Central air-conditioning load resource operation characteristic correction method based on sensible temperature

By constructing a somatosensory temperature model and correction model, combining outdoor temperature, passenger flow and weather factors, the operation characteristics analysis of central air conditioners is optimized, and the problems of somatosensory temperature being ignored and environmental factors not considered in the existing methods are solved, and the analysis accuracy is improved and load response capabilities enable more accurate energy management.

CN118980157AActive Publication Date: 2024-11-19NORTHEAST DIANLI UNIVERSITY +2

Patent Information

Application Number
CN202411104430.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-11-19
Estimated Expiration
2044-08-13

AI Technical Summary

Technical Problem

The existing central air conditioner operation characteristics analysis method ignores somatosensory temperature, resulting in deviations from the actual results, failure to monitor and adjust in real time, resulting in lag in regulation strategies, unable to respond to environmental changes in time, and not fully considering outdoor temperature, passenger flow and weather factors , resulting in insufficient accuracy of analysis and regulation.

Method used

Construct a central air conditioner load resource operation characteristics correction method based on somatosensory temperature, including constructing a somatosensory temperature model, controlling operating mode and correction model, comprehensively considering somatosensory temperature, outdoor temperature, passenger flow and weather factors, and formulating operation characteristics in four typical scenarios Correct the model to optimize the start/stop operation cycle of central air conditioners and improve the accuracy of response capability assessment.

Benefits of technology

It improves the accuracy of the analysis of the operating characteristics of central air conditioners, improves the accuracy of the evaluation of load response capabilities, enhances the ability to regulate central air conditioners, and ensures user comfort and energy efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118980157A_ABST
    Figure CN118980157A_ABST
Patent Text Reader

Abstract

The invention discloses a central air conditioner load resource operation characteristic correction method based on sensible temperature, belongs to the field of electric power systems, and solves the problem that an existing analysis method is insufficient in central air conditioner operation characteristic regulation and control analysis accuracy. The method comprises the following steps that firstly, a central air conditioner load sendible temperature model is built, then, a central air conditioner control operation mode based on sendible temperature is built, and finally, a central air conditioner load operation characteristic correction model considering passenger flow volume and outdoor temperature is built. The operation characteristics of the central air conditioner are corrected by comprehensively considering the sensible temperature, the outdoor temperature, the passenger flow volume and the weather factors, the accuracy of central air conditioner operation characteristic analysis is improved, the accuracy of central air conditioner load response capability evaluation can be further improved, the mining degree of the central air conditioner resource response capability is improved, and the economic benefit is increased. And finally, the regulation capability of the novel urban power grid is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of electric power systems, and in particular relates to a method for correcting operating characteristics of central air-conditioning load resources based on body-perceived temperature. Background Art

[0002] Accurately evaluating the operating characteristics of central air conditioners is of great significance, which helps to optimize energy use under different load conditions and avoid unnecessary energy waste. Based on the operating characteristics, more sophisticated control strategies can be implemented to reduce energy consumption. By monitoring and analyzing the operating characteristics, potential faults or abnormal conditions can be detected early, so that preventive maintenance can be carried out to reduce the system failure rate. Accurate operating characteristic data can help formulate more effective maintenance plans and extend the service life of equipment. Based on the operating characteristics, central air conditioners can respond more quickly to changes in the environment and user needs, providing a more stable and comfortable indoor environment. The control system can adjust the temperature, humidity and air flow based on real-time data to ensure user comfort while reducing energy consumption.

[0003] The existing central air conditioning operation characteristics analysis methods have the following shortcomings: 1) Ignoring the perceived temperature. Traditional analysis methods often only focus on the indoor air temperature and ignore the perceived temperature, which makes it impossible to accurately reflect the user's comfort. The perceived temperature is affected by many factors, such as humidity, air flow velocity, radiation temperature, etc. It is difficult to fully evaluate the user experience by relying solely on air temperature. 2) There is a deviation between the evaluation results and the actual situation. Due to the simplification of the model and algorithm, the analysis results often have a certain deviation from the actual situation; Failure to monitor and adjust in real time leads to a lag in the control strategy and failure to respond to environmental changes in a timely manner. 3) Insufficient consideration of factors such as outdoor temperature, passenger flow, and weather. Changes in outdoor temperature will affect the load and efficiency of central air conditioning, but traditional methods may not fully consider this; changes in passenger flow will affect indoor heat load. Traditional methods often ignore this important factor, resulting in inaccurate control during peak or trough periods; The impact of weather conditions (such as sunny, cloudy, rainy, etc.) on air conditioning load is also not fully considered. 4) Lack of detailed modeling. Traditional methods lack detailed modeling of the above factors (outdoor temperature, passenger flow, weather, etc.), resulting in insufficient accuracy of analysis and control. Summary of the invention

[0004] In view of the above problems, the present invention proposes a method for correcting the operating characteristics of central air-conditioning load resources based on body temperature, which solves the problem that the existing central air-conditioning operating characteristics analysis method is insufficient in accuracy in regulating and analyzing the operating characteristics of central air-conditioning.

[0005] The technical solution adopted by the present invention is as follows: a method for correcting the operating characteristics of central air-conditioning load resources based on body temperature, the steps are as follows:

[0006] S1: Construct a central air-conditioning load perceived temperature model, and control the central air-conditioning participation response based on the temperature model;

[0007] S2: Constructing a central air-conditioning control operation mode based on body-felt temperature: including three operation modes: switch control operation mode, body-felt temperature control operation mode, and mixed control operation mode. The switch control operation mode controls the central air-conditioning according to the switch, the body-felt temperature control mode controls the central air-conditioning by adjusting the body-felt temperature range, and the mixed control mode controls the central air-conditioning by comprehensively adjusting the body-felt temperature range and combining the switch;

[0008] S3: Construct a correction model for the central air-conditioning load operating characteristics considering passenger flow and outdoor temperature: Under the perceived temperature control operating mode, the operating characteristics of the central air-conditioning load are corrected by comprehensively considering the influence of factors such as outdoor temperature, passenger flow, air humidity, and wind speed. Four typical scenarios are given: sunny weekday scenario, sunny holiday scenario, cloudy weekday scenario, and cloudy holiday scenario. A correction model for the operating characteristics of the central air-conditioning under different scenarios is constructed to provide more accurate operating characteristics for the evaluation of the central air-conditioning's responsiveness.

[0009] Furthermore, in step S1, the central air conditioning load perceived temperature model is constructed as shown in formula (1):

[0010]

[0011] Where AT(t) is the perceived temperature at time t; T(t) is the indoor temperature at time t; Pa(t) is the indoor water vapor pressure at time t; V(t) is the wind speed at time t; Q p is the rated cooling capacity of the chiller; β c is the chilled water temperature parameter; T1 is the central air conditioning cooling period δ c (t) = 1 initial indoor temperature at the beginning; T0 is the CAC shutdown period δ c (t) = 0 initial indoor temperature at the beginning; δ c is the central air-conditioning operation state matrix: 1-operation state, 0-stop state; RH is relative humidity; a1 is the heat coefficient inside the building; a2 is the heat coefficient on the top of the building; a3(t) is the indoor and outdoor heat load coefficient; a4 is the chilled water heat coefficient;

[0012] Among them, the parameters of commercial buildings must satisfy formula (2):

[0013]

[0014] Where a1 is the heat coefficient inside the building; a2 is the heat coefficient of the building roof; a3(t) is the indoor and outdoor heat load coefficient; a4 is the chilled water heat coefficient; ρ a is the air density; Ca is the specific heat capacity of air; V k is the volume inside the building; K s is the heat storage coefficient of the building inner wall; S w-in is the area of ​​the interior wall of the building; K top is the thermal conductivity of the building roof; K w is the thermal conductivity of the building wall; S top is the roof area of ​​the building; S w is the building wall area; T out is the outdoor temperature; m w is the quality of chilled water; C w is the specific heat capacity of chilled water; T wc T is the chilled water outlet temperature; wj is the chilled water inlet temperature; Q L (t) is the indoor cooling load at time t; K e is the equipment cooling load; K z is the lighting cooling load; q e is the heat dissipation per unit area of ​​the equipment; q z S is the heat dissipation per unit area of ​​lighting; c is the cooling area; K x is the apparent cooling load coefficient of the human body; q x q is the sensible heat dissipation of the human body; n is the latent heat dissipation of the human body; h q is the clustering coefficient.

[0015] Furthermore, in step S2, the central air conditioner operates periodically to keep the indoor air temperature at [T min ,T max ], in the summer cooling process, the air conditioner is turned off, and the indoor air temperature gradually rises from point m to point n. The power of the air conditioner during the process from point m to point n is 0, and the shutdown period is τ off , the air conditioner is turned on, the indoor air temperature drops from point n to point k, the air conditioner generates operating power from point n to point k, and the operating cycle is τ on , indoor air temperature range [T min ,T max ]Affects the air conditioning start / stop cycleτ on , τ off , thus affecting the user's response time. In the switch control operation mode, the central air conditioner turns on or off the air conditioner after receiving the command, always in [T min ,T max ] temperature range; in the body temperature control operation mode, the central air conditioner changes the upper and lower limits of the temperature to [AT min ,AT max] to participate in the response, the indoor temperature operation range during the central air-conditioning shutdown period changes from (m, n) to (g, h), and the shutdown period changes from τ off becomes τ' off , the interval with power 0 changes from (m, n) to (g, h); in the mixed control operation mode, the central air conditioner changes the upper and lower limits of temperature and the switch state at the same time, and the response ends and returns to the comfortable temperature zone [T min ,T max ], the start / stop cycle is still τ on , τ off ; Combined with the central air-conditioning load perceived temperature model, the perceived temperature-switch hybrid control mode is adopted to participate in the regulation under the premise of ensuring human comfort.

[0016] Furthermore, in step S3, the start / stop operation cycle of the central air conditioner is affected by factors such as outdoor temperature, passenger flow, air humidity, and wind speed. Therefore, four typical central air conditioner operation scenarios are constructed:

[0017] a) Sunny working day scenario: In this scenario, the outdoor temperature is T out1 , the passenger flow is η p1 , correct the central air conditioning start / stop operation cycle in this scenario and

[0018] b) Sunny holiday scene: In this scene, the outdoor temperature is T out1 , the passenger flow is η p2 , correct the central air conditioning start / stop operation cycle in this scenario and

[0019] c) Cloudy weekday scenario: In this scenario, the outdoor temperature is T out2 , the passenger flow is η p1 , correct the central air conditioning start / stop operation cycle in this scenario and

[0020] d) Cloudy holiday scene: In this scene, the outdoor temperature is T out2 , the passenger flow is η p2 , correct the central air conditioning start / stop operation cycle in this scenario and

[0021] According to the sunny outdoor temperature T out1 , passenger flow η P1 , build the operating characteristic correction model of the central air conditioning on sunny weekdays, and correct the operating cycle of the central air conditioning in this scenario Outage period As shown in formula (3)-(4):

[0022]

[0023] Based on the same method above, the operation characteristic correction models of the central air-conditioning for sunny holiday scenarios, cloudy weekday scenarios, and cloudy holiday scenarios are constructed, and the start / stop operation cycle of the central air-conditioning is corrected respectively, and then the central air-conditioning is controlled to obtain more accurate central air-conditioning operation characteristics, and finally obtain more accurate central air-conditioning load and its response capability.

[0024] The advantages and beneficial effects of the present invention are as follows: The present invention comprehensively considers the perceived temperature, outdoor temperature, passenger flow, and weather factors to correct the operating characteristics of the central air-conditioning, thereby improving the accuracy of the analysis of the operating characteristics of the central air-conditioning, and further improving the accuracy of the evaluation of the central air-conditioning load response capability, thereby improving the degree of exploration of the central air-conditioning resource response capability, and ultimately improving the regulation capability of the new urban power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is the principle diagram of the correction method of the present invention;

[0026] Figure 2 It is the central air-conditioning load operation characteristic diagram under different control modes;

[0027] Figure 3 This is the effect of passenger flow on the operating characteristics of central air conditioning;

[0028] Figure 4 This is a diagram showing the impact of outdoor temperature on the operating characteristics of central air conditioning. DETAILED DESCRIPTION

[0029] The present invention will be further described below with reference to the accompanying drawings as examples:

[0030] Example 1

[0031] like Figure 1 As shown, a method for correcting the operating characteristics of central air-conditioning load resources based on body temperature is as follows:

[0032] S1: Construct a somatic temperature model for the central air-conditioning load: The somatic temperature is the body temperature index felt by the human body, which is determined by the air temperature, wind speed and relative humidity. In the actual control of the power grid, the actual temperature setting of the central air-conditioning is affected by the somatic temperature. Most existing methods control the air-conditioning based on the air temperature displayed on the panel, ignoring the somatic temperature. The evaluation results deviate from the actual situation. Therefore, this embodiment comprehensively considers the factors of building parameters, indoor and outdoor temperature difference, air-conditioning cooling load, wind speed, and relative humidity to construct a somatic temperature model for the central air-conditioning load, and controls the central air-conditioning to participate in the response based on the temperature. The central air-conditioning system includes a chiller, a chilled water pump, a cooling water pump, a cooling tower and a fan coil. During the central air-conditioning cooling period, the chiller cools the chilled water, and the chilled water pump and the fan send the cooled air into the room to reduce the temperature. During the central air-conditioning shutdown period, no chilled water is generated. Affected by factors such as the indoor and outdoor temperature difference, indoor heat dissipation equipment, and human heat dissipation, the indoor temperature gradually rises. Among them, the constructed somatic temperature model for the central air-conditioning load is shown in formula (1),

[0033]

[0034] Where AT(t) is the perceived temperature at time t; T(t) is the indoor temperature at time t; Pa(t) is the indoor water vapor pressure at time t; V(t) is the wind speed at time t; Q p is the rated cooling capacity of the chiller; β c is the chilled water temperature parameter; T1 is the central air conditioning cooling period δ c (t) = 1 initial indoor temperature at the beginning; T0 is the CAC shutdown period δ c (t) = 0 initial indoor temperature at the beginning; δ c is the central air-conditioning operation state matrix: 1-operation state, 0-stop state; RH is relative humidity; a1 is the heat coefficient inside the building; a2 is the heat coefficient on the top of the building; a3(t) is the indoor and outdoor heat load coefficient; a4 is the chilled water heat coefficient;

[0035] Among them, the parameters of commercial buildings must satisfy formula (2):

[0036]

[0037] Where a1 is the heat coefficient inside the building; a2 is the heat coefficient of the building roof; a3(t) is the indoor and outdoor heat load coefficient; a4 is the chilled water heat coefficient; ρ a is the air density; C a is the specific heat capacity of air; V k is the volume inside the building; K s is the heat storage coefficient of the building inner wall; S w-in is the area of ​​the interior wall of the building; K top K is the thermal conductivity of the building roof; wis the thermal conductivity of the building wall; S top is the roof area of ​​the building; S w is the building wall area; T out is the outdoor temperature; m w is the quality of chilled water; C w is the specific heat capacity of chilled water; T wc T is the chilled water outlet temperature; wj is the chilled water inlet temperature; Q L (t) is the indoor cooling load at time t; K e is the equipment cooling load; K z is the lighting cooling load; q e is the heat dissipation per unit area of ​​the equipment; q z S is the heat dissipation per unit area of ​​lighting; c is the cooling area; K x is the apparent cooling load coefficient of the human body; q x q is the sensible heat dissipation of the human body; n is the latent heat dissipation of the human body; h q is the clustering coefficient.

[0038] S2: Construct a central air-conditioning control operation mode based on the perceived temperature: including three operation modes: switch control operation mode, perceived temperature control operation mode, and mixed control operation mode. The switch control operation mode controls the central air-conditioning according to the switch, the perceived temperature control mode controls the central air-conditioning by adjusting the perceived temperature range, and the mixed control mode controls the central air-conditioning by comprehensively adjusting the perceived temperature range and combining the switch. The central air-conditioning has different operating characteristics in different operation modes, and thus has different response capabilities. This embodiment obtains more accurate operating characteristics by adjusting the perceived temperature range and switch control of the central air-conditioning. Among them, the central air-conditioning has three operation modes under the perceived temperature: Figure 2 As shown. The central air conditioner operates periodically, keeping the indoor air temperature at [T min ,T max ] range. In the summer cooling process, the air conditioner is turned off, and the indoor air temperature gradually rises from point m to point n. The power of the air conditioner during the process from point m to point n is 0, and the shutdown period is τ off The air conditioner is turned on, and the indoor air temperature drops from point n to point k. The air conditioner generates operating power from point n to point k, and the operating cycle is τ on ,like Figure 2 (a) As shown. Indoor air temperature range [T min ,T max ] Mainly affects the air conditioning start / stop cycle τ on , τ off, which in turn affects the time that users can participate in responding. In the switch control mode, the central air conditioner turns on or off the air conditioner after receiving the command, always in [T min ,T max ] operating within the temperature range, such as Figure 2 (b) In the body temperature control mode, the central air conditioner changes the upper and lower limits of the temperature to [AT min ,AT max ] to participate in the response, the indoor temperature operation range during the central air-conditioning shutdown period changes from (m, n) to (g, h), and the shutdown period changes from τ off becomes τ' off , the interval with power 0 changes from (m, n) to (g, h), such as Figure 2 (c) As shown. In the mixed control mode, the central air conditioner changes the upper and lower limits of temperature and the switch state at the same time, and the response ends and returns to the comfortable temperature zone [T min ,T max ], the start / stop cycle is still τ on , τ off ,like Figure 2 (d) As shown. Compared with switch control and sensible temperature control, hybrid control is more flexible. Switch control generally directly shuts down the central air-conditioning system, stops the chilled water pump and the cooling water pump from working, and the chilled water and cooling water no longer circulate, which may cause the chilled water in the evaporator to cool down rapidly or even freeze; and then the cooling water in the condenser heats up rapidly, which has an adverse effect on the host. The load of the chiller in the central air-conditioning system accounts for 70% of the total load. This embodiment combines the sensible temperature model of the central air-conditioning load and adopts the sensible temperature-switch hybrid control mode to participate in the regulation under the premise of ensuring human comfort.

[0039] S3: A correction model for the central air-conditioning load operating characteristics considering passenger flow and outdoor temperature. In the perceived temperature control mode, this embodiment comprehensively considers the influence of outdoor temperature, passenger flow, and weather conditions (air humidity, wind speed) to correct the operating characteristics of the central air-conditioning load, that is, to correct the start / stop operation cycle τ on and τ off , both can directly reflect the operating characteristics of the central air-conditioning, and thus affect the adjustment capacity.

[0040] ① The impact of passenger flow on the operating characteristics of central air conditioners: Traditional studies rarely consider the impact of passenger flow on the central air conditioner's adjustment capacity. The passenger flow in commercial buildings varies greatly, which has a greater impact on the central air conditioner's adjustment capacity. The impact mechanism of passenger flow on the central air conditioner's adjustment capacity is as follows: Figure 3 As shown: passenger flow mainly affects the indoor cooling load Q L To affect the central air conditioning start / stop operation cycle τ on and τ off , thus affecting its tuning ability. Figure 2 Passenger flow ηp1 <η p2 , η p2 The corresponding indoor cooling load is larger. When the temperature is reduced by the same amount, the required cooling cycle is longer. on Increase to τ on1 ; When the temperature rises by the same amplitude, the shutdown period becomes shorter, and τ off Reduced to τ off1 , and the central air conditioning adjustment time becomes shorter.

[0041] ② The impact of outdoor temperature on the operating characteristics of central air conditioning: Different outdoor temperatures have different impacts on the regulation response characteristics of central air conditioning. Figure 4 The influence mechanism of outdoor temperature on the control capacity is given. Different outdoor temperatures require different cooling capacities to lower the indoor temperature to the same level, and the speed at which the indoor temperature rises is also different. Figure 4 In the outdoor temperature T out1 <T out2 , refrigeration cycle τ on <τ on2 , outage period τ off >τ off2 .

[0042] Under different weather conditions, such as different outdoor temperatures on sunny and rainy days, the air conditioning response characteristics are different, resulting in different adjustment capabilities of the central air conditioner. Therefore, four typical central air conditioning operation scenarios are constructed:

[0043] a) Sunny working day scenario: In this scenario, the outdoor temperature is T out1 , the passenger flow is η p1 , correct the central air conditioning start / stop operation cycle in this scenario and

[0044] b) Sunny holiday scene: In this scene, the outdoor temperature is T out1 , the passenger flow is η p2 , correct the central air conditioning start / stop operation cycle in this scenario and

[0045] c) Cloudy weekday scenario: In this scenario, the outdoor temperature is T out2 , the passenger flow is η p1 , correct the central air conditioning start / stop operation cycle in this scenario and

[0046] d) Cloudy holiday scene: In this scene, the outdoor temperature is T out2 , the passenger flow is η p2 , correct the central air conditioning start / stop operation cycle in this scenario and

[0047] The corrected central air conditioning start / stop cycle is shown in Table 1.

[0048] Table 1: Correction of central air conditioning operation cycle under the first four typical scenarios

[0049]

[0050] Take a sunny working day as an example. According to the sunny outdoor temperature T out1 、 Weekday passenger flow η P1 , build a central air conditioning operation characteristic correction model to correct the operation cycle of the central air conditioning in this scenario Outage period Obtain more accurate central air conditioning operation characteristics, as shown in equations (3)-(4):

[0051]

[0052] Based on the same method above, the operation characteristic correction models of the central air-conditioning for sunny holiday scenarios, cloudy weekday scenarios, and cloudy holiday scenarios are constructed, and the start / stop operation cycle of the central air-conditioning is corrected respectively, and then the central air-conditioning is controlled to obtain more accurate central air-conditioning operation characteristics, and finally obtain more accurate central air-conditioning load and its response capability.

Claims

1. A method for correcting the operating characteristics of central air-conditioning load resources based on body temperature. It is characterized in that Here are the steps: S1: Construct a central air-conditioning load perceived temperature model, and control the central air-conditioning participation response based on the temperature model; S2: Constructing a central air-conditioning control operation mode based on body-felt temperature: including three operation modes: switch control operation mode, body-felt temperature control operation mode, and mixed control operation mode. The switch control operation mode controls the central air-conditioning according to the switch, the body-felt temperature control mode controls the central air-conditioning by adjusting the body-felt temperature range, and the mixed control mode controls the central air-conditioning by comprehensively adjusting the body-felt temperature range and combining the switch; S3: Construct a correction model for the central air-conditioning load operating characteristics considering passenger flow and outdoor temperature: Under the perceived temperature control operating mode, the operating characteristics of the central air-conditioning load are corrected by comprehensively considering the influence of factors such as outdoor temperature, passenger flow, air humidity, and wind speed. Four typical scenarios are given: sunny weekday scenario, sunny holiday scenario, cloudy weekday scenario, and cloudy holiday scenario. A correction model for the operating characteristics of the central air-conditioning under different scenarios is constructed to provide more accurate operating characteristics for the evaluation of the central air-conditioning's responsiveness.

2. According to claim 1, a method for correcting the operating characteristics of central air-conditioning load resources based on body temperature, It is characterized in that In step S1, the central air conditioning load perceived temperature model is constructed as shown in formula (1): Where AT(t) is the perceived temperature at time t; T(t) is the indoor temperature at time t; Pa(t) is the indoor water vapor pressure at time t; V(t) is the wind speed at time t; Q p is the rated cooling capacity of the chiller; β c is the chilled water temperature parameter; T 1 is the cooling period of central air conditioning c (t) = 1 Initial indoor temperature at the beginning; T 0 is the CAC outage period δ c (t) = 0 Initial indoor temperature at the beginning; δ c is the central air conditioning operation state matrix: 1-operation state, 0-stop state; RH is relative humidity; a 1 is the heat coefficient in the building; a 2 is the thermal coefficient of the building roof; a 3 (t) is the indoor and outdoor heat load coefficient; a 4 is the thermal coefficient of the frozen water; Among them, the parameters of commercial buildings must satisfy formula (2): In the formula, a 1 is the heat coefficient in the building; a 2 is the thermal coefficient of the building roof; a 3 (t) is the indoor and outdoor heat load coefficient; a 4 is the thermal coefficient of frozen water; ρ a is the air density; C a is the specific heat capacity of air; V k is the volume inside the building; K s is the heat storage coefficient of the building inner wall; S w-in is the area of ​​the interior wall of the building; K top K is the thermal conductivity of the building roof; w is the thermal conductivity of the building wall; S top is the roof area of ​​the building; S w is the building wall area; T out is the outdoor temperature; m w is the quality of chilled water; C w is the specific heat capacity of chilled water; T wc T is the chilled water outlet temperature; wj is the chilled water inlet temperature; Q L (t) is the indoor cooling load at time t; K e is the equipment cooling load; K z is the lighting cooling load; q e is the heat dissipation per unit area of ​​the equipment; q z S is the heat dissipation per unit area of ​​lighting; c is the cooling area; K x is the apparent cooling load coefficient of the human body; q x q is the sensible heat dissipation of the human body; n is the latent heat dissipation of the human body; h q is the clustering coefficient.

3. According to claim 2, a method for correcting the operating characteristics of central air-conditioning load resources based on body temperature, It is characterized in that In step S2, the central air conditioner operates periodically to keep the indoor air temperature at [T min ,T max ], in the summer cooling process, the air conditioner is turned off, and the indoor air temperature gradually rises from point m to point n. The power of the air conditioner during the process from point m to point n is 0, and the shutdown period is τ off , the air conditioner is turned on, the indoor air temperature drops from point n to point k, the air conditioner generates operating power from point n to point k, and the operating cycle is τ on , indoor air temperature range [T min ,T max ]Affects the air conditioning start / stop cycleτ on , τ off , thus affecting the user's response time. In the switch control operation mode, the central air conditioner turns on or off the air conditioner after receiving the command, always in [T min ,T max ] temperature range; in the body temperature control operation mode, the central air conditioner changes the upper and lower limits of the temperature to [AT min ,AT max ] to participate in the response, the indoor temperature operation range during the central air-conditioning shutdown period changes from (m, n) to (g, h), and the shutdown period changes from τ off becomes τ' off , the interval with power 0 changes from (m, n) to (g, h); in the mixed control operation mode, the central air conditioner changes the upper and lower limits of temperature and the switch state at the same time, and the response ends and returns to the comfortable temperature zone [T min ,T max ], the start / stop cycle is still τ on , τ off ; Combined with the central air-conditioning load perceived temperature model, the perceived temperature-switch hybrid control mode is adopted to participate in the regulation under the premise of ensuring human comfort.

4. According to claim 3, a method for correcting the operating characteristics of central air-conditioning load resources based on body temperature, It is characterized in that In step S3, the start / stop operation cycle of the central air conditioner is affected by factors such as outdoor temperature, passenger flow, air humidity, and wind speed. Therefore, four typical central air conditioner operation scenarios are constructed: a) Sunny working day scenario: In this scenario, the outdoor temperature is T out1 , the passenger flow is η p1 , correct the central air conditioning start / stop operation cycle in this scenario and b) Sunny holiday scene: In this scene, the outdoor temperature is T out1 , the passenger flow is η p2 , correct the central air conditioning start / stop operation cycle in this scenario and c) Cloudy weekday scenario: In this scenario, the outdoor temperature is T out2 , the passenger flow is η p1 , correct the central air conditioning start / stop operation cycle in this scenario and d) Cloudy holiday scene: In this scene, the outdoor temperature is T out2 , the passenger flow is η p2 , correct the central air conditioning start / stop operation cycle in this scenario and According to the sunny outdoor temperature T out1 , passenger flow η P1 , build the operating characteristic correction model of the central air conditioning on sunny weekdays, and correct the operating cycle of the central air conditioning in this scenario Outage period As shown in formula (3)-(4): Based on the same method above, the operation characteristic correction models of the central air-conditioning for sunny holiday scenarios, cloudy weekday scenarios, and cloudy holiday scenarios are constructed, and the start / stop operation cycle of the central air-conditioning is corrected respectively, and then the central air-conditioning is controlled to obtain more accurate central air-conditioning operation characteristics, and finally obtain more accurate central air-conditioning load and its response capability.

Citation Information

Patent Citations

  • Method and device for evaluating demand response capability of commercial building central air conditioner

    CN117557405A

  • Air conditioner electricity consumption decomposition evaluation method based on effective duration and terminal

    CN117893095A

  • Air conditioner

    JP2006057908A

  • Air conditioning system control device

    JP2011214794A

Cited By

  • Commercial building load simulation method and system considering multi-element influence

    CN120387300A

  • Cooling load prediction and energy-saving optimization system and method based on large model

    CN121655079A