Multi-time-scale cooperative scheduling method for wind-light-hydrogen storage coupling system
By adopting the pre-scheduling, variable prediction domain rolling optimization and variational modal decomposition that minimizes operating costs in the wind and light hydrogen storage coupling system, the problem of insufficient coordination of long and short scheduling in the existing technology is solved, and the economics of the system is realized. Global optimization and improve the operating performance and service life of different types of energy storage.
Patent Information
- Application Number
- CN202411075304.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-11-15
AI Technical Summary
The existing multi-time scale coordinated scheduling method of wind and solar hydrogen storage coupled systems lacks effective long-term optimization and short-term scheduling coordination mechanism, fails to reasonably take into account the degree of energy storage adjustment and adjustment margin, and does not fully consider the operating characteristics of different types of energy storage. .
A few days-old scheduling with the goal of minimizing operating costs is adopted, combined with variable prediction domain rolling optimization and variable modal decomposition, a few days-old plan is formulated and real-time power correction is carried out to give full play to the operational advantages of different types of energy storage. Specific steps include day-to-day scheduling, intraday rolling optimization and real-time control, screening high and low-frequency components through variational modal decomposition, and power correction based on the hydrogen energy storage operation mode.
Improve the economical operation of the system, reduce operating costs, ensure global optimization, give full play to the rapid regulation capability of supercapacitors, flexible regulation capability of lithium-ion batteries, and large-scale regulation capability of hydrogen energy storage, effectively reducing The number of start and stops of hydrogen energy storage improves the operating performance and service life of the system.
Smart Images

Figure CN118970865A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of new energy operation and control, and in particular to a multi-time scale coordinated scheduling method for a wind-solar-hydrogen storage coupling system, which is suitable for coordinated scheduling analysis of a system containing hybrid energy storage. Background Art
[0002] With the proposal of the "dual carbon" goal and the rapid development of new power systems, renewable energy such as wind and solar energy have been widely used, but their randomness and volatility have brought challenges to the safe and stable operation of the power grid. The hybrid energy storage system (HESS) composed of different types of energy storage can achieve complementary characteristics of each energy storage, which is of great significance to improving the operating performance and power regulation capability of wind and solar power generation systems.
[0003] Coordinated dispatch of HESS can reasonably allocate energy storage power and improve system performance and robustness. Therefore, the coordinated dispatch strategy of wind-solar-hydrogen storage coupling system deserves in-depth study. As various types of energy are coupled with each other, and the uncertainty and prediction accuracy of renewable energy increase with the decrease of time scale, the existing HESS coordinated dispatch strategy is mostly based on multi-time scale dispatch as the basic framework.
[0004] The current HESS multi-time scale collaborative scheduling methods can all perform rolling corrections based on continuously updated forecast information to improve scheduling accuracy, but there is a lack of effective coordination and cooperation mechanism between long-term optimization and short-term scheduling, and they fail to reasonably take into account the degree and margin of energy storage regulation, and rarely fully consider the differences in operating characteristics of different types of energy storage. Summary of the invention
[0005] To solve the above problems, the present invention discloses a multi-time scale collaborative scheduling method for a wind-solar-hydrogen storage coupling system. First, with the goal of minimizing operating costs, day-ahead scheduling is performed and a day-ahead scheduling plan is formulated. Then, variable prediction domain rolling optimization is adopted in intraday scheduling to adjust the day-ahead plan and ensure global optimality. Finally, in real-time control, high and low frequency components are screened by variational mode decomposition (VMD), and power correction is performed based on the hydrogen energy storage operation mode, giving full play to the operating advantages of different types of energy storage.
[0006] The specific plan is as follows:
[0007] A multi-time scale coordinated scheduling method for a wind-solar-hydrogen storage coupling system comprises the following steps:
[0008] Step 1: In the day-ahead scheduling, the goal is to minimize the operating cost, formulate a day-ahead scheduling plan, and impose constraints;
[0009] Step 2: Use variable prediction domain rolling optimization in intraday scheduling to adjust the day-ahead plan and ensure global optimality;
[0010] Step 3: Use variational mode decomposition to screen high and low frequency components in real-time control, and perform power correction based on the hydrogen energy storage operation mode to give full play to the operating characteristics of different types of energy storage.
[0011] As a further improvement of the present invention,
[0012] The step 1 specifically comprises the following steps:
[0013] Step 11: Construct a wind-solar-hydrogen-storage coupling system model, which is mainly composed of power generation equipment, electric energy storage equipment, hydrogen energy storage equipment and load; power generation equipment includes wind turbines (WT) and photovoltaic arrays (PV); electric energy storage equipment includes lithium-ion batteries (LIB) and supercapacitors (SC); hydrogen energy storage equipment includes electrolytic cells (EL), hydrogen storage tanks (HST) and fuel cells (FC); according to energy characteristics, energy storage is divided into electric energy storage (LIB and hydrogen energy storage) and power energy storage (SC);
[0014] Step 12: Day-ahead scheduling time scale Δt DA is 1h to minimize the running cost C DA As the goal, based on the long-term forecast information of the day before, the day-ahead power reference values and hydrogen energy storage start-stop plan of LIB, EL, and FC are determined, and the results are provided for intraday rolling optimization. DA The expression is:
[0015]
[0016] Where: the superscript “DA” represents the day-ahead reference value of the corresponding variable; N DA is the total number of time periods before the day; are the charging cost and discharging cost of LIB respectively; c EL 、c FC are the hydrogen production cost of EL and the power generation cost of FC respectively; They are the cost of purchasing hydrogen and the cost of selling hydrogen respectively; are the amount of hydrogen purchased and sold in period t, respectively; c cut 、c loss They are the wind and solar power abandonment costs and the load power failure penalty costs respectively; are the start-stop costs of EL and FC respectively; are the start and stop times of EL and FC respectively;
[0017] Step 13: Constrain the day-ahead scheduling. The constraints are:
[0018] ① System power balance constraints
[0019] P WT (t)+P PV (t)+P LIB (t)+P FC (t)+P SC (t)=
[0020] P load (t)+P EL (t)+P sell (t)-P buy (t)+P cu t(t)-P loss (t)(2)
[0021] Where: t is the current period; P WT is WT power; P PV is the PV power; P LIB is the LIB power; P FC is FC power; P SC is the SC power; P WT is the load power; P EL is the EL power; P sell P is the electricity sales power; buy P is the purchased power; cut P is the abandoned wind and solar power; loss is the load power loss;
[0022] ② Upper and lower limits of energy storage power
[0023]
[0024] Where: is the charge and discharge power of LIB; is the charge and discharge power of SC; and is the maximum discharge and charge power of LIB; and is the maximum discharge and charge power of SC; P HES is the hydrogen energy storage power; and are the maximum powers of EL and FC respectively; characterize the charge and discharge states of LIB, respectively characterize the charge and discharge states of the SC, σEL , σ FC Respectively characterize the start and stop status of EL and FC;
[0025] ③Energy type energy storage power climbing constraints
[0026] -R i △t≤P i (t)-P i (t-1)≤R i △t DA (5)
[0027] Where: i = 1, 2, 3 represent LIB, EL and FC respectively; R i is the upper limit of the ramp rate of the i-th type of energy storage;
[0028] ④ Constraints on the purchase / sale of electricity power and purchase / sale of hydrogen rate
[0029]
[0030] Where: are the maximum values of the system's purchased power and sold power respectively; v buy 、v sell are the hydrogen purchase rate and hydrogen sales rate respectively; are the maximum values of the system hydrogen purchase rate and hydrogen production rate respectively;
[0031] ⑤ Wind and solar power abandonment / load power failure power constraints
[0032]
[0033] Where: They are the maximum values of wind and solar power abandonment power and load power failure power respectively.
[0034] ⑥Lithium-ion battery status constraints
[0035]
[0036] S SOC _ LIB (1) = S SOC _ LIB (N) (11)
[0037] Where: S SOC_LIB , S SOC_SC are the charge states of LIB and SC respectively; υ LIB ,υ SC are the self-discharge rates of LIB and SC respectively; η LIB , η SC are the charge and discharge efficiency of LIB and SC respectively; are the minimum and maximum values of the LIB state of charge, respectively; are the minimum and maximum values of the SC state of charge, respectively;
[0038] ⑥ Hydrogen storage state constraints
[0039]
[0040]
[0041] H SOH (1) = H SOH (N) (14)
[0042] Where: H SOH is the HST hydrogen storage state; z0 is the hydrogen compression constant; R is the molar gas constant; T b is the temperature of the hydrogen storage tank; M is the molar mass of hydrogen; p max v is the maximum pressure of hydrogen that can be stored in the hydrogen storage tank; EL 、v FC are the EL hydrogen production rate and the FC hydrogen consumption rate, respectively; are the minimum and maximum values of HST hydrogen storage state respectively.
[0043] As a further improvement of the present invention, the step 2 specifically comprises the following steps:
[0044] Step 21: Perform intraday rolling optimization, time scale Δt IN is 20 minutes to minimize the intraday cost function C IN As the goal, the latest system status information is used to continuously correct and refresh the day-ahead scheduling results, and the prediction domain is set from the current time to the start time of the next day, ensuring the global optimality on the basis of rolling correction of the scheduling results; C IN The expression is:
[0045]
[0046] Where: the superscript "IN" represents the intraday reference value of the corresponding variable; n0 is the current period; N IN is the total number of time periods in a day; Z(t) is the adjustment cost of time period t; are the start-stop cost and the number of charge-discharge cycles of LIB, respectively;
[0047]
[0048] Where: They are the charging adjustment cost and discharging adjustment cost of LIB respectively; Respectively represent the change of LIB charging and discharging power in period t; γ EL , γ FCare the hydrogen production adjustment cost of EL and the power generation adjustment cost of FC respectively; ΔP EL (t), ΔP FC (t) are the power changes of EL and FC in period t respectively;
[0049] Step 22: The intraday scheduling constraints are the same as the day-ahead scheduling, except that the scheduling time interval Δt DA Change to Δt IN ; The rolling optimization of the intraday variable prediction domain formulates the intraday power adjustment amount of energy storage and the start and stop plan of lithium-ion batteries, and transmits them to the real-time control layer.
[0050] As a further improvement of the present invention, the step 3 specifically comprises the following steps:
[0051] Step 31: In order to fully consider the impact of different types of energy storage output characteristics on power distribution, a real-time control layer is added with a time scale Δt RT The power of the electric / hydrogen HESS is corrected in real time for 1 minute. The intrinsic modal functions (IMF) components and residual signals res of the p-order frequencies from low to high are obtained by VMD. After decomposition, the critical charging and discharging frequencies f of power-type energy storage and energy-type energy storage are calculated. lim As a benchmark, high and low frequency components are screened. The specific steps are as follows:
[0052] Step 311: Set the reconstruction order n=1, calculate the center frequency f1 of res, if it is less than f lim , then let the input signal be all low-frequency components and the high-frequency components be 0, otherwise go to step 2;
[0053] Step 312: Let n=n+1, calculate The center frequency f n , if n <p,f n >f lim , and f n+1 <f lim , then go to step 3; if n=p, then go to step 4, otherwise continue to step 2;
[0054] Step 313: Order is the low frequency component, is the high frequency component;
[0055] Step 314: Calculation The center frequency f p+1 , if f p+1 <f lim , let IMF1 be the low-frequency component, is the high frequency component, otherwise the input signal is all high frequency components and the low frequency components are 0;
[0056] After filtering the high and low frequency components, the low frequency components are used as energy storage power tasks and provided to the intraday layer, and the high frequency components are used as power storage power tasks and allocated to the SC;
[0057] Step 32: In order to fully tap the wide-range regulation potential of hydrogen energy storage and extend the service life of hydrogen energy storage, the following four hydrogen energy storage operation modes are constructed by dividing the power range:
[0058] ① Normal operation mode: EL and FC operate in the normal power range, the power ranges are and
[0059] ② Overload mode: EL and FC operate beyond rated power, and the maximum overload power is and The power range is and The maximum continuous running time is and
[0060] ③ Low power mode: EL and FC operate below the minimum normal operating power, the minimum power is and The power range is and The maximum continuous running time is and
[0061] ④Stop mode: In this mode, EL and FC stop running;
[0062] Step 33: Due to the time scale Δt of the intraday layer IN The time scale Δt above the real-time layer RT Therefore, the intraday scheduling results are first interpolated into the real-time layer, and then the energy storage power is corrected in real time based on the interpolation results and the hydrogen energy storage operation mode. The specific situation is as follows:
[0063] ①σ EL (t-1),σ EL (t),σ FC (t-1),σ FC When (t) is 0, EL and FC remain in shutdown state and no adjustment is performed.
[0064] ②σ EL (t-1),σ EL When both (t) and (t) are 1, EL maintains the running state; when P cut When (t) is equal to 0, no adjustment is made; when P cutWhen (t) is greater than 0, EL is in overload operation and the duration does not exceed
[0065] ③σ FC (t-1),σ FC When both (t) and (t) are 1, FC maintains the running state; when P loss When (t) is equal to 0, no adjustment is made; when P loss When (t) is greater than 0, the FC is overloaded and the duration does not exceed
[0066] ④σ EL (t-1) is 0, σ EL When (t) is 1, EL will start; when P cut When (t) is 0, EL remains in shutdown state, and the power error generated is compensated by LIB and the power grid; when P cut When (t) is greater than 0, EL is still started and no adjustment is made;
[0067] ⑤σ FC (t-1) is 0, σ FC When (t) is 1, FC will start; when P loss When (t) is 0, FC remains in shutdown state, and the power error generated is compensated by LIB and the grid; when P loss When (t) is greater than 0, FC is still started and no adjustment is performed;
[0068] ⑥σ EL (t-1) is 1, σ EL When (t) is 0, EL will shut down; EL maintains the running state and operates at low power for a period not exceeding , EL remains shut down and no adjustment is made;
[0069] ⑦σ FC (t-1) is 1, σ FC When (t) is 0, FC will shut down; FC maintains operation and operates at low power for a period not exceeding , FC remains shut down and no adjustment is performed.
[0070] The beneficial effects of the present invention are:
[0071] 1) The economy of system operation is improved and the operating cost is reduced through day-ahead scheduling;
[0072] 2) Adopt rolling optimization of intraday variable prediction domain to ensure global optimality;
[0073] 3) Through real-time control, the rapid adjustment capability of SC, the flexible adjustment capability of LIB and the wide range adjustment capability of hydrogen energy storage are fully utilized;
[0074] 4) Power correction is performed based on the hydrogen energy storage operation mode, which effectively reduces the start and stop times of hydrogen energy storage and improves the operating performance and service life of the electric / hydrogen HESS. BRIEF DESCRIPTION OF THE DRAWINGS
[0075] Figure 1 This is the structural diagram of the wind-solar-hydrogen storage coupling system.
[0076] Figure 2 Filter the result plot for high and low frequency components.
[0077] Figure 3 This is the supercapacitor power diagram.
[0078] Figure 4 This is the charge state diagram of the supercapacitor.
[0079] Figure 5 This is the power change diagram of energy type energy storage.
[0080] Figure 6 The following are the scheduling result diagrams of different models.
[0081] Figure 7 It is a strategy flow chart of the present invention. DETAILED DESCRIPTION
[0082] The present invention is further explained below in conjunction with the accompanying drawings and specific embodiments. It should be understood that the following specific embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. It should be noted that the words "front", "rear", "left", "right", "upper" and "lower" used in the following description refer to directions in the accompanying drawings, and the words "inner" and "outer" refer to directions toward or away from the geometric center of a specific component, respectively.
[0083] Example 1
[0084] This embodiment provides a multi-time scale coordinated scheduling method for a wind-solar-hydrogen storage coupling system, comprising the following steps:
[0085] 1. Day-ahead scheduling mainly includes the following steps:
[0086] 1) Build a wind-solar-hydrogen-storage coupling system model, such as Figure 1 As shown, it is mainly composed of power generation equipment, electric energy storage equipment, hydrogen energy storage equipment and load. According to energy characteristics, energy storage can be divided into energy storage (LIB and hydrogen storage) and power storage (SC).
[0087] 2) With the goal of minimizing operating costs, the day-ahead power reference values and hydrogen energy storage start-stop plans for LIB, EL, and FC are determined based on long-term forecast information, and the results are provided for intraday rolling optimization. The day-ahead scheduling takes into account the slow dynamic characteristics of hydrogen energy storage, and adds the start-stop costs of EL and FC to the target, which can provide a reasonable reference start-stop plan for hydrogen energy storage for intraday and real-time scheduling.
[0088] 2. Perform rolling optimization of the intraday variable prediction domain, which mainly includes the following steps:
[0089] 1) With the goal of minimizing the intraday cost function, intraday rolling optimization is performed, and the latest system status information is used to continuously correct and refresh the day-ahead scheduling results. The prediction domain is set from the current time to the beginning of the next day, and global optimality is ensured on the basis of rolling correction of the scheduling results.
[0090] 2) Intraday scheduling takes into account the faster dynamic characteristics of LIB and incorporates the LIB charging and discharging costs into the target, providing reasonable energy storage power adjustment and LIB charging and discharging plan for real-time control.
[0091] 3. Real-time control mainly includes the following steps:
[0092] 1) Use variational mode decomposition to obtain the p-order frequency from low to high natural mode function components and residual signals, and then use the critical charge and discharge frequency f of power type energy storage and energy type energy storage lim After filtering the high and low frequency components, the low frequency components are used as energy storage power tasks and provided to the intraday layer, and the high frequency components are used as power storage power tasks and allocated to the SC.
[0093] 2) In order to fully tap the large-scale regulation potential of hydrogen energy storage and increase the service life of hydrogen energy storage, different operating modes are divided for EL and FC and operating strategies are formulated to broaden the operating range of hydrogen energy storage and reduce the number of starts and stops of hydrogen energy storage. By dividing the power range, the hydrogen energy storage operating mode can be divided into normal operating mode, overload mode, low power mode and shutdown mode. Then the intraday scheduling results are interpolated into the real-time layer, and the energy storage power is corrected in real time based on the interpolation results and the hydrogen energy storage operating mode.
[0094] Example 2
[0095] The multi-time scale coordinated dispatch of the wind-solar-hydrogen-storage coupling system is carried out in the Matlab platform, and its parameters are shown in Tables 1 and 2. The wind power, photovoltaic and load power data from 0:00 to 24:00 on a certain day in a certain area of Jiangsu are selected as input data. The total installed capacity of wind power and photovoltaic in the area is 4418kW and 3096kW, respectively.
[0096] First, the input data is predicted. Then, in order to highlight the advantages of the strategy proposed in this article, three scheduling models are set up in the simulation and scheduled separately:
[0097] Model 1: Day-ahead scheduling model;
[0098] Model 2: Day-ahead-intraday scheduling model;
[0099] Model 3: The scheduling model proposed in this paper.
[0100] Perform simulation and use VMD to filter the high and low frequency components of the system net power. The results are as follows: Figure 2 As shown in the figure, f5 is greater than f lim , and f6 is smaller than f lim Therefore, IMF3+IMF4+IMF5+IMF6+res are selected as the high-frequency components, and IMF1+IMF2 are selected as the low-frequency components.
[0101] Taking the high frequency component as the SC power task, the SC power and state of charge can be obtained as follows: Figure 3 and Figure 4 As shown in the figure, SC has a good high-frequency fluctuation smoothing effect. SOC _ sc Maintaining it within a reasonable range, the rapid stabilization capability of SC is fully utilized.
[0102] Table 1 Parameters of Example 2
[0103]
[0104]
[0105] Table 2 Time-of-use electricity prices
[0106]
[0107] The low-frequency component is used as the energy storage power task P EBES and compare its change with P when VMD is not used EBES The results are as follows: Figure 5 As shown in the figure, when VMD is not used, P EBES The total fluctuation is 1860.4 kWh, and after use it is 495.9 kWh, a decrease of 73.3%. This shows that the high and low frequency component screening method based on VMD can significantly reduce the power fluctuation of energy storage, thereby reducing the frequent adjustment of LIB and hydrogen energy storage equipment, and improving their operating performance and service life.
[0108] Define LIB utilization α LIB and hydrogen storage utilization rate α HESare the percentage of LIB and hydrogen storage state time that does not exceed the limit in the total time. The scheduling results of different models are compared. Figure 6 As shown in Table 3. It can be seen from the figure:
[0109] 1) Electric energy storage fully plays the role of peak shaving and valley filling. During the period of 8:00-16:00, the wind and solar power output is at its peak, and the surplus power generated is mainly consumed by EL electrolysis hydrogen production; during the period of 17:00-23:00, the regional electricity consumption is at its peak, and the shortfall power generated is mainly compensated by FC hydrogen consumption power generation. Hydrogen energy storage bears most of the unbalanced power when the net power value of the system is large, reflecting its large-scale storage capacity; LIB bears the remaining electric energy storage power task, realizing the flexible complementary adjustment of electric / hydrogen HESS.
[0110] 2) The electricity purchase / sale link not only brings economic benefits of electricity, but also reflects the support capacity of the power grid for the coupled system, effectively improving the utilization rate of LIB; the hydrogen purchase / sale link not only brings hydrogen energy benefits, but also realizes the flexible adjustment of HST hydrogen storage capacity, effectively improving the utilization rate of hydrogen energy storage. 3) Model 1 has a large scheduling time scale, the scheduling results are extensive, and the scheduling results cannot be updated according to the system status. The operating cost is the highest, and the energy imbalance rate E IR The highest and the lowest electricity / hydrogen HESS utilization.
[0111] 4) Model 2 adds variable prediction domain rolling optimization to achieve global economic optimization, and the operating cost is 9.24% lower than that of Model 1. However, it has poor effects on system net power stabilization and energy storage state regulation, and the EIR is high. LIB and α HES Lower.
[0112] 5) In model 3, EL operates at overload during the periods of 11:00-11:30 and 13:30-14:00, and FC operates at overload during the periods of 18:25-19:05 and 20:05-20:35. LIB and α HES All are 100%, indicating that the electric / hydrogen HESS always has sufficient adjustment margin. In addition, compared with Model 2, the operating cost of Model 3 is reduced by 26.3%, E IR It has dropped by 41.1%. It dropped 2 times. It dropped by 2 times. This shows that the real-time layer fully considers the rapid regulation characteristics of SC, the flexible regulation characteristics of LIB, and the wide range regulation characteristics and start-stop characteristics of hydrogen energy storage, increases the regulation ability of energy storage on the system, and realizes flexible correction of intraday scheduling results.
[0113] Table 3 Comparison of scheduling data of different models
[0114]
[0115]
[0116] The technical means disclosed in the scheme of the present invention are not limited to the technical means disclosed in the above-mentioned implementation mode, but also include technical schemes composed of any combination of the above technical features.
Claims
1. A multi-time scale coordinated scheduling method for a wind-solar-hydrogen storage coupling system, characterized in that: The following steps are involved: Step 1: In the day-ahead scheduling, the goal is to minimize the operating cost, formulate a day-ahead scheduling plan, and impose constraints; Step 2: Use variable prediction domain rolling optimization in intraday scheduling to adjust the day-ahead plan and ensure global optimality; Step 3: Use variational mode decomposition to screen high and low frequency components in real-time control, and perform power correction based on the hydrogen energy storage operation mode to give full play to the operating characteristics of different types of energy storage.
2. According to claim 1, a multi-time scale coordinated scheduling method for a wind-solar-hydrogen storage coupling system is characterized in that: The step 1 specifically comprises the following steps: Step 11: Construct a wind-solar-hydrogen-storage coupling system model, which mainly consists of power generation equipment, electric energy storage equipment, hydrogen energy storage equipment and loads; Step 12: Minimize the running cost C DA As the target, day-ahead scheduling is performed with a time scale of Δt DA The day-ahead power reference values of LIB, EL, and FC and the start-stop plan of hydrogen energy storage are determined, and the results are provided for intraday rolling optimization; C DA The expression is: Where: the superscript "DA" represents the day-ahead reference value of the corresponding variable; N DA is the total number of time periods before the day; are the charging cost and discharging cost of L IB respectively; c EL 、c FC are the hydrogen production cost of EL and the power generation cost of FC respectively; They are the cost of purchasing hydrogen and the cost of selling hydrogen respectively; are the amount of hydrogen purchased and sold in period t, respectively; c cut 、c loss They are the wind and solar power abandonment costs and the load power failure penalty costs respectively; are the start-stop costs of EL and FC respectively; are the start and stop times of EL and FC respectively; Step 13: Imposing constraints on the day-ahead plan, including system power balance constraints, energy storage power upper and lower limit constraints, energy storage power ramping constraints, electricity purchase / sale power and hydrogen purchase / sale rate constraints, wind and solar power abandonment / load power loss power constraints, lithium-ion battery status constraints, and hydrogen storage status constraints.
3. According to claim 1, a multi-time scale coordinated scheduling method for a wind-solar-hydrogen storage coupling system is characterized in that: The step 2 specifically includes the following steps: Step 21: Minimize the intraday cost function C IN As the target, intraday scheduling is performed with a time scale of Δt IN The daily power adjustment of energy storage and the start-stop plan of lithium-ion batteries are determined for 20 minutes, and the results are provided to real-time control; C IN The expression is: Where: the superscript "IN" indicates the intraday reference value of the corresponding variable; n0 is the current period; N IN is the total number of time periods in a day; Z(t) is the adjustment cost of time period t; are the start-stop cost and the number of charge-discharge cycles of LIB, respectively; Where: are the charging adjustment cost and discharging adjustment cost of LIB respectively; ΔP Respectively represent the change of LIB charging and discharging power in period t; γ EL , γ FC are the hydrogen production adjustment cost of EL and the power generation adjustment cost of FC respectively; ΔP EL (t), ΔP FC (t) are the power changes of EL and FC in period t respectively; Step 22: Apply constraints to the intraday rolling optimization in the same form as the day-ahead constraints, except that the scheduling interval is changed to Δt IN .
4. The multi-time scale coordinated scheduling method for a wind-solar-hydrogen storage coupling system according to claim 1 is characterized in that: The step 3 specifically comprises the following steps: Step 31: In order to fully consider the impact of different types of energy storage output characteristics on power allocation, a real-time correction layer is added with a time scale of Δt RT The power of the electric / hydrogen hybrid energy storage is corrected in real time for 1 minute. The p-order frequency intrinsic mode function components and residual signals res from low to high are obtained by VMD. After decomposition, the critical charge and discharge frequencies f of power type energy storage and energy type energy storage are obtained. lim As a benchmark, high and low frequency components are screened; Step 32: Divide EL and FC into different operation modes and formulate operation strategies, broaden the operation range of hydrogen energy storage and reduce the number of hydrogen energy storage starts and stops, fully tap the large-scale regulation potential of hydrogen energy storage and extend the service life of hydrogen energy storage; Step 33: Due to the time scale Δt of the intraday layer IN Time scale Δt above the real-time layer RT ,Therefore, the intraday scheduling results are first interpolated into the real-time layer, and then the energy storage power is corrected in real time based on the interpolation results and the hydrogen energy storage operation mode.
5. The multi-time scale coordinated scheduling method for a wind-solar-hydrogen storage coupling system according to claim 1 is characterized in that: The step 31 specifically includes the following steps: Step 311: Set the reconstruction order n=1, calculate the center frequency f1 of res, if it is less than f lim , then let the input signal be all low-frequency components and the high-frequency components be 0, otherwise go to step 2; Step 312: Let n=n+1, calculate The center frequency f n , if n <p,f n >f lim , and f n+1 <f lim , then go to step 3; if n=p, then go to step 4, otherwise continue to step 2; Step 313: Order is the low frequency component, is the high frequency component; Step 314: Calculation The center frequency f p+1 , if f p+1 <f lim , let IMF1 be the low-frequency component, is the high frequency component, otherwise the input signal is all high frequency components and the low frequency components are 0; After filtering the high and low frequency components, the low frequency components are taken as energy type energy storage power tasks and provided to the intraday layer, and the high frequency components are taken as power type energy storage power tasks and allocated to the SC.
6. The multi-time scale coordinated scheduling method for a wind-solar-hydrogen storage coupling system according to claim 1 is characterized in that: The step 32 constructs the following four hydrogen energy storage operation modes: ① Normal operation mode: EL and FC operate in the normal power range, the power ranges are and ② Overload mode: EL and FC operate beyond rated power, and the maximum overload power is and The power range is and The maximum continuous running time is and ③ Low power mode: EL and FC operate below the minimum normal operating power, the minimum power is and The power range is and The maximum continuous running time is and ④Stop mode: In this mode, EL and FC stop running.
7. The multi-time scale coordinated scheduling method for a wind-solar-hydrogen storage coupling system according to claim 1 is characterized in that: The specific situation of step 33 is as follows: ①σ EL (t-1),σ EL (t),σ FC (t-1),σ FC When (t) is 0, EL and FC remain in shutdown state and no adjustment is performed; ②σ EL (t-1),σ EL When both (t) and (t) are 1, EL maintains the running state; when P cut When (t) is equal to 0, no adjustment is made; when P cut When (t) is greater than 0, EL is in overload operation and the duration does not exceed ③σ FC (t-1),σ FC When both (t) and (t) are 1, FC maintains the running state; when P loss When (t) is equal to 0, no adjustment is made; when P loss When (t) is greater than 0, the FC is overloaded and the duration does not exceed ④σ EL (t-1) is 0, σ EL When (t) is 1, EL will start; when P cut When (t) is 0, EL remains in shutdown state, and the power error generated is compensated by LIB and the power grid; when P cut When (t) is greater than 0, EL is still started and no adjustment is made; ⑤σ FC (t-1) is 0, σ FC When (t) is 1, FC will start; when P loss When (t) is 0, FC remains in shutdown state, and the power error generated is compensated by LIB and the grid; when P loss When (t) is greater than 0, FC is still started and no adjustment is performed; ⑥σ EL (t-1) is 1, σ EL When (t) is 0, EL will shut down; EL maintains the running state and operates at low power for a period not exceeding , EL remains shut down and no adjustment is made; ⑦σ FC (t-1) is 1, σ FC When (t) is 0, FC will shut down; FC maintains operation and operates at low power for a period not exceeding , FC remains shut down and no adjustment is performed.
Citation Information
Cited By
Cooperative operation optimization and comprehensive benefit evaluation method for wind-solar-hydrogen multi-energy complementary system
CN120320391A
Energy coordination method for wind and light hydrogen storage system
CN121584739A
