Sagomean new energy delivery base operation model based on electricity market
By constructing a multi-objective function Shagohuang New Energy Transportation Base operation model, combining the constraints of thermal power units, photothermal power stations and pumped storage power stations, the DC transmission mode is optimized, and the problem of poor stability of new energy transmission operation is solved. , achieving the maximization of comprehensive benefits and efficient consumption of new energy.
Patent Information
- Application Number
- CN202410877086.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-11-15
AI Technical Summary
In the prior art, the new energy delivery operation model has poor stability and cannot effectively reflect the comprehensive benefits of the Shagohuang New Energy Base, especially in terms of economic benefits, environmental factors and flexibility, and it is difficult to optimize the DC power curve to reduce wind decontamination. Abandon the photoelectricity.
The operation model of Shagohuang New Energy Transportation Base adopts a multi-objective function. By adjusting the random power prediction error value, combining the constraints of thermal power units, photothermal power stations and pumped storage power stations, the tower photothermal power station operation model and storage are constructed. Energy model, optimize the DC outgoing mode, determine the optimal proportion of medium and long-term trading and spot trading electricity, and realize the peak-cutting and valley-filling of new energy and the flexible adjustment of power system.
Improve the accuracy of the timing operation simulation results of the new energy delivery base, realize the maximization of the comprehensive benefits of the Shagohuang New Energy Base, ensure the stability of DC transmission power and efficient absorption of new energy, and reduce the wind abandonment. Abandon the photoelectricity.
Smart Images

Figure QLYQS_1 
Figure QLYQS_4 
Figure QLYQS_5
Abstract
Description
Technical Field
[0001] The invention discloses an operation model of a Shagohuang new energy transmission base based on an electricity market, belonging to the technical field of new energy transmission. Background Art
[0002] The prior art simulates the timing operation of the Shagohuang new energy transmission base, but the objective function of the existing timing operation simulation method is a single objective function, which cannot reflect the comprehensive benefits of the Shagohuang new energy transmission base. The objective function of the present invention is a multi-objective function, which considers the DC utilization hours on the basis of taking into account the economic benefits, environmental factors and flexibility of the Shagohuang new energy base. The economic benefits, environmental factors and flexibility of the Shagohuang new energy base are quantified by net profit, carbon emissions and peak-shaving and valley-filling electricity, and the annual comprehensive optimal solution is obtained by multiple calls and solutions in units of weeks. The problem of single description and inaccuracy of other timing operation simulation methods is avoided. The DC transmission mode affects the consumption of new energy and the efficient utilization of DC transmission channels. The DC transmission mode is mainly divided into two types: medium- and long-term transmission transactions and cross-regional spot transactions of surplus renewable energy. In addition to the agreed electricity, medium- and long-term transmission transactions often agree on power curves. If it is not for grid safety reasons, it generally needs to be rigidly executed; while spot transactions stipulate that only renewable energy that cannot be absorbed locally can be transmitted, which can be temporarily adjusted according to the demand and capacity of the transmission and receiving ends before and during the day. Therefore, under the existing trading model, it is difficult to optimize the DC power curve while ensuring that the daily exchange power remains unchanged. Therefore, it is necessary to determine the optimal ratio of long-term trading power and spot trading power, and optimize the DC power curve to ensure the stability of DC transmission power and reduce the amount of wind and solar power abandoned. Summary of the invention
[0003] The purpose of the present invention is to provide a Shagohuang new energy transmission base operation model based on the electricity market to solve the problem of poor stability of the new energy transmission operation model in the prior art.
[0004] An operation model of the Shagohuang new energy transmission base based on the power market, including: S1 adjusts the random power prediction error value to make the fitted wind and solar power output fluctuation characteristics consistent with the fluctuation characteristics of historical measured data: S2 constrains the peak load regulation depth and start-stop times of thermal power units; S3, based on the configuration of electric heating devices, combines the CSP unit aggregation modeling method to model the tower CSP power station operation model. The tower CSP power station operation model includes: heat balance constraints, generator unit output constraints, generator unit operation quantity constraints, and thermoelectric conversion power constraints. S4 stores the electric energy when the output of new energy is overflowing, and releases the stored electric energy when the output of new energy is insufficient, thus realizing peak shaving and valley filling of new energy. The S5 pumped storage power station selects variable speed constant frequency units, which enables the pumped storage to achieve continuous adjustment of the pumping power by adjusting the motor speed under pumping conditions. At the same time, the pumped storage can achieve power adjustment under power generation conditions, and ultimately achieve power adjustment of the pumped storage power station under two conditions, providing more flexible adjustment resources for the power system.
[0005] S1 includes: ; In the formula, Contribute to the joint efforts of wind and solar, It represents the theoretical output of wind and solar power combined in period t.
[0006] S2 includes converting the decision-making problem of multiple unit on / off combinations into the problem of optimizing the overall number of units in operation. The aggregated constraints of the thermal power unit operation model include: unit output constraint, unit operation number constraint, unit ramp-up power constraint, and unit ramp-down power constraint: ; ; ; ; In the formula, t is the time period sequence; The time spanned by a single period; Indicates the output power of thermal power units; Express the minimum technical output of thermal power units; Indicates the rated output of thermal power units; is the number of thermal power units put into operation; is the maximum number of thermal power units put into operation; is the minimum number of thermal power units put into operation; Indicates the maximum climbing power of a single thermal power unit; Indicates the maximum ramp-down power of a single thermal power unit.
[0007] S3 includes: ; ; ; ; In the formula, Indicates the solar heat received by the light field; Indicates the electrical energy received by the electric heating device; It represents the abandoned heat generated by the light field; Indicates the waste heat generated by the electric heating device during the heating process; It represents the waste heat generated in the process of heat storage and heat release; Indicates the heat supplied by the heat storage tank to the generator set; It represents the heat storage in the heat storage tank during period t; Indicates the output power of the generator set; , Indicates the upper and lower limits of the output power of the generator set; is the number of CSP power stations put into operation; is the maximum number of CSP plants put into operation; is the thermoelectric conversion efficiency.
[0008] S4 includes building an energy storage model, which includes: energy storage power constraints, energy storage charge state constraints, and energy storage capacity constraints: ; ; ; In the formula, They represent the charging and discharging power of the energy storage power station in period t respectively; Indicates the maximum charging and discharging power of the energy storage power station; It represents the storage capacity of the energy storage power station in period t; , Indicates the maximum and minimum storage capacity of the energy storage power station.
[0009] S5 includes building a pumped storage power station model, which includes the power generation constraints of the pumped storage power station, the water storage power constraints of the pumped storage power station, and the power generation / pumping state constraints of the pumped storage power station: ; ; ; In the formula, Indicates the power generation capacity of the pumped storage power station; It represents the pumping power of the pumped storage power station; , They are power generation / pumping state variables, both are 0-1 variables. When the pumped storage unit is in power generation state , when the pumped storage unit is in the pumping state , its power generation and pumping states are mutually exclusive.
[0010] Compared with the prior art, the present invention has the following beneficial effects: the delivery model constructed by the present invention takes multiple constraints into consideration, performs new energy delivery according to actual conditions, improves the accuracy of the model, and achieves optimal timing operation simulation results of the Shagohuang new energy delivery base. DETAILED DESCRIPTION
[0011] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention is described clearly and completely below. Obviously, the described embodiments are part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0012] An operation model of the Shagohuang new energy transmission base based on the power market, including: S1 adjusts the random power prediction error value to make the fitted wind and solar power output fluctuation characteristics consistent with the fluctuation characteristics of historical measured data: S2 constrains the peak load regulation depth and start-stop times of thermal power units; S3, based on the configuration of electric heating devices, combines the CSP unit aggregation modeling method to model the tower CSP power station operation model. The tower CSP power station operation model includes: heat balance constraints, generator unit output constraints, generator unit operation quantity constraints, and thermoelectric conversion power constraints. S4 stores the electric energy when the output of new energy is overflowing, and releases the stored electric energy when the output of new energy is insufficient, thus realizing peak shaving and valley filling of new energy. The S5 pumped storage power station selects variable speed constant frequency units, which enables the pumped storage to achieve continuous adjustment of the pumping power by adjusting the motor speed under pumping conditions. At the same time, the pumped storage can achieve power adjustment under power generation conditions, and ultimately achieve power adjustment of the pumped storage power station under two conditions, providing more flexible adjustment resources for the power system.
[0013] S1 includes: ; In the formula, Contribute to the joint efforts of wind and solar, It represents the theoretical output of wind and solar power combined in period t.
[0014] S2 includes converting the decision-making problem of multiple unit on / off combinations into the problem of optimizing the overall number of units in operation. The aggregated constraints of the thermal power unit operation model include: unit output constraint, unit operation number constraint, unit ramp-up power constraint, and unit ramp-down power constraint: ; ; ; ; In the formula, t is the time period sequence; The time spanned by a single period; Indicates the output power of thermal power units; Express the minimum technical output of thermal power units; Indicates the rated output of thermal power units; is the number of thermal power units put into operation; is the maximum number of thermal power units put into operation; is the minimum number of thermal power units put into operation; Indicates the maximum climbing power of a single thermal power unit; Indicates the maximum ramp-down power of a single thermal power unit.
[0015] S3 includes: ; ; ; ; In the formula, Indicates the solar heat received by the light field; Indicates the electrical energy received by the electric heating device; It represents the abandoned heat generated by the light field; Indicates the waste heat generated by the electric heating device during the heating process; It represents the waste heat generated in the process of heat storage and heat release; Indicates the heat supplied by the heat storage tank to the generator set; It represents the heat storage in the heat storage tank during period t; Indicates the output power of the generator set; , Indicates the upper and lower limits of the output power of the generator set; is the number of CSP power stations put into operation; is the maximum number of CSP plants put into operation; is the thermoelectric conversion efficiency.
[0016] S4 includes building an energy storage model, which includes: energy storage power constraints, energy storage charge state constraints, and energy storage capacity constraints: ; ; ; In the formula, They represent the charging and discharging power of the energy storage power station in period t respectively; Indicates the maximum charging and discharging power of the energy storage power station; It represents the storage capacity of the energy storage power station in period t; , Indicates the maximum and minimum storage capacity of the energy storage power station.
[0017] S5 includes building a pumped storage power station model, which includes the power generation constraints of the pumped storage power station, the water storage power constraints of the pumped storage power station, and the power generation / pumping state constraints of the pumped storage power station: ; ; ; In the formula, Indicates the power generation capacity of the pumped storage power station; It represents the pumping power of the pumped storage power station; , They are power generation / pumping state variables, both are 0-1 variables. When the pumped storage unit is in power generation state , when the pumped storage unit is in the pumping state , its power generation and pumping states are mutually exclusive.
[0018] The present invention is a method for simulating the timing operation of the Shagohuang new energy transmission base under the optimal DC transmission mode. The timing operation simulation results are used to determine the proportion of the transmission power of the two DC transmission modes, and finally the timing operation simulation results of the Shagohuang new energy transmission base are optimized. The designed application scenario is a typical Shagohuang area new energy transmission base, where the main power sources are wind power generation and photovoltaic power generation, and supporting thermal power units provide support, supporting grid-side energy storage to provide peak-shaving services, supporting solar thermal power generation to strengthen support, supporting pumped storage to share the peak-shaving pressure of energy storage, realizing the multi-energy complementarity of the Shagohuang new energy base, and improving the consumption level of the Shagohuang new energy base.
[0019] The present invention discloses a method for simulating the timing operation of the Shagohuang new energy transmission base considering the DC transmission mode. The fast solving capability of the particle swarm algorithm is used to determine the optimal proportion of two DC transmission modes, namely the medium- and long-term transmission transaction mode and the spot transmission transaction mode. The large-scale multi-objective solving capability of the GUROBI solver is used to fully utilize the supporting capabilities of thermal power and solar thermal power generation and the regulating capabilities of energy storage and pumped storage, and to consider the volatility, randomness and seasonality of wind power and photovoltaic power, and to coordinate the various types of power sources in the Shagohuang new energy transmission base to solve the timing operation simulation results of the Shagohuang new energy transmission base, and realize the multi-energy complementarity of the Shagohuang transmission base. Through iteration, the proportion of the two DC transmission modes is continuously updated until the optimal solution is obtained.
[0020] The timing operation simulation method of the Shagohuang new energy transmission base considering the DC transmission mode proposed in the present invention can quantify the comprehensive benefits of the Shagohuang new energy transmission base under the consideration of economic benefits, environmental factors, flexibility and DC utilization hours, provide a reference for the large-scale concentrated development of new energy in the Shagohuang area, and help transform energy resource advantages into economic development advantages.
[0021] The Shagohuang New Energy Base mainly relies on wind power and photovoltaic power generation, with supporting thermal power units and grid-side energy storage to provide peak-shaving services. At the same time, it is equipped with solar thermal power generation to strengthen support and pumped storage to share the peak-shaving pressure of energy storage, realizing the multi-energy complementarity of the Shagohuang New Energy Base and improving the absorption level of the Shagohuang New Energy Base.
[0022] For the probability distribution of new energy, including the probability distribution of wind power and photovoltaic output. At present, the parameter method is often used to calculate the probability distribution model of wind speed and light amplitude, and then the wind speed-wind power and light amplitude-light power conversion models are used to solve the wind power and photovoltaic output probability models. However, the power of new energy is not only affected by natural factors such as wind speed and light irradiance, but also by the physical factors of wind turbines and photovoltaic panels themselves. Therefore, the model error solved based on the parameter method is large. In order to ensure that the fitted wind and solar output can fit the actual situation in the Shagohuang area and reduce the impact on the operation and decision-making of the power system, the non-parametric kernel density estimation method is used to fit the historical output data of wind power and photovoltaics, estimate the probability density function of wind power and photovoltaics, and obtain the joint probability distribution of wind and solar output according to the Copula theory.
[0023] In view of the short-term volatility of wind and solar power, a wind-solar joint output simulation idea of "time series power curve + random power prediction error + output characteristic verification" is proposed. The non-parametric method is used to fit the wind power prediction error of each week to obtain the time series characteristics of the prediction error, and the time series power curve and the random power prediction error value are superimposed as the wind-solar output. At the same time, characteristic numerical indicators are introduced to evaluate the fluctuation characteristics of the measured data of wind and solar output in each week. By adjusting the random power prediction error value, the fitted wind and solar output fluctuation characteristics are consistent with the fluctuation characteristics of the historical measured data. This model can not only reflect the seasonal characteristics and randomness of wind and solar output, but also ensure the short-term volatility of wind and solar output.
[0024] The peak-shaving depth of thermal power units affects the consumption range of new energy sources, but too high a peak-shaving depth affects the safe operation of thermal power units, and multiple starts and stops will also affect the life of the units. Therefore, the peak-shaving depth and the number of starts and stops of thermal power units are constrained. In order to reduce the scale of integer variables and improve the efficiency of simulation calculations, the decision-making problem of the combination of multiple units on and off is transformed into the problem of optimizing the overall number of units in operation. The constraints of the aggregated thermal power unit operation model include: unit output constraints, unit number constraints, unit ramp-up power constraints, and unit ramp-down power constraints.
[0025] The configuration of electric heating devices in CSP power stations can not only expand the output range of CSP power stations, but also store the electric energy generated by renewable energy in the form of thermal energy for later use. The electric heating device heats the heat transfer medium and stores it in the heat storage tank to achieve energy conversion and time shift. On the basis of configuring the electric heating device, combined with the CSP unit aggregation modeling method, the tower CSP power station operation model is modeled including: heat balance constraints, generator unit output constraints, generator unit operation quantity constraints, and thermoelectric conversion power constraints.
[0026] The pumped storage power station selects variable speed constant frequency units, so that the pumped storage can achieve continuous adjustable pumping power by adjusting the motor speed under pumping conditions. At the same time, the pumped storage can achieve adjustable power under power generation conditions, and finally achieve adjustable power under two conditions for the pumped storage power station, providing more flexible adjustment resources for the power system. The pumped storage power station model includes: pumped storage power station power generation constraint, pumped storage power station water storage constraint, and pumped storage power generation / pumping state constraint.
[0027] The DC transmission mode is mainly divided into two types: medium- and long-term transmission transactions and cross-regional spot transactions of surplus renewable energy. In addition to the agreed amount of electricity, medium- and long-term transmission transactions often also agree on power curves, which are generally required to be rigidly executed unless there are grid security reasons; while spot transactions stipulate that only renewable energy that cannot be absorbed locally can be transmitted, and can be temporarily adjusted based on the needs and capabilities of the transmission and receiving ends before and during the day.
[0028] Medium- and long-term transmission transactions require that the sending end needs to increase the start-up of thermal power to ensure the rigid execution of the transmission of power. The maximum and minimum technical outputs of conventional units increase accordingly. However, cross-regional spot transactions require that when wind and solar power are abandoned, the DC transmission power is increased through spot transactions, and the transmission of power does not need to be guaranteed in other periods. The sending end does not need to increase the start-up of thermal power, nor does it change the minimum technical output of conventional units. The new energy consumption capacity increased by transmission is equal to the transmission power. Therefore, under the existing trading model, it is difficult to optimize the DC power curve while ensuring that the daily exchange power remains unchanged. Therefore, it is necessary to determine the optimal proportion of long-term trading power and spot trading power, and optimize the DC power curve to ensure the stability of DC transmission power and reduce the amount of wind and solar power abandoned.
[0029] At the same time, the Shagohuang new energy transmission base is far away from the load center, the collection grid is weak, and the pressure of stable transmission is high. Conventional DC transmission schemes have problems such as absorbing a large amount of reactive power from the AC system, prone to phase change failure, large reactive power compensation capacity, and insufficient stable operation ability when connected to weak AC systems, which restrict the efficient use of new energy and DC transmission channels. Flexible DC transmission technology has unique technical advantages such as flexible control and easy networking. It can solve many technical problems currently faced by AC and DC transmission technologies. In recent years, it has been widely used in domestic and foreign power grid construction.
[0030] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some or all of the technical features thereof may be replaced by equivalents, and these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. An operation model of the Shagohuang new energy transmission base based on the power market, characterized in that: include: S1 adjusts the random power prediction error value to make the fitted wind and solar power output fluctuation characteristics consistent with the fluctuation characteristics of historical measured data: S2 constrains the peak load regulation depth and start-stop times of thermal power units; S3, based on the configuration of electric heating devices, combines the CSP unit aggregation modeling method to model the tower CSP power station operation model. The tower CSP power station operation model includes: heat balance constraints, generator unit output constraints, generator unit operation quantity constraints, and thermoelectric conversion power constraints. S4 stores the electric energy when the output of new energy is overflowing, and releases the stored electric energy when the output of new energy is insufficient, thus realizing peak shaving and valley filling of new energy. The S5 pumped storage power station selects variable speed constant frequency units, which enables the pumped storage to achieve continuous adjustment of the pumping power by adjusting the motor speed under pumping conditions. At the same time, the pumped storage can achieve power adjustment under power generation conditions, and ultimately achieve power adjustment of the pumped storage power station under two conditions, providing more flexible adjustment resources for the power system.
2. According to the operation model of the Shagohuang new energy transmission base based on the power market in claim 1, it is characterized in that: S1 includes: ; In the formula, Contribute to the joint efforts of wind and solar, It represents the theoretical output of wind and solar power combined in period t.
3. According to claim 2, a Shagohuang new energy transmission base operation model based on the power market is characterized in that: S2 includes converting the decision-making problem of multiple unit on / off combinations into the problem of optimizing the overall number of units in operation. The aggregated constraints of the thermal power unit operation model include: unit output constraint, unit operation number constraint, unit ramp-up power constraint, and unit ramp-down power constraint: ; ; ; ; In the formula, t is the time period sequence; The time spanned by a single period; Indicates the output power of thermal power units; Express the minimum technical output of thermal power units; Indicates the rated output of thermal power units; is the number of thermal power units put into operation; is the maximum number of thermal power units put into operation; is the minimum number of thermal power units put into operation; Indicates the maximum climbing power of a single thermal power unit; Indicates the maximum ramp-down power of a single thermal power unit.
4. The operation model of the Shagohuang new energy transmission base based on the power market according to claim 3 is characterized in that S3 include: ; ; ; ; In the formula, It represents the solar heat received by the light field; Indicates the electrical energy received by the electric heating device; It represents the abandoned heat generated by the light field; Indicates the waste heat generated by the electric heating device during the heating process; It represents the waste heat generated in the process of heat storage and heat release; Indicates the heat supplied by the heat storage tank to the generator set; It represents the heat storage in the heat storage tank during period t; Indicates the output power of the generator set; , Indicates the upper and lower limits of the output power of the generator set; is the number of CSP power stations put into operation; is the maximum number of CSP plants put into operation; is the thermoelectric conversion efficiency.
5. The operation model of the Shagohuang new energy transmission base based on the power market according to claim 4 is characterized in that: S4 includes building an energy storage model, which includes: energy storage power constraints, energy storage charge state constraints, and energy storage capacity constraints: ; ; ; In the formula, They represent the charging and discharging power of the energy storage power station in period t respectively; Indicates the maximum charging and discharging power of the energy storage power station; It represents the storage capacity of the energy storage power station in period t; , Indicates the maximum and minimum storage capacity of the energy storage power station.
6. The operation model of the Shagohuang new energy transmission base based on the power market according to claim 5 is characterized in that: S5 includes building a pumped storage power station model, which includes the power generation constraints of the pumped storage power station, the water storage power constraints of the pumped storage power station, and the power generation / pumping state constraints of the pumped storage power station: ; ; ; In the formula, Indicates the power generation capacity of the pumped storage power station; It represents the pumping power of the pumped storage power station; , They are power generation / pumping state variables, both are 0-1 variables. When the pumped storage unit is in power generation state , when the pumped storage unit is in the pumping state , its power generation and pumping states are mutually exclusive.