Comprehensive power generation low-carbon economic optimization scheduling method

The scheduling of wind power-photovoltaic-pumped storage system is solved through the chaotic mapping adaptive step length bat algorithm, and the problem of slow convergence speed and easy to fall into local optimality in the existing technology is solved, and an efficient, economical and environmentally friendly integrated power generation operation is achieved .

CN118971143APending Publication Date: 2024-11-15STATE GRID HEBEI ELECTRIC POWER CO LTD +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411064103.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

When existing genetic algorithms, particle swarm optimization algorithms, etc. deal with the scheduling of wind power-photovoltaic-pumped storage integrated power generation systems, the convergence speed is slow and easy to fall into local optimality, making it difficult to effectively solve large-scale, multi-objective, and nonlinear power. System scheduling issues.

Method used

The chaotic mapping adaptive step size bat algorithm is adopted, and the adaptive step size and Cauchy change factor adjustment of the bat algorithm are improved to improve the solution efficiency and accuracy of the scheduling model, and a comprehensive power generation scheduling model for wind power-photovoltaic-pumped storage is constructed.

Benefits of technology

It realizes efficient, economical and environmentally friendly operation of the integrated power generation system, reduces harmful gas emissions, provides new technical support, improves scheduling flexibility and adaptability, and avoids local optimal traps.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118971143A_ABST
    Figure CN118971143A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of wind power-photovoltaic-pumped storage comprehensive power generation optimization scheduling, and discloses a comprehensive power generation low-carbon economic optimization scheduling method, which comprises the following steps of: 1, constructing a wind power-photovoltaic-pumped storage system model; 2, constructing a wind power-photovoltaic-pumped storage comprehensive power generation dispatching model; step 3, constructing a bat algorithm; and 4, performing population initialization by using chaotic mapping, updating a bat position according to the fitness and the random probability, and adjusting a scheduling model of a bat algorithm of the adaptive step size bat flight speed of the chaotic mapping through an adaptive step size and a Cauchy change factor. According to the comprehensive power generation low-carbon economic optimization scheduling method, population initialization is carried out by adopting a chaotic mapping method, and meanwhile, the convergence speed of the algorithm is improved and a local optimal solution is effectively avoided through adaptive step length updating and introduction of a Cauchy change inverse cumulative distribution function; and a new technical support is provided for efficient, economic and environment-friendly operation of a comprehensive power generation system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of wind power-photovoltaic-pumped storage integrated power generation optimization scheduling, and in particular to a low-carbon economic optimization scheduling method for integrated power generation. Background Art

[0002] Wind power-photovoltaic-pumped storage integrated power generation technology is an important part of the power grid. Due to the intermittency and uncertainty of renewable energy sources such as wind power and solar power, the stable operation and economic dispatch of integrated power generation face challenges. Traditional genetic algorithms, particle swarm optimization algorithms and gray wolf algorithms are no longer applicable.

[0003] With the continuous growth of global energy demand and the improvement of environmental protection awareness, the effective use of renewable energy has become a research hotspot in the energy field. In particular, wind and solar energy are regarded as important alternatives to traditional fossil energy due to their clean and renewable characteristics. However, wind and solar energy have significant intermittency and instability, which poses new challenges to the stable operation and dispatching of power systems. The randomness and volatility of wind power and photovoltaic power generation require that the dispatching system must have higher flexibility and adaptability. Pumped storage, as an effective energy storage method, can store energy when the grid load is low and release energy at peak times, which plays an important role in balancing supply and demand and improving system stability. Existing optimization algorithms, such as genetic algorithms and particle swarm optimization algorithms, often face limitations such as slow convergence and easy to fall into local optimality when solving large-scale, multi-objective, nonlinear power system dispatching problems. Summary of the invention

[0004] 1. Technical issues to be resolved

[0005] In view of the shortcomings of the existing technology, the present invention provides a low-carbon economic optimization scheduling method for integrated power generation, which adopts a chaotic mapping adaptive step-length bat algorithm to handle the scheduling optimization of the integrated power generation system, providing new technical support for the efficient, economical and environmentally friendly operation of the integrated power generation system, and solving the problems of slow convergence speed and easy falling into local optimality in the existing technology.

[0006] (II) Technical solution

[0007] To achieve the above-mentioned purpose, the present invention provides the following technical solution: a method for optimizing the dispatching of a comprehensive power generation low-carbon economy, comprising the following steps:

[0008] Step 1: Construction of wind power-photovoltaic-pumped storage system model;

[0009] Step 2: Construction of wind power-photovoltaic-pumped storage integrated power generation dispatching model;

[0010] Step 3: Construct bat algorithm;

[0011] Step 4: Use chaotic mapping to initialize the population, update the bat position according to fitness and random probability, and adjust the chaotic mapping adaptive step size and the Cauchy change factor to solve the scheduling model of the bat algorithm for the bat flight speed.

[0012] Preferably, the construction steps of step 1 are as follows:

[0013] Step 1.1: Establish a pumped storage model. The mathematical model of energy storage and release process can be expressed as:

[0014]

[0015] P pump (t) = ρ w QUR t η t (2)

[0016] Where P ps is the power of the pump, ρ w is the density of water, g is the acceleration due to gravity, H is the pressure head of the water pump, Q ps is the volume flow rate of water pumped into the reservoir, η p-m is the efficiency of the pump, P pump is the power generated by the turbine, Q t is the volume flow rate of water from the reservoir to the turbine, η t is the efficiency of the turbine.

[0017] Preferably, the construction steps of step 2 are as follows:

[0018] Step 2.1: Objective function construction

[0019] Step 2.1.1: A scheduling model with the highest total benefit of the symbiotic system as the goal is to build a scheduling model. The objective function can be expressed as:

[0020] maxF=max(F pwpg -F wp -F p -F g -F c ) (3)

[0021] In the formula, F pwpg is the combined grid-connected revenue of wind power, photovoltaic, thermal power units and pumped storage, F wp is the operating cost of wind power and photovoltaic power, F p is the pumping cost of the pumped storage unit, F g is the electricity generation cost of the thermal power unit, F c is the penalty cost for pollutant emissions;

[0022] Step 2.1.2. Feed-in tariff F for a comprehensive system consisting of wind power, photovoltaic and thermal power units and pumped storage pwpg It can be expressed as:

[0023] F pwpg =C pv ×P pv (t)+C wind ×P wind (t)+C pump ×P pump (t)+C g P g (t) (4)

[0024] In the formula, C pv is the photovoltaic grid-connected electricity price, C wind is the on-grid electricity price of wind power, C pump is the on-grid electricity price for pumped storage power generation, C g is the on-grid electricity price of the thermal power unit, P pv (t) is the electric energy delivered by the photovoltaic power station to the grid at time t, P wind (t) is the electric energy delivered by the wind power station to the grid at time t, P pump (t) is the electric energy delivered to the grid by the pumped storage at time t, P g (t) is the electric energy delivered by the thermoelectric unit to the grid at time t;

[0025] Step 2.1.3: The operating costs of wind power and photovoltaic power can be expressed as:

[0026]

[0027] Where C1 and C2 are the power generation cost factors of wind turbines and photovoltaics, P w,i,t is the actual power generation of the ith wind turbine at time t, P pv,j,t is the actual power generation of the jth photovoltaic at time t, N w is the number of wind turbines, N P is the number of PVs;

[0028] Step 2.1.4: Pumping cost F of pumped storage unit p It can be expressed as:

[0029] F p =C c ×P ps (t) (6)

[0030] In the formula, C c is the water price for pumped storage, P ps (t) is the pumping power of pumped storage;

[0031] Step 2.1.5. The cost of electricity generation from the thermal power unit F g It can be expressed as:

[0032]

[0033] Where P G,j,t is the electrical energy generated by the jth thermal power generation unit in time period t, T is the total duration of the motion control cycle, N G is the number of thermal power generation units, c j , b j and S j is the power generation cost factor of the jth thermal power generation unit, S j and j,t is the startup cost and startup status of the jth thermal power generation unit;

[0034] Step 2.1.6: Consider the penalty cost F of the pollutant emission coefficient of the thermal power generation unit c It can be expressed as:

[0035]

[0036] In the formula, α j , β j and γ j is the pollutant emission factor of the jth thermal power generation unit;

[0037] Step 2.2: Constraint function construction

[0038] Step 2.2.1: In the power balance constraint, the mathematical relationship between the thermal unit output, wind power cluster, photovoltaic output, energy storage charging and discharging power and the integrated system can be expressed as:

[0039]

[0040] Where P G,j,t is the electrical energy generated by the jth thermal power generation unit in time period t, P w,j,t is the actual power generation of the i-th wind turbine at time, P pv,j,t is the actual power generation of the PV at time t, P ps (t) is the pumping power of pumped storage, P pump (t) is the electric energy delivered to the grid by the pumped storage at time t, P L is the load power;

[0041] Step 2.2.2: Under the upper and lower limits of offshore wind turbine output, the random characteristics of light intensity over a period of time can be approximately described by Beta distribution, and the probability density of light intensity is as follows:

[0042] P w,min≤P w,i,t ≤P w,max (10)

[0043] Where P w,min and P w,max are the upper and lower limits on the wind turbine output;

[0044] Step 2.2.3: The upper and lower limits of photovoltaic output can be expressed as:

[0045] P p,min ≤P pv,j,t ≤P p,max (11)

[0046] Where P p,min and P p,max are the upper and lower limits of PV output;

[0047] Step 2.2.4: The upper and lower limits of the thermal unit output can be expressed as:

[0048] P G,j,min ≤P G,j,t ≤P G,j,max (12)

[0049] Where P G,j,min and P G,j,max are the upper and lower limits of the thermal power generation unit output;

[0050] Step 2.2.5, in the ramp constraint of the thermal power unit, the amount of electricity that can be increased or decreased per unit time of different thermal power units depends on their generator operation adjustment parameters. Therefore, for the speed of thermal power unit output scheduling, the output ramp rate needs to be considered. The ramp rates of different thermal power units are different. The output cannot be increased or decreased too much per unit time. The ramp constraint of each thermal power unit must be considered in the scheduling plan, so:

[0051] P G,j,t -P G,j,t-l ·v up,j (1-y j,t )+P G,j,min y j,t (13)

[0052] P G,j,t-1 -P G,j,t ·v down,j (1-z j,t )+P G,j,min z j,t (14)

[0053] y j,t -z j,t =I j,t -I j,t-1(15)

[0054] y j,t +z j,t ·1(16)

[0055] In the formula, y j,t is the startup state of the jth thermal power generation unit in time period t, z j,t is the shutdown state of the jth thermal power generation unit in time period j, I j,t is the operating state of the jth thermal power generation unit in time period t, v up,j and v down,j are the rising and falling ramp rates of the jth thermal power generation unit in time period t within the scheduling cycle, respectively;

[0056] Step 2.2.6: The output constraint of the pumped storage unit can be expressed as:

[0057]

[0058] In the formula, and are the maximum and minimum outputs of the pumped storage unit, respectively;

[0059] Step 2.2.7: The grid acceptance capacity constraint can be expressed as:

[0060] P min ≤P pv +P w +P pump +P G ≤P max (18)

[0061] Where P min and P max They are the upper and lower limits of power that the grid can accept.

[0062] Preferably, the construction steps of step 3 are as follows:

[0063] Step 3.1: Set the bat population size nPop, the maximum pulse tone intensity A, the maximum pulse frequency r0, and the upper limit of the pulse frequency f max , the lower limit f min , the pitch intensity attenuation coefficient α and the frequency increase coefficient γ, set the dimension of the position vector nVar and the maximum number of iterations MaxIt;

[0064] Step 3.2: Initialize the position S of a single bat i (i=1,2,...,nVar), and calculate the fitness value of the bat position according to the objective function to find the individual S with the optimal position best , the initialization formula of the bat position can be expressed as:

[0065] S i =W min +(W max -W min )rand(1,nVar) (19)

[0066] Where W max and W min Respectively represent the upper and lower limits of the area where the bats are located. rand(1,nVar) means randomly generating a one-dimensional vector matrix from the range (0, 1), containing nVar individual values.

[0067] Step 3.3: Initialize the pulse frequency of a single bat, calculate the flight speed of a single bat, and update the position of the bat. The update equation can be expressed as:

[0068] f i =f min +(f min -f max )rand (20)

[0069]

[0070] In the formula, rand is a random factor uniformly distributed in the interval (0, 1), and are the flight speeds of the i-th bat at time t-1 and t, respectively. and Indicates the position of the bat;

[0071] Step 3.4. In each iteration, generate a random number rand1 for a single bat. If Then select the current best solution for local perturbation, where is the pulse frequency of the i-th bat, and the local disturbance can be expressed as:

[0072]

[0073] Step 3.5: Calculate the new fitness of the bat after the disturbance. If the new fitness is better than its own best fitness, or Then replace the old position with the new position after perturbation and save it, and update the pulse frequency and tone intensity at the same time, which can be expressed as:

[0074] r i t+1 =r0[1-exp(-γt)] (24)

[0075]

[0076] Where r0 is the pulse tone intensity of the i-th bat, α is the sound intensity attenuation coefficient, r0 is the maximum pulse frequency, and γ is the frequency increase coefficient;

[0077] Step 3.6: When the maximum number of iterations is reached, stop searching and output the position and fitness value of a single bat corresponding to the global optimal solution. Otherwise, jump back to step 3 to continue searching.

[0078] Preferably, the solution steps of step 4 are as follows:

[0079] Step 4.1, use chaos mapping to perform population initialization operation;

[0080] Step 4.1.1, the bat algorithm initially uses a random method to initialize the population, but it cannot cover the entire scheduling solution space. Therefore, on this basis, the chaotic mapping method is used to initialize the population to improve the coverage of the initial scheduling solution space. The calculation formula can be expressed as:

[0081]

[0082] In the formula, is a chaotic sequence, nVar is the dimension of the initialization population, and nPop is the number of the initialization population;

[0083] Step 4.1.2: Perform the reverse mirror operation to obtain the solution space initialization population pair. The calculation formula can be expressed as:

[0084]

[0085] In the formula, l i and u i are the minimum and maximum values ​​of the variable value range, respectively;

[0086] Step 4.2: Adaptive step size update: dynamically adjust the bat’s flight step size according to the algorithm iteration process. The initial step size of the algorithm is large, which improves the convergence speed of the scheduling benefit. In the later stage of the algorithm, the step size becomes smaller and the search becomes more refined, which can be expressed as:

[0087]

[0088] In the formula, step min is the minimum step size, T max is the maximum number of iterations, t is the current number of iterations, and K is the adjustment factor;

[0089] Step 4.3, introduce the Cauchy operator as the variable step length. The Cauchy change comes from the Cauchy distribution of the continuous probability distribution. Use a suitable random variable to generate the Cauchy change factor, which is used in the third step of the bat algorithm. At time t, add the Cauchy change factor to the speed variable. When the total benefit of the symbiotic scheduling system falls into a local optimum, a larger step size can help the individual jump out of the local extreme value. When the individual is close to convergence and searching for the optimal solution of the total benefit of the symbiotic scheduling system, a smaller step size can accelerate the convergence of the individual to change the flight speed of the bat and enhance the ability of the total benefit of the symbiotic scheduling system to jump out of the local optimum. The change formula and the probability density function expression of the one-dimensional standard Cauchy distribution can be expressed as:

[0090]

[0091] In the formula, is the position of the Kth randomly selected locust in the dth dimension. Cauchy is the Cauchy operator. f(x) is the probability density function expression of the one-dimensional standard Cauchy distribution.

[0092] (III) Beneficial effects

[0093] Compared with the prior art, the present invention provides a comprehensive power generation low-carbon economic optimization scheduling method, which has the following beneficial effects:

[0094] This integrated power generation low-carbon economic optimization scheduling method is built based on the wind power-photovoltaic-pumped storage integrated power generation scheduling model, and adopts the chaotic mapping adaptive step-length bat algorithm to handle the scheduling optimization of the integrated power generation system. It can not only realize the economic operation of the integrated power generation technology, but also reduce harmful gas emissions and realize the low-carbon economic operation of the integrated power generation technology, providing new technical support for the efficient, economical and environmentally friendly operation of the integrated power generation system. BRIEF DESCRIPTION OF THE DRAWINGS

[0095] Figure 1 This is a schematic diagram of the pumped storage integrated power generation system proposed by the present invention. DETAILED DESCRIPTION

[0096] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0097] This embodiment takes into account photovoltaic, wind power and pumped storage units, regards the pumped storage unit as an energy storage unit, and builds it based on the wind power-photovoltaic-pumped storage integrated power generation scheduling model, and proposes a chaotic mapping adaptive step-size bat algorithm, which provides a flexible and adaptive solution for dealing with the significant intermittent and instability of wind power and photovoltaics in the integrated power generation scheduling system.

[0098] See also Figure 1 , a comprehensive power generation low-carbon economic optimization scheduling method, comprising the following steps:

[0099] Step 1: Wind power-photovoltaic-pumped storage system model construction, the construction steps are as follows:

[0100] Step 1.1: Establish a pumped storage model. The mathematical model of energy storage and release process can be expressed as:

[0101]

[0102] P pump (t) = ρ w QUR t η t (2)

[0103] Where P ps is the power of the pump, ρ w is the density of water, g is the acceleration due to gravity, H is the pressure head of the water pump, Q ps is the volume flow rate of water pumped into the reservoir, η p-m is the efficiency of the pump, P pump is the power generated by the turbine, Q t is the volume flow rate of water from the reservoir to the turbine, η t is the efficiency of the turbine.

[0104] Step 2: Construction of wind power-photovoltaic-pumped storage integrated power generation dispatching model. The construction steps are as follows:

[0105] Step 2.1: Objective function construction

[0106] Step 2.1.1: A scheduling model with the highest total benefit of the symbiotic system as the goal is to build a scheduling model. The objective function can be expressed as:

[0107] maxF=max(F pwpg -F wp -F p -F g -F c ) (3)

[0108] In the formula, F pwpg is the combined grid-connected revenue of wind power, photovoltaic, thermal power units and pumped storage, Fwp is the operating cost of wind power and photovoltaic power, F p is the pumping cost of the pumped storage unit, F g is the electricity generation cost of the thermoelectric unit, F c is the penalty cost for pollutant emissions;

[0109] Step 2.1.2. Feed-in tariff F for a comprehensive system consisting of wind power, photovoltaic and thermal power units and pumped storage pwpg It can be expressed as:

[0110] F pwpg =C pv ×P pv (t)+C wind ×P wind (t)+C pump ×P pump (t)+C g P g (t) (4)

[0111] In the formula, C pv is the photovoltaic grid-connected electricity price, C wind is the on-grid electricity price of wind power, C pump is the on-grid electricity price for pumped storage power generation, C g is the on-grid electricity price of the thermal power unit, P pv (t) is the electric energy delivered by the photovoltaic power station to the grid at time t, P wind (t) is the electric energy delivered by the wind power station to the grid at time t, P pump (t) is the electric energy delivered to the grid by the pumped storage at time t, P g (t) is the electric energy delivered by the thermoelectric unit to the grid at time t;

[0112] Step 2.1.3: The operating costs of wind power and photovoltaic power can be expressed as:

[0113]

[0114] Where C1 and C2 are the power generation cost factors of wind turbines and photovoltaics, P w,i,t is the actual power generation of the ith wind turbine at time t, P pv,j,t is the actual power generation of the jth photovoltaic at time t, N w is the number of wind turbines, N P is the number of PVs;

[0115] Step 2.1.4: Pumping cost F of pumped storage unit p It can be expressed as:

[0116] F p =C c ×Pps (t) (6)

[0117] In the formula, C c is the water price for pumped storage, P ps (t) is the pumping power of pumped storage;

[0118] Step 2.1.5. The cost of electricity generation from the thermal power unit F g It can be expressed as:

[0119]

[0120] Where P G,j,t is the electrical energy generated by the jth thermal power generation unit in time period t, T is the total duration of the motion control cycle, N G is the number of thermal power generation units, c j , b j and S j is the power generation cost factor of the jth thermal power generation unit, S j and j,t is the startup cost and startup status of the jth thermal power generation unit;

[0121] Step 2.1.6: Consider the penalty cost F of the pollutant emission coefficient of the thermal power generation unit c It can be expressed as:

[0122]

[0123] In the formula, α j , β j and γ j is the pollutant emission factor of the jth thermal power generation unit;

[0124] Step 2.2: Constraint function construction

[0125] Step 2.2.1: In the power balance constraint, the mathematical relationship between the thermal unit output, wind power cluster, photovoltaic output, energy storage charging and discharging power and the integrated system can be expressed as:

[0126]

[0127] Where P G,j,t is the electrical energy generated by the jth thermal power generation unit in time period t, P w,j,t is the actual power generation of the i-th wind turbine at time, P pv,j,t is the actual power generation of the PV at time t, P ps (t) is the pumping power of pumped storage, P pump (t) is the electric energy delivered to the grid by the pumped storage at time t, P L is the load power;

[0128] Step 2.2.2: Under the upper and lower limits of offshore wind turbine output, the random characteristics of light intensity over a period of time can be approximately described by Beta distribution, and the probability density of light intensity is as follows:

[0129] P w,min ≤P w,i,t ≤P w,max (10)

[0130] Where P w,min and P w,max are the upper and lower limits on the wind turbine output;

[0131] Step 2.2.3: The upper and lower limits of photovoltaic output can be expressed as:

[0132] P p,min ≤P pv,j,t ≤P p,max (11)

[0133] Where P p,min and P p,max are the upper and lower limits of PV output;

[0134] Step 2.2.4: The upper and lower limits of the thermal unit output can be expressed as:

[0135] P G,j,min ≤P G,j,t ≤P G,j,max (12)

[0136] Where P G,j,min and P G,j,max are the upper and lower limits of the thermal power generation unit output;

[0137] Step 2.2.5, in the ramp constraint of the thermal power unit, the amount of electricity that can be increased or decreased per unit time of different thermal power units depends on their generator operation adjustment parameters. Therefore, for the speed of thermal power unit output scheduling, the output ramp rate needs to be considered. The ramp rates of different thermal power units are different. The output cannot be increased or decreased too much per unit time. The ramp constraint of each thermal power unit must be considered in the scheduling plan, so:

[0138] P G,j,t -P G,j,t-l ·v up,j (1-y j,t )+P G,j,min y j,t (13)

[0139] P G,j,t-1 -P G,j,t ·v down,j (1-zj,t )+P G,j,min z j,t (14)

[0140] y j,t -z j,t =I j,t -I j,t-1 (15)

[0141] y j,t +z j,t ·1(16)

[0142] In the formula, y j,t is the startup state of the jth thermal power generation unit in time period t, z j,t is the shutdown state of the jth thermal power generation unit in time period j, I j,t is the operating state of the jth thermal power generation unit in time period t, v up,j and v down,j are the rising and falling ramp rates of the jth thermal power generation unit in time period t within the scheduling cycle, respectively;

[0143] Step 2.2.6: The output constraint of the pumped storage unit can be expressed as:

[0144]

[0145] In the formula, and are the maximum and minimum outputs of the pumped storage unit, respectively;

[0146] Step 2.2.7: The grid acceptance capacity constraint can be expressed as:

[0147] P min ≤P pv +P w +P pump +P G ≤P max (18)

[0148] Where P min and P max They are the upper and lower limits of power that the grid can accept.

[0149] Step 3: Construct the bat algorithm. The construction steps are as follows:

[0150] Step 3.1: Set the bat population size nPop, the maximum pulse tone intensity A, the maximum pulse frequency r0, and the upper limit of the pulse frequency f max , the lower limit f min , the pitch intensity attenuation coefficient α and the frequency increase coefficient γ, set the dimension of the position vector nVar and the maximum number of iterations MaxIt;

[0151] Step 3.2: Initialize the position S of a single bat i (i=1,2,...,nVar), and calculate the fitness value of the bat position according to the objective function to find the individual S with the optimal position best , the initialization formula of the bat position can be expressed as:

[0152] S i =W min +(W max -W min )rand(1,nVar) (19)

[0153] Where W max and W min Respectively represent the upper and lower limits of the area where the bats are located. rand(1,nVar) means randomly generating a one-dimensional vector matrix from the range (0, 1), containing nVar individual values.

[0154] Step 3.3: Initialize the pulse frequency of a single bat, calculate the flight speed of a single bat, and update the position of the bat. The update equation can be expressed as:

[0155] f i =f min +(f min -f max )rand (20)

[0156]

[0157] In the formula, rand is a random factor uniformly distributed in the interval (0, 1), and are the flight speeds of the i-th bat at time t-1 and t, respectively. and Indicates the position of the bat;

[0158] Step 3.4. In each iteration, generate a random number rand1 for a single bat. If Then select the current best solution for local perturbation, where is the pulse frequency of the i-th bat, and the local disturbance can be expressed as:

[0159]

[0160] Step 3.5: Calculate the new fitness of the bat after the disturbance. If the new fitness is better than its own best fitness, or Then replace the old position with the new position after perturbation and save it, and update the pulse frequency and tone intensity at the same time, which can be expressed as:

[0161] r i t+1 =r0[1-exp(-γt)] (24)

[0162]

[0163] Where r0 is the pulse tone intensity of the i-th bat, α is the sound intensity attenuation coefficient, r0 is the maximum pulse frequency, and γ is the frequency increase coefficient;

[0164] Step 3.6: When the maximum number of iterations is reached, stop searching and output the position and fitness value of a single bat corresponding to the global optimal solution. Otherwise, jump back to step 3 to continue searching.

[0165] Step 4: Use chaotic mapping to initialize the population, update the bat position according to fitness and random probability, adjust the chaotic mapping adaptive step size and Cauchy change factor to solve the scheduling model of the bat algorithm for bat flight speed, and the solution steps are as follows:

[0166] Step 4.1, use chaos mapping to perform population initialization operation;

[0167] Step 4.1.1, the bat algorithm initially uses a random method to initialize the population, but it cannot cover the entire scheduling solution space. Therefore, on this basis, the chaotic mapping method is used to initialize the population to improve the coverage of the initial scheduling solution space. The calculation formula can be expressed as:

[0168]

[0169] In the formula, is a chaotic sequence, nVar is the dimension of the initialization population, and nPop is the number of the initialization population;

[0170] Step 4.1.2: Perform the reverse mirror operation to obtain the solution space initialization population pair. The calculation formula can be expressed as:

[0171]

[0172] In the formula, l i and u i are the minimum and maximum values ​​of the variable value range, respectively;

[0173] Step 4.2: Adaptive step size update: dynamically adjust the bat’s flight step size according to the algorithm iteration process. The initial step size of the algorithm is large, which improves the convergence speed of the scheduling benefit. In the later stage of the algorithm, the step size becomes smaller and the search becomes more refined, which can be expressed as:

[0174]

[0175] In the formula, step min is the minimum step size, T max is the maximum number of iterations, t is the current number of iterations, and K is the adjustment factor;

[0176] Step 4.3, introduce the Cauchy operator as the variable step length. The Cauchy change comes from the Cauchy distribution of the continuous probability distribution. Use a suitable random variable to generate the Cauchy change factor, which is used in the third step of the bat algorithm. At time t, add the Cauchy change factor to the speed variable. When the total benefit of the symbiotic scheduling system falls into a local optimum, a larger step size can help the individual jump out of the local extreme value. When the individual is close to convergence and searching for the optimal solution of the total benefit of the symbiotic scheduling system, a smaller step size can accelerate the convergence of the individual to change the flight speed of the bat and enhance the ability of the total benefit of the symbiotic scheduling system to jump out of the local optimum. The change formula and the probability density function expression of the one-dimensional standard Cauchy distribution can be expressed as:

[0177]

[0178] In the formula, is the position of the Kth randomly selected locust in the dth dimension. Cauchy is the Cauchy operator. f(x) is the probability density function expression of the one-dimensional standard Cauchy distribution.

[0179] In summary, this integrated power generation low-carbon economic optimization scheduling method can effectively reduce operating costs and pollutant gas emissions while ensuring system stability, and improve the economy and environmental protection of wind power-photovoltaic-pumped storage integrated power generation scheduling.

[0180] It should be noted that the term "comprises" or any other variation thereof is intended to cover non-exclusive inclusion, so that a process, method, article, or device that includes a series of elements includes not only those elements, but also includes other elements that are not explicitly listed, or also includes elements inherent to such process, method, article, or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the presence of other identical elements in the process, method, article, or device that includes the element.

[0181] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for optimizing the dispatching of low-carbon economy of comprehensive power generation, characterized in that: The following steps are involved: Step 1: Construction of wind power-photovoltaic-pumped storage system model; Step 2: Construction of wind power-photovoltaic-pumped storage integrated power generation dispatching model; Step 3: Construct bat algorithm; Step 4: Use chaotic mapping to initialize the population, update the bat position according to fitness and random probability, and adjust the chaotic mapping adaptive step size and the Cauchy change factor to solve the scheduling model of the bat algorithm for the bat flight speed.

2. A comprehensive power generation low-carbon economic optimization scheduling method according to claim 1, characterized in that: The construction steps of step 1 are as follows: Step 1.1: Establish a pumped storage model. The mathematical model of energy storage and release process can be expressed as: P pump (t)=ρ w gHQ t or t (2) Where P ps is the power of the pump, ρ w is the density of water, g is the acceleration due to gravity, H is the pressure head of the water pump, Q ps is the volume flow rate of water pumped into the reservoir, η p-m is the efficiency of the pump, P pump is the power generated by the turbine, Q t is the volume flow rate of water from the reservoir to the turbine, η t is the efficiency of the turbine.

3. The method for optimizing the dispatching of comprehensive power generation and low-carbon economy according to claim 1, characterized in that: The construction steps of step 2 are as follows: Step 2.1: Objective function construction Step 2.1.1: A scheduling model with the highest total benefit of the symbiotic system as the goal is to build a scheduling model. The objective function can be expressed as: max F=max(F pwpg -F wp -F p -F g -F c ) (3) In the formula, F pwpg is the combined grid-connected revenue of wind power, photovoltaic, thermal power units and pumped storage, F wp is the operating cost of wind power and photovoltaic power, F p is the pumping cost of the pumped storage unit, F g is the electricity generation cost of the thermoelectric unit, F c is the penalty cost for pollutant emissions; Step 2.1.

2. Feed-in tariff F for a comprehensive system consisting of wind power, photovoltaic and thermal power units and pumped storage pwpg It can be expressed as: F pwpg =C pv ×P pv (t)+C wind ×P wind (t)+C pump ×P pump (t)+C g P g (t) (4) In the formula, C pv is the photovoltaic grid-connected electricity price, C wind is the on-grid electricity price of wind power, C pump is the on-grid electricity price for pumped storage power generation, C g is the on-grid electricity price of the thermal power unit, P pv (t) is the electric energy delivered by the photovoltaic power station to the grid at time t, P wind (t) is the electric energy delivered by the wind power station to the grid at time t, P pump (t) is the electric energy delivered to the grid by the pumped storage at time t, P g (t) is the electric energy delivered by the thermoelectric unit to the grid at time t; Step 2.1.3: The operating costs of wind power and photovoltaic power can be expressed as: Where C1 and C2 are the power generation cost factors of wind turbines and photovoltaics, P w,i,t is the actual power generation of the ith wind turbine at time t, P pv,j,t is the actual power generation of the jth photovoltaic at time t, N w is the number of wind turbines, N P is the number of PVs; Step 2.1.4: Pumping cost F of pumped storage unit p It can be expressed as: F p =C c ×P ps (t) (6) In the formula, C c is the water price for pumped storage, P ps (t) is the pumping power of pumped storage; Step 2.1.

5. Power generation cost F of the thermal power unit g It can be expressed as: Where P G,j,t is the electrical energy generated by the jth thermal power generation unit in time period t, T is the total duration of the motion control cycle, N G is the number of thermal power generation units, c j , b j and S j is the generation cost factor of the jth thermal power generation unit, S j and j,t is the startup cost and startup status of the jth thermal power generation unit; Step 2.1.6: Consider the penalty cost F of the pollutant emission coefficient of the thermal power generation unit c It can be expressed as: In the formula, α j , β j and γ j is the pollutant emission factor of the jth thermal power generation unit; Step 2.2: Constraint function construction Step 2.2.1: In the power balance constraint, the mathematical relationship between the thermal unit output, wind power cluster, photovoltaic output, energy storage charging and discharging power and the integrated system can be expressed as: Where P G,j,t is the electrical energy generated by the jth thermal power generation unit in time period t, P w,j,t is the actual power generation of the i-th wind turbine at time, P pv,j,t is the actual power generation of the PV at time t, P ps (t) is the pumping power of pumped storage, P pump (t) is the electric energy delivered to the grid by the pumped storage at time t, P L is the load power; Step 2.2.2: Under the upper and lower limits of offshore wind turbine output, the random characteristics of light intensity over a period of time can be approximately described by Beta distribution, and the probability density of light intensity is as follows: P w,min ≤P w,i,t ≤P w,max (10) Where P w,min and P w,max are the upper and lower limits on the wind turbine output; Step 2.2.3: The upper and lower limits of photovoltaic output can be expressed as: P p,min ≤P pv,j,t ≤P p,max (11) Where P p,min and P p,max are the upper and lower limits of PV output; Step 2.2.4: The upper and lower limits of the thermal unit output can be expressed as: P G,j,min ≤P G,j,t ≤P G,j,max (12) Where P G,j,min and P G,j,max are the upper and lower limits of the thermal power generation unit output; Step 2.2.5, in the ramp constraint of the thermal power unit, the amount of electricity that can be increased or decreased per unit time of different thermal power units depends on their generator operation adjustment parameters. Therefore, for the speed of thermal power unit output scheduling, the output ramp rate needs to be considered. The ramp rates of different thermal power units are different. The output cannot be increased or decreased too much per unit time. The ramp constraint of each thermal power unit must be considered in the scheduling plan, so: P G,j,t -P G,j,t-l ·v up,j (1-y j,t )+P G,j,min y j,t (13) P G,j,t-1 -P G,j,t ·v down,j (1-z j,t )+P G,j,min z j,t (14) y j,t -z j,t =I j,t -I j,t-1 (15) y j,t +z j,t ·1 (16) In the formula, y j,t is the startup state of the jth thermal power generation unit in time period t, z j,t is the shutdown state of the jth thermal power generation unit in time period j, I j,t is the operating state of the jth thermal power generation unit in time period t, v up,j and v down,j are the rising and falling ramp rates of the jth thermal power generation unit in time period t within the scheduling cycle, respectively; Step 2.2.6: The output constraint of the pumped storage unit can be expressed as: In the formula, and are the maximum and minimum outputs of the pumped storage unit, respectively; Step 2.2.7: The grid acceptance capacity constraint can be expressed as: P min ≤P pv +P w +P pump +P G ≤P max (18) Where P min and P max They are the upper and lower limits of power that the grid can accept.

4. The method for optimizing the dispatching of comprehensive power generation and low-carbon economy according to claim 1, characterized in that: The construction steps of step 3 are as follows: Step 3.1: Set the bat population size nPop, the maximum pulse tone intensity A, the maximum pulse frequency r0, and the upper limit of the pulse frequency f max , the lower limit f min , the pitch intensity attenuation coefficient α and the frequency increase coefficient γ, set the dimension of the position vector nVar and the maximum number of iterations MaxIt; Step 3.2: Initialize the position S of a single bat i (i=1,2,...,nVar), and calculate the fitness value of the bat position according to the objective function to find the individual S with the optimal position best , the initialization formula of the bat position can be expressed as: S i =W min +(W max -W min )rand(1,nVar) (19) Where W max and W min Respectively represent the upper and lower limits of the area where the bats are located. rand(1,nVar) means randomly generating a one-dimensional vector matrix from the range (0, 1), containing nVar individual values. Step 3.3: Initialize the pulse frequency of a single bat, calculate the flight speed of a single bat, and update the position of the bat. The update equation can be expressed as: f i =f min +(f min -f max )rand (20) In the formula, rand is a random factor uniformly distributed in the interval (0, 1), and are the flight speeds of the i-th bat at time t-1 and t, respectively. and Indicates the position of the bat; Step 3.

4. In each iteration, generate a random number rand1 for a single bat. If Then select the current best solution for local perturbation, where is the pulse frequency of the i-th bat, and the local disturbance can be expressed as: Step 3.5: Calculate the new fitness of the bat after the disturbance. If the new fitness is better than its own best fitness, or Then replace the old position with the new position after disturbance and save it, and update the pulse frequency and tone intensity at the same time, which can be expressed as: Where r0 is the pulse tone intensity of the i-th bat, α is the sound intensity attenuation coefficient, r0 is the maximum pulse frequency, and γ is the frequency increase coefficient; Step 3.6: When the maximum number of iterations is reached, stop searching and output the position and fitness value of a single bat corresponding to the global optimal solution. Otherwise, jump back to step 3 to continue searching.

5. The method for optimizing the dispatching of comprehensive power generation and low-carbon economy according to claim 1, characterized in that: The solution steps of step 4 are as follows: Step 4.1, use chaos mapping to perform population initialization operation; Step 4.1.1, the bat algorithm initially uses a random method to initialize the population, but it cannot cover the entire scheduling solution space. Therefore, on this basis, the chaotic mapping method is used to initialize the population to improve the coverage of the initial scheduling solution space. The calculation formula can be expressed as: In the formula, is a chaotic sequence, nVar is the dimension of the initialization population, and nPop is the number of the initialization population; Step 4.1.2: Perform the reverse mirror operation to obtain the solution space initialization population pair. The calculation formula can be expressed as: In the formula, l i and u i are the minimum and maximum values ​​of the variable value range, respectively; Step 4.2: Adaptive step size update: dynamically adjust the bat’s flight step size according to the algorithm iteration process. The initial step size of the algorithm is large, which improves the convergence speed of the scheduling benefit. In the later stage of the algorithm, the step size becomes smaller and the search becomes more refined, which can be expressed as: In the formula, step min is the minimum step size, T max is the maximum number of iterations, t is the current number of iterations, and K is the adjustment factor; Step 4.3, introduce the Cauchy operator as the variable step length. The Cauchy change comes from the Cauchy distribution of the continuous probability distribution. Use a suitable random variable to generate the Cauchy change factor, which is used in the third step of the bat algorithm. At time t, add the Cauchy change factor to the speed variable. When the total benefit of the symbiotic scheduling system falls into a local optimum, a larger step size can help the individual jump out of the local extreme value. When the individual is close to convergence and searching for the optimal solution of the total benefit of the symbiotic scheduling system, a smaller step size can accelerate the convergence of the individual to change the flight speed of the bat and enhance the ability of the total benefit of the symbiotic scheduling system to jump out of the local optimum. The change formula and the probability density function expression of the one-dimensional standard Cauchy distribution can be expressed as: In the formula, is the position of the Kth randomly selected locust in the dth dimension. Cauchy is the Cauchy operator. f(x) is the probability density function expression of the one-dimensional standard Cauchy distribution.

Citation Information

Cited By

  • Wind-light-pumped energy storage combined power generation dispatching method based on improved bat algorithm

    CN121216630A

  • A Wind-Solar-Pumped Hydro Storage Joint Power Generation Dispatch Method Based on an Improved Bat Algorithm

    CN121216630B