Low-overload control method for gas-fired launch canister of small unmanned aerial vehicle

Through the multi-stage gas generator grading ignition and precise control ignition interval technology, the problem of large overload of gas-type transmitters of small drones is solved, and the maximum overload is reduced while ensuring the discharge speed, reducing unmanned aircraft design and production costs and improve flight performance.

CN118977874APending Publication Date: 2024-11-19XIAN KEWEI IND DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411315790.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The launch overload of the gas-fired launch cylinder of a small drone is large, resulting in the drone having high overload resistance, which increases the design difficulty and production cost, and affects flight performance.

Method used

The multi-stage gas generator grading ignition and precise control ignition interval technology are used to adjust the ignition interval time through theoretical calculation and experiment to reduce the maximum launch overload of the drone.

Benefits of technology

On the premise of ensuring the discharge speed, the maximum emission overload is effectively reduced by 30% to 50%, reducing structural weight and design difficulty, reducing the design and production requirements of gas generators, improving flight performance and reducing costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118977874A_ABST
    Figure CN118977874A_ABST
Patent Text Reader

Abstract

The invention provides a low-overload control method for a gas type launch canister of a small unmanned aerial vehicle. The low-overload control method comprises the steps that multiple stages of gas generators are arranged on the launch canister and connected with a circuit; and multi-stage ignition is realized at a preset time interval. The preset interval time is determined as follows: analyzing the stress of the adapter to obtain a state equation; initial ignition interval time is selected, and a time-emission overload and speed curve under the interval time is obtained; judging whether the launching overload and the speed meet the requirements or not through theoretical calculation, and if not, adjusting the ignition interval time according to the preset ignition interval time adjustment precision; actual overload and speed data are obtained through a launching test; actual overload and speed data are compared with theoretical overload and speed data, and expected ignition interval time is corrected; and the process is repeated, and the reasonable ignition interval time covering all the working conditions is determined. Launching overload of the gas type launching canister of the small unmanned aerial vehicle can be greatly reduced, the design and production cost of the unmanned aerial vehicle is effectively reduced, and the product performance of the unmanned aerial vehicle is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of unmanned aerial vehicle (UAV) gas cylinder launch control, and in particular relates to a control method for low launch overload of a small UAV gas-type launch cylinder. Background Art

[0002] The gas-fired launch tube is a device used to launch small folding fixed-wing UAVs. Its principle is to generate instantaneous high-temperature gas when the gas generator is working, which drives the UAV to accelerate in the launch tube and reach the initial speed required for the UAV to take off. At present, small UAV gas-fired launch tubes all use a single gas generator. In order to ensure a certain take-off speed and reduce the size and weight of the launch tube, the maximum overload of the launch is generally between 150g and 200g. This requires the UAV body structure and equipment to have a high overload resistance. The weight of the body structure increases, and the requirements for materials and components are high, which makes the design of the UAV more difficult, the production cost increases, and the flight performance is affected to a certain extent. In addition, the design and production of the gas generator is difficult, and it is difficult to achieve a smooth overload curve during the launch process. Summary of the invention

[0003] The purpose of the present invention is to solve the problem that the current UAV gas-fired launch tube has a large launch overload, which leads to high requirements for the UAV's anti-overload capability. A low-overload control method for a UAV gas-fired launch tube is provided. Through the staged ignition of a multi-stage gas generator and the precise control of the ignition interval, the maximum launch overload of the UAV can be effectively reduced while ensuring a certain launch speed of the UAV, thereby reducing the design difficulty and production cost of the UAV, reducing the structural weight, improving the flight performance, and reducing the design and production requirements for the gas generator, facilitating rapid adjustment and reducing costs.

[0004] To achieve the above purpose, the technical solution provided by the present invention is:

[0005] A low overload control method for a small UAV gas-fired launch tube comprises the following steps:

[0006] Step 1, arranging a multi-stage gas generator on a gas-fired launch tube and connecting its circuit;

[0007] Step 2, after receiving the ignition command, the multi-stage gas generators are ignited in stages at preset intervals, and the next-stage gas generator is ignited after the preset interval after the ignition of the previous-stage gas generator. The preset interval is determined according to the following algorithm:

[0008] Step 2.1, perform force analysis on the adapter used to move in the launch tube under the action of the high-pressure gas generated by the gas generator, and obtain the state equation:

[0009]

[0010] Where m1 is the total weight of the adapter and the drone, f1 is the thrust of the low-pressure chamber gas on the adapter, f2 is the external atmospheric pressure force, f3 is the friction between the adapter and the drone and the launch tube, S c is the cross-sectional area of ​​the cylinder, P1 is the gas pressure in the closed chamber at different times, calculated according to the following formula:

[0011]

[0012] Where m is the burning mass of the charge, n g is the number of moles of gas produced by the combustion of 1 kg of charge, R is the gas constant, T c is the gas temperature, P ig is the ignition pressure, V ci is the initial volume of the low-pressure chamber, S1 is the adapter area, X is the adapter stroke, ρ is the charge density, t is the burning time, r is the charge burning speed, A b is the burning area of ​​the charge, α is the burning rate coefficient, and n is the combustion pressure index of the charge;

[0013] Step 2.2, selecting the initial ignition interval time, and obtaining the time-launch overload curve and the time-launch speed curve under the initial ignition interval time according to the established state equation;

[0014] Step 2.3, determining whether the launch overload and the launch speed meet the requirements through theoretical calculation, if not, adjusting the ignition interval time with the preset ignition interval time adjustment accuracy and returning to step 2.2 until the expected ignition interval time that meets the requirements is obtained;

[0015] Step 2.4, conduct a launch test according to the theoretical calculation of the ignition interval time that meets the requirements, measure and record the overload data during the launch process, and obtain the actual overload and speed data;

[0016] Step 2.5, compare the actual overload and speed data with the theoretically calculated overload and speed data to correct the expected ignition interval time;

[0017] Step 2.6, repeat steps 2.2, 2.3, 2.4 and 2.5 to determine the reasonable ignition interval time covering high and low temperature environments and individual differences of gas generators, and ultimately achieve the goal of minimizing the maximum overload of the launch while meeting the requirements of the barrel exit speed.

[0018] Furthermore, step 1 includes: connecting the multi-stage gas generators in series to an integrated launch device or an independent ignition control board, so that the multi-stage gas generators are ignited one by one after a certain time interval.

[0019] Furthermore, the starting control device of the gas-fired launch tube includes a power-on switch and a trigger switch, and has the functions of power-on indication and ready-to-launch indication.

[0020] Furthermore, the ignition interval time can be adjusted before use, and after adjustment, it is preset in the launch device or the ignition control panel, and the interval ignition is automatically implemented when in use.

[0021] Furthermore, the preset ignition interval time adjustment accuracy is 1 ms or higher.

[0022] Further, the ignition interval time of the gas generator is determined to be adjustable within the range of 0ms to 100ms.

[0023] The advantages of the present invention are:

[0024] The low overload control method of the gas-fired launch tube of a small unmanned aerial vehicle of the present invention is to arrange a multi-stage gas generator on the gas-fired launch tube, and to ignite the multi-stage gas generator in stages at certain intervals during one launch process. Through theoretical calculation and experimental verification, it is obtained that the maximum overload of the unmanned aerial vehicle during launch can be effectively reduced under the premise of ensuring a certain exit speed. Through experiments and product verification, under the premise of the same exit speed requirement, the maximum overload of the method of the present invention is reduced by 30% to 50% compared with the traditional method of using a single-stage gas generator. During the entire launch process, its overload-time curve is full, which effectively solves the requirement of reaching a certain speed within a limited launch range. The present invention solves the high overload problem of the gas-fired launch tube of a small unmanned aerial vehicle during launch, and at the same time greatly reduces the requirements for the selection of structural materials and device selection, reduces the research and development and manufacturing costs of the unmanned aerial vehicle increased to achieve the high overload resistance of the body structure and equipment, reduces the weight and volume of the launch tube, and improves the flight performance of the unmanned aerial vehicle. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The above and / or other features and advantages of the present invention will become more easily understood through the following description with reference to the accompanying drawings, which are not drawn to scale and some features are exaggerated or reduced to show details of specific components. In the accompanying drawings:

[0026] Figure 1 It is a flow chart of a low overload control method of a small UAV gas-fired launch tube of the present invention;

[0027] Figure 2 is the time-emission overload curve obtained according to the present invention. DETAILED DESCRIPTION

[0028] The present invention will be described in detail below with reference to the accompanying drawings by means of exemplary embodiments of the present invention. It should be noted that the following detailed description of the present invention is only for the purpose of illustration, and is not intended to limit the present invention.

[0029] The present invention provides a low overload control method for a gas-fired launch tube of a small unmanned aerial vehicle, which is used to control the maximum launch overload of the gas-fired launch tube of a small unmanned aerial vehicle, aiming to reduce the launch overload of the unmanned aerial vehicle and simultaneously ensure a certain launch speed.

[0030] Reference Figure 1 As an exemplary embodiment of the present invention, a low overload control method for a small UAV gas-fired launch tube includes:

[0031] Step S1, arranging a multi-stage gas generator on a gas launch tube and connecting its circuit;

[0032] Step S2, after receiving the ignition command, the multi-stage gas generators are ignited in stages at preset intervals, and the next-stage gas generator is ignited after the preset interval after the ignition of the previous-stage gas generator. Taking a two-stage gas generator including a first-stage gas generator and a second-stage gas generator as an example, the second-stage gas generator is ignited after the preset interval after the ignition of the first-stage gas generator. When there are more than two stages of gas generators, the same is true. The ignition interval time is adjustable before use, and after adjustment, it is preset in the launch device or the ignition control panel, and the interval ignition is automatically implemented when in use.

[0033] The multi-stage gas generator can be connected in series and connected to an integrated launch device or an independent ignition control board to enable the multi-stage gas generator to ignite one by one after a certain interval. The gas generator can be installed on the bottom plate of the launch tube in the low-pressure chamber inside the launch tube, and the adapter inside the tube is used to connect the drone. Taking the two-stage gas generator as an example, the gas generator starts working after receiving the ignition signal. The first-stage gas generator produces a small amount of gas to achieve the purpose of expanding the initial low-pressure chamber volume so that the overload at this stage is not too large. The second-stage gas generator produces a large amount of gas when working, so that it can maintain a large overload after the low-pressure chamber volume is rapidly expanded, and realize the stability and smoothness of the entire acceleration process. The two work together to push the adapter to move toward the tube mouth, and the adapter pushes the drone to accelerate in the tube until it exits the tube.

[0034] The control circuit of the gas launch tube consists of two parts, namely the starting control device and the ignition control board. The starting control device is a manual power output device equipped with a power switch and a launch button, which is used to control the ignition power output and has the power-on status indication and the ready-to-launch indication functions. The ignition control board is preset with a certain ignition interval time, and after receiving the ignition power input, it automatically realizes multiple ignition outputs according to the preset time interval.

[0035] The preset time interval for delayed ignition of the gas generator can be quantitatively controlled according to the algorithm to be described below.

[0036] The algorithm includes step S2.1: performing a force analysis on the adapter used to move in the launch tube under the action of the high-pressure gas generated by the gas generator, and obtaining the state equation:

[0037]

[0038] Where m1 is the total weight of the adapter and the drone, f1 is the thrust of the low-pressure chamber gas on the adapter, f2 is the external atmospheric pressure force, f3 is the friction between the adapter and the drone and the launch tube, S c is the cross-sectional area of ​​the cylinder, P1 is the gas pressure in the closed chamber at different times, calculated according to the following formula:

[0039]

[0040] Where m is the burning mass of the charge, n g is the number of moles of gas produced by the combustion of 1 kg of charge, R is the gas constant, T c is the gas temperature, P ig is the ignition pressure, V ci is the initial volume of the low-pressure chamber, S1 is the cross-sectional area of ​​the adapter, X is the adapter stroke, ρ is the charge density, t is the burning time, r is the charge burning speed, A b is the burning area of ​​the charge, α is the burning rate coefficient, and n is the combustion pressure index of the charge.

[0041] After the state equation is established, step S2.2 is performed: the initial ignition interval time is selected, and according to the established state equation, the time-firing overload curve and the time-firing speed curve under the initial ignition interval time are obtained.

[0042] Then proceed to step S2.3: determine whether the launch overload and launch speed meet the requirements through theoretical calculation. If not, adjust the ignition interval time with the preset ignition interval time adjustment accuracy and return to step S2.2 until the expected ignition interval time that meets the requirements is obtained.

[0043] After obtaining the required ignition interval through theoretical calculation, the expected ignition interval is corrected through the launch test, including:

[0044] Step S2.4, perform a launch test according to the theoretical calculation of the ignition interval time that meets the requirements, measure and record the overload data during the launch process, and obtain the actual overload and speed data;

[0045] Step S2.5, comparing the actual overload and speed data with the theoretically calculated overload and speed data, and correcting the expected ignition interval time;

[0046] Step S2.6, repeat steps S2.2, S2.3, S2.4 and S2.5 to determine the reasonable ignition interval time covering high and low temperature environments, individual differences of gas generators, etc., and ultimately achieve the goal of minimizing the maximum overload of the launch while meeting the requirements of the barrel exit speed.

[0047] After multiple iterations of calculations and repeated tests, it was finally determined that the adjustable range of the gas generator ignition sequence is 0ms to 100ms, and the controllable adjustment accuracy is 1ms or higher, preferably 1ms. After multiple tests and verifications, the optimal delayed ignition control time is between 10 and 65ms, especially between 22ms and 40ms. In this range of adjustment, the launch overload of the tube-launched aircraft can be guaranteed to be less than 100g under the premise of ensuring a certain launch speed. The theoretical values ​​(part) of the launch system trajectory parameter design are shown in Table 1:

[0048] Table 1

[0049] Time t(ms) Combustion chamber pressure (Mpa) Overload (g) (X-axis heading) 20 0.480 74.199 21 0.491 76.007 22 0.499 77.228 23 0.503 77.894 24 0.504 78.048 25 0.502 77.741 26 0.498 77.025 27 0.491 75.955 28 0.482 74.586 29 0.472 72.969

[0050] Combining the data in Table 1 and Figure 2 It can be seen from the time-overload curve that when using a gas generator as a power source, compared with the single-stage gas generator working condition, the secondary action of the two-stage gas generator after ignition continues to increase the pressure in the combustion chamber, which can form a stable and reliable force. The staged ignition of the gas generator makes the thrust release after ignition smoother and more continuous than the single-stage ignition connection. At the same time, with the precise control of the ignition interval time of the dual gas generator system in milliseconds, an overload time curve similar to the saddle curve is achieved, and the maximum overload of the launch is less than 100g while ensuring a certain exit speed. The maximum overload of similar products on the market is generally 150g to 200g.

[0051] The present invention effectively reduces the high overload problem of launching UAVs from a gas-fired launch tube, greatly reduces the requirements for the selection of structural materials and components, reduces the R&D and manufacturing costs of UAVs to achieve the overload resistance of the body indicators, and achieves a significant reduction in the cost of tube-launched UAVs without increasing the cost of the launch tube. Taking this project as an example, the original UAV solution was designed to withstand 200g, but now it is designed to withstand 120g, reducing the cost by about 40% and increasing the flight time by about 20%.

[0052] Next, the low overload control method for a small UAV gas-fired launch tube provided by the present invention is further explained with reference to an example.

[0053] In this example, the drone is a 10kg-class fixed-wing drone with foldable wings and tail. After folding, the length of the whole drone is 1030mm, which can be loaded into a launch tube with an inner cross-sectional size of 132mm×132mm and a length of 1200mm. The maximum overload requirement for launch is not more than 100g, and the exit speed is required to be no less than 34m / s. First, ignition preparation is carried out. Two-stage gas generators are arranged in series on the gas cylinder. After preparation is completed, the first-stage gas generator is ignited through the ignition control board. At the same time, according to the theoretical calculation of the amount of gunpowder, the first-stage gas generator with matching control is selected, and the electrical performance parameters are: resistance 2.0Ω±0.2Ω; full ignition current: 1.7A / 2ms; non-ignition current: 0.2mA / 10s. After pressing the ignition button of the external starting control device, the first-stage gas generator outputs the ignition current (current 2A, time 5ms).

[0054] Then, the second-stage gas generator is ignited after a preset time interval. The electrical performance parameters of the second-stage gas generator with matching control are: 2.0Ω±0.3Ω; full ignition current: 1.2A / 2ms, non-ignition current: 0.4A / 10s. About 30ms after the first-stage gas generator is ignited, the second-stage gas generator outputs the ignition current (current 2A, time 5ms), and the work is completed.

[0055] According to the above scheme, after multiple tests, the two test results with the largest deviation were selected for comparison with the theoretical design values. The test values ​​were basically close to the theoretical values, and the error was controlled within ±10%, which can achieve accurate control of the overload parameters. The verification of the UAV launch test is as follows:

[0056] In the first test, the maximum overload of the first-stage generator was 84.9g, which occurred at 22ms; the maximum overload of the second-stage generator was 86.5g, which occurred at 49ms, and the exit speed was 36.7m / s.

[0057] In the second test, the maximum overload of the first-stage generator was 69.9g, which occurred at 23ms; the maximum overload of the second-stage generator was 92.3g, which occurred at 48ms, and the exit speed was 36.4m / s.

[0058] Table 2

[0059] t(ms) Overload (g) (X-axis heading) Design value 24 78.048 First trial 22 84.895107 Second test 23 69.922408

[0060] Through the analysis of the test data after the above 10kg-class UAV gas-fired tube-launched UAV launch test, the use of dual gas generator system time-sharing ignition and graded ignition delay precision control technology can achieve control of low launch overload for gas-fired tube-launched UAV.

[0061] Finally, it should be noted that the features mentioned and / or shown in the above description of the exemplary embodiments of the present invention may be combined in the same or similar manner into one or more other embodiments, combined with the features in other embodiments or substituted for the corresponding features in other implementations. The technical solutions obtained by these combinations or substitutions shall also be deemed to be included in the protection scope of the present invention.

Claims

1. A low overload control method for a small UAV gas-fired launch tube, characterized in that: The following steps are involved: Step 1, arranging a multi-stage gas generator on a gas-fired launch tube and connecting its circuit; Step 2, after receiving the ignition command, the multi-stage gas generators are ignited in stages at preset intervals, and the next-stage gas generator is ignited after the preset interval after the ignition of the previous-stage gas generator. The preset interval is determined according to the following algorithm: Step 2.1, perform force analysis on the adapter used to move in the launch tube under the action of the high-pressure gas generated by the gas generator, and obtain the state equation: Where m1 is the total weight of the adapter and the drone, f1 is the thrust of the low-pressure chamber gas on the adapter, f2 is the external atmospheric pressure force, f3 is the friction between the adapter and the drone and the launch tube, S c is the cross-sectional area of ​​the cylinder, P1 is the gas pressure in the closed chamber at different times, calculated according to the following formula: Where m is the burning mass of the charge, n g is the number of moles of gas produced by the combustion of 1 kg of charge, R is the gas constant, T c is the gas temperature, P ig is the ignition pressure, V ci is the initial volume of the low-pressure chamber, S1 is the adapter area, X is the adapter stroke, ρ is the charge density, t is the burning time, r is the charge burning speed, A b is the burning area of ​​the charge, α is the burning rate coefficient, and n is the combustion pressure index of the charge; Step 2.2, selecting the initial ignition interval time, and obtaining the time-launch overload curve and the time-launch speed curve under the initial ignition interval time according to the established state equation; Step 2.3, determining whether the launch overload and the launch speed meet the requirements through theoretical calculation, if not, adjusting the ignition interval time with the preset ignition interval time adjustment accuracy and returning to step 2.2 until the expected ignition interval time that meets the requirements is obtained; Step 2.4, conduct a launch test according to the theoretical calculation of the ignition interval time that meets the requirements, measure and record the overload data during the launch process, and obtain the actual overload and speed data; Step 2.5, compare the actual overload and speed data with the theoretically calculated overload and speed data to correct the expected ignition interval time; Step 2.6, repeat steps 2.2, 2.3, 2.4 and 2.5 to determine the reasonable ignition interval time covering high and low temperature environments and individual differences of gas generators, and ultimately achieve the goal of minimizing the maximum overload of the launch while meeting the requirements of the barrel exit speed.

2. The small UAV gas-fired launch tube according to claim 1 is characterized in that: The step 1 comprises: connecting the multi-stage gas generators in series to an integrated launch device or an independent ignition control board, so that the multi-stage gas generators are ignited one by one after a certain time interval.

3. The small UAV gas-fired launch tube according to claim 1 or 2, characterized in that: The starting control device of the gas-fired launch tube includes a power switch and a trigger switch, which has the functions of power-on indication and ready-to-launch indication.

4. The small UAV gas-fired launch tube according to claim 2 is characterized in that: The ignition interval time can be adjusted before use, and after adjustment it is preset in the transmitting device or the ignition control panel, and the interval ignition is automatically implemented when in use.

5. The small UAV gas-fired launch tube according to claim 3 is characterized in that: The preset ignition interval time adjustment accuracy is 1 ms or higher.

6. The small UAV gas-fired launch tube according to claim 1 or 2, characterized in that: The ignition interval time of the gas generator is determined to be adjustable within the range of 0ms to 100ms.