Voltage control method and device, nonvolatile storage medium and electronic equipment
By obtaining and processing distribution network and transmission network models in the power grid energy management system, adjusting the power generation power prediction value of new energy power stations to adjust the 10kV bus voltage, the voltage fluctuation caused by the lack of interaction between energy storage equipment and substations is solved, and the voltage fluctuation problem is improved. The voltage stability and quality of the power grid.
Patent Information
- Application Number
- CN202411025014.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-11-15
AI Technical Summary
In the power system, there is a lack of interaction between the energy storage equipment and the substation, which causes voltage fluctuations in the power grid due to the access of the energy storage equipment, affecting the stability and voltage quality of the power grid.
By obtaining the distribution network model and transmission model in the power grid energy management system, determining the feeder area and coordination control area, obtaining the predicted power generation power of the new energy power station, and adjusting the voltage of the 10kV busbar after addition to increase the energy storage equipment and The interaction of the substation in the voltage control process.
It improves the voltage stability and voltage quality of the transmission and distribution network, and solves the voltage fluctuation problem caused by the access of energy storage equipment.
Smart Images

Figure CN118970981A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of automatic voltage control of power systems, and in particular to a voltage control method and device, a non-volatile storage medium, and an electronic device. Background Art
[0002] The Automatic Voltage Control (AVC) system is an important means to achieve safe (improving voltage stability margin), economic (reducing network losses), and high-quality (improving voltage qualification rate) operation of the transmission network. The AVC system is based on the Energy Management System (EMS) of the power grid. It can use the real-time operation data of the transmission network to scientifically decide the best reactive voltage adjustment plan from the perspective of global optimization of the transmission network, and automatically send it to power plants, substations, and lower-level grid dispatching agencies for execution. In the power system, the automatic voltage control capability and effect of the transmission network substation directly affect the overall control result of the automatic voltage control of the power system. The substation is equipped with discrete reactive equipment (capacitors, reactors) of a certain capacity. The switching of capacitors and reactors is mainly used to eliminate bus voltage over-limit, and is also used to increase the voltage level of the substation to reduce the network loss of the system.
[0003] In the power system, the distribution network is at the end of the entire system, and its voltage quality is directly related to whether the user's electrical equipment can operate stably. When the voltage provided by the system is lower than the rated voltage of the user's electrical equipment, the user's electrical equipment will not be able to operate normally. Conversely, when the voltage provided by the system is higher than the rated voltage of the user's electrical equipment, the service life of the user's electrical equipment will be shortened, or even cause damage to the electrical equipment.
[0004] At present, my country is actively and steadily promoting carbon peak and carbon neutrality, vigorously developing new energy, and accelerating the construction of a new power system. At the same time, as traditional fossil energy is rapidly depleted, clean and sustainable new energy represented by wind power and photovoltaic power generation has attracted much attention, and a large number of new energy power plants have also emerged. However, whether it is wind power or photovoltaic power generation, the inherent intermittent characteristics bring great pressure to the operation and dispatch of the power grid.
[0005] After a large number of new energy sources are connected to the distribution network, not only the one-way energy flow characteristics of the traditional power grid are changed, but also the reactive voltage characteristics have undergone significant changes, and the overall reactive voltage characteristics of the power grid are affected. The degree of impact is related to its output, access location, access method and power factor. The scale of new energy access is likely to exceed the carrying capacity of the local distribution network, and then cause problems such as overvoltage and reverse overload.
[0006] Under the current reactive power voltage control mode, the new energy connected to the grid through the 10kV feeder belongs to the control scope of the distribution automation system, and the substation that leads to the 10kV feeder belongs to the control scope of the transmission area dispatching automation system. There is a lack of interaction between the two, resulting in problems such as unreasonable reactive power exchange, frequent operation of reactive equipment, and poor coordinated control effect.
[0007] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention
[0008] The embodiments of the present application provide a voltage control method and device, a non-volatile storage medium, and an electronic device to at least solve the technical problem that the power grid may experience voltage fluctuations due to the access of energy storage devices due to the lack of interaction between energy storage devices and substations during the voltage control process.
[0009] According to one aspect of an embodiment of the present application, a voltage control method is provided, comprising: obtaining a distribution network model and a transmission network model in a power grid energy management system, wherein the distribution network model includes: one or more 10kV lines operating in a closed loop, and the transmission network model includes: one or more 10kV busbars operating in parallel; in the distribution network model, a feeder area is determined according to one or more 10kV lines operating in a closed loop, and in the transmission network model, a coordinated control area is determined according to the feeder area and one or more 10kV busbars operating in parallel, wherein the coordinated control area includes: S new energy power stations, wherein S is a positive integer; obtaining a power generation prediction value of each new energy power station, adding the power generation prediction values of each new energy power station to obtain a power generation prediction value of the new energy power station on one or more 10kV busbars operating in parallel; and adjusting the voltage of one or more 10kV busbars operating in parallel according to the power generation prediction value of the new energy power station on one or more 10kV busbars operating in parallel.
[0010] Optionally, the predicted power generation value of each new energy power station is obtained, and the predicted power generation values in the predicted power generation values of each new energy power station are added to obtain the predicted power generation value of the new energy power station on one or more 10kV buses running in parallel, including: within a preset time range, according to a preset time interval, obtaining X predicted power generation values of each new energy power station at X moments, X is a positive integer greater than 1; using a matrix to represent the X predicted power generation values to obtain S matrices; adding the S matrices to obtain a target matrix, wherein the target matrix includes: X rows, and the rows of the target matrix are used to represent the predicted power generation value of the new energy power station on one or more 10kV buses running in parallel at each moment in the X moments.
[0011] Optionally, according to the power generation prediction value of the new energy power station on one or more 10kV buses running in parallel, the voltage of one or more 10kV buses running in parallel is adjusted, including: judging whether the power generation prediction value of the first row is greater than or equal to the maximum power value, and if the power generation prediction value of the first row is greater than or equal to the maximum power value, using the power generation prediction value of the first row as the maximum power value for the next judgment; judging whether the power generation prediction value of the first row is less than or equal to the minimum power value, and if the power generation prediction value of the first row is less than or equal to the minimum power value, using the power generation prediction value of the first row as the maximum power value for the next judgment. The predicted power generation value of the a-th row is used as the minimum power value for the next judgment; from 2 to X-1, determine whether the predicted power generation value of the a-th row is greater than or equal to the maximum power value. If the predicted power generation value of the a-th row is greater than or equal to the maximum power value, the predicted power generation value of the a-th row is used as the maximum power value for the next judgment; determine whether the predicted power generation value of the a-th row is less than or equal to the minimum power value. If the predicted power generation value of the a-th row is less than or equal to the minimum power value, the predicted power generation value of the a-th row is used as the minimum power value for the next judgment, where a is a positive integer not greater than X; determine whether the predicted power generation value of the Xth row is greater than or equal to the maximum power value of the X-1th row; if the predicted power generation value of the Xth row is greater than or equal to the maximum power value of the X-1th row, determine the predicted power generation value of the Xth row as the first target power generation; if the predicted power generation value of the Xth row is less than the maximum power value of the X-1th row, determine the maximum power value of the X-1th row as the first target power generation; determine whether the predicted power generation value of the Xth row is less than or equal to the minimum power value of the X-1th row; if the predicted power generation value of the Xth row is less than or equal to the minimum power value of the X-1th row, determine the predicted power generation value of the X-1th row as the first target power generation; When the power of the X-1th row is the minimum value, the predicted power generation value of the Xth row is determined as the second target power generation power. When the predicted power generation power of the Xth row is greater than the minimum power value, the minimum power value of the X-1th row is determined as the second target power generation power. Determine a first difference between the predicted power generation value of the yth row and the predicted power generation value of the y-1th row, where y is a positive integer greater than 1 and not greater than X. Determine a second difference between the first target power generation power and the second target power generation power. Determine a ratio of the first difference to the second difference, and adjust the voltage of one or more 10kV buses running in parallel according to the ratio.
[0012] Optionally, adjusting the voltage of one or more 10kV busbars running in parallel includes: when the ratio is greater than a first preset threshold, reducing the voltage of one or more 10kV busbars running in parallel; when the ratio is less than a second preset threshold, increasing the voltage of one or more 10kV busbars running in parallel.
[0013] Optionally, in the distribution network model, the feeder area is determined according to one or more 10kV lines operating in a closed loop, including: in the distribution network model, deleting the disconnecting switches and circuit breakers in the disconnected state to obtain a first distribution network model; performing topological coloring processing on the first distribution network model to obtain multiple topological islands, wherein each topological island includes: multiple electrically connected electrical equipment; in the topological island, determining the target line, wherein the target line is one or more 10kV lines operating in a closed loop connected to the same target 10kV bus, and the target 10kV bus is determined by closing the bus tie switches between multiple 10kV busbars operating in parallel; and determining the feeder area according to the feeder where the target line is located.
[0014] Optionally, adjusting the voltage of one or more 10kV busbars running in parallel includes: sending an adjustment instruction to the automatic voltage control system of the transmission network where the one or more 10kV busbars running in parallel are located, the automatic voltage control system being used to coordinate voltage values of different voltage levels and select reactive equipment to be activated to adjust the voltage of one or more 10kV busbars running in parallel.
[0015] Optionally, in the distribution network model, the feeder area is determined according to one or more 10kV lines operating in a ring, including: determining the feeder area according to one or more 10kV lines operating in a ring, multiple 10kV distribution network feeder lines connected to the outgoing line side of one or more 10kV lines operating in a ring, and a 10kV grid-connected new energy power station.
[0016] According to another aspect of the embodiment of the present application, a voltage control device is also provided, including: an acquisition module, used to acquire a distribution network model and a transmission network model in a power grid energy management system, wherein the distribution network model includes: one or more 10kV lines running in a closed loop, and the transmission network model includes: one or more 10kV busbars running in parallel; a determination module, used to determine a feeder area in the distribution network model according to one or more 10kV lines running in a closed loop, and to determine a coordinated transmission network model according to the feeder area and one or more 10kV busbars running in parallel. A coordination control area, wherein the coordination control area includes: S new energy power stations, wherein S is a positive integer; a processing module, used to obtain a power generation prediction value of each new energy power station, and add the power generation prediction values of each new energy power station to obtain a power generation prediction value of the new energy power station on one or more 10kV buses running in parallel; an adjustment module, used to adjust the voltage of one or more 10kV buses running in parallel according to the power generation prediction value of the new energy power station on one or more 10kV buses running in parallel.
[0017] According to another aspect of the embodiments of the present application, a non-volatile storage medium is provided, the storage medium includes a stored program, wherein when the program is executed, the device where the storage medium is located is controlled to execute the above voltage control method.
[0018] According to another aspect of the embodiments of the present application, there is further provided an electronic device, including: a memory and a processor, wherein the processor is used to run a program stored in the memory, wherein the above voltage control method is executed when the program is run.
[0019] According to yet another aspect of the embodiments of the present application, a computer program is further provided, wherein the above voltage control method is implemented when the computer program is executed by a processor.
[0020] According to another aspect of the embodiments of the present application, a computer program product is provided, which includes a non-volatile computer-readable storage medium, wherein the non-volatile computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the above voltage control method is implemented.
[0021] In an embodiment of the present application, a distribution network model and a transmission network model are obtained in a power grid energy management system, wherein the distribution network model includes: one or more 10kV lines running in a ring, and the transmission network model includes: one or more 10kV busbars running in parallel; in the distribution network model, a feeder area is determined according to one or more 10kV lines running in a ring, and in the transmission network model, a coordinated control area is determined according to the feeder area and one or more 10kV busbars running in parallel, wherein the coordinated control area includes: S new energy power stations, wherein S is a positive integer; the predicted power generation value of each new energy power station is obtained, and the power generation power of each new energy power station is converted into the power generation power of each new energy power station. The predicted power generation values in the predicted values are added together to obtain the predicted power generation values of the new energy power station on one or more 10kV buses running in parallel; according to the predicted power generation values of the new energy power station on one or more 10kV buses running in parallel, the voltage of one or more 10kV buses running in parallel is adjusted, thereby achieving the purpose of increasing the interaction between the energy storage device and the substation in the voltage control process, thereby achieving the technical effect of improving the voltage stability and voltage quality of the transmission and distribution network, and further solving the technical problem that the power grid may generate voltage fluctuations due to the access of the energy storage device due to the lack of interaction between the energy storage device and the substation in the voltage control process. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0023] Figure 1is a flow chart of a voltage control method according to an embodiment of the present application;
[0024] Figure 2 is a schematic diagram of a transmission and distribution coordination control area according to an embodiment of the present application;
[0025] Figure 3 is a structural diagram of a voltage control device according to an embodiment of the present application;
[0026] Figure 4 It is a hardware structure block diagram of a computer terminal according to a voltage control method of an embodiment of the present application. DETAILED DESCRIPTION
[0027] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0028] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0029] According to an embodiment of the present application, a method embodiment of a voltage control method is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0030] Figure 1 is a flow chart of a voltage control method according to an embodiment of the present application, such as Figure 1 As shown, the method comprises the following steps:
[0031] Step S102, obtaining a distribution network model and a transmission network model in the power grid energy management system, wherein the distribution network model includes: one or more 10kV lines running in a ring, and the transmission network model includes: one or more 10kV busbars running in parallel.
[0032] The Energy Management System (EMS) is an intelligent system that integrates software and hardware. It is used to monitor, control and optimize the energy flow and energy consumption in the power grid. EMS plays a vital role in the operation of the power grid. It is similar to the "brain" of the power grid, which can ensure the safe, stable and efficient operation of the power grid. The following is a detailed introduction to the power grid energy management system: Based on data collection, analysis and decision support technology, EMS can monitor the operating status, energy consumption and environmental conditions of power grid equipment in real time, and use advanced algorithms and models to efficiently manage and optimize the power grid. EMS is widely used in the new energy storage industry, solar energy storage, wind energy storage, electric vehicle charging piles and other fields, and is an important guarantee for new energy power generation and power grid security.
[0033] EMS uses sensors and instrumentation to monitor the generation, storage and consumption of energy in the power grid in real time. It can collect various data, including battery charging and discharging status, temperature, voltage, current, photovoltaic power generation, wind power generation, etc. Relying on advanced data analysis technology, EMS processes and analyzes the collected data to understand the working status and performance of the power grid. Through the analysis of data, it can find out potential problems in the power grid and provide optimization suggestions, such as adjusting the charging and discharging strategy and optimizing energy utilization efficiency. EMS can intelligently dispatch and control energy according to real-time energy demand and power grid operation. It can reasonably arrange the charging and discharging operations of energy storage facilities according to demand forecasts, electricity prices, power grid load and other factors to achieve efficient utilization and conservation of energy. EMS can timely detect and alarm faults in the power grid, such as battery over-discharge, overcharging, abnormal temperature, power grid equipment failure, etc., to ensure the safe operation of the power grid. At the same time, it can also work with the distribution network system to achieve remote control and protection of the power grid. EMS provides comprehensive data analysis functions to help users understand the overall operation of the power grid and provide data support for power grid optimization and decision-making. Through the visual interface and reports, users can intuitively see the grid's operating status, energy consumption, load distribution and other information.
[0034] The distribution network model (distribution network model) is mainly used to describe and simulate the structure, operation characteristics and behavior of the distribution network. The distribution network mainly includes substations (power sources), switch stations, lines (overhead lines, cables), poles, transformers, switch blades, etc. and various types of power user units connected to the transformer. These elements constitute the overall structure of the distribution network through complex connection relationships and power flows. The distribution network has the characteristics of closed-loop structure and open-loop operation. During steady-state operation, the network structure is mostly radial. Only when a fault occurs or the load is switched, a short-term ring network operation may occur. In contrast, the transmission system is usually a ring network. The distribution system is generally a load node, while there are a large number of generator nodes in the transmission system. The total length of the distribution network is longer than that of the transmission line, and there are many branch lines and small line diameters, resulting in a higher R / X value of the distribution network, which is greater than 1 in most cases, and the charging capacitance of the line can be ignored. These characteristics make the power flow calculation of the distribution network usually adopt a simple and efficient forward-backward method, while for the power flow of power generation and transmission with high nonlinearity, the traditional Z matrix rule is difficult to obtain good convergence performance. Distribution network models are widely used in power grid automation, topology analysis, power flow calculation, fault identification, etc. For example, distribution network models can realize functions such as real-time monitoring of distribution networks, rapid fault location and isolation, load forecasting and optimized scheduling.
[0035] The transmission network model (transmission network model) is mainly used to describe and simulate the structure, operating characteristics and behavior of the transmission system. The transmission system consists of high-voltage transmission lines, substations, power plants, etc., and is responsible for transmitting electricity from the power plants to various load centers. The transmission system is usually a ring network structure with high reliability and redundancy. The transmission network has a large transmission capacity and a high voltage level, which can meet the needs of large-scale and long-distance power transmission. The transmission network has high requirements for stability, and various measures need to be taken to ensure voltage stability and frequency stability during power transmission.
[0036] The transmission network model plays an important role in power system planning, design, operation, and control. The transmission network model can be used to simulate and analyze the transmission system, optimize scheduling, and predict and respond to faults.
[0037] Closed-loop operation refers to the process of connecting two or more originally independently operated power systems to form a unified power grid operation mode by closing the interconnecting switch between them. In a 10kV distribution network, closed-loop operation is for example: the 10kV busbars of two substations each carry a distribution line, and the two lines are connected by interconnecting switches to achieve mutual transfer of loads and improve the reliability of power supply.
[0038] Busbar parallel operation refers to running two or more busbars in parallel through a common connection point to form a way of power distribution. In a 10kV power system, the busbar is one of the core devices of the transmission system and is responsible for distributing and transmitting electrical energy. When one or more 10kV busbars are running in parallel, they can achieve the effect of improving the reliability and power supply quality of the power grid through reasonable load distribution at the same voltage.
[0039] Step S104, in the distribution network model, the feeder area is determined according to one or more 10kV lines running in a ring, and in the transmission network model, the coordinated control area is determined according to the feeder area and one or more 10kV busbars running in parallel, wherein the coordinated control area includes: S new energy power stations, where S is a positive integer.
[0040] Step S106, obtaining the power generation prediction value of each new energy power station, adding the power generation prediction values of each new energy power station, and obtaining the power generation prediction value of the new energy power station on one or more 10kV buses running in parallel.
[0041] There are many methods for predicting the power generation of new energy power stations, mainly including the following: 1. Statistical method: by finding out the internal laws of historical data, establishing the functional mapping relationship between historical data and output power, and further predicting the power generation. This method requires a large amount of historical data as the basis for modeling and is suitable for power stations with a long commissioning time. 2. Physical method: using numerical weather forecast (NWP) data as input, studying the characteristics of power generation equipment, and establishing a corresponding mathematical model for power generation and NWP data. The prediction accuracy of the physical method is slightly worse than that of the statistical method, but it does not require the support of a large amount of historical data and is suitable for new power stations. 3. Learning method: using artificial intelligence to establish a mapping relationship between input and output, mainly used in nonlinear mapping models. With the development of artificial intelligence technology, more and more new energy power stations use this method to predict power generation. 4. Combined prediction method: combining multiple prediction methods to improve prediction accuracy. For example, you can comprehensively compare the results of several prediction methods and select a method with smaller errors and simpler operations; you can also weight the results of several prediction methods by weight and then average them.
[0042] The power generation forecast of new energy power stations can be divided into the following categories according to the time range: Ultra-short-term forecast: The general forecast range is less than 4 hours, mainly used to control and manage power station systems, etc. Short-term forecast: Forecast 24 to 72 hours in advance, mainly used to control power system operation, economic dispatch, unit input, etc. Medium- and long-term forecast: The general forecast range is one month to one year, mainly used for power station maintenance and planning.
[0043] Step S108, adjusting the voltage of one or more 10kV buses running in parallel according to the predicted power generation value of the new energy power station on one or more 10kV buses running in parallel.
[0044] According to the above steps, a distribution network model and a transmission network model are obtained in the power grid energy management system, wherein the distribution network model includes: one or more 10kV lines running in a ring, and the transmission network model includes: one or more 10kV busbars running in parallel; in the distribution network model, the feeder area is determined according to one or more 10kV lines running in a ring, and in the transmission network model, the coordinated control area is determined according to the feeder area and one or more 10kV busbars running in parallel, wherein the coordinated control area includes: S new energy power stations, wherein S is a positive integer; obtain each The power generation prediction value of the new energy power station is obtained by adding the power generation prediction values of each new energy power station to obtain the power generation prediction value of the new energy power station on one or more 10kV buses running in parallel; according to the power generation prediction value of the new energy power station on one or more 10kV buses running in parallel, the voltage of one or more 10kV buses running in parallel is adjusted, thereby achieving the purpose of increasing the interaction between the energy storage equipment and the substation in the voltage control process, thereby achieving the technical effect of improving the voltage stability and voltage quality of the transmission and distribution network.
[0045] According to some optional embodiments of the present application, the predicted power generation value of each new energy power station is obtained, and the predicted power generation values in the predicted power generation values of each new energy power station are added together to obtain the predicted power generation value of the new energy power station on one or more 10kV buses running in parallel, which can be achieved by the following method:
[0046] Within a preset time range, according to a preset time interval, X power generation prediction values of each new energy power station at X moments are obtained, where X is a positive integer greater than 1; the X power generation prediction values are represented by matrices to obtain S matrices; the S matrices are added to obtain a target matrix, wherein the target matrix includes: X rows, and the rows of the target matrix are used to represent the power generation prediction value of the new energy power station on one or more parallel 10kV buses at each moment in the X moments.
[0047] For example, the preset time range is 24 hours, and the preset time interval is 15 minutes. That is to say, every 15 minutes in a day, the power generation forecast value of the new energy power station is read from the coordinated control area, and 96 power generation forecast values corresponding to each new energy power station can be obtained.
[0048] The sth matrix can be expressed as:
[0049]
[0050] Among them, P s represents the predicted power generation value of the sth new energy power station, P s t It represents the predicted value of new energy at the s-th new energy plant at the t-th moment, where s=1...S, t=1...96.
[0051] Add the S matrices to get the target matrix P i , where the addition calculation can be implemented by the following method.
[0052]
[0053] P i There are 96 rows, i.e., 96 moments in 24 hours, of the predicted power generation values of the new energy power station on one or more 10kV buses running in parallel.
[0054] Furthermore, according to the predicted power generation value of the new energy power station on one or more 10kV buses running in parallel, the voltage of one or more 10kV buses running in parallel can be adjusted by the following method:
[0055] Determine whether the predicted power generation value of the first row is greater than or equal to the maximum power value. If the predicted power generation value of the first row is greater than or equal to the maximum power value, use the predicted power generation value of the first row as the maximum power value for the next judgment; Determine whether the predicted power generation value of the first row is less than or equal to the minimum power value. If the predicted power generation value of the first row is less than or equal to the minimum power value, use the predicted power generation value of the first row as the minimum power value for the next judgment;
[0056] From 2 to X-1, determine whether the predicted power generation value of the a-th row is greater than or equal to the maximum power value. If the predicted power generation value of the a-th row is greater than or equal to the maximum power value, use the predicted power generation value of the a-th row as the maximum power value for the next judgment; determine whether the predicted power generation value of the a-th row is less than or equal to the minimum power value. If the predicted power generation value of the a-th row is less than or equal to the minimum power value, use the predicted power generation value of the a-th row as the minimum power value for the next judgment, where a is a positive integer not greater than X;
[0057] Determine whether the predicted power generation value of the Xth row is greater than or equal to the maximum power value of the X-1th row. If the predicted power generation value of the Xth row is greater than or equal to the maximum power value of the X-1th row, determine the predicted power generation value of the Xth row as the first target power generation. If the predicted power generation value of the Xth row is less than the maximum power value of the X-1th row, determine the maximum power value of the X-1th row as the first target power generation.
[0058] Determine whether the predicted power generation value of the Xth row is less than or equal to the minimum power value of the X-1th row. If the predicted power generation value of the Xth row is less than or equal to the minimum power value of the X-1th row, determine the predicted power generation value of the Xth row as the second target power generation. If the predicted power generation value of the Xth row is greater than the minimum power value, determine the minimum power value of the X-1th row as the second target power generation.
[0059] Determine a first difference between the predicted power generation value of the y-th row and the predicted power generation value of the y-1-th row, where y is a positive integer greater than 1 and not greater than X;
[0060] determining a second difference between the first target power generation and the second target power generation;
[0061] The ratio of the first difference to the second difference is determined, and based on the ratio, the voltage of one or more 10 kV buses running in parallel is adjusted.
[0062] Preferably, adjusting the voltage of one or more 10kV busbars running in parallel according to the ratio can be achieved by the following method: when the ratio is greater than a first preset threshold, reducing the voltage of one or more 10kV busbars running in parallel; when the ratio is less than a second preset threshold, increasing the voltage of one or more 10kV busbars running in parallel.
[0063] For example, it is determined whether the power prediction value of the first row is greater than or equal to 10000. If the power prediction value of the first row is greater than or equal to the maximum power value, the power prediction value of the first row is used as the maximum power value for the next judgment; it is determined whether the power prediction value of the first row is less than or equal to -10000. If the power prediction value of the first row is less than or equal to the minimum power value, the power prediction value of the first row is used as the minimum power value for the next judgment. From 2 to 95, it is determined whether the power prediction value of the ath row is greater than or equal to the maximum power value. If the power prediction value of the ath row is greater than or equal to the maximum power value, the power prediction value of the ath row is used as the maximum power value for the next judgment; it is determined whether the power prediction value of the ath row is less than or equal to the minimum power value. If the power prediction value of the ath row is less than or equal to the minimum power value, the power prediction value of the ath row is used as the minimum power value for the next judgment, where a is a positive integer not greater than X.
[0064] Determine whether the predicted power generation value of the 96th row is greater than or equal to the maximum power value of the 95th row. If the predicted power generation value of the Xth row is greater than or equal to the maximum power value of the 95th row, determine the predicted power generation value of the 96th row as the first target power generation. If the predicted power generation value of the 96th row is less than the maximum power value of the 95th row, determine the maximum power value of the 95th row as the first target power generation. Determine whether the predicted power generation value of the 96th row is less than or equal to the minimum power value of the 95th row. If the predicted power generation value of the 96th row is less than or equal to the minimum power value of the 95th row, determine the predicted power generation value of the 96th row as the second target power generation. If the predicted power generation value of the 96th row is greater than the minimum power value, determine the minimum power value of the 95th row as the second target power generation.
[0065] Determine a first difference between the predicted power generation value of the second row and the predicted power generation value of the first row, and determine a second difference between the first target power generation and the second target power generation; determine a ratio of the first difference to the second difference, and adjust the voltage of one or more 10kV buses running in parallel according to the ratio.
[0066] On the other hand, according to the predicted power generation value of the new energy power station on one or more 10kV buses running in parallel, adjusting the voltage of one or more 10kV buses running in parallel can also be achieved by the following methods:
[0067] In P i At the t0th time point corresponding to the current time T, the active power value at the t0th time point is The next prediction value corresponds to the time point t1, and the corresponding active power prediction value at that time is
[0068] In P i The maximum value is set to The minimum value is set to right These 96 numbers are judged cyclically. The specific judgment process is as follows.
[0069] 1. Set the initial value a=1.
[0070] 2. If but if but
[0071] 3. a=a+1, if a≤96, go to step 2 for determination; otherwise exit the loop and get and
[0072] Secondly, determine the power change value between the current moment and the next moment, the peak-to-valley difference throughout the day, and the change rate, where:
[0073] Power change value between current moment and next moment
[0074] The peak-to-valley difference throughout the day is
[0075] The rate of change is
[0076] Then, the change amplitude at the next moment is determined, and the change rate threshold α=0.1, that is, the first preset threshold is 0.1, and the second preset threshold is -0.1. If the change amount at adjacent moments is greater than 0.1, it is considered that the new energy power generation will enter a high-generation stage, and it is necessary to adjust the 10kV busbar of the transmission network. The voltage value is used to stabilize the overall voltage level of the distribution network.
[0077] Specifically, if α t0 >α, it is necessary to reduce the voltage of one or more 10kV buses running in parallel; if α t0 <-α, it is necessary to increase the voltage of one or more 10kV buses running in parallel.
[0078] According to other optional embodiments of the present application, in a distribution network model, determining a feeder area based on one or more 10kV lines operating in a closed loop can be achieved by the following method: in the distribution network model, deleting disconnectors and circuit breakers in a disconnected state to obtain a first distribution network model; performing topological coloring processing on the first distribution network model to obtain multiple topological islands, wherein each topological island includes: multiple electrically connected electrical equipment; in the topological island, determining a target line, wherein the target line is one or more 10kV lines operating in a closed loop connected to the same target 10kV bus, and the target 10kV bus is determined by closing the bus tie switches between multiple 10kV busbars operating in parallel; determining a feeder area based on the feeder where the target line is located.
[0079] Among them, deleting disconnectors and circuit breakers in the disconnected state includes the following steps: First, it is necessary to traverse the entire distribution network model and identify all disconnectors and circuit breakers in the disconnected (disconnected) state. This can usually be done by checking the status tags of these devices or reading their control signals. Once these disconnected devices are identified, they need to be removed from the model. When removing, it is necessary to ensure that they are disconnected from other electrical devices in the model to maintain the accuracy and consistency of the model. After completing the deletion operation, the distribution network model is updated to generate a first distribution network model, which removes all disconnecting devices that are not involved in the current power transmission.
[0080] The first distribution network model is subjected to topological coloring, which includes the following steps: Topological coloring is a technique in graph theory, which is used to group nodes (here, electrical devices) in a graph so that nodes in the same group are connected to each other, while nodes in different groups are not directly connected. Commonly used algorithms include depth-first search (DFS), breadth-first search (BFS), or a union-find-based method. First, the first distribution network model is traversed and processed using a selected coloring algorithm. In this process, the algorithm classifies electrically interconnected electrical devices into the same group (i.e., the same topological island) and assigns a unique color (or identifier) to each group. Secondly, after coloring is completed, the electrical devices in the model are divided into multiple topological islands. The electrical devices in each topological island are electrically connected, i.e., they can transmit electrical energy through closed switches or wires. Different topological islands are separated by disconnected isolating switches or circuit breakers.
[0081] Preferably, in the distribution network model, the feeder area is determined according to one or more 10kV lines operating in a ring, which can be achieved by the following method: the feeder area is determined according to one or more 10kV lines operating in a ring, multiple 10kV distribution network feeder lines connected to the outgoing line side of one or more 10kV lines operating in a ring, and a 10kV grid-connected new energy power station.
[0082] For example, the feeder area is determined in the following form.
[0083]
[0084] in, For 10kV outgoing lines, one or multiple lines in a ring, that is, lines connected to a 10kV busbar, which are subordinate to a certain 10kV busbar, totaling M; For 10kV line segments, multiple 10kV distribution network feeder line segments connected from the 10kV outgoing line, with their ends connected to the upper 10kV line or other line segments, totaling H; It is a 10kV grid-connected new energy power station. Through the 10kV grid-connected new energy station, it acts as an adjustable equivalent generator in the distribution network, and its endpoints are connected to a certain 10kV line segment node, with a total of S nodes.
[0085] Further, coordinate the control area It can be determined as follows:
[0086]
[0087] in, A 10 kV busbar and a 10 kV feeder area connected to the busbar, a total of 1; It is a 10kV busbar, one or multiple buses running in parallel, that is, the power root node of the region, belonging to a 110kV or 35kV substation, i represents the region For a 10kV feeder area, one or multiple lines operating in a ring and their connected equipment constitute the feeder area, totaling O lines.
[0088] In some optional embodiments of the present application, adjusting the voltage of one or more 10kV busbars running in parallel can be achieved by the following method: sending an adjustment instruction to the automatic voltage control system of the transmission network where the one or more 10kV busbars running in parallel are located, the automatic voltage control system is used to coordinate voltage values of different voltage levels and select reactive equipment to be activated to adjust the voltage of one or more 10kV busbars running in parallel.
[0089] The automatic voltage control system is a technical means to centrally monitor and analyze the reactive voltage status of the entire network. It coordinates and optimizes the widely dispersed reactive devices of the power grid from a global perspective to achieve the purpose of maintaining system voltage stability, improving the quality of the power grid voltage and the economic operation level of the entire system. The AVC system combines economy and safety, conforms to the development trend of smart grids, and can reduce the workload of dispatchers.
[0090] The AVC system first collects grid operation data in real time through the data acquisition and monitoring control system, including the voltage, current, reactive power and other parameters of one or more 10kV buses running in parallel. After obtaining real-time data, the AVC system performs state estimation and optimization calculations, and formulates voltage adjustment strategies based on the operation status and safety constraints of the power grid. Based on the optimization calculation results, the AVC system generates adjustment instructions, which include the type of reactive equipment to be adjusted, the adjustment direction and the adjustment amount. The entire instruction is sent to each relevant control subsystem through the power dispatching data communication network (such as the IEC 61850 standard communication protocol), including the AVC substation system installed in power plants, substations, etc.
[0091] After receiving the adjustment instructions from the master station, the AVC substation system selects the most appropriate reactive equipment for adjustment according to the actual situation of the plant station (such as equipment operating status, capacity limitation, etc.). The selection process may involve calculating the service value that the equipment can provide to the system, and considering factors such as the equipment's action delay. After selecting the reactive equipment, the AVC system controls the equipment through a remote terminal (such as RTU), such as adjusting the reactive output of the generator, adjusting the tap position of the on-load tap-changing transformer, and switching on reactive compensation devices (such as capacitors and reactors). By adjusting the reactive equipment, the AVC system realizes the coordinated control of the voltage of one or more 10kV buses running in parallel. When the voltage of one bus changes, the AVC system can respond quickly and adjust the voltage level of other buses to maintain the voltage stability of the entire power grid.
[0092] In some preferred embodiments, a voltage control method is also provided, which specifically comprises the following steps:
[0093] Step S1, pre-set the calculation period Q, for example, set Q=15 minutes.
[0094] Step S2, the current time is T. If the number of minutes at time T is divisible by Q, the calculation starts, and the complete transmission network model and distribution network model, as well as the flow calculation result data, are obtained from the power grid EMS system, thereby forming a transmission and distribution coordination control area.
[0095] Step S21, the complete transmission network model is processed, the 10kV buses operating in parallel are merged into one by closing the bus tie switch, and a coordinated control area is established based on the bus, which is expressed as follows: In the form of:
[0096]
[0097] in, 10kV busbar and 10kV feeder area connected to the busbar, totaling 1; 10kV busbar, one or multiple buses running in parallel, that is, the power root node of the region, belongs to 110kV or 35kV substation, i represents the region In the 10kV feeder area, one or multiple lines operating in a ring and their connected equipment constitute the feeder area, totaling O lines.
[0098] For example, the coordinated control area is Figure 2 shown.
[0099] Step S22, processing the complete distribution network model, and deleting disconnectors and circuit breakers in the off state.
[0100] Step S23, performing topological coloring analysis on the remaining distribution network models to form a number of topological islands, each of which includes a number of grid devices electrically connected together.
[0101] Step S24, check all topological islands in turn, and form a feeder area with one or multiple 10kV outgoing lines connected to the same 10kV busbar (busbars running in parallel through closed bus tie switches are merged into one) contained in the topological island, and the feeder where the one or multiple 10kV outgoing lines running in a closed loop are located. And the coordinated control area corresponding to the connected 10kV bus is Among them, 10kV feeder area Defined as:
[0102]
[0103] in, 10kV outgoing line, 1 or multiple lines in a ring, i.e., lines connected to a 10kV busbar, which are subordinate to a certain 10kV busbar, totaling M lines; 10kV line segment, multiple 10kV distribution network feeder line segments connected from the 10kV outgoing line, with their ends connected to the upper 10kV line or other line segments, totaling H lines; The 10kV grid-connected new energy power station, through the 10kV grid-connected new energy station, acts as an adjustable equivalent generator in the distribution network, and its endpoints are connected to a certain 10kV line segment node, totaling S stations.
[0104] Step S3, First, set i = 1. area to be calculated.
[0105] Step S4: read today's full day data from the distribution network automation system The active power forecast data of all new energy plants in the region is collected every 15 minutes, with a total of 96 moments of data. The matrix is used to represent the new energy forecast data of S new energy plants in the region at 96 moments:
[0106]
[0107] Among them, P s represents today's new energy forecast data for the sth new energy plant, P s t It represents the predicted value of new energy at the s-th new energy plant at the t-th moment, where s=1...S, t=1...96.
[0108] Step S5, adding the new energy prediction data obtained in step S4 to 10kV busbar of regional power root node The power change of the new energy power generation fed back to the 10kV bus is obtained:
[0109]
[0110] Among them, P i Representatives add the new energy forecast to the 10kV bus The power prediction value, P t i Indicates 10kV bus The predicted value of new energy at the tth time point, P s t It represents the predicted value of new energy at the s-th new energy plant at the t-th time point, where s=1...S, t=1...96.
[0111] Step S6, the current time T corresponds to the point t0 in the predicted value, the hour of T is h, and the minute of T is m. Since the prediction value interval is 15 minutes, t0=h*4+m / 15.
[0112] Step S7, based on the result obtained in step S5 10kV busbar of regional power root node The power forecast value for the whole day is used to determine:
[0113] Step S71, in P i In the example, the current moment T corresponds to the t0th moment, and the active power value at that moment is Set the next prediction value to correspond to the time point t1, and the corresponding active power prediction value at that time is
[0114] Step S72, in P i The maximum value is set to The minimum value is set to right These 96 numbers are judged cyclically:
[0115] Step S721, set the initial value a=1;
[0116] Step S722, if but if but
[0117] Step S723, a=a+1, if a≤96, then go to step 7.2.2) for determination; otherwise, exit the loop and obtain and
[0118] Step S73, determine the change amplitude at the next moment, the threshold value of the change rate is α=0.1, if the change between two adjacent moments is greater than the threshold, it is considered that the new energy generation will enter a high-generation stage, and it is necessary to adjust the 10kV busbar of the transmission network The voltage value is used to stabilize the overall voltage level of the distribution network:
[0119] Step S731: power change value between current moment and next moment
[0120] Step S732, the peak-to-valley difference throughout the day is
[0121] Step S733, the change rate is
[0122] Step S734, if α t0 >α, it is necessary to reduce the 10kV busbar of the transmission network voltage; if α t0 <-α, the transmission network needs to be upgraded to 10kV busbar otherwise, it is regulated by the self-regulating ability of the distribution network.
[0123] Step S8: According to step S734, if it is necessary to adjust the 10kV busbar of the transmission network If the voltage is high, it is necessary to report this demand to the automatic voltage control system (AVC) of the transmission network. The AVC system of the transmission network will comprehensively coordinate the voltage values of each voltage level and select the reactive equipment that needs to be operated to achieve the purpose of voltage regulation.
[0124] Step S9, let i=i+1, if i<=I, then go to step S4 to continue the determination; if i>I, it means that all the regions in this round are calculated. When the cycle arrives, return to step S2 and start a new round of calculation.
[0125] In summary, the coordinated control area of the transmission and distribution network is automatically generated through the above steps, and the active power change trend of the 10kV grid-connected bus of the transmission network is obtained based on the prediction of the new energy active power of the new energy power station connected to the distribution network and the active quasi-steady-state sensitivity between the nodes. When the active power changes greatly, the capacitive reactor hung on the 10kV bus node of the transmission network is preferentially operated to stabilize the overall voltage level of the bus and the downstream distribution network, and avoid voltage fluctuations caused by the high generation of new energy.
[0126] Specifically, when each calculation cycle arrives, the complete transmission network model and distribution network model, as well as the flow calculation results, are read to form an online transmission and distribution coordination control area, which includes the 10kV power bus node of the transmission network and various types of equipment connected to the 10kV feeder of the distribution network below, including new energy plants and stations connected to the grid through the 10kV line segment of the distribution network; then the new energy forecast data of the new energy plant and station at 96 moments of the day are obtained, and according to the relationship of the transmission and distribution coordination control area, the forecast data is accumulated on the 10kV bus of the transmission network; then, according to the accumulated forecast power curve of the day on the 10kV bus, it is determined whether there is a relatively large change in power at the next moment. If the change is large, it is necessary to adjust the voltage of the 10kV bus of the transmission network according to the judgment situation, so as to support the overall voltage level of the distribution network, ensure sufficient reactive power support, and reduce the voltage fluctuation amplitude, thereby improving the voltage stability and voltage quality of the transmission and distribution network, and also ensuring the economic operation of the power grid.
[0127] Figure 3 is a structural diagram of a voltage control device according to an embodiment of the present application, such as Figure 3 As shown, the device comprises:
[0128] The acquisition module 30 is used to acquire the distribution network model and the transmission network model in the power grid energy management system, wherein the distribution network model includes: one or more 10kV lines running in a ring, and the transmission network model includes: one or more 10kV buses running in parallel.
[0129] The determination module 32 is used to determine the feeder area in the distribution network model according to one or more 10kV lines running in a closed loop, and to determine the coordinated control area in the transmission network model according to the feeder area and one or more 10kV busbars running in parallel, wherein the coordinated control area includes: S new energy power stations, where S is a positive integer.
[0130] The processing module 34 is used to obtain the power generation prediction value of each new energy power station, add the power generation prediction values of each new energy power station, and obtain the power generation prediction value of the new energy power station on one or more 10kV buses running in parallel.
[0131] The adjustment module 36 is used to adjust the voltage of one or more 10kV buses running in parallel according to the predicted value of the generated power of the new energy power station on one or more 10kV buses running in parallel.
[0132] Optionally, the processing module 34 is further used to perform the following steps: within a preset time range, according to a preset time interval, obtain X predicted power generation values of each new energy power station at X moments, where X is a positive integer greater than 1; use a matrix to represent the X predicted power generation values to obtain S matrices; add the S matrices to obtain a target matrix, wherein the target matrix includes: X rows, and the rows of the target matrix are used to represent the predicted power generation value of the new energy power station on one or more parallel 10kV buses at each moment in the X moments.
[0133] Optionally, the adjustment module 36 is further configured to perform the following steps: determining whether the power generation prediction value of the first row is greater than or equal to the maximum power value, and if the power generation prediction value of the first row is greater than or equal to the maximum power value, using the power generation prediction value of the first row as the maximum power value for the next judgment; determining whether the power generation prediction value of the first row is less than or equal to the minimum power value, and if the power generation prediction value of the first row is less than or equal to the minimum power value, using the power generation prediction value of the first row as the minimum power value for the next judgment; from 2 to X-1 , determine whether the power generation prediction value of the a-th row is greater than or equal to the maximum power value. If the power generation prediction value of the a-th row is greater than or equal to the maximum power value, the power generation prediction value of the a-th row is used as the maximum power value for the next judgment; determine whether the power generation prediction value of the a-th row is less than or equal to the minimum power value. If the power generation prediction value of the a-th row is less than or equal to the minimum power value, the power generation prediction value of the a-th row is used as the minimum power value for the next judgment, where a is a positive integer not greater than X; determine whether the power generation prediction value of the X-th row is less than or equal to the minimum power value. The power value is greater than or equal to the maximum power value of the X-1th row. If the power prediction value of the Xth row is greater than or equal to the maximum power value of the X-1th row, the power prediction value of the Xth row is determined as the first target power generation power. If the power prediction value of the Xth row is less than the maximum power value of the X-1th row, the power maximum value of the X-1th row is determined as the first target power generation power. Determine whether the power prediction value of the Xth row is less than or equal to the minimum power value of the X-1th row. If the power prediction value of the Xth row is less than or equal to the minimum power value of the X-1th row, In the case of , the predicted power generation value of the Xth row is determined as the second target power generation power, and in the case that the predicted power generation power of the Xth row is greater than the minimum power value, the minimum power value of the X-1th row is determined as the second target power generation power; determine a first difference between the predicted power generation value of the yth row and the predicted power generation value of the y-1th row, wherein y is a positive integer greater than 1 and not greater than X; determine a second difference between the first target power generation power and the second target power generation power; determine the ratio of the first difference to the second difference, and adjust the voltage of one or more 10kV buses running in parallel according to the ratio.
[0134] Optionally, the adjustment module 36 is also used to perform the following steps: when the ratio is greater than a first preset threshold, reducing the voltage of one or more 10kV busbars running in parallel; when the ratio is less than a second preset threshold, increasing the voltage of one or more 10kV busbars running in parallel.
[0135] Optionally, the determination module 32 is also used to perform the following steps: in the distribution network model, delete the disconnecting switches and circuit breakers in the disconnected state to obtain a first distribution network model; perform topological coloring processing on the first distribution network model to obtain multiple topological islands, wherein each topological island includes: multiple electrically connected electrical equipment; in the topological island, determine the target line, wherein the target line is one or more 10kV lines connected to the same target 10kV busbar that are operated in a closed loop, and the target 10kV busbar is determined by closing the bus tie switches between multiple 10kV busbars operating in parallel; determine the feeder area according to the feeder where the target line is located.
[0136] Optionally, the adjustment module 36 is also used to perform the following steps: sending an adjustment instruction to the automatic voltage control system of the transmission network where one or more 10kV busbars running in parallel are located, the automatic voltage control system is used to coordinate voltage values of different voltage levels and select reactive equipment to be activated to adjust the voltage of one or more 10kV busbars running in parallel.
[0137] Optionally, the determination module 32 is also used to perform the following steps: determine the feeder area based on one or more 10kV lines operating in a closed loop, multiple 10kV distribution network feeder lines connected to the outgoing line side of one or more 10kV lines operating in a closed loop, and a 10kV grid-connected new energy power station.
[0138] It should be noted that the above Figure 3 The modules in the embodiment may be program modules (e.g., a set of program instructions for implementing a specific function) or hardware modules. For the latter, they may be expressed in the following forms, but are not limited thereto: the expression form of the above modules is a processor, or the functions of the above modules are implemented by a processor.
[0139] It should be noted that Figure 3 The preferred implementation of the illustrated embodiment can be found in Figure 1 The relevant description of the illustrated embodiment will not be repeated here.
[0140] Figure 4 FIG. 1 shows a hardware structure block diagram of a computer terminal for implementing a voltage control method. Figure 4As shown, the computer terminal 40 may include one or more (402a, 402b, ..., 402n are used to illustrate) processors 402 (the processor 402 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA), a memory 404 for storing data, and a transmission module 406 for communication functions. In addition, it may also include: a display, an input / output interface (I / O interface), a universal serial bus (USB) port (which may be included as one of the ports of the BUS bus), a network interface, a power supply and / or a camera. It can be understood by those skilled in the art that Figure 4 The structure shown is only for illustration and does not limit the structure of the above electronic device. Figure 4 More or fewer components as shown, or with Figure 4 Different configurations shown.
[0141] It should be noted that the one or more processors 402 and / or other data processing circuits described above may generally be referred to herein as "data processing circuits". The data processing circuits may be embodied in whole or in part as software, hardware, firmware, or any other combination thereof. In addition, the data processing circuit may be a single independent processing module, or may be incorporated in whole or in part into any of the other components in the computer terminal 40. As involved in the embodiments of the present application, the data processing circuit acts as a processor control (e.g., selection of a variable resistor terminal path connected to an interface).
[0142] The memory 404 can be used to store software programs and modules of application software, such as the program instructions / data storage device corresponding to the voltage control method in the embodiment of the present application. The processor 402 executes various functional applications and data processing by running the software programs and modules stored in the memory 404, that is, the above-mentioned voltage control method is realized. The memory 404 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 404 may further include a memory remotely arranged relative to the processor 402, and these remote memories may be connected to the computer terminal 40 via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0143] The transmission module 406 is used to receive or send data via a network. The specific example of the above network may include a wireless network provided by a communication provider of the computer terminal 40. In one example, the transmission module 406 includes a network adapter (Network Interface Controller, NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission module 406 can be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.
[0144] The display may be, for example, a touch screen liquid crystal display (LCD) that enables a user to interact with a user interface of the computer terminal 40 .
[0145] It should be noted that, in some optional embodiments, the above Figure 4 The computer terminal shown may include hardware elements (including circuits), software elements (including computer code stored on a computer-readable medium), or a combination of hardware elements and software elements. It should be noted that Figure 4 This is merely one example of a particular embodiment and is intended to illustrate the types of components that may be present in the computer terminal described above.
[0146] It should be noted that Figure 4 The computer terminal shown is used to execute Figure 1 The voltage control method shown, therefore the relevant explanations in the execution method of the above command are also applicable to the electronic device and will not be repeated here.
[0147] An embodiment of the present application further provides a non-volatile storage medium, which includes a stored program, wherein when the program is executed, the device where the storage medium is located is controlled to execute the above voltage control method.
[0148] A program for executing the following functions in a non-volatile storage medium: obtaining a distribution network model and a transmission network model in a power grid energy management system, wherein the distribution network model includes: one or more 10kV lines running in a closed loop, and the transmission network model includes: one or more 10kV buses running in parallel; in the distribution network model, determining a feeder area according to one or more 10kV lines running in a closed loop, and in the transmission network model, determining a coordinated control area according to the feeder area and one or more 10kV buses running in parallel, wherein the coordinated control area includes: S new energy power stations, wherein S is a positive integer; obtaining a power generation prediction value of each new energy power station, adding the power generation prediction values of each new energy power station to obtain a power generation prediction value of the new energy power station on one or more 10kV buses running in parallel; adjusting the voltage of one or more 10kV buses running in parallel according to the power generation prediction value of the new energy power station on one or more 10kV buses running in parallel.
[0149] An embodiment of the present application further provides an electronic device, including: a memory and a processor, wherein the processor is used to run a program stored in the memory, wherein the above voltage control method is executed when the program is run.
[0150] The processor is used to run a program that performs the following functions: obtaining a distribution network model and a transmission network model in a power grid energy management system, wherein the distribution network model includes: one or more 10kV lines running in a closed loop, and the transmission network model includes: one or more 10kV busbars running in parallel; in the distribution network model, determining a feeder area according to one or more 10kV lines running in a closed loop, and in the transmission network model, determining a coordinated control area according to the feeder area and one or more 10kV busbars running in parallel, wherein the coordinated control area includes: S new energy power stations, wherein S is a positive integer; obtaining a power generation prediction value of each new energy power station, adding the power generation prediction values of each new energy power station to obtain a power generation prediction value of the new energy power station on one or more 10kV busbars running in parallel; adjusting the voltage of one or more 10kV busbars running in parallel according to the power generation prediction value of the new energy power station on one or more 10kV busbars running in parallel.
[0151] The serial numbers of the above-mentioned embodiments of the present application are for description only and do not represent the advantages or disadvantages of the embodiments.
[0152] In the above embodiments of the present application, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, please refer to the relevant description of other embodiments.
[0153] In the above-mentioned embodiments of the present application, the collected information is information and data authorized by the user or fully authorized by all parties, and the collection, storage, use, processing, transmission, provision, disclosure and application of the relevant data comply with relevant laws, regulations and standards, take necessary protection measures, do not violate public order and good morals, and provide corresponding operation entrances for users to choose to authorize or refuse.
[0154] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0155] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0156] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0157] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the relevant technology or all or part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, disk or optical disk, etc. Various media that can store program codes.
[0158] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.
Claims
1. A voltage control method, characterized in that: include: Obtaining a distribution network model and a transmission network model in a power grid energy management system, wherein the distribution network model includes: one or more 10kV lines running in a ring, and the transmission network model includes: one or more 10kV busbars running in parallel; In the distribution network model, a feeder area is determined according to the one or more 10kV lines running in a closed loop, and in the transmission network model, a coordinated control area is determined according to the feeder area and the one or more 10kV buses running in parallel, wherein the coordinated control area includes: S new energy power stations, wherein S is a positive integer; Obtaining a power generation prediction value of each of the new energy power stations, adding the power generation prediction values of each of the new energy power stations to obtain a power generation prediction value of the new energy power station on the one or more 10 kV buses running in parallel; According to the predicted value of the generated power of the new energy power station on the one or more 10kV buses running in parallel, the voltage of the one or more 10kV buses running in parallel is adjusted.
2. The method according to claim 1, characterized in that Obtaining a power generation prediction value of each of the new energy power stations, adding the power generation prediction values of each of the new energy power stations, and obtaining a power generation prediction value of the new energy power station on the one or more 10 kV buses running in parallel, including: Within a preset time range, according to a preset time interval, obtain X predicted power generation values of each of the new energy power stations at X moments, where X is a positive integer greater than 1; Using matrices to represent the X predicted values of generated power to obtain S matrices; Add the S matrices to obtain a target matrix, wherein the target matrix includes: X rows, the rows of the target matrix are used to represent the predicted value of the generated power of the new energy power station on the one or more parallel-operating 10 kV buses at each of the X moments.
3. The method according to claim 2, characterized in that According to the predicted value of the power generation of the new energy power station on the one or more 10kV buses running in parallel, adjusting the voltage of the one or more 10kV buses running in parallel, including: Determine whether the predicted power generation value of the first row is greater than or equal to the maximum power value. If the predicted power generation value of the first row is greater than or equal to the maximum power value, use the predicted power generation value of the first row as the maximum power value for the next judgment; Determine whether the predicted power generation value of the first row is less than or equal to the minimum power value. If the predicted power generation value of the first row is less than or equal to the minimum power value, use the predicted power generation value of the first row as the minimum power value for the next judgment; From 2 to X-1, determine whether the predicted power generation value of the a-th row is greater than or equal to the maximum power value. If the predicted power generation value of the a-th row is greater than or equal to the maximum power value, use the predicted power generation value of the a-th row as the maximum power value for the next judgment; determine whether the predicted power generation value of the a-th row is less than or equal to the minimum power value. If the predicted power generation value of the a-th row is less than or equal to the minimum power value, use the predicted power generation value of the a-th row as the minimum power value for the next judgment, where a is a positive integer not greater than X; Determine whether the predicted power generation value of the Xth row is greater than or equal to the maximum power value of the X-1th row. If the predicted power generation value of the Xth row is greater than or equal to the maximum power value of the X-1th row, determine the predicted power generation value of the Xth row as the first target power generation. If the predicted power generation value of the Xth row is less than the maximum power value of the X-1th row, determine the maximum power value of the X-1th row as the first target power generation. Determine whether the predicted power generation value of the Xth row is less than or equal to the minimum power value of the X-1th row. If the predicted power generation value of the Xth row is less than or equal to the minimum power value of the X-1th row, determine the predicted power generation value of the Xth row as the second target power generation. If the predicted power generation value of the Xth row is greater than the minimum power value, determine the minimum power value of the X-1th row as the second target power generation. Determine a first difference between the predicted power generation value of the y-th row and the predicted power generation value of the y-1-th row, where y is a positive integer greater than 1 and not greater than X; determining a second difference between the first target generated power and the second target generated power; Determine a ratio of the first difference to the second difference, and adjust the voltage of the one or more 10kV buses running in parallel according to the ratio.
4. The method according to claim 3, characterized in that According to the ratio, adjusting the voltage of the one or more 10 kV buses running in parallel comprises: When the ratio is greater than a first preset threshold, reducing the voltage of the one or more 10 kV buses running in parallel; When the ratio is less than a second preset threshold, the voltage of the one or more 10 kV buses running in parallel is increased.
5. The method according to claim 1, characterized in that In the distribution network model, the feeder area is determined according to the one or more 10 kV lines in closed-loop operation, including: In the distribution network model, the disconnecting switches and circuit breakers in the disconnected state are deleted to obtain a first distribution network model; Performing topological coloring processing on the first distribution network model to obtain a plurality of topological islands, wherein each of the topological islands includes: a plurality of electrically connected electrical devices; In the topological island, a target line is determined, wherein the target line is one or more 10kV lines connected to the same target 10kV busbar and operating in a closed loop, and the target 10kV busbar is determined by closing a bus tie switch between multiple 10kV busbars operating in parallel; The feeder area is determined according to the feeder where the target line is located.
6. The method according to claim 1, characterized in that Adjusting the voltage of the one or more 10kV buses running in parallel, including: The adjustment instruction is sent to the automatic voltage control system of the transmission network where the one or more 10kV busbars running in parallel are located. The automatic voltage control system is used to coordinate voltage values of different voltage levels and select reactive equipment to be activated to adjust the voltage of the one or more 10kV busbars running in parallel.
7. The method according to claim 1, characterized in that In the distribution network model, the feeder area is determined according to the one or more 10 kV lines in closed-loop operation, including: The feeder area is determined based on the one or more 10kV lines operating in a closed loop, multiple 10kV distribution network feeder lines connected to the outgoing line side of the one or more 10kV lines operating in a closed loop, and a 10kV grid-connected new energy power station.
8. A voltage control device, characterized in that: include: An acquisition module is used to acquire a distribution network model and a transmission network model in a power grid energy management system, wherein the distribution network model includes: one or more 10kV lines running in a closed loop, and the transmission network model includes: one or more 10kV buses running in parallel; A determination module is used to determine the feeder area in the distribution network model according to the one or more 10kV lines running in a closed loop, and in the transmission network model, determine the coordinated control area according to the feeder area and the one or more 10kV buses running in parallel, wherein the coordinated control area includes: S new energy power stations, where S is a positive integer; A processing module, used to obtain a power generation prediction value of each of the new energy power stations, and add the power generation prediction values of each of the new energy power stations to obtain a power generation prediction value of the new energy power station on the one or more 10kV buses running in parallel; The adjustment module is used to adjust the voltage of the one or more 10kV buses running in parallel according to the predicted value of the power generation of the new energy power station on the one or more 10kV buses running in parallel.
9. A non-volatile storage medium, characterized in that: The non-volatile storage medium includes a stored program, wherein when the program is executed, the device where the non-volatile storage medium is located is controlled to execute the voltage control method according to any one of claims 1 to 7.
10. An electronic device, characterized in that: include: A memory and a processor, wherein the processor is used to run a program stored in the memory, wherein the voltage control method according to any one of claims 1 to 7 is executed when the program is run.
11. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the voltage control method according to any one of claims 1 to 7 is implemented.