New energy consumption capability off-line evaluation method, apparatus and device, and storage medium

Through the offline evaluation method of new energy consumption capacity, the new energy consumption situation is evaluated through simulation and simulation calculation, and the problem of insufficient consumption capacity of traditional power systems after accessing new energy is solved, and the safe and stable operation of the power system is achieved.

CN118971180AInactive Publication Date: 2024-11-15ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID QINGHAI ELECTRIC POWER COMPANY +2
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411005208.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-11-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

After traditional power systems are connected to wind power and photovoltaic new energy, it is difficult to effectively regulate the load, resulting in insufficient new energy consumption capacity and affecting the safety and stability of the system.

Method used

Provide an offline evaluation method for new energy consumption capacity, configuring production simulation benchmark cases, setting simulation parameters and constraints, simulated calculation of new energy consumption, and compare it with the actual consumption situation to evaluate new energy consumption capacity. The method includes power balance, line safety, backup requirements, thermal power units, hydropower units, new energy, energy storage and cross-contact lines constraints.

Benefits of technology

Based on simulation, the maximum consumption capacity of the new energy power grid is estimated, and reference is provided to improve the consumption capacity and ensure the safe and stable operation of the power system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118971180A_ABST
    Figure CN118971180A_ABST
Patent Text Reader

Abstract

The invention provides a new energy consumption capability offline evaluation method and device, equipment and a storage medium. The method comprises the following steps: firstly, setting a production simulation reference case based on actual operation conditions of a power grid, and setting simulation parameters including power supply installation, load, section limit, output electric quantity and the like; then, according to a new energy generating capacity maximization target, constraint conditions covering multiple aspects of power balance, line safety, standby requirements and the like are constructed; and evaluating the new energy consumption condition under the original scheduling strategy through simulation calculation, and comparing the new energy consumption condition with the actual consumption condition to determine an evaluation result. According to the method, the maximum absorption capacity of the new energy power grid can be estimated in advance, and reference is provided for improvement of the absorption capacity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the field of power grid energy absorption block evaluation, and in particular, relates to an offline evaluation method, device, equipment and storage medium for new energy absorption capacity. Background Art

[0002] Against the backdrop of the global energy structure transformation and upgrading, the proportion of new energy sources is gradually increasing. However, new energy sources such as wind power and photovoltaics have brought new challenges to the operation and management of traditional power systems due to their volatility and intermittent characteristics. To meet this challenge, current power system optimization research is focusing on achieving coordinated dispatch and control of multiple energy sources, aiming to efficiently utilize new energy sources and improve the flexibility and absorption capacity of the system.

[0003] Traditional power systems mainly rely on stable conventional energy sources such as thermal power and hydropower, and their power generation output is easy to predict and control. However, with the access of wind power and photovoltaic power generation, the load regulation of the power system has become more complicated. Since the output of new energy is affected by external environment such as weather, there is a great deal of uncertainty. Therefore, how to maximize the consumption of new energy while ensuring the safety and stability of the power system has become an urgent problem to be solved. Summary of the invention

[0004] The purpose of the present application is to overcome the above-mentioned prior art and provide a method and device for handling UHV DC faults.

[0005] This application provides an offline evaluation method for new energy consumption capacity, including:

[0006] Configure production simulation benchmark cases based on the actual operating boundary conditions of the new energy grid;

[0007] Setting simulation parameters within a preset evaluation period for the production simulation benchmark case, including: power supply installed capacity, load power consumption, section limit and external power;

[0008] Set constraints on power balance, line safety, backup demand, thermal power units, hydropower units, new energy, energy storage, and section-interconnection lines based on the maximum target of new energy grid power generation;

[0009] Simulate and calculate the new energy consumption within a preset evaluation period according to the simulation parameters and the constraint conditions;

[0010] The new energy consumption situation is compared with the actual consumption situation of the directly detected power grid, and the new energy consumption capacity assessment result is determined based on the comparison result.

[0011] Optionally, the constraints on the operation of the thermal power unit include:

[0012] The number of starts, the number of shutdowns, the minimum operating time after start-up, the number of operating units, the minimum operating mode of the heating units, the maximum and minimum output constraints of the heating units, the fixed output of some units, the daily changes in the maximum and minimum output of the units, the changes in the standby capacity mode, the power constraints of some units, and the lack of power constraints on some units.

[0013] Optionally, the constraints on the operation of the hydropower unit include:

[0014] The constraints on power generation of units with regulatory capabilities, the seasonal changes in power generation levels, and the relationship between the flow rate of hydropower and the step distance.

[0015] Optionally, the constraints for the operation of the new energy include:

[0016] New energy installed capacity changes month by month and different new energy sequences operate in the same area.

[0017] Optionally, the constraints for energy storage operation include:

[0018] Capacity constraints, charge and discharge operations, and state of charge constraints.

[0019] Optionally, the constraints on the section-tie line operation include:

[0020] Different transmission sections, section limits changing at different time periods, section limits changing within a certain positive and negative range, interconnection lines operating on a fixed plan, interconnection lines operating within a certain positive and negative range, interconnection lines operating with monthly power constraints, and interconnection lines changing multiple times within a day.

[0021] Optionally, the constraints of power balance, line safety, and standby demand are expressed as follows:

[0022] Maximum target for new energy grid power generation:

[0023]

[0024] Power Balance:

[0025]

[0026] Line safety:

[0027]

[0028] Backup requirements:

[0029]

[0030] in, The wind power output of the whole network at each time period, The photovoltaic output power of the whole network at each time period, The output power of thermal power in the whole network, Contribute to the energy storage of the entire network, t l is the interconnection line power, For the whole network system load, is the positive reserve power of the whole network system, τ is the given time scale, is the negative standby power of the whole network system, -F m is the channel capacity constraint, r t + is the system positive reserve, and δ is the increase ratio of new energy consumption during the assessment period.

[0031] The present application also provides an offline evaluation device for new energy consumption capacity, comprising:

[0032] Case module, used to configure production simulation benchmark cases according to the actual operating boundary conditions of the new energy grid;

[0033] A parameter module, used to set simulation parameters within a preset evaluation period for the production simulation benchmark case, including: power supply installed capacity, load power consumption, section limit and external power;

[0034] The conditional module is used to set constraints on power balance, line safety, backup demand, thermal power units, hydropower units, new energy, energy storage, and section-interconnection lines based on the maximum target of new energy grid power generation;

[0035] A calculation module, used for simulating and calculating the consumption of new energy within a preset evaluation period according to the simulation parameters and the constraint conditions;

[0036] The judgment module is used to compare the new energy consumption situation with the actual consumption situation of the power grid directly detected, and determine the new energy consumption capacity assessment result according to the comparison result.

[0037] The present application also provides an offline evaluation device for new energy consumption capacity, including:

[0038] A memory for storing a computer executable program of the above-mentioned offline evaluation method for new energy consumption capacity;

[0039] The processor is used to call the computer executable program to execute: configuring a production simulation benchmark case according to the actual operating boundary conditions of the new energy power grid; setting simulation parameters within a preset evaluation period for the production simulation benchmark case, including: power installed capacity, load power consumption, section limit and external power transmission; setting power balance, line safety, backup demand, thermal power units, hydropower units, new energy, energy storage and section-interconnection line constraints based on the maximum power generation target of the new energy power grid; simulating and calculating the new energy consumption situation within a preset evaluation period according to the simulation parameters and the constraints; comparing the new energy consumption situation with the actual power grid consumption situation directly detected, and determining the new energy consumption capacity evaluation result according to the comparison result.

[0040] The present application also provides a storage medium storing a computer executable program, which is used to be called by a processor to execute the steps of the above-mentioned offline evaluation method for new energy absorption capacity.

[0041] The beneficial effects of this application are:

[0042] The present application provides an offline evaluation method for the absorption capacity of new energy sources, including: configuring a production simulation benchmark case according to the actual operating boundary conditions of the new energy power grid; setting simulation parameters within a preset evaluation period for the production simulation benchmark case, including: power supply installed capacity, load power consumption, section limit and external power transmission; setting power balance, line safety, backup demand, thermal power units, hydropower units, new energy, energy storage and section-interconnection line constraints based on the maximum power generation target of the new energy power grid; simulating and calculating the absorption of new energy sources within a preset evaluation period according to the simulation parameters and the constraints; comparing the absorption of new energy sources with the actual absorption of the power grid directly detected, and determining the evaluation result of the absorption capacity of new energy sources according to the comparison result. The present application pre-estimates the maximum absorption capacity of the new energy power grid based on simulation, thereby providing a reference for improving the absorption capacity. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 This is a schematic diagram of an offline evaluation process of new energy consumption capacity in this application;

[0044] Figure 2 This is a schematic diagram of the insufficient flexibility of the real power grid throughout the year in this application;

[0045] Figure 3 This is a schematic diagram of the maximum shortfall in flexibility of the real power grid throughout the year in this application;

[0046] Figure 4 This is a schematic diagram of the duration of insufficient flexibility of the real power grid throughout the year in this application;

[0047] Figure 5This is a schematic diagram of the expected lack of flexibility in the real power grid downward adjustment throughout the year in this application;

[0048] Figure 6 This is a schematic diagram of the maximum shortfall in flexibility of the real power grid throughout the year in this application;

[0049] Figure 7 This is a schematic diagram of the duration of insufficient flexibility in actual grid downregulation in this application. DETAILED DESCRIPTION

[0050] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that various forms of implementing the present disclosure should not be limited by the embodiments set forth herein. On the contrary, the embodiments are provided to more thoroughly understand the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.

[0051] Please refer to Figure 1 As shown, the present application provides an offline evaluation method for new energy consumption capacity, and the specific steps of the method include:

[0052] S101. Configure a production simulation benchmark case based on the actual operating boundary conditions of the new energy power grid.

[0053] First, it is necessary to comprehensively analyze the actual operating boundary conditions of the power grid, which include but are not limited to: the topological structure of the power grid, load characteristics, power supply characteristics, and power grid constraints.

[0054] The topological structure of the power grid includes the layout and connection relationship of power plants, substations, transmission lines and other facilities in the power grid.

[0055] The load characteristics include the temporal and spatial distribution, seasonal changes, peak and valley characteristics, etc. of the load.

[0056] The power supply characteristics include output characteristics, installed capacity, operating restrictions, etc. of conventional energy (such as thermal power, hydropower, nuclear power, etc.) and new energy (such as wind power, photovoltaic power, etc.).

[0057] The grid constraints include capacity limitations of transmission lines, capacity limitations of transformers, and requirements for voltage and frequency stability.

[0058] Secondly, based on the above actual operating boundary conditions, a benchmark case for production simulation is configured.

[0059] The benchmark case should truly reflect the actual operation of the power grid, including the actual output of various power sources, the actual demand of the load, the actual constraints of the power grid, etc.

[0060] The benchmark case should represent the typical operation of the power grid over a certain period of time, such as year, quarter or month.

[0061] When configuring the benchmark case, set the time range of the simulation, such as one year, one quarter, or one month. Import the topology, power characteristics, load characteristics and other data of the power grid into the production simulation software. According to the actual constraints of the power grid, set various constraints in the simulation process, such as transmission line capacity restrictions, transformer capacity restrictions, etc.

[0062] Finally, start the production simulation software and run the simulation according to the set time range and constraints.

[0063] S102, setting simulation parameters within a preset evaluation period for the production simulation benchmark case, including:

[0064] Power installed capacity, load power consumption, section limits and power transmission.

[0065] In the process of power system production simulation, it is crucial to set appropriate simulation parameters for the benchmark case, which can ensure the accuracy and realism of the simulation and provide valuable analysis results.

[0066] The power supply installed capacity parameters involve the installed capacity and characteristic settings of various power supplies in the power grid system, including: the installed capacity of conventional energy (such as thermal power, hydropower, etc.) and new energy (such as wind power, photovoltaic, etc.). When setting, the actual operating characteristics of the power supply are considered, such as output limit, ramp rate, start and stop time, etc. In addition, for new energy, it is also necessary to consider the characteristics of its output being affected by weather and environmental factors.

[0067] The load power consumption parameters reflect the power demand of the system in different time periods. When setting, it is necessary to refer to historical load data and forecast data to ensure that the load demand during the simulation is consistent with the actual situation. At the same time, it is also necessary to consider the seasonal changes, daily changes of the load, and the impact of special events (such as holidays, extreme weather, etc.) on the load demand.

[0068] Section limit parameters involve capacity limits on key transmission sections in the power grid. These limits are designed to ensure the stability and safety of the power grid in both normal operation and fault conditions. When setting section limit parameters, it is necessary to consider the topology of the power grid, the physical characteristics of the transmission lines, and the operating constraints of the system.

[0069] The power transmission parameters reflect the power exchange between the system and other power grids or regions within the preset evaluation period. When setting, it is necessary to consider the actual power transmission contract, power exchange plan, and the interconnection of the power grid. In addition, it is also necessary to pay attention to the loss and efficiency issues in the power transmission process.

[0070] S103. Based on the maximum target of the new energy grid power generation, set constraints on power balance, line safety, backup demand, thermal power units, hydropower units, new energy, energy storage and section-interconnection lines.

[0071] The timing operation optimization model is an important tool in the dispatching and operation of the power system. It aims to maximize the renewable energy power generation of the entire network through optimization strategies, while ensuring the stable and safe operation of the system. In this application, the timing operation optimization model sets a variety of constraints, including system power balance, backup demand, line transmission safety, and operation constraints of various power sources.

[0072] In this application, the main goal of the timing operation optimization model is to maximize the renewable energy power generation of the entire network.

[0073] Maximum target for renewable energy power generation:

[0074]

[0075] in, The wind power output of the whole network at each time period, It is the photovoltaic output power of the entire network at each time period.

[0076] Renewable energy usually refers to the power generation of new energy such as wind power and solar power. Through the optimization model, the best power output combination and scheduling strategy are found to maximize the power generation of new energy.

[0077] The constraints include:

[0078] 1. Power balance constraints:

[0079]

[0080] in, The wind power output of the whole network at each time period, The photovoltaic output power of the whole network at each time period, The output power of thermal power in the whole network, Contribute to the energy storage of the entire network, t l is the interconnection line power, For the whole network system load, It is the positive standby power of the whole network system. It is the negative standby power for the entire network system.

[0081] The power balance constraint is a basic constraint for power system dispatching, which requires that the system's power generation at any time must be equal to the sum of the load power and the line loss. In other words, the power on the power generation side must meet the power consumption side's demand to maintain the stable operation of the system.

[0082] 2. Line safety constraints:

[0083]

[0084] in, The wind power output of the whole network at each time period, The photovoltaic output power of the whole network at each time period, The output power of thermal power in the whole network, Contribute to the energy storage of the entire network, t l is the interconnection line power, For the whole network system load, It is the positive standby power of the whole network system. Negative backup power for the entire network system, It is the channel capacity constraint.

[0085] Line safety constraints mean that the transmission power of equipment such as transmission lines and transformers in the system must be within its safety range. The capacity of these devices is limited, and if the transmission power exceeds its safety limit, it may cause equipment damage or system crash. Therefore, the timing operation optimization model needs to ensure that the transmission power of all equipment is within its safety range.

[0086] 3. Backup demand constraints of backup reservation strategy:

[0087]

[0088] in, The wind power output of the whole network at each time period, The photovoltaic output power of the whole network at each time period, The output power of thermal power in the whole network, Contribute to the energy storage of the entire network, t + is the system positive reserve, and δ is the increase ratio of new energy consumption during the assessment period.

[0089] The backup demand constraint is to ensure that the system can maintain stable operation under unexpected situations (such as equipment failure, load surge, etc.). By incorporating the reliable output of renewable energy into the backup demand, the model determines a reasonable backup reservation strategy, that is, to reduce the reserved amount of backup as much as possible while ensuring system safety, so as to improve the utilization rate of renewable energy.

[0090] 4. Other operating constraints:

[0091] a. Operation constraints of thermal power units:

[0092] Number of starts and stops: The number of starts and stops of thermal power units in a day or a certain period is limited to avoid damage to the equipment caused by frequent starts and stops.

[0093] Minimum operating time: After the thermal power unit is started up, it needs to maintain a certain minimum operating time to ensure the stable operation and efficiency of the equipment.

[0094] Constraints on the number of operating units and output: The number of operating units and output of thermal power units in the system are limited by factors such as total installed capacity, equipment status and load demand.

[0095] Heating unit constraints: For heating units, their minimum and maximum outputs, minimum operating mode, etc. need to meet the heating demand.

[0096] Fixed output of some units: Some units may need to maintain fixed output due to special reasons (such as contractual constraints, equipment characteristics, etc.).

[0097] Unit output changes: The maximum and minimum output of the unit may change daily due to equipment aging, maintenance, etc.

[0098] Changes in the way backup capacity is provided: Depending on system requirements, the way backup capacity is provided may change (such as switching from thermal power to energy storage, etc.).

[0099] Electricity constraints: Some thermal power units may be subject to electricity plans and need to generate electricity according to the plan.

[0100] b. Operation constraints of hydropower units:

[0101] Power generation constraints: Hydropower units with regulation capabilities need to determine power generation based on factors such as water volume and reservoir water level.

[0102] Cascade hydropower constraints: For cascade hydropower stations, it is necessary to consider the relationship between water flow velocity and cascade distance, as well as the water balance between upstream and downstream hydropower stations.

[0103] Section and tie line operation constraints:

[0104] Different sending sections and limits: There may be multiple different sending sections in the system, and the transmission limit of each section may be different and may change over time.

[0105] Planned operation of tie lines: The operation of tie lines may be subject to a fixed plan and needs to be carried out according to the plan.

[0106] Changes in interconnection line power and output: The power and output of interconnection lines may change multiple times within a day, and their change constraints need to be met.

[0107] c. New energy operation constraints:

[0108] Changes in renewable energy installed capacity: The installed capacity of renewable energy may change from month to month, and the model needs to consider the impact of such changes on power generation.

[0109] Operation of different renewable energy sequences: There may be multiple renewable energy sources (such as wind power and photovoltaics) in the same region, and their output may differ, requiring coordinated operation.

[0110] d. Energy storage operation constraints:

[0111] Power constraint: The power of the energy storage device needs to vary within a certain range to ensure its normal operation and safety.

[0112] Charging and discharging operation: Energy storage equipment performs charging and discharging operations, and its charging and discharging strategy needs to meet the characteristics of the equipment and the requirements of the system.

[0113] State of charge constraint: The state of charge of the energy storage device (i.e. the ratio of power to capacity) needs to vary within a certain range to avoid damage to the device due to overcharging or over-discharging.

[0114] S104 simulates and calculates the new energy consumption situation within a preset evaluation period according to the simulation parameters and the constraint conditions.

[0115] The choice of preset evaluation period is usually determined according to actual needs, which can be daily, weekly, monthly, quarterly or annual. Different preset evaluation periods help to analyze the consumption of new energy from different time scales. Setting the preset evaluation period is the first step in evaluating the consumption of new energy, which ensures a comprehensive and accurate analysis of the operation of the power system within a certain period of time.

[0116] After setting the preset evaluation period and simulation parameters, the production simulation calculation is carried out. It mainly uses the simulation software or model of the power system to simulate the operation of the power system within the preset evaluation period, especially the power generation and consumption of new energy.

[0117] Through production simulation calculation, the consumption of new energy within the preset evaluation period is obtained. This mainly includes the following aspects of evaluation:

[0118] Power generation from renewable energy: actual power generation from renewable energy within the preset assessment period.

[0119] New energy consumption rate: the proportion of new energy power generation that is actually consumed by the power system. This is a key indicator for evaluating the consumption of new energy.

[0120] Abandonment of wind and solar power: Due to insufficient grid capacity or other reasons, renewable energy power generation may not be fully absorbed, resulting in some electricity being wasted. This wasted electricity is called "abandonment of wind" or "abandonment of solar power".

[0121] S105 compares the new energy consumption situation with the actual consumption situation of the power grid directly detected, and determines the new energy consumption capacity assessment result according to the comparison result.

[0122] The actual operation of new energy consumption refers to the amount of new energy electricity actually accepted and utilized by the power system during the actual operation process. This data is obtained through the monitoring and statistics of the power system, reflecting the performance of the system in actual operation and the consumption of new energy.

[0123] By comparing the simulated new energy consumption with the actual new energy consumption, the contribution of the multi-energy complementary system to the new energy consumption in terms of operation improvement is evaluated. The difference between the two is the new energy consumption improved by the operation of the multi-energy complementary system within the preset evaluation period.

[0124] If the simulated new energy consumption is higher than the actual new energy consumption, it means that there may be certain limitations or problems in the actual operation of the system, resulting in the failure to fully utilize the new energy consumption capacity. At this time, the system needs to be further optimized and improved to improve the new energy consumption capacity.

[0125] If the simulated new energy consumption is similar to or slightly lower than the actual new energy consumption, it means that the system is operating efficiently and the new energy consumption capacity has been well utilized. At this point, further explore the optimization potential of the system to further improve the new energy consumption and system operation efficiency.

[0126] For example:

[0127] Please refer to Figure 2 to Figure 7 As shown, based on the full-year operating data of a certain grid (the actual grid corresponding to the benchmark case in this application), a post-flexibility assessment was carried out. The assessment results showed that there was insufficient flexibility margin throughout the year, with a probability of insufficient upward flexibility of 1.9% throughout the year, a duration of insufficient flexibility of 164h, and an expected value of insufficient flexibility of 10MW.

[0128] According to the evaluation results, the period of insufficient upward flexibility in a certain network is mainly concentrated in the hydropower dry season from January to February, when electricity needs to be received from neighboring provinces to meet local power load demand. Based on the full-year operation data of a certain network, the post-evaluation of downward flexibility was carried out: the probability of insufficient downward flexibility throughout the year was 39.1%, the duration of insufficient flexibility was 3433h, and the expected value of insufficient flexibility was 211MW. The insufficient downward flexibility was more serious from October to December.

[0129] Based on the offline evaluation method, the benchmark case is configured based on the actual operation of a certain grid throughout the year when the multi-energy complementary system is not deployed. The deviation of the new energy consumption in the benchmark case from the actual situation is about 0.15%. It can be considered that the benchmark case better reflects the operation strategy of the original dispatching control system.

[0130] The details are as follows:

[0131] The actual renewable energy generation of a certain grid was 24.84 billion kWh, the abandoned electricity was 1.85 billion kWh, and the utilization rate of renewable energy was 93.1%. The benchmark case renewable energy generation was 24.80 billion kWh, the abandoned electricity was 1.85 billion kWh, the utilization rate of renewable energy was 93.1%, and the deviation of renewable energy consumption was 40 million kWh.

[0132] The preset evaluation period for the post-evaluation of the absorption capacity is half a year. Taking the actual operation of a certain grid as the boundary condition, the absorption capacity improvement effect after the adoption of the multi-energy complementary system is calculated. The results show that the absorption capacity of new energy is increased by 5.9% through multi-energy complementation within the preset evaluation period, as follows:

[0133] The original system's new energy power generation calculated by production simulation was 37.598 billion kWh, of which wind power generation was 6.724 billion kWh, photovoltaic power generation was 9.757 billion kWh, and hydropower generation was 21.117 billion kWh; the actual renewable energy power generation in half a year was 39.81 billion kWh, of which wind power generation was 7.354 billion kWh, photovoltaic power generation was 10.647 billion kWh, and hydropower generation was 21.809 billion kWh. The new energy consumption increased by 2.212 billion kWh, an increase of 5.9%.

[0134] The present application also provides an offline evaluation device for new energy consumption capacity, comprising:

[0135] Case module, used to configure production simulation benchmark cases according to the actual operating boundary conditions of the new energy grid;

[0136] A parameter module, used to set simulation parameters within a preset evaluation period for the production simulation benchmark case, including: power supply installed capacity, load power consumption, section limit and external power;

[0137] A condition module, used to set constraints on power balance, line safety, standby demand, thermal power units, hydropower units, new energy, energy storage and section-interconnection lines with the goal of maximizing the power generation of the new energy grid;

[0138] A calculation module, used for simulating and calculating the new energy consumption situation under the original scheduling operation strategy within a preset evaluation period according to the simulation parameters and the constraint conditions;

[0139] The judgment module is used to compare the new energy consumption situation with the actual consumption situation of the power grid, and determine the new energy consumption capacity assessment result according to the comparison result.

[0140] The present application also provides an offline evaluation device for new energy consumption capacity, including:

[0141] A memory for storing a computer executable program of the above-mentioned offline evaluation method for new energy consumption capacity;

[0142] The processor is used to call the computer executable program to execute: configuring a production simulation benchmark case according to the actual operating boundary conditions of the new energy power grid; setting simulation parameters within a preset evaluation period for the production simulation benchmark case, including: power installed capacity, load power consumption, section limit and external power transmission; setting power balance, line safety, backup demand, thermal power units, hydropower units, new energy, energy storage and section-interconnection line constraints with the maximum power generation of the new energy power grid as the goal; simulating and calculating the new energy consumption situation under the original scheduling operation strategy within the preset evaluation period according to the simulation parameters and the constraints; comparing the new energy consumption situation with the actual power grid consumption situation, and determining the new energy consumption capacity evaluation result according to the comparison result.

[0143] The present application also provides a storage medium storing a computer executable program, which is used to be called by a processor to execute the steps of the above-mentioned offline evaluation method for new energy absorption capacity.

Claims

1. An offline evaluation method for new energy consumption capacity, It is characterized in that include: Configure production simulation benchmark cases based on the actual operating boundary conditions of the new energy grid; Setting simulation parameters within a preset evaluation period for the production simulation benchmark case, including: power supply installed capacity, load power consumption, section limit and external power; Set constraints on power balance, line safety, backup demand, thermal power units, hydropower units, new energy, energy storage, and section-interconnection lines based on the maximum target of new energy grid power generation; Simulate and calculate the new energy consumption within a preset evaluation period according to the simulation parameters and the constraint conditions; The new energy consumption situation is compared with the actual consumption situation of the directly detected power grid, and the new energy consumption capacity assessment result is determined based on the comparison result.

2. According to the offline evaluation method of new energy consumption capacity according to claim 1, It is characterized in that The constraints on the operation of the thermal power unit include: The number of starts, the number of shutdowns, the minimum operating time after start-up, the number of operating units, the minimum operating mode of the heating units, the maximum and minimum output constraints of the heating units, the fixed output of some units, the daily changes in the maximum and minimum output of the units, the changes in the standby capacity mode, the power constraints of some units, and the lack of power constraints on some units.

3. According to the offline evaluation method of new energy consumption capacity according to claim 1, It is characterized in that The constraints on the operation of the hydropower unit include: The constraints on power generation of units with regulatory capabilities, the seasonal changes in power generation levels, and the relationship between the flow rate of hydropower and the step distance.

4. According to the offline evaluation method of new energy consumption capacity according to claim 1, It is characterized in that The constraints on the operation of new energy include: New energy installed capacity changes month by month and different new energy sequences operate in the same area.

5. According to the offline evaluation method of new energy consumption capacity according to claim 1, It is characterized in that Constraints on energy storage operation include: Capacity constraints, charge and discharge operations, and state of charge constraints.

6. According to the offline evaluation method of new energy consumption capacity according to claim 1, It is characterized in that The constraints on the operation of the section-tie line include: Different transmission sections, section limits changing at different time periods, section limits changing within a certain positive and negative range, interconnection lines operating on a fixed plan, interconnection lines operating within a certain positive and negative range, interconnection lines operating with monthly power constraints, and interconnection lines changing multiple times within a day.

7. According to the offline evaluation method of new energy consumption capacity according to claim 1, It is characterized in that The constraints of power balance, line safety, and backup requirements are expressed as follows: Maximum target for new energy grid power generation: Power Balance: Line safety: Backup requirements: in, Wind power output, is the photovoltaic output power, For thermal power output, For energy storage output, P t l is the interconnection line power, For system load, is the system positive standby power, is the system negative standby power, -F m is the channel capacity constraint, r t + is the system positive reserve, and δ is the increase ratio of new energy consumption during the assessment period.

8. An offline evaluation device for new energy consumption capacity, It is characterized in that include: Case module, used to configure production simulation benchmark cases according to the actual operating boundary conditions of the new energy grid; A parameter module, used to set simulation parameters within a preset evaluation period for the production simulation benchmark case, including: power supply installed capacity, load power consumption, section limit and external power; The condition module is used to set constraints on power balance, line safety, backup demand, thermal power unit operation, hydropower unit operation, new energy operation, energy storage operation and section-interconnection line operation based on the maximum target of new energy grid power generation; A calculation module, used for simulating and calculating the consumption of new energy within a preset evaluation period according to the simulation parameters and the constraint conditions; The judgment module is used to compare the new energy consumption situation with the actual consumption situation of the power grid directly detected, and determine the new energy consumption capacity assessment result according to the comparison result.

9. An offline evaluation device for new energy consumption capacity, It is characterized in that include: A memory for storing a computer executable program of the offline evaluation method for new energy consumption capacity according to any one of claims 1 to 7; The processor is used to call the computer executable program to execute: configuring a production simulation benchmark case according to actual operating boundary conditions of the new energy power grid; Setting simulation parameters within a preset evaluation period for the production simulation benchmark case, including: power supply installed capacity, load power consumption, section limit and external power; Based on the maximum target of the new energy power grid power generation, constraints on power balance, line safety, backup demand, thermal power unit operation, hydropower unit operation, new energy operation, energy storage operation and section-interconnection line operation are set; the new energy consumption situation within a preset evaluation period is simulated and calculated according to the simulation parameters and the constraints; the new energy consumption situation is compared with the actual consumption situation of the power grid directly detected, and the evaluation result of the new energy consumption capacity is determined according to the comparison result.

10. A storage medium, It is characterized in that A computer executable program is stored, and the computer executable program is used to be called by a processor to execute the steps of the offline evaluation method for new energy consumption capacity according to any one of claims 1 to 7.

Citation Information

Patent Citations

  • Method for evaluating new energy development potential of regional power grids based on power generation absorption

    CN106874630A

  • Post-evaluation method and device for new energy consumption increase amount

    CN113452081A

  • New energy production optimization simulation method and system considering standby sharing

    CN115544433A