Hydroelectric generating set operation monitoring method based on AGC operation rate and hydraulic power plant operation monitoring method based on AGC operation rate
By monitoring the AGC operation rate of hydropower units or hydropower plants and issuing an alarm, the problem of AGC operation rate not meeting the standards in the existing technology is solved, the statistical accuracy of AGC operation rate and the adjustment efficiency of operating status are improved, and the Grid assessment fee.
Patent Information
- Application Number
- CN202410994535.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-15
AI Technical Summary
The existing hydropower plants and hydropower units lack monitoring functions based on AGC operation rate, which may cause the AGC operation rate to fail to meet the standards, resulting in an increase in power grid assessment and related costs.
By obtaining the grid connection status and AGC operation status of the hydropower unit or hydropower plant, calculate the AGC operation rate, and issue an alarm to remind the operation personnel to make adjustments based on the set value to ensure that the AGC operation rate meets the requirements.
It realizes automatic calculation of AGC operation rate and real-time alarm, improves statistical accuracy, helps operators to adjust equipment status in a timely manner, and avoids increasing assessment costs.
Smart Images

Figure CN118971214A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of power generation system operation, and in particular to a method for monitoring the operation of a hydropower unit based on an AGC commissioning rate and a method for monitoring the operation of a hydropower plant based on an AGC commissioning rate. Background Art
[0002] During the grid-connected operation of the hydro-turbine generator set, under normal circumstances, the active output needs to be controlled according to the load curve issued by the dispatcher. The control method is to use the plant automatic generation control (AGC) to automatically track and adjust the active output of the whole plant and single machine. Compared with manual adjustment, this method is safer and more reliable, and the adjustment speed is faster. The AGC commissioning rate is an important indicator for examining the reliability of AGC control, and it is also an important assessment standard for the power grid to the power plant.
[0003] Existing hydropower plants and the hydropower units in the hydropower plants do not have the function of monitoring the operating status of the hydropower plants and the hydropower units based on the AGC operation rate, which may result in the grid being assessed due to the AGC operation rate not meeting the standards, resulting in assessment fees. Therefore, a monitoring method based on the AGC operation rate is currently used to monitor the operating status of the hydropower units or hydropower plants. Summary of the invention
[0004] The embodiments of the present application provide a method for monitoring the operation of a hydropower unit based on an AGC operation rate and a method for monitoring the operation of a hydropower plant based on an AGC operation rate.
[0005] Other features and advantages of the present application will become apparent from the following detailed description, or may be learned in part by the practice of the present application.
[0006] According to a first aspect of an embodiment of the present application, a method for monitoring the operation of a hydropower unit based on an AGC commissioning rate is provided, comprising:
[0007] Based on the grid-connected state and active power of the hydropower unit, the grid-connected start time point and grid-connected end time point of the hydropower unit are obtained;
[0008] Based on the AGC operation status of the hydropower unit, the AGC operation time point and AGC de-operation time point of the hydropower unit are obtained;
[0009] Calculate the AGC operation rate of the hydropower unit on the day / month based on the grid connection start time point, the grid connection end time point, the AGC operation time point and the AGC decommissioning time point;
[0010] The operating status of the hydropower unit is monitored based on the AGC operation rate of the hydropower unit.
[0011] In some embodiments of the present application, based on the above scheme, the step of obtaining the grid connection start time point and grid connection end time point of the hydropower unit based on the grid connection state and active power of the hydropower unit includes:
[0012] Reading the grid-connected state of the hydropower unit, and when the hydropower unit is in the grid-connected state, detecting the active power of the hydropower unit;
[0013] When the active power is greater than the first set value, the start time point of obtaining the hydropower unit is recorded;
[0014] When the active power is less than or equal to the first set value, the grid connection completion time point of the hydropower unit is recorded and obtained.
[0015] In some embodiments of the present application, based on the above scheme, the obtaining of the AGC commissioning time point and the AGC decommissioning time point of the hydropower unit based on the AGC commissioning status of the hydropower unit includes:
[0016] Determine whether the hydropower unit is in the AGC operation state. If so, record and obtain the AGC operation time point of the hydropower unit. If not, record and obtain the AGC de-operation time point of the hydropower unit.
[0017] In some embodiments of the present application, based on the above-mentioned solution, the monitoring of the operating state of the hydropower unit based on the AGC commissioning rate of the hydropower unit includes:
[0018] When the AGC operation rate of the hydropower unit is less than or equal to the second set value, an alarm is issued to remind the staff to adjust the operation state of the hydropower unit;
[0019] When the AGC operation rate of the hydropower unit is greater than the second set value, the alarm is restored.
[0020] According to a second aspect of an embodiment of the present application, a method for monitoring operation of a hydropower plant based on an AGC commissioning rate is provided, comprising:
[0021] Based on the number of hydropower units connected to the grid in the hydropower plant, the grid connection start time point and grid connection end time point of the hydropower plant are obtained;
[0022] Based on the AGC operation status of the hydropower plant, the AGC operation time point and AGC de-operation time point of the hydropower plant are obtained;
[0023] Calculate the AGC operation rate of the hydropower plant on that day / month based on the grid connection start time point, the grid connection end time point, the AGC operation time point and the AGC decommissioning time point;
[0024] The operating status of the hydropower plant is monitored based on the AGC operation rate of the hydropower plant.
[0025] In some embodiments of the present application, based on the above-mentioned solution, the obtaining of the grid connection start time point and the grid connection end time point of the hydropower plant based on the number of hydropower units connected to the grid in the hydropower plant includes:
[0026] Detecting the number of hydropower units connected to the grid in the hydropower plant, and when the number of hydropower units connected to the grid in the hydropower plant is greater than or equal to a third set value, recording and obtaining the grid connection start time point of the hydropower plant;
[0027] When the number of grid-connected hydropower generating units of the hydropower plant is less than a third set value, the grid-connection completion time point of the hydropower plant is recorded and obtained.
[0028] In some embodiments of the present application, based on the above solution, the obtaining of the AGC commissioning time point and the AGC decommissioning time point of the hydropower plant based on the AGC commissioning status of the hydropower plant includes:
[0029] Determine whether the hydropower plant is in the AGC operation state. If so, record and obtain the AGC operation time point of the hydropower plant. If not, record and obtain the AGC de-operation time point of the hydropower plant.
[0030] In some embodiments of the present application, based on the above solution, monitoring the operating status of the hydropower plant based on the AGC commissioning rate of the hydropower plant includes:
[0031] When the AGC operation rate of the hydropower plant is less than or equal to a fourth set value, an alarm is issued to remind the staff to adjust the operation state of the hydropower plant;
[0032] When the AGC operation rate of the hydropower plant is greater than the fourth set value, the alarm is restored.
[0033] The technical solution of the present application can automatically calculate the AGC operation rate of the hydropower unit and / or hydropower plant, thereby improving the accuracy of the AGC operation rate statistics. In addition, an alarm can be issued based on the AGC operation rate to remind the operating personnel to adjust the equipment status in time to meet the AGC operation rate requirements.
[0034] It should be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] The drawings herein are incorporated into the specification and constitute a part of the specification, showing embodiments consistent with the present application, and together with the specification, are used to explain the principles of the present application. Obviously, the drawings described below are only some embodiments of the present application, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. In the drawings:
[0036] Figure 1 A schematic flow chart of a method for monitoring the operation of a hydropower unit based on the AGC commissioning rate according to an embodiment of the present application is shown;
[0037] Figure 2 A schematic flow chart of a method for monitoring the operation of a hydropower plant based on the AGC commissioning rate according to an embodiment of the present application is shown;
[0038] Figure 3 A block diagram of an electronic device according to an embodiment of the present application is shown;
[0039] Figure 4 A schematic diagram of the structure of a computer system suitable for implementing an electronic device of an embodiment of the present application is shown. DETAILED DESCRIPTION
[0040] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in a variety of forms and should not be construed as limited to the examples set forth herein; rather, these embodiments are provided so that this application will be more comprehensive and complete and fully convey the concept of the example embodiments to those skilled in the art.
[0041] In addition, described feature, structure or characteristic can be combined in one or more embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present application. However, those skilled in the art will appreciate that the technical scheme of the present application can be put into practice without one or more of the specific details, or other methods, components, devices, steps, etc. can be adopted. In other cases, known methods, devices, realizations or operations are not shown or described in detail to avoid blurring the various aspects of the application.
[0042] The block diagrams shown in the accompanying drawings are merely functional entities and do not necessarily correspond to physically independent entities. That is, these functional entities may be implemented in software form, or in one or more hardware modules or integrated circuits, or in different networks and / or processor devices and / or microcontroller devices.
[0043] The flowcharts shown in the accompanying drawings are only exemplary and do not necessarily include all the contents and operations / steps, nor must they be executed in the order described. For example, some operations / steps can be decomposed, and some operations / steps can be combined or partially combined, so the actual execution order may change according to actual conditions.
[0044] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the objects used in this way can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those shown or described.
[0045] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution in the embodiment of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiment of the present invention. Obviously, the described embodiment is only a part of the embodiment of the present invention, not all the embodiments. Based on the embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0046] Some embodiments of the present application will be described in detail below in conjunction with the accompanying drawings. In the absence of conflict, the following embodiments and features in the embodiments may be combined with each other.
[0047] See also Figure 1 , shows a flow chart of a method for monitoring the operation of a hydropower unit based on the AGC commissioning rate according to an embodiment of the present application.
[0048] like Figure 1 As shown, a method for monitoring the operation of a hydropower unit based on the AGC commissioning rate is shown, including steps S110 to S140.
[0049] Step S110, obtaining the grid-connection start time point and grid-connection end time point of the hydropower unit based on the grid-connection status and active power of the hydropower unit.
[0050] In some feasible embodiments, based on the above scheme, the step of obtaining the grid connection start time point and grid connection end time point of the hydropower unit based on the grid connection state and active power of the hydropower unit includes:
[0051] Reading the grid-connected state of the hydropower unit, and when the hydropower unit is in the grid-connected state, detecting the active power of the hydropower unit;
[0052] When the active power is greater than the first set value, the start time point of obtaining the hydropower unit is recorded;
[0053] When the active power is less than or equal to the first set value, the grid connection completion time point of the hydropower unit is recorded and obtained.
[0054] Continue to refer Figure 1 , step S120, obtaining the AGC operation time point and the AGC de-operation time point of the hydropower unit based on the AGC operation status of the hydropower unit.
[0055] In some feasible embodiments, based on the above scheme, obtaining the AGC commissioning time point and AGC decommissioning time point of the hydropower unit based on the AGC commissioning status of the hydropower unit includes:
[0056] Determine whether the hydropower unit is in the AGC operation state. If so, record and obtain the AGC operation time point of the hydropower unit. If not, record and obtain the AGC de-operation time point of the hydropower unit.
[0057] It is understandable that judging whether a hydropower unit is in operation can be achieved by confirming whether the hydropower unit is put into "southward diversion".
[0058] Continue to refer Figure 1 , step S130, calculating the AGC operation rate of the hydropower unit on the day / month based on the grid connection start time point, the grid connection end time point, the AGC operation time point and the AGC decommissioning time point.
[0059] It should be noted that the AGC operation rate of the day = (AGC decommissioning time of the day - AGC operation time of the day) / (grid-connected end time of the day - grid-connected start time of the day), among which the AGC decommissioning time of the day and the grid-connected end time of the day are calculated as 24:00 if they are later than 24:00 of the day; the AGC operation time of the day and the grid-connected start time of the day are calculated as 00:00 if they are earlier than 00:00 of the day; the AGC operation rate of the month is similarly compared between 00:00 of the first day of the natural month and 24:00 of the last day.
[0060] Continue to refer Figure 1 , step S140, monitoring the operating status of the hydropower unit based on the AGC operation rate of the hydropower unit.
[0061] In some feasible embodiments, based on the above scheme, monitoring the operating status of the hydropower unit based on the AGC commissioning rate of the hydropower unit includes:
[0062] When the AGC operation rate of the hydropower unit is less than or equal to the second set value, an alarm is issued to remind the staff to adjust the operation state of the hydropower unit;
[0063] When the AGC operation rate of the hydropower unit is greater than the second set value, the alarm is restored.
[0064] It is understandable that the second set value can be adjusted and determined according to the power grid assessment value.
[0065] It is understandable that after an alarm is issued, the alarm can also be reset manually.
[0066] Based on the same inventive concept, an embodiment of the present application also provides a hydropower plant operation monitoring method based on AGC commissioning rate.
[0067] For example, see Figure 2 , shows a flow chart of a method for monitoring the operation of a hydropower plant based on the AGC commissioning rate according to an embodiment of the present application.
[0068] like Figure 2 As shown, a method for monitoring the operation of a hydropower plant based on the AGC commissioning rate is shown, including steps S210 to S240.
[0069] Step S210, obtaining the grid connection start time point and grid connection end time point of the hydropower plant based on the number of hydropower units connected to the grid in the hydropower plant.
[0070] In some feasible embodiments, based on the above scheme, the obtaining of the grid connection start time point and grid connection end time point of the hydropower plant based on the number of hydropower units connected to the grid in the hydropower plant includes:
[0071] Detecting the number of hydropower units connected to the grid in the hydropower plant, and when the number of hydropower units connected to the grid in the hydropower plant is greater than or equal to a third set value, recording and obtaining the grid connection start time point of the hydropower plant;
[0072] When the number of grid-connected hydropower generating units of the hydropower plant is less than a third set value, the grid-connection completion time point of the hydropower plant is recorded and obtained.
[0073] Normally, the third set value is 1. When the number of hydropower generating units connected to the grid in the hydropower plant is greater than or equal to 1, the start time of the grid connection of the hydropower plant can be recorded. Otherwise, the end time of the grid connection of the hydropower plant is recorded.
[0074] It is understandable that for the AGC of a hydropower plant, as long as there are hydropower units connected to the grid, the AGC of the entire plant should be put into use. That is, when the number of hydropower units connected to the grid in the hydropower plant is greater than or equal to 1, the start time of the hydropower plant's grid connection can be calculated.
[0075] Continue to refer Figure 2 , step S220, obtaining the AGC operation time point and the AGC de-operation time point of the hydropower plant based on the AGC operation status of the hydropower plant.
[0076] In some feasible embodiments, based on the above solution, the obtaining of the AGC commissioning time point and the AGC decommissioning time point of the hydropower plant based on the AGC commissioning status of the hydropower plant includes:
[0077] Determine whether the hydropower plant is in the AGC operation state. If so, record and obtain the AGC operation time point of the hydropower plant. If not, record and obtain the AGC de-operation time point of the hydropower plant.
[0078] It is understandable that judging whether a hydropower plant is in operation can be achieved by confirming whether the hydropower plant is put into "southward diversion".
[0079] Continue to refer Figure 2 , step S230, calculating the AGC operation rate of the hydropower plant on the current day / month based on the grid connection start time point, the grid connection end time point, the AGC operation time point and the AGC decommissioning time point.
[0080] It can be understood that the calculation method of the AGC operation rate of the hydropower plant on the same day / month is the same as the calculation method of the AGC operation rate of the hydropower unit on the same day / month in the above embodiment.
[0081] Continue to refer Figure 2 , step S240, monitoring the operating status of the hydropower plant based on the AGC operation rate of the hydropower plant.
[0082] In some feasible embodiments, based on the above solution, monitoring the operating status of the hydropower plant based on the AGC commissioning rate of the hydropower plant includes:
[0083] When the AGC operation rate of the hydropower plant is less than or equal to a fourth set value, an alarm is issued to remind the staff to adjust the operation state of the hydropower plant;
[0084] When the AGC operation rate of the hydropower plant is greater than the fourth set value, the alarm is restored.
[0085] It is understandable that the fourth set value can be adjusted and determined according to the power grid assessment value.
[0086] It is understandable that after an alarm is issued, the alarm can also be reset manually.
[0087] To sum up, the embodiments of the present application provide a hydropower unit operation monitoring method based on the AGC operation rate and a hydropower plant operation monitoring method based on the AGC operation rate, which can automatically calculate the AGC operation rate. When the daily / monthly AGC operation rate is less than the alarm value, a real-time alarm function is realized to remind the operating personnel to adjust the equipment status in time to meet the daily / monthly AGC operation rate requirements.
[0088] like Figure 3 As shown, an embodiment of the present application also provides an electronic device 300, including a memory 310, a processor 320, and a computer program 311 stored in the memory 310 and executable on the processor. When the processor 320 executes the computer program 311, the steps of the above-mentioned method for monitoring the operation of a hydropower unit based on the AGC commissioning rate are implemented.
[0089] Since the electronic device introduced in this embodiment is a device used to implement a method for monitoring the operation of a hydropower unit based on the AGC commissioning rate in the embodiment of the present application, based on the method introduced in the embodiment of the present application, technical personnel in this field can understand the specific implementation mode of the electronic device of this embodiment and its various variations. Therefore, how the electronic device implements the method in the embodiment of the present application is not introduced in detail here. As long as the equipment used by technical personnel in this field to implement the method in the embodiment of the present application falls within the scope of protection of this application.
[0090] During the specific implementation process, when the computer program 311 is executed by a processor, any implementation method in the embodiments corresponding to the first aspect can be implemented.
[0091] Figure 4 A schematic diagram of the structure of a computer system suitable for implementing an electronic device of an embodiment of the present application is shown.
[0092] It should be noted that Figure 4 The computer system 400 of the electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.
[0093] like Figure 4 As shown, the computer system 400 includes a central processing unit (CPU) 401, which can perform various appropriate actions and processes according to the program stored in the read-only memory (ROM) 402 or the program loaded from the storage part 408 to the random access memory (RAM) 403, such as executing the method described in the above embodiment. In the RAM 403, various programs and data required for system operation are also stored. The CPU 401, ROM 402 and RAM 403 are connected to each other through a bus 404. An input / output (I / O) interface 405 is also connected to the bus 404.
[0094] The following components are connected to the I / O interface 405: an input section 406 including a keyboard, a mouse, etc.; an output section 407 including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker, etc.; a storage section 408 including a hard disk, etc.; and a communication section 409 including a network interface card such as a LAN (Local Area Network) card, a modem, etc. The communication section 409 performs communication processing via a network such as the Internet. A drive 410 is also connected to the I / O interface 405 as needed. A removable medium 411, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 410 as needed so that a computer program read therefrom is installed into the storage section 408 as needed.
[0095] In particular, according to an embodiment of the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, an embodiment of the present application includes a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication section 409, and / or installed from a removable medium 411. When the computer program is executed by a central processing unit (CPU) 401, various functions defined in the system of the present application are executed.
[0096] It should be noted that the computer-readable medium shown in the embodiment of the present application may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, - but not limited to - an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM), a flash memory, an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present application, a computer-readable storage medium may be any tangible medium containing or storing a program, which may be used by an instruction execution system, device or device or used in combination with it. In the present application, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, wherein a computer-readable program code is carried. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than computer-readable storage media, which may send, propagate, or transmit programs for use by or in conjunction with an instruction execution system, apparatus, or device. The program code contained on the computer-readable medium may be transmitted using any appropriate medium, including but not limited to: wireless, wired, etc., or any suitable combination of the above.
[0097] The flowchart and block diagram in the accompanying drawings illustrate the possible architecture, functions and operations of the system, method and computer program product according to various embodiments of the present application. Wherein, each box in the flowchart or block diagram can represent a module, a program segment, or a part of the code, and the above-mentioned module, program segment, or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram or flowchart, and the combination of boxes in the block diagram or flowchart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.
[0098] The units involved in the embodiments described in this application may be implemented by software or hardware, and the units described may also be set in a processor. The names of these units do not, in some cases, constitute limitations on the units themselves.
[0099] As another aspect, the present application further provides a computer program product or a computer program, the computer program product or the computer program including computer instructions, the computer instructions being stored in a computer-readable storage medium. A processor of a computer device reads the computer instructions from the computer-readable storage medium, and the processor executes the computer instructions, so that the computer device executes a method for monitoring the operation of a hydropower unit based on the AGC commissioning rate described in the above embodiment.
[0100] As another aspect, the present application also provides a computer-readable medium, which may be included in the electronic device described in the above embodiment; or may exist independently without being assembled into the electronic device. The above computer-readable medium carries one or more programs, and when the above one or more programs are executed by an electronic device, the electronic device implements a method for monitoring the operation of a hydropower unit based on the AGC commissioning rate described in the above embodiment.
[0101] It should be noted that, although several modules or units of the equipment for action execution are mentioned in the above detailed description, this division is not mandatory. In fact, according to the embodiments of the present application, the features and functions of two or more modules or units described above can be embodied in one module or unit. On the contrary, the features and functions of one module or unit described above can be further divided into being embodied by multiple modules or units.
[0102] Through the description of the above implementation methods, it is easy for those skilled in the art to understand that the example implementation methods described here can be implemented by software or by combining software with necessary hardware. Therefore, the technical solution according to the implementation methods of the present application can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.) or on a network, and includes several instructions to enable a computing device (which can be a personal computer, a server, a touch terminal, or a network device, etc.) to execute the method according to the implementation methods of the present application.
[0103] Those skilled in the art will readily appreciate other embodiments of the present application after considering the specification and practicing the embodiments disclosed herein. The present application is intended to cover any variations, uses or adaptations of the present application, which follow the general principles of the present application and include common knowledge or customary techniques in the art that are not disclosed in the present application. It should be understood that the present application is not limited to the precise structures described above and shown in the accompanying drawings, and various modifications and changes can be made without departing from the scope thereof. The scope of the present application is limited only by the appended claims.
Claims
1. A method for monitoring the operation of a hydropower unit based on AGC commissioning rate, characterized in that: include: Obtaining the grid connection start time and grid connection end time of the hydropower unit based on the grid connection status and active power of the hydropower unit; Obtain the AGC commissioning time point and AGC decommissioning time point of the hydropower unit based on the AGC commissioning status of the hydropower unit; Calculate the AGC operation rate of the hydropower unit on the day / month based on the grid connection start time point, the grid connection end time point, the AGC operation time point and the AGC decommissioning time point; The operating status of the hydropower unit is monitored based on the AGC operation rate of the hydropower unit.
2. The method according to claim 1, characterized in that The obtaining of the grid connection start time point and the grid connection end time point of the hydropower generating unit based on the grid connection state and active power of the hydropower generating unit includes: reading the grid-connected state of the hydroelectric generator set, and detecting the active power of the hydroelectric generator set when the hydroelectric generator set is in the grid-connected state; When the active power is greater than a first set value, the start time point of obtaining the hydropower unit is recorded; When the active power is less than or equal to the first set value, the grid connection completion time point of the hydropower unit is recorded and obtained.
3. The method according to claim 1, characterized in that The obtaining of the AGC commissioning time point and the AGC decommissioning time point of the hydropower unit based on the AGC commissioning status of the hydropower unit includes: Determine whether the hydropower unit is in the AGC operation state. If so, record and obtain the AGC operation time point of the hydropower unit. If not, record and obtain the AGC de-operation time point of the hydropower unit.
4. The method according to claim 1, wherein The monitoring of the operating status of the hydropower unit based on the AGC operation rate of the hydropower unit includes: When the AGC operation rate of the hydropower unit is less than or equal to a second set value, an alarm is issued to remind staff to adjust the operating state of the hydropower unit; When the AGC operation rate of the hydropower unit is greater than the second set value, the alarm is reset.
5. A hydropower plant operation monitoring method based on AGC commissioning rate, characterized in that: include: Obtain the grid connection start time and grid connection end time of the hydropower plant based on the number of hydropower units connected to the grid in the hydropower plant; Based on the AGC operation status of the hydropower plant, the AGC operation time point and AGC de-operation time point of the hydropower plant are obtained; Calculate the AGC operation rate of the hydropower plant on the current day / month based on the grid connection start time point, the grid connection end time point, the AGC operation time point, and the AGC decommissioning time point; An operating status of the hydropower plant is monitored based on the AGC operation rate of the hydropower plant.
6. The method according to claim 5, characterized in that The obtaining of the grid connection start time point and the grid connection end time point of the hydropower plant based on the number of hydropower units connected to the grid in the hydropower plant includes: Detecting the number of hydropower generating units connected to the grid in the hydropower plant, and when the number of hydropower generating units connected to the grid in the hydropower plant is greater than or equal to a third set value, recording and obtaining a grid connection start time point for the hydropower plant; When the number of grid-connected hydropower generating units of the hydropower plant is less than a third set value, a grid-connection completion time point of the hydropower plant is recorded and obtained.
7. The method according to claim 5, characterized in that The obtaining of the AGC commissioning time point and the AGC decommissioning time point of the hydropower plant based on the AGC commissioning status of the hydropower plant includes: Determine whether the hydropower plant is in an AGC operation state. If so, record and obtain the AGC operation time point of the hydropower plant. If not, record and obtain the AGC de-operation time point of the hydropower plant.
8. The method according to claim 5, characterized in that The monitoring of the operating status of the hydropower plant based on the AGC operation rate of the hydropower plant includes: When the AGC operation rate of the hydropower plant is less than or equal to a fourth set value, an alarm is issued to remind staff to adjust the operation status of the hydropower plant; When the AGC operation rate of the hydropower plant is greater than a fourth set value, the alarm is reset.
