Prefabricated steel structure split box girder supporting structure and method

Through the prefabricated steel structure split box girder support structure, the close combination of box girders and arch frames is used to solve the problem of on-site casting deformation in underground projects, the construction efficiency and structural stability are improved, and the safety of underground projects is ensured.

CN118979762APending Publication Date: 2024-11-19SICHUAN HUAYINGSHAN LONGTAN COAL
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411072122.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

In underground projects, the internal wall of reinforced concrete on site is poured due to the large one-time excavation section, which can easily lead to deformation, which increases the construction difficulty and risks, and it is difficult to effectively solve the problem of existing technologies.

Method used

A prefabricated steel structure split box girder support structure, including box girder and arch frame, with a cavity and grouting pipe inside the box girder. The arch frame is connected to the joints of the box girder and is tightly connected to the prefabricated box girder and arch frame. In combination, as the bearing boundary of the slurry, the problem of casting deformation is solved, and the structure is strengthened as a skeleton after casting.

Benefits of technology

It improves construction efficiency and structural stability, ensures the safety of subsequent operations, and realizes effective reinforcement and maintenance of complex disaster sections of underground projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118979762A_ABST
    Figure CN118979762A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of roadway supporting, and provides a prefabricated steel structure split box girder supporting structure and method.The prefabricated steel structure split box girder supporting structure comprises a roadway, box girders and arch frames, the box girders and the arch frames are attached to the inner wall of the roadway, the arch frames are connected to joints of the two sides of the adjacent box girders, and cavities used for being filled with grout are formed in the box girders; first communicating holes used for communicating the adjacent box girders are formed in the side walls of the box girders, grouting pipes communicated with the lower portions of the box girders are arranged at the inner bottom ends of the box girders, the box girders and the arch frames are prefabricated, the arch frames are connected to joints on the two sides of the adjacent box girders and serve as bearing boundaries of grout in the pouring process, the problems that cast-in-place is difficult, and deformation is prone to occurring are solved, and after pouring, the grouting pipes are not prone to deformation. The box girder and the arch frame can be used as a framework to play a role in structural reinforcement, so that the safety of subsequent operation is ensured, the reinforcement and maintenance of a complex disaster section of underground engineering are realized, the construction efficiency and the structural stability are improved, and the safety of subsequent operation is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of tunnel support, and in particular to a prefabricated steel structure split box girder support structure and method. Background Art

[0002] In the construction and maintenance of underground projects such as mines, roads and railways, water conservancy and hydropower, geological problems such as faults, karst, weakly cemented mud and sand rock mass and rock burst are often encountered. The underground engineering geological poor section with these problems is called the underground engineering complex disaster section, which may cause serious disasters, including roof collapse, water inrush, sediment influx, rock burst and deformation, which not only poses a major obstacle to the construction of underground projects, but also poses a hidden danger to the subsequent operation safety. In order to solve these problems, such projects usually need to carry out support reinforcement and water plugging consolidation to eliminate potential safety hazards. However, there are still some problems in the implementation of the existing technology, especially when pouring reinforced concrete inner wall on site, because the one-time excavation section is too large, it is easy to cause deformation, thereby increasing the difficulty and risk of construction. Summary of the invention

[0003] The purpose of the present invention is to provide a prefabricated steel structure split box girder support structure and method to solve the above-mentioned technical problems, improve construction efficiency and structural stability, and ensure the safety of subsequent operation.

[0004] An embodiment of the present invention is achieved through the following technical scheme: a prefabricated steel structure split box girder support structure, including a tunnel and a box girder and an arch frame arranged to fit the inner wall of the tunnel, the arch frame is connected to the joints on both sides of adjacent box girders, a cavity for filling slurry is provided in the box girder, a first connecting hole for connecting adjacent box girders is opened on the side wall of the box girder, and a grouting pipe connected to the bottom of the box girder is provided at the bottom end of the box girder.

[0005] Furthermore, the box beam comprises a main box body and side box bodies, the side box bodies are symmetrically connected to both sides of the main box body, and the side walls of the main box body and the side box bodies are both provided with second connecting holes that are connected to each other.

[0006] Furthermore, a reinforcing rib is connected to the inner bottom end of the box girder, and the projections of the end faces of the reinforcing rib on both sides of the box girder overlap with the projections of the arch frame on both sides of the box girder.

[0007] Furthermore, a plurality of sections of the box beam are closely arranged along the axial direction of the tunnel, and a sealing plate is connected to the outer side wall of the box beam arranged at the end of the tunnel.

[0008] Furthermore, the inner sides of adjacent arch frames are sealed and connected with side baffles, the lower ends of the side baffles are sealed and butted with the box beam, and drainage holes are opened on the side baffles.

[0009] Furthermore, longitudinal compression rods are placed on the box beam along the axial direction of the tunnel for horizontally compacting the box beam on the bottom surface of the tunnel.

[0010] Furthermore, the box girder is prefabricated using A3 alloy steel.

[0011] Furthermore, bolts are used to fasten the box beam and the arch frame, the adjacent box beams and the adjacent arch frames.

[0012] A method for supporting a prefabricated steel structure split box beam comprises the following steps:

[0013] S1. Pre-treatment of tunnel support, intercepting water flow and breaking up the rock mass at the bottom of the tunnel;

[0014] S2. Excavate the disaster section in sections and determine the specific location and excavation length of the disaster section based on the disaster situation revealed at the tunnel site;

[0015] S3, the sub-sections install the box beams and arch frames in sequence, starting from the karst water outlet of the disaster section to the axial ends of the tunnel;

[0016] S4. Grouting at the bottom of the tunnel. Grouting is done between the tunnel and the box beam through the grouting pipe. Grouting is stopped when the grouting reaches the gap between the box beams or the grouting pressure reaches 1MPa. After a period of stability, grouting is stopped.

[0017] S5. Cast the box girder, set up the reserved drainage ditch, and pour slurry into the box girder.

[0018] Furthermore, firstly, three sections of box girders are installed closely along the cross section of the tunnel by leveling on the left and right, positioning up and down, and then the arch frames are installed accordingly, and then the subsequent box girders and arch frames are installed in sequence.

[0019] The present invention has at least the following advantages and beneficial effects: by prefabricating box girders and arch frames, the arch frames are connected to the joints on both sides of adjacent box girders. During pouring, the arch frames serve as the bearing boundaries of the slurry, thus solving the problems of difficulty in on-site pouring and easy deformation. After pouring, the box girders and arch frames can be used as skeletons to strengthen the structure, thereby ensuring the safety of subsequent operation, realizing the reinforcement and maintenance of complex disaster sections of underground projects, improving construction efficiency and structural stability, and ensuring the safety of subsequent operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0021] Figure 1 A structural schematic diagram of a prefabricated steel structure split box girder support structure provided by the present invention;

[0022] Figure 2 A front view of a prefabricated steel structure split box beam support structure provided by the present invention;

[0023] Figure 3 A structural schematic diagram of a main box in a prefabricated steel structure split box beam support structure provided by the present invention;

[0024] Figure 4 A schematic structural diagram of a side box in a prefabricated steel structure split box beam support structure provided by the present invention;

[0025] Figure 5 A process flow chart of a prefabricated steel structure split box girder supporting method provided by the present invention;

[0026] Icons: 1-tunnel, 2-box girder, 20-cavity, 201-first connecting hole, 202-second connecting hole, 21-main box body, 22-side box body, 23-grouting pipe, 24-reinforcement rib, 3-arch frame, 4-sealing plate, 5-side baffle, 50-drainage hole, 6-longitudinal compression rod. DETAILED DESCRIPTION

[0027] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0028] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] Example

[0030] like Figure 1-4As shown, in this embodiment, a prefabricated steel structure split box girder support structure is mainly disclosed, which is used for the reinforcement and operation maintenance of the complex disaster section construction of underground engineering, including a tunnel 1 and a box girder 2 and an arch frame 3 arranged in contact with the inner wall of the tunnel 1, the arch frame 3 is connected to the joints on both sides of the adjacent box girder 2, a cavity 20 for filling slurry is provided in the box girder 2, a first connecting hole 201 for connecting the adjacent box girder 2 is opened on the side wall of the box girder 2, and a grouting pipe 23 connected to the bottom of the box girder 2 is provided at the bottom end of the box girder 2. Specifically, the box girder 2 and the arch frame 3 are prefabricated in advance, which can save on-site construction time and improve construction efficiency; the box girder 2 is installed at the bottom of the tunnel 1, and the arch frame 3 is arched for supporting the upper part of the tunnel 1. The specific dimensions of the box girder 2 and the arch frame 3 are set according to the section of the tunnel 1 and the disaster characteristics of the treatment object. In this embodiment, the box girder 2 adopts a trough structure with an open top. The bottom of the box girder 2 is in an arc shape, and concrete slurry is poured inside it. The arch frame 3 is made of I-beam or channel steel; an arch frame 3 is connected to two adjacent box girders 2 to form an integral support structure, which can effectively disperse and transfer loads and enhance the stability of the structure; slurry is poured into one box girder 2, and the pouring of the remaining box girders 2 can be achieved through the first connecting hole 201; when the box girder 2 is prefabricated, a grouting pipe 23 is welded at the bottom of the box girder 2, and the grouting pipe 23 can be vertically arranged at the center of the bottom of the box girder 2, which is convenient for grouting between the box girder 2 and the tunnel 1, so that the box girder 2 and the tunnel 1 are cast and integrated; when the box girder 2 is poured, it serves as the bearing boundary of the slurry, which solves the problem of difficulty in on-site pouring and easy deformation. After pouring, the box girder 2 and the arch frame 3 can be used as a skeleton to strengthen the structure and ensure the safety of subsequent operation.

[0031] Furthermore, in the specific implementation, Figure 3 , 4 As shown, the box girder 2 provided in the embodiment of the present invention includes a main box body 21 and a side box body 22, and the side box bodies 22 are symmetrically connected to both sides of the main box body 21. The side walls of the main box body 21 and the side box bodies 22 are provided with second connecting holes 202 that are connected to each other. Specifically, the box girder 2 is divided into a middle main box body 21 and side boxes 22 on both sides for three-section prefabrication, which is convenient for transportation and reduces the difficulty of on-site construction. The main box body 21 and the side box body 22 are connected to form a whole through the second connecting hole 202.

[0032] Furthermore, in the specific implementation, if Figure 3 , 4As shown, in the embodiment of the present invention, the inner bottom end of the box girder 2 is connected with a reinforcing rib 24, and the projections of the end faces of the reinforcing rib 24 on both sides of the box girder 2 overlap with the projections of the arch frame 3 on both sides of the box girder 2; specifically, the reinforcing rib 24 is processed into a shape that fits the bottom plate of the box girder 2, and two are provided, which are respectively welded at the two ends of the adjacent box girder 2 close to the docking; when the box girder 2 is connected to the arch frame 3, one end of the same arch frame 3 can simultaneously transmit the action on two different reinforcing ribs 24 of the adjacent box girder 2, which can effectively improve the shear resistance and bending stiffness of the box girder 2, and enhance the connection strength and stability of the structure.

[0033] Furthermore, in the specific implementation, if Figure 1 As shown, the box girder 2 provided in the embodiment of the present invention has multiple sections arranged closely along the axial direction of the tunnel 1, and a sealing plate 4 is connected to the outer wall of the box girder 2 arranged at the end of the tunnel 1, and the sealing plates 4 at both ends constitute the axial casting boundary of the tunnel 1.

[0034] Furthermore, in the specific implementation, if Figure 1 As shown, the inner side of the adjacent arch frames 3 provided in the embodiment of the present invention is sealed and connected with a side baffle plate 5, the lower end of the side baffle plate 5 is sealed and connected with the box beam 2, and the side baffle plate 5 is provided with drainage holes 50 for draining water seepage from the joints and cracks of the surrounding rock.

[0035] Furthermore, in the specific implementation, if Figure 1 As shown, on the box girder 2 provided in the embodiment of the present invention, longitudinal compression rods 6 for horizontally compacting the box girder 2 on the bottom surface of the tunnel 1 are placed along the axial direction of the tunnel 1; specifically, a plurality of longitudinal compression rods 6 can be symmetrically placed on the box girder 2. When the box girder 2 is installed, each box girder 2 is evenly compacted by force and it is ensured that the upper edges of the box girder 2 are all located on the same horizontal plane.

[0036] Furthermore, in the specific implementation, the box girder 2 provided in the embodiment of the present invention is prefabricated with A3 alloy steel material, which has excellent mechanical properties, plasticity, toughness, welding performance and corrosion resistance; bolts are used to fasten the box girder 2 and the arch frame 3, between adjacent box girders 2 and between adjacent arch frames 3, which can limit the axial movement of the support structure along the tunnel 1, ensure the stability of the overall support structure, and avoid deformation and failure of the support structure at key positions of the tunnel 1.

[0037] like Figure 5 As shown, in this embodiment, a method for supporting a prefabricated steel structure split box girder 2 is also disclosed, comprising the following steps:

[0038] S1, tunnel 1 support pretreatment, water interception and crushing of the bottom of tunnel 1; in this embodiment, the disaster area is located at the bottom of tunnel 1, and preparatory work such as water interception, crushing of the bottom, and removal of belts and tracks is required before excavation;

[0039] S2. Excavate the disaster section in sections. According to the disaster situation revealed on site in Lane 1, determine the specific location and excavation length of the disaster section. It should be noted that when the disaster section is a fissure section, the excavation depth is deeper than when the disaster section is a bedrock section. The bottom of the disaster section is excavated in an arc shape and needs to be excavated to the solid bottom. If there are still fissures and soft mud after excavation to the designed size, crushed stone filling treatment is required;

[0040] S3, the divisions sequentially install the box beam 2 and the arch frame 3, and install them from the karst water outlet of the disaster section to the axial ends of the tunnel 1 respectively; first, level and position the three sections of the box beam 2 closely along the cross section of the tunnel 1, and then install the arch frame 3 accordingly, and then sequentially install the subsequent box beams 2 and the arch frame 3. Specifically, first install the three sections of the main box body 21 to facilitate leveling and positioning, and then install the corresponding six sections of the side box body 22. After the installation is in place, level and position again. With this, the three sections of the box beam 2 are gradually installed to the axial ends of the tunnel 1 corresponding to the reference, ensuring the accurate installation of the box beam 2 and the arch frame 3, and effectively avoiding the stress concentration caused by the uneven structure;

[0041] S4, grouting at the bottom of the tunnel 1. After the box beam 2 and the arch frame 3 are installed in place, grouting is performed between the tunnel 1 and the box beam 2 through the grouting pipe 23. When the grouting reaches the gap between the box beams 2 and the grouting pressure reaches 1MPa, the grouting is stopped after a period of stability, so that each box beam 2 is cast and solidified into one body, and the bonding between the box beam 2 and the foundation is effectively improved, the gap is filled and additional foundation support is provided, and the overall stability is enhanced;

[0042] S5, pouring the box girder 2, setting up a reserved drainage ditch, and pouring slurry into the box girder 2. Specifically, the drainage ditch can be formed by pouring through a baffle in the middle of the tunnel 1 above the main box body 21.

[0043] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A prefabricated steel structure split box beam support structure, characterized in that: The invention comprises a tunnel (1) and a box beam (2) and an arch frame (3) arranged to fit the inner wall of the tunnel (1); the arch frame (3) is connected to the joints on both sides of the adjacent box beams (2); a cavity (20) for filling slurry is provided in the box beam (2); a first connecting hole (201) for connecting with the adjacent box beams (2) is opened on the side wall of the box beam (2); and a grouting pipe (23) connected to the bottom of the box beam (2) is provided at the inner bottom end of the box beam (2).

2. A prefabricated steel structure split box beam support structure as claimed in claim 1, characterized in that: The box beam (2) comprises a main box body (21) and a side box body (22), wherein the side box bodies (22) are symmetrically connected to two sides of the main box body (21), and the side walls of the main box body (21) and the side box bodies (22) are both provided with second communication holes (202) that are connected to each other.

3. A prefabricated steel structure split box beam support structure as claimed in claim 1, characterized in that: A reinforcing rib (24) is connected to the inner bottom end of the box beam (2), and the projections of the end faces of the reinforcing rib (24) on both sides of the box beam (2) overlap with the projections of the arch frame (3) on both sides of the box beam (2).

4. A prefabricated steel structure split box beam support structure as claimed in claim 1, characterized in that: The box beam (2) has multiple sections arranged closely together along the axial direction of the tunnel (1), and a sealing plate (4) is connected to the outer side wall of the box beam (2) arranged at the end of the tunnel (1).

5. The prefabricated steel structure split box beam support structure according to claim 1, characterized in that: The inner side of the adjacent arch frame (3) is sealed and connected with a side baffle (5), the lower end of the side baffle (5) is sealed and butted with the box beam (2), and a drainage hole (50) is opened on the side baffle (5).

6. A prefabricated steel structure split box beam support structure as claimed in claim 1, characterized in that: A longitudinal compression rod (6) is placed on the box beam (2) along the axial direction of the tunnel (1) for horizontally compacting the box beam (2) on the bottom surface of the tunnel (1).

7. The prefabricated steel structure split box beam support structure according to claim 1, characterized in that: The box beam (2) is prefabricated using A3 alloy steel.

8. The prefabricated steel structure split box beam support structure according to claim 1, characterized in that: The box beam (2) and the arch frame (3), adjacent box beams (2) and adjacent arch frames (3) are fastened with bolts.

9. A supporting method for a prefabricated steel structure split box beam supporting structure according to any one of claims 1 to 8, characterized in that: The following steps are involved: S1, pre-processing the support of the tunnel (1), intercepting water and breaking the bottom of the tunnel (1); S2, excavating the disaster section in sections, and determining the specific location and excavation length of the disaster section according to the disaster situation revealed on site in the tunnel (1); S3, the box beam (2) and the arch frame (3) are installed in sequence in sections, from the karst water outlet of the disaster section to the axial ends of the tunnel (1); S4, grouting the bottom of the tunnel (1), grouting between the tunnel (1) and the box beam (2) through the grouting pipe (23), until the gap between the box beam (2) is grouted and the grouting liquid flows back or the grouting pressure reaches 1 MPa, and then the grouting is stopped after a period of stability; S5, casting the box girder (2), setting up a reserved drainage ditch, and pouring slurry into the box girder (2).

10. A method for supporting a prefabricated steel structure split box beam as claimed in claim 9, characterized in that: First, the three sections of the box beams (2) are installed along the cross section of the tunnel (1) by leveling on the left and right, positioning up and down, and then the arch frames (3) are installed accordingly, and then the subsequent box beams (2) and arch frames (3) are installed in sequence.