Storage location distribution and interface definition method for four-way shuttle vehicle stereoscopic warehouse
By decomposing the incoming task into two subtasks and optimizing the path according to the tunnel occupancy, the problem of task blockage in the dense storage of four-way vehicles is solved, the efficiency of incoming and exiting the warehouse is improved, and the process continues when the equipment fails or the system is powered off, and the implementation of the implementation of the implementation of the process. Efficient task execution.
Patent Information
- Application Number
- CN202411366192.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-29
- Publication Date
- 2024-11-19
AI Technical Summary
In a three-dimensional warehouse with dense storage of four-way shuttle vehicles, when multiple end points of incoming tasks are allocated to the same lane, traditional methods lead to the problem of blockage and jamming of tasks, and when solved through logical lock-up control, it has an impact on the efficiency of incoming and exiting warehouses. .
Decompose the inlet task into two subtasks: subtask 1 from the starting point to the tunnel entrance and subtask 2 from the tunnel entrance to the cargo space. It is executed in order and recorded in the database, and is based on the storage space occupancy in the tunnel. The situation is generated and issued a second subtask to ensure task order and path optimization.
It effectively avoids road blockage in the tunnel, improves the efficiency of entry and exit, is suitable for a variety of task types, and ensures that the process continues when equipment failure or system power outage, reducing transportation and maintenance costs.
Smart Images

Figure CN118977957A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of automated warehousing and logistics, and specifically relates to a method for storage location allocation and interface definition of a four-way shuttle vehicle stereoscopic warehouse. Background Art
[0002] In a three-dimensional warehouse with dense storage of four-way shuttles, according to the allocation strategy of inbound and outbound storage, traditional inbound and outbound storage, transfer and other tasks directly generate a storage task from the starting point to the end point, and then send it to the execution system. This method is relatively simple and commonly used compared to task generation and task processing at the business level.
[0003] However, when there are multiple warehousing tasks and the terminal storage locations are assigned to the same lane, if the four-way vehicle task assigned to the storage location outside the lane arrives first, after the task is completed, the pallet that has completed the warehousing will block the subsequent warehousing tasks, causing the subsequent tasks to be unable to enter the inner outbound storage, thus causing the task to be blocked or stuck;
[0004] Even if the scheduling system is used for logical card control, the internal storage task must be executed first before the external storage task can be executed. This approach can indeed avoid the problem of task blocking and jamming, but this card control method will have a certain impact and loss on the efficiency of storage. This task card control has a great impact on the efficiency of storage. Especially in the occasions where there are many storage tasks and high efficiency requirements, there are great disadvantages. Summary of the invention
[0005] The purpose of the present invention is to provide a method for storage location allocation and interface definition of a four-way shuttle warehouse in order to solve the above-mentioned problems.
[0006] The technical solution adopted by the present invention is as follows: a method for storage location allocation and interface definition of a four-way shuttle warehouse, the method comprising the following steps:
[0007] S1: The warehouse management system decomposes the main task of entering the warehouse into the storage location into two subtasks: a. Subtask 1 of entering the warehouse from the starting point to the storage location entrance; b. Subtask 2 of entering the warehouse from the entrance to the storage location, and then associates the two subtasks with the main task in order and stores them in the database;
[0008] S2: When the warehouse management system executes the main task of warehousing, it issues the first subtask in order according to the subtasks associated with the main task. After the first task is completed, the second subtask is generated according to the storage space occupancy in the lane and recorded in the database;
[0009] S3: After receiving the first subtask assigned by the upper system, the warehouse scheduling system schedules the handling equipment to start executing the task and feeds back the task execution status to the upper-level WMS warehouse management system;
[0010] S4: After the warehouse management system receives the completion status of Task 1 reported by the scheduling system, it indicates that the task has reached the aisle entrance of the storage location and the first subtask 1 has been completed. At this time, the management system updates the status of Task 1 in the database, determines the occupancy of the aisle cargo location, generates subtask 2 from the aisle to the storage location, and then sends this subtask 2 to the task scheduling system;
[0011] S5: After receiving the second subtask assigned by the upper level, the warehouse scheduling system starts scheduling the equipment to execute the task, and reports the task execution status to the upper management system.
[0012] S6: After receiving the completion status of Task 2, the warehouse management system updates the completion status of Task 2 in the database. This indicates that the task has arrived at the storage location and the entire main task has been completed, so the completion status of the main task in the database is updated at the same time.
[0013] In a preferred embodiment, in step S1, the library-to-main task is decomposed into two subtasks of different stages, so the two tasks are serial tasks, and subtask 1 must be executed first, and then subtask 2 is executed.
[0014] In a preferred embodiment, during the execution of subtask 1, the execution of other tasks may cause the storage space occupancy of the lane to change. Therefore, in step S4, subtask 2 from the lane to the storage space is generated based on logical conditions after task 1 is completed.
[0015] In a preferred embodiment, subtask 2 is a task generated based on the occupancy of storage spaces in the lane, so there will be no traffic jams in the lane, and there is no need to worry about avoidance issues when multiple tasks are simultaneously stored in the same lane. The tasks that arrive first will be given priority in allocating storage spaces in the lane.
[0016] In a preferred embodiment, in step S1, the following needs to be considered when decomposing tasks:
[0017] Equipment type: Different types of handling equipment (such as four-way shuttles, stackers) have different handling capabilities and efficiencies. It is necessary to select appropriate equipment to perform subtasks based on actual conditions.
[0018] Cargo characteristics: Different types of cargo (such as weight, volume, shape) have different requirements for handling equipment and storage space. It is necessary to consider the characteristics of the cargo when performing task decomposition and storage space allocation.
[0019] Lane structure: Different lanes have different structural characteristics such as length, width, turning radius, etc., and path planning and task scheduling need to be carried out according to the lane structure.
[0020] Task priority: Task priority needs to be set based on factors such as the urgency and importance of the task, and high-priority tasks should be executed first.
[0021] In a preferred embodiment, in step S2, considering the scheduling strategy includes:
[0022] Task sorting: Sort subtask 1 according to factors such as task priority and lane occupancy, and give priority to tasks with high priority or idle lanes.
[0023] Path planning: Path planning is carried out based on factors such as tunnel structure, equipment type, and cargo characteristics, and the optimal path is selected to perform the task.
[0024] Load balancing: Rationally allocate tasks to different handling equipment to avoid overloading some equipment and affecting overall efficiency.
[0025] In a preferred embodiment, in step S3, if the handling equipment fails during the execution of subtask 1, it is necessary to promptly repair or replace the equipment and reschedule the task. If the goods are damaged or lost, it is necessary to promptly handle it and update the goods information in the database. If the lane is blocked, it is necessary to promptly handle it, such as clearing the obstacle or adjusting the task path.
[0026] In a preferred embodiment, in step S4, if some storage spaces in the lane are occupied during the generation and delivery of subtask 2, it is necessary to reselect free storage spaces as the target of subtask 2. If the execution time of subtask 1 changes, it is necessary to timely adjust the delivery time of subtask 2. If the status of the handling equipment changes, it is necessary to timely adjust the execution equipment of subtask 2.
[0027] In a preferred embodiment, in step S5, during the execution of subtask 2, it is necessary to monitor the execution status of subtask 2 in real time, such as start, in progress, and completed; monitor the status of the handling equipment in real time, such as operating status and fault status; and monitor the status of the goods in real time, such as whether it has reached the target storage location, whether it is damaged, etc.
[0028] In a preferred embodiment, in step S6, after the main task is completed, it is necessary to perform:
[0029] Efficiency analysis: Analyze the completion time of warehousing tasks, utilization rate of handling equipment, etc., to evaluate warehousing efficiency.
[0030] Cost analysis: Analyze the transportation cost, equipment maintenance cost, etc. of the warehousing task to evaluate the warehousing cost.
[0031] Optimization analysis: Based on the results of data analysis, optimize task decomposition, path planning, equipment scheduling, etc. to improve warehousing efficiency and reduce warehousing costs.
[0032] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0033] In the present invention, the decomposition of tasks and the generation of subtasks are all recorded in the database, and the execution status of tasks: such as the start of execution and the completion of execution are all recorded in the database. Therefore, even if there is a device failure during the execution process, or even a system power outage, the unfinished task can be continued after recovery, and the entire process will not be affected. The allocation method in this application is applicable to any type of task assigned to a cargo location, including warehouse transfer tasks, tally tasks, warehouse return tasks, etc. As long as the target location is a task of bringing goods to a storage location, this method can be used to first generate subtask 1 assigned to the cargo location lane entrance, and when subtask 1 is completed, subtask 2 to the cargo location is generated. Based on the above, the present application perfectly solves the traffic congestion problem when four-way vehicles are densely stored in cargo location allocation, improves the efficiency of warehousing and warehousing, and has good practicality and promotion value. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 A schematic diagram of the dense storage warehouse racks and lanes of the present invention;
[0035] Figure 2 It is an explanation of the interaction between the warehouse management system and the warehouse scheduling system in the present invention;
[0036] Figure 3 It is a schematic diagram of the functional modules of the warehouse management system in the present invention;
[0037] Figure 4 It is a schematic diagram of the functional modules of the warehouse scheduling system in the present invention;
[0038] Figure 5 It is the warehousing flow chart of the present invention;
[0039] Figure 6 It is a schematic diagram of the advantages of the allocation method in the present invention. DETAILED DESCRIPTION
[0040] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0041] Reference Figure 1-6 ,
[0042] A method for allocating storage locations and defining interfaces for a four-way shuttle warehouse comprises the following steps:
[0043] S1: The warehouse management system decomposes the main task of entering the warehouse into the storage location into two subtasks: a. Subtask 1 of entering the warehouse from the starting point to the storage location entrance; b. Subtask 2 of entering the warehouse from the entrance to the storage location, and then associates the two subtasks with the main task in order and stores them in the database;
[0044] S2: When the warehouse management system executes the main task of warehousing, it issues the first subtask in order according to the subtasks associated with the main task. After the first task is completed, the second subtask is generated according to the storage space occupancy in the lane and recorded in the database;
[0045] S3: After receiving the first subtask assigned by the upper system, the warehouse scheduling system schedules the handling equipment to start executing the task and feeds back the task execution status to the upper-level WMS warehouse management system;
[0046] S4: After the warehouse management system receives the completion status of Task 1 reported by the scheduling system, it indicates that the task has reached the aisle entrance of the storage location and the first subtask 1 has been completed. At this time, the management system updates the status of Task 1 in the database, determines the occupancy of the aisle cargo location, generates subtask 2 from the aisle to the storage location, and then sends this subtask 2 to the task scheduling system;
[0047] S5: After receiving the second subtask assigned by the upper level, the warehouse scheduling system starts scheduling the equipment to execute the task, and reports the task execution status to the upper management system.
[0048] S6: After receiving the completion status of Task 2, the warehouse management system updates the completion status of Task 2 in the database. This indicates that the task has arrived at the storage location and the entire main task has been completed, so the completion status of the main task in the database is updated at the same time.
[0049] In step S1, the library-to-main task is decomposed into two subtasks of different stages, so the two tasks are serial tasks, and subtask 1 must be executed first, and then subtask 2 is executed.
[0050] During the execution of subtask 1, the execution of other tasks may change the occupancy of the storage space in the lane. Therefore, in ④, subtask 2 from the lane to the storage space is generated based on the logical conditions after task 1 is completed.
[0051] Subtask 2 is a task generated based on the occupancy of storage spaces in the lane, so there will be no traffic jams in the lane, and there is no need to worry about the avoidance problem when multiple tasks are simultaneously stored in the same lane. The tasks that arrive first will be given priority in allocating storage spaces in the lane.
[0052] In step S1, the following needs to be considered when decomposing tasks:
[0053] Equipment type: Different types of handling equipment (such as four-way shuttles, stackers) have different handling capabilities and efficiencies. It is necessary to select appropriate equipment to perform subtasks based on actual conditions.
[0054] Cargo characteristics: Different types of cargo (such as weight, volume, shape) have different requirements for handling equipment and storage space. It is necessary to consider the characteristics of the cargo when performing task decomposition and storage space allocation.
[0055] Lane structure: Different lanes have different structural characteristics such as length, width, turning radius, etc., and path planning and task scheduling need to be carried out according to the lane structure.
[0056] Task priority: Task priority needs to be set based on factors such as the urgency and importance of the task, and high-priority tasks should be executed first.
[0057] In step S2, the scheduling strategies considered include:
[0058] Task sorting: Sort subtask 1 according to factors such as task priority and lane occupancy, and give priority to tasks with high priority or idle lanes.
[0059] Path planning: Path planning is carried out based on factors such as tunnel structure, equipment type, and cargo characteristics, and the optimal path is selected to perform the task.
[0060] Load balancing: Rationally allocate tasks to different handling equipment to avoid overloading some equipment and affecting overall efficiency.
[0061] In step S3, if the handling equipment fails during the execution of subtask 1, it is necessary to repair or replace the equipment in time and reschedule the task. If the goods are damaged or lost, it is necessary to deal with it in time and update the goods information in the database. If the lane is blocked, it is necessary to deal with it in time, such as clearing the obstacle or adjusting the task path.
[0062] In step S4, if some storage spaces in the lane are occupied during the generation and delivery of subtask 2, it is necessary to reselect free storage spaces as the target of subtask 2. If the execution time of subtask 1 changes, it is necessary to adjust the delivery time of subtask 2 in a timely manner. If the status of the handling equipment changes, it is necessary to adjust the execution equipment of subtask 2 in a timely manner.
[0063] In step S5, during the execution of subtask 2, it is necessary to monitor the execution status of subtask 2 in real time, such as start, in progress, and completed; monitor the status of the handling equipment in real time, such as operating status and fault status; monitor the status of the goods in real time, such as whether it has reached the target storage location, whether it is damaged, etc.
[0064] In step S6, after the main task is completed, it is necessary to:
[0065] Efficiency analysis: Analyze the completion time of warehousing tasks, utilization rate of handling equipment, etc., to evaluate warehousing efficiency.
[0066] Cost analysis: Analyze the transportation cost, equipment maintenance cost, etc. of the warehousing task to evaluate the warehousing cost.
[0067] Optimization analysis: Based on the results of data analysis, optimize task decomposition, path planning, equipment scheduling, etc. to improve warehousing efficiency and reduce warehousing costs.
[0068] When there are multiple tasks assigned to the storage location of the same lane in the storage system, there will be tasks that arrive at the lane entrance one after another. Subtask 2 is a task generated based on the storage location occupancy in the lane, so there will be no road blockage in the lane, and there is no need to worry about the avoidance problem when multiple tasks are stored in the same lane at the same time. The task that arrives first will be allocated the storage location in the lane first;
[0069] In the conventional task delivery interface, the task types are mostly warehousing, warehousing, warehouse transfer and transportation. After the introduction of this patented storage allocation method, the task types are increased to warehousing to the aisle entrance, releasing goods from the aisle entrance to the storage location and warehouse transfer to the aisle entrance;
[0070] The conventional task type 1 warehousing is a combination of the newly added warehousing to the lane entrance and releasing goods from the lane entrance to the storage location. Task type 3 is a combination of warehousing to the lane entrance, releasing goods from the lane entrance to the storage location, and transferring goods to the lane entrance. That is, the upper-level system first allocates the warehousing sub-lane, sends the first sub-task to the sub-lane entrance, and then allocates the second sub-task of the specific storage location after arriving at the sub-lane entrance. The timing of allocating the storage location can be delayed to the sub-lane entrance, thereby reducing the efficiency loss caused by the execution order of the card-controlled warehousing tasks on the same sub-track.
[0071] The present invention decomposes the main task of warehousing to the cargo location into: subtask 1 of warehousing to the lane entrance and subtask 2 from the lane entrance to the cargo location. The two subtasks are serial tasks. After subtask 1 is issued and executed, subtask 2 is generated and then issued for execution.
[0072] In view of the fact that the storage space allocation during traditional warehousing is directly from the entrance to the storage space, when there are multiple warehousing and warehousing tasks at the same time, due to the order of arrival of the tasks, there is a high probability that the path will be blocked or waiting, which will affect the efficiency of warehousing and warehousing. Therefore, in the present invention, the second subtask is generated after the first subtask is completed, and the generated task is allocated in real time based on the actual occupancy rate of the current storage space channel. After the subtask 2 is generated, it is sent to the scheduling system for execution at the same time, thus perfectly avoiding traffic jams or efficiency losses.
[0073] As a preferred implementation scheme of system software, the decomposition of tasks and the generation of subtasks are all recorded in the database, and the execution status of tasks, such as the start and completion of execution, are all recorded in the database. Therefore, even if there is a device failure during the execution process, or even a system power outage, after recovery, the unfinished tasks can be continued without affecting the entire process.
[0074] This storage location allocation method is applicable to any type of task assigned to a storage location, including warehouse transfer tasks, sorting tasks, warehouse return tasks, etc. As long as the target location is a task of bringing goods to a storage location, this method can be used to first generate subtask 1 assigned to the aisle entrance of the storage location. When subtask 1 is completed, subtask 2 to the storage location is generated.
[0075] Based on the above, the new technical solution perfectly solves the traffic congestion problem when four-way vehicles are densely stored in cargo space allocation, improves the efficiency of warehousing and out-of-warehouse, and has good practicality and promotion value.
[0076] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the term "comprises" or any other variant thereof is intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0077] The above description enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A method for storage location allocation and interface definition of a four-way shuttle warehouse, characterized in that: The method comprises the following steps: S1: The warehouse management system decomposes the main task of entering the warehouse into the storage location into two subtasks: a. Subtask 1 of entering the warehouse from the starting point to the storage location entrance; b. Subtask 2 of entering the warehouse from the entrance to the storage location, and then associates the two subtasks with the main task in order and stores them in the database; S2: When the warehouse management system executes the main task of warehousing, it issues the first subtask in order according to the subtasks associated with the main task; after the first task is completed, it generates the second subtask according to the storage space occupancy in the lane and records it in the database; S3: After receiving the first subtask assigned by the upper system, the warehouse scheduling system schedules the handling equipment to start executing the task and feeds back the task execution status to the upper-level WMS warehouse management system; S4: After the warehouse management system receives the completion status of Task 1 reported by the scheduling system, it indicates that the task has reached the aisle entrance of the storage location and the first subtask 1 has been completed; at this time, the management system updates the status of Task 1 in the database, determines the occupancy of the aisle cargo location, generates subtask 2 from the aisle to the storage location, and then sends this subtask 2 to the task scheduling system; S5: After receiving the second subtask assigned by the upper level, the warehouse scheduling system starts scheduling the equipment to execute the task, and reports the task execution status to the upper management system; S6: After receiving the completion status of Task 2, the warehouse management system updates the completion status of Task 2 in the database; this indicates that the task has arrived at the storage location and the entire main task has been completed, so the completion status of the main task in the database is also updated.
2. A method for storage location allocation and interface definition of a four-way shuttle warehouse as claimed in claim 1, characterized in that: In step S1, the library-to-main task is decomposed into two subtasks of different stages, so the two tasks are serial tasks, and subtask 1 must be executed first, and then subtask 2 is executed.
3. A method for storage location allocation and interface definition of a four-way shuttle warehouse as claimed in claim 2, characterized in that: During the execution of subtask 1, the execution of other tasks may change the storage space occupancy of the lane. Therefore, in step S4, subtask 2 from lane to storage space is generated based on logical conditions after task 1 is completed.
4. A method for storage location allocation and interface definition of a four-way shuttle warehouse as claimed in claim 3, characterized in that: The subtask 2 is a task generated based on the storage space occupancy in the lane.
5. The method for storage location allocation and interface definition of a four-way shuttle warehouse as claimed in claim 1, characterized in that: In step S1, the following factors need to be considered when decomposing tasks: equipment type, cargo characteristics, lane structure, and task priority.
6. The method for storage location allocation and interface definition of a four-way shuttle warehouse as claimed in claim 1, characterized in that: In step S2, the scheduling strategy considered includes: Task sorting: sort subtask 1 according to task priority and lane occupancy, and give priority to tasks with high priority or idle lanes; Path planning: Path planning is performed based on factors such as lane structure, equipment type, and cargo characteristics, and the optimal path is selected to execute the task; Load balancing: Rationally allocate tasks to different handling equipment to avoid overloading some equipment and affecting overall efficiency.
7. The method for storage location allocation and interface definition of a four-way shuttle warehouse as claimed in claim 1, characterized in that: In step S3, if the handling equipment fails during the execution of subtask 1, it is necessary to promptly repair or replace the equipment and reschedule the task; if the goods are damaged or lost, it is necessary to promptly handle it and update the goods information in the database; if the lane is blocked, it is necessary to promptly handle it, such as clearing the obstacle or adjusting the task path.
8. The method for storage location allocation and interface definition of a four-way shuttle warehouse as claimed in claim 1, characterized in that: In step S4, if some storage locations in the lane are occupied during the generation and issuance of subtask 2, it is necessary to reselect free storage locations as the target of subtask 2; if the execution time of subtask 1 changes, it is necessary to adjust the issuance time of subtask 2 in time; if the status of the handling equipment changes, it is necessary to adjust the execution equipment of subtask 2 in time.
9. The method for storage location allocation and interface definition of a four-way shuttle warehouse as claimed in claim 1, characterized in that: In step S5, during the execution of subtask 2, it is necessary to monitor the execution status of subtask 2 in real time, including start, in progress, and completion; monitor the status of the handling equipment in real time, including operating status and fault status; and monitor the status of the goods in real time, including whether it has reached the target storage location and whether it is damaged.
10. The method for storage location allocation and interface definition of a four-way shuttle warehouse as claimed in claim 1, characterized in that: In step S6, after the main task is completed, it is necessary to perform: Efficiency analysis: Analyze the completion time of warehousing tasks, the utilization rate of handling equipment, and evaluate warehousing efficiency; Cost analysis: Analyze the transportation cost and equipment maintenance cost of the warehousing task, and evaluate the warehousing cost; Optimization analysis: Based on the results of data analysis, optimize task decomposition, path planning, and equipment scheduling to improve warehousing efficiency and reduce warehousing costs.
Citation Information
Patent Citations
PLC-based stereo warehouse cyclic delivery method
CN106553857A
Logistics sorting method and device, warehousing system and storage medium
CN112239043A
Multi-path warehouse-in and warehouse-out warehousing system
CN116750393A
Logistics management method of stereoscopic warehouse system
CN118154104A
Automatic goods allocation method based on multi-layer shuttle vehicle storage form
CN118579421A