoming the defects of being unable to match the target historical project due to the non-standard preparation of project information or quota information and the time-consuming and labor-intensive manual estimation. At the same time, after obtaining the initial manpower / material / machine costs of the project to be estimated / audited, the initial manpower / material / machine costs are converted using a conversion coefficient to obtain the final manpower / material / machine cost that eliminates price fluctuations caused by time differences, so that the calculated final cost is relatively accurate and reasonable, and the final manpower / material / machine cost after conversion is used for estimation, with high estimation accuracy, and the final manpower / material / machine cost after conversion is used for auditing, with high audit fairness.

[0010] In some embodiments, the initial manpower / material / machine cost is converted according to the current cycle number of the engineering project to be estimated / audited, the target historical cycle number of the target historical engineering project, and the pre-stored conversion coefficients of each unit cycle to obtain the converted final manpower / material / machine cost, including:

[0011] Obtain the current cycle number of the engineering project to be estimated / audited;

[0012] Obtain the target historical cycle number of the target historical engineering project;

[0013] Matching a corresponding target conversion coefficient from the pre-stored conversion coefficients of each unit cycle according to the current cycle number and the target historical cycle number;

[0014] The target conversion coefficient is used to convert the initial labor / material / machine cost to obtain the final labor / material / machine cost.

[0015] The initial labor / material / machine costs are converted using conversion factors to eliminate price differences caused by time factors.

[0016] In some embodiments, the conversion coefficient of each unit period is calculated as follows:

[0017] Obtain the labor / material / machine price information for each unit period published by the cost station;

[0018] Determine the benchmark unit cycle based on the labor / material / machine price information;

[0019] Calculating the price index of each of the unit periods relative to the base unit period;

[0020] The ratio of the value index of any unit period to the price index of other unit periods is used as the conversion coefficient of the said unit period to the said other unit periods;

[0021] The conversion factor is stored.

[0022] The conversion coefficients between unit periods are calculated in advance for use in conversion, making the subsequent calculation of the final labor / material / machine cost efficient and convenient.

[0023] In some embodiments, determining the benchmark unit period according to the labor / material / machine price information includes:

[0024] The unit period with the smallest standard deviation of the labor / material / machine price information in each unit period is selected as the reference period. The unit period with small volatility is selected as the reference period, and the calculated conversion coefficient is relatively stable and accurate.

[0025] In some embodiments, the initial manpower / material / machine cost of the engineering project to be estimated / audited is calculated based on the target quota information and the matched target historical engineering project, including:

[0026] Obtaining target standard quota information of the target historical engineering project, wherein the target standard quota information includes standard names of manpower / materials / machines, measurement units, costs corresponding to each standard name, and standard proportion information;

[0027] Adjusting the original names of people / materials / machines in the target quota information according to the standard names to obtain adjusted target names;

[0028] Determine the target proportion information corresponding to each target name in the target quota information according to the standard proportion information;

[0029] Determine the initial cost corresponding to each target name according to the measurement unit, the cost corresponding to each standard name, the target name and the required quantity in the target quota information;

[0030] Output the initial cost corresponding to each target name and the corresponding target proportion information.

[0031] Refer to the closest target historical project to calculate the initial cost corresponding to each target name in the estimated / audited project, which is efficient and fast.

[0032] In some embodiments, the reasoning analysis model is trained with non-native generalization and zero-sample generalization. The reasoning analysis model trained with non-native generalization and zero-sample generalization can identify and predict quota information that is not written in a standardized or non-standard manner.

[0033] In some embodiments, before inputting the target project information and target quota information of the engineering project to be estimated / audited into the reasoning analysis model, the method further includes:

[0034] Obtaining a target quota code of the engineering project to be estimated / audited, and using the target quota code to match a historical engineering project database, wherein the historical engineering project database stores historical engineering projects with standard quotas;

[0035] If a historical engineering project with a standard quota is matched, the target project information and target quota information of the engineering project to be estimated / audited are input into the reasoning analysis model;

[0036] If no historical engineering project with standard quota is matched, the subsequent steps will not be executed.

[0037] Before inputting the engineering projects to be estimated / audited into the reasoning analysis model, the engineering projects to be estimated / audited are screened in advance through quota codes to exclude engineering projects that cannot be identified by the reasoning analysis model.

[0038] In a second aspect, the present application provides a device for calculating the cost of an engineering project, the device comprising:

[0039] An input module, used to input the target project information and target quota information of the engineering project to be estimated / audited into the reasoning analysis model, wherein the reasoning analysis model is pre-trained based on the project information and standard quota information of historical engineering projects;

[0040] A reasoning analysis module, which is used for the reasoning analysis model to perform reasoning analysis according to the target project information and the target quota information, select a matching target historical engineering project, and calculate the initial manpower / material / machine cost of the engineering project to be estimated / audited according to the target quota information and the matched target historical engineering project;

[0041] The conversion module is used to convert the initial labor / material / machine costs according to the current cycle number of the engineering project to be estimated / audited, the target historical cycle number of the target historical engineering project, and the pre-stored conversion coefficients of each unit cycle to obtain the converted final labor / material / machine cost.

[0042] In a third aspect, the present application provides an electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the method for calculating the engineering project cost as described in the first aspect above is implemented.

[0043] In a fourth aspect, the present application provides a non-transitory computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the method for calculating the construction project cost as described in the first aspect above.

[0044] In a fifth aspect, the present application provides a chip, comprising a processor and a communication interface, wherein the communication interface is coupled to the processor, and the processor is used to run programs or instructions to implement the method for calculating the construction project cost as described in the first aspect.

[0045] In a sixth aspect, the present application provides a computer program product, including a computer program, which, when executed by a processor, implements the method for calculating the construction project cost as described in the first aspect above.

[0046] The above one or more technical solutions in the embodiments of the present application have at least the following technical effects:

[0047] According to the project cost calculation method, device, storage medium and electronic device provided in the embodiments of the present application, the target historical project that best matches the project to be estimated / audited is inferred through an inference analysis model, and then the initial manpower / material / machine costs of the project to be estimated / audited are calculated based on the target historical project, thereby overcoming the defects of being unable to match the target historical project due to the non-standard preparation of project information or quota information and the time-consuming and labor-intensive manual estimation. At the same time, after obtaining the initial manpower / material / machine costs of the project to be estimated / audited, the initial manpower / material / machine costs are converted using a conversion coefficient to obtain the final manpower / material / machine cost that eliminates price fluctuations caused by time differences, so that the calculated final cost is relatively accurate and reasonable, and the final manpower / material / machine cost after conversion is used for estimation, with high estimation accuracy, and the final manpower / material / machine cost after conversion is used for auditing, with high audit fairness.

[0048] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0050] Figure 1 This is one of the flow charts of the method for calculating the construction project cost provided in the embodiment of the present application;

[0051] Figure 2 This is the second flow chart of the method for calculating the construction project cost provided in the embodiment of the present application;

[0052] Figure 3It is a structural schematic diagram of a device for calculating the cost of an engineering project provided in an embodiment of the present application;

[0053] Figure 4 It is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0054] The following will be combined with the drawings in the embodiments of the present application to clearly describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments in the present application belong to the scope of protection of this application.

[0055] The terms "first", "second", etc. in the specification and claims of the present application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable under appropriate circumstances, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" in the specification and claims represents at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.

[0056] In conjunction with the accompanying drawings, the project cost calculation method, project cost calculation device, electronic device and readable storage medium provided in the embodiments of the present application are described in detail through specific embodiments and their application scenarios.

[0057] Among them, the project cost calculation method can be applied to the terminal, and can be specifically executed by hardware or software in the terminal.

[0058] The project cost calculation method provided in the embodiment of the present application may be executed by an electronic device or a functional module or functional entity in the electronic device that can implement the project cost calculation method. The electronic devices mentioned in the embodiment of the present application include but are not limited to mobile phones, tablet computers, computers, cameras, and wearable devices. The project cost calculation method provided in the embodiment of the present application is described below using an electronic device as an example of an execution subject.

[0059] like Figure 1 As shown, the project cost calculation method includes the following steps:

[0060] S100, inputting the target project information and target quota information of the engineering project to be estimated / audited into the reasoning analysis model, wherein the reasoning analysis model is pre-trained based on the project information and standard quota information of historical engineering projects.

[0061] It is understandable that before executing this step, the project information and standard quota information of historical engineering projects will be collected and stored in the database to form a historical engineering project database. Of course, each time a new engineering project appears, the engineering project can be stored in the database to gradually form a historical engineering project database. Among them, the project information includes the quota code and project name of the engineering project, and the standard quota information includes the measurement unit, quota base price, standard name of manpower / material / machine, and standard proportion information of each standard name.

[0062] The inference analysis model is obtained through pre-training with project information and standard quota information of historical engineering projects. Specifically, it can extract, select and convert features of project names, quota codes, units of measurement, quota base prices, and standard names and standard proportions of manpower / materials / machines, and use the extracted, selected and converted features to perform non-similar generalization training and zero-sample generalization training, so that the inference analysis model can accurately predict the irregular and non-standard project information and quota information in engineering projects, thereby realizing inference prediction for estimated / audited engineering projects.

[0063] It should be noted that the non-synonymous generalization in the embodiments of the present application is a special generalization process, which does not involve the extension of synonyms or similar meanings, but is based on the promotion of non-similar attributes. That is, in the reasoning process, it is not generalized based on two or more similar or approximate or similar attributes, but is based on a broader and more essential attribute, feature or law. It requires the model to have strong learning and generalization capabilities to cope with complex and changeable tasks and data. Non-synonymous generalization can include generalization based on non-similar attributes, cross-domain generalization, and abstract concept generalization. For example, in generalization based on non-similar attributes, "blind ditches, stone-built rapids troughs, sand filter layers and other projects" can be generalized to "protection projects". Here, the generalization is based on the common attribute characteristics of each project, rather than the similarity of each project; for example, in cross-domain generalization, the laws or principles of a certain field can be applied to another field that seems unrelated but has a similar essence; for example, in abstract concept generalization, "all integers satisfy the commutative law of addition" can be generalized to "all commutative algebraic structures satisfy a certain form of commutative law". Here, the generalization is based on the abstract properties of algebraic structures, rather than the specific properties of integers. It should be noted that non-synonymous generalization is not a strictly defined term, and its meaning may vary depending on the context. In practical applications, this concept needs to be understood and applied according to specific circumstances.

[0064] Zero-sample generalization in the embodiments of the present application is an important concept in the fields of machine learning, natural language processing, and computer vision, and is particularly critical when dealing with categories or tasks that do not directly appear in the training data. The core of zero-sample generalization reasoning is that the model can use existing knowledge or information to understand and process new, previously unseen categories or tasks. It usually has knowledge transfer, semantic understanding, and generalization capabilities. For example, the model may need to understand the similarity between "cats" and "dogs", and be able to infer that "tigers" may be more similar to "cats" without having seen "tigers".

[0065] It is understandable that the reasoning analysis model in the embodiment of the present application is obtained after training and adjusting the existing non-similar generalization model and zero-sample generalization model using relevant data and parameters in the engineering project, and can adapt to the reasoning and prediction of non-standard, non-standard and unknown related content in the engineering project. For example, the model knows the standard quota for slope protection of a certain road. When it is found that a certain road is on the riverside, due to the soft foundation, it can be inferred that the labor cost is twice the standard quota.

[0066] In addition, after training the reasoning analysis model, the model can also be fine-tuned, including fine-tuning of model parameters, such as: adjustment of similarity, weight of regularization term, number of neural network layers, etc., and fine-tuning of learning strategies, such as: adjustment of weight decay rate, so that the reasoning analysis model can be applied to subsequent reasoning tasks.

[0067] S200, the reasoning analysis model performs reasoning analysis based on the target project information and the target quota information, selects a matching target historical engineering project, and calculates the initial manpower / material / machine costs of the engineering project to be estimated / audited based on the target quota information and the matched target historical engineering project.

[0068] Since the reasoning analysis model is trained with the project information and standard quota information of historical engineering projects, after the engineering project to be estimated / audited is input into the reasoning analysis model, the reasoning analysis model will comprehensively use the quota code and project name in the target project information as well as the measurement unit, quota base price, names of man / material / machine and the proportion of each man, material and machine in the target quota information to infer the most matching target historical engineering project.

[0069] Specifically, when the reasoning analysis model selects the matching target historical engineering project, it can directly determine the target historical engineering project based on the project name and / or quota code of the engineering project to be estimated / audited. However, if the engineering project to be estimated / audited is not marked with the project name and quota code, it is necessary to determine the target historical engineering project based on the original name of the man / material / machine of the engineering project to be estimated / audited and the possible original proportion information of the original name. Combined with Table 1-1 and Table 1-2, Table 1-1 is a breakdown table of the proportion of the main materials of the engineering project, and Table 1-2 is a breakdown table of the proportion of labor costs, machine costs, management fees and profits of the engineering project. It can be understood that Tables 1-1 and 1-2 can be displayed in one table. If the standard quota code "D1-1-137" and the project name "Road Roller Compacted Earth (Stone) Filling" of the engineering project to be estimated / audited are input into the inference analysis model, the target historical engineering project corresponding to the engineering project to be estimated / audited is directly determined to be "Road Roller Compacted Earth (Stone) Filling"; if the standard quota code and project name are not clear, and only the main materials included are known to be "Medium Coarse Sand" and "Crushed Stone", then the inference analysis model infers that the target historical engineering project of the engineering project to be estimated / audited may be engineering projects "D1-2-1", "D 1-2-2", "D1-3-57", "D1-3-58", and then according to the rough original proportion information provided by the engineering project to be estimated / audited, "medium-coarse sand accounts for 70%" and "gravel accounts for 30%", the target historical engineering project can be locked as "D1-2-1"; or if the project name of the engineering project to be estimated / audited is known, "blind ditch cross-sectional area", the possible target historical engineering project inferred by the reasoning analysis model is "D1-2-1" or "D1-2-2", and then the target historical engineering project is locked according to the proportion of the main materials.

[0070] Table 1-1

[0071]

[0072]

[0073]

[0074]

[0075] Table 1-2

[0076]

[0077]

[0078]

[0079]

[0080] It should be noted that, in this embodiment, the engineering project to be estimated / audited that is input into the reasoning analysis model is an engineering project for which at least part of the quota information and project information is known in advance.

[0081] After obtaining the target historical engineering project, the target quota information is adaptively adjusted and modified according to the target standard quota information of the target historical engineering project, so that the relevant information of people / materials / machines of the engineering project to be estimated / audited that is finally output is relatively reasonable and accurate.

[0082] Specifically, refer to Figure 2 , step S200 includes:

[0083] S210, obtaining target standard quota information of the target historical engineering project, wherein the target standard quota information includes standard names of manpower / materials / machines, measurement units, costs corresponding to each standard name, and standard proportion information.

[0084] S220, adjusting the original names of people / materials / machines in the target quota information according to the standard names to obtain adjusted target names.

[0085] S230: Determine target proportion information corresponding to each target name in the target quota information according to the standard proportion information.

[0086] S240: Determine the initial cost corresponding to each of the target names according to the measurement unit, the cost corresponding to each of the standard names, the target name, and the required quantity in the target quota information.

[0087] S250, outputting the initial cost corresponding to each target name and the corresponding target proportion information.

[0088] Usually, engineers are unable to provide accurate quota information and project information. For example, the target historical project is "D1-2-1", and the names of the main materials in the target quota information of the project to be estimated / audited provided by the engineer are "coarse sand" and "gravel". Therefore, after identifying and reasoning, the inference analysis model will modify and adjust it according to the standard names in the target historical project, and modify the names of the main materials to "medium coarse sand" and "crushed stone"; similarly, if the original proportion of the main materials of the project to be estimated / audited is "medium coarse sand accounts for 70%" and "crushed stone accounts for 30%", then after reasoning and analysis, it will be modified and adjusted to "medium coarse sand accounts for 74.68%" and "crushed stone accounts for 25.16%" according to the standard proportion information; finally, the initial cost of manpower / materials / machines is calculated based on the demand quantity of the project to be estimated / audited and the relevant target standard quota information in the target historical project. For example: if the demand quantity of the project to be estimated / audited is 50m3 , while the unit of measurement for the target historical project is 10m 3 The cost of medium-coarse sand is 2494.94 yuan, and the cost of crushed stone is 840.61 yuan. Based on the corresponding proportions, it is calculated that the cost of medium-coarse sand for the project to be estimated / audited is 2494.94*5=12474.7 yuan, and the cost of crushed stone is 840.61*5=4203.05 yuan. Similarly, the determination and calculation methods of equipment costs, labor costs, management fees and profits are the same.

[0089] In some embodiments, if the quantity required for the project to be estimated / audited is uncertain, for example, we only know that the possible demand is 50m 3 , the basic cost is given through the reasoning analysis model, and then the unit price of manpower / materials / machines is given. Then, according to specific needs, the initial estimated cost is obtained by using the basic cost and the cost of each man / material / machine increase or decrease unit.

[0090] Therefore, the reasoning analysis model can output quota information of the engineering project to be estimated / audited that is relatively consistent with the standard quota information, making the final display effect clearer. The reasoning analysis model can also directly analyze and calculate the initial manpower / material / machine costs of the engineering project to be estimated / audited, eliminating the original manual calculation and reasoning process, which not only saves manpower and time costs, but also is highly efficient.

[0091] S300, converting the initial manpower / material / machine costs according to the current cycle number of the engineering project to be estimated / audited, the target historical cycle number of the target historical engineering project and the pre-stored conversion coefficients of each unit cycle to obtain the converted final manpower / material / machine cost.

[0092] It should be noted that the above-mentioned labor / material / machine costs include material costs, machine costs, labor costs, management fees and profits, among which material costs include the costs of more specific subclassified materials.

[0093] Specifically, step S300 includes: obtaining the current cycle number of the engineering project to be estimated / audited. Obtaining the target historical cycle number of the target historical engineering project. Matching the corresponding target conversion coefficient from the pre-stored conversion coefficients of each unit cycle according to the current cycle number and the target historical cycle number. Using the target conversion coefficient to convert the initial man / material / machine cost to obtain the final man / material / machine cost.

[0094] In some embodiments, the initial labor / material / machine costs are converted using a target conversion coefficient to obtain the final labor / material / machine cost, including: multiplying the initial labor / material / machine costs by the target conversion coefficient to obtain the final labor / material / machine cost.

[0095] It can be understood that the conversion coefficients between unit periods are stored in advance. Therefore, when two engineering projects in different unit periods are obtained, the initial labor / material / machine costs can be quickly converted according to the conversion coefficients, which can eliminate the problem of inaccurate price estimates caused by time factors.

[0096] The conversion coefficient of each unit period is calculated as follows:

[0097] Obtain the labor / material / machine price information for each unit period published by the cost station.

[0098] The benchmark unit period is determined according to the labor / material / machine price information.

[0099] The price index of each of the unit periods relative to the base unit period is calculated.

[0100] The ratio of the value index of any unit period to the price index of other unit periods is used as the conversion coefficient of the said unit period relative to the said other unit periods.

[0101] The conversion factor is stored.

[0102] The cost station will publish the price information of manpower / material / machine for each unit period. First, determine the base unit period, and then calculate the price index of manpower / material / machine for each unit period relative to the base unit period. For example, taking month as the unit period, the cost station publishes the material prices, machine prices, labor costs, and management costs for January, if January is selected as the base unit period, divide the material prices, machine prices, labor costs, and management costs published for February, March, April, May, June, July, August, September, October, November, and December by the material prices, machine prices, labor costs, and management costs published in January, and obtain the material price index, machine price index, labor price index, and management price index for February, March, April, May, June, July, August, September, October, November, and December. When calculating the conversion coefficient, the ratio of the value index of a certain unit period to the price index of other unit periods can be used as the conversion coefficient of any unit period relative to the other unit periods. For example, if the conversion coefficient of December relative to October is calculated, the material conversion coefficient = the material price index corresponding to December / the material price index corresponding to October, the tool price index = the tool price index corresponding to December / the tool price index corresponding to October, the labor cost conversion coefficient = the labor price index corresponding to December / the labor price index corresponding to October, and the management fee conversion coefficient = the management price index corresponding to December / the management price index corresponding to October. Correspondingly, if the conversion coefficient of October relative to December is calculated, the ratio of each value index corresponding to October to each value index corresponding to December is used as the conversion coefficient. If there are N unit periods, the final stored conversion coefficient is (N-1)*N. All conversion coefficients are stored for use in converting the final labor / material / machine cost in step S300.

[0103] Preferably, in some embodiments, the unit period with the smallest standard deviation of the labor / material / machine price information in each of the unit periods is selected as the reference period.

[0104] The standard deviation can represent the volatility of price information. The smaller the standard deviation, the smaller the volatility. By selecting a unit period with small volatility as the base period, the calculated value indexes and conversion factors will be relatively stable, thus making the calculated final construction cost relatively accurate and reasonable.

[0105] In some embodiments, after obtaining the final labor / material / machine cost, it also includes: taking the final sum of material costs, equipment costs, labor costs, management fees and profits as the final total price of the project to be estimated / audited, and participating in project cost estimation and / or audit comparison reference.

[0106] According to the project cost calculation method provided in the embodiment of the present application, the target historical project that best matches the project to be estimated / audited is inferred through an inference analysis model, and then the initial manpower / material / machine costs of the project to be estimated / audited are calculated based on the target historical project, thereby overcoming the defects of being unable to match the target historical project due to the non-standard preparation of project information or quota information and the time-consuming and labor-intensive manual estimation. At the same time, after obtaining the initial manpower / material / machine costs of the project to be estimated / audited, the initial manpower / material / machine costs are converted using a conversion coefficient to obtain the final manpower / material / machine cost that eliminates price fluctuations caused by time differences, so that the calculated final cost is relatively accurate and reasonable, and the final manpower / material / machine cost after conversion is used for estimation, with high estimation accuracy, and the final manpower / material / machine cost after conversion is used for auditing, with high audit fairness.

[0107] In some embodiments, before step S100, the method further includes:

[0108] The target quota code of the engineering project to be estimated / audited is obtained, and the target quota code is used to match a historical engineering project database, in which historical engineering projects with standard quotas are stored.

[0109] If a historical engineering project with a standard quota is matched, the target project information and target quota information of the engineering project to be estimated / audited are input into the reasoning analysis model.

[0110] If no historical engineering project with standard quota is matched, the subsequent steps will not be executed.

[0111] It can be seen from the description of the aforementioned embodiment that the engineering project to be estimated / audited input into the reasoning analysis model is an engineering project for which at least part of the quota information and project information are known in advance. If the engineering project to be estimated / audited does not match the historical engineering project of the standard quota at all, it means that the project is a brand-new custom-coded project. At this time, the historical engineering projects in the historical engineering project database no longer have any reference significance for it. The reasoning analysis model is also obtained by training based on historical engineering projects. If the engineering project to be estimated / audited of the historical engineering project that does not match the standard quota is input into the reasoning analysis model, the model will not be able to perform effective reasoning. Therefore, it is necessary to first exclude the engineering projects to be estimated / audited of the historical engineering projects that do not match the standard quota, and only input the engineering projects to be estimated / audited of the historical engineering projects that match the standard quota into the reasoning analysis model.

[0112] The project cost calculation method provided in the embodiment of the present application can be executed by a project cost calculation device. In the embodiment of the present application, the project cost calculation device is used as an example to illustrate the project cost calculation method.

[0113] The present application also provides a device for calculating the cost of an engineering project. Figure 3 As shown, the project cost calculation device includes: an input module 100, which is used to input the target project information and target quota information of the project to be estimated / audited into the reasoning analysis model, wherein the reasoning analysis model is pre-trained based on the project information and standard quota information of the historical project. A reasoning analysis module 200, which is used for the reasoning analysis model to perform reasoning analysis based on the target project information and the target quota information, select a matching target historical project, and calculate the initial man / material / machine costs of the project to be estimated / audited based on the target quota information and the matched target historical project. A conversion module 300, which is used to convert the initial man / material / machine costs based on the current cycle number of the project to be estimated / audited and the target historical cycle number of the target historical project and the pre-stored conversion coefficients of each unit cycle to obtain the converted final man / material / machine cost.

[0114] According to the engineering project cost calculation device provided in the embodiment of the present application, the target historical engineering project that best matches the engineering project to be estimated / audited is inferred through an inference analysis model, and then the initial manpower / material / machine costs of the engineering project to be estimated / audited are calculated based on the target historical engineering project, thereby overcoming the defects of being unable to match the target historical engineering project due to the non-standard preparation of project information or quota information and the time-consuming and labor-intensive manual estimation. At the same time, after obtaining the initial manpower / material / machine costs of the engineering project to be estimated / audited, the initial manpower / material / machine costs are converted using a conversion coefficient to obtain a final manpower / material / machine cost that eliminates price fluctuations caused by time differences, so that the calculated final cost is relatively accurate and reasonable, and the final manpower / material / machine cost after conversion is used for estimation, with high estimation accuracy, and the final manpower / material / machine cost after conversion is used for auditing, with high audit fairness.

[0115] In some embodiments, the conversion module 300 is also used to obtain the current cycle number of the engineering project to be estimated / audited; obtain the target historical cycle number of the target historical engineering project; match the corresponding target conversion coefficient from the pre-stored conversion coefficients of each unit cycle according to the current cycle number and the target historical cycle number; use the target conversion coefficient to convert the initial man / material / machine cost to obtain the final man / material / machine cost.

[0116] In some embodiments, the conversion coefficient of each unit period is calculated as follows:

[0117] Obtain the labor / material / machine price information of each unit period published by the cost station; determine the base unit period according to the labor / material / machine price information; calculate the price index of each unit period relative to the base unit period; use the ratio of the value index of any unit period to the price index of other unit periods as the conversion coefficient of any unit period relative to other unit periods; and store the conversion coefficient.

[0118] In some embodiments, the unit period with the smallest standard deviation of the labor / material / machine price information among the unit periods is selected as the reference period.

[0119] In some embodiments, the reasoning analysis module 200 is also used to obtain the target standard quota information of the target historical engineering project, the target standard quota information including the standard name of man / material / machine, the unit of measurement, the quota base price and the standard proportion information; adjust the original name of man / material / machine in the target quota information according to the standard name to obtain the adjusted target name; determine the target proportion information of each target name in the target quota information according to the standard proportion information; determine the initial cost corresponding to each target name according to the unit of measurement, the quota base price, the target proportion information and the required quantity in the target quota information.

[0120] In some embodiments, the inference analysis model is trained with near-miss generalization and zero-shot generalization.

[0121] In some embodiments, the project cost calculation device further includes: a matching module for obtaining a target quota code of the project to be estimated / audited, and using the target quota code to match a historical project database, wherein the historical project database stores historical projects with standard quotas;

[0122] If a historical engineering project with a standard quota is matched, the input module is entered; if a historical engineering project with a standard quota is not matched, the input module is not entered.

[0123] The project cost calculation device in the embodiment of the present application can be an electronic device, or a component in the electronic device, such as an integrated circuit or a chip. The electronic device can be a terminal, or other devices other than a terminal. Exemplarily, the electronic device can be a mobile phone, a tablet computer, a laptop computer, a PDA, a vehicle-mounted electronic device, a mobile Internet device (Mobile Internet Device, MID), an augmented reality (augmented reality, AR) / virtual reality (virtual reality, VR) device, a robot, a wearable device, an ultra-mobile personal computer (ultra-mobile personal computer, UMPC), a netbook or a personal digital assistant (personal digital assistant, PDA), etc., and can also be a server, a network attached storage (Network Attached Storage, NAS), a personal computer (personal computer, PC), a television (television, TV), a teller machine or a self-service machine, etc., which is not specifically limited in the embodiment of the present application.

[0124] The project cost calculation device in the embodiment of the present application may be a device having an operating system. The operating system may be a Microsoft (Windows) operating system, an Android (Android) operating system, an IOS operating system, or other possible operating systems, which are not specifically limited in the embodiment of the present application.

[0125] The engineering project cost calculation device provided in the embodiment of the present application can achieve Figure 1 to Figure 2 To avoid repetition, the various processes implemented by the method embodiment are not described here.

[0126] In some embodiments, Figure 4 As shown, an embodiment of the present application also provides an electronic device 800, including a processor 801, a memory 802, and a computer program stored in the memory 802 and executable on the processor 801. When the program is executed by the processor 801, each process of the above-mentioned engineering project cost calculation method embodiment is implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.

[0127] It should be noted that the electronic devices in the embodiments of the present application include the mobile electronic devices and non-mobile electronic devices mentioned above.

[0128] The embodiment of the present application also provides a non-transitory computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the various processes of the above-mentioned engineering project cost calculation method embodiment are implemented, and the same technical effect can be achieved. To avoid repetition, it will not be repeated here.

[0129] The processor is the processor in the electronic device described in the above embodiment. The readable storage medium includes a computer readable storage medium, such as a computer read-only memory ROM, a random access memory RAM, a magnetic disk or an optical disk.

[0130] An embodiment of the present application also provides a computer program product, including a computer program, which implements the above-mentioned engineering project cost calculation method when executed by a processor.

[0131] The processor is the processor in the electronic device described in the above embodiment. The readable storage medium includes a computer readable storage medium, such as a computer read-only memory ROM, a random access memory RAM, a magnetic disk or an optical disk.

[0132] An embodiment of the present application further provides a chip, which includes a processor and a communication interface, wherein the communication interface is coupled to the processor, and the processor is used to run programs or instructions to implement the various processes of the above-mentioned engineering project cost calculation method embodiment, and can achieve the same technical effect. To avoid repetition, it will not be repeated here.

[0133] It should be understood that the chip mentioned in the embodiments of the present application can also be called a system-level chip, a system chip, a chip system or a system-on-chip chip, etc.

[0134] It should be noted that, in this article, the terms "comprise", "include" or any other variant thereof are intended to cover non-exclusive inclusion, so that the process, method, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise one..." do not exclude the presence of other identical elements in the process, method, article or device including the element. In addition, it should be pointed out that the scope of the methods and devices in the embodiments of the present application is not limited to performing functions in the order shown or discussed, and may also include performing functions in a substantially simultaneous manner or in reverse order according to the functions involved, for example, the described method may be performed in an order different from that described, and various steps may also be added, omitted, or combined. In addition, the features described with reference to certain examples may be combined in other examples.

[0135] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the relevant technology, can be embodied in the form of a computer software product, which is stored in a storage medium (such as ROM / RAM, a disk, or an optical disk), and includes a number of instructions for a terminal (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present application.

[0136] The embodiments of the present application are described above in conjunction with the accompanying drawings, but the present application is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the guidance of the present application, ordinary technicians in this field can also make many forms without departing from the purpose of the present application and the scope of protection of the claims, all of which are within the protection of the present application.

[0137] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials, or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0138] Although the embodiments of the present application have been shown and described, those skilled in the art will appreciate that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the claims and their equivalents.

Claims

1. A method for calculating the cost of an engineering project, characterized in that: include: Inputting the target project information and target quota information of the engineering project to be estimated / audited into the reasoning analysis model, wherein the reasoning analysis model is pre-trained based on the project information and standard quota information of historical engineering projects; The inference analysis model performs inference analysis based on the target project information and the target quota information, selects a matching target historical engineering project, and calculates the initial manpower / material / machine costs of the engineering project to be estimated / audited based on the target quota information and the matched target historical engineering project; According to the current cycle number of the engineering project to be estimated / audited, the target historical cycle number of the target historical engineering project and the pre-stored conversion coefficients of each unit cycle, the initial labor / material / machine costs are converted to obtain the converted final labor / material / machine costs.

2. The method according to claim 1, characterized in that The initial manpower / material / machine cost is converted according to the current cycle number of the engineering project to be estimated / audited, the target historical cycle number of the target historical engineering project, and the pre-stored conversion coefficients of each unit cycle to obtain the converted final manpower / material / machine cost, including: Obtain the current cycle number of the engineering project to be estimated / audited; Obtain the target historical cycle number of the target historical engineering project; Matching a corresponding target conversion coefficient from the pre-stored conversion coefficients of each unit cycle according to the current cycle number and the target historical cycle number; The target conversion coefficient is used to convert the initial labor / material / machine cost to obtain the final labor / material / machine cost.

3. The method according to claim 2, characterized in that The conversion coefficients of the unit cycles are calculated as follows: Obtain the labor / material / machine price information for each unit period published by the cost station; Determine the benchmark unit cycle based on the labor / material / machine price information; Calculating the price index of each of the unit periods relative to the base unit period; The ratio of the value index of any unit period to the price index of other unit periods is used as the conversion coefficient of the said unit period to the said other unit periods; The conversion factor is stored.

4. The method according to claim 3, characterized in that The determining of the benchmark unit period according to the price information of manpower, material and machine includes: The unit period with the smallest standard deviation of the labor / material / machine price information in each of the unit periods is selected as the reference period.

5. The method according to any one of claims 1 to 4, characterized in that: The initial manpower / material / machine cost of the engineering project to be estimated / audited is calculated based on the target quota information and the matched target historical engineering project, including: Obtaining target standard quota information of the target historical engineering project, wherein the target standard quota information includes standard names of manpower / materials / machines, measurement units, costs corresponding to each standard name, and standard proportion information; Adjusting the original names of people / materials / machines in the target quota information according to the standard names to obtain adjusted target names; Determine the target proportion information corresponding to each target name in the target quota information according to the standard proportion information; Determine the initial cost corresponding to each target name according to the measurement unit, the cost corresponding to each standard name, the target name and the required quantity in the target quota information; Output the initial cost corresponding to each target name and the corresponding target proportion information.

6. The method according to claim 5, characterized in that The inference analysis model is trained with no-nearest generalization and zero-shot generalization.

7. The method according to any one of claims 1 to 4, characterized in that: Before inputting the target project information and target quota information of the engineering project to be estimated / audited into the reasoning analysis model, the method further includes: Obtaining a target quota code of the engineering project to be estimated / audited, and using the target quota code to match a historical engineering project database, wherein the historical engineering project database stores historical engineering projects with standard quotas; If a historical engineering project with a standard quota is matched, the target project information and target quota information of the engineering project to be estimated / audited are input into the reasoning analysis model; If no historical engineering project with standard quota is matched, the subsequent steps will not be executed.

8. A device for calculating the cost of an engineering project, characterized in that: include: An input module, used to input the target project information and target quota information of the engineering project to be estimated / audited into the reasoning analysis model, wherein the reasoning analysis model is pre-trained based on the project information and standard quota information of historical engineering projects; A reasoning analysis module, which is used for the reasoning analysis model to perform reasoning analysis according to the target project information and the target quota information, select a matching target historical engineering project, and calculate the initial manpower / material / machine cost of the engineering project to be estimated / audited according to the target quota information and the matched target historical engineering project; The conversion module is used to convert the initial labor / material / machine costs according to the current cycle number of the engineering project to be estimated / audited, the target historical cycle number of the target historical engineering project, and the pre-stored conversion coefficients of each unit cycle to obtain the converted final labor / material / machine cost.

9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the method for calculating the construction project cost as described in any one of claims 1 to 7 is implemented.

10. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for calculating the construction project cost as described in any one of claims 1 to 7 is implemented.