Road engineering roadbed compactness detection method
By designing a support separation mechanism and a hole-punch collection mechanism in the roadbed compaction detection equipment for highway engineering, using universal wheels, threaded columns, motors and other components, the problem of soil collection and weighing is solved, and automatic collection and storage is realized , simplifies subsequent operations and improves the practicality of the equipment.
Patent Information
- Application Number
- CN202411150953.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-19
AI Technical Summary
The existing roadbed compaction detection equipment for road construction projects is difficult to collect and weigh the soil after being drilled, resulting in cumbersome and inconvenient cleaning.
A method for compaction detection of roadbeds in highway engineering is designed. Through the combination of support separation mechanism and hole-punching collection mechanism, the automatic collection and storage of soil is achieved by using components such as universal wheels, threaded columns, motors and cylinders, which is convenient for the Subsequent staff will weigh it.
It realizes automatic collection and storage of soil, simplifies the subsequent cleaning process, and improves the practicality and operation efficiency of the equipment.
Smart Images

Figure CN118979484A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of roadbed detection, in particular to a method for detecting the compactness of a roadbed in a highway engineering project. Background Art
[0002] The planning and formulation of highway projects is a heavy and complicated task. For the construction department and the traffic management department, it is very important to accurately obtain the soil quality of the highway base before highway construction. Therefore, corresponding testing equipment is required. At present, when testing the compaction of the roadbed of highway projects, the most commonly used method is the pit digging and sand filling method. However, in the process of digging pits, due to the lack of corresponding protective structures, gravel is prone to splashing, causing certain injuries to the staff. Patent documents have been made to improve this.
[0003] For example, Chinese patent CN217078686U is a roadbed compaction detection device for highway engineering. The following scheme is proposed, which includes a mobile base, an n-shaped bracket is fixed on the top of the mobile base, a hydraulic cylinder is fixed on the top of the n-shaped bracket, the telescopic end of the hydraulic cylinder passes through the n-shaped bracket, and is fixedly connected to a lifting plate, the lifting plate is slidably sleeved on the outside of the n-shaped bracket, the bottom end of the lifting plate is rotatably connected to a drilling rod, the outside of the drilling rod is fixedly connected to gear one, and one side of gear one is meshedly connected to gear two. The utility model is different from the prior art, and utilizes a synchronous tightening positioning mechanism, and rotates the corresponding screw rod through a hand wheel, and cooperates with the action of multiple components, so that the four arc-shaped tightening plates can respectively tighten and brake the corresponding outer sides of the rollers. At the same time, the four positioning rods can move down at the same time and penetrate into the ground, effectively ensuring the stability of the equipment during detection and avoiding the phenomenon of displacement during drilling.
[0004] Although the equipment in the above document has a shield added to prevent splashing during the punching process and protect the workers, it still has obvious defects in actual use, such as: Generally, when drilling, holes are drilled directly on the compacted roadbed. Although this equipment can also protect the drilling, the soil excavated during drilling cannot be collected and weighed, and all is accumulated inside the protective cover. Subsequent staff are required to manually clean and collect it on the ground. In addition, part of the soil accumulated inside the protective cover will fall inside the hole when the screw is pulled out, and it needs to be cleaned again. The process is cumbersome and inconvenient. Therefore, a highway engineering roadbed compaction detection device capable of collecting soil is now designed to solve such defects. Summary of the invention
[0005] In view of the shortcomings of the prior art, the present invention provides a method for detecting the compaction degree of roadbed in highway engineering, which solves the problem that soil accumulates after drilling in the prior art equipment and is inconvenient to collect and weigh.
[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: A method for detecting the compaction degree of roadbed in a highway engineering project, specifically comprising the following steps: S1. Equipment movement: Use the universal wheels in the supporting separation mechanism to move the equipment to the designated location; S2, limited docking: Rotate the threaded column to lower the load-bearing ring to fix the entire equipment; S3, drilling and collecting: starting the motor and cylinder in the drilling and collecting mechanism to descend to drill holes in the roadbed and collect soil; S4, lifting and discharging: using the hollow frame to connect with the circular storage frame, the circular storage frame is pulled up, and the soil inside is discharged and recycled; S5. Manual testing: Manually pour the sand into the drilled holes for testing.
[0007] Preferably, the supporting and separating mechanism comprises a load-bearing bottom plate, and a perforated collecting mechanism is installed on the top of the load-bearing bottom plate.
[0008] Preferably, the front and rear parts on both sides of the bottom of the load-bearing base plate are rotatably connected to universal wheels through bearing parts, and the front and rear parts on both sides of the top of the load-bearing base plate are slidably installed with rectangular guide rods through openings, the bottom ends of the rectangular guide rods are fixedly connected to load-bearing rings, and the load-bearing rings are sleeved on the surfaces of the universal wheels, a U-shaped plate is fixedly connected between the top ends of several of the rectangular guide rods, the top of the U-shaped plate is threadedly connected to a threaded column through an opening, and the bottom end of the threaded column is rotatably connected to the top of the load-bearing base plate through a bearing part.
[0009] Preferably, an annular circular opening is provided at the top of the load-bearing base plate, and a vertical guide rod is fixedly connected between the bottom ends of the rectangular guide rods on the same side via a bracket, and the top end of the vertical guide rod passes through the annular circular opening and extends to the upper part of the load-bearing base plate, and a circular storage frame for use with the annular circular opening is slidably installed between the surfaces of the two vertical guide rods, a first spring is sleeved on the surface of the vertical guide rod and located below the circular storage frame, and a lifting circular opening is provided at the bottom of the circular storage frame.
[0010] Preferably, the front side of the top of the load-bearing base plate is fixedly connected to a rear vertical support plate, the left side of the rear vertical support plate is fixedly connected to a limiting sliding frame via a bracket, a double-head frame is slidably installed on the inner side of the limiting sliding frame, a second spring is fixedly connected between the double-head frame and the surface of the rear vertical support plate, and both ends of the front part of the double-head frame are fixedly connected to inclined plug rods.
[0011] Preferably, a rectangular gear rod is slidably installed on the surface of the rear vertical support plate through an opening, and a supporting recess is fixedly connected to the rear end of the rectangular gear rod. A third spring is sleeved on the surface of the rectangular gear rod and located at the rear part of the rear vertical support plate. A limited torque groove is opened on the surface of the rear vertical support plate, and a convex baffle plate used in conjunction with the rectangular gear rod is slidably installed on the inner side of the limited torque groove.
[0012] Preferably, side slide grooves are provided on both sides of the rear vertical support plate, and an arc abutment plate is slidably installed between the two side slide grooves.
[0013] Preferably, the punching and collecting mechanism includes a cylinder, and the cylinder is fixedly installed on the rear side of the top of the load-bearing base plate, the top end of the cylinder is fixedly connected to an upper top plate frame, the inner side of the upper top plate frame is fixedly connected to a motor, the output shaft of the motor is fixedly connected to a rotating rod through a coupling, the lower part of the rotating rod surface is fixedly connected to an auger blade used in conjunction with a lifting circular mouth, and both sides of the upper top plate frame surface are fixedly connected to double arc guide frames used in conjunction with a double-head frame.
[0014] Preferably, compression ring frames are fixedly connected to both sides of the upper top plate frame, and the compression ring frames are slidably installed on the surface of the vertical guide rod, and a ring pressure sleeve is slidably installed on the surface of the vertical guide rod, and a fourth spring is fixedly connected to the surface of the vertical guide rod between the compression ring frame and the ring pressure sleeve on the same side, and the surface of the rotating rod is fixedly connected to a sealing disc used in conjunction with the lifting circular mouth.
[0015] Preferably, both sides of the surface of the rotating rod and the upper part of the blocking disc are fixedly connected with a hollow frame through a fixing plate, and a blocking moment block is slidably installed on the inner side of the hollow frame. The opposite ends of the two blocking moment blocks are fixedly connected with an arc-surface clamping block used in conjunction with a circular storage frame, and a fifth spring used in conjunction with an inclined insertion rod is provided on the top of the blocking moment block, and the fifth spring is fixedly connected between the blocking moment block and the inner wall of the hollow frame. Beneficial Effects
[0016] The present invention provides a method for detecting the compaction degree of a highway engineering roadbed. Compared with the existing technology, it has the following beneficial effects: (1) The method for detecting the compaction degree of the roadbed of a highway project uses a supporting separation mechanism and a punching and collecting mechanism in combination. The arrangement of the two mechanisms can collect the excavated soil inside a circular storage frame when the cylinder drives the auger blade to descend to dig a hole. After the hole is dug, the sealing disc is used to seal the lifting circular mouth, and the arc-surface clamping block is connected with the circular storage frame. After the cylinder restarts to rise, the circular storage frame can also be driven to rise, which is convenient for the staff to collect and weigh the soil inside it, which is satisfactory for current use.
[0017] (2) The method for detecting the compaction degree of the roadbed of a highway project is provided with a circular storage frame inside the annular circular opening, and is used in combination with auger blades, a sealing disc and an arc-surface clamping block. The arrangement of these structures can use the auger blades to push the excavated soil into the circular storage frame for storage during the drilling process, and can use the arc-surface clamping block to retract and connect with the circular storage frame during the descent process, so as to facilitate the subsequent lifting of the circular storage frame. The sealing disc can block the lifting circular opening for sealing, so as to prevent the soil inside the circular storage frame from spilling, thereby improving the overall practicality of the equipment.
[0018] (3) The method for detecting the compaction degree of the roadbed of a highway project is to open an inclined through groove on the top of the blocking moment block, and use it in combination with an inclined insertion rod and a double arc guide frame. The arrangement of these structures can allow the inclined insertion rod to be inserted into the inclined through groove after the circular storage frame rises, and squeeze the arc block to retract, thereby separating the arc block from the circular storage frame. In addition, the double arc guide frame can squeeze the double-head frame during lifting and lowering to allow the inclined insertion rod to move forward and backward without hindering the lifting and lowering of the upper top plate frame.
[0019] (4) The method for detecting the compaction degree of the roadbed of the highway engineering project is to install a rectangular stopper and a supporting recess on the surface of the rear vertical support plate, and use them in combination with a convex baffle and an arc-shaped support plate. The arrangement of these structures can use the arc-shaped support plate to squeeze the convex baffle after the circular storage frame rises, so that the supporting recess moves forward under the pulling force of the third spring, thereby supporting the bottom of the circular storage frame, preventing the circular storage frame from falling directly to the bottom after the arc-shaped block retracts, and facilitating the workers to take out the soil. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the process of the present invention; Figure 2 It is a structural schematic diagram of the present invention; Figure 3 A bottom view of the structure of the present invention; Figure 4 It is a schematic diagram of the supporting and separating mechanism structure of the present invention; Figure 5 It is a cross-sectional view of the circular storage frame structure of the present invention; Figure 6 It is a schematic diagram of the rectangular lever, the supporting recess and the third spring structure of the present invention; Figure 7 It is a schematic diagram of the convex baffle structure of the present invention; Figure 8 It is a schematic diagram of the double-head frame, the inclined plane insertion rod and the second spring structure of the present invention; Fig. 9 It is a schematic diagram of the side slide groove, arc abutment plate and limit moment groove structure of the present invention; Fig.10It is a schematic diagram of the load-bearing base plate, threaded column and annular circular opening structure of the present invention; Fig.11 It is a schematic diagram of the structure of the punching and collecting mechanism of the present invention; Fig.12 It is a cross-sectional view of the hollow frame structure of the present invention; Fig.13 It is a cross-sectional view of the blocking moment block structure of the present invention.
[0021] In the figure: 1, supporting separation mechanism; 2, punching collection mechanism; 101, load-bearing bottom plate; 102, universal wheel; 103, rectangular guide rod; 104, load-bearing ring; 105, U-shaped plate; 106, threaded column; 107, annular round mouth; 108, vertical guide rod; 109, circular storage frame; 110, first spring; 111, lifting round mouth; 112, rear vertical support plate; 113, limited sliding frame; 114, double-head frame; 115, inclined plug rod; 116, second spring; 117, rectangular gear lever; 118, supporting Concave frame; 119, third spring; 120, convex baffle; 121, side slide groove; 122, arc stop plate; 123, limit moment groove; 201, cylinder; 202, upper top plate frame; 203, motor; 204, rotating rod; 205, auger blade; 206, compression ring frame; 207, fourth spring; 208, ring pressure sleeve; 209, blocking disc; 210, double arc guide frame; 211, hollow frame; 212, arc surface block; 213, stop moment block; 214, inclined through groove; 215, fifth spring. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0023] See also Figure 1-13 The present invention provides a technical solution: a method for detecting the compaction degree of a highway engineering roadbed, which specifically comprises the following steps: S1. Equipment movement: using the universal wheel 102 in the supporting and separating mechanism 1 to move the equipment to a designated position; S2, limited docking: rotating the threaded column 106 to lower the load-bearing ring 104 to fix the whole device; S3, drilling and collecting: starting the motor 203 and the cylinder 201 in the drilling and collecting mechanism 2 to descend and drill holes in the roadbed and collect soil; S4, lifting and discharging: using the hollow frame 211 to dock with the circular storage frame 109, the circular storage frame 109 is pulled up, and the soil inside is discharged and recycled; S5. Manual testing: Manually pour the sand into the drilled holes for testing.
[0024] The above-mentioned method for detecting the compaction degree of roadbed in highway engineering has the following more specific steps: S1, equipment movement: use the universal wheel 102 to push the load-bearing base plate 101 to move to the detection position, and make the circular storage frame 109 face the position to be punched, and then go to step S2; S2, limited docking: the rotating threaded column 106 pushes the four load-bearing rings 104 to descend under the limit of the rectangular guide rod 103. After the load-bearing rings 104 are lowered, they will contact the ground and lift the universal wheels 102 to separate from the ground. At this time, the load-bearing bottom plate 101 is limited, and the descent of the load-bearing rings 104 will also drive the vertical guide rods 108 to descend. At this time, the circular storage frame 109 will descend a distance, but under the elastic force of the first spring 110, the circular storage frame 109 has not yet completely contacted the ground, and then go to step S3; S3, drilling and collecting: after the load-bearing bottom plate 101 is fixed, the cylinder 201 is started to push the motor 203 and the compression ring frame 206 to descend, and the hollow frame 211 will first follow the descent and separate from the inclined surface plug rod 115. At this time, the arc surface block 212 pops out under the elastic force of the fifth spring 215, and at the same time, the elastic force of the fourth spring 207 pushes the ring pressure sleeve 208 to press the circular storage frame 109 downward, so that the circular storage frame 109 is completely in contact with the ground. As the upper top plate frame 202 descends, the two double-arc guide frames 210 squeeze the double-head frame 114 and move forward under the limit of the limit sliding frame 113, so that the inclined surface plug rod 115 will not block the upper top plate frame 202. At this time, the motor 203 is started and the rotating rod 204 is used to drive the blocking disc 209 , the auger blade 205 and the hollow frame 211 rotate slowly, and the auger blade 205 passes through the lifting circular opening 111 to drill a hole in the roadbed, and the soil inside the hole is driven by the auger blade 205 to fall on the inner side of the circular storage frame 109 for storage. After the auger blade 205 completely enters the hole, the cambered block 212 extends under the elastic force of the fifth spring 215 to engage with the inner wall of the circular storage frame 109, and at the same time, the blocking disc 209 docks with the lifting circular opening 111 to seal the lifting circular opening 111. At this time, the cylinder 201 stops, and the motor 203 uses the rotating rod 204 to rotate the two hollow frames 211 to the initial horizontal position, and then goes to step S4; S4, lifting and discharging: after the arc surface block 212 is engaged with the circular storage frame 109, the cylinder 201 is started to use the upper top plate frame 202 to pull the motor 203 up. At this time, the circular storage frame 109 is engaged with the arc surface block 212, which will drive the circular storage frame 109 to rise. After the double arc guide frame 210 rises and separates from the double head frame 114, the inclined surface insertion rod 115 will move back again under the elastic force of the second spring 116 and be perpendicular to the inclined surface slot 214. The rising of the circular storage frame 109 will also lift the arc support plate 122 When the arc plate 122 rises to the top, it will push the convex baffle plate 120 up. When the convex baffle plate 120 rises, it will no longer block the rectangular lever 117. At this time, the rectangular lever 117 moves backward under the elastic force of the third spring 119 and inserts into the bottom of the circular storage frame 109. In this process, the bottom end of the inclined surface insertion rod 115 will be inserted into the inner side of the inclined surface through groove 214 and squeeze the resistance moment block 213 to retract the arc surface block 212 to the inner side of the hollow frame 211. At this time, the arc surface block 212 is separated from the circular storage frame 109, and the circular storage frame 109 The bottom is supported by the supporting recess 118, and then the soil inside the circular storage frame 109 is taken out. After the soil is taken out, the supporting recess 118 is retracted by hand to be pulled out from the bottom of the circular storage frame 109. After the rectangular lever 117 is pulled to the limit, the convex baffle 120 descends to block the rectangular lever 117 again, and the circular storage frame 109 is no longer limited and descends to the inner side of the annular round opening 107 under the elastic force of the fourth spring 207; S5. Manual detection: After the circular storage frame 109 is reset, the threaded column 106 is twisted to raise the load-bearing ring 104 to allow the universal wheel 102 to contact the ground, and then the equipment is pushed, and the sand is manually introduced into the hole according to the process for measurement.
[0025] The above-mentioned method for detecting the compaction degree of roadbed in a highway engineering project is implemented by the following structure: Please refer to Figure 4 , Figure 5 , Figure 6 , Figure 7 , Figure 8 , Fig. 9 and Fig.10, showing the overall structure of the supporting and separating mechanism 1, the supporting and separating mechanism 1 includes a load-bearing base plate 101, a punching and collecting mechanism 2 is installed on the top of the load-bearing base plate 101, the front and rear parts of both sides of the bottom of the load-bearing base plate 101 are rotatably connected with universal wheels 102 through bearings, the front and rear parts of both sides of the top of the load-bearing base plate 101 are slidably installed with rectangular guide rods 103 through openings, the bottom ends of the rectangular guide rods 103 are fixedly connected with load-bearing rings 104, and the load-bearing rings 104 are sleeved on the surface of the universal wheels 102, and the tops of several rectangular guide rods 103 are fixed between them. A U-shaped plate 105 is connected, and a threaded column 106 is threadedly connected to the top of the U-shaped plate 105 through an opening, and the bottom end of the threaded column 106 is rotatably connected to the top of the load-bearing base plate 101 through a bearing member. An annular circular opening 107 is opened on the top of the load-bearing base plate 101, and a vertical guide rod 108 is fixedly connected between the bottom ends of the rectangular guide rods 103 on the same side through a bracket, and the top end of the vertical guide rod 108 passes through the annular circular opening 107 and extends to the upper part of the load-bearing base plate 101, and a circular storage frame 1 used in conjunction with the annular circular opening 107 is slidably installed between the surfaces of the two vertical guide rods 108 09, a first spring 110 is sleeved on the surface of the vertical guide rod 108 and located below the circular storage frame 109, a lifting circular opening 111 is opened at the bottom of the circular storage frame 109, a rear vertical support plate 112 is fixedly connected to the front side of the top of the load-bearing bottom plate 101, a limited position sliding frame 113 is fixedly connected to the left side of the rear vertical support plate 112 through a bracket, a double-head frame 114 is slidably installed on the inner side of the limited position sliding frame 113, a second spring 116 is fixedly connected between the double-head frame 114 and the surface of the rear vertical support plate 112, and both ends of the front part of the double-head frame 114 are fixedly connected to inclined plug rods 115, A rectangular shift rod 117 is slidably installed on the surface of the rear vertical support plate 112 through an opening, and a supporting recess 118 is fixedly connected to the rear end of the rectangular shift rod 117. A third spring 119 is sleeved on the surface of the rectangular shift rod 117 and located at the rear part of the rear vertical support plate 112. A limited moment groove 123 is provided on the surface of the rear vertical support plate 112, and a convex baffle 120 used in conjunction with the rectangular shift rod 117 is slidably installed on the inner side of the limited moment groove 123. Side slide grooves 121 are provided on both sides of the rear vertical support plate 112, and an arc stop plate 122 is slidably installed between the two side slide grooves 121.
[0026] Please refer to Fig.11 , Fig.12 and Fig.13, showing the overall structure of the punching and collecting mechanism 2, the punching and collecting mechanism 2 includes a cylinder 201, and the cylinder 201 is fixedly installed on the rear side of the top of the load-bearing base plate 101, the top of the cylinder 201 is fixedly connected to an upper top plate frame 202, the inner side of the upper top plate frame 202 is fixedly connected to a motor 203, the motor 203 is a servo motor, the output shaft of the motor 203 is fixedly connected to a rotating rod 204 through a coupling, the lower part of the surface of the rotating rod 204 is fixedly connected to an auger blade 205 used in conjunction with the lifting circular mouth 111, both sides of the surface of the upper top plate frame 202 are fixedly connected to double-arc guide frames 210 used in conjunction with the double-head frame 114, both sides of the upper top plate frame 202 are fixedly connected to compression ring frames 206, and the compression ring frames 206 are slidably installed on the surface of the vertical guide rod 108, and the surface of the vertical guide rod 108 is slidably installed with a ring compression sleeve Plate 208, a fourth spring 207 is fixedly connected to the surface of the vertical guide rod 108 between the compression ring frame 206 and the ring pressure sleeve plate 208 on the same side, and a sealing disc 209 used in conjunction with the lifting circular mouth 111 is fixedly connected to the surface of the rotating rod 204, and both sides of the surface of the rotating rod 204 and located on the upper part of the sealing disc 209 are fixedly connected with a hollow frame 211 through a fixed plate, the top and bottom of the hollow frame 211 are both in an open state, and a resistance moment block 213 is slidably installed on the inner side of the hollow frame 211, and the opposite ends of the two resistance moment blocks 213 are fixedly connected with an arc block 212 used in conjunction with the circular storage frame 109, and the top of the resistance moment block 213 is provided with a fifth spring 215 used in conjunction with the inclined insertion rod 115, and the fifth spring 215 is fixedly connected between the resistance moment block 213 and the inner wall of the hollow frame 211.
[0027] Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.
Claims
1. A method for detecting the compaction degree of roadbed in highway engineering. Features: The specific steps include: S1, equipment movement: using the universal wheel (102) in the supporting and separating mechanism (1) to move the equipment to a designated position; S2, limited docking: rotating the threaded column (106) to lower the load-bearing ring (104) to fix the entire device; S3, drilling and collecting: starting the motor (203) and the cylinder (201) in the drilling and collecting mechanism (2) to descend and drill holes in the roadbed and collect soil; S4, lifting and discharging: using the hollow frame (211) to dock with the circular storage frame (109), the circular storage frame (109) is pulled up, and the soil inside is discharged and recycled; S5. Manual testing: Manually pour the sand into the drilled holes for testing.
2. A method for detecting compaction of roadbed in highway engineering according to claim 1, Features: The supporting and separating mechanism (1) comprises a load-bearing bottom plate (101), and a perforated collection mechanism (2) is installed on the top of the load-bearing bottom plate (101).
3. A method for detecting compaction of roadbed in highway engineering according to claim 2, Features: The front and rear parts of both sides of the bottom of the load-bearing base plate (101) are rotatably connected to universal wheels (102) via bearings; the front and rear parts of both sides of the top of the load-bearing base plate (101) are slidably mounted with rectangular guide rods (103) via openings; the bottom ends of the rectangular guide rods (103) are fixedly connected to load-bearing rings (104), and the load-bearing rings (104) are sleeved on the surfaces of the universal wheels (102); the top ends of a plurality of the rectangular guide rods (103) are fixedly connected to U-shaped plates (105); the tops of the U-shaped plates (105) are threadedly connected to threaded columns (106) via openings, and the bottom ends of the threaded columns (106) are rotatably connected to the top of the load-bearing base plate (101) via bearings.
4. A method for detecting compaction of roadbed in highway engineering according to claim 3, Features: An annular circular opening (107) is provided at the top of the load-bearing bottom plate (101); a vertical guide rod (108) is fixedly connected between the bottom ends of the rectangular guide rods (103) on the same side via a bracket, and the top end of the vertical guide rod (108) passes through the annular circular opening (107) and extends to the upper part of the load-bearing bottom plate (101); a circular storage frame (109) used in conjunction with the annular circular opening (107) is slidably mounted between the surfaces of the two vertical guide rods (108); a first spring (110) is sleeved on the surface of the vertical guide rod (108) and located below the circular storage frame (109); and a lifting circular opening (111) is provided at the bottom of the circular storage frame (109).
5. A method for detecting compaction of roadbed in highway engineering according to claim 4, Features: The front side of the top of the load-bearing bottom plate (101) is fixedly connected to a rear vertical support plate (112); the left side of the rear vertical support plate (112) is fixedly connected to a limit slide frame (113) via a bracket; a double-head frame (114) is slidably mounted on the inner side of the limit slide frame (113); a second spring (116) is fixedly connected between the double-head frame (114) and the surface of the rear vertical support plate (112); and both ends of the front portion of the double-head frame (114) are fixedly connected to inclined plug rods (115).
6. A method for detecting compaction of roadbed in highway engineering according to claim 5, Features: A rectangular shift rod (117) is slidably mounted on the surface of the rear vertical support plate (112) through an opening, a rear end of the rectangular shift rod (117) is fixedly connected to a supporting recess (118), a third spring (119) is sleeved on the surface of the rectangular shift rod (117) and located at the rear of the rear vertical support plate (112), a limited moment groove (123) is formed on the surface of the rear vertical support plate (112), and a convex baffle (120) used in conjunction with the rectangular shift rod (117) is slidably mounted on the inner side of the limited moment groove (123).
7. A method for detecting compaction of roadbed in highway engineering according to claim 6, Features: Side sliding grooves (121) are provided on both sides of the rear vertical support plate (112), and an arc stop plate (122) is slidably mounted between the two side sliding grooves (121).
8. A method for detecting compaction of roadbed in highway engineering according to claim 5, Features: The punching and collecting mechanism (2) comprises a cylinder (201), and the cylinder (201) is fixedly mounted on the rear side of the top of the load-bearing bottom plate (101), the top end of the cylinder (201) is fixedly connected to an upper top plate frame (202), the inner side of the upper top plate frame (202) is fixedly connected to a motor (203), the output shaft of the motor (203) is fixedly connected to a rotating rod (204) via a coupling, the lower part of the surface of the rotating rod (204) is fixedly connected to an auger blade (205) used in conjunction with a lifting circular opening (111), and both sides of the surface of the upper top plate frame (202) are fixedly connected to a double-arc guide frame (210) used in conjunction with a double-head frame (114).
9. A method for detecting compaction of roadbed in highway engineering according to claim 8, Features: Both sides of the upper top plate frame (202) are fixedly connected with compression ring frames (206), and the compression ring frames (206) are slidably mounted on the surface of the vertical guide rod (108), and a ring pressure sleeve (208) is slidably mounted on the surface of the vertical guide rod (108), and a fourth spring (207) is fixedly connected between the compression ring frame (206) and the ring pressure sleeve (208) on the same side and located on the surface of the vertical guide rod (108), and a sealing disc (209) used in conjunction with the lifting circular opening (111) is fixedly connected to the surface of the rotating rod (204).
10. A method for detecting compaction of a highway engineering roadbed according to claim 9, Features: Both sides of the surface of the rotating rod (204) and located above the blocking disc (209) are fixedly connected to a hollow frame (211) via a fixing plate, a blocking moment block (213) is slidably mounted on the inner side of the hollow frame (211), and the two opposing ends of the two blocking moment blocks (213) are fixedly connected to an arc-surface clamping block (212) used in conjunction with the circular storage frame (109), a fifth spring (215) used in conjunction with the inclined insertion rod (115) is provided on the top of the blocking moment block (213), and the fifth spring (215) is fixedly connected between the blocking moment block (213) and the inner wall of the hollow frame (211).
Citation Information
Patent Citations
Road engineering roadbed compactness detection equipment
CN217078686U
Cited By
Geological disaster monitoring and early warning device
CN121034025A