Rural power distribution network frame planning method, device and equipment and storage medium

Through the multi-objective collaborative planning method, a trend calculation model for rural distribution networks is constructed, photovoltaic site selection and network line configuration are optimized, which solves the problem of insufficient new energy consumption capacity in rural distribution networks and increases the voltage during new energy access Quality and consumption capacity.

CN118970896APending Publication Date: 2024-11-15GUANGDONG POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411005446.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing technology has failed to effectively enhance the new energy consumption capacity of rural distribution networks, resulting in an increase in voltage quality and network loss when new energy is accessed, but the absorption capacity of new energy is not fully considered.

Method used

By adopting a multi-objective collaborative planning method, the rural distribution network is constructed by building a trend calculation model, combining the minimum system voltage deviation and the maximum new energy consumption capacity as the goal, photovoltaic site selection and new grid lines are configured to form a rural distribution network Collaborative planning scheme with new energy.

Benefits of technology

The new energy consumption capacity of rural distribution networks has been improved, the comprehensiveness and rationality of the planning scheme have been enhanced, and the optimal configuration of high-proportion new energy access has been achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118970896A_ABST
    Figure CN118970896A_ABST
Patent Text Reader

Abstract

The invention discloses a rural power distribution network frame planning method, device and equipment and a storage medium, and the method comprises the steps: determining a feeder line of a to-be-planned rural power distribution network, and obtaining the basic parameters and operation data of the rural power distribution network; constructing a power distribution network load flow calculation model according to the feeder line of the rural power distribution network, and performing load flow calculation to obtain a load flow calculation result; with the minimum voltage deviation of the power distribution network system and the maximum new energy consumption capability as targets, a multi-target collaborative planning model and operation constraints of a rural power distribution network frame and new energy under new energy access are constructed; and under the constraint of the operation constraint, solving the multi-target collaborative planning model to obtain a corresponding photovoltaic site selection and a configuration result of a newly added network frame line, and then obtaining a planning scheme of rural power distribution network frame and new energy collaborative planning. Through the method, the new energy consumption capability of the rural power distribution network can be enhanced, and the comprehensiveness and rationality of a rural power distribution network planning scheme are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power distribution network framework optimization planning, and in particular to a rural power distribution network framework planning method, device, equipment and storage medium. Background Art

[0004] At present, the research on the planning of rural distribution network structure for renewable energy access has been quite mature in terms of improving voltage quality and reducing network losses, but these studies rarely focus on enhancing the renewable energy absorption capacity of rural distribution networks. Therefore, it is necessary to find a better planning method to ensure the most comprehensive planning scheme that takes into account the renewable energy absorption capacity of rural distribution networks. Summary of the invention

[0005] The present invention provides a rural distribution network framework planning method, device, equipment and storage medium to solve the technical problem that the prior art fails to enhance the new energy consumption capacity of the rural distribution network.

[0006] In order to solve the above technical problems, an embodiment of the present invention provides a rural distribution network framework planning method, including:

[0007] Determine the feeders of the rural distribution network to be planned, and obtain basic parameters and operation data corresponding to the rural distribution network;

[0008] Constructing a corresponding distribution network power flow calculation model according to the feeder of the rural distribution network, and performing power flow calculation according to the distribution network power flow calculation model to obtain corresponding power flow calculation results;

[0009] According to the basic parameters, operation data and power flow calculation results, with the goal of minimizing the voltage deviation of the distribution network system and maximizing the new energy absorption capacity, a multi-objective collaborative planning model of the rural distribution network framework and new energy under the access of new energy is constructed, as well as the operation constraints of the multi-objective collaborative planning model;

[0010] Under the constraints of the operating constraints, the multi-objective collaborative planning model is solved to obtain the corresponding photovoltaic site selection and configuration results of the newly added grid lines. Based on the configuration results of the photovoltaic site selection and the newly added grid lines, a planning scheme for the collaborative planning of the rural distribution network grid and new energy is obtained.

[0011] As a preferred solution, the basic parameters and operating data corresponding to the rural distribution network include: the topological structure of the rural distribution network to be planned, all candidate locations of photovoltaic power stations to be planned, the line lengths of all candidate new grid lines connected to the rural distribution network nodes, the configuration parameters of all photovoltaic power stations and new grid lines, the photovoltaic output data under all photovoltaic output scenarios, and the system total load curve.

[0012] As a preferred solution, the multi-objective collaborative planning model is:

[0013]

[0014]

[0015]

[0016]

[0017] Among them, f1 is the annual equivalent operation investment, f2 is the system voltage deviation, and f3 is the new energy consumption capacity; C ins The annual equivalent construction investment for the construction of new grid lines and photovoltaic power stations; line ,ω pv are the annual equivalent coefficients of the investment in the construction of new grid lines and photovoltaic power stations; δ is the discount rate; T line , T pv are the service life of the newly added grid lines and photovoltaic power station equipment; μ l and μ pvi is a 0-1 variable, μ l The value 1 / 0 indicates construction / no construction of new grid lines l, μ pvi The value 1 / 0 indicates that node i is configured / not configured with a photovoltaic power station; L l is the length of the newly added grid line l; S pvi Configure the capacity of the photovoltaic power station for node i; a0 and b0 are the fixed installation costs related to the number of new grid lines and photovoltaic power station construction and installation; a1 and b2 are the installation costs proportional to the line length and photovoltaic power station capacity; Ω G is the node set of the upper power station; Ω line ,Ω pv are the candidate lines or node sets for newly added grid lines and photovoltaic power stations; D y is the number of days in a year; c G P is the unit price of electricity purchased from the superior power station; Gi,t is the injected active power of the upper power station at node i in time period t; T is the total number of time periods in the operation cycle; T is the time interval, which is 1h; U i , U i,N are the amplitude and reference value of the voltage at node i respectively; N is the total number of nodes in the rural distribution network.

[0018] As a preferred solution, the operation constraints include: distribution network operation and safety constraints;

[0019] The distribution network operation and safety constraints include: distribution network operation constraints and distribution network safety constraints;

[0020] The distribution network operation constraints are:

[0021]

[0022] Among them, σ(i) is the set of all end nodes of the branch whose first node is i; π(i) is the set of all first nodes of the branch whose last node is i; R ji , X ji is the resistance and reactance of branch ji; P ik,t , Q ik,t are respectively the active power and reactive power of branch ik in time period t; ji,t , Q ji,t ,I ji,t are respectively the active power, reactive power and current of branch ji in time period t; U j,t , U i,t is the voltage of nodes j and i at time period t; P pvi,t is the active power injection amount of the photovoltaic power station at node i in time period t; P Gi,t , Q Gi,t are respectively the active power injection amount and reactive power injection amount of the upper power station at node i in time period t; P Li,t , Q Li,t are the active load and reactive load of node i in time period t respectively;

[0023] The distribution network security constraints are:

[0024]

[0025] Among them U i,t,max , U i,t,min are the upper and lower voltage limits of node i in time period t, respectively; r dgi 、r ugi They are respectively the power adjusted downward and upward per unit time when the upper power station at node i injects power into the distribution network.

[0026] As a preferred solution, the operation constraints further include: photovoltaic power station operation and configuration constraints;

[0027] The photovoltaic power station operation and configuration constraints include: photovoltaic power station operation constraints and photovoltaic power station configuration constraints;

[0028] The photovoltaic power station operation constraints are:

[0029] P pvi,t =S pvi P rt .;

[0030] Among them, P rt The photovoltaic output of the unit configuration capacity;

[0031] The photovoltaic power station configuration constraints are:

[0032]

[0033] Among them, N pv,max k is the upper limit of the number of photovoltaic power stations planned to be connected to the rural distribution network; pvi The number of photovoltaic inverters configured for node i; S pv0 It is the rated capacity of a single photovoltaic inverter.

[0034] As a preferred solution, the operation constraints also include: newly added grid line operation and configuration constraints;

[0035] The newly added grid line operation and configuration constraints include: newly added grid line operation constraints and newly added grid line configuration constraints;

[0036] The operation constraints of the newly added grid lines are:

[0037]

[0038] The newly added grid line configuration constraints are:

[0039]

[0040] Among them, N pv-line,max N is the upper limit of the number of new grid lines connecting each photovoltaic power station; line,max The total amount of new grid lines planned for rural distribution networks is capped.

[0041] As a preferred solution, the multi-objective collaborative planning model is solved to obtain the corresponding photovoltaic site selection and configuration results of the newly added grid lines, including:

[0042] According to a preset model solving method for solving the compromise optimal solution, the multi-objective collaborative planning model is solved, with the goal of minimizing the normalized distance between the multi-objective solution and the utopian solution, and an optimization model for directly solving the compromise optimal solution is constructed;

[0043] The optimization model is solved to obtain the decision variables of the corresponding multi-objective collaborative planning model, and then the corresponding photovoltaic site selection and configuration results of the newly added grid lines are solved based on the decision variables.

[0044] Based on the above embodiment, another embodiment of the present invention provides a rural power distribution network framework planning device, including: a data acquisition module, a power flow calculation module, a model building module and a planning scheme generation module;

[0045] The data acquisition module is used to determine the feeder of the rural distribution network to be planned, and to obtain basic parameters and operation data corresponding to the rural distribution network;

[0046] The power flow calculation module is used to construct a corresponding distribution network power flow calculation model according to the feeder of the rural distribution network, and perform power flow calculation according to the distribution network power flow calculation model to obtain a corresponding power flow calculation result;

[0047] The model building module is used to build a multi-objective collaborative planning model of the rural distribution network framework and new energy under the access of new energy, and the operation constraints of the multi-objective collaborative planning model, based on the basic parameters, operation data and power flow calculation results, with the goal of minimizing the voltage deviation of the distribution network system and maximizing the new energy absorption capacity;

[0048] The planning scheme generation module is used to solve the multi-objective collaborative planning model under the constraints of the operating constraints to obtain the corresponding photovoltaic site selection and configuration results of the newly added grid lines, and obtain the planning scheme for the collaborative planning of the rural distribution network grid and new energy based on the configuration results of the photovoltaic site selection and the newly added grid lines.

[0049] Based on the above embodiments, another embodiment of the present invention provides an electronic device, which includes a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor. When the processor executes the computer program, the rural distribution network framework planning method described in the above invention embodiments is implemented.

[0050] Based on the above embodiments, another embodiment of the present invention provides a storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the storage medium is located is controlled to execute the rural distribution network framework planning method described in the above invention embodiment.

[0051] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:

[0052] The present invention provides a rural distribution network framework planning method, which determines the feeder of the rural distribution network to be planned, and obtains the basic parameters and operation data corresponding to the rural distribution network; constructs a corresponding distribution network flow calculation model according to the feeder of the rural distribution network, and performs flow calculation according to the distribution network flow calculation model to obtain corresponding flow calculation results; according to the basic parameters, operation data and flow calculation results, with the minimum voltage deviation of the distribution network system and the maximum new energy absorption capacity as the goals, constructs a multi-objective collaborative planning model of the rural distribution network framework and new energy under the access of new energy, and the operation constraints of the multi-objective collaborative planning model; under the constraints of the operation constraints, solves the multi-objective collaborative planning model to obtain the corresponding photovoltaic site selection and the configuration results of the newly added grid line, and obtains the planning scheme of the coordinated planning of the rural distribution network framework and new energy according to the photovoltaic site selection and the configuration results of the newly added grid line.

[0053] Compared with the traditional planning of distribution network framework for new energy access, the present invention proposes a multi-objective collaborative planning method for rural distribution network framework considering high proportion of new energy access, and simultaneously performs collaborative planning of rural distribution network framework from several dimensions such as minimizing system voltage deviation and maximizing new energy absorption capacity, constructs a multi-objective collaborative planning model of rural distribution network framework and new energy under new energy access, and solves the multi-objective collaborative planning model to obtain the most comprehensive rural distribution network planning scheme considering the new energy absorption capacity of the rural distribution network, which can enhance the new energy absorption capacity of the rural distribution network and improve the comprehensiveness and rationality of the rural distribution network planning scheme. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] Figure 1 It is a flow chart of a rural distribution network framework planning method provided by an embodiment of the present invention;

[0055] Figure 2 It is the system topology diagram of the rural distribution network to be planned;

[0056] Figure 3 It is the total load curve of the distribution network system;

[0057] Figure 4 It is the photovoltaic output characteristic curve under various scenarios;

[0058] Figure 5 It is a structural schematic diagram of a rural distribution network framework planning device provided by one embodiment of the present invention. DETAILED DESCRIPTION

[0059] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in this application will be clearly and completely described below in conjunction with the drawings in the embodiments of this application. Obviously, the described embodiments are part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0060] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which this application belongs; the terms used herein are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" in the specification and claims of this application and the above-mentioned figure descriptions and any variations thereof are intended to cover non-exclusive inclusions.

[0061] In the description of the embodiments of the present application, the technical terms "first", "second", etc. are only used to distinguish different objects, and cannot be understood as indicating or implying relative importance or implicitly indicating the number, specific order or primary and secondary relationship of the indicated technical features. In the description of the embodiments of the present application, the meaning of "multiple" is more than two, unless otherwise clearly and specifically defined.

[0062] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0063] In the description of the embodiments of the present application, the term "and / or" is only a description of the association relationship of the associated objects, indicating that there may be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0064] In the description of the embodiments of the present application, the term "multiple" refers to more than two (including two). Similarly, "multiple groups" refers to more than two groups (including two groups), and "multiple pieces" refers to more than two pieces (including two pieces).

[0065] In the description of the embodiments of the present application, unless otherwise clearly specified and limited, technical terms such as "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal connection of two elements or the interaction relationship between two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the embodiments of the present application can be understood according to the specific circumstances.

[0066] Embodiment 1

[0067] Please refer to Figure 1 , is a flow chart of a rural distribution network framework planning method provided by an embodiment of the present invention, comprising the following specific steps:

[0068] S1. Determine the feeder of the rural distribution network to be planned, and obtain basic parameters and operation data corresponding to the rural distribution network;

[0069] Preferably, the basic parameters and operating data corresponding to the rural distribution network include: the topological structure of the rural distribution network to be planned, all candidate locations of photovoltaic power stations to be planned, the line lengths of all candidate new grid lines connected to the rural distribution network nodes, the configuration parameters of all photovoltaic power stations and new grid lines, the photovoltaic output data under all photovoltaic output scenarios, and the system total load curve.

[0070] Specifically, the rural distribution network framework planning method described in the present invention specifically includes the following implementation steps:

[0071] (1) Confirm the 10 kV feeder lines of the rural distribution network that need to be optimized and obtain the basic parameters and operating data required for calculation;

[0072] The basic parameters and operating data include: the topological structure of the distribution network to be optimized, the candidate locations of all photovoltaic power stations to be planned in the distribution network, the line lengths of all candidate new grid lines connected to the rural distribution network nodes, the configuration parameters of all photovoltaic power stations and new grid lines, the photovoltaic output data under all photovoltaic output scenarios, and the total load curve of the distribution network system.

[0073] S2. constructing a corresponding distribution network power flow calculation model according to the feeder of the rural distribution network, and performing power flow calculation according to the distribution network power flow calculation model to obtain a corresponding power flow calculation result;

[0074] (2) construct a distribution network power flow calculation model for the feeder, perform initial power flow calculation on it, and obtain the corresponding power flow calculation results;

[0075] S3. Based on the basic parameters, operation data and power flow calculation results, with the goal of minimizing the voltage deviation of the distribution network system and maximizing the new energy absorption capacity, a multi-objective collaborative planning model of the rural distribution network framework and new energy under the access of new energy is constructed, as well as the operation constraints of the multi-objective collaborative planning model;

[0076] Preferably, the multi-objective collaborative planning model is:

[0077]

[0078]

[0079]

[0080]

[0081] Among them, f1 is the annual equivalent operation investment, f2 is the system voltage deviation, and f3 is the new energy consumption capacity; C ins The annual equivalent construction investment for the construction of new grid lines and photovoltaic power stations; line ,ω pv are the annual equivalent coefficients of the investment in the construction of new grid lines and photovoltaic power stations; δ is the discount rate; T line , T pv are the service life of the newly added grid lines and photovoltaic power station equipment; μ l and μ pvi is a 0-1 variable, μ l The value 1 / 0 indicates construction / no construction of new grid lines l, μ pvi The value 1 / 0 indicates that node i is configured / not configured with a photovoltaic power station; L l is the length of the newly added grid line l; S pvi Configure the capacity of the photovoltaic power station for node i; a0 and b0 are the fixed installation costs related to the number of new grid lines and photovoltaic power station construction and installation; a1 and b2 are the installation costs proportional to the line length and photovoltaic power station capacity; Ω G is the node set of the upper power station; Ω line ,Ω pv are the candidate lines or node sets for newly added grid lines and photovoltaic power stations; D y is the number of days in a year; c G P is the unit price of electricity purchased from the superior power station; Gi,t is the injected active power of the upper power station at node i in time period t; T is the total number of time periods in the operation cycle; T is the time interval, which is 1h; U i , U i,N are the amplitude and reference value of the voltage at node i respectively; N is the total number of nodes in the rural distribution network.

[0082] Preferably, the operation constraints include: distribution network operation and safety constraints; the distribution network operation and safety constraints include: distribution network operation constraints and distribution network safety constraints;

[0083] The distribution network operation constraints are:

[0084]

[0085] Among them, σ(i) is the set of all end nodes of the branch whose first node is i; π(i) is the set of all first nodes of the branch whose last node is i; R ji , X ji is the resistance and reactance of branch ji; P ik,t , Q ik,t are respectively the active power and reactive power of branch ik in time period t; ji,t , Q ji,t ,I ji,t are respectively the active power, reactive power and current of branch ji in time period t; U j,t , U i,t is the voltage of nodes j and i at time period t; P pvi,t is the active power injection amount of the photovoltaic power station at node i in time period t; P Gi,t , Q Gi,t are respectively the active power injection amount and reactive power injection amount of the upper power station at node i in time period t; P Li,t , Q Li,t are the active load and reactive load of node i in time period t respectively;

[0086] The distribution network security constraints are:

[0087]

[0088] Among them U i,t,max , U i,t,min are the upper and lower voltage limits of node i in time period t, respectively; r dgi 、r ugi They are respectively the power adjusted downward and upward per unit time when the upper power station at node i injects power into the distribution network.

[0089] Preferably, the operation constraints further include: photovoltaic power station operation and configuration constraints; the photovoltaic power station operation and configuration constraints include: photovoltaic power station operation constraints and photovoltaic power station configuration constraints;

[0090] The photovoltaic power station operation constraints are:

[0091] P pvi,t =S pvi P rt .;

[0092] Among them, P rtThe photovoltaic output of the unit configuration capacity;

[0093] The photovoltaic power station configuration constraints are:

[0094]

[0095] Among them, N pv,max k is the upper limit of the number of photovoltaic power stations planned to be connected to the rural distribution network; pvi The number of photovoltaic inverters configured for node i; S pv0 It is the rated capacity of a single photovoltaic inverter.

[0096] Preferably, the operation constraints further include: newly added grid line operation and configuration constraints; the newly added grid line operation and configuration constraints include: newly added grid line operation constraints and newly added grid line configuration constraints;

[0097] The operation constraints of the newly added grid lines are:

[0098]

[0099] The newly added grid line configuration constraints are:

[0100]

[0101] Among them, N pv-line,max N is the upper limit of the number of new grid lines connecting each photovoltaic power station; line,max The total amount of new grid lines planned for rural distribution networks is capped.

[0102] (3) Establish the objective function of the multi-objective collaborative planning model of rural distribution network and new energy under high proportion of new energy access;

[0103] The objective function of the coordinated planning model of rural distribution network and new energy is to minimize the annual equivalent investment and operating cost f 1,min , minimize the system voltage deviation f 2,min , maximize the new energy consumption capacity 3,max , the objective function is as follows:

[0104]

[0105] Among them, the calculation method of annual equivalent investment operating cost f1 is as follows:

[0106]

[0107] In the formula, C ins The annual equivalent construction investment cost for the construction of new grid lines and photovoltaic power stations is line ,ω pvare the annual equivalent coefficients of the investment costs of the newly added grid lines and photovoltaic power stations, δ is the discount rate, T line , T pv are the service life of the newly added grid lines and photovoltaic power station equipment, μ l and μ pvi is a 0-1 variable, μ l The value 1 / 0 indicates construction / no construction of new grid lines l, μ pvi The value 1 / 0 indicates that node i is configured / not configured with a photovoltaic power station. l is the length of the newly added grid line l, S pvi Configure the capacity of the photovoltaic power station for node i. a0 and b0 are the fixed installation costs related to the number of new grid lines and photovoltaic power station construction and installation, including land development, transportation and installation, support towers and other costs. a1 and b2 are the installation costs proportional to the line length and photovoltaic power station capacity, including construction materials, operation and maintenance costs, etc. G is the node set of the upper power station, Ω line ,Ω pv are the candidate lines or node sets of the newly added grid lines and photovoltaic power stations, respectively. y is the number of days in a year, c G P is the unit price of electricity purchased from the upstream power station, Gi,t is the injected active power of the upper power station at node i in time period t, T is the total number of time periods in the operation cycle, Δt is the time interval, which is 1h;

[0108] The calculation method of system voltage deviation f2 is shown in the following formula:

[0109]

[0110] Where U i , U i,N are the amplitude and reference value of the voltage at node i, respectively, and N is the total number of nodes in the rural distribution network;

[0111] The calculation method of new energy consumption capacity f3 is as follows:

[0112]

[0113] (4) Setting constraints for the multi-objective collaborative planning model;

[0114] The constraints of the model set in the present invention are divided into three aspects: distribution network operation, photovoltaic power station operation and configuration, and new grid line operation and configuration. That is, distribution network operation and safety constraints, photovoltaic power station operation and configuration constraints, and new grid line operation and configuration constraints; the three aspects of constraints are as follows:

[0115] 1.1 Distribution network operation and safety constraints

[0116] (1) Distribution network operation constraints

[0117] The distribution network operation constraints include the branch power flow equations and operation safety constraints of the distribution network as shown below:

[0118]

[0119] Where: σ(i) is the set of all end nodes of the branch whose first node is i; π(i) is the set of all first nodes of the branch whose last node is i. ji , X ji is the resistance and reactance of branch ji; P ik,t , Q ik,t are respectively the active power and reactive power of branch ik in time period t; ji,t , Q ji,t ,I ji,t are respectively the active power, reactive power and current of branch ji in time period t; U j,t , U i,t is the voltage of nodes j and i at time period t; P pvi,t is the active power injection amount of the photovoltaic power station at node i in time period t; P Gi,t , Q Gi,t are respectively the active and reactive power injection of the upper power station at node i in time period t; P Li,t , Q Li,t are the active load and reactive load of node i in period t respectively;

[0120] (2) Distribution network security constraints

[0121] The security constraints of the distribution network include the security constraints of node voltage and branch power, the upper and lower limit constraints of the power injected by the upstream power station into the distribution network, and the continuous adjustment constraints of the power injected by the substation into the distribution network. The constraints are shown in the following formula:

[0122]

[0123] Where: U i,t,max , U i,t,min are the upper and lower limits of the voltage at node i in time period t, respectively. The subscripts max and min are used to represent the upper and lower limits of each parameter, respectively. The same below; r dgi 、r ugi They are respectively the downward and upward adjustment power per unit time of the power injected into the distribution network by the upper power station at node i;

[0124] (II) PV power station operation and configuration constraints

[0125] (1) PV power station operation constraints

[0126] The present invention only considers the active power output of the photovoltaic power station. Its active power output should be proportional to the photovoltaic configuration capacity of the corresponding node. Therefore, the operation constraints of the photovoltaic power station are as follows:

[0127] P pvi,t =S pvi P rt . (7)

[0128] Where P rt The photovoltaic output of the unit configuration capacity;

[0129] (2) PV power station configuration constraints

[0130] The photovoltaic power station configuration constraints set by the present invention include the upper and lower limit constraints of the configuration capacity of each node and the upper limit constraint of the grid-connected node. pvi It should be an integer multiple of the rated capacity of a single photovoltaic inverter. The constraints are as follows:

[0131]

[0132] Where: N pv,max k is the upper limit of the number of photovoltaic power stations planned to be connected to the rural distribution network; pvi The number of photovoltaic inverters configured for node i; S pv0 is the rated capacity of a single photovoltaic inverter;

[0133] (III) New grid line operation and configuration constraints

[0134] (1) New grid line operation constraints

[0135] The operation constraints of the newly added grid lines are consistent with those of the conventional lines, as shown in formula (5);

[0136] (2) New grid line configuration constraints

[0137] The configuration constraints of the newly added grid lines include the upper limit of the number of newly added grid lines connecting each photovoltaic power station and the upper limit of the total number of newly added grid lines in the distribution network planning. The constraints are shown in the following formula:

[0138]

[0139] Where: N pv-line,max N is the upper limit of the number of new grid lines connecting each photovoltaic power station; line,max The total amount of new grid lines planned for rural distribution networks is capped.

[0140] S4. Under the constraints of the operating constraints, the multi-objective collaborative planning model is solved to obtain the corresponding photovoltaic site selection and configuration results of the newly added grid lines. According to the configuration results of the photovoltaic site selection and the newly added grid lines, a planning scheme for the collaborative planning of the rural distribution network grid and new energy is obtained.

[0141] Preferably, solving the multi-objective collaborative planning model to obtain corresponding photovoltaic site selection and configuration results of newly added grid lines includes: solving the multi-objective collaborative planning model according to a preset model solving method for solving a compromise optimal solution, with the goal of minimizing the normalized distance between the multi-objective solution and the utopian solution, and constructing an optimization model for directly solving the compromise optimal solution; solving the optimization model to obtain the decision variables of the corresponding multi-objective collaborative planning model, and then solving the corresponding photovoltaic site selection and configuration results of newly added grid lines according to the decision variables.

[0142] (5) using a fast solution method for directly solving the compromise optimal solution to solve the multi-objective collaborative planning model to obtain the multi-objective compromise optimal solution; specifically comprising the following steps:

[0143] (5-1) According to each single objective optimal solution x a* The corresponding other target values ​​f1(x a* ), f2(x a* ), …, f p (x a* ), and obtain the utopian solution composed of the optimal values ​​of each single objective (f1(x 1* ), f2(x 2* ), …, f p (x p* )), and the p×p payment matrix A pay As shown below:

[0144]

[0145] The maximum value of each element in the ath column of the payment matrix is ​​recorded as f amax .

[0146] (5-2) With the goal of minimizing the normalized distance between the multi-objective solution and the utopian solution, an optimization model for directly solving the compromise optimal solution is constructed as shown in the following formula:

[0147]

[0148] In the formula, d, d a are the normalized distances between the multi-objective solution, the single-objective solution and the utopian solution, respectively.

[0149] (6) By sorting out the decision variables of the multi-objective collaborative planning obtained by solving the multi-objective collaborative planning model, the photovoltaic site selection and configuration results of the new grid lines with the multi-objective optimization compromise optimal solution and the rural distribution network grid planning scheme that makes multiple objectives optimal are obtained, and the calculation results are output as a planning report document.

[0150] In a specific embodiment, taking an actual rural power distribution network system as an example, the specific implementation of the present invention is further described:

[0151] (1) Confirm the 10 kV feeder of the rural distribution network that needs to be optimized and obtain the basic parameters and operating data required for calculation:

[0152] Please refer to Figure 2 , which is the system topology diagram of the rural distribution network to be planned. The rural distribution network to be optimized has 180 nodes, 179 branches, and 12 10kV feeders F13-F24. Node 180 is a balancing node connected to the upper power station. The system topology is as follows: Figure 2 shown.

[0153] The safety upper and lower limits of node voltage are set to 1.07 and 0.93, and the maximum power supply capacity of each 10kV distribution line is 6MW. Figure 2 As shown, there are 9 candidate photovoltaic power stations from P1 to P9.

[0154] The line lengths of each candidate newly added grid line connected to the rural distribution network node are shown in the following Table 1, where P1-36 indicates that the candidate newly added grid line connects the photovoltaic power station P1 and the distribution network node 36, and the rest are similar.

[0155]

[0156]

[0157] Table 1 Candidate new grid lines connected to rural distribution network nodes

[0158] (a) Photovoltaic power station, discount rate δ = 6%, life span T pv =20, fixed installation price a0 = 150,000 yuan / unit, large-scale installation cost a1 = 2 million yuan / MW, node access capacity upper limit S pv,max =10MW, single photovoltaic inverter capacity S pv0 =0.5MW, the upper limit of the configuration quantity is N pv,max =4.

[0159] (b) For grid lines, the discount rate is δ = 6% and the service life is T line=10, fixed installation price b0 = 50,000 yuan / line, scale installation cost b1 = 100,000 yuan / km, the upper limit of the number of new grid lines connecting each photovoltaic power station is N pv-line,max =2, the total upper limit of new grid lines N line,max =6.

[0160] (c) The unit price of electricity purchased from the upstream power station c G = 0.6 yuan / kWh, the number of days in a year D y =365.

[0161] Please refer to Figure 3 , is the total load curve of the distribution network system. The newly added grid lines are directly connected to the 10kV line nodes of the rural distribution network. The average load of the rural distribution network in one year is selected as the typical daily load, and its load curve is attached. Figure 3 shown.

[0162] (d) The light output is sampled to generate 10 scenarios of photovoltaic output. The photovoltaic output characteristic curves under each scenario are shown in Figure 2. Figure 4 shown.

[0163] (2) Construct a distribution network power flow calculation model for the feeder and perform initial power flow calculation on it.

[0164] (3) Establish the objective function of the multi-objective collaborative planning model of rural distribution network and new energy under high proportion of new energy access

[0165] The grid optimization objective function under high proportion of new energy access is established as follows:

[0166]

[0167] Calculate the minimum annual equivalent investment operating cost:

[0168]

[0169] Calculate the system voltage deviation:

[0170]

[0171] Calculate the new energy consumption capacity:

[0172]

[0173] (4) Setting constraints for the multi-objective collaborative planning model;

[0174] The constraints of the model set in the present invention are divided into three aspects: distribution network operation, photovoltaic power station operation and configuration, and new grid line operation and configuration constraints, namely, distribution network operation and safety constraints, photovoltaic power station operation and configuration constraints, and new grid line operation and configuration constraints.

[0175] Set distribution network operation constraints:

[0176]

[0177] Set distribution network security constraints:

[0178]

[0179] Set the operation constraints of the PV power plant:

[0180] P pvi,t =S pvi P rt .;

[0181] Set the PV power plant configuration constraints:

[0182]

[0183] The newly added grid line operation constraint settings are consistent with the distribution network operation constraints.

[0184] Set up the new grid line configuration constraints:

[0185]

[0186] (5) Using a fast solution method that directly solves the optimal compromise solution to obtain the multi-objective compromise optimal solution;

[0187] (a) According to each single objective optimal solution x a* The corresponding other target values ​​f1(x a* ), f2(x a* ), …, f p (x a* ), and obtain the utopian solution composed of the optimal values ​​of each single objective (f1(x 1* ), f2(x 2* ), …, f p (x p* )), and the p×p payment matrix A pay As shown below:

[0188]

[0189] (b) The solution method for minimizing the normalized distance between the multi-objective solution and the utopian solution is as follows:

[0190]

[0191] (6) Organize the data and obtain the coordinated planning scheme of rural distribution network framework and new energy, and output the generated planning report.

[0192] Using the method proposed in step 5 to directly obtain the optimal solution of multi-objective optimization compromise, the objective values ​​of the optimal solution of multi-objective optimization compromise and the distances from the Utopia point are directly obtained as shown in Table 2 below:

[0193] Optimization goals <![CDATA[Target value of f1 / 10,000 yuan]]> <![CDATA[f2 target value (per unit)]]> <![CDATA[f3 target value / MW]]> Distance from Utopia <![CDATA[min f1]]> 8206.54 2.608 28.5 1.246 <![CDATA[min f2]]> 8704.73 1.127 27.5 1.414 <![CDATA[max f3]]> 8355.64 2.855 33.0 1.043 The best compromise solution 8309.39 1.451 31.5 0.592

[0194] Table 2 The target values ​​of the optimal solution and the distance from the utopia point

[0195] The coordinated planning and configuration results of the distribution network framework and new energy sources for the optimal solution of multi-objective optimization compromise are shown in Table 3:

[0196]

[0197]

[0198] Table 3 Results of coordinated planning and configuration of distribution network and new energy sources for the optimal solution of multi-objective optimization compromise

[0199] The multi-objective compromise optimal solution obtained in the calculation results integrates the results of each single-objective optimization and obtains a solution that makes the three objectives optimal. Compared with the original optimal power flow results, it achieves simultaneous improvement of multiple objectives (annual equivalent investment and operating costs are saved by 33.6084 million yuan, the total system voltage deviation is reduced by 64.6%, and the new energy absorption capacity of the rural distribution network is increased by 31.5MW). It can be used as a compromise optimal solution for the multi-objective coordinated planning and configuration of rural distribution network grid and new energy.

[0200] It can be seen that the present invention provides a rural distribution network framework planning method, through which the following beneficial effects can be achieved:

[0201] (1) Compared with the traditional planning of distribution network framework with new energy access, a multi-objective collaborative planning calculation method for rural distribution network framework considering high proportion of new energy access is proposed. The collaborative planning of rural distribution network framework is carried out simultaneously from three dimensions: minimizing the annual equivalent investment and operating costs, minimizing the system voltage deviation, and maximizing the new energy absorption capacity.

[0202] (2) The fast method for directly solving the compromise optimal solution proposed in the patent of this invention effectively improves the efficiency of calculation, ensures the global coverage of the optimization scheme, reduces the calculation time of the optimal solution and the risk of missing a better solution.

[0203] Embodiment 2

[0204] Please refer to Figure 5 , is a schematic diagram of the structure of a rural power distribution network framework planning device provided by an embodiment of the present invention, the device comprising: a data acquisition module, a flow calculation module, a model building module and a planning scheme generation module;

[0205] The data acquisition module is used to determine the feeder of the rural distribution network to be planned, and to obtain basic parameters and operation data corresponding to the rural distribution network;

[0206] The power flow calculation module is used to construct a corresponding distribution network power flow calculation model according to the feeder of the rural distribution network, and perform power flow calculation according to the distribution network power flow calculation model to obtain a corresponding power flow calculation result;

[0207] The model building module is used to build a multi-objective collaborative planning model of the rural distribution network framework and new energy under the access of new energy, and the operation constraints of the multi-objective collaborative planning model, based on the basic parameters, operation data and power flow calculation results, with the goal of minimizing the voltage deviation of the distribution network system and maximizing the new energy absorption capacity;

[0208] The planning scheme generation module is used to solve the multi-objective collaborative planning model under the constraints of the operating constraints to obtain the corresponding photovoltaic site selection and configuration results of the newly added grid lines, and obtain the planning scheme for the collaborative planning of the rural distribution network grid and new energy based on the configuration results of the photovoltaic site selection and the newly added grid lines.

[0209] It should be noted that the device embodiments described above are merely schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. In addition, in the accompanying drawings of the device embodiments provided by the present invention, the connection relationship between the modules indicates that there is a communication connection between them, which may be specifically implemented as one or more communication buses or signal lines. A person of ordinary skill in the art may understand and implement it without paying any creative effort.

[0210] Those skilled in the art can clearly understand that, for the sake of convenience and brevity, the specific working process of the device described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0211] Embodiment 3

[0212] Accordingly, an embodiment of the present invention provides an electronic device, comprising a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein when the processor executes the computer program, the rural distribution network framework planning method described in the above-mentioned embodiment of the invention is implemented.

[0213] The electronic device may be a computing device such as a desktop computer, a notebook, a palm computer, a cloud server, etc. The device may include, but is not limited to, a processor and a memory.

[0214] The processor may be a central processing unit (CPU), other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc. The processor is the control center of the device, and various interfaces and lines are used to connect various parts of the entire device.

[0215] Embodiment 4

[0216] Accordingly, an embodiment of the present invention provides a storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the storage medium is located is controlled to execute the rural distribution network framework planning method described in the above-mentioned embodiment of the invention.

[0217] The memory can be used to store the computer program, and the processor realizes various functions of the device by running or executing the computer program stored in the memory and calling the data stored in the memory. The memory can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, at least one application required for a function, etc.; the data storage area can store data created according to the use of the mobile phone, etc. In addition, the memory can include a high-speed random access memory, and can also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Med ia Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.

[0218] The storage medium is a computer-readable storage medium, and the computer program is stored in the computer-readable storage medium. When the computer program is executed by the processor, the steps of each method embodiment described above can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form, etc. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, USB flash drive, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-On l yMemory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium, etc. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable media do not include electric carrier signals and telecommunication signals.

[0219] The above is a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications are also considered to be within the scope of protection of the present invention.

Claims

1. A rural distribution network framework planning method, characterized in that: include: Determine the feeders of the rural distribution network to be planned, and obtain basic parameters and operation data corresponding to the rural distribution network; Constructing a corresponding distribution network power flow calculation model according to the feeder of the rural distribution network, and performing power flow calculation according to the distribution network power flow calculation model to obtain corresponding power flow calculation results; According to the basic parameters, operation data and power flow calculation results, with the goal of minimizing the voltage deviation of the distribution network system and maximizing the new energy absorption capacity, a multi-objective collaborative planning model of the rural distribution network framework and new energy under the access of new energy is constructed, as well as the operation constraints of the multi-objective collaborative planning model; Under the constraints of the operating constraints, the multi-objective collaborative planning model is solved to obtain the corresponding photovoltaic site selection and configuration results of the newly added grid lines. Based on the configuration results of the photovoltaic site selection and the newly added grid lines, a planning scheme for the collaborative planning of the rural distribution network grid and new energy is obtained.

2. The rural distribution network planning method according to claim 1, characterized in that: The basic parameters and operating data corresponding to the rural distribution network include: the topological structure of the rural distribution network to be planned, all candidate locations of photovoltaic power stations to be planned, the line lengths of all candidate new grid lines connected to the rural distribution network nodes, the configuration parameters of all photovoltaic power stations and new grid lines, the photovoltaic output data under all photovoltaic output scenarios, and the system total load curve.

3. The rural distribution network planning method according to claim 1, characterized in that: The multi-objective collaborative planning model is: Among them, f1 is the annual equivalent operation investment, f2 is the system voltage deviation, and f3 is the new energy consumption capacity; C ins The annual equivalent construction investment for the construction of new grid lines and photovoltaic power stations; line ,ω pv are the annual equivalent coefficients of the investment in the construction of new grid lines and photovoltaic power stations; δ is the discount rate; T line , T pv are the service life of the newly added grid lines and photovoltaic power station equipment; μ l and μ pvi is a 0-1 variable, μ l The value 1 / 0 indicates construction / no construction of new grid lines l, μ pvi The value 1 / 0 indicates that node i is configured / not configured with a photovoltaic power station; L l is the length of the newly added grid line l; S pvi Configure the capacity of the photovoltaic power station for node i; a0 and b0 are the fixed installation costs related to the number of new grid lines and photovoltaic power station construction and installation; a1 and b2 are the installation costs proportional to the line length and photovoltaic power station capacity; Ω G is the node set of the upper power station; Ω line ,Ω pv are the candidate lines or node sets for newly added grid lines and photovoltaic power stations; D y is the number of days in a year; c G P is the unit price of electricity purchased from the superior power station; Gi,t is the injected active power of the upper power station at node i in time period t; T is the total number of time periods in the operation cycle; T is the time interval, which is 1h; U i , U i,N are the amplitude and reference value of the voltage at node i respectively; N is the total number of nodes in the rural distribution network.

4. The rural distribution network framework planning method according to claim 3, characterized in that: The operation constraints include: distribution network operation and safety constraints; The distribution network operation and safety constraints include: distribution network operation constraints and distribution network safety constraints; The distribution network operation constraints are: Among them, σ(i) is the set of all end nodes of the branch whose first node is i; π(i) is the set of all first nodes of the branch whose last node is i; R ji , X ji is the resistance and reactance of branch ji; P ik,t , Q ik,t are respectively the active power and reactive power of branch ik in time period t; ji,t , Q ji,t ,I ji,t are respectively the active power, reactive power and current of branch ji in time period t; U j,t , U i,t is the voltage of nodes j and i at time period t; P pvi,t is the active power injection amount of the photovoltaic power station at node i in time period t; P Gi,t , Q Gi,t are respectively the active power injection amount and reactive power injection amount of the upper power station at node i in time period t; P Li,t , Q Li,t are the active load and reactive load of node i in time period t respectively; The distribution network security constraints are: Among them U i,t,max , U i,t,min are the upper and lower voltage limits of node i in time period t, respectively; r dgi 、r ugi They are respectively the power adjusted downward and upward per unit time when the upper power station at node i injects power into the distribution network.

5. The rural distribution network framework planning method according to claim 4, characterized in that: The operation constraints also include: photovoltaic power station operation and configuration constraints; The photovoltaic power station operation and configuration constraints include: photovoltaic power station operation constraints and photovoltaic power station configuration constraints; The operation constraints of the photovoltaic power station are: P pvi,t =S pvi P rt .; Among them, P rt The photovoltaic output of the unit configuration capacity; The photovoltaic power station configuration constraints are: Among them, N pv,max k is the upper limit of the number of photovoltaic power stations planned to be connected to the rural distribution network; pvi The number of photovoltaic inverters configured for node i; S pv0 It is the rated capacity of a single photovoltaic inverter.

6. The rural distribution network framework planning method according to claim 5, characterized in that: The operation constraints also include: newly added grid line operation and configuration constraints; The newly added grid line operation and configuration constraints include: newly added grid line operation constraints and newly added grid line configuration constraints; The operation constraints of the newly added grid lines are: The newly added grid line configuration constraints are: Among them, N pv-line,max N is the upper limit of the number of new grid lines connecting each photovoltaic power station; line,max The total upper limit for the number of new grid lines planned in rural distribution networks.

7. The rural distribution network planning method according to claim 1, characterized in that: The multi-objective collaborative planning model is solved to obtain corresponding photovoltaic site selection and configuration results of newly added grid lines, including: According to a preset model solving method for solving the compromise optimal solution, the multi-objective collaborative planning model is solved, with the goal of minimizing the normalized distance between the multi-objective solution and the utopian solution, and an optimization model for directly solving the compromise optimal solution is constructed; The optimization model is solved to obtain the decision variables of the corresponding multi-objective collaborative planning model, and then the corresponding photovoltaic site selection and configuration results of the newly added grid lines are solved based on the decision variables.

8. A rural distribution network framework planning device, characterized in that: include: Data acquisition module, power flow calculation module, model building module and planning scheme generation module; The data acquisition module is used to determine the feeder of the rural distribution network to be planned, and to obtain basic parameters and operation data corresponding to the rural distribution network; The power flow calculation module is used to construct a corresponding distribution network power flow calculation model according to the feeder of the rural distribution network, and perform power flow calculation according to the distribution network power flow calculation model to obtain a corresponding power flow calculation result; The model building module is used to build a multi-objective collaborative planning model of the rural distribution network framework and new energy under the access of new energy, and the operation constraints of the multi-objective collaborative planning model, based on the basic parameters, operation data and power flow calculation results, with the goal of minimizing the voltage deviation of the distribution network system and maximizing the new energy absorption capacity; The planning scheme generation module is used to solve the multi-objective collaborative planning model under the constraints of the operating constraints to obtain the corresponding photovoltaic site selection and configuration results of the newly added grid lines, and obtain the planning scheme for the collaborative planning of the rural distribution network grid and new energy based on the configuration results of the photovoltaic site selection and the newly added grid lines.

9. An electronic device, characterized in that: The method comprises a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor, wherein when the processor executes the computer program, the rural distribution network framework planning method as described in any one of claims 1 to 7 is implemented.

10. A storage medium, characterized in that: The storage medium includes a stored computer program, wherein when the computer program is running, the device where the storage medium is located is controlled to execute the rural distribution network framework planning method according to any one of claims 1 to 7.