Turn-back method and system for operating train entering vehicle depot

By setting the destination code in the reversing track and performing the reversing operation according to the plan, the problem of branch trains being unable to reversing is solved, and automatic reversing and switching operations in the depot are realized, ensuring the normality of train operations and the matching of plan .

CN118977756APending Publication Date: 2024-11-19CRSC URBAN RAIL TRANSIT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411040860.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

In rail transit, when the branch line lacks a turn-back scenario, the train cannot complete the turn-back and switch-back operation normally, affecting the operation of the main train.

Method used

Set the destination code for the rewind rail in the rewind rail, obtain the destination code for the rewind rail according to the upward or downward plan of the day, and perform the rewind operation, including changing it to a headcode car and matching the new plan, ensuring that the train automatically triggers the rewind in the depot and switch.

Benefits of technology

It realizes automatic reversal and replacement of trains in the depot, avoiding the problem of unreversal of branch lines and ensuring the normality of train operations and the matching of plan.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118977756A_ABST
    Figure CN118977756A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of train turn-back, and particularly relates to a turn-back method and system for an operating train entering a depot. The method comprises the following steps: setting a turn-back rail destination code in a turn-back rail; driving the planned vehicle according to the current-day uplink plan, and when the planned vehicle is driven to the current-day uplink plan terminal station, acquiring a turn-back rail destination code of the current plan by the planned vehicle; and determining the destination according to the destination code of the turn-back rail, and executing the turn-back operation action of the planned vehicle. According to the method, the problem that the branch line cannot turn back is effectively solved, normal turn-back end changing operation of the branch line train can be met, and a plan can be matched in a section or a main line small platform according to the actual situation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of train reversal, and in particular relates to a method and system for reversing an operating train entering a vehicle depot. Background Art

[0002] As a public transportation system in metropolitan areas, urban rail transit has become an indispensable means of transportation in modern cities with its strong carrying capacity and convenient ride. Rail transit has strong organizational coordination and has made significant contributions to the mobility of urban people and the reduction of urban carbon emissions. Rail transit is generally divided according to lines. According to the established routes of different lines, morning and evening peaks, etc., the number of trains to be put into operation is arranged in advance, and the travel plan of each train is determined. The vehicles match different train numbers for each train according to the pre-arranged operation plan to support the operation on the same day.

[0003] Each train runs along the entire or part of the line according to the matching train number (number) plan and the route specified in the plan. During the train running, the front end of the train in the direction of travel is the train activation end. When the train reaches the terminal station of the current plan, the train completes the end change operation and completes the new plan matching at the designated location (return track). The train starts the next round of route according to the new plan. Figure 1 shown.

[0004] Therefore, when planning the line, it is necessary to fully consider the train operation mode and reasonably set the storage track, platform track, small platform and return track according to the actual operation situation. Generally, the return track is set at the terminal return station and an intermediate station, and runs from the up (down) to the down (up) return track through the turnout, completing the end change and starting a new round of planning.

[0005] At present, the reversals on various lines are generally divided into reversals before the station (the platform track is used as the reversing track) and reversals after the station (crossing the current platform to the reversing track). Both require switches to be set in front of the reversing track to match the change in operating direction with the new plan after the reversal.

[0006] When the branch line lacks a turnaround scenario, the train cannot complete the turnaround and end-changing operation normally, such as Figure 2 As shown in the figure, when the train with the train number 00111026 needs to switch from the branch line down to the branch line up to complete the reversal and end-changing operation, according to the scenario in the figure, the train needs to follow the operating direction (from ① to ⑨ in order), respectively at the (down) small platform, (up) main line platform, complete the reversal and end-changing, and then run to the (up) small platform to complete the reversal and end-changing before continuing the branch line up operation. During the main line reversal process (⑤, ⑥), the main line train operation will be greatly affected. Summary of the invention

[0007] In view of the above problems, the present disclosure provides a method for an operating train to enter a vehicle depot and turn around, the method comprising:

[0008] Setting a destination code of the reentry track in the reentry track;

[0009] The planned train is driven according to the up-travel plan for the day, and when the planned train reaches the terminal station of the up-travel plan for the day, the planned train obtains the return track destination code of the plan;

[0010] The destination is determined according to the reversing track destination code, and the planned reversing operation of the vehicle is executed.

[0011] Preferably, the destination is determined according to the reversing track destination code, and the reversing operation of the planned vehicle is executed, including:

[0012] The planned vehicle is changed to the first-hand vehicle according to the destination code of the reentry rail, and the reentry rail corresponding to the destination code of the reentry rail is used as the destination to run the first-hand vehicle to realize the reentry.

[0013] Preferably, the destination is determined according to the reversing track destination code, and the reversing operation of the planned vehicle is executed, including:

[0014] The reentry track corresponding to the reentry track destination code is taken as the destination, and the planned vehicle is operated to realize the reentry.

[0015] Preferably, after the reversing track corresponding to the reversing track destination code is used as the destination to run the head yard vehicle to realize reversing, the method includes:

[0016] Update the downlink destination code of the first wharf vehicle and run it. When the first wharf vehicle reaches the starting point of the downlink plan for the day, it will automatically match the downlink plan for the day;

[0017] The first car will be changed to a planned car according to the downlink plan for the day.

[0018] Preferably, the reentry track corresponding to the reentry track destination code is used as the destination, and after the planned vehicle is operated to realize reentry, the following steps are included:

[0019] When the first wharf vehicle reaches the starting point of the day's downline plan, it automatically matches the day's downline plan;

[0020] The scheduled train will be operated according to the downlink plan of the day.

[0021] Preferably, before operating the planned vehicle according to the downlink plan of the day, the method includes:

[0022] Compare the actual plan of the planned vehicle with the downline plan of the day to obtain the time deviation;

[0023] Passengers will be informed of time deviations through the broadcast and information systems.

[0024] Preferably, the switchback rail is arranged in a vehicle depot.

[0025] The present disclosure also proposes a system for operating trains entering a vehicle depot and returning thereto, the system comprising:

[0026] A setting module, used for setting a reentry track destination code in the reentry track;

[0027] The acquisition module is used to drive the planned vehicle according to the up-travel plan of the day, and when the planned vehicle drives to the terminal station of the up-travel plan of the day, the planned vehicle obtains the return track destination code of this plan;

[0028] The reversing module is used to determine the destination according to the reversing track destination code and execute the reversing operation of the planned vehicle.

[0029] Preferably, the reversing module is used to determine the destination according to the reversing track destination code and execute the reversing operation of the planned vehicle, including:

[0030] The reentry module is used to change the planned vehicle to the head-end vehicle according to the reentry rail destination code, and use the reentry rail corresponding to the reentry rail destination code as the destination to run the head-end vehicle to realize reentry.

[0031] Preferably, the reversing module is used to determine the destination according to the reversing track destination code and execute the reversing operation of the planned vehicle, including:

[0032] The reentry module is used to take the reentry track corresponding to the reentry track destination code as the destination and run the planned vehicle to realize the reentry.

[0033] Preferably, after the reversing track corresponding to the reversing track destination code is used as the destination to run the head yard vehicle to realize reversing, the method includes:

[0034] Update the downlink destination code of the first wharf vehicle and run it. When the first wharf vehicle reaches the starting point of the downlink plan for the day, it will automatically match the downlink plan for the day;

[0035] The first car will be changed to a planned car according to the downlink plan for the day.

[0036] Preferably, the reentry track corresponding to the reentry track destination code is used as the destination, and after the planned vehicle is operated to realize reentry, the following steps are included:

[0037] When the first wharf vehicle reaches the starting point of the day's downline plan, it automatically matches the day's downline plan;

[0038] The scheduled train will be operated according to the downlink plan of the day.

[0039] The present disclosure has the following beneficial effects:

[0040] (1) The vehicle depot in the present disclosure has an automatic train route triggering function, and according to the daily plan information, for the trains that are determined to turn around, the planned car / head car turns around and matches the exit plan / head car;

[0041] (2) The train depot in the present disclosure is equipped with a reversing rail after the station, and during the reversing operation, the reversing rail after the station must keep the switch in position to prevent the train from reversing sideways at the switch; when triggering the route to the destination of the reversing rail, in the route file, ensure that the switch remains in position, otherwise the route arrangement will not be performed;

[0042] (3) The present disclosure effectively avoids the problem of branch line being unable to turn back, can meet the normal turning back and changing ends operation of branch line trains, and can match the plan within the section or at a small platform on the main line according to the actual situation.

[0043] Other features and advantages of the present disclosure will be described in the following description, and partly become apparent from the description, or be understood by implementing the present disclosure. The purpose and other advantages of the present disclosure can be realized and obtained by the structures indicated in the description and the drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] In order to more clearly illustrate the embodiments of the present disclosure or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0045] Figure 1 The schematic diagram of the existing positive line return is shown;

[0046] Figure 2 A schematic diagram of an existing branch line interface station is shown;

[0047] Figure 3 A diagram showing a method for an operating train to enter a vehicle depot and turn around according to the present disclosure;

[0048] Figure 4 A schematic diagram of the head wharf vehicle entering the stage and turning back according to an embodiment of the present disclosure is shown;

[0049] Figure 5 A schematic diagram showing a planned vehicle entry and return according to an embodiment of the present disclosure is shown;

[0050] Figure 6 A diagram showing a turnaround plan according to an embodiment of the present disclosure is shown;

[0051] Figure 7 A diagram showing a turnaround system for an operating train entering a vehicle depot according to an embodiment of the present disclosure is shown;

[0052] Figure 8 A diagram showing the turnaround equipment for an operating train entering a vehicle depot according to an embodiment of the present disclosure is shown. DETAILED DESCRIPTION

[0053] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in a variety of forms and should not be construed as being limited to the examples set forth herein; on the contrary, these embodiments are provided so that the present disclosure will be more comprehensive and complete, and the concepts of the example embodiments are fully conveyed to those skilled in the art. The described features, structures, or characteristics may be combined in one or more embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present disclosure. However, those skilled in the art will appreciate that the technical solutions of the present disclosure may be practiced while omitting one or more of the specific details, or other methods, components, devices, steps, etc. may be adopted. In other cases, known technical solutions are not shown or described in detail to avoid obscuring various aspects of the present disclosure.

[0054] In addition, the accompanying drawings are only schematic illustrations of the present disclosure and are not necessarily drawn to scale. The same reference numerals in the figures represent the same or similar parts, and thus their repeated description will be omitted. Some of the block diagrams shown in the accompanying drawings are functional entities and do not necessarily correspond to physically or logically independent entities. These functional entities can be implemented in software form, or implemented in one or more hardware units or integrated circuits, or implemented in different networks and / or processor devices and / or microcontroller devices.

[0055] The flowcharts shown in the accompanying drawings are only exemplary and do not necessarily include all the steps. For example, some steps may be decomposed, while some steps may be combined or partially combined, so the actual execution order may change according to the actual situation.

[0056] The terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the terms used in this way can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein, for example.

[0057] In addition, the terms "include" and "have" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product, or apparatus comprising a series of steps or sub-modules is not necessarily limited to those steps or sub-modules explicitly listed, but may include other steps or sub-modules not explicitly listed or inherent to these processes, methods, products, or apparatuses.

[0058] This disclosure is intended to address the situation in which, in rail transit operation scenarios, the mainline station cannot turn around, and the vehicle depot is needed to complete the turnaround and end-changing operations and implement a new operation plan.

[0059] like Figure 3 As shown, the present disclosure proposes a method for an operating train to enter a vehicle depot and turn around, the method comprising:

[0060] Setting a destination code of the reentry track in the reentry track;

[0061] The planned train is driven according to the up-travel plan for the day, and when the planned train reaches the terminal station of the up-travel plan for the day, the planned train obtains the return track destination code of the plan;

[0062] The destination is determined according to the reversing track destination code, and the planned reversing operation of the vehicle is executed.

[0063] Specifically, the destination is determined according to the reversing track destination code, and the reversing operation of the planned vehicle is executed, including:

[0064] The planned vehicle is changed to the first-hand vehicle according to the destination code of the reentry rail, and the reentry rail corresponding to the destination code of the reentry rail is used as the destination to run the first-hand vehicle to realize the reentry.

[0065] Specifically, the destination is determined according to the reversing track destination code, and the reversing operation of the planned vehicle is executed, including:

[0066] The reentry track corresponding to the reentry track destination code is taken as the destination, and the planned vehicle is operated to realize the reentry.

[0067] Specifically, after the reversing track corresponding to the reversing track destination code is used as the destination to run the head vehicle to realize reversing, it includes:

[0068] Update the downlink destination code of the first wharf vehicle and run it. When the first wharf vehicle reaches the starting point of the downlink plan for the day, it will automatically match the downlink plan for the day;

[0069] The first car will be changed to a planned car according to the downlink plan for the day.

[0070] Specifically, the reentry track corresponding to the reentry track destination code is used as the destination, and after the planned vehicle is operated to realize reentry, the following steps are included:

[0071] When the first wharf vehicle reaches the starting point of the day's downline plan, it automatically matches the day's downline plan;

[0072] The scheduled train will be operated according to the downlink plan of the day.

[0073] Specifically, before the planned vehicle is operated according to the downlink plan of the day, the following steps are included:

[0074] Compare the actual plan of the planned vehicle with the downline plan of the day to obtain the time deviation;

[0075] Passengers will be informed of time deviations through the broadcast and information systems.

[0076] Specifically, the return rail is arranged in a vehicle depot.

[0077] When a train enters the depot to complete the reversing and switching operation, the depot needs to include an automatic train route triggering function. Therefore, the depot needs to be upgraded to an automated depot (a non-automated depot does not have the train route and automatic triggering functions), and the turnout section needs to be opened as a reversing track to meet the reversing and switching requirements. The reversing and switching operation can be completed through the following two solutions.

[0078] Solution 1: If Figure 4 As shown, the train enters the vehicle depot and automatically triggers the route according to the destination, so that the head car can drive to the reversing track. After the end change is completed, the exit head car is matched, and the exit route is automatically triggered, and the train runs to the main line.

[0079] The specific process of Scheme 1 is as follows:

[0080] (1) Set up a return track in the depot and set a unique destination code for the line (such as Figure 4 The destination code is used as the destination of the head car when it leaves the depot, so that the return train can find the return track and use it as the destination to automatically trigger the route.

[0081] (2) The cartographer draws the plan for the day and uses the small platform as the end point of the turnaround plan. The train plans before and after entering the depot are manually confirmed and spliced ​​together, so that the planned train before entering the depot (small platform) is changed to the head train, and the head train after leaving the depot (small platform) is automatically matched with the planned train;

[0082] (3) If the train matches the daily schedule and needs to run to the up (down) small platform, the train number will be automatically updated to the destination of the down (up) return track in the depot after the train stops steadily at the up (down) small platform. The train route from the up (down) small platform to the down (up) return track will be automatically triggered in the form of the first wharf car.

[0083] (4) After the train runs to the down (up) return track of the depot, the driver completes the end change operation, and the train number is automatically matched to the head code from the depot to the down (up) small platform, and the down (up) return track to the down (up) small platform is automatically triggered;

[0084] (5) When the train reaches a small platform, it automatically matches the new plan connected to the previous plan (the plan for the day that has been drawn up by the cartographer) and starts operating according to the new plan.

[0085] In this scheme, when the train travels from the small platform to the reversing track, it can adopt the straight-in and side-out method or the side-in and straight-out method according to the actual situation.

[0086] Embodiment of Scheme 1

[0087] like Figure 6 As shown, (1) the train depot sets the turnout section (17-21DG, length 150 meters) as the return track, and sets the unique destination code AA for this line for the return track;

[0088] (2) When the scheduled train (train number 00111026) travels along the branch line to the depot and turns back, passes through the Chongguang platform, and stops at the up / down small platform, the scheduled train (train number 00111026) is changed to the first terminal train (001AA);

[0089] (3) The first wharf car (001AA) automatically triggers the entry route, drives to the return track AA, completes the end change operation on board, drives to the down / up small platform through the exit wharf, and receives the plan (train number 00122031);

[0090] Solution 2: If Figure 5 As shown, the small platform (conversion rail) is used as the depot platform, the turnaround area in the depot is set as the turnaround rail, the depot is changed to an automated depot, the train passes through the mainline train, travels to the depot turnaround rail, and matches the depot plan, and then is put into operation according to the new operation plan.

[0091] The specific process of Solution 2 is as follows:

[0092] (1) The setting of the destination code is the same as that in Solution 1;

[0093] (2) The small platform is used as the platform track of the vehicle depot. The train updates the actual track map information here. When leaving the depot, the passenger information system and the broadcasting system are informed of the deviation between the actual track map and the planned map to inform passengers that the train is about to enter the station;

[0094] (3) The in-segment return rail is used as the post-station return rail of the vehicle depot for the planned vehicle to return when entering the depot;

[0095] (4) If the planned destination is the reversing track behind the depot station, when the train reaches the small platform, the train route from the small platform to the reversing track is automatically triggered according to the planned destination. The train runs to the reversing track behind the station as a planned train, completes the reversal and changes ends, and automatically matches the plan after the reversal;

[0096] (5) After the train matches the reversal plan, a new round of operations will be carried out according to the new plan.

[0097] Example of Scheme 2

[0098] like Figure 6 As shown, (1) the train depot sets the turnout section (17-21DG, length 150 meters) as the return track, and sets the unique destination code AA for this line for the return track;

[0099] (2) When the planned train (train number 00111026) travels along the branch line to the depot and turns back, passes through the Chongguang platform, passes through the up / down small platform, and arrives at the depot turnaround track, the planned train (train number 00111026) is changed to the post-turnaround planned train (00122031);

[0100] (3) The train completes the end-changing operation and automatically triggers the exit route according to the planned train (00122031) information, passes the down / up small platform, runs to the down / up platform track, and starts the operation of this plan;

[0101] like Figure 7 As shown, the present disclosure also proposes a system for operating trains entering a vehicle depot and returning, the system comprising

[0102] A setting module, used for setting a reentry track destination code in the reentry track;

[0103] The acquisition module is used to drive the planned vehicle according to the up-travel plan of the day, and when the planned vehicle drives to the terminal station of the up-travel plan of the day, the planned vehicle obtains the return track destination code of this plan;

[0104] The reversing module is used to determine the destination according to the reversing track destination code and execute the reversing operation of the planned vehicle.

[0105] like Figure 8 As shown, corresponding to the above-mentioned method for an operating train to enter a vehicle depot and turn around, the present disclosure also provides a device for an operating train to enter a vehicle depot and turn around. Since the embodiment of the device is similar to the above-mentioned method embodiment, the description is relatively simple. For relevant matters, please refer to the description of the above-mentioned method embodiment. The device described below is only schematic. The device may include: a processor 1, a memory 2, a communication bus (i.e., the above-mentioned device bus) and a search engine, wherein the processor 1 and the memory 2 communicate with each other through the communication bus and communicate with the outside through the communication interface. The processor 1 can call the logic instructions in the memory 2 to execute the method for an operating train to enter a vehicle depot and turn around.

[0106] In addition, the logic instructions in the above-mentioned memory 2 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on such an understanding, the technical solution of the present disclosure is essentially or the part that contributes to the prior art or the part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present disclosure. The aforementioned storage medium includes: a storage chip, a U disk, a mobile hard disk, a read-only memory (ROM, Read-Only Memory), a random access memory (RAM, Random Access Memory), a disk or an optical disk, and other media that can store program codes.

[0107] On the other hand, an embodiment of the present disclosure further provides a processor-readable storage medium, on which a computer program 3 is stored. When the computer program 3 is executed by the processor 1, it is implemented to execute the method for an operating train to enter a vehicle depot and return provided in the above-mentioned embodiments.

[0108] The processor-readable storage medium can be any available medium or data storage device that can be accessed by the processor 1, including but not limited to magnetic storage (such as floppy disks, hard disks, magnetic tapes, magneto-optical disks (MO), etc.), optical storage (such as CD, DVD, BD, HVD, etc.), and semiconductor storage (such as ROM, EPROM, EEPROM, non-volatile memory (NANDFLASH), solid-state drive (SSD)), etc.

[0109] Those skilled in the art should understand that although the present disclosure is described in detail with reference to the aforementioned embodiments, it is still possible to modify the technical solutions recorded in the aforementioned embodiments, or to make equivalent replacements for some of the technical features therein; and these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the spirit and scope of the technical solutions of the embodiments of the present disclosure.

Claims

1. A method for turning back when an operating train enters a vehicle depot. It is characterized in that The method comprises: Setting a reentry track destination code in the reentry track; The planned train is driven according to the up-travel plan for the day, and when the planned train reaches the terminal station of the up-travel plan for the day, the planned train obtains the return track destination code of the plan; The destination is determined according to the reversing track destination code, and the planned reversing operation of the vehicle is executed.

2. The method for turning back when an operating train enters a vehicle depot according to claim 1, It is characterized in that Determine the destination according to the reversing track destination code and execute the planned reversing operation of the vehicle, including: The planned vehicle is changed to the first-hand vehicle according to the destination code of the reentry rail, and the reentry rail corresponding to the destination code of the reentry rail is used as the destination to run the first-hand vehicle to realize the reentry.

3. The method for turning back when an operating train enters a vehicle depot according to claim 1, It is characterized in that Determine the destination according to the reversing track destination code and execute the planned reversing operation of the vehicle, including: The reentry track corresponding to the reentry track destination code is taken as the destination, and the planned vehicle is operated to realize the reentry.

4. The method for turning back when an operating train enters a vehicle depot according to claim 2, It is characterized in that After the turnaround track corresponding to the turnaround track destination yard is used as the destination to run the head wharf vehicle to realize the turnaround, it includes: Update the downlink destination code of the first wharf vehicle and run it. When the first wharf vehicle reaches the starting point of the downlink plan for the day, it will automatically match the downlink plan for the day; The first car will be changed to a planned car according to the downlink plan for the day.

5. The method for turning back when an operating train enters a vehicle depot according to claim 3, It is characterized in that The reversing track corresponding to the reversing track destination code is used as the destination. After the planned vehicle is operated to realize reversing, the following steps are included: When the first wharf vehicle reaches the starting point of the day's downline plan, it automatically matches the day's downline plan; The scheduled train will be operated according to the downlink plan of the day.

6. The method for turning back when an operating train enters a vehicle depot according to claim 5, It is characterized in that Before the planned vehicle is operated according to the downlink plan of the day, the following steps are included: Compare the actual plan of the planned vehicle with the downline plan of the day to obtain the time deviation; Passengers will be informed of time deviations through the broadcast and information systems.

7. The method for turning back when an operating train enters a vehicle depot according to claim 1, It is characterized in that The return rail is arranged in the vehicle section.

8. A system for turning back the train when it enters the depot. It is characterized in that The system comprises A setting module, used for setting a reentry track destination code in the reentry track; The acquisition module is used to drive the planned vehicle according to the up-travel plan of the day, and when the planned vehicle drives to the terminal station of the up-travel plan of the day, the planned vehicle obtains the return track destination code of this plan; The reversing module is used to determine the destination according to the reversing track destination code and execute the reversing operation of the planned vehicle.

9. The system for turning back a train entering a vehicle depot according to claim 8, It is characterized in that The reversing module is used to determine the destination according to the reversing track destination code and execute the reversing operation of the planned vehicle, including: The reentry module is used to change the planned vehicle to the head-end vehicle according to the reentry rail destination code, and use the reentry rail corresponding to the reentry rail destination code as the destination to run the head-end vehicle to realize reentry.

10. The system for turning back a train entering a vehicle depot according to claim 8, It is characterized in that The reversing module is used to determine the destination according to the reversing track destination code and execute the reversing operation of the planned vehicle, including: The reentry module is used to take the reentry track corresponding to the reentry track destination code as the destination and run the planned vehicle to realize the reentry.

11. The system for turning back a train entering a vehicle depot according to claim 8, It is characterized in that After the turnaround track corresponding to the turnaround track destination yard is used as the destination to run the head wharf vehicle to realize the turnaround, it includes: Update the downlink destination code of the first wharf vehicle and run it. When the first wharf vehicle reaches the starting point of the downlink plan for the day, it will automatically match the downlink plan for the day; The first car will be changed to a planned car according to the downlink plan for the day.

12. The system for turning back a train entering a vehicle depot according to claim 8, It is characterized in that The reversing track corresponding to the reversing track destination code is used as the destination. After the planned vehicle is operated to realize reversing, the following steps are included: When the first wharf vehicle reaches the starting point of the day's downline plan, it automatically matches the day's downline plan; The scheduled train will be operated according to the downlink plan of the day.